Heat exchange systems and waste heat heating systems used in steel production systems

By designing a heat exchange system in the steel production system, the waste heat generated during the steel production process is replaced into the heating water and recycled in cascades, which solves the problem that the waste heat cannot be reused and achieves energy saving and emission reduction effects in the steel production process.

CN114231680BActive Publication Date: 2024-10-25BEIJING JINGCHENGKELIN ENVIRONMENTAL PROTECTION TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210040833.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-14
Publication Date
2024-10-25
Estimated Expiration
2042-01-14

AI Technical Summary

Technical Problem

The waste heat generated during the steel production process cannot be reused, resulting in energy waste and environmental pollution.

Method used

A heat exchange system applied to the steel production system is designed. Multiple heat exchangers and heating devices are connected through a primary network pipeline. The waste heat generated in each process of the steel production system is replaced into the heating water. The temperature is gradually raised and the temperature is achieved through the heating device. Compensate and improve waste heat utilization.

Benefits of technology

It effectively reduces fossil energy consumption, improves the utilization rate of waste heat, and achieves energy conservation and emission reduction in the steel production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114231680B_ABST
    Figure CN114231680B_ABST
Patent Text Reader

Abstract

The present invention provides a heat exchange system and a waste heat heating system applied to a steel production system, and relates to the field of heating engineering technology. The steel production system includes: a blast furnace with a water-cooled wall, a kiln with a flue gas outlet, an industrial steam turbine with an exhaust steam outlet, a blast furnace slag flushing pool, and a circulating cooling water pool. The heat exchange system includes: a first heat exchanger, a second heat exchanger, a third heat exchanger, a fourth heat exchanger, a fifth heat exchanger, and a heating device, which are sequentially connected through a primary network pipeline. The waste heat generated by the steel production system can be replaced into the primary network pipeline for heating through the heat exchange system, which saves energy consumption in the heating process. The present invention also provides a waste heat heating system, which includes a steel production system and a heat exchange system. By applying the aforementioned heat exchange system to the steel production system, the consumption of fossil energy is reduced, and the effect of energy conservation and emission reduction is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of heating engineering, and in particular to a heat exchange system and a waste heat heating system applied to a steel production system. Background Art

[0002] In the process of steel production, a large amount of fossil energy is consumed. The combustion of fossil energy will generate a large amount of heat and carbon dioxide, which will cause a large amount of waste gas and process water containing waste heat in the steel production process. The quality of the waste heat in these waste gases and process water is low and cannot be reused in the internal production process of the steel plant. If these waste gases and process water containing waste heat are directly discharged, it will not only cause thermal pollution to the environment, but also waste this part of waste heat energy.

[0003] The temperature range of the waste gas or process water containing waste heat generated by steel mills is relatively consistent with the temperature range of urban heating water. In order to avoid energy waste and increase the utilization rate of waste heat from steel mills, it is necessary to develop a system that can collect waste heat from steel mills for urban heating. Summary of the invention

[0004] In order to overcome the above-mentioned defects of the prior art, the technical problem to be solved by the embodiments of the present invention is to provide a heat exchange system and a waste heat heating system applied to a steel production system. The heat exchange system can replace the waste heat generated by the steel production system into a primary network pipeline for heating, which reduces the energy consumption in the heating process, enables the waste heat generated in the steel production process to be reused, and plays a role in energy conservation and emission reduction.

[0005] The above-mentioned object of the present invention can be achieved by adopting the following technical scheme. The present invention provides a heat exchange system applied to a steel production system, wherein the steel production system comprises: a blast furnace with a water-cooled wall, a furnace with a smoke outlet, an industrial steam turbine with an exhaust steam outlet, a blast furnace slag flushing pool and a circulating cooling water pool, wherein the heat exchange system comprises: a first heat exchanger, a second heat exchanger, a third heat exchanger, a fourth heat exchanger, a fifth heat exchanger and a heating device which are sequentially connected through a primary network pipeline;

[0006] The first heat exchanger is used to displace the heat of the water-cooled wall, the second heat exchanger is used to displace the heat of the flue gas in the flue gas outlet, the third heat exchanger is used to displace the heat of the exhaust steam in the exhaust steam outlet, the fourth heat exchanger is used to displace the heat of the slag flushing water in the blast furnace slag flushing water pool, and the fifth heat exchanger is used to displace the heat of the cooling water in the circulating cooling water pool.

[0007] In a preferred embodiment of the present invention, a maintenance flow mechanism is provided on the primary network pipeline, and the maintenance flow mechanism includes a first maintenance mechanism arranged in parallel with the first heat exchanger, a second maintenance mechanism arranged in parallel with the second heat exchanger, a third maintenance mechanism arranged in parallel with the third heat exchanger, a fourth maintenance mechanism arranged in parallel with the fourth heat exchanger, a fifth maintenance mechanism arranged in parallel with the fifth heat exchanger and a sixth maintenance mechanism arranged in parallel with the heating device.

[0008] In a preferred embodiment of the present invention, a first control valve is provided at the inlet of the primary network pipeline, and a second control valve is provided at the outlet of the primary network pipeline.

[0009] The present invention also provides a waste heat heating system, which includes the steel production system and the aforementioned heat exchange system applied to the steel production system.

[0010] In a preferred embodiment of the present invention, the waste heat heating system is provided with the maintenance flow mechanism, the first maintenance mechanism comprises a first water inlet valve arranged on the cold side inlet of the first heat exchanger, a first water outlet valve arranged on the cold side outlet of the first heat exchanger, and a first flow pipe arranged in parallel with the first heat exchanger, and a first flow valve is arranged on the first flow pipe;

[0011] The second maintenance mechanism comprises a second water inlet valve arranged on the cold side inlet of the second heat exchanger, a second water outlet valve arranged on the cold side outlet of the second heat exchanger, and a second flow pipe arranged in parallel with the second heat exchanger, wherein the second flow pipe is provided with a second flow valve;

[0012] The third maintenance mechanism comprises a third water inlet valve arranged on the cold side inlet of the third heat exchanger, a third water outlet valve arranged on the cold side outlet of the third heat exchanger, and a third flow pipe arranged in parallel with the third heat exchanger, wherein the third flow pipe is provided with a third flow valve;

[0013] The fourth inspection mechanism includes a fourth water inlet valve arranged on the cold side inlet of the fourth heat exchanger, a fourth water outlet valve arranged on the cold side outlet of the fourth heat exchanger, and a fourth flow pipe arranged in parallel with the fourth heat exchanger, and a fourth flow pipe is provided with a fourth flow valve;

[0014] The fifth inspection mechanism comprises a fifth water inlet valve arranged on the cold side inlet of the fifth heat exchanger, a fifth water outlet valve arranged on the cold side outlet of the fifth heat exchanger, and a fifth flow pipe arranged in parallel with the fifth heat exchanger, wherein the fifth flow pipe is provided with a fifth flow valve;

[0015] The sixth inspection mechanism includes a sixth water inlet valve arranged on the cold side inlet of the heating device, a sixth water outlet valve arranged on the cold side outlet of the heating device, and a sixth flow pipe arranged in parallel with the heating device, and a sixth flow pipe is provided with a sixth flow valve.

[0016] In a preferred embodiment of the present invention, the first heat exchanger is a plate heat exchanger, and a first cold side inlet and a first cold side outlet and a first hot side inlet and a first hot side outlet are provided on the plate heat exchanger, the first cold side inlet and the first cold side outlet are respectively connected to the primary network pipeline, the first hot side inlet is connected to the hot side outlet of the water-cooled wall, and the first hot side outlet is connected to the cold side inlet of the water-cooled wall.

[0017] In a preferred embodiment of the present invention, the second heat exchanger is an air-to-water heat exchanger, and a second cold side inlet and a second cold side outlet as well as a second hot side inlet and a second hot side outlet are provided on the air-to-water heat exchanger, the second cold side inlet and the second cold side outlet are respectively connected to the primary network pipeline, the second hot side inlet is connected to the flue gas outlet, and the second hot side outlet is used to communicate with the atmosphere.

[0018] In a preferred embodiment of the present invention, the third heat exchanger is a condenser, and a third cold side outlet and a third cold side inlet as well as a third hot side inlet and a third hot side outlet are provided on the condenser, the third cold side inlet and the third cold side outlet are respectively connected to the primary network pipeline, the third hot side inlet is connected to the exhaust steam outlet, and the third hot side outlet is used to discharge condensate.

[0019] In a preferred embodiment of the present invention, the fourth heat exchanger is a slag water heat exchanger, and the slag water heat exchanger is provided with a fourth cold side inlet and a fourth cold side outlet and a fourth hot side inlet and a fourth hot side outlet, the fourth cold side inlet and the fourth cold side outlet are respectively connected to the primary network pipeline, the fourth hot side inlet is connected to the blast furnace slag flushing water pool through the first conveying pipeline, and the fourth hot side outlet is connected to the blast furnace slag flushing water pool through the first return water pipeline.

[0020] In a preferred embodiment of the present invention, the fifth heat exchanger is an absorption heat pump, and the absorption heat pump is provided with a fifth cold side inlet and a fifth cold side outlet and a fifth hot side inlet and a fifth hot side outlet, the fifth cold side inlet and the fifth cold side outlet are respectively connected to the primary network pipeline, the fifth hot side inlet is connected to the circulating cooling water pool through the second delivery pipeline, and the fifth hot side outlet is connected to the circulating cooling water pool through the second return water pipeline.

[0021] In a preferred embodiment of the present invention, the absorption heat pump is driven by a heat source, and the absorption heat pump is also provided with a heat source inlet and a heat source outlet, the heat source is steam, the heat source inlet is used to connect to a first steam pipeline, and the heat source outlet is used to connect to a first discharge pipeline.

[0022] In a preferred embodiment of the present invention, the heating device is a peak heater, and a sixth cold side inlet and a sixth cold side outlet as well as a sixth hot side inlet and a sixth hot side outlet are provided on the peak heater, the sixth cold side inlet and the sixth cold side outlet are respectively connected to the primary network pipeline, the sixth hot side inlet is used to connect to the second steam pipeline, and the sixth hot side outlet is used to connect to the second discharge pipeline.

[0023] The technical solution of the present invention has the following significant beneficial effects:

[0024] The heat exchange system applied to the steel production system of the present invention can replace the waste heat generated by each process of the steel production system into the primary network pipeline through the heat exchange device, so that the heating water in the primary network pipeline gradually heats up, and finally heats the heating water in the primary network pipeline through the heating device to achieve the effect of temperature compensation, so that the heating water in the primary network pipeline can reach a preset temperature to achieve a better heating effect. The heat exchange system applied to the steel production system described in the present application can sequentially set multiple heat exchange devices on the primary network pipeline, and then perform step-by-step recovery of the waste heat generated by each device in the steel production system, so that the utilization rate of the waste heat is greatly improved.

[0025] The waste heat heating system of the present invention can fully recover the waste heat in the steel production process to heat the heating water in the primary network pipeline by applying the aforementioned heat exchange system to the steel production system, thereby reducing the consumption of fossil energy and achieving the effect of energy conservation and emission reduction. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0027] The accompanying drawings described herein are only for explanation purposes and are not intended to limit the scope of the present invention in any way. In addition, the shapes and proportional dimensions of the various components in the figures are only schematic, used to help understand the present invention, and are not specifically limited to the shapes and proportional dimensions of the various components of the present invention. Those skilled in the art can select various possible shapes and proportional dimensions to implement the present invention according to the teachings of the present invention.

[0028] Figure 1 This is a schematic diagram of the installation structure of the waste heat heating system.

[0029] Reference numerals of the above drawings:

[0030] 1. Blast furnace; 11. Water-cooled wall;

[0031] 2. Furnace; 21. Smoke outlet;

[0032] 3. Industrial steam turbine; 31. Exhaust steam outlet;

[0033] 4. Blast furnace slag flushing pool; 41. First conveying pipeline; 42. First return water pipeline;

[0034] 5. Circulating cooling water pool; 51. Second delivery pipeline; 52. Second return water pipeline;

[0035] 6. Primary network pipeline; 61. First heat exchanger; 62. Second heat exchanger; 63. Third heat exchanger; 633. Third hot side outlet; 64. Fourth heat exchanger; 65. Fifth heat exchanger; 651. First steam pipeline; 652. First discharge pipeline; 66. Heating device; 661. Second steam pipeline; 662. Second discharge pipeline; 67. First control valve; 68. Second control valve;

[0036] 7. Repair the over-current mechanism;

[0037] 71. First maintenance mechanism; 711. First water inlet valve; 712. First water outlet valve; 713. First overflow pipeline; 714. First overflow valve;

[0038] 72. Second inspection mechanism; 721. Second water inlet valve; 722. Second water outlet valve; 723. Second overflow pipeline; 724. Second overflow valve;

[0039] 73. The third inspection mechanism; 731. The third water inlet valve; 732. The third water outlet valve; 733. The third flow pipe; 734. The third flow valve;

[0040] 74. Fourth maintenance mechanism; 741. Fourth water inlet valve; 742. Fourth water outlet valve; 743. Fourth flow pipe; 744. Fourth flow valve;

[0041] 75. The fifth inspection mechanism; 751. The fifth water inlet valve; 752. The fifth water outlet valve; 753. The fifth flow pipe; 754. The fifth flow valve;

[0042] 76. The sixth inspection mechanism; 761. The sixth water inlet valve; 762. The sixth water outlet valve; 763. The sixth flow pipe; 764. The sixth flow valve. DETAILED DESCRIPTION

[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] In the process of steel production, a large amount of fossil energy is consumed. A large amount of heat and carbon dioxide will be generated during the combustion of fossil energy, which will result in a large amount of waste gas and process water containing waste heat in the steel production process. The quality of the waste heat in these waste gases and process water is low and cannot be reused in the internal production process of the steel plant. If these waste gases and process water containing waste heat are directly discharged, it will not only cause thermal pollution to the environment, but also waste this part of the waste heat energy. This application mainly solves the problem of waste heat recovery and reuse through a heat exchange system applied to a steel production system.

[0045] Please refer to Figure 1 The present invention provides a heat exchange system applied to a steel production system, the steel production system comprising: a blast furnace 1 with a water-cooled wall 11, a kiln 2 with a flue gas outlet 21, an industrial steam turbine 3 with an exhaust steam outlet 31, a blast furnace slag flushing pool 4 and a circulating cooling water pool 5, the heat exchange system comprising: a first heat exchanger 61, a second heat exchanger 62, a third heat exchanger 63, a fourth heat exchanger 64, a fifth heat exchanger 65 and a heating device 66 connected in sequence through a primary network pipeline 6; the first heat exchanger 61 is used to replace the heat of the water-cooled wall 11, the second heat exchanger 62 is used to replace the heat of the flue gas in the flue gas outlet 21, the third heat exchanger 63 is used to replace the heat of the exhaust steam in the exhaust steam outlet 31, the fourth heat exchanger 64 is used to replace the heat of the slag flushing water in the blast furnace slag flushing pool 4, and the fifth heat exchanger 65 is used to replace the heat of the cooling water in the circulating cooling water pool 5.

[0046] On the whole, when the heat exchange system described in the present application is used, a plurality of heat exchange devices and heating devices 66 are sequentially arranged on the primary network pipeline 6, and the waste heat is replaced into the primary network pipeline 6 by the heat exchange device, thereby realizing the process of step-by-step recovery of the waste heat generated by each device in the steel production system, so that the heating water in the primary network pipeline 6 gradually heats up, and finally the heating water in the primary network pipeline 6 is heated by the heating device 66 to achieve the effect of temperature compensation, so that the heating water in the primary network pipeline 6 can reach the preset temperature, so as to achieve a better heating effect. Among them, in the actual use of the steel production system, a temperature gradient from low temperature to high temperature will be roughly formed between the water-cooled wall 11, the flue gas outlet 21, the exhaust steam outlet 31, the blast furnace slag flushing pool 4 and the circulating cooling water pool 5, and the heat exchange device can be arranged according to the waste heat energy level of each device in the steel production system. The heat exchange system in the present application can gradually heat up by utilizing this temperature gradient. Specifically, after the heating water is used, low-temperature return water is formed in the primary network pipe 6, and the low-temperature return water enters along the inlet of the primary network pipe 6. The temperature of the low-temperature return water is about 30°C. After passing through each heat exchange device in the heat exchange system, the low-temperature return water is gradually heated to about 90°C, and finally heated to about 120°C by the heating device 66, and then transported along the outlet of the primary network pipe 6 for urban heating.

[0047] For details, please refer to Figure 1 The heat exchange system applied to the steel production system may include: a primary network pipeline 6; a first heat exchanger 61; a second heat exchanger 62; a third heat exchanger 63; a fourth heat exchanger 64; a fifth heat exchanger 65; and a heating device 66.

[0048] In this embodiment, a maintenance flow mechanism 7 is provided on the primary network pipeline 6, and the maintenance flow mechanism 7 includes a first maintenance mechanism 71 arranged in parallel with the first heat exchanger 61, a second maintenance mechanism 72 arranged in parallel with the second heat exchanger 62, a third maintenance mechanism 73 arranged in parallel with the third heat exchanger 63, a fourth maintenance mechanism 74 arranged in parallel with the fourth heat exchanger 64, a fifth maintenance mechanism 75 arranged in parallel with the fifth heat exchanger 65, and a sixth maintenance mechanism 76 arranged in parallel with the heating device 66.

[0049] Specifically, the maintenance flow mechanism 7 can be a combination of maintenance pipelines and valves, and the maintenance pipelines and the corresponding heat exchange devices and heating devices 66 can be arranged in parallel, so that when the devices in the steel production system are under maintenance or fail, or when the heat exchange devices and heating devices 66 fail or are under maintenance, the heating water in the primary network pipeline 6 can bypass the maintenance or failed devices by using the cooperation of the maintenance pipelines and valves, so as not to affect the heating process of the primary network pipeline 6. After the heating water bypasses one or more devices, the temperature supplement of the heating device 66 can still make the heating water reach the preset temperature, so as to provide heating water stably for the town.

[0050] In order to control the flow in the primary network pipeline 6, in this embodiment, a first control valve 67 is provided at the inlet of the primary network pipeline 6, and a second control valve 68 is provided at the outlet of the primary network pipeline 6. The water flow in the primary network pipeline 6 can be freely adjusted by using the first control valve 67 and the second control valve 68.

[0051] When the present invention is applied to the heat exchange system of a steel production system, the waste heat generated by each process of the steel production system can be replaced into the primary network pipeline 6 through the heat exchange device, so that the heating water in the primary network pipeline 6 gradually heats up, and finally the heating water in the primary network pipeline 6 is heated by the heating device 66 to achieve temperature compensation, so that the temperature of the heating water can meet the needs of urban heating.

[0052] The beneficial effects of the heat exchange system applied to the steel production system of the present invention: the heat exchange system applied to the steel production system is achieved by sequentially arranging a plurality of heat exchange devices on the primary network pipeline 6. The heat exchange devices can be arranged according to the waste heat energy level of each device in the steel production system, thereby performing step-by-step recovery of the waste heat generated by each device in the steel production system, thereby greatly improving the utilization rate of the waste heat.

[0053] A waste heat heating system, please refer to Figure 1 The waste heat heating system may include the steel production system and the heat exchange system applied to the steel production system in the aforementioned embodiment.

[0054] In this embodiment, the waste heat heating system is provided with the maintenance flow mechanism 7, and the first maintenance mechanism 71 includes a first water inlet valve 711 arranged on the cold side inlet of the first heat exchanger 61, a first water outlet valve 712 arranged on the cold side outlet of the first heat exchanger 61, and a first flow pipe 713 arranged in parallel with the first heat exchanger 61, and a first flow pipe 713 is provided with a first flow valve 714.

[0055] The second inspection mechanism 72 includes a second water inlet valve 721 arranged on the cold side inlet of the second heat exchanger 62, a second water outlet valve 722 arranged on the cold side outlet of the second heat exchanger 62, and a second flow pipe 723 arranged in parallel with the second heat exchanger 62, and a second flow pipe 723 is provided with a second flow valve 724.

[0056] The third inspection mechanism 73 includes a third water inlet valve 731 arranged on the cold side inlet of the third heat exchanger 63, a third water outlet valve 732 arranged on the cold side outlet of the third heat exchanger 63, and a third flow pipe 733 arranged in parallel with the third heat exchanger 63, and a third flow pipe 733 is provided with a third flow valve 734.

[0057] The fourth inspection mechanism 74 includes a fourth water inlet valve 741 arranged on the cold side inlet of the fourth heat exchanger 64, a fourth water outlet valve 742 arranged on the cold side outlet of the fourth heat exchanger 64, and a fourth flow pipe 743 arranged in parallel with the fourth heat exchanger 64, and the fourth flow pipe 743 is provided with a fourth flow valve 744.

[0058] The fifth inspection mechanism 75 includes a fifth water inlet valve 751 arranged on the cold side inlet of the fifth heat exchanger 65, a fifth water outlet valve 752 arranged on the cold side outlet of the fifth heat exchanger 65, and a fifth flow pipe 753 arranged in parallel with the fifth heat exchanger 65, and a fifth flow pipe 753 is provided with a fifth flow valve 754.

[0059] The sixth inspection mechanism 76 includes a sixth water inlet valve 761 arranged on the cold side inlet of the heating device 66, a sixth water outlet valve 762 arranged on the cold side outlet of the heating device 66, and a sixth flow pipe 763 arranged in parallel with the heating device, and the sixth flow pipe 763 is provided with a sixth flow valve 764.

[0060] By closing the water inlet valve and the water outlet valve and opening the overflow valve, the heating water in the primary network pipeline 6 can bypass the faulty or under-maintenance device, which will not affect the normal operation of the primary network pipeline 6, allowing the heating system to operate stably to supply heating water to the town.

[0061] In this embodiment, the first heat exchanger 61 is a plate heat exchanger, and the plate heat exchanger is provided with a first cold side inlet and a first cold side outlet, and a first hot side inlet and a first hot side outlet, the first cold side inlet and the first cold side outlet are respectively connected to the primary network pipeline 6, the first hot side inlet is connected to the hot side outlet of the water-cooled wall 11, and the first hot side outlet is connected to the cold side inlet of the water-cooled wall 11. Among them, the water-cooled wall 11 is a soft water closed circulation cooling system arranged on the blast furnace 1. The heat in the water-cooled wall 11 on the blast furnace 1 can be replaced into the heating water through the plate heat exchanger, so that the reflux heating water of about 30°C is heated to about 35°C, forming a primary temperature rise. Of course, in actual use, the heating water can also be other temperatures. Here, the heating water of 30°C is heated to 35°C as an example, and other temperatures are not limited.

[0062] In this embodiment, the second heat exchanger 62 is an air-water heat exchanger, and the air-water heat exchanger is provided with a second cold side inlet and a second cold side outlet, and a second hot side inlet and a second hot side outlet, the second cold side inlet and the second cold side outlet are respectively connected to the primary network pipeline 6, the second hot side inlet is connected to the flue gas outlet 21, and the second hot side outlet is used to communicate with the atmosphere. The flue gas heat in the flue gas outlet 21 on the kiln 2 can be replaced into the heating water through the air-water heat exchanger, so that the heating water at about 35°C is heated to about 45°C, forming a secondary temperature rise. Of course, in actual use, the heating water can also be other temperatures. Here, the heating water at 35°C is heated to 45°C as an example, and other temperatures are not limited.

[0063] In this embodiment, the third heat exchanger 63 is a condenser, and the condenser is provided with a third cold side outlet and a third cold side inlet, and a third hot side inlet and a third hot side outlet 633, the third cold side inlet and the third cold side outlet are respectively connected to the primary network pipeline 6, the third hot side inlet is connected to the exhaust steam outlet 31, and the third hot side outlet 633 is used to discharge condensed water. The heat in the exhaust steam in the exhaust steam outlet 31 on the industrial steam turbine 3 can be replaced into the heating water through the condenser, so that the heating water at about 45°C is heated to about 50°C, forming three-time temperature rise. Of course, in actual use, the heating water can also be other temperatures. Here, the heating water at 45°C is heated to 50°C as an example, and other temperatures are not limited.

[0064] In this embodiment, the fourth heat exchanger 64 is a slag water heat exchanger, which is provided with a fourth cold side inlet and a fourth cold side outlet, as well as a fourth hot side inlet and a fourth hot side outlet. The fourth cold side inlet and the fourth cold side outlet are respectively connected to the primary network pipeline 6, the fourth hot side inlet is connected to the blast furnace slag flushing water pool 4 through the first conveying pipeline 41, and the fourth hot side outlet is connected to the blast furnace slag flushing water pool 4 through the first return water pipeline 42 for return water. The heat of the slag flushing water in the blast furnace slag flushing water pool 4 can be replaced into the heating water through the slag water heat exchanger, so that the heating water at about 50°C is heated to about 60°C, forming four times of temperature rise. Of course, in actual use, the heating water can also be at other temperatures. Here, the heating water at 50°C is heated to 60°C as an example, and other temperatures are not limited.

[0065] In this embodiment, the fifth heat exchanger 65 is an absorption heat pump, which is provided with a fifth cold side inlet and a fifth cold side outlet and a fifth hot side inlet and a fifth hot side outlet. The fifth cold side inlet and the fifth cold side outlet are respectively connected to the primary network pipeline 6, the fifth hot side inlet is connected to the circulating cooling water pool 5 through the second delivery pipeline 51, and the fifth hot side outlet is connected to the circulating cooling water pool 5 through the second return water pipeline 52 for return water.

[0066] Specifically, the absorption heat pump is driven by a heat source, and a heat source inlet and a heat source outlet are also provided on the absorption heat pump. The heat source is steam, and the heat source inlet is used to connect the first steam pipeline 651, and the heat source outlet is used to connect the first discharge pipeline 652. Among them, the absorption heat pump can use steam as a driving heat source to pump heat from a low-temperature heat source to a high-temperature heat source, thereby improving the utilization efficiency of thermal energy. The absorption heat pump can replace the heat of the cooling water in the circulating cooling water pool 5 into the heating water, so that the heating water at about 60°C is heated to 90°C, forming five times of temperature rise. Among them, the absorption heat pump can also use other types of heat sources. Here, steam is taken as an example, and other heat sources are not limited. Of course, in actual use, the heating water can also be other temperatures. Here, the heating water at 60°C is heated to 90°C as an example, and other temperatures are not limited.

[0067] In this embodiment, the heating device 66 is a peak heater, and the peak heater is provided with a sixth cold side inlet and a sixth cold side outlet, and a sixth hot side inlet and a sixth hot side outlet, the sixth cold side inlet and the sixth cold side outlet are respectively connected to the primary network pipeline 6, the sixth hot side inlet is used to connect the second steam pipeline 661, and the sixth hot side outlet is used to connect the second discharge pipeline 662. Among them, the peak heater is a steam-water heat exchange device that can use the heat of high-temperature steam to heat hot water. The peak heater can be used to compensate the temperature of the heating water, and the heating water of about 90°C can be heated to a preset temperature to meet the needs of urban heating. In this embodiment, the preset temperature is set to about 120°C, and the user can also adjust the preset temperature to other values ​​according to needs, which is not limited here. Of course, in actual use, the heating water can also be other temperatures. Here, the heating water of 90°C is heated to 120°C as an example, and other temperatures are not limited.

[0068] The waste heat heating system of the present invention can fully recover the waste heat in the steel production process to heat the heating water in the primary network pipeline 6 by applying the aforementioned heat exchange system to the steel production system, thereby reducing the consumption of fossil energy and achieving the effect of energy conservation and emission reduction.

[0069] All articles and references disclosed, including patent applications and publications, are incorporated herein by reference for various purposes. The term "consisting essentially of ... " describing a combination should include determined elements, ingredients, parts or steps and other elements, ingredients, parts or steps that do not substantially affect the basic novel features of the combination. The use of the terms "comprising" or "including" to describe the combination of elements, ingredients, parts or steps here also contemplates the implementation method consisting essentially of these elements, ingredients, parts or steps. Here, by using the term "may", it is intended to illustrate that any attribute described that "may" includes is optional. Multiple elements, ingredients, parts or steps can be provided by a single integrated element, ingredient, part or step. Alternatively, a single integrated element, ingredient, part or step can be divided into separate multiple elements, ingredients, parts or steps. The disclosure "one" or "one" used to describe an element, ingredient, part or step is not said to exclude other elements, ingredients, parts or steps.

[0070] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the embodiments can be referred to each other. The above embodiments are only for illustrating the technical concept and features of the present invention. The purpose is to enable people familiar with this technology to understand the content of the present invention and implement it accordingly, and it cannot be used to limit the scope of protection of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be covered within the scope of protection of the present invention.

Claims

1. A heat exchange system for a steel production system, the steel production system comprising: A blast furnace with a water-cooled wall, a kiln with a flue gas outlet, an industrial steam turbine with an exhaust steam outlet, a blast furnace slag flushing pool and a circulating cooling water pool, characterized in that the heat exchange system comprises: a first heat exchanger, a second heat exchanger, a third heat exchanger, a fourth heat exchanger, a fifth heat exchanger and a heating device which are sequentially connected through a primary network pipeline; wherein the first heat exchanger is a plate heat exchanger, the second heat exchanger is an air-water heat exchanger, the third heat exchanger is a condenser, the fourth heat exchanger is a slag water heat collector, the fifth heat exchanger is an absorption heat pump, and the heating device is a peak heater; The first heat exchanger is used to displace the heat of the water-cooled wall, the second heat exchanger is used to displace the heat of the flue gas in the flue gas outlet, the third heat exchanger is used to displace the heat of the exhaust steam in the exhaust steam outlet, the fourth heat exchanger is used to displace the heat of the slag flushing water in the blast furnace slag flushing water pool, and the fifth heat exchanger is used to displace the heat of the cooling water in the circulating cooling water pool.

2. The heat exchange system for use in a steel production system according to claim 1, characterized in that: A maintenance flow mechanism is provided on the primary network pipeline, and the maintenance flow mechanism includes a first maintenance mechanism arranged in parallel with the first heat exchanger, a second maintenance mechanism arranged in parallel with the second heat exchanger, a third maintenance mechanism arranged in parallel with the third heat exchanger, a fourth maintenance mechanism arranged in parallel with the fourth heat exchanger, a fifth maintenance mechanism arranged in parallel with the fifth heat exchanger, and a sixth maintenance mechanism arranged in parallel with the heating device.

3. The heat exchange system for use in a steel production system according to claim 1, characterized in that: The inlet of the primary network pipeline is provided with a first control valve, and the outlet of the primary network pipeline is provided with a second control valve.

4. A waste heat heating system, characterized in that: The waste heat heating system comprises a steel production system and a heat exchange system applied to the steel production system according to any one of claims 1 to 3.

5. The waste heat heating system according to claim 4, characterized in that: The waste heat heating system is provided with a maintenance flow mechanism, which includes a first maintenance mechanism arranged in parallel with the first heat exchanger, a second maintenance mechanism arranged in parallel with the second heat exchanger, a third maintenance mechanism arranged in parallel with the third heat exchanger, a fourth maintenance mechanism arranged in parallel with the fourth heat exchanger, a fifth maintenance mechanism arranged in parallel with the fifth heat exchanger, and a sixth maintenance mechanism arranged in parallel with the heating device; The first maintenance mechanism comprises a first water inlet valve arranged on the cold side inlet of the first heat exchanger, a first water outlet valve arranged on the cold side outlet of the first heat exchanger, and a first flow pipe arranged in parallel with the first heat exchanger, wherein the first flow pipe is provided with a first flow valve; The second maintenance mechanism comprises a second water inlet valve arranged on the cold side inlet of the second heat exchanger, a second water outlet valve arranged on the cold side outlet of the second heat exchanger, and a second flow pipe arranged in parallel with the second heat exchanger, wherein the second flow pipe is provided with a second flow valve; The third maintenance mechanism comprises a third water inlet valve arranged on the cold side inlet of the third heat exchanger, a third water outlet valve arranged on the cold side outlet of the third heat exchanger, and a third flow pipe arranged in parallel with the third heat exchanger, wherein the third flow pipe is provided with a third flow valve; The fourth inspection mechanism includes a fourth water inlet valve arranged on the cold side inlet of the fourth heat exchanger, a fourth water outlet valve arranged on the cold side outlet of the fourth heat exchanger, and a fourth flow pipe arranged in parallel with the fourth heat exchanger, and a fourth flow pipe is provided with a fourth flow valve; The fifth inspection mechanism comprises a fifth water inlet valve arranged on the cold side inlet of the fifth heat exchanger, a fifth water outlet valve arranged on the cold side outlet of the fifth heat exchanger, and a fifth flow pipe arranged in parallel with the fifth heat exchanger, wherein the fifth flow pipe is provided with a fifth flow valve; The sixth inspection mechanism includes a sixth water inlet valve arranged on the cold side inlet of the heating device, a sixth water outlet valve arranged on the cold side outlet of the heating device, and a sixth flow pipe arranged in parallel with the heating device, and a sixth flow pipe is provided with a sixth flow valve.

6. The waste heat heating system according to claim 4, characterized in that: The plate heat exchanger is provided with a first cold side inlet and a first cold side outlet and a first hot side inlet and a first hot side outlet, the first cold side inlet and the first cold side outlet are respectively connected to the primary network pipeline, the first hot side inlet is connected to the hot side outlet of the water-cooled wall, and the first hot side outlet is connected to the cold side inlet of the water-cooled wall.

7. The waste heat heating system according to claim 4, characterized in that: The air-water heat exchanger is provided with a second cold side inlet and a second cold side outlet and a second hot side inlet and a second hot side outlet. The second cold side inlet and the second cold side outlet are respectively connected to the primary network pipeline, the second hot side inlet is connected to the flue gas outlet, and the second hot side outlet is used to communicate with the atmosphere.

8. The waste heat heating system according to claim 4, characterized in that: The condenser is provided with a third cold side outlet and a third cold side inlet and a third hot side inlet and a third hot side outlet. The third cold side inlet and the third cold side outlet are respectively connected to the primary network pipeline, the third hot side inlet is connected to the exhaust steam outlet, and the third hot side outlet is used to discharge condensate.

9. The waste heat heating system according to claim 4, characterized in that: The slag water heat exchanger is provided with a fourth cold side inlet and a fourth cold side outlet and a fourth hot side inlet and a fourth hot side outlet. The fourth cold side inlet and the fourth cold side outlet are respectively connected to the primary network pipeline, the fourth hot side inlet is connected to the blast furnace slag flushing water pool through the first conveying pipeline, and the fourth hot side outlet is connected to the blast furnace slag flushing water pool through the first return water pipeline.

10. The waste heat heating system according to claim 4, characterized in that: The absorption heat pump is provided with a fifth cold side inlet and a fifth cold side outlet and a fifth hot side inlet and a fifth hot side outlet. The fifth cold side inlet and the fifth cold side outlet are respectively connected to the primary network pipeline, the fifth hot side inlet is connected to the circulating cooling water pool through the second delivery pipeline, and the fifth hot side outlet is connected to the circulating cooling water pool through the second return water pipeline.

11. The waste heat heating system according to claim 10, characterized in that: The absorption heat pump is driven by a heat source and is also provided with a heat source inlet and a heat source outlet. The heat source is steam. The heat source inlet is used to connect to a first steam pipeline, and the heat source outlet is used to connect to a first discharge pipeline.

12. The waste heat heating system according to claim 4, characterized in that: The peak heater is provided with a sixth cold side inlet and a sixth cold side outlet and a sixth hot side inlet and a sixth hot side outlet. The sixth cold side inlet and the sixth cold side outlet are respectively connected to the primary network pipeline, the sixth hot side inlet is used to connect to the second steam pipeline, and the sixth hot side outlet is used to connect to the second discharge pipeline.