A risk-based railway operation safety identification method

Through the risk-based railway operation safety identification method, the directed weighted network and the Bayesian network are used to calculate the railway resilience value, which solves the problem of difficulty in assessing the overall operation safety of the railway system in the existing technology and improves the accuracy of disaster risk assessment. and disaster prevention capabilities.

CN114358539BActive Publication Date: 2024-10-22HUAZHONG UNIV OF SCI & TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111586254.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-21
Publication Date
2024-10-22
Estimated Expiration
2041-12-21

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively assess the overall operational safety of the railway system, making it difficult for operators to accurately judge whether the railway is in a safe state when facing disasters, especially when the railway infrastructure in mountainous areas is fragile and the consequences of disaster chain transmission are serious.

Method used

Adopt a risk-based railway operation safety identification method, divide the railway system into subsystems, extract the causes and results of accidents, construct operational safety analysis indicators, and use directed weighted networks and Bayesian networks to calculate the railway's resilience value and judge Operational security.

Benefits of technology

It improves the accuracy of railway disaster risk assessment, provides specific operational ideas for disaster prevention intervention, and can effectively judge and improve railway operation status to avoid disaster accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114358539B_ABST
    Figure CN114358539B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of railway operation safety, and discloses a risk-based railway operation safety identification method, including: dividing into subsystems; extracting disaster events, and classifying disaster events of the same category as one accident; presetting a primary index, selecting a secondary index from the subsystem, and merging the primary index and the secondary index to form a railway operation safety analysis index; constructing a railway operation safety identification model of the railway to be tested according to the railway operation safety analysis index; solving the toughness value of the railway to be tested according to the railway operation safety identification model of the railway to be tested, and judging whether the operation of the railway to be tested is safe according to whether the size of the toughness value exceeds the preset value. The present invention has the following advantages and effects: analyzing the operation of the railway to be tested through the railway operation safety analysis index, obtaining the railway operation safety identification model of the railway to be tested, solving the railway toughness value through the railway operation safety identification model, and judging and comparing whether the operation of the railway is safe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of railway operation safety technology, and specifically to a risk-based railway operation safety identification method. Background Art

[0002] At present, in the face of catastrophic risks, the vulnerability of mountain railway infrastructure is relatively large compared to that of flat hill railways, and the ability to recover and adapt to disasters is relatively weak. Whether it is a disaster event from outside the railway system or a disturbance (failure) within the system, its probability of occurrence and destructiveness are often difficult to predict through historical event statistics, and the consequences of losses caused by disaster chains and secondary disasters are often catastrophic. Large-scale disasters have serious consequences, and they all have one thing in common, that is, through the transmission and amplification of the disaster chain, their impact and prevention are far beyond the directly affected areas.

[0003] In the field of infrastructure construction, resilience is currently mainly used in urban construction. For example, the paper "Study on Comprehensive Risk Assessment of Urban Disasters in Xiamen from the Perspective of Resilience" means "the ability and degree to absorb and resolve urban changes before the urban system structure is reorganized." The meaning of railway resilience was also applied for World Heritage status from the study of urban resilience, that is, the ability of the railway system to respond to and resolve disasters before suffering serious damage.

[0004] In the existing technology, effective evaluation methods have been formed for single railway subsystems, and corresponding norms and regulations have been formed. However, the evolution mechanism of railway accident disaster risk is extremely complex. The railway system has a high degree of complexity and uncertainty. Under the impact of major external emergencies, huge disturbances may be generated inside the system, and the system state will change accordingly. At the same time, the railway system is a complex system with multiple subjects and has a hierarchy.

[0005] Therefore, it is difficult to extend the evaluation of a single subsystem to the evaluation of the overall operational safety of the railway system. This also leads to a vague assessment of the overall operational safety of the railway system by operators, who can only make approximate estimates based on experience, accident frequency, etc., and have no way of knowing whether the railway under test is in a safe operating state. Summary of the invention

[0006] In view of the defects existing in the prior art, the purpose of this application is to provide a risk-based railway operation safety identification method, which can intuitively obtain the toughness value of the railway, characterize the toughness state of the railway, so that the toughness of the railway can be represented by a numerical value, and the safety level of the railway can be determined by setting one or more preset values.

[0007] In order to achieve the above objectives, on the one hand, the technical solutions adopted are:

[0008] It provides a risk-based railway operation safety assessment method, including:

[0009] Divide the railway system into several subsystems according to different characteristics;

[0010] Extract the causes and results from railway accident investigation reports and railway accident records as disaster events, and classify disaster events of the same category into one accident;

[0011] Preset the first-level indicators according to the direction of investigation, select the preliminary indicators related to the preset first-level indicators from the subsystem, obtain the second-level indicators according to the correlation between accidents and preliminary indicators, and combine the first-level indicators and the second-level indicators to form the railway operation safety analysis indicators;

[0012] Construct a railway operation safety identification model for the railway to be tested based on railway operation safety analysis indicators;

[0013] The toughness value of the railway to be tested is solved according to the railway operation safety identification model of the railway to be tested, and whether the operation of the railway to be tested is safe is judged according to whether the toughness value exceeds a preset value.

[0014] Preferably, the step of obtaining the secondary index according to the correlation between the accident and the preparatory index comprises the following steps:

[0015] Combine all accidents into a railway accident causation dataset;

[0016] A directed weighted network is constructed based on each accident in the railway accident cause data set as a node, and the comprehensive importance of the node is solved based on the directed weighted network;

[0017] Nodes whose comprehensive importance ranks before the preset position are selected, and preliminary indicators that are related to the occurrence or evolution of the accident are selected from the preliminary indicators according to the accident corresponding to the selected node as the secondary indicators.

[0018] Preferably, the method for establishing the railway accident cause data set comprises the following steps:

[0019] Select one type of accident as the first accident, select another type of accident as the second accident, and record the number of times the first accident leads to the second accident in the railway accident investigation report and the railway accident record until all combinations of the first accident and the second accident are traversed;

[0020] An adjacency matrix is ​​established using the combination of all first accidents and second accidents as a railway accident cause dataset.

[0021] Preferably, the method for solving the comprehensive importance of nodes according to the directed weighted network comprises the following steps:

[0022] Calculate the node strength, clustering coefficient and betweenness of each node in the directed weighted network respectively;

[0023] The node strength, clustering coefficient and betweenness of all nodes are sorted in the same way and assigned values ​​according to the ranking;

[0024] The comprehensive importance of the node is obtained by summing up the ranking values ​​of the node strength, clustering coefficient and betweenness of each node.

[0025] Preferably, the first-level indicators include disaster preparedness, resistance, recovery and adaptability.

[0026] Preferably, constructing a railway operation safety identification model for the railway to be tested includes the following steps:

[0027] Extract disaster events from the railway accident records of the railway to be tested as the disaster event set of the railway to be tested;

[0028] Each first-level indicator and second-level indicator in the railway operation safety analysis index is taken as a root node, and whether a disaster occurs on the railway is taken as the top event to construct a Bayesian network;

[0029] The probability of all secondary indicators leading to disaster events is calculated through the set of railway disaster events to be tested, which is used as the prior probability of the root node corresponding to the secondary indicator;

[0030] The probability of all first-level indicators leading to disaster events is calculated through the set of railway disaster events to be tested, which is used as the conditional probability of the first-level indicator corresponding to the root node;

[0031] The prior probability of all secondary indicators corresponding to the root node and the conditional probability of all primary indicators corresponding to the root node are assigned to the Bayesian network, which is the railway operation safety identification model.

[0032] Preferably, the method for calculating the conditional probability of the primary indicator corresponding to the root node includes the following steps:

[0033] According to the first-level indicator, select all the second-level indicators related to the first-level indicator;

[0034] Multiple secondary indicator status combinations are formed according to different situations of whether each secondary indicator leads to an accident;

[0035] Calculate the occurrence probability of each secondary indicator state combination;

[0036] The probability of whether the first-level indicator leads to an accident is calculated through the Bayesian formula and the occurrence probability of all second-level indicator state combinations, which is used as the conditional probability of the root node corresponding to the first-level indicator.

[0037] Preferably, solving the toughness value of the railway to be tested includes the following steps:

[0038] The probability of the top event occurring is calculated through the Bayesian network, which is the railway resilience value.

[0039] Preferably, the railway operation safety identification method further includes the following steps:

[0040] Adjust any node in the railway operation safety identification model to cause the frequency or number of accidents to occur, and record the change in the railway resilience value;

[0041] The sensitivity of the root node is determined according to the adjustment range of the frequency or number of accidents caused by the root node and the change range of the railway resilience value, and the root nodes are ranked from large to small according to the sensitivity;

[0042] A root node ranked before a preset ranking is selected, and the secondary indicator corresponding to the selected root node is used as a key secondary indicator to guide the improvement of the operating status of the railway to be tested.

[0043] Preferably, dividing the railway system into subsystems according to characteristics comprises the following steps:

[0044] The railway system is divided into several subsystems according to the organizational personnel system, facility and equipment system, management system and environmental system.

[0045] The beneficial effects of the technical solution provided by this application include:

[0046] The risk-based railway operation safety identification method of this application defines railway disaster resilience from a macro perspective and establishes railway operation safety analysis indicators. This application uses the preset first-level indicators to extract disturbance factors of railway system operation failure from major railway accident reports published at home and abroad, and analyzes their importance and correlation, and finally selects the second-level indicators. The railway operation safety analysis indicators are obtained based on the first-level indicators and the second-level indicators. The railway operation safety analysis indicators can improve the accuracy of the comprehensive risk assessment of railway response to disasters. By interfering with the second-level indicators, the railway operation safety can be effectively improved, and the specific operational ideas for railway disaster prevention intervention before and after disasters are provided.

[0047] The railway operation safety analysis index is used to analyze the operation status of the railway to be tested, and a railway operation safety identification model of the railway to be tested is obtained. The railway toughness value can be solved through the railway operation safety identification model, and the railway toughness value can be used to judge and compare whether the railway operation is safe.

[0048] At the same time, the operational safety identification model of the railway to be tested can also be used to analyze and find out the key secondary indicators that affect the railway to be tested. The key secondary indicators can be used to guide the railway to be tested to make corresponding improvements, thereby avoiding the occurrence of railway disasters and accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0050] Figure 1 Schematic diagram of railway operation safety analysis indicators in this application. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solutions and advantages of the present application clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in each embodiment of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0052] The present application provides an embodiment of a risk-based railway operation safety identification technology, including the following method:

[0053] The railway system is divided into several subsystems according to different characteristics; preferably, the railway system is generally divided into several subsystems according to the organizational personnel system, facility and equipment system, management system and environmental system. The organizational personnel system involves the psychological, physiological and behavioral factors of personnel; the facility and equipment system involves the failure or damage of equipment or facilities related to train operation, including: bridges, tunnels, tracks, roadbeds, power supply equipment, signal equipment, EMUs, etc.; the environmental system involves the risks of natural environment, geographical environment, and train operation environment; the management system involves rules and regulations, supervision and regulation, safety skills, equipment maintenance, machine maintenance, risk emergency response, etc. For example, if the railway system is divided according to personnel factors, a subsystem representing the skill level of employees can be divided. If it is divided according to equipment factors, a subsystem for tunnel maintenance, a dispatching equipment subsystem or a locomotive subsystem can be found, etc.

[0054] Extract the causes and results from the railway accident investigation report and railway accident records as disaster events, and classify the disaster events of the same category into one accident; specifically, for example, in an accident record, the following situation occurs: a rainstorm brings a landslide, the landslide brings track deviation, the track deviation plus the failure to find the line risk in time, and finally causes derailment or collision, among which the rainstorm, landslide, track deviation, failure to find the line risk in time, derailment and landslide are all disaster events that should be extracted from the record. On the other hand, the two disaster events of employees accidentally touching a specific button and employees inputting wrong instructions to the control system should be summarized as a violation of operating regulations or execution errors.

[0055] According to the direction of the investigation, the first-level indicator is preset, and the preliminary indicator associated with the preset first-level indicator is selected from the subsystem. The second-level indicator is obtained according to the correlation between the accident and the preliminary indicator. The first-level indicator and the second-level indicator are combined to form the railway operation safety analysis indicator; specifically, the establishment of the first-level indicator needs to be defined according to the direction to be investigated. For example, if it is necessary to investigate the ability of the railway to reduce the adverse effects of sudden disasters, the first-level indicator can be set as resistance, or to test the coordination and organizational capabilities of various modules such as emergency response, emergency rescue, and emergency repair, then the recovery capacity needs to be set as a first-level indicator. In general, there will be multiple first-level indicators to ensure the accuracy of the corresponding resilience value. In some preferred embodiments, the first-level indicators are selected as four indicators: disaster preparedness, resistance, recovery, and adaptability. The preliminary indicator is to select indicators associated with the first-level indicator from the subsystem according to the selected first-level indicator. For example, we can select multiple preliminary indicators such as operation safety management mechanism, operation disaster event risk assessment and countermeasures associated with the first-level indicator of disaster preparedness from the subsystem of the civil engineering system. The secondary indicators are obtained based on the correlation between the accident and the preparatory indicators. In general embodiments, the secondary indicators are selected from the preparatory indicators based on whether the preparatory indicators will affect the occurrence of the accident or whether the preparatory indicators can block the process of one accident evolving into another. At the same time, it can be seen that there is a correlation between the primary indicators and the secondary indicators. Figure 1 The figure shown is used to represent it.

[0056] In some preferred embodiments, obtaining the secondary index according to the correlation between the accident and the preparatory index includes the following steps:

[0057] All accidents are combined into a railway accident cause data set; for the convenience of calculation, in a general embodiment, the railway accident cause data set is usually represented by a matrix, wherein a preferred embodiment includes the following steps:

[0058] Select one type of accident as the first accident and another type of accident as the second accident, and record the number of times the first accident leads to the second accident in the railway accident investigation report and railway accident records until all combinations of the first accident and the second accident are traversed.

[0059] An adjacency matrix is ​​established using the combination of all first accidents and second accidents as a railway accident cause dataset.

[0060] Specifically, if a total of 59 types of accidents are counted, the railway accident data set can be represented by an adjacency matrix A with 59 rows and 59 columns. In general, the accidents are first numbered, such as rainstorms are numbered x and landslides are numbered y, then the number of landslides caused by rainstorms is recorded as a. xy , then the element A at the position in the xth row and yth column of the adjacency matrix A is xy The value of a xy .

[0061] After the railway accident cause data set is established, a directed weighted network is constructed based on each accident in the railway accident cause data set as a node, and the comprehensive importance of the node is solved based on the directed weighted network;

[0062] In a preferred embodiment, the node comprehensive importance is calculated according to the following method:

[0063] The node strength, clustering coefficient and betweenness of each node in the directed weighted network are calculated respectively. The specific calculation method is as follows:

[0064] Node Degree in represents the number of nodes m pointing to nodes j, It represents the number of nodes j pointing to node m. The factors with larger node degree value play a more critical role in the occurrence of accidents. Clustering coefficient

[0065] where c i Represents the clustering coefficient of node i. Factors with a large clustering coefficient are also strongly associated with their neighbor factors. Once an abnormality occurs, it is easy to cause risks to neighbor factors. Average path Where N is the number of nodes in the network, d ij is the distance between nodes i and j. The larger the average path, the closer the relationship between the nodes.

[0066] The node strength, clustering coefficient and betweenness of all nodes are sorted in the same way and assigned values ​​according to the ranking;

[0067] Specifically, assuming that node A ranks 30th in node strength, 20th in clustering coefficient, and 15th in betweenness among 59 nodes, then the corresponding L 节点 =30, L 聚类 =20,L 介数 =15.

[0068] Nodes whose comprehensive importance ranks before the preset position are selected, and preliminary indicators related to the accident are selected from the preliminary indicators according to the accident corresponding to the selected node as the secondary indicators.

[0069] Specifically, the comprehensive importance L = L 节点 +L 聚类 +L 介数 It should be noted that the node strength, clustering coefficient and betweenness should be ranked in ascending or descending order, otherwise the final summed value cannot represent the importance of the node. After the calculation is completed, the comprehensive importance of all nodes is arranged in descending order according to the size of the value. The accidents corresponding to the nodes before the preset position are taken as the more critical accidents. In this embodiment, the preset position is the 20th, so the first 20 accidents with greater impact are selected for analysis.

[0070] The preset indicators selected previously are summarized and sorted to analyze whether the preset indicators will affect the occurrence of the selected accidents, or whether they will hinder the selected accidents from deriving other accidents. For example, the accident we selected is a communication failure. After logical analysis, the work quality of the personnel will prevent the communication failure from evolving into a collision, so the work quality of the personnel can be selected as the secondary indicator.

[0071] After the selection of the secondary indicators and the primary indicators is completed, the construction of the railway operation safety analysis indicators is completed. In a general embodiment, the railway operation safety analysis indicators can be recorded after being established once and used in multiple railways to be tested.

[0072] After the railway operation safety analysis indicators are established, a railway operation safety identification model for the railway to be tested is constructed based on the railway operation safety analysis indicators.

[0073] One preferred method of constructing a railway operation safety identification model for the railway to be tested is:

[0074] Disaster events are extracted from the railway accident records of the railway to be tested as the disaster event set of the railway to be tested.

[0075] Each primary and secondary indicator in the railway operation safety analysis index is taken as a root node, and whether a disaster occurs on the railway is taken as the top event to construct a Bayesian network.

[0076] The probability of all secondary indicators leading to disaster events is calculated through the set of railway disaster events to be tested, which is used as the prior probability of the root node corresponding to the secondary indicator. Specifically, the calculation of the prior probability is the probability of whether the selected secondary indicator leads to an accident, which is generally calculated by frequency. For example, if the selected secondary indicator is the work quality of personnel, then the prior probability of the node corresponding to the work quality of personnel is the ratio of the number of disaster events caused by the work quality of personnel to the total number of disaster events.

[0077] The probability of whether all first-level indicators lead to disaster events is calculated through the set of railway disaster events to be tested, which is used as the conditional probability of the first-level indicator corresponding to the root node. Specifically, the first-level indicator is usually broad and conceptual, and it is difficult to accurately count whether the first-level indicator is inappropriate and leads to the occurrence of the accident. Therefore, after calculating the prior probability of the second-level indicator corresponding to the first-level indicator, it is necessary to calculate the conditional probability of the first-level indicator through the prior probability of the second-level indicator, as the conditional probability of the first-level indicator corresponding to the root node.

[0078] One preferred embodiment is: selecting all secondary indicators associated with the primary indicator according to the primary indicator;

[0079] Multiple secondary indicator status combinations are formed according to different situations of whether each secondary indicator leads to an accident;

[0080] Calculate the occurrence probability of each secondary indicator state combination;

[0081] The probability of whether the first-level indicator leads to an accident is calculated through the Bayesian formula and the occurrence probability of all second-level indicator state combinations, which is used as the conditional probability of the root node corresponding to the first-level indicator.

[0082] For details, see Figure 1 The first-level indicator adaptability is associated with four second-level indicators: operation and maintenance predictive repair capability, emergency rescue training and drills, disaster accident prevention information intelligence, and disaster risk monitoring and early warning technology intelligence. For the convenience of description, we call operation and maintenance predictive repair capability O1, emergency rescue training and drills O2, disaster accident prevention information intelligence O3, disaster risk monitoring and early warning technology intelligence O4, and adaptability U1. If one of the second-level indicator state combinations is O1 meets the requirements, O2 does not meet the requirements, O3 does not meet the requirements, and O4 does not meet the requirements, the probability of an accident occurring under this second-level indicator state combination is the conditional probability of the first-level indicator corresponding to the second-level indicator state combination.

[0083] The prior probability of all secondary indicators corresponding to the root node and the conditional probability of all primary indicators corresponding to the root node are assigned to the Bayesian network, which is the railway operation safety identification model.

[0084] Specifically, in this embodiment, the Bayesian network is visualized through the GeNIe software, and the prior probability of the root node corresponding to the aforementioned secondary indicators and the conditional probability of the root node corresponding to all primary indicators are filled into the network node table established by the GeNIe software to obtain the railway operation safety judgment model.

[0085] The toughness value of the railway to be tested is solved according to the railway operation safety identification model of the railway to be tested, and whether the operation of the railway to be tested is safe is judged according to whether the toughness value exceeds a preset value.

[0086] Specifically, the probability of the top event is calculated through the Bayesian network, and the probability of the railway accident is obtained, which is used as the resilience value of the railway. The calculated resilience value is used as an indicator to evaluate the specific resilience of the railway. It can be used to judge the railway's tolerance to disaster damage and improve the accuracy of the comprehensive risk assessment of the railway's response to disasters. At the same time, it can be used to compare the disaster response capabilities of different railways. After long-term application on different railways and accumulation of data, a complete set of evaluation standards can be formed.

[0087] In some other embodiments, the railway operation safety identification method further includes the following steps:

[0088] Adjust any node in the railway operation safety identification model to cause the frequency or number of accidents to occur, and record the change in the railway resilience value;

[0089] The sensitivity of the root node is determined according to the adjustment range of the frequency or number of accidents caused by the root node and the change range of the railway resilience value, and the root nodes are ranked from large to small according to the sensitivity;

[0090] A root node ranked before a preset ranking is selected, and the secondary indicator corresponding to the selected root node is used as a key secondary indicator to guide the improvement of the operating status of the railway to be tested.

[0091] Specifically, after establishing and improving the Bayesian network, the secondary indicator corresponding to the root node is adjusted to cause the frequency or number of accidents to occur. In this embodiment, we use GeNIe software for calculation, and the changed railway resilience value can be obtained according to the above-mentioned railway resilience value calculation method.

[0092] We can determine the sensitivity of the root node based on the amplitude of the adjustment of the frequency or number of accidents, and the amplitude of the change in the railway resilience value before and after adjusting the frequency or number of accidents caused by the secondary indicators corresponding to the root node. It is generally calculated in absolute value. For example, the frequency of accidents caused by root node A only increased by 0.1 percentage points, and the railway resilience value changed by 10%, while the frequency of accidents caused by root node B decreased by 5 percentage points, and the railway resilience value only changed by 2%. Then we can determine that the sensitivity of root node A is higher than that of root node B. According to this method, the root nodes are sorted, and the root nodes ranked before the preset ranking are selected, and the corresponding secondary indicators are found from them as the key secondary indicators.

[0093] Railway system managers can improve railway operation management based on the selected key secondary indicators, thereby improving railway resilience.

[0094] The present application is not limited to the above-mentioned implementation modes. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications are also considered to be within the protection scope of the present invention.

[0095] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.

[0096] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0097] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A risk-based approach to identifying railway operational resilience. It is characterized in that include: Divide the railway system into several subsystems according to different characteristics; Extract the causes and results from railway accident investigation reports and railway accident records as disaster events, and classify disaster events of the same category into one accident; Preset the first-level indicators according to the direction of investigation, select the preliminary indicators related to the preset first-level indicators from the subsystem, obtain the second-level indicators according to the correlation between accidents and preliminary indicators, and combine the first-level indicators and the second-level indicators to form railway operation risk analysis indicators; According to the railway operation risk analysis indicators, a railway operation resilience identification model for the railway to be tested is constructed; The resilience value of the railway to be tested is solved according to the railway operation resilience identification model of the railway to be tested. When the resilience value is less than the preset threshold, it means that the disaster resistance capacity of the railway to be tested is qualified. The construction of the railway operation resilience identification model for the railway to be tested includes the following steps: Extract disaster events from the railway accident records of the railway to be tested as the disaster event set of the railway to be tested; Each primary and secondary indicator in the railway operation risk analysis index is taken as a root node, and whether a disaster occurs on the railway is taken as the top event to construct a Bayesian network; The probability of all secondary indicators leading to disaster events is calculated through the set of railway disaster events to be tested, which is used as the prior probability of the root node corresponding to the secondary indicator; The probability of all first-level indicators leading to disaster events is calculated through the set of railway disaster events to be tested, which is used as the conditional probability of the first-level indicator corresponding to the root node; The prior probability of all secondary indicators corresponding to the root node and the conditional probability of all primary indicators corresponding to the root node are assigned to the Bayesian network, which is the railway operation resilience identification model; The railway operation safety identification method also includes the following steps: For any node in the railway operation resilience identification model, adjust the frequency or number of accidents that cause them to occur, and record the change in the railway resilience value; The sensitivity of the root node is determined according to the adjustment range of the frequency or number of accidents and the change range of the railway resilience value, and the root nodes are ranked from large to small according to the sensitivity; A root node ranked before a preset ranking is selected, and the secondary indicator corresponding to the selected root node is used as a key secondary indicator to guide the improvement of the operating status of the railway to be tested.

2. According to the risk-based railway operation resilience identification method of claim 1, It is characterized in that The step of obtaining the secondary index according to the correlation between the accident and the preparation index comprises the following steps: Combine all accidents into a railway accident causation dataset; A directed weighted network is constructed based on each accident in the railway accident cause data set as a node, and the comprehensive importance of the node is solved based on the directed weighted network; Nodes whose comprehensive importance ranks before the preset position are selected, and according to the accidents corresponding to the selected nodes, preliminary indicators that are related to the occurrence or evolution of the accidents are selected from the preliminary indicators as secondary indicators.

3. According to the risk-based railway operation resilience identification method of claim 2, Features: The method for establishing the railway accident cause data set comprises the following steps: Select one type of accident as the first accident, select another type of accident as the second accident, and record the number of times the first accident leads to the second accident in the railway accident investigation report and the railway accident record until all combinations of the first accident and the second accident are traversed; An adjacency matrix is ​​established using the combination of all first accidents and second accidents as the railway accident cause dataset.

4. A risk-based railway operation resilience identification method according to claim 2, It is characterized in that The method for solving the comprehensive importance of nodes according to a directed weighted network includes the following steps: Calculate the node strength, clustering coefficient and betweenness of each node in the directed weighted network respectively; The node strength, clustering coefficient and betweenness of all nodes are sorted in the same way and assigned values ​​according to the ranking; The comprehensive importance of the node is obtained by summing up the ranking values ​​of the node strength, clustering coefficient and betweenness of each node.

5. A risk-based railway operation resilience identification method according to claim 2, It is characterized in that The first-level indicators include disaster preparedness, resistance, recovery and adaptation.

6. A risk-based railway operation resilience identification method according to claim 1, It is characterized in that The calculation method of the conditional probability of the first-level indicator corresponding to the root node includes the following steps: According to the first-level indicator, select all the second-level indicators related to the first-level indicator; Multiple secondary indicator status combinations are formed according to different situations of whether each secondary indicator leads to an accident; Calculate the occurrence probability of each secondary indicator state combination; The probability of whether the first-level indicator leads to an accident is calculated through the Bayesian formula and the occurrence probability of all second-level indicator state combinations, which is used as the conditional probability of the root node corresponding to the first-level indicator.

7. A risk-based railway operation resilience identification method according to claim 1, It is characterized in that Solving the toughness value of the railway to be tested includes the following steps: The probability of the top event occurring is calculated through the Bayesian network, which is the railway resilience value.

8. A risk-based railway operation resilience identification method according to claim 1, Features: The subsystem division of the railway system according to its characteristics includes the following steps: The railway system is divided into several subsystems according to the organization and personnel, facilities and equipment, management system and environmental system.