Calculation method of disconnection fault based on generator grouping and transmission line power flow

Through generator grouping and power flow analysis, the symmetrical component method disconnection fault model is established, which solves the problem that traditional methods cannot truly reflect the non-all-phase disconnection fault current of transmission lines, and achieves more accurate fault analysis and damage mitigation measures.

CN114400668BActive Publication Date: 2024-10-15CHINA SOUTHERN POWER GRID COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111620538.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-27
Publication Date
2024-10-15
Estimated Expiration
2041-12-27

AI Technical Summary

Technical Problem

Traditional transmission line fault calculation methods cannot truly reflect the current situation after a non-all-phase disconnection fault, resulting in ineffective fault analysis and damage mitigation measures.

Method used

A disconnection fault calculation method based on generator grouping and transmission line power flow is adopted. By solving the generator node voltage and setting the grouped generator potential phase according to the power flow distribution, a symmetrical component method disconnection fault solution model is established to calculate the initial voltage at the fault port. To reflect the current situation after the disconnection fault.

Benefits of technology

It effectively avoids the current calculation problem of zero caused by setting the initial voltage to 1 in the traditional method, and achieves a more accurate reflection of the current situation after a disconnection fault, which has practical engineering significance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114400668B_ABST
    Figure CN114400668B_ABST
Patent Text Reader

Abstract

The present invention proposes a line break fault calculation method based on generator grouping and transmission line flow, which relates to the technical field of power system transmission line fault analysis. The generator node voltage is solved by the injected current of the fault port of the transmission line where the line break fault occurs, and then the generators are grouped. The potential phase of the generator after grouping is set according to the transmission line flow before the fault. A line break fault solution model is established based on the symmetrical component method. The initial voltage of the fault port is calculated and then brought into the line break fault solution model to solve the current situation after the fault. This effectively avoids the situation in the traditional fault calculation process where the node initial voltage is set to 1, resulting in the calculated current of each sequence after the fault being zero. This can more accurately and truly reflect the actual current situation after the transmission line break fault, and has practical engineering significance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system transmission line fault analysis, and more specifically, to a line break fault calculation method based on generator grouping and transmission line power flow. Background Art

[0002] Transmission lines are responsible for the important task of transmitting electric energy, and their failures directly threaten the safe operation of the power system. With the continuous improvement of the productivity level of modern society, power users have higher and higher requirements for power supply reliability, especially continuity. High-quality, reliable and stable power supply has become a common demand of power users. Relay protection is an important part of the power system. The correct operation of relay protection devices plays an important role in ensuring the safe and stable operation of the power system, ensuring the quality of electric energy, and preventing the expansion of faults and accidents.

[0003] Transmission line faults can be generally divided into two categories: horizontal faults and vertical faults. Among them, most faults are horizontal faults, which refer to various types of transmission line short circuits. In addition, the power system will also have non-full-phase line break faults, called vertical faults. Longitudinal faults mainly refer to single-phase line break and two-phase line break. When the power system transmission line is not in full-phase operation, it will generate currents with zero-sequence components and negative-sequence components. The negative-sequence current will cause harm to the rotor of the generator, and the zero-sequence current will interfere with the communication lines near the transmission line. Both of these may also cause some relay protection malfunctions. In order to minimize the damage caused by non-full-phase line break faults of transmission lines, it is of great significance to propose effective measures, calculate the non-full-phase line break faults of power system transmission lines, and analyze the causes of the faults.

[0004] The non-full-phase disconnection fault of the transmission line is an asymmetric fault. Asymmetric faults are usually analyzed using the symmetrical component method, which decomposes the asymmetric three-phase quantity after the fault into three-phase quantities with positive sequence, negative sequence and zero sequence for solution, that is, "symmetricizing the asymmetric problem". The traditional fault calculation method in the prior art usually sets the node initial voltage to 1 to calculate the quantity after the power system fails. However, the non-full-phase disconnection fault of the transmission line is a longitudinal asymmetric fault. If the traditional fault calculation method is used, the node initial voltage is set to 1, and the initial voltage of the fault port is 0. At this time, the calculated currents of each sequence are all 0, which cannot truly reflect the current situation of the transmission line after the non-full-phase disconnection fault occurs, which is not conducive to further analysis of the fault situation, and is even more unfavorable for power companies to take effective measures to avoid faults and reduce the damage caused by faults. Summary of the invention

[0005] In order to solve the problem that the traditional transmission line fault calculation method cannot truly reflect the current situation after the transmission line breaks, and has poor reliability when used for line break fault analysis, the present invention proposes a line break fault calculation method based on generator grouping and transmission line flow, which truly and reliably reflects the current situation after the transmission line has a non-full-phase line break, which is beneficial for the staff to further analyze the fault situation.

[0006] In order to achieve the above technical effects, the technical solution of the present invention is as follows:

[0007] A method for calculating line disconnection faults based on generator grouping and transmission line power flow, comprising:

[0008] S1. Collect parameter data of the transmission line, determine the type of disconnection fault that occurs in the transmission line, and form an impedance matrix after the disconnection fault based on the parameter data;

[0009] S2. For any generator node i in the transmission line, starting from the injected current of the two nodes corresponding to the fault port of the transmission line disconnection, solve the voltage of the generator node i, and divide the generators of the whole network into groups according to the solved voltage of the generator node i;

[0010] S3. According to the power flow distribution before the transmission line disconnection fault occurs, the potential amplitude and the potential phase of the generator after the grouping are set;

[0011] S4. Calculate the injected current of the generator node i and the initial voltage of the two nodes corresponding to the transmission line disconnection fault port according to the potential of the generator after grouping;

[0012] S5. Determine the initial voltage of the transmission line disconnection fault port by the initial voltage of the two nodes corresponding to the transmission line disconnection fault port;

[0013] S6. Establishing a disconnection fault solution model;

[0014] S7. Substitute the initial voltage of the transmission line disconnection fault port obtained in S5 into the disconnection fault solution model to obtain the current situation at the fault point after the transmission line disconnection fault occurs.

[0015] In the present technical scheme, the node voltage of the generator is solved by the injected current of the fault port of the transmission line where the line break fault occurs, and then the generators are grouped. The potential phase of the generators after grouping is set according to the transmission line flow before the fault, and the potential phases of the generators in different groups are different. A line break fault solution model is established based on the symmetrical component method, and the initial voltage of the fault port is calculated and then brought into the line break fault solution model to solve the current situation after the fault. This effectively avoids the situation in the traditional fault calculation process where the initial node voltage is set to 1, resulting in the calculated current of each sequence after the fault being zero. This can more accurately and truly reflect the actual current situation after the transmission line break fault, and has practical engineering significance.

[0016] Preferably, the parameter data of the power transmission line described in step S1 include resistance, reactance, conductance and susceptance; and the types of line break faults occurring in the power transmission line include single-phase line break faults and two-phase line break faults.

[0017] Preferably, in step S2, the two nodes corresponding to the transmission line disconnection fault port are assumed to be node k and node m, and the injection current of other nodes and the injection current of the generator are not considered. The voltage solution expression of any generator node i in the transmission line is:

[0018]

[0019] Among them, Z ik , Z im are the mutual impedances between generator node i and node k and node m respectively; represents the injected current at node k, represents the injected current of node m;

[0020] Assuming the injected currents of nodes k and m are 1 and -1 respectively, the voltage of any generator node i can be expressed as:

[0021] U i =Z ik -Z im

[0022] Here, the purpose of solving the voltage of the generator node i in this step is to group the generators. The generator grouping is divided into groups according to the influence of the generator on the node k and the node m of the line break fault port. Therefore, only the injected current of the node k and the node m is considered.

[0023] Preferably, when only the reactance value in the transmission line parameter data is considered, the resistance value and the conductance value are ignored, all elements in the impedance matrix are real numbers, and the voltage of any generator node i obtained is only positive or negative. According to the positive or negative voltage of any generator node i, all generators in the entire network are divided into group A generators and group B generators, wherein generators with positive node voltage belong to group A generators, and generators with negative node voltage belong to group B generators.

[0024] Preferably, when all parameter data of the transmission line are considered simultaneously, all elements in the impedance matrix are complex numbers, and the voltage of any generator node i obtained is also a complex number. According to the phase angle of the voltage of any generator node i, all generators in the entire network are divided into group A generators and group B generators, wherein generators with a node voltage phase angle between 0° and 180° belong to group A generators, and generators with a node voltage phase angle between -180° and 0° belong to group B generators.

[0025] Preferably, in step S3, the power flow before the power line is disconnected is assumed to be P+jQ, where P represents the active power in the power flow distribution of the power line, and Q represents the reactive power in the power flow distribution of the power line; the node where the power flows out is assumed to be the head-end node, and the voltage is θ represents the voltage phase angle of the head node, the node into which the power flow is injected is the end node, and the voltage is The impedance between the first and last nodes of the transmission line is expressed as Z∠α, where α represents the impedance angle. Then:

[0026]

[0027]

[0028] in, It represents the current between the first and last nodes of the transmission line; express Taking the conjugate, the voltage phase angle of the head-end node is obtained according to the above formula:

[0029]

[0030] Wherein, Z represents the impedance value between the head node and the terminal node of the transmission line; at this time, the potential of all generators in group A is set to 1.0∠θ, and the potential of all generators in group B is set to 1.0∠0°, where 1 represents the potential amplitude of the generator after grouping, θ represents the potential phase of all generators in group A after grouping, and 0° represents the potential phase of all generators in group B after grouping.

[0031] Preferably, the expression for calculating the injected current of the generator node i according to the potential of the generator after grouping is:

[0032]

[0033] in, Represents the node voltage of generator node i. When the generator corresponding to node i is a generator of group A, is 1.0∠θ, when the generator corresponding to node i is a generator of group B, is 1.0∠0°, x i represents the reactance between the generator at node i and node i, represents the injected current of the generator node i;

[0034] Expand to any generator j in group A and group B, and assume that the two nodes corresponding to the transmission line fault port are node k and node m, then the initial voltages of node k and node m are:

[0035]

[0036]

[0037] Among them, U k (0) represents the initial voltage of node k; U m (0) represents the initial voltage of node m; represents the injected current of the node connected to generator j; Z kj represents the impedance between node k and the node to which generator j is connected; Z mj represents the impedance between node m and the node to which generator j is connected;

[0038] In step S5, the initial voltage of the transmission line disconnection fault port is determined by the initial voltage of the two nodes corresponding to the transmission line disconnection fault port:

[0039] U ff' (0) =U k (0) -U m (0)

[0040] Among them, U ff' (0) Indicates the initial voltage of the transmission line disconnection fault port.

[0041] Preferably, the line break fault solution model described in step S6 is determined by the line break fault type occurring in the transmission line. When a single-phase line break fault occurs in the transmission line, the line break fault solution model is a single-phase line break fault solution model. When a two-phase line break fault occurs in the transmission line, the line break fault solution model is a two-phase line break fault solution model. The establishment of the single-phase line break fault solution model or the two-phase line break fault solution model is based on the symmetrical component method. A group of asymmetrical potential sources are inserted into the fault port of the transmission line. The group of asymmetrical potential sources is decomposed into positive sequence components, negative sequence components and zero sequence components by the symmetrical component method. Then, a positive sequence equivalent network, a negative sequence equivalent network and a zero sequence equivalent network are constructed. The positive sequence component, the negative sequence component and the zero sequence equivalent network act on the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network respectively. The voltage equations of the fault ports of the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network are respectively:

[0042]

[0043]

[0044]

[0045] in, is the open circuit voltage of the transmission line disconnection fault port, which is the same as the initial voltage of the transmission line disconnection fault port obtained in step S5; FF(1) is the equivalent impedance seen from the fault port in the positive sequence equivalent network; Z FF(2) is the equivalent impedance seen from the fault port in the negative sequence equivalent network; Z FF(0) is the equivalent impedance seen from the fault port in the zero-sequence equivalent network; Indicates the positive sequence current at the fault; Indicates the negative sequence current at the fault; Indicates the zero-sequence current at the fault location; They represent the fault port voltages of the positive sequence equivalent network, negative sequence equivalent network and zero sequence equivalent network respectively.

[0046] Preferably, when the disconnection fault of the transmission line is a single-phase disconnection, based on the voltage equation of the fault port of the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network and the boundary conditions at the single-phase disconnection fault, the single-phase disconnection fault solution model is obtained as follows:

[0047]

[0048]

[0049]

[0050] In step S7, the initial voltage of the transmission line disconnection fault port obtained in step S5 is Substitute the single-phase disconnection fault solution model to obtain the positive sequence current at the fault point when a single-phase disconnection fault occurs in the transmission line Negative sequence current and zero sequence current

[0051] Preferably, when the disconnection fault of the electric line is a two-phase disconnection, based on the voltage equations of the fault ports of the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network and the boundary conditions at the two-phase disconnection fault, the two-phase disconnection fault solution model is obtained as follows:

[0052]

[0053] In step S7, the initial voltage of the transmission line disconnection fault port obtained in step S5 is Substitute the two-phase disconnection fault solution model to obtain the equal positive sequence current at the fault point when a two-phase disconnection fault occurs in the transmission line Negative sequence current and zero sequence current

[0054] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:

[0055] The present invention proposes a line break fault calculation method based on generator grouping and transmission line flow. The generator node voltage is solved by the injected current of the fault port of the transmission line where the line break fault occurs, and then the generators are grouped. The potential phase of the generators after grouping is set according to the transmission line flow before the fault. A line break fault solution model is established based on the symmetrical component method. The initial voltage of the fault port is calculated and then brought into the line break fault solution model to solve the current situation after the fault. This effectively avoids the situation in the traditional fault calculation process where the initial node voltage is set to 1, resulting in the calculated current of each sequence after the fault being zero. This can more accurately and truly reflect the actual current situation after the transmission line break fault, and has practical engineering significance. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] Figure 1 A schematic flow chart showing a method for calculating a disconnection fault based on generator grouping and transmission line power flow proposed in Embodiment 1 of the present invention;

[0057] Figure 2 A schematic diagram showing a situation in which a line disconnection fault occurs in a power transmission line proposed in Embodiment 1 of the present invention, with the line disconnection fault port as a starting point;

[0058] Figure 3 A schematic diagram showing a model of phase a, phase b and phase c of a fault port when a disconnection fault occurs in the power transmission line proposed in Embodiment 1 of the present invention;

[0059] Figure 4 A diagram showing a positive sequence equivalent network structure proposed in Embodiment 1 of the present invention;

[0060] Figure 5 A diagram showing a negative sequence equivalent network structure proposed in Embodiment 1 of the present invention;

[0061] Figure 6 It shows the zero-sequence equivalent network structure diagram proposed in Example 1 of the present invention. DETAILED DESCRIPTION

[0062] The drawings are for illustrative purposes only and should not be construed as limiting the present patent;

[0063] In order to better illustrate the present embodiment, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the actual size;

[0064] It is understandable to those skilled in the art that descriptions of certain well-known contents in the drawings may be omitted.

[0065] The positional relationships described in the drawings are only for illustrative purposes and should not be construed as limiting the present patent;

[0066] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0067] Example 1

[0068] In the first embodiment of the present invention, a method for calculating a disconnection fault based on generator grouping and transmission line power flow is proposed. Figure 1 , the method specifically comprises the following steps:

[0069] S1. Collect parameter data of the transmission line, determine the type of disconnection fault that occurs in the transmission line, and form an impedance matrix after the disconnection fault based on the parameter data;

[0070] In this step, for a transmission line to be subjected to line break fault analysis and calculation, the parameter data of each transmission line itself and other network elements in the system, such as resistance, reactance, conductance and susceptance parameters, etc., are clarified, and the self-impedance and mutual impedance of each transmission line are clarified. In addition, in actual situations, the line break fault occurring in the transmission line may be a single-phase line break fault or a two-phase line break fault. Therefore, the type of line break fault occurring in the transmission line is first determined, and then an impedance matrix after the line break fault is formed based on the parameter data. Whether it is a single-phase line break fault or a two-phase line break fault, it is a non-full-phase operation fault of the transmission line. In this embodiment, a single-phase line break fault occurring in the transmission line is taken as an example for explanation. After the impedance matrix after the single-phase line break fault is formed based on the parameter data, step S2 is executed.

[0071] S2. For any generator node i in the transmission line, starting from the injected current of the two nodes corresponding to the fault port of the transmission line disconnection, solve the voltage of the generator node i, and divide the generators of the whole network into groups according to the solved voltage of the generator node i;

[0072] In step S2, if Figure 2 As shown in the figure, the two nodes corresponding to the fault port of the transmission line are node k and node m respectively. The purpose of solving the voltage of the generator node i is to group the generators. The generator grouping is divided into groups according to the influence of the generator on the node k and node m of the fault port of the line break. Therefore, only the injected current of node k and node m is considered, and the injected current of other nodes and the injected current of the generator are not considered. The voltage solution expression of any generator node i in the transmission line is:

[0073]

[0074] Among them, Z ik , Z im are the mutual impedances between generator node i and node k and node m respectively; represents the injected current at node k, represents the injected current of node m;

[0075] Assuming the injected currents of nodes k and m are 1 and -1 respectively, the voltage of any generator node i can be expressed as:

[0076] U i =Z ik -Z im

[0077] For impedance, it is accurately represented in the form of R+jx, that is, there are real and imaginary parts. When the generators in the entire network are grouped according to the voltage of the solved generator node i, if a simplified line model is used, when only the reactance value in the transmission line parameter data is considered, the resistance value and the conductance value are ignored, all elements in the impedance matrix are real numbers, and the voltage of any generator node i obtained is only positive or negative. According to the positive or negative voltage of any generator node i, all generators in the entire network are divided into group A generators and group B generators, among which generators with positive node voltage belong to group A generators, and generators with negative node voltage belong to group B generators.

[0078] S3. According to the power flow distribution before the transmission line disconnection fault occurs, the potential amplitude and the potential phase of the generator after the grouping are set;

[0079] In step S2, the power flow before the transmission line is disconnected is assumed to be P+jQ, where P represents the active power in the power flow distribution of the transmission line, and Q represents the reactive power in the power flow distribution of the transmission line. The power flow distribution before the transmission line is disconnected can be solved by a commonly used power flow calculation method, which will not be described here. The node where the power flow flows out is assumed to be the head-end node, and the voltage is θ represents the voltage phase angle of the head node, the node into which the power flow is injected is the end node, and the voltage is The impedance between the first and last nodes of the transmission line is expressed as Z∠α, where α represents the impedance angle. Then:

[0080]

[0081]

[0082] in, It represents the current between the first and last nodes of the transmission line; express Taking the conjugate, the voltage phase angle of the head-end node is obtained according to the above formula:

[0083]

[0084] Wherein, Z represents the impedance value between the head node and the terminal node of the transmission line; at this time, the potential of all generators in the A group is set to 1.0∠θ, and the potential of all generators in the B group is set to 1.0∠0°, where 1 represents the potential amplitude of the generator after grouping, θ represents the potential phase of all generators in the A group after grouping, and 0° represents the potential phase of all generators in the B group after grouping. At this time, the situation in which the initial voltage of the node is set to 1 in the traditional fault calculation process, resulting in the calculated sequence currents after the fault being zero, can be avoided, and step S4 is performed based on this.

[0085] S4. Calculate the injected current of the generator node i and the initial voltage of the two nodes corresponding to the transmission line disconnection fault port according to the potential of the generator after grouping;

[0086] Combination Figure 2 The expression for calculating the injected current of the generator node i is:

[0087]

[0088] in, Represents the node voltage of generator node i. When the generator corresponding to node i is a generator of group A, is 1.0∠θ, when the generator corresponding to node i is a generator of group B, is 1.0∠0°, x irepresents the reactance between the generator at node i and node i, represents the injected current of the generator node i;

[0089] Expand to any generator j in group A and group B, and assume that the two nodes corresponding to the transmission line fault port are node k and node m, then the initial voltages of node k and node m are:

[0090]

[0091]

[0092] Among them, U k (0) represents the initial voltage of node k; U m (0) represents the initial voltage of node m; represents the injected current of the node connected to generator j; Z kj represents the impedance between node k and the node to which generator j is connected; Z mj represents the impedance between node m and the node to which generator j is connected;

[0093] S5. Determine the initial voltage of the transmission line disconnection fault port by the initial voltage of the two nodes corresponding to the transmission line disconnection fault port;

[0094] Specifically, in step S5, the initial voltage of the transmission line disconnection fault port is determined by the initial voltage of the two nodes corresponding to the transmission line disconnection fault port:

[0095] U ff' (0) =U k (0) -U m (0)

[0096] Among them, U ff' (0) Indicates the initial voltage of the transmission line disconnection fault port.

[0097] S6. Establishing a disconnection fault solution model;

[0098] The line break fault solution model described in step S6 is determined by the line break fault type that occurs in the transmission line. When a single-phase line break fault occurs in the transmission line, the line break fault solution model is a single-phase line break fault solution model. When a two-phase line break fault occurs in the transmission line, the line break fault solution model is a two-phase line break fault solution model. In this embodiment, taking a single-phase line break fault in the transmission line as an example, the single-phase line break fault solution model is implemented based on the symmetrical component method. The model schematic diagram of the fault port is as follows: Figure 3 As shown, Figure 3 In the figure, a, b, and c represent the three phases of the transmission line, respectively. "a" on each phase line represents the rotation factor. A set of asymmetric potential sources are inserted at the fault port of the transmission line. The set of asymmetric potential sources is decomposed into positive sequence components, negative sequence components, and zero sequence components by the symmetrical component method. Then, the positive sequence equivalent network, negative sequence equivalent network, and zero sequence equivalent network are constructed as shown in the figure. Figure 4 , Figure 5 and Figure 6 As shown (f1-f1' represents the fault port), the positive sequence component, negative sequence component and zero sequence component act on the positive sequence equivalent network, negative sequence equivalent network and zero sequence equivalent network respectively; the voltage equations of the fault port of the positive sequence equivalent network, negative sequence equivalent network and zero sequence equivalent network are respectively:

[0099]

[0100]

[0101]

[0102] in, is the open circuit voltage of the transmission line disconnection fault port, which is the same as the initial voltage of the transmission line disconnection fault port obtained in step S5; FF(1) is the equivalent impedance seen from the fault port in the positive sequence equivalent network; Z FF(2) is the equivalent impedance seen from the fault port in the negative sequence equivalent network; Z FF(0) is the equivalent impedance seen from the fault port in the zero-sequence equivalent network; Indicates the positive sequence current at the fault; Indicates the negative sequence current at the fault; Indicates the zero-sequence current at the fault location; They represent the fault port voltages of the positive sequence equivalent network, negative sequence equivalent network and zero sequence equivalent network respectively.

[0103] S7. Substitute the initial voltage of the transmission line disconnection fault port obtained in S5 into the disconnection fault solution model to obtain the current situation at the fault point after the transmission line disconnection fault occurs.

[0104] In this embodiment, the line break fault is a single-phase line break fault. Taking the a-phase line break fault as an example, the boundary condition at the fault is:

[0105]

[0106]

[0107] in, Indicates the fault current of phase a. When phase a is disconnected, the fault port voltages of phases b and c are equal, satisfying Rewriting the boundary conditions using the symmetric component method yields the expression:

[0108]

[0109]

[0110] Based on the voltage equations of the fault ports of the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network and the boundary conditions at the single-phase disconnection fault, the single-phase disconnection fault solution model is obtained as follows:

[0111]

[0112]

[0113]

[0114] In step S7, the initial voltage of the transmission line disconnection fault port obtained in step S5 is Substitute the single-phase disconnection fault solution model to obtain the positive sequence current at the fault point when a single-phase disconnection fault occurs in the transmission line Negative sequence current and zero sequence current

[0115] On the whole, the generator node voltage is solved by the injected current of the fault port of the transmission line where the line break fault occurs, and then the generators are grouped. The potential phase of the generators after grouping is set according to the transmission line flow before the fault, and the potential phases of generators in different groups are different. A line break fault solution model is established based on the symmetrical component method, and the initial voltage of the fault port is calculated and then brought into the line break fault solution model to solve the current situation after the fault. This effectively avoids the situation in the traditional fault calculation process where the initial node voltage is set to 1, resulting in the calculated current of each sequence after the fault being zero. This can more accurately and truly reflect the actual current situation after the transmission line break fault, which has practical engineering significance.

[0116] Example 2

[0117] In this embodiment, a two-phase disconnection fault in a transmission line is taken as an example for explanation. Compared with Embodiment 1, the only difference between this embodiment and Embodiment 1 is the type of disconnection fault. The two-phase disconnection fault is also a type of non-full-phase operation fault of the transmission line. After forming an impedance matrix after the two-phase disconnection fault based on parameter data, steps S2 to S5 are executed.

[0118] The node voltage of the generator is solved by the injection current of the fault port of the transmission line with the line break fault, and then the generators are grouped. The potential phase of the generators after grouping is set according to the transmission line flow before the fault. The potential phases of the generators in different groups are different.

[0119] When the two-phase disconnection fault solution model is established by using the symmetrical component method in step S6, it is assumed that the two-phase disconnection fault of phase b and phase c occurs, and the boundary conditions at the fault location satisfy:

[0120]

[0121]

[0122] Rewrite the above formula using the symmetric component method to express it as:

[0123]

[0124]

[0125] When the disconnection fault of the transmission line is a two-phase disconnection, based on the voltage equations of the fault ports of the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network and the boundary conditions at the two-phase disconnection fault, the two-phase disconnection fault solution model is obtained as follows:

[0126]

[0127] In step S7, the initial voltage of the transmission line disconnection fault port obtained in step S5 is Substitute the two-phase disconnection fault solution model to obtain the equal positive sequence current at the fault point when a two-phase disconnection fault occurs in the transmission line Negative sequence current and zero sequence current

[0128] Example 3

[0129] Basically similar to Example 1 or Example 2, but in this embodiment, out of consideration of the model adopted for the transmission line, when considering the construction of the impedance matrix of the transmission line, if an accurate line model is adopted, when the generators are grouped, there is a certain difference from when only the reactance parameters of the transmission line are considered. In this embodiment, when all parameter data of the transmission line are considered at the same time, all elements in the impedance matrix are complex numbers, and the voltage of any generator node i obtained is also a complex number. According to the phase angle of the voltage of any generator node i, all generators in the entire network are divided into group A generators and group B generators, wherein the generators with a node voltage phase angle between 0° and 180° belong to group A generators, and the generators with a node voltage phase angle between -180° and 0° belong to group B generators.

[0130] Obviously, the above embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A method for calculating line failure based on generator grouping and transmission line power flow, characterized in that: include: S1. Collect parameter data of the transmission line, determine the type of disconnection fault that occurs in the transmission line, and form an impedance matrix after the disconnection fault based on the parameter data; S2. For any generator node i in the transmission line, starting from the injected current of the two nodes corresponding to the fault port of the transmission line disconnection, solve the voltage of the generator node i, and divide the generators of the whole network into groups according to the solved voltage of the generator node i; When only the reactance value in the transmission line parameter data is considered, the resistance value and the conductance value are ignored, and all elements in the impedance matrix are real numbers. The voltage of any generator node i can only be positive or negative. According to the positive or negative voltage of any generator node i, all generators in the entire network are divided into group A generators and group B generators, where generators with positive node voltages belong to group A generators, and generators with negative node voltages belong to group B generators. S3. According to the power flow distribution before the transmission line disconnection fault occurs, the potential amplitude and the potential phase of the generator after the grouping are set; S4. Calculate the injected current of the generator node i and the initial voltage of the two nodes corresponding to the transmission line disconnection fault port according to the potential of the generator after grouping; The expression for calculating the injected current of the generator node i according to the potential of the generator after grouping is: in, Represents the node voltage of generator node i. When the generator corresponding to node i is a generator of group A, is 1.0∠θ, when the generator corresponding to node i is a generator of group B, is 1.0∠0°, x i represents the reactance between the generator at node i and node i, represents the injected current of the generator node i; Expand to any generator j in group A and group B, and assume that the two nodes corresponding to the transmission line fault port are node k and node m, then the initial voltages of node k and node m are: Among them, U k (0) represents the initial voltage of node k; U m (0) represents the initial voltage of node m; represents the injected current of the node connected to generator j; Z kj represents the impedance between node k and the node to which generator j is connected; Z mj represents the impedance between node m and the node to which generator j is connected; S5. Determine the initial voltage of the transmission line disconnection fault port by the initial voltage of the two nodes corresponding to the transmission line disconnection fault port; The expression for determining the initial voltage of the transmission line disconnection fault port by the initial voltages of the two nodes corresponding to the transmission line disconnection fault port is: IN ff' (0) =U k (0) -IN m (0) Among them, U ff' (0) Indicates the initial voltage of the transmission line disconnection fault port; S6. Establishing a disconnection fault solution model; The line break fault solution model is determined by the line break fault type that occurs in the transmission line. When a single-phase line break fault occurs in the transmission line, the line break fault solution model is a single-phase line break fault solution model. When a two-phase line break fault occurs in the transmission line, the line break fault solution model is a two-phase line break fault solution model. The establishment of the single-phase line break fault solution model or the two-phase line break fault solution model is based on the symmetrical component method. A group of asymmetrical potential sources are inserted into the fault port of the transmission line. The group of asymmetrical potential sources is decomposed into positive sequence components, negative sequence components and zero sequence components by the symmetrical component method. Then, a positive sequence equivalent network, a negative sequence equivalent network and a zero sequence equivalent network are constructed. The positive sequence component, the negative sequence component and the zero sequence equivalent network act on the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network respectively; the voltage equations of the fault ports of the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network are respectively: in, is the open circuit voltage of the transmission line disconnection fault port, which is the same as the initial voltage of the transmission line disconnection fault port obtained in step S5; FF(1) is the equivalent impedance seen from the fault port in the positive sequence equivalent network; Z FF(2) is the equivalent impedance seen from the fault port in the negative sequence equivalent network; Z FF(0) is the equivalent impedance seen from the fault port in the zero-sequence equivalent network; Indicates the positive sequence current at the fault; Indicates the negative sequence current at the fault; Indicates the zero-sequence current at the fault location; Respectively represent the fault port voltages of the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network; When the disconnection fault of the transmission line is a single-phase disconnection, based on the voltage equations of the fault ports of the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network and the boundary conditions at the single-phase disconnection fault, the single-phase disconnection fault solution model is obtained as follows: When the disconnection fault of the power line is a two-phase disconnection, based on the voltage equations of the fault ports of the positive sequence equivalent network, the negative sequence equivalent network and the zero sequence equivalent network and the boundary conditions at the two-phase disconnection fault, the two-phase disconnection fault solution model is obtained as follows: S7. Substitute the initial voltage of the transmission line disconnection fault port obtained in S5 into the disconnection fault solution model to obtain the current situation at the fault point after the transmission line disconnection fault occurs, including: The initial voltage of the transmission line disconnection fault port obtained by S5 is Substitute the single-phase disconnection fault solution model to obtain the positive sequence current at the fault point when a single-phase disconnection fault occurs in the transmission line Negative sequence current and zero sequence current The initial voltage of the transmission line disconnection fault port obtained by S5 is Substitute the two-phase disconnection fault solution model to obtain the equal positive sequence current at the fault point when a two-phase disconnection fault occurs in the transmission line Negative sequence current and zero sequence current 2. The method for calculating line failure based on generator grouping and transmission line power flow according to claim 1, characterized in that: The parameter data of the power transmission line described in step S1 include resistance, reactance, conductance and susceptance; the types of line break faults occurring in the power transmission line include single-phase line break faults and two-phase line break faults.

3. The method for calculating line failure based on generator grouping and transmission line power flow according to claim 2, characterized in that: In step S2, the two nodes corresponding to the transmission line disconnection fault port are assumed to be node k and node m, and the injection current of other nodes and the injection current of the generator are not considered. The voltage solution expression of any generator node i in the transmission line is: Among them, Z ik , Z im are the mutual impedances between generator node i and node k and node m respectively; represents the injected current at node k, represents the injected current of node m; Assuming the injected currents of nodes k and m are 1 and -1 respectively, the voltage of any generator node i can be expressed as: AT i =Z ik -WITH im 。 4. The method for calculating line failure based on generator grouping and transmission line power flow according to claim 3, characterized in that: When all parameter data of the transmission line are considered at the same time, all elements in the impedance matrix are complex numbers, and the voltage of any generator node i is also a complex number. According to the phase angle of the voltage of any generator node i, all generators in the entire network are divided into group A generators and group B generators. Among them, generators with a node voltage phase angle between 0° and 180° belong to group A generators, and generators with a node voltage phase angle between -180° and 0° belong to group B generators.

5. The method for calculating line disconnection faults based on generator grouping and transmission line power flow according to claim 1 or 4, characterized in that: In step S3, the power flow before the transmission line is disconnected is assumed to be P+jQ, where P represents the active power in the power flow distribution of the transmission line, and Q represents the reactive power in the power flow distribution of the transmission line; the node where the power flows out is assumed to be the head-end node, and the voltage is θ represents the voltage phase angle of the head node, the node into which the power flow is injected is the end node, and the voltage is The impedance between the first and last nodes of the transmission line is expressed as Z∠α, where α represents the impedance angle. Then: in, It represents the current between the first and last nodes of the transmission line; express Taking the conjugate, the voltage phase angle of the head-end node is obtained according to the above formula: Wherein, Z represents the impedance value between the head node and the terminal node of the transmission line; at this time, the potential of all generators in group A is set to 1.0∠θ, and the potential of all generators in group B is set to 1.0∠0°, where 1 represents the potential amplitude of the generator after grouping, θ represents the potential phase of all generators in group A after grouping, and 0° represents the potential phase of all generators in group B after grouping.