A method and device for predicting the production of a screw pump well

By analyzing the torque data of the screw pump and the wellhead oil sleeve pressure, combining the characteristic curve and multi-phase flow formula, the problem of insufficient accuracy of screw pump well production forecast and working condition analysis in the existing technology is solved, and more accurate liquid production is achieved Measuring and working condition diagnosis have improved the application level of intelligent oilfield construction.

CN114412439BActive Publication Date: 2024-11-22SHENYANG ZHONGKE AOWEI SCI & TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111672725.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-31
Publication Date
2024-11-22
Estimated Expiration
2041-12-31

AI Technical Summary

Technical Problem

In the prior art, the maturity of screw pump well analysis and metering is limited, making it difficult to accurately predict output and operating conditions.

Method used

By analyzing the torque data of the screw pump per second, minute, hour and day, we determine the second, minute, hour and day deviations of torque changes, combining the initial fluid production volume and wellhead oil sleeve pressure, using characteristic curve formula and multiple The phase flow formula calculates the head and dynamic fluid level and adjusts the data to achieve an error less than the threshold.

Benefits of technology

The accuracy of screw pump well working condition diagnosis has been improved, more accurate liquid production metering has been achieved, and the application foundation of intelligent oilfield construction has been enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114412439B_ABST
    Figure CN114412439B_ABST
Patent Text Reader

Abstract

The present invention provides a method and device for predicting the production of a screw pump well, including determining the second-level data change Ts, minute-level data change Tm, hour-level data change Th, and daily data change Td according to the condition that the torque of the screw pump changes beyond the standard; determining the minute-level data change trend ΔTm, hour-level data change trend ΔTh, and daily data change trend ΔTd of the torque of the screw pump; judging the working state of the screw pump well according to the conditions of ΔTm, ΔTh, and ΔTd; obtaining the initial liquid production and initial head of the screw pump; determining the head of the screw pump; and determining the dynamic liquid level of the oil well according to the suction pressure corresponding to the head of the screw pump. The method and device for predicting the production of a screw pump well provided by the present invention improve the accuracy of the diagnosis of the working condition of the screw pump well, more accurately analyze the non-drastic working condition of the screw pump well; realize the measurement of the liquid production of the screw pump well; and strengthen the application foundation of intelligent construction of oil fields in screw pumps.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oil production engineering, and in particular to a method and a device for predicting the production of a screw pump well. Background Art

[0002] As a mature oil production process, screw pump oil production is widely adopted by major oil fields at home and abroad for its easy control, strong adaptability to sand and heavy oil. In recent years, with the advancement of oil field digitization and Internet of Things construction, screw pump well analysis and metering technology based on real-time acquisition parameters has become one of the core technologies for the in-depth application of Internet of Things in oil and gas production. This technology is based on the characteristics of screw pump well production data, and classifies and identifies the characteristics of non-drastic working conditions. As the main technical support for the intelligent application of such oil production technology, it provides an important reference for the decision-making of measures related to the optimization of screw pump well production, which is of great significance to the realization of intelligent management of screw pump wells.

[0003] At present, the overall maturity of this technology is limited and further research and improvement is needed. How to further combine oil production engineering theory with digital acquisition testing and artificial intelligence analysis is one of the keys to improving this technology. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] The present invention provides a method and device for predicting the production of a screw pump well, so as to overcome the defect that the technical maturity of the analysis and measurement of the screw pump well in the prior art is still relatively limited.

[0006] (II) Technical solution

[0007] In order to solve the above problems, the present invention provides a method and device for predicting the production of a screw pump well, including: determining a second-level deviation, a minute-level deviation, an hour-level deviation, and a daily deviation according to the torque of the screw pump per second, the average torque of the screw pump per minute, the average torque of the screw pump per hour, and the average torque of the screw pump per day and a reference torque, and determining a second-level data change Ts, a minute-level data change Tm, an hour-level data change Th, and a daily data change Td of the screw pump torque that exceeds the standard when the second-level deviation, the minute-level deviation, the hour-level deviation, and the daily deviation exceed corresponding thresholds;

[0008] Determine the minute-level data change trend ΔTm, hour-level data change trend ΔTh, and daily data change trend ΔTd of the screw pump torque according to the torque of the screw pump within the set time before each minute, the torque of the screw pump within the set time before each hour, and the torque of the screw pump within the set time before each day;

[0009] When ΔTm, ΔTh and ΔTd are stable, and (Td-Tb) / Tb is less than the first threshold, it is determined that the screw pump well is in a normal working condition; when ΔTh is stable, the Td variation exceeding the standard condition is decreasing exceeding the standard, ΔTd is decreasing, and (Tb-Td) / Tb is less than the first threshold, it is determined that the screw pump well is in a parameter small working condition; when ΔTh is stable, the Td variation exceeding the standard condition is increasing exceeding the standard, ΔTd is increasing, and (Td-Tb) / Tb is greater than the first threshold, it is determined that the screw pump well is in a parameter small working condition. When the second threshold is exceeded, it is determined that the screw pump well is in a parameter-excessive working condition; when the ΔTh is stable, the Td variation exceeding the standard condition is increasing exceeding the standard, the ΔTd is increasing, and (Td-Tb) / Tb is greater than the first threshold and less than the second threshold, it is determined that the screw pump well is in a waxing working condition; when the ΔTh is stable, the Td variation exceeding the standard condition is decreasing exceeding the standard, the ΔTd is decreasing, and (Tb-Td) / Tb is greater than the second threshold, it is determined that the screw pump well is in a leakage working condition;

[0010] When the screw pump well is in the normal working condition, the parameter is too small working condition, the parameter is too large working condition, the wax deposition working condition or the leakage working condition, obtaining the initial liquid production and initial head of the screw pump;

[0011] Determining the head of the screw pump according to the initial liquid production and the wellhead casing pressure of the screw pump well;

[0012] When the error between the actual lift and the lift of the screw pump is smaller than a third threshold, the dynamic liquid level of the oil well is determined according to the suction pressure corresponding to the lift of the screw pump.

[0013] Preferably, obtaining the initial liquid production of the screw pump includes:

[0014] The liquid production corresponding to the average pump efficiency of the working condition of the screw pump at the current speed is used as the initial liquid production.

[0015] Preferably, the actual lift is determined according to the following characteristic curve formula:

[0016] H real =(1-ΔH)(aQ 2 +bQ+c),

[0017] Among them, H real is the actual head, ΔH is the head deviation coefficient, ranging from 0 to 1, Q is the initial liquid production, and a, b, and c are fitting coefficients.

[0018] Preferably, determining the head of the screw pump according to the initial liquid production and the wellhead casing pressure of the screw pump well includes:

[0019] The lift of the screw pump is calculated using a multiphase flow formula according to the initial liquid production and the wellhead casing pressure of the screw pump well.

[0020] Preferably, the error between the initial head and the head of the screw pump is determined according to the following formula:

[0021] ΔH cul =|H real -H cul | / H real ,

[0022] Among them, H real is the actual head, H cul is the calculated head of the screw pump, ΔH cul is the error between the actual head and the calculated head of the screw pump.

[0023] Preferably, when the error between the calculated head and the actual head of the screw pump is not less than a third threshold value, and the screw pump well is in the normal working condition, the parameter is too small working condition, or the parameter is too large working condition, the value of the initial liquid production is adjusted until the error between the calculated head and the actual head of the screw pump is less than the third threshold value;

[0024] When the error between the calculated head and the actual head of the screw pump is not less than a third threshold value and the screw pump well is in the wax deposition working condition, the effective pipe diameter value is adjusted downward until the error between the calculated head and the actual head of the screw pump is less than the third threshold value;

[0025] When the error between the calculated head and the actual head of the screw pump is not less than a third threshold value and the screw pump well is in the lost leakage working condition, the characteristic curve is corrected and the initial head is determined according to the corrected characteristic curve formula, and the value of the initial liquid production is adjusted until the error between the calculated head and the actual head of the screw pump is less than the third threshold value.

[0026] Preferably, the third threshold is 0.05.

[0027] In another aspect, the present invention provides a production prediction device for a screw pump well, comprising:

[0028] A first determination unit determines a second-level deviation, a minute-level deviation, an hour-level deviation, and a daily deviation according to the torque of the screw pump per second, the average torque of the screw pump per minute, the average torque of the screw pump per hour, and the average torque of the screw pump per day and a reference torque, and determines a second-level data change Ts, a minute-level data change Tm, an hour-level data change Th, and a daily data change Td of the screw pump torque that exceeds a standard change condition when the second-level deviation, the minute-level deviation, the hour-level deviation, and the daily deviation exceed corresponding thresholds;

[0029] The second determination unit determines the minute-level data change trend ΔTm, the hour-level data change trend ΔTh, and the daily data change trend ΔTd of the torque of the screw pump according to the torque of the screw pump within the set time before each minute, the torque of the screw pump within the set time before each hour, and the torque of the screw pump within the set time before each day;

[0030] The third determination unit determines that the screw pump well is in a normal working condition when ΔTm, ΔTh and ΔTd are stable and (Td-Tb) / Tb is less than a first threshold value; determines that the screw pump well is in a parameter small working condition when ΔTh is stable, the Td variation exceeding standard condition is decreasing exceeding standard, the ΔTd is decreasing, and (Tb-Td) / Tb is less than the first threshold value; determines that the screw pump well is in a parameter small working condition when ΔTh is stable, the Td variation exceeding standard condition is increasing exceeding standard, the ΔTd is increasing, and (Td-Tb) / Tb is less than the first threshold value. When / Tb is greater than the second threshold, it is determined that the screw pump well is in a parameter-excessive working condition; when ΔTh is stable, the Td variation exceeding the standard condition is increasing exceeding the standard, the ΔTd is increasing, and (Td-Tb) / Tb is greater than the first threshold and less than the second threshold, it is determined that the screw pump well is in a waxing working condition; when ΔTh is stable, the Td variation exceeding the standard condition is decreasing exceeding the standard, the ΔTd is decreasing, and (Tb-Td) / Tb is greater than the second threshold, it is determined that the screw pump well is in a leakage working condition;

[0031] A first acquisition unit is configured to acquire an initial liquid production and an initial head of the screw pump when the screw pump well is in the normal working condition, the parameter is too small working condition, the parameter is too large working condition, the wax deposition working condition or the leakage working condition;

[0032] A fourth determining unit, which determines the head of the screw pump according to the initial liquid production and the wellhead casing pressure of the screw pump well;

[0033] The fifth determining unit determines the dynamic liquid level of the oil well according to the suction pressure corresponding to the lift of the screw pump when the error between the actual lift and the lift of the screw pump is less than a third threshold.

[0034] (III) Beneficial effects

[0035] The production prediction method and device for a screw pump well provided by the present invention can maximize the accuracy of the diagnosis of the working condition of the screw pump well, more accurately analyze the non-drastic working condition of the screw pump well, achieve the measurement of the liquid production of the screw pump well, and strengthen the application foundation of intelligent construction of oil fields in screw pumps. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0037] Figure 1 This is a flow chart of a method for predicting the production of a screw pump well according to an embodiment of the present invention;

[0038] Figure 2 It is a schematic diagram of the production prediction structure of a screw pump well according to an embodiment of the present invention. DETAILED DESCRIPTION

[0039] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] like Figure 1 As shown, the present invention provides a method and device for predicting the production of a screw pump well, comprising:

[0041] Step S1, determining the second-level deviation, minute-level deviation, hour-level deviation, and daily deviation according to the torque of the screw pump per second, the average torque of the screw pump per minute, the average torque of the screw pump per hour, and the average torque of the screw pump per day and the reference torque, and determining the second-level data change Ts, minute-level data change Tm, hour-level data change Th, and daily data change Td of the screw pump torque that exceeds the standard when the second-level deviation, minute-level deviation, hour-level deviation, and daily deviation exceed corresponding thresholds;

[0042] Step S2, determining the minute-level data change trend ΔTm, hour-level data change trend ΔTh, and daily data change trend ΔTd of the screw pump torque according to the torque of the screw pump within the set time before each minute, the torque of the screw pump within the set time before each hour, and the torque of the screw pump within the set time before each day;

[0043] Step S3, when ΔTm, ΔTh and ΔTd are stable, and (Td-Tb) / Tb is less than a first threshold, it is determined that the screw pump well is in a normal working condition; when ΔTh is stable, the Td variation exceeding standard condition is decreasing exceeding standard, the ΔTd is decreasing, and (Tb-Td) / Tb is less than the first threshold, it is determined that the screw pump well is in a parameter small working condition; when ΔTh is stable, the Td variation exceeding standard condition is increasing exceeding standard, the ΔTd is increasing, and (Td-Tb) / Tb is less than the first threshold, it is determined that the screw pump well is in a parameter small working condition. When Tb is greater than the second threshold, it is determined that the screw pump well is in a parameter-excessive working condition; when ΔTh is stable, the Td variation exceeding the standard condition is increasing exceeding the standard, the ΔTd is increasing, and (Td-Tb) / Tb is greater than the first threshold and less than the second threshold, it is determined that the screw pump well is in a waxing working condition; when ΔTh is stable, the Td variation exceeding the standard condition is decreasing exceeding the standard, the ΔTd is decreasing, and (Tb-Td) / Tb is greater than the second threshold, it is determined that the screw pump well is in a leakage working condition;

[0044] Step S4, when the screw pump well is in the normal working condition, the parameter is too small working condition, the parameter is too large working condition, the wax deposition working condition or the leakage working condition, obtaining the initial liquid production and initial head of the screw pump;

[0045] Step S5, determining the head of the screw pump according to the initial liquid production and the wellhead casing pressure of the screw pump well;

[0046] Step S6: when the error between the actual lift and the lift of the screw pump is less than a third threshold, determine the dynamic liquid level of the oil well according to the suction pressure corresponding to the lift of the screw pump.

[0047] Wherein, obtaining the initial liquid production of the screw pump includes:

[0048] The liquid production corresponding to the average pump efficiency of the working condition of the screw pump at the current speed is used as the initial liquid production.

[0049] Wherein: the actual lift is determined according to the following characteristic curve formula:

[0050] H real =(1-ΔH)(aQ 2 +bQ+c),

[0051] Among them, H real is the actual head, ΔH is the head deviation coefficient, ranging from 0 to 1, Q is the initial liquid production, and a, b, and c are fitting coefficients.

[0052] Wherein, determining the head of the screw pump according to the initial liquid production and the wellhead casing pressure of the screw pump well includes:

[0053] The lift of the screw pump is calculated using a multiphase flow formula according to the initial liquid production and the wellhead casing pressure of the screw pump well.

[0054] The error between the initial head and the head of the screw pump is determined according to the following formula:

[0055] ΔH cul =|H real -H cul | / H real ,

[0056] Among them, H real is the actual head, H cul is the calculated head of the screw pump, ΔH cul is the error between the actual head and the calculated head of the screw pump.

[0057] Wherein, when the error between the calculated head and the actual head of the screw pump is not less than a third threshold value, and the screw pump well is in the normal working condition, the parameter is too small working condition or the parameter is too large working condition, the value of the initial liquid production is adjusted until the error between the calculated head and the actual head of the screw pump is less than the third threshold value;

[0058] When the error between the calculated initial head and the actual head of the screw pump is not less than a third threshold value and the screw pump well is in the wax deposition working condition, the effective pipe diameter value is adjusted downward until the error between the calculated head and the actual head of the screw pump is less than the third threshold value;

[0059] When the error between the calculated head and the actual head of the screw pump is not less than the third threshold value and the screw pump well is in the lost leakage working condition, the characteristic curve is corrected and the initial head is determined according to the corrected characteristic curve formula, and the value of the initial liquid production is adjusted until the error between the calculated head and the actual head of the screw pump is less than the third threshold value. The third threshold value in this embodiment is 0.05.

[0060] The following is a detailed description of the production prediction method for the screw pump well based on actual application conditions: The embodiment of the present invention uses the change amplitude of the torque value converted by the electrical parameter compared with the reference torque, processes the parameters collected and calculated in real time into the following four time dimension data, and performs change rate and trend analysis:

[0061] 1) Ts: Second-level data changes. If the deviation from the baseline value exceeds 30% or the before-after comparison value exceeds 30%, the warning state is entered;

[0062] 2) Tm: minute-level data changes. The average value of 60 second-level data per minute is taken. If the change rate exceeds 20% compared with the baseline value, an early warning is issued. The change trend of the minute-level data in the past 60 minutes (linear fitting of 60 points) ΔTm is calculated every minute and is divided into four states: rising, falling, stable, and fluctuating.

[0063] 3) Th: Hourly data trend change, take the average of 60 minute-level data per hour, and issue an early warning if the change exceeds 15% compared with the baseline value. Every hour, calculate the change trend ΔTh (linear fit of 72 points) of the hourly data in the past 72 hours, which is divided into four conditions: rising, falling, stable, and fluctuating.

[0064] 4) Td: Daily data trend change. The average value of 24 hourly data per day is taken as the daily data. If the change exceeds 10% compared with the baseline value, an early warning is issued. The change trend of daily data in the past 30 days, ΔTd, is calculated every day and divided into four conditions: rising, falling, stable, and fluctuating.

[0065] The working conditions without drastic changes are divided into the following five categories:

[0066] 1) The parameters are too large, which are characterized by increased head, low submergence, low pump efficiency, and large electrical parameters; the criteria are:

[0067] A. The trend of ΔTh is stable; B. Td is increasing and there is a warning; C. The trend of ΔTd is increasing; D. (Td-Tb) / Tb is greater than 0.20

[0068] 2) When wax is deposited, the characteristics are increased discharge pressure, increased head, reduced output, rising liquid level, decreased actual lifting height, increased pump loss, and slow increase in electrical parameters. The criteria are:

[0069] A. The trend of ΔTh is stable; B. Td is increasing and there is a warning; C. The trend of ΔTd is increasing; D. (Td-Tb) / Tb is greater than 0.10 and less than 0.2;

[0070] 3) Normal: The electrical parameters and wellhead pressure remain basically unchanged. The criteria are:

[0071] A. The trends of ΔTm, ΔTh, and ΔTd are all stable; B. (Td-Tb) / Tb is less than 0.1

[0072] 4) Parameters are too small: Its characteristics are high dynamic liquid level, high pump efficiency, and stable electrical parameters. The criteria are:

[0073] A. The trend of ΔTh is stable; B. Td decreases and an early warning is issued; C. The trend of ΔTd is decreasing; D. (Tb-Td) / Tb is less than 0.1;

[0074] 5) Leakage (leakage caused by normal wear of the pump): Its characteristics are that the lifting pressure remains unchanged, the liquid level rises, and the output decreases. The pump is lightly loaded, and the electrical parameters drop slightly (the characteristic curve needs to be readjusted). The judgment criteria are:

[0075] A. The trend of ΔTh is stable; B. Td decreases and an early warning is issued; C. The trend of ΔTd is decreasing; D. (Tb-Td) / Tb is greater than 0.2;

[0076] Characteristic curve correction:

[0077] 1) Obtain the initial characteristic curve of the pump

[0078] The initial characteristic curve of the screw pump is expressed as a series of parallel line equations

[0079]

[0080] The initial characteristic curve Qi is the displacement, n is the speed,

[0081] k is a parameter related to the geometric dimensions of the screw pump. When the screw pump remains unchanged, this parameter remains unchanged.

[0082] vi lift influence factor, different lift H will correspond to different v values,

[0083] Obtain the relationship curve between liquid production and head at a given speed

[0084] By giving a fixed value to n in the above formula, we can obtain a set of (Q, H) relationships. By fitting the relationship between Q and H using the least squares method, we can obtain:

[0085] H=aQ 2 +bQ+c (2)

[0086] 2) Acquisition of actual production data, corresponding liquid production, dynamic liquid level, power and torque.

[0087] Calculate the actual pump head H based on actual production data real

[0088] Calculation of screw pump suction pressure p in

[0089] p in =p c +H cmd [ρ w F w +ρ o (1-F w )]g (3)

[0090] Calculation of screw pump discharge pressure p out

[0091] Taking the oil pressure as the starting point, use the multiphase flow formula (provided in the manual) to calculate to the pump outlet, and then obtain p out

[0092] Actual head of the pump: H real

[0093] H real =[ρ w F w +ρ o (1-F w )](p out -p in ) / g (4)

[0094] Substitute the actual liquid production into formula (2) to obtain an H th

[0095] Head deviation coefficient

[0096] ΔH=(H real -H th ) / H real (5)

[0097] If ΔH is less than 0.05, the initial formula is used directly, otherwise, characteristic curve correction is performed.

[0098] H cmd , submergence, the difference between the dynamic liquid level of the oil well and the position of the screw pump suction port, m;

[0099] H cmd =H d -H dfl (6)

[0100] H d , pump depth, i.e. the position of the screw pump suction port, m;

[0101] H dfl , dynamic liquid level of oil well, m;

[0102] F w , volumetric moisture content, decimal;

[0103] p t , oil pressure, MPa;

[0104] p c , casing pressure, MPa;

[0105] ρ w , relative density of formation water, dimensionless;

[0106] ρ o , relative density of crude oil, dimensionless.

[0107] ΔH is generally between 0-1.

[0108] Note: The initial head deviation coefficient ΔH is calculated based on production data using the above formula. If the fitting effect is not good, ΔH can be adjusted according to the needs of the fitting. After ΔH is selected, the actual characteristic curve of the screw pump can be calculated using formula (7).

[0109] 3) Obtain multiple sets of data and fit the relationship between the head deviation coefficient and the liquid production, speed and power

[0110] If multiple sets of fitting values ​​are available, the average head deviation coefficient needs to be calculated.

[0111] 4) Obtain the actual characteristic curve

[0112] The actual pump head is calculated by the following formula:

[0113] H real =(1-ΔH)H th

[0114] Corrected characteristic curve:

[0115] H real =(1-ΔH)(aQ 2 +bQ+c) (7)

[0116] Liquid volume measurement and dynamic liquid level prediction

[0117] Production forecast according to different working conditions

[0118] Category 1: Production planning under normal, small parameters, and large parameters:

[0119] 1) Take the liquid production corresponding to the statistical average pump efficiency of various working conditions at the current speed of the pump as the initial value Q;

[0120] 2) According to the corrected characteristic curve formula (7), take the corresponding initial lift value H real ;

[0121] 3) According to the initial liquid volume and the tested wellhead casing pressure, the corresponding head is calculated using the multiphase flow formula to obtain H cul

[0122] 4) Determine the calculation error ΔH of the two lifts cul Is it less than 0.05? If so, the calculation stops and the result is output. If not, the Q value is fine-tuned until the calculation error is less than 0.05.

[0123] ΔHcul =|H real -H cul | / H real .....(8)

[0124] 5) Calculate the dynamic liquid level of the oil well by the suction pressure corresponding to the lift that satisfies the lift calculation error.

[0125] H dfl =H d -(p in -p c ) / [ρ w F w +ρ o (1-F w )]g........(9)

[0126] The second category is the production planning under wax deposition conditions:

[0127] 1) Take the liquid production corresponding to the statistical average pump efficiency of the wax deposition condition at the current speed of the pump as the initial value Q;

[0128] 2) According to the corrected characteristic curve formula (7), take the corresponding initial lift value H real ;

[0129] 3) According to the initial liquid volume and the tested wellhead casing pressure, the corresponding head is calculated using the multiphase flow formula to obtain H cul ;

[0130] 4) Apply formula (8) to determine the calculation error ΔH of the two lifts cul Is it less than 0.05? If yes, the calculation stops and the result is output. If no, the effective pipe diameter value is fine-tuned until the calculation error is less than 0.05.

[0131] 5) Calculate the dynamic liquid level of the oil well from the suction pressure corresponding to the lift that satisfies the lift calculation error, and apply formula (9).

[0132] The third category is the production calculation under the condition of missing work: recalibrate the characteristic curve and calculate the production according to the method of the first category after correction.

[0133] like Figure 2 As shown, the present invention also provides a production prediction device for a screw pump well, comprising:

[0134] The first determination unit 21 determines the second deviation, minute deviation, hour deviation, and daily deviation according to the torque of the screw pump per second, the average torque of the screw pump per minute, the average torque of the screw pump per hour, and the average torque of the screw pump per day and the reference torque, and determines the second data change Ts, minute data change Tm, hour data change Th, and daily data change Td of the screw pump torque that exceeds the standard when the second deviation, minute deviation, hour deviation, and daily deviation exceed corresponding thresholds;

[0135] The second determining unit 22 determines the minute-level data change trend ΔTm, the hour-level data change trend ΔTh, and the daily data change trend ΔTd of the torque of the screw pump according to the torque of the screw pump within the set time before each minute, the torque of the screw pump within the set time before each hour, and the torque of the screw pump within the set time before each day;

[0136] The third determination unit 23 determines that the screw pump well is in a normal working condition when ΔTm, ΔTh and ΔTd are stable and (Td-Tb) / Tb is less than a first threshold value; determines that the screw pump well is in a parameter small working condition when ΔTh is stable, the Td variation exceeding standard condition is decreasing exceeding standard, the ΔTd is decreasing, and (Tb-Td) / Tb is less than the first threshold value; determines that the screw pump well is in a parameter small working condition when ΔTh is stable, the Td variation exceeding standard condition is increasing exceeding standard, the ΔTd is increasing, and (Td-Tb ) / Tb is greater than the second threshold, it is determined that the screw pump well is in a parameter-large working condition; when ΔTh is stable, the Td variation exceeding the standard condition is increasing exceeding the standard, the ΔTd is increasing, and (Td-Tb) / Tb is greater than the first threshold and less than the second threshold, it is determined that the screw pump well is in a waxing working condition; when ΔTh is stable, the Td variation exceeding the standard condition is decreasing exceeding the standard, the ΔTd is decreasing, and (Tb-Td) / Tb is greater than the second threshold, it is determined that the screw pump well is in a leakage working condition;

[0137] The first acquisition unit 24 acquires the initial liquid production and initial head of the screw pump when the screw pump well is in the normal working condition, the parameter is too small working condition, the parameter is too large working condition, the wax deposition working condition or the leakage working condition;

[0138] A fourth determining unit 25 determines the head of the screw pump according to the initial liquid production and the wellhead casing pressure of the screw pump well;

[0139] The fifth determining unit 26 determines the dynamic liquid level of the oil well according to the suction pressure corresponding to the lift of the screw pump when the error between the actual lift and the lift of the screw pump is less than a third threshold.

[0140] The production prediction method and device for a screw pump well provided by the present invention can maximize the accuracy of the diagnosis of the working condition of the screw pump well, more accurately analyze the non-drastic working condition of the screw pump well, achieve the measurement of the liquid production of the screw pump well, and strengthen the application foundation of intelligent construction of oil fields in screw pumps.

[0141] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0142] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A method for predicting the production of a screw pump well, characterized in that: include: Determine the second-level deviation, minute-level deviation, hour-level deviation and daily deviation respectively according to the torque of the screw pump per second, the average torque of the screw pump per minute, the average torque of the screw pump per hour, the average torque of the screw pump per day and the reference torque; and determine the second-level data change Ts, minute-level data change Tm, hour-level data change Th and daily data change Td of the screw pump torque that exceeds the standard when the second-level deviation, minute-level deviation, hour-level deviation and daily deviation exceed the corresponding thresholds; Determine the minute-level data change trend ΔTm, hour-level data change trend ΔTh, and daily data change trend ΔTd of the screw pump torque according to the torque of the screw pump within the set time before each minute, the torque of the screw pump within the set time before each hour, and the torque of the screw pump within the set time before each day; When ΔTm, ΔTh and ΔTd are stable, and (Td-Tb) / Tb is less than the first threshold, where Tb is the reference torque, it is determined that the screw pump is in a normal working condition; when ΔTh is stable, the Td variation exceeding the standard condition is decreasing exceeding the standard, ΔTd is decreasing, and (Tb-Td) / Tb is less than the first threshold, it is determined that the screw pump is in a parameter-small working condition; when ΔTh is stable, the Td variation exceeding the standard condition is increasing exceeding the standard, ΔTd is increasing, and (Td-Tb ) / Tb is greater than the second threshold, it is determined that the screw pump well is in a parameter-large working condition; when ΔTh is stable, the Td variation exceeding the standard condition is increasing exceeding the standard, the ΔTd is increasing, and (Td-Tb) / Tb is greater than the first threshold and less than the second threshold, it is determined that the screw pump well is in a waxing working condition; when ΔTh is stable, the Td variation exceeding the standard condition is decreasing exceeding the standard, the ΔTd is decreasing, and (Tb-Td) / Tb is greater than the second threshold, it is determined that the screw pump well is in a leakage working condition; When the screw pump well is in the normal working condition, the parameter is too small working condition, the parameter is too large working condition, the wax deposition working condition or the leakage working condition, obtaining the initial liquid production and initial head of the screw pump; Determining the calculated head of the screw pump according to the initial liquid production and the wellhead casing pressure of the screw pump well; When the error between the actual head and the calculated head of the screw pump is less than a third threshold, determining the dynamic liquid level of the oil well according to the suction pressure corresponding to the calculated head of the screw pump; The actual lift is determined according to the following characteristic curve formula: H real =(1-ΔH)(aQ 2 +bQ+c), Among them, H real is the actual head, ΔH is the head deviation coefficient, the value range is 0-1, Q is the initial liquid production, a, b, c are fitting coefficients; Wherein, determining the calculated head of the screw pump according to the initial liquid production and the wellhead casing pressure of the screw pump well includes: Calculating the calculated head of the screw pump using a multiphase flow formula according to the initial liquid production and the wellhead casing pressure of the screw pump well; The error between the actual lift and the calculated lift is determined according to the following formula: ΔH cul =|H real -H cul | / H real , Among them, H real is the actual head, H cul To calculate the head, ΔH cul is the error between the actual lift and the calculated lift.

2. The method according to claim 1, characterized in that The obtaining of the initial liquid production of the screw pump comprises: The liquid production corresponding to the average pump efficiency of the working condition of the screw pump at the current speed is used as the initial liquid production.

3. The method according to claim 1, characterized in that include: When the error between the calculated head and the actual head of the screw pump is not less than a third threshold value, and the screw pump well is in the normal working condition, the parameter is too small working condition, or the parameter is too large working condition, adjusting the value of the initial liquid production until the error between the calculated head and the actual head of the screw pump is less than the third threshold value; When the error between the calculated head and the actual head of the screw pump is not less than a third threshold value and the screw pump well is in the wax deposition working condition, the effective pipe diameter value is adjusted downward until the error between the calculated head and the actual head of the screw pump is less than the third threshold value; When the error between the calculated head and the actual head of the screw pump is not less than a third threshold value and the screw pump well is in the lost leakage working condition, the characteristic curve is corrected and the initial head is determined according to the corrected characteristic curve formula, and the value of the initial liquid production is adjusted until the error between the calculated head and the actual head of the screw pump is less than the third threshold value.

4. The method according to claim 3, characterized in that The third threshold is 0.

05.

5. A production prediction device for a screw pump well based on the production prediction method for a screw pump well according to any one of claims 1 to 4, characterized in that: include: A first determination unit determines a second-level deviation, a minute-level deviation, an hour-level deviation, and a daily deviation according to the torque of the screw pump per second, the average torque of the screw pump per minute, the average torque of the screw pump per hour, and the average torque of the screw pump per day and a reference torque, and determines a second-level data change Ts, a minute-level data change Tm, an hour-level data change Th, and a daily data change Td that the torque of the screw pump has exceeded a standard change when the second-level deviation, the minute-level deviation, the hour-level deviation, and the daily deviation exceed corresponding thresholds; The second determination unit determines the minute-level data change trend ΔTm, the hour-level data change trend ΔTh, and the daily data change trend ΔTd of the torque of the screw pump according to the torque of the screw pump within the set time before each minute, the torque of the screw pump within the set time before each hour, and the torque of the screw pump within the set time before each day; The third determination unit determines that the screw pump is in a normal working condition when ΔTm, ΔTh and ΔTd are stable and (Td-Tb) / Tb is less than a first threshold value, wherein Tb is a reference torque; determines that the screw pump is in a parameter-small working condition when ΔTh is stable, the Td variation exceeding standard condition is decreasing exceeding standard, the ΔTd is decreasing, and (Tb-Td) / Tb is less than the first threshold value; determines that the screw pump is in a parameter-small working condition when ΔTh is stable, the Td variation exceeding standard condition is increasing exceeding standard, the ΔTd is increasing, and (Tb-Td) / Tb is less than the first threshold value. When (Td-Tb) / Tb is greater than the second threshold, it is determined that the screw pump well is in a parameter-excessive working condition; when ΔTh is stable, the Td variation exceeding the standard condition is increasing exceeding the standard, the ΔTd is increasing, and (Td-Tb) / Tb is greater than the first threshold and less than the second threshold, it is determined that the screw pump well is in a waxing working condition; when ΔTh is stable, the Td variation exceeding the standard condition is decreasing exceeding the standard, the ΔTd is decreasing, and (Tb-Td) / Tb is greater than the second threshold, it is determined that the screw pump well is in a leakage working condition; A first acquisition unit is configured to acquire an initial liquid production and an initial head of the screw pump when the screw pump well is in the normal working condition, the parameter is too small working condition, the parameter is too large working condition, the wax deposition working condition or the leakage working condition; A fourth determining unit, which determines the calculated head of the screw pump according to the initial liquid production and the wellhead casing pressure of the screw pump well; The fifth determining unit determines the dynamic liquid level of the oil well according to the suction pressure corresponding to the calculated head of the screw pump when the error between the actual head and the calculated head of the screw pump is less than a third threshold.