An online multi-dimensional collaborative site selection system for planning projects based on CIM technology
Through CIM technology and deep learning, the automation of project site selection and multi-dimensional collaborative site selection are realized, which solves the problems of inaccurate site selection and complicated data management in the existing technology, improves the accuracy and efficiency of site selection, and satisfies many needs. The need for regulatory controls and environmental impacts.
Patent Information
- Application Number
- CN202111583476.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-22
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-12-22
AI Technical Summary
Existing project site selection methods have problems such as excessive interference from human factors, insufficient data support, inaccurate site selection, lack of automation, complicated data management, and neglect of multi-regulatory controls and environmental impacts, resulting in site selection results that do not meet actual needs.
An online multi-dimensional collaborative site selection system based on CIM technology is used to conduct automated site selection through the CIM model, and deep learning and visual display technology are used to combine the client and business server to achieve site selection index strategy formulation, data screening and result verification. Consider Multi-regulatory control and environmental impacts.
It improves the accuracy and efficiency of site selection, provides intuitive graphics and text integrated display, reduces manual screening time, and enhances the accuracy of site selection results and the ability to meet actual needs.
Smart Images

Figure CN114417457B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of project planning and site selection, and in particular relates to an online multi-dimensional collaborative site selection system for planning projects based on CIM technology. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] "Multi-plan integration" means strengthening the connection of various plans such as national economic and social development planning, urban and rural planning, land use planning, environmental protection, cultural relics protection, forest and farmland protection, comprehensive transportation, water resources, cultural and ecological tourism resources, and social undertakings planning under the first-level government and first-level affairs, ensuring the consistency of important spatial parameters such as protective space, development boundaries, and urban scale determined by "multi-plans", and establishing a control line system on a unified spatial information platform to achieve the goals of optimizing spatial layout, effectively allocating land resources, and improving the government's spatial control level and governance capabilities; construction projects are the support of industries and the carrier of investment. They are the basic work to promote economic and social development and an important guarantee for achieving urban quality improvement, professional transformation, economic growth, and improvement of people's livelihood. Carrying out the preparation of "multi-plan integration" planning, forming "one blueprint" and "one plan" jointly recognized by the development and reform department, the planning department, and the land department, the ultimate goal is to accelerate and promote the rapid and efficient site selection and "landing" of construction projects.
[0004] However, for a long time, due to the different planning entities, different technical standards, compilation methods, planning periods, data formats, coordinate systems, etc., there are differences in "multiple plans", which often result in the site selection of construction projects not being able to be used directly because it does not comply with relevant plans or only complies with one plan. With the acceleration of urbanization, problems derived from "planning conflicts" are common. For example, urban planning builds shopping malls and cinemas around large real estate projects, but the site selection plots may be agricultural land rather than commercial land in land planning, resulting in the inability to build shopping malls and cinemas, resulting in insufficient supporting public service facilities and municipal facilities. At the same time, there are large differences in the area and boundaries of ecological land delineated by the city master plan and land use plan. The phenomenon of construction project site selection touching ecological land occurs from time to time, and the protection scope of ecological land lacks coordination, which affects the ecological security of the city.
[0005] The inventors found that the existing project addressing method has the following problems:
[0006] (1) Most existing project site selection methods are still in the paper stage, with many interference factors from human factors, a single analysis and comparison method for the project environment, and a lack of effective support from a large amount of data. In addition, the selected addresses are inaccurate and have large errors. In addition, traditional site selection methods cannot achieve project site selection automation;
[0007] (2) Traditional addressing methods are often carried out by multiple departments within the enterprise, which increases the difficulty of managing site selection work. These traditional drawings and documents are usually scattered among various functional departments and individuals, resulting in a large amount of data accumulation, making it difficult for drawings and documents to be effectively managed and utilized. This also makes file search and management very complicated.
[0008] (3) There are many factors that affect project site selection, but the existing site selection methods mainly focus on basic numerical information such as project type, land use nature of the proposed plot, and land area. They seriously ignore the semantic information of text data such as multi-regulatory control requirements, the impact of surrounding facilities, traffic impact, and surrounding environmental impact. As a result, the data that can be used in the project site selection process is single, and there are a large number of site selection results that cannot meet actual needs. Further manual screening is required, which is time-consuming and labor-intensive. Summary of the invention
[0009] In order to overcome the shortcomings of the above-mentioned prior art, the present invention provides an online multi-dimensional collaborative site selection system for planning projects based on CIM technology. The scheme is based on the CIM model, and adopts an automated method to perform online site selection for planning projects, and visualizes the site selection results and their surrounding environment based on CIM model data. Compared with the traditional method of manual screening based on drawings, it is more intuitive, accurate and efficient.
[0010] To achieve the above objectives, one or more embodiments of the present invention provide the following technical solutions:
[0011] A client, which is connected to a business server for communication, comprises:
[0012] The indicator editing module is used to formulate the site selection indicator strategy based on the control planning indicators to be selected by dragging the interface module;
[0013] A data acquisition module, which is used to acquire one or more filtered target addresses and their related CIM data from the business server based on a specified site selection indicator strategy;
[0014] The site selection evaluation module is used to perform visual display based on the CIM data of the target address. Based on the visual display results, the control planning indicators of the target address are checked through expert evaluation methods to determine the optimal site selection result.
[0015] Furthermore, each target address in the visual display interface is associated with its control planning indicator, realizing an integrated graphic and text display of the target address and the control planning indicator.
[0016] Furthermore, the visualization based on the target address CIM data is specifically as follows:
[0017] Load CIM data for initial display;
[0018] The position information of the mouse in the initial display interface is obtained, and a grid of a preset size is generated with the current position as the center. The scene is displayed for the nine-square grid formed by the grid and its neighboring grids, so as to realize the three-dimensional display of the current target address and its surrounding environment.
[0019] One or more embodiments provide a service server, which is connected to the client for communication, including:
[0020] A data acquisition module, which is used to acquire CIM data within a pre-selected range and receive a site selection indicator strategy issued by a client;
[0021] A multi-dimensional site selection module is used to perform step-by-step screening of target addresses from the acquired CIM data based on the control planning indicators in the site selection strategy. The screening process includes: based on the basic indicators in the control planning indicators and CIM data, an initial site selection set is determined from vacant plots by query; based on the environmental indicators in the control planning indicators, a deep learning method is used to perform secondary screening from the initial site selection set; and the secondary screening results are fed back to the client.
[0022] Furthermore, the site selection index strategy includes a number of control planning indicators arranged in order of priority, and the priority is determined by the order in which the modules are dragged during the site selection index strategy formulation process.
[0023] Furthermore, the basic indicators include but are not limited to quantified numerical information on project type, land use nature and land area, and the environmental indicators include but are not limited to textual description information on surrounding facility impact, traffic impact and surrounding environmental impact.
[0024] Furthermore, the environmental indicators are obtained by:
[0025] By means of web crawlers, we can obtain the public evaluation information on different environmental indicators around the target address;
[0026] The principal component analysis method is used to determine the key components from the crawled evaluation information;
[0027] These key components were considered as candidate environmental indicators.
[0028] Furthermore, the deep learning method is used to perform secondary screening from the initial site selection set, specifically:
[0029] Based on the initial site selection set, the environmental evaluation text of each candidate address is obtained by means of a web crawler, and feature extraction is performed based on a pre-trained neural network model to obtain features of the environmental evaluation text;
[0030] Based on the pre-set environmental indicators, the text semantic features are extracted through the pre-trained neural network model to obtain the environmental indicator features;
[0031] Based on the similarity calculation between the environmental indicator features and the environmental evaluation text features, one or more secondary screening results are determined.
[0032] Furthermore, the neural network model adopts a convolutional neural network.
[0033] One or more embodiments provide an online multi-dimensional collaborative site selection system for planning projects based on CIM technology, including the above-mentioned client and business server.
[0034] Furthermore, the client is configured to be one or more and connected to the business server, and is used to obtain the site selection result from the business server and to display the site selection result in three dimensions based on the CIM data.
[0035] One or more of the above technical solutions have the following beneficial effects:
[0036] (1) The solution described in the present invention provides an online multi-dimensional collaborative site selection system for planning projects based on CIM technology. The system is based on a C / S architecture and a CIM model that integrates rich spatial data, government business data, IoT data, and data generated by the public. It uses an automated method to select sites for planning projects online, and visualizes the site selection results and their surrounding environment based on CIM model data. Compared with the traditional method of manual screening based on drawings, the system is more intuitive and has higher accuracy and efficiency.
[0037] (2) The present invention integrates the three-dimensional image of the target address area and the control planning indicators in the client, so that when multiple site selection targets are obtained, multiple site selection targets can be compared and checked in a more friendly manner to determine the optimal solution.
[0038] (3) The scheme described in the present invention fully considers the impact of text information such as multi-regulatory control requirements, surrounding facilities impact, traffic impact and surrounding environment impact on site selection needs, and adopts a deep learning-based method to extract semantic features from the relevant text information of the initial site selection results and pre-defined environmental indicators. The initial site selection result set is secondary screened based on similarity calculation, effectively screening out redundant items that do not meet actual needs, thereby further improving the site selection accuracy and efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0040] Figure 1 This is a structural diagram of an online multi-dimensional collaborative site selection system for planning projects based on CIM technology as described in Example 1 of the present invention. DETAILED DESCRIPTION
[0041] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0042] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0043] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.
[0044] Embodiment 1
[0045] The purpose of this embodiment is to provide an online multi-dimensional collaborative site selection system for planning projects based on CIM technology.
[0046] like Figure 1 As shown, an online multi-dimensional collaborative site selection system for planning projects based on CIM technology includes:
[0047] The client includes:
[0048] The indicator editing module is used to formulate the site selection indicator strategy based on the control planning indicators to be selected by dragging the interface module;
[0049] A data acquisition module, which is used to acquire one or more filtered target addresses and their related CIM data from the business server based on a specified site selection indicator strategy;
[0050] The site selection evaluation module is used to visualize the CIM data of the target address. Based on the visualization results, the control planning indicators of the target address are checked by expert evaluation to determine the optimal site selection result.
[0051] A business server, comprising:
[0052] A data acquisition module, which is used to acquire CIM data within a pre-selected range and receive a site selection indicator strategy issued by a client;
[0053] A multi-dimensional site selection module, which is used to perform step-by-step screening of target addresses from the acquired CIM data based on the control planning indicators in the site selection strategy, wherein the screening process includes: determining an initial site selection set from vacant plots by querying based on the basic indicators in the control planning indicators and CIM data; performing secondary screening from the initial site selection set by deep learning based on the environmental indicators in the control planning indicators; and feeding back the secondary screening results to the client;
[0054] The client is configured to be one or more and connected to the business server, and is used to obtain the site selection result from the business server and to perform three-dimensional display of the site selection result based on CIM data.
[0055] Furthermore, each target address in the visual display interface is associated with its control planning indicator, realizing an integrated graphic and text display of the target address and the control planning indicator.
[0056] Furthermore, the visualization based on the target address CIM data is specifically as follows:
[0057] Load CIM data for initial display;
[0058] The position information of the mouse in the initial display interface is obtained, and a grid of a preset size is generated with the current position as the center. The scene is displayed for the nine-square grid formed by the grid and its neighboring grids, so as to realize the three-dimensional display of the current target address and its surrounding environment.
[0059] Specifically, the visualization display is a rough overall display of the scene; the position of the mouse in the screen is obtained, and the position of the mouse in the screen is converted into a coordinate position in the scene. Based on the position of the mouse in the scene, a grid of a set size is generated with the position as the center, and only the nine-square grid composed of the square and its neighboring squares is displayed for viewing the current plot and the surrounding three-dimensional model information. In this way, users can use the system to authorize viewing according to the radiation range of the plot, without the need for high-precision visualization of the entire scene. Each time, only the three-dimensional data and indicator information in the nine-square grid are displayed on demand, and the loading speed is fast. The user can refer to the surrounding scenes of the target address and the associated control planning indicators to verify the results of the site selection, and select the best site selection result from several site selection results through an integrated graphic and text display (mainly for some empirical control planning indicators that are not easy to quantify and express in text).
[0060] City Information Modeling (CIM) is an organic complex of three-dimensional urban spatial model and urban information based on urban information data. In terms of scope, it is an organic combination of large-scale GIS data, small-scale BIM (Building Information Modeling) data and the Internet of Things. A CIM database contains not only rich spatial data, but also business data of various government departments, IoT (Internet of Things) data and data generated by the public. Since the main focus of the site selection process for planning projects is the structure and appearance of the facilities and environment around the target address, it is not necessary to visualize all the information of the BIM model in the CIM data. In order to improve the model loading efficiency without affecting the integrity of the model, this embodiment uses a lightweight BIM engine to separate the topological structure of the BIM model and extract some data from the BIM model for display.
[0061] Specifically, the lightweight BIM engine adopts a digital-analog separation mechanism to store geometric information and non-geometric information separately. When loading, the topological structure of the BIM model is separated, the corresponding data of the basic framework structure is extracted from the BIM model, and the necessity of the component topological relationship and attributes is judged to ensure the integrity of the model loading. Separating the topological structure of the BIM model includes the following processes:
[0062] (1) Preliminary judgment of the collision relationship between two components through the directional bounding box;
[0063] (2) Based on the initial judgment result, traverse all the line segments on the edge geometry of one component and perform two-segment ray detection on all the faces of the other component. If they do not intersect, they are classified as non-intersecting; if they intersect but the distance is less than the line segment length, they are classified as non-intersecting; if they intersect and the distance is less than the line segment length, they are classified as intersecting;
[0064] (3) The two components respectively perform the intersection judgment of the boundary geometric points with the surface of the other component. If no data appears in the intersection class, it is determined that the two components do not intersect. On the contrary, if any line segment intersects with any surface, it is determined that the two objects collide.
[0065] (4) Determine whether the two components are in a containment relationship. Take all the geometric point positions of the first component as the starting point, emit rays in any direction, and monitor collision with the second component. If the number of single collisions in all collision information is an odd number, then the second component is determined to contain the first component. If the number of single collisions in all collision information is an even number, then the second component is determined not to contain the first component. If all collision information contains both even and odd numbers, then the second component is determined to partially contain the first component, and the second component and the first component collide.
[0066] Furthermore, the system also includes a CIM database server for storing three-dimensional urban spatial data, business data of various government departments, IoT data, data generated by the public, time series data, object-oriented data and related service support data;
[0067] Specifically, the CIM database includes 3D simulated real scenes and surrounding data, and real-time viewing of the distribution of surrounding population, enterprise distribution, traffic operation, etc. By inputting multiple restrictions such as project type, construction scale, site selection range, adjacent elements, avoidance elements, etc., matching and analyzing regional industry and project access policies, intelligently searching for suitable project land space, and analyzing and displaying the specific element information of each candidate space (industry access type, investment intensity, output efficiency, energy consumption standards, emission standards and other attribute information), a multi-dimensional scoring evaluation is performed on multiple recommended plans.
[0068] Furthermore, the site selection index strategy includes a number of control planning indicators arranged in order of priority, and the priority is determined by the order in which the modules are dragged during the site selection index strategy formulation process.
[0069] Furthermore, the basic indicators include but are not limited to quantified numerical information on project type, land use nature and land area, and the environmental indicators include but are not limited to textual description information on surrounding facility impact, traffic impact and surrounding environmental impact.
[0070] Furthermore, the environmental indicators are obtained by:
[0071] By means of web crawlers, we can obtain the public evaluation information on different environmental indicators around the target address;
[0072] The principal component analysis method is used to determine the key components from the crawled evaluation information;
[0073] These key components were considered as candidate environmental indicators.
[0074] Furthermore, the deep learning method is used to perform secondary screening from the initial site selection set, specifically:
[0075] Based on the initial site selection set, the environmental evaluation text of each candidate address is obtained by means of a web crawler, and feature extraction is performed based on a pre-trained neural network model to obtain features of the environmental evaluation text;
[0076] Based on the pre-set environmental indicators, the text semantic features are extracted through the pre-trained neural network model to obtain the environmental indicator features;
[0077] Based on the similarity calculation between the environmental indicator features and the environmental evaluation text features, one or more secondary screening results are determined.
[0078] Furthermore, the neural network model adopts a convolutional neural network, which extracts features from text data and obtains its text semantic information.
[0079] Furthermore, the control planning indicators may also include: project site distribution layer management, district control planning layer management, block control planning layer management, special integration layer management, urban design layer management, land use red line layer management, project annotation layer management, central area layer management, characteristic town layer management and park green map layer management, etc.
[0080] Furthermore, the system incorporates the requirements of urban design such as height, public space, corridors, and green ecology into the rigid indicators of the control plan, and automatically generates planning conditions with one click according to the type of project to be reviewed. When carrying out the preliminary planning and generation work of the project, it is possible to check whether the spatial location of the project meets the planning requirements one by one, and automatically compare the multiple rigid indicators such as volume ratio, building density, green space ratio and green ecological technical indicators in the planning conditions with the project application information to realize the intelligent review of the planning scheme. During the review process, it supports annotation of the content that does not meet the requirements, which is convenient for later management and review. In the above-mentioned various review processes, according to the review results, the review report is automatically generated, and it is connected with the green engineering construction project approval subsystem through the interface, and the review report is pushed to the approval subsystem.
[0081] At the same time, the site selection model is sorted out according to national standards, starting area standards, etc., as the basic basis for intelligent site selection. The system can automatically list all candidate plots that meet the conditions based on the project type selected by the user, the land use nature and land area of the proposed plot, and the approximate range of the project site selection set; at the same time, it can locate the specific location of each plot, view the main control planning indicators of the candidate plot, such as land use nature, land control type and other information, and assist in project planning and site selection through integrated graphic and text information viewing.
[0082] On the basis of simple project site selection, according to the characteristics of the regional geographical environment, comprehensive consideration of multi-regulation control requirements, surrounding facilities, traffic impact, surrounding environment impact and other factors, establish a project site selection model to provide accurate site selection for the project. Relevant managers of various departments in the starting area can input basic project information, sponsor information, construction unit information, project construction plan and other information to form a project reserve library. Connect with the planning "one blueprint" spatial information platform, provide multi-regulation compliance review, form a "project physical examination report", and assist business personnel in judging the compliance of the project based on the results of multi-regulation.
[0083] Embodiment 2
[0084] The purpose of this embodiment is to provide a client.
[0085] A client, which is connected to a business server for communication, comprises:
[0086] The indicator editing module is used to formulate the site selection indicator strategy based on the control planning indicators to be selected by dragging the interface module;
[0087] A data acquisition module, which is used to acquire one or more filtered target addresses and their related CIM data from the business server based on a specified site selection indicator strategy;
[0088] The site selection evaluation module is used to perform visual display based on the CIM data of the target address. Based on the visual display results, the control planning indicators of the target address are checked through expert evaluation methods to determine the optimal site selection result.
[0089] Furthermore, each target address in the visual display interface is associated with its control planning indicator, realizing an integrated graphic and text display of the target address and the control planning indicator.
[0090] Furthermore, the visualization based on the target address CIM data is specifically as follows:
[0091] Load CIM data for initial display;
[0092] The position information of the mouse in the initial display interface is obtained, and a grid of a preset size is generated with the current position as the center. The scene is displayed for the nine-square grid formed by the grid and its neighboring grids, so as to realize the three-dimensional display of the current target address and its surrounding environment.
[0093] Embodiment 3
[0094] The purpose of this embodiment is to provide a service server.
[0095] A business server, which is connected to the client for communication, comprises:
[0096] A data acquisition module, which is used to acquire CIM data within a pre-selected range and receive a site selection indicator strategy issued by a client;
[0097] A multi-dimensional site selection module is used to perform step-by-step screening of target addresses from the acquired CIM data based on the control planning indicators in the site selection strategy. The screening process includes: based on the basic indicators in the control planning indicators and CIM data, an initial site selection set is determined from vacant plots by query; based on the environmental indicators in the control planning indicators, a deep learning method is used to perform secondary screening from the initial site selection set; and the secondary screening results are fed back to the client.
[0098] Furthermore, the site selection index strategy includes a number of control planning indicators arranged in order of priority, and the priority is determined by the order in which the modules are dragged during the site selection index strategy formulation process.
[0099] Furthermore, the basic indicators include but are not limited to quantified numerical information on project type, land use nature and land area, and the environmental indicators include but are not limited to textual description information on surrounding facility impact, traffic impact and surrounding environmental impact.
[0100] Furthermore, the environmental indicators are obtained by:
[0101] By means of web crawlers, we can obtain the public evaluation information on different environmental indicators around the target address;
[0102] The principal component analysis method is used to determine the key components from the crawled evaluation information;
[0103] These key components were considered as candidate environmental indicators.
[0104] Furthermore, the deep learning method is used to perform secondary screening from the initial site selection set, specifically:
[0105] Based on the initial site selection set, the environmental evaluation text of each candidate address is obtained by means of a web crawler, and feature extraction is performed based on a pre-trained neural network model to obtain features of the environmental evaluation text;
[0106] Based on the pre-set environmental indicators, the text semantic features are extracted through the pre-trained neural network model to obtain the environmental indicator features;
[0107] Based on the similarity calculation between the environmental indicator features and the environmental evaluation text features, one or more secondary screening results are determined.
[0108] Furthermore, the neural network model adopts a convolutional neural network, and the convolutional neural network is used to extract features from text data to obtain its text semantic information.
[0109] Those skilled in the art should understand that the modules or steps of the present invention described above can be implemented by a general-purpose computer device, or alternatively, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. The present invention is not limited to any specific combination of hardware and software.
[0110] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. An online multi-dimensional collaborative site selection system for planning projects based on CIM technology. It is characterized in that include: A business server, which is connected to a client for communication, comprises: A data acquisition module, which is used to acquire CIM data within a pre-selected range and receive a site selection indicator strategy issued by a client; The multi-dimensional site selection module is used to perform step-by-step screening of target addresses from the acquired CIM data based on the control planning indicators in the site selection indicator strategy. The screening process includes: determining the initial site selection set from the vacant plots by querying based on the basic indicators in the control planning indicators and the CIM data; performing secondary screening from the initial site selection set by deep learning based on the environmental indicators in the control planning indicators; and feeding back the secondary screening results to the client; wherein the secondary screening from the initial site selection set by deep learning is specifically as follows: Based on the initial site selection set, the environmental evaluation text of each candidate address is obtained by means of a web crawler, and feature extraction is performed based on a pre-trained neural network model to obtain features of the environmental evaluation text; Based on the pre-set environmental indicators, the text semantic features are extracted through the pre-trained neural network model to obtain the environmental indicator features; Determine one or more secondary screening results based on similarity calculation between environmental indicator features and environmental assessment text features; The client, which is in communication connection with the business server, includes: The indicator editing module is used to formulate the site selection indicator strategy based on the control planning indicators to be selected by dragging the interface module; A data acquisition module, which is used to acquire one or more filtered target addresses and their related CIM data from the business server based on a specified site selection indicator strategy; The site selection evaluation module is used to perform visual display based on the CIM data of the target address. Based on the visual display results, the control planning indicators of the target address are checked through expert evaluation methods to determine the optimal site selection result.
2. An online multi-dimensional collaborative site selection system for planning projects based on CIM technology as claimed in claim 1, It is characterized in that The site selection index strategy includes a number of control planning indicators arranged in order of priority, and the priority is determined by the order in which the modules are dragged during the site selection index strategy formulation process.
3. The online multi-dimensional collaborative site selection system for planning projects based on CIM technology as claimed in claim 1, It is characterized in that The basic indicators include quantified numerical information on project type, land use nature and land area, and the environmental indicators include textual description information on surrounding facility impact, traffic impact and surrounding environmental impact.
4. The online multi-dimensional collaborative site selection system for planning projects based on CIM technology as claimed in claim 3, It is characterized in that The acquisition of the environmental indicators is specifically as follows: By means of web crawlers, we can obtain the public evaluation information on different environmental indicators around the target address; The principal component analysis method is used to determine the key components from the crawled evaluation information; These key components were considered as candidate environmental indicators.
5. The online multi-dimensional collaborative site selection system for planning projects based on CIM technology as claimed in claim 1, It is characterized in that Each target address in the visual display interface is associated with its control planning indicator, realizing an integrated graphic and text display of the target address and control planning indicator.
6. The online multi-dimensional collaborative site selection system for planning projects based on CIM technology as claimed in claim 1, It is characterized in that The visualization based on the target address CIM data is specifically as follows: Load CIM data for initial display; The position information of the mouse in the initial display interface is obtained, and a grid of a preset size is generated with the current position as the center. The scene is displayed for the nine-square grid formed by the grid and its neighboring grids, so as to realize the three-dimensional display of the current target address and its surrounding environment.
7. The online multi-dimensional collaborative site selection system for planning projects based on CIM technology as claimed in claim 1, It is characterized in that The client is configured to be one or more and connected to the business server, and is used to obtain the site selection result from the business server and to perform three-dimensional display of the site selection result based on CIM data.