A method for extracting and depressurizing gas by ground drilling
By laying arrays of ground drilling in the coal mining area and adjusting the extraction negative pressure in real time, the problems of low ground drilling extraction efficiency and safety hazards in the existing technology have been solved, and the wellbore stability and extraction efficiency have been improved, reducing the Energy consumption.
Patent Information
- Application Number
- CN202210064803.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-24
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-01-24
AI Technical Summary
There is a lack of implementation plans in the gas extraction process of existing ground drilling and drilling technology, which leads to inefficiency and safety hazards, and it is difficult to effectively regulate the extraction negative pressure, affecting the gas extraction effect.
Arrays of ground drilling along the direction of the mining working surface are arranged, including skewed air tunnels and machine tunnels, and real-time negative pressure regulation is carried out through gas extraction pipes, and the extraction equipment is adjusted according to the propulsion distance of the working surface, gas extraction concentration and flow rate to ensure the well body Stability and extraction efficiency.
Improve the wellbore stability and extraction efficiency of ground drilling, extend the effective extraction time, reduce the required number of ground drilling, improve the operating efficiency, and realize safe and effective regulation of extraction negative pressure, reducing energy Consumption.
Smart Images

Figure CN114458373B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mining, and in particular relates to a method for extracting and depressurizing gas by ground drilling. Background Art
[0002] Gas prevention and control has always been the focus of coal mine safety work, and the most widely used and effective gas prevention and control technology is gas extraction. Therefore, coalbed methane extraction projects are regarded as life projects and resource projects.
[0003] Coalbed methane extraction can be divided into three categories: underground coal mine, surface and combined surface and underground extraction. Because surface extraction and coal seam mining have fewer constraints on each other, surface coalbed methane extraction technology and combined surface and underground extraction technology have developed rapidly in the past two decades.
[0004] On the other hand, according to the time relationship with the coal production in the mine, the surface extraction technology of coalbed methane can be divided into extraction before mining, extraction during mining and extraction after mining. After the coal seam is mined, a goaf is formed behind the mining face, and a pressure relief space is formed in the goaf. The cracks generated by the pressure relief effect form "three horizontal zones" and "three vertical zones" in the horizontal and vertical directions, namely the coal wall support influence zone, the separation zone, the re-compaction zone, the caving zone, the fracture zone and the curved sinking zone. With the advancement of the working face, the "three horizontal zones" and "three vertical zones" will also undergo dynamic changes, which has an important impact on the gas outburst of the coal seam and the adjacent coal seams. Extraction during mining is extraction in the mining area. With the operation of the ground coalbed methane drilling, the decompression coalbed methane extraction of the mined coal seam and the coal seam within the influence range is realized, and then the coalbed methane in the goaf just formed behind the working face is extracted, thereby effectively reducing the gas outburst of the working face and achieving a better extraction effect.
[0005] The industry standard provides some guiding ideas for the design basis, requirements, extraction effect evaluation and safety protection direction of ground drilling. In view of the lack of specific implementation plans for the field application of this standard, the present invention, based on continuous innovative research and experiments, provides a technical solution for ground drilling extraction and decompression gas with good feasibility and strong versatility.
[0006] Therefore, it is necessary to provide an improved technical solution to address the above-mentioned deficiencies in the prior art. Summary of the invention
[0007] The purpose of the present invention is to provide a method for extracting and depressurizing gas by ground drilling to solve the deficiencies in the prior art.
[0008] In order to achieve the above object, the present invention provides the following technical solutions:
[0009] A method for extracting pressure-relief gas by ground drilling comprises the following steps:
[0010] Step S1, based on the boundary of the coal seam goaf, arrange a group of ground drilling wells along the direction of the mining face, wherein the ground drilling wells are staggered with ventilation lanes and machine lanes;
[0011] Step S2, performing ground drilling construction before mining;
[0012] Step S3, lowering a gas extraction pipe into the ground well, and when the mining reaches a certain distance from the ground well, extracting gas from the section between the rock section and the coal seam roof;
[0013] Step S4, adjusting the extraction negative pressure of the gas extraction equipment in real time according to the working face advancement distance, gas extraction concentration, coal seam goaf gas extraction flow rate, and total gas flow rate.
[0014] In the above-mentioned method for extracting depressurized gas by surface drilling, preferably, in step S1, each group of surface drillings has two wells, and they are spaced apart in a direction perpendicular to the direction of the working face;
[0015] The distance between each group of ground drilling wells and the ventilation lane and machine lane is 30-70m;
[0016] The interval between the two surface drilling wells in each group of surface drilling wells is 80-150m.
[0017] In the above-mentioned method of extracting gas by ground drilling, preferably, in step S1, the distance between each group of ground drillings and the air lane and the machine lane is 50m; the distance between two ground drillings in each group is 100m;
[0018] Along the direction of the working face, the lateral distance between the first and second groups of ground drilling wells is 100m, and the lateral distance between the other two adjacent groups of ground drilling wells is 150m; in the last group of ground drilling wells, the ground drilling wells close to the return air channel are less than or equal to 150m away from the stop production line, and the ground drilling wells close to the intake air channel are less than or equal to 100m away from the stop production line.
[0019] In the above-mentioned method for extracting depressurized gas by surface drilling, preferably, in step S2, the surface drilling includes a surface layer section, a rock layer section and a depressurization extraction section from top to bottom, and the depressurization extraction section is a section extending from the bottom end of the rock layer section through the depressurized coal seam to a certain height from the top plate of the mined coal seam;
[0020] The diameters of the surface section, rock section and pressure relief extraction section decrease successively. The surface section is from the ground to the bedrock layer, the rock section extends downward from the bedrock layer to 20 to 100 m above the top of the pressure relief coal seam, and the bottom end of the pressure relief extraction section is 5 to 7 times the mining height of the top of the mined coal seam and more than 10 m away from the top of the mined coal seam.
[0021] In the above-mentioned method for extracting depressurized gas by drilling on the ground, preferably, in step S3, before lowering the gas extraction pipe into the ground well, firstly, casing is lowered into both the surface section and the rock section and cemented with cement, and the depressurized extraction section is not cemented; a displacement buffer spacing is left between the gas extraction pipe and the casing and the well wall of the depressurized extraction section;
[0022] The gas extraction pipe is a whole pipe, which runs through the entire wellbore of the ground drilling. The whole pipe includes a screen pipe and a solid pipe. The screen pipe and the solid pipe have the same diameter.
[0023] The portion of the gas extraction pipe that passes through the pressure-relieved coal seam is the screen pipe, and the screen pipe is wound with metal wires, and the spacing between the metal wires is 0.5mm-2mm.
[0024] In the method of extracting and depressurizing gas by surface drilling as described above, preferably, the surface drilling is any one of a vertical well, a directional well, an inclined vertical well, and a horizontal well.
[0025] In the method of extracting and depressurizing gas by surface drilling as described above, preferably, the surface drilling well is an inclined vertical well with a diameter of 219 mm.
[0026] In the method of extracting and depressurizing gas by ground drilling as described above, preferably, in step S3, extraction begins when the working face is extracted to a position 5-10m above the borehole, and the negative pressure value at the initial stage of ground drilling extraction is between the upper and lower limit values of the negative pressure of the entire extraction process.
[0027] In the above-mentioned method for extracting depressurized gas by drilling on the ground, preferably, in the initial stage of extraction by drilling on the ground, the gas is extracted at a constant negative pressure value;
[0028] The ratios Q / C and q / C of the total gas flow Q and the gas extraction flow q in the coal seam goaf to the numerator of the surface drilling gas extraction concentration C% are calculated in real time. When Q / C and q / C are both in the stable fluctuation range [a, b] within the duration T, and the working face advancement distance S is greater than the set value L, it is determined that the initial stage of surface drilling extraction ends and enters the attenuation stage.
[0029] During the attenuation stage, the extraction negative pressure decreases as the surface drilling gas extraction concentration C% decreases until it reaches the negative pressure limit value.
[0030] In the method of ground drilling extraction and depressurization gas as described above, preferably, step S5 is also included. When the extraction negative pressure in the attenuation stage is at the negative pressure limit value, if Q, q, and C% are all lower than the set values, and the working face advances more than 250m, the extraction is stopped, the gas extraction equipment is dismantled, and the well is sealed.
[0031] Beneficial effects: The extraction method of the present invention has a clear and operable implementation reference for field operations. It has strong wellbore stability and can greatly extend the effective extraction time of ground drilling. It has a higher extraction rate than vertical wells, requires fewer ground drilling wells, and improves operation efficiency. At the same time, its drilling difficulty is lower than that of directional wells and horizontal wells, making it easier to implement. At the same time, it proposes the regulation of extraction negative pressure, making extraction safe and effective, and saving unnecessary energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. Among them:
[0033] Figure 1 It is a schematic diagram of the geological structure of the mining area of the present invention;
[0034] Figure 2 It is a schematic overview of ground drilling arrangement in one embodiment of the present invention;
[0035] Figure 3 is a schematic cross-sectional structure diagram of a ground drilling well in one embodiment of the present invention;
[0036] Figure 4 It is a schematic diagram of the cross-sectional structure when the ground drilling adopts an inclined vertical well in one embodiment of the present invention;
[0037] Figure 5 It is a schematic diagram of ground drilling arrangement in one embodiment of the present invention;
[0038] Figure 6 It is a statistical diagram of changes in gas concentration during a surface drilling extraction process in one embodiment of the present invention;
[0039] Figure 7 It is a statistical diagram of changes in gas extraction volume during a surface drilling extraction process in one embodiment of the present invention;
[0040] Figure 8 yes Figure 6 The relationship between the surface drilling gas extraction flow rate and concentration as the working face advances;
[0041] Fig. 9 This is another relationship diagram of the surface drilling gas extraction flow rate and concentration as the working face advances in an embodiment of the present invention.
[0042] The names corresponding to the reference numerals in the figure are: 7-ground drilling; 71-1#ground drilling; 72-2#ground drilling; 73-3#ground drilling; 74-4#ground drilling; 75-5#ground drilling; 76-6#ground drilling; 77-7#ground drilling; 78-(N-3)#ground drilling; 79-(N-2)#ground drilling; 710-(N-1)#ground drilling; 711-N#ground drilling; 81-ground surface; 82-2#coal seam; 83-3#coal seam; 84-5# and 6# coal seams; 841-5# coal seam; 842-6# coal seam; 85-7# first mining coal seam; 86-8# coal seam; 87-bent sinking zone; 88-fracture zone; 89-caving zone; 810-bottom drum crushing zone; 9-stop mining line; 101-return air lane; 102-inlet air lane; 103-working face; 111-surface section; 112-rock section; 113-pressure relief extraction section; 121-surface casing; 122-rock casing; 131-solid pipe; 132-screen pipe. DETAILED DESCRIPTION
[0043] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention belong to the scope of protection of the present invention.
[0044] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention. The terms "connected" and "connected" used in the present invention should be understood in a broad sense. For example, they can be fixedly connected or detachably connected; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0045] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.
[0046] The present invention is based on the change law of the mining area before and after mining, so as to construct a ground well in the area to realize negative pressure extraction of coalbed methane. Figure 1As shown in the figure, specifically, the mining area is affected by the leading support force and lagging support force of the working face, the pressure in front of the working face increases and the pressure in the back decreases. Under the action of its own weight, the top rock layer above the goaf bends, breaks, breaks into pieces and falls, and accumulates irregularly in the goaf, forming a falling zone 89, whose height is usually 3 to 5 times the mined thickness. The falling rock blocks have certain fragmentation and expansion, and the space between the rock blocks is large, which provides a good channel for the flow of gas. However, the rock layer above the falling zone 89 will produce greater bending, deformation and damage due to the lack of support from the top rock layer. Delamination cracks along the bedding plane of the rock layer and broken cracks perpendicular to the bedding plane appear in the rock mass, forming a fracture zone 88, whose height is generally 10 to 30 times the mining height. The mutual penetration of some interlayer broken cracks provides a flow channel for the gas in the adjacent layer in the fracture zone to flow into the goaf. The coal-rock layer far away from the mining layer and located above the fracture zone 88 is relatively less affected by mining, and the rock layer does not break, and vertical fractures that penetrate the rock layer cannot be formed, but larger separation fractures can be generated. The separation fractures formed near the overlying long-distance coal seam in the curved sinking zone 87 become the main channels for the accumulation and circulation of decompression gas in the coal seam.
[0047] When the coal seam is depressurized, the deformation, rupture and increase of the fissures in the coal body will greatly increase the permeability of the coal rock mass, produce the depressurization and permeability enhancement effect, form gas flow conditions, highly develop the fissures, and release a large amount of gas. Due to the different distribution of coal rock fissures in different areas, the gas analysis and flow conditions are different. The ground drilling gas extraction system can realize the desorbed gas flowing along the depressurization fissures through the ground drilling extraction negative pressure, and merge into the extraction ground drilling, which greatly reduces the gas content of the depressurized coal seam. At the same time, it eliminates the danger of depressurized coal seams and gas outbursts, and reduces the amount of gas gushing into the wind flow of the working face, thereby creating the necessary conditions for the safe and efficient mining of the depressurized coal seam.
[0048] Based on the above analysis, the present invention provides a method for extracting gas by ground drilling, which comprises the following steps:
[0049] Step S1, determining the boundary of the coal seam goaf area on the ground, arranging a plurality of ground drilling wells 7 along the working face, and staggering the ventilation lanes and machine lanes in the ground drilling wells;
[0050] Step S2, before the working face is mined, ground drilling 7 is carried out;
[0051] Step S3, firstly lowering a gas extraction pipe into the ground well, then installing a gas extraction device including a vacuum pump on the ground well, and when mining reaches a certain distance from the ground well, extracting gas from the section between the rock section 112 and the coal seam roof;
[0052] Step S4, adjusting the extraction negative pressure of the gas extraction equipment in real time according to the advancement distance of the working face 103, the gas extraction concentration, the gas extraction flow rate in the coal seam goaf, and the total gas flow rate.
[0053] The drilling distribution design of this scheme has a balanced distribution. After implementation and verification in the test area, both the surface drilling for ground extraction close to the return air channel 101 and the surface drilling for ground extraction close to the air intake channel 102 can extract the pressure relief gas more stably during the period of use. It has good feasibility and strong versatility.
[0054] like Figure 2 , 5 As shown, in step S1, each group of surface drilling wells 7 has two, and are spaced apart in a direction perpendicular to the direction of the working face. The spacing between each group of surface drilling wells 7 and the air lane and the machine lane is 30-70m (for example: 30m, 35m, 40m, 45m, 50m, 60m, 65m or 70m); the spacing between the two surface drilling wells in each group of surface drilling wells is 80-150m (for example: 80m, 85m, 90m, 95m, 100m, 105m, 110m, 115m, 120m, 125m, 130m, 135m, 140m, 145m or 150m).
[0055] In an optional embodiment of the present invention, Figure 2 As shown, in step S1, along the working face 103, the lateral distance between the first and second groups of ground drilling wells is 100m, and the lateral distance between the remaining two adjacent groups of ground drilling wells is 150m; in the last group of ground drilling wells, the ground drilling wells close to the return air lane are less than or equal to 150m away from the stop production line 9, and the ground drilling wells close to the intake air lane 102 are less than or equal to 100m away from the stop production line 9.
[0056] In another optional embodiment of the present invention, Figure 5 As shown, in step S1, in order to avoid factors such as unstable pressure in the early stage of mining, along the direction of the working face, the ground drilling spacing between the 1# ground drilling well in the 1st group of ground drilling wells and the 3# ground drilling well in the second group of ground drilling wells is 100m, and the lateral spacing between the remaining adjacent ground drilling wells is 150m.
[0057] In another optional embodiment of the present invention, Figure 3 As shown, in step S2, the ground drilling includes a surface section 111, a rock section 112 and a pressure relief extraction section 113 from top to bottom. The pressure relief extraction section 113 extends from the bottom end of the rock section 112 through the pressure relief coal seam to a section at a certain height from the top plate of the mined coal seam.
[0058] The diameters of the surface section 111, the rock section 112 and the pressure relief extraction section 113 decrease successively, and the diameters of the surface section 111, the rock section 112 and the pressure relief extraction section 113 are 273 mm, 219.5 mm and 177 mm respectively.
[0059] The surface section 111 is from the ground to the bedrock layer, the rock layer section extends downward from the bedrock layer to 20 to 100 m (for example: 20m, 30m, 40m, 50m, 60m, 70m, 80m, 90m or 100m) above the top of the unloaded coal seam, and the bottom end of the unloaded coal seam section is 5 to 7 times the mining height of the top of the mined coal seam and more than 10m away from the top of the mined coal seam (for example: 10m, 11m, 12m, 13m, 14m, 15m, 16m, 17m, 18m, 19m, 20m, 25m, 30m, 35m or 40m).
[0060] In an optional embodiment of the present invention, Figure 3 As shown, in step S3, before the gas extraction pipe is lowered into the ground well, casing is firstly lowered into both the surface section 111 and the rock section 112 and cemented with cement to reinforce the wellbore and prevent water, coal slag and sand from flowing into the well to affect the gas extraction effect. The pressure relief extraction section is not cemented. The casing includes a surface casing 121 and a rock casing 122.
[0061] A buffer space is left between the gas extraction pipe and the casing and the well wall of the pressure relief extraction section to allow for displacement.
[0062] The gas extraction pipe is a whole pipe that runs through the entire wellbore of the ground drilling. The whole pipe includes a screen pipe 132 and a solid pipe 131. The diameters of the screen pipe 132 and the solid pipe 131 are the same. The part of the gas extraction pipe that passes through the pressure-relieved coal seam is the screen pipe 131, and the screen pipe 132 is treated with casing strengthening technology.
[0063] The casing strengthening technology is: the screen tube 132 is wrapped with metal wires, and the metal wire spacing is 0.5mm-2mm (for example: 0.5mm, 0.6mm, 0.7mm, 0.9mm, 1.1mm, 1.3mm, 1.5mm, 1.6mm, 1.7mm, 1.8mm or 2.0mm). Preferably, the metal wire spacing is 0.8mm-1.2mm; most preferably, the metal wire spacing is 1mm.
[0064] In an optional embodiment of the present invention, the ground drilling is any one of a vertical well, a directional well, an inclined vertical well, and a horizontal well.
[0065] In a preferred embodiment of the present invention, in view of the problems existing in the current domestic vertical ground drilling, the ground drilling uses an inclined vertical well with a diameter of 219 mm. Figure 4As shown, based on the existing wellbore structure, the above-mentioned structural setting makes the wellbore more stable, can greatly extend the effective extraction time of ground drilling, has a higher extraction rate than vertical wells, requires fewer ground drilling wells, and improves operating efficiency; at the same time, its drilling difficulty is lower than that of directional wells and horizontal wells, and is easy to implement.
[0066] In an optional embodiment of the present invention, in step S3, when the working face 103 is mined to 5-10m (e.g., 5m, 5.5m, 6m, 6.5m, 7m, 7.5m, 8m, 8.5m, 9m, 9.5m or 10m) from the surface position of the ground drilling, the negative pressure value at the initial stage of ground drilling extraction is between the upper and lower limits of the negative pressure of the entire extraction process. Generally, the design of ground drilling extraction negative pressure shall not be less than 30kPa (e.g., 30kPa, 31kPa, 32kPa, 35kPa, 38kPa, 40kPa, 42kPa, 45kPa, 48kPa, 50kPa, 55kPa, 60kPa, 65kPa or 70kPa). Considering the extraction safety and extraction effect, it is better to take one of the middle values to ensure that the gas extraction volume can reach a stable state as soon as possible.
[0067] In an optional embodiment of the present invention, in step S3, at the initial stage of ground drilling extraction, gas is extracted at a constant negative pressure value; the ratios Q / C and q / C of the total gas flow Q and the gas extraction flow q of the coal seam goaf to the numerator of the ground drilling gas extraction concentration C% are calculated in real time. When Q / C and q / C are both in the stable fluctuation range [a, b] within the duration T, and the working face advancement distance S is greater than the set value L, it is determined that the initial stage of ground drilling extraction ends and enters the decay stage; in the decay stage, the extraction negative pressure decreases with the decrease of the ground drilling gas extraction concentration C% until the negative pressure limit value. In the decay stage, the jump fluctuations of Q, C, and q end. According to the test results, the above parameters all enter a stable decay period, which basically conforms to the parabolic decline stage. At this time, the power of the vacuum pump can be effectively and safely adjusted, that is, the negative pressure is adjusted. In the decay stage, the extraction negative pressure decreases with the decrease of the ground drilling gas extraction concentration C% until the negative pressure limit value. Accurately and effectively identifying the initial stage and the attenuation stage can not only limit the negative pressure to the safe value, but also ensure the extraction efficiency and save energy.
[0068] In an optional embodiment of the present invention, the method for extracting and depressurizing gas by ground drilling also includes step S5. When the extraction negative pressure in the attenuation stage is at the negative pressure limit value, if Q, q, and C% are all lower than the set values, and the working face advances more than 250m, the extraction is stopped, the gas extraction equipment is disassembled, and the well is sealed, so as to timely recover the equipment and restore the working face.
[0069] The Wulan Coal Mine was used as a test area to verify the implementation effect of the present invention. According to the research results of the project "Key technologies for mining protective layers and ground drilling to extract and decompress gas in high-gas outburst coal seams in the west", it can be seen that 20% of the extraction volume of ground drilling in the Wulan Coal Mine comes from the protective layer goaf, and the remaining 80% of the extraction volume is decompressed gas from the 2# and 3# coal seams. Therefore, the total gas extraction volume of ground drilling should be about 50 m³ / min to solve the problem of gas outburst in the protective layer working face.
[0070] During the advancement of the Ⅱ020703 working face, the surface drilling extracted a total of 1747.68 × 104m gas. 3 , 349.54×104m3 of gas was extracted from the goaf of the 7# coal seam 3 The maximum gas extraction volume of a single well reached 296.09 × 104m 3 , the maximum extraction concentration is 90%, and the average extraction concentration is 61.5% (such as Figure 6 The total extraction rate is maintained at about 50 m³ / min, and the gas extraction rate in the goaf of the 7# coal seam is maintained at about 10 m³ / min (as shown in Figure 7 As shown in the figure, in some areas with large gas emission, when the overall gas emission of the working face exceeded 100 m³ / min, the surface drilling extraction volume exceeded 60 m³ / min. The extraction method of this scheme well shared the gas emission control work during the mining period of the Ⅱ020703 working face.
[0071] In addition, two more surface wells were taken to verify the feasibility of the above negative pressure regulation. During the mining period of the Ⅱ020703 working face, 35# and 36# surface wells were opened for single well extraction, which was well verified.
[0072] The 35# surface drilling started to extract gas when it was pushed 4.4m from the Ⅱ020703 working face 103. When the working face 103 was pushed 250m beyond the surface drilling, the extraction was stopped. The surface drilling was operated for 78 days, and the extraction negative pressure was about 30kPa. A total of 147.17 × 104m of gas was extracted. 3 , 7# coal seam goaf area 29.43×104m 3 The maximum gas extraction concentration is 90%, and the average extraction gas concentration is 61.7%. During the mining period, the gas concentration and flow rate of the 35# ground drilling well changed as follows: Figure 8 shown.
[0073] When the Ⅱ020703 working face 103 was pushed past 50m, the extraction volume reached the maximum. As the working face continued to advance, the extraction volume tended to decrease gradually, but it was maintained at 15-25m³ / min. As the working face continued to advance, 35 #After the surface drilling was pushed past 150m from the working face, the extraction rate gradually decreased to below 15m³ / min. Finally, as the working face continued to advance, 35 # The ground drilling did not decay until the working face advanced more than 250m, and the gas was basically unextractable.
[0074] 36 # The ground drilling began to investigate the gas extraction situation when the working face was 9.8m away from the well. The gas extraction volume in the ground drilling reached 22m³ / min. When the working face 103 was pushed past a position of about 50m, the extraction volume reached the maximum. As the working face continued to advance, the extraction volume tended to decrease gradually, but it was maintained at 15-25m³ / min. As the working face continued to advance, 36 # After the surface drilling was pushed past 150m from the working face, the extraction rate gradually decreased to 15m³ / min. Finally, as the working face 103 continued to advance, 36 # When the surface drilling is advanced to more than 262m, the conditions for stopping extraction are reached and the gas is attenuated to the point where basically no gas can be extracted. # The surface drilling work lasted for 73 days, the negative pressure of extraction was about 30 kPa, and a total of 120.03 × 10 4 m 3 , 7 # Coal seam goaf 24×10 4 m 3 The maximum gas extraction concentration was 90%, and the average gas extraction concentration was 64.5%. # The changes in gas concentration and flow rate during surface drilling extraction are as follows: Fig. 9 shown.
[0075] The test data show that: (1) After each surface well is pushed forward more than 50m in the working face 103, the extraction effect reaches the best, and then the gas extraction volume has a gradual downward trend, but is maintained at 15-25m³ / min. (2) In terms of tendency, when two surface wells in each row are pushed forward within the range of 50m-150m in the working face, the overall extraction volume is maintained at about 50m³ / min, solving the 7 # The gas in the coal seam goaf is about 10m³ / min. (3) After the working face is pushed past about 150m, the extraction volume drops to below 15m³ / min. Finally, as the working face continues to advance, the surface drilling extraction volume decreases to the point where basically no gas can be extracted after the working face is pushed past 250m, and the surface drilling stops working at this time.
[0076] It should be understood that the above description is merely exemplary and the embodiments of the present application do not limit this.
[0077] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are within the scope of protection of the pending claims of the present invention.
Claims
1. A method for extracting pressure-relieved gas by ground drilling, characterized in that: The following steps are involved: Step S1, based on the boundary of the coal seam goaf, arrange a group of ground drilling wells along the direction of the mining face, wherein the ground drilling wells are staggered with ventilation lanes and machine lanes; Step S2, performing ground drilling construction before mining; Step S3, lowering a gas extraction pipe into the ground well, and when the mining reaches a certain distance from the ground well, extracting gas from the section between the rock section and the coal seam roof; Step S4, adjusting the negative pressure of the gas extraction equipment in real time according to the working face advancement distance, gas extraction concentration, gas extraction flow rate in the coal seam goaf, and the total gas flow rate; In step S1, each group of surface drilling wells has two wells, which are spaced apart in a direction perpendicular to the direction of the working face; The distance between each group of ground drilling wells and the ventilation lane and machine lane is 30-70m; The interval between the two surface wells in each group of surface wells is 80-150m; In step S1, the distance between each group of surface drilling wells and the ventilation lane and machine lane is 50m; the distance between two surface drilling wells in each group is 100m; Along the working face, the horizontal distance between the first and second groups of ground drilling wells is 100m, and the horizontal distance between the other two adjacent groups of ground drilling wells is 150m; in the last group of ground drilling wells, the ground drilling wells close to the return air lane are less than or equal to 150m away from the stop production line, and the ground drilling wells close to the intake air lane are less than or equal to 100m away from the stop production line; In step S2, the ground drilling includes a surface section, a rock section and a pressure relief extraction section from top to bottom, wherein the pressure relief extraction section extends from the bottom of the rock section through the pressure relief coal seam to a section at a certain height from the top plate of the mined coal seam; The diameters of the surface section, rock section and pressure relief extraction section decrease in sequence. The surface section is from the ground to the bedrock layer, the rock section is from the bedrock layer downward to 20 to 100 m above the top of the pressure relief coal seam, and the bottom of the pressure relief extraction section is 5 to 7 times the mining height of the top of the mined coal seam and more than 10 m away from the top of the mined coal seam. In the step S3, before the gas extraction pipe is lowered into the ground well, casing is firstly lowered into the surface section and the rock section and cemented with cement, and the pressure relief extraction section is not cemented; a displacement buffer spacing is left between the gas extraction pipe and the casing and the well wall of the pressure relief extraction section; The gas extraction pipe is a whole pipe, which runs through the entire wellbore of the ground drilling. The whole pipe includes a screen pipe and a solid pipe. The screen pipe and the solid pipe have the same diameter. The portion of the gas extraction pipe that passes through the pressure-relieved coal seam is the screen pipe, and the screen pipe is wound with metal wires, and the spacing between the metal wires is 0.5mm-2mm.
2. The method for extracting pressure-relieved gas by ground drilling according to claim 1, characterized in that: The surface drilling well is any one of a vertical well, a directional well, an inclined vertical well, and a horizontal well.
3. The method for extracting pressure-relieved gas by ground drilling according to claim 2, characterized in that: The ground drilling well is an inclined vertical well with a diameter of 219 mm.
4. The method for extracting pressure-relieved gas by ground drilling according to claim 2, characterized in that: In step S3, extraction begins when the working face is 5-10 m away from the ground position of the borehole, and the negative pressure value at the initial stage of ground drilling extraction is between the upper and lower limit values of the negative pressure in the entire extraction process.
5. The method for extracting pressure-relieved gas by ground drilling according to claim 4, characterized in that: In the initial stage of surface drilling and extraction, gas is extracted at a constant negative pressure value; The ratios Q / C and q / C of the total gas flow Q and the gas extraction flow q in the coal seam goaf to the numerator of the surface drilling gas extraction concentration C% are calculated in real time. When Q / C and q / C are both in the stable fluctuation range [a, b] within the duration T, and the working face advancement distance S is greater than the set value L, it is determined that the initial stage of surface drilling extraction ends and enters the attenuation stage. During the attenuation stage, the extraction negative pressure decreases as the surface drilling gas extraction concentration C% decreases until it reaches the negative pressure limit value.
6. The method for extracting pressure-relieved gas by ground drilling according to claim 5, characterized in that: It also includes step S5. When the extraction negative pressure in the attenuation stage is at the negative pressure limit value, if Q, q, and C% are all lower than the set values, and the working face advances more than 250m, the extraction is stopped, the gas extraction equipment is dismantled, and the well is sealed.
Citation Information
Patent Citations
Protected seam bottom plate upward comb-shaped drilled hole gas extraction method
CN102661167A
Ground and underground combined coal and coal-bed gas co-mining method for low-permeability coal bed group
CN111042791A
Method for degassing of coal seams
RU2117764C1