Double side marking system
By designing the bilateral line system, using symmetrical lines and telescopic rack assemblies, combined with roller brushes and thermal oil pipes, the existing hot -melt line equipment has low efficiency and poor heat -melting liquidity. Efficient and simple bilateral stroke operations.
Patent Information
- Application Number
- CN202210099608.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-27
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2042-01-27
AI Technical Summary
The existing hot melt marking equipment has low scribe efficiency, single-side marking, hot melt is easy to cool, poor fluidity, and complex equipment configuration and high cost.
Design a bilateral line -down system. Through two symmetrical line devices and telescopic rack assemblies, two standard lines are used to combine with rolling brushes and thermal oil pipes to ensure the insulation and liquidity of hot -melt materials.
Improve the efficiency of the line, ensure the liquidity of the hot melt, simplify the equipment structure, and reduce the construction cost and time.
Smart Images

Figure CN114481796B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of road marking, in particular to a double-side marking system. Background Art
[0002] As the social division of labor becomes more and more specialized and labor costs become higher and higher, higher requirements are put forward for road marking equipment: high marking efficiency, safety, no road closure during construction, no impact on traffic, and high integration. Traditional hand-pushed and driving road marking machines are increasingly unable to meet the needs.
[0003] The existing hot melt marking equipment on the market has many accompanying equipment, many personnel, high costs, slow construction speed, usually single-sided marking, low marking efficiency, and the hot melt entering the marking mechanism is easy to cool and has poor fluidity. Summary of the invention
[0004] The purpose of the present invention is to provide a double-sided marking system. The present invention has a scientific design, a simple structure, can mark two lines at a time, has a high marking efficiency, ensures that the hot melt entering the marking mechanism is kept warm, and keeps the hot melt fluidity good.
[0005] To achieve the above object, the present invention adopts the following technical solution:
[0006] The double-sided marking system includes two marking devices, which are symmetrically arranged on the left and right sides of the lower middle part of the marking vehicle frame through a marking device telescopic frame assembly. A roller brush assembly is arranged on the telescopic frame assembly of the marking device in front of the marking device. The marking device is connected to the hot melt kettle on the marking vehicle through a feed pipe.
[0007] The marking device comprises a marking mechanism, a marking device connecting frame and a marking device actuating air valve. The marking mechanism is connected to the marking device telescopic frame assembly through the marking device connecting frame. The marking device actuating air valve is connected to the marking mechanism or the marking device connecting frame through a fastener. The discharge end of the feeding pipe is connected to the feed end of the marking device actuating air valve. The discharge end of the marking device actuating air valve is connected to the feed end of the marking mechanism.
[0008] The telescopic frame assembly of the marking device includes a hanger assembly, an upper swing arm assembly, a swing rod assembly, a lower swing arm assembly, an upper swing arm cylinder and a lower swing arm cylinder. The hanger assembly is fixed to the frame of the marking vehicle through fasteners. The upper end of the upper swing arm assembly is hinged to the front side of the bottom of the hanger assembly, the upper end of the upper swing arm cylinder is hinged to the rear side of the bottom of the hanger assembly, the rear end of the swing rod assembly is hinged to the lower end of the upper swing arm assembly, the front end of the swing rod assembly is hinged to the upper end of the lower swing arm assembly, the lower end of the upper swing arm cylinder and the rear end of the lower swing arm cylinder are both hinged to the lower end of the upper swing arm assembly, the front end of the lower swing arm cylinder is hinged to the upper end of the lower swing arm assembly, the upper swing arm cylinder and the lower swing arm cylinder are connected to the hydraulic pump on the marking vehicle through a hydraulic oil circuit, the lower end of the lower swing arm assembly is fixedly connected to a marking device seat, and the marking mechanism is connected to the marking device seat through a marking device connecting frame.
[0009] The upper swing arm assembly comprises a left upper swing arm and a right upper swing arm which are arranged in parallel and spaced apart from each other. The upper ends of the left upper swing arm and the right upper swing arm are hinged to the front side of the bottom of the hanger assembly through a first hinge, and the rear sides of the lower parts of the left upper swing arm and the right upper swing arm are connected as a whole through an upper connecting plate; the upper end of the upper swing arm oil cylinder is hinged to the rear side of the bottom of the hanger assembly through a second hinge;
[0010] The lower swing arm assembly includes a left lower swing arm and a right lower swing arm which are arranged in parallel and spaced apart from each other. The front sides of the lower parts of the left lower swing arm and the right lower swing arm are connected as a whole through a lower connecting plate, and a marking device seat is horizontally fixedly connected to the lower ends of the left lower swing arm and the right lower swing arm.
[0011] The sway bar assembly includes two left sway bars and two right sway bars arranged in parallel, the two left sway bars are arranged at intervals up and down, the two right sway bars are arranged at intervals up and down, the left sway bar on the upper side corresponds to the right sway bar on the upper side, and the left sway bar on the lower side corresponds to the right sway bar on the lower side;
[0012] The rear ends of a left swing rod on the upper side and a right swing rod on the upper side are rotatably connected between the lower ends of the left upper swing arm and the right upper swing arm through a first pin shaft; the front ends of a left swing rod on the upper side and a right swing rod on the upper side are rotatably connected between the upper ends of the left lower swing arm and the right lower swing arm through a second pin shaft; the rear ends of a left swing rod on the lower side and a right swing rod on the lower side are rotatably connected between the lower ends of the left upper swing arm and the right upper swing arm through a third pin shaft, and the front ends of a left swing rod on the lower side and a right swing rod on the lower side are rotatably connected between the upper ends of the left lower swing arm and the right lower swing arm through a fourth pin shaft; the first pin shaft is located in front of and above the third pin shaft, and the second pin shaft is located in front of and above the fourth pin shaft.
[0013] Two upper swing arm oil cylinders are provided, and two lower swing arm oil cylinders are provided. The lower ends of the upper swing arm oil cylinders and the rear ends of the lower swing arm oil cylinders are both rotatably connected to the third pin shaft, and the front ends of the lower swing arm oil cylinders are rotatably connected to the second pin shaft.
[0014] The roller brush assembly includes a roller brush frame, a roller brush motor, a coupling and a roller brush. The roller brush motor is fixed on the roller brush frame, and the roller brush is rotatably installed on the roller brush frame. The roller brush frame is fixed on the marking device seat and is located on the front side of the marking mechanism. The power shaft of the roller brush motor is connected to the central axis of the roller brush through a coupling transmission, and the roller brush motor is connected to the hydraulic pump on the marking vehicle through a hydraulic oil circuit.
[0015] The material delivery pipe is fixed on the marking device seat by fasteners, a heat conduction ring cavity is arranged in the pipe wall of the material delivery pipe, and a heat conduction oil pipe communicating with the heat conduction ring cavity is connected to the material delivery pipe.
[0016] Compared with the prior art, the present invention has outstanding substantial features and remarkable progress. Specifically, during the marking operation, the present invention controls the upper swing arm assembly to perform a rotational motion around the first hinge as the center according to the marking needs, thereby maximizing the movement of the lower parts of the lower swing arm assembly; at the same time, the lower end of the upper swing arm cylinder and the rear end of the lower swing arm cylinder are both rotationally connected to the lower part of the upper swing arm assembly through one end of the third pin shaft, and the front end of the lower swing arm cylinder is rotationally connected to the lower swing arm assembly through the second pin shaft. When in use, it is necessary to control the lower swing arm assembly to perform a rotational motion around the second pin shaft as the center, thereby moving the marking mechanism connected to the lower part of the lower swing arm assembly to a predetermined position, and the lower part of the roller brush is in contact with the road surface. The marking device is in contact with the vehicle, and the air valve (equivalent to a pneumatic valve) that controls the movement of the marking device moves. The feed pipe transports hot melt to the marking mechanism, and the vehicle moves forward to start the marking operation. At the same time, the roller brush motor is controlled to work, and the roller brush motor drives the central axis of the roller brush to rotate, so that the roller brush rotates to clean the road, ensuring that the road surface in front of the marking mechanism is clean. The marking mechanism evenly applies the hot melt on the road. The two marking mechanisms can work at the same time, so that two marking lines can be drawn at one time, and the marking efficiency is high. The heat transfer oil pipe injects high-temperature heat transfer oil into the heat transfer ring cavity in the pipe wall of the feed pipe, thereby heating the hot melt in the feed pipe, ensuring that the hot melt entering the marking mechanism is kept warm, and the fluidity of the hot melt remains good.
[0017] It should be noted that the swing arm assembly in the present invention is composed of four swing arms, a parallelogram composed of the upper swing arm, the lower swing arm, the upper swing arm and the lower swing arm. The lower swing arm cylinder drives a set of diagonals of the parallelogram, which makes it easier to achieve telescopic and rotational movements. In addition, the parallelogram structure is also a key factor in preventing disordered movement of components connected to the lower part of the lower swing arm assembly.
[0018] The invention has scientific design and simple structure, can mark two marking lines at one time, has high marking efficiency, ensures the heat preservation of the hot melt entering the marking mechanism, and keeps the fluidity of the hot melt good. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of the present invention.
[0020] Figure 2It is a structural schematic diagram of the telescopic frame assembly of the marking device of the present invention. DETAILED DESCRIPTION
[0021] The embodiments of the present invention are further described below with reference to the accompanying drawings.
[0022] like Figure 1 and Figure 2 As shown, the double-sided marking system includes two marking devices, which are symmetrically arranged on the left and right sides of the lower middle part of the marking vehicle frame through a marking device telescopic frame assembly. The marking device telescopic frame assembly is provided with a roller brush assembly located on the front side of the marking device, and the marking device is connected to the hot melt kettle on the marking vehicle through a feed pipe 12.
[0023] The marking device includes a marking mechanism 1, a marking device connecting frame 2 and a marking device actuating air valve 3. The marking mechanism 1 is connected to the marking device telescopic frame assembly through the marking device connecting frame 2. The marking device actuating air valve 3 is connected to the marking mechanism 1 or the marking device connecting frame 2 through fasteners. The discharge end of the conveying pipe 12 is connected to the feed end of the marking device actuating air valve 3, and the discharge end of the marking device actuating air valve 3 is connected to the feed end of the marking mechanism 1.
[0024] The telescopic frame assembly of the marking device includes a hanger assembly 4, an upper swing arm assembly, a rocker arm assembly, a lower swing arm assembly, an upper swing arm cylinder 5 and a lower swing arm cylinder 6. The hanger assembly 4 is fixed to the frame of the marking vehicle by fasteners. The upper end of the upper swing arm assembly is hinged to the front side of the bottom of the hanger assembly 4, the upper end of the upper swing arm cylinder 5 is hinged to the rear side of the bottom of the hanger assembly 4, the rear end of the rocker arm assembly is hinged to the lower end of the upper swing arm assembly, the front end of the rocker arm assembly is hinged to the upper end of the lower swing arm assembly, the lower end of the upper swing arm cylinder 5 and the rear end of the lower swing arm cylinder 6 are both hinged to the lower end of the upper swing arm assembly, the front end of the lower swing arm cylinder 6 is hinged to the upper end of the lower swing arm assembly, the upper swing arm cylinder 5 and the lower swing arm cylinder 6 are both connected to the hydraulic pump on the marking vehicle through a hydraulic oil circuit, the lower end of the lower swing arm assembly is fixedly connected to a marking device seat 7, and the marking mechanism 1 is connected to the marking device seat 7 through a marking device connecting frame 2.
[0025] The upper swing arm assembly includes a left upper swing arm 14 and a right upper swing arm 15 which are arranged in parallel and spaced apart from each other. The upper ends of the left upper swing arm 14 and the right upper swing arm 15 are hinged to the front side of the bottom of the hanger assembly 4 through a first hinge 16, and the lower rear sides of the left upper swing arm 14 and the right upper swing arm 15 are connected as a whole through an upper connecting plate 17; the upper end of the upper swing arm cylinder 5 is hinged to the rear side of the bottom of the hanger assembly 4 through a second hinge 18;
[0026] The lower swing arm assembly includes a left lower swing arm 19 and a right lower swing arm 20 which are arranged in parallel and spaced apart from each other. The lower front sides of the left lower swing arm 19 and the right lower swing arm 20 are connected as a whole through a lower connecting plate 27, and the marking device seat 7 is horizontally fixedly connected to the lower ends of the left lower swing arm 19 and the right lower swing arm 20.
[0027] The swing rod assembly includes two left swing rods 21 and two right swing rods 22 arranged in parallel. The two left swing rods 21 are arranged at intervals in the upper and lower parts, and the two right swing rods 22 are arranged at intervals in the upper and lower parts. The upper left swing rod 21 corresponds to the upper right swing rod 22 on the left and right sides, and the lower left swing rod 21 corresponds to the lower right swing rod 22 on the left and right sides.
[0028] The rear ends of a left swing rod 21 on the upper side and a right swing rod 22 on the upper side are rotationally connected between the lower ends of the left upper swing arm 14 and the right upper swing arm 15 through a first pin shaft 23; the front ends of a left swing rod 21 on the upper side and a right swing rod 22 on the upper side are rotationally connected between the upper ends of the left lower swing arm 19 and the right lower swing arm 20 through a second pin shaft 24; the rear ends of a left swing rod 21 on the lower side and a right swing rod 22 on the lower side are rotationally connected between the lower ends of the left upper swing arm 14 and the right upper swing arm 15 through a third pin shaft 25, and the front ends of a left swing rod 21 on the lower side and a right swing rod 22 on the lower side are rotationally connected between the upper ends of the left lower swing arm 19 and the right lower swing arm 20 through a fourth pin shaft 26; the first pin shaft 23 is located in front of and above the third pin shaft 25, and the second pin shaft 24 is located in front of and above the fourth pin shaft 26.
[0029] There are two upper swing arm cylinders 5 and two lower swing arm cylinders 6. The lower end of the upper swing arm cylinder 5 and the rear end of the lower swing arm cylinder 6 are both rotatably connected to the third pin shaft 25, and the front end of the lower swing arm cylinder 6 is rotatably connected to the second pin shaft 24.
[0030] The roller brush assembly includes a roller brush frame 8, a roller brush motor 9, a coupling 10 and a roller brush 11. The roller brush motor 9 is fixed on the roller brush frame 8. The roller brush 11 is rotatably mounted on the roller brush frame 8. The roller brush frame 8 is fixed on the marking device seat 7 and is located at the front side of the marking mechanism 1. The power shaft of the roller brush motor 9 is connected to the central axis of the roller brush 11 through the coupling 10. The roller brush motor 9 is connected to the hydraulic pump on the marking vehicle through the hydraulic oil circuit.
[0031] The material delivery pipe 12 is fixed on the marking device seat 7 by fasteners. A heat conduction ring cavity is arranged in the pipe wall of the material delivery pipe 12. A heat conduction oil pipe 13 communicating with the heat conduction ring cavity is connected to the material delivery pipe 12.
[0032] The marking mechanism 1 and the marking device actuating air valve 3 are both conventional components in the industry, and their specific structures and working principles are not described in detail. The control technology contained in the components of the present invention is conventional technology and does not involve new computer programs.
[0033] During the marking operation of the present invention, according to the marking needs, the upper swing arm assembly is controlled to perform a rotational motion around the first hinge 16, thereby maximizing the movement of the lower parts of the lower swing arm assembly; at the same time, the lower end of the upper swing arm oil cylinder 5 and the rear end of the lower swing arm oil cylinder 6 are both rotationally connected to the lower part of the upper swing arm assembly through one end of the third pin shaft 25, and the front end of the lower swing arm oil cylinder 6 is rotationally connected to the lower swing arm assembly through the second pin shaft 24. When in use, it is necessary to control the lower swing arm assembly to perform a rotational motion around the second pin shaft 24, thereby moving the marking mechanism 1 connected to the lower part of the lower swing arm assembly to a predetermined position, and the lower part of the roller brush 11 contacts the road surface, and the air valve 3 (equivalent to the pneumatic valve) controlling the marking device to actuate is actuated. The material delivery pipe 12 delivers hot melt to the marking mechanism 1 through the marking device actuating air valve 3, the vehicle moves forward to start the marking operation, and at the same time controls the roller brush motor 9 to work, the roller brush motor 9 drives the central axis of the roller brush 11 to rotate, so that the roller brush 11 rotates to clean the road, ensuring that the road surface in front of the marking mechanism 1 is clean, and the marking mechanism 1 evenly applies the hot melt on the road. The two marking mechanisms 1 can work at the same time, so that two marking lines can be drawn at one time, and the marking efficiency is high. The heat transfer oil pipe 13 injects high-temperature heat transfer oil into the heat transfer ring cavity in the pipe wall of the material delivery pipe 12, so that the hot melt in the material delivery pipe 12 can be heated, ensuring that the hot melt entering the marking mechanism 1 is kept warm, so that the fluidity of the hot melt remains good.
[0034] It should be noted that the swing arm assembly in the present invention is composed of four swing arms, a parallelogram composed of the upper swing arm, the lower swing arm, the upper swing arm and the lower swing arm. The lower swing arm cylinder 6 drives a set of diagonals of the parallelogram, which makes it easier to achieve telescopic and rotational movements. In addition, the parallelogram structure is also a key factor in preventing disordered movement of components connected to the lower part of the lower swing arm assembly.
[0035] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.
Claims
1. Double-side marking system, characterized by: It includes two marking devices, which are symmetrically arranged on the left and right sides of the lower middle part of the marking vehicle frame through a marking device telescopic frame assembly, and a roller brush assembly located on the front side of the marking device is arranged on the marking device telescopic frame assembly. The marking device is connected to the hot melt kettle on the marking vehicle through a material conveying pipe; The telescopic frame assembly of the marking device includes a hanger assembly, an upper swing arm assembly, a swing rod assembly, a lower swing arm assembly, an upper swing arm oil cylinder and a lower swing arm oil cylinder. The hanger assembly is fixed to the frame of the marking vehicle through fasteners. The upper end of the upper swing arm assembly is hinged to the front side of the bottom of the hanger assembly, the upper end of the upper swing arm oil cylinder is hinged to the rear side of the bottom of the hanger assembly, the rear end of the swing rod assembly is hinged to the lower end of the upper swing arm assembly, the front end of the swing rod assembly is hinged to the upper end of the lower swing arm assembly, the lower end of the upper swing arm oil cylinder and the rear end of the lower swing arm oil cylinder are both hinged to the lower end of the upper swing arm assembly, the front end of the lower swing arm oil cylinder is hinged to the upper end of the lower swing arm assembly, the upper swing arm oil cylinder and the lower swing arm oil cylinder are connected to the hydraulic pump on the marking vehicle through a hydraulic oil circuit, the lower end of the lower swing arm assembly is fixedly connected to a marking device seat, and the marking mechanism is connected to the marking device seat through a marking device connecting frame; The upper swing arm assembly comprises a left upper swing arm and a right upper swing arm which are arranged in parallel and spaced apart from each other. The upper ends of the left upper swing arm and the right upper swing arm are hinged to the front side of the bottom of the hanger assembly through a first hinge, and the rear sides of the lower parts of the left upper swing arm and the right upper swing arm are connected as a whole through an upper connecting plate; the upper end of the upper swing arm oil cylinder is hinged to the rear side of the bottom of the hanger assembly through a second hinge; The lower swing arm assembly comprises a left lower swing arm and a right lower swing arm which are arranged in parallel and spaced apart from each other. The front sides of the lower parts of the left lower swing arm and the right lower swing arm are connected as a whole through a lower connecting plate. The marking device seat is horizontally fixedly connected to the lower ends of the left lower swing arm and the right lower swing arm. The sway bar assembly includes two left sway bars and two right sway bars arranged in parallel, the two left sway bars are arranged at intervals up and down, the two right sway bars are arranged at intervals up and down, the left sway bar on the upper side corresponds to the right sway bar on the upper side, and the left sway bar on the lower side corresponds to the right sway bar on the lower side; The rear ends of a left swing rod on the upper side and a right swing rod on the upper side are rotatably connected between the lower ends of the left upper swing arm and the right upper swing arm through a first pin shaft; the front ends of a left swing rod on the upper side and a right swing rod on the upper side are rotatably connected between the upper ends of the left lower swing arm and the right lower swing arm through a second pin shaft; the rear ends of a left swing rod on the lower side and a right swing rod on the lower side are rotatably connected between the lower ends of the left upper swing arm and the right upper swing arm through a third pin shaft, and the front ends of a left swing rod on the lower side and a right swing rod on the lower side are rotatably connected between the upper ends of the left lower swing arm and the right lower swing arm through a fourth pin shaft; the first pin shaft is located above and in front of the third pin shaft, and the second pin shaft is located above and in front of the fourth pin shaft; There are two upper swing arm oil cylinders and two lower swing arm oil cylinders. The lower end of the upper swing arm oil cylinder and the rear end of the lower swing arm oil cylinder are both rotatably connected to the third pin shaft, and the front end of the lower swing arm oil cylinder is rotatably connected to the second pin shaft. The roller brush assembly includes a roller brush frame, a roller brush motor, a coupling and a roller brush. The roller brush motor is fixed on the roller brush frame, and the roller brush is rotatably installed on the roller brush frame. The roller brush frame is fixed on the marking device seat and is located on the front side of the marking mechanism. The power shaft of the roller brush motor is connected to the central axis of the roller brush through a coupling transmission, and the roller brush motor is connected to the hydraulic pump on the marking vehicle through a hydraulic oil circuit.
2. The double-sided marking system according to claim 1, characterized in that: The marking device comprises a marking mechanism, a marking device connecting frame and a marking device actuating air valve. The marking mechanism is connected to the marking device telescopic frame assembly through the marking device connecting frame. The marking device actuating air valve is connected to the marking mechanism or the marking device connecting frame through a fastener. The discharge end of the feeding pipe is connected to the feed end of the marking device actuating air valve. The discharge end of the marking device actuating air valve is connected to the feed end of the marking mechanism.
3. The double-sided marking system according to claim 1, characterized in that: The material delivery pipe is fixed on the marking device seat by fasteners, a heat conduction ring cavity is arranged in the pipe wall of the material delivery pipe, and a heat conduction oil pipe communicating with the heat conduction ring cavity is connected to the material delivery pipe.
Citation Information
Patent Citations
Hot-melt spraying road marking vehicle
CN111041961A
Guide rail type road sweeping and marking device
CN113957778A
Bilateral scribing system
CN216809503U