Calculation and evaluation method and device for longitudinal water system connectivity of complex river networks in plains
By constructing a river network diagram model and calculating the weighted connectivity, the problem that the vertical connectivity evaluation method of river network in the existing technology has failed to effectively reflect the functional connectivity, and a comprehensive evaluation and dynamic connectivity evaluation of different river networks are realized. It is suitable for various complex river networks and provides more objective and intuitive evaluation results.
Patent Information
- Application Number
- CN202111482825.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-07
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-12-07
AI Technical Summary
The existing quantitative evaluation method for vertical connectivity of river networks mainly starts from the perspective of quantity and structure, and fails to effectively reflect the functional connectivity of river networks. It is not applicable enough to different river networks, so it is impossible to comprehensively consider the impact of multiple factors on connectivity. .
By constructing a river network diagram model, the edge weights are calculated based on the water momentum and related parameters (such as river slope, section morphology, and river roughness), the connectivity factor is constructed, and the weighted connectivity of the river network is calculated by matrix multiplication to reflect the river network Dynamic water transfer capacity and connectivity level are evaluated based on this.
A comprehensive evaluation of different river networks is achieved, which can accurately reflect the dynamic connectivity of river networks. It is suitable for various complex river networks, providing a more objective and intuitive comparison of connectivity levels, providing water resource allocation, river channel adjustment and flood control. Technical support.
Smart Images

Figure CN114491920B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of water system connectivity calculation, and specifically relates to a calculation and evaluation method and device for the vertical water system connectivity of a complex river network in a plain. Background Art
[0002] As an important foundation for regional flood control, water supply and ecological security, river network connectivity plays an important role in responding to water and drought disasters, optimizing water resource allocation and improving the health of rivers and lakes. The description of river network connectivity is relatively complex, involving the contents of multiple disciplines such as historical geography, landscape ecology, discrete mathematics, hydrology, and river dynamics. The quantitative evaluation of river network connectivity has always been a difficult point in water environment evaluation.
[0003] Existing studies on quantitative evaluation methods for river network longitudinal connectivity have been conducted mainly from two aspects. The first is based on the evaluation indicators of landscape ecology theory. Most calculation methods need to use the GIS platform to describe the relative relationship between the patches in the study area, or focus on evaluating some quantitative relationships such as area and river length. There are also some evaluation indicators such as ring index and node connection rate, which focus on evaluating the advantages and disadvantages of river network structure from the relative relationship between the number of river channels and the number of nodes. However, the above methods only start from the perspective of quantity and structure, and do not reflect the functional connectivity of the river network. On the other hand, the above methods only describe the static connectivity level of the river network, and cannot reflect the dynamic water transfer capacity of the river network. The evaluation of the connectivity of some connected but not connected rivers is biased. The second is the river network connectivity evaluation method based on improved graph theory, of which two methods are relatively mature and widely used. First, combined with hydrological simulation, the flow rate is used as the water volume transmission capacity indicator, and the weighted adjacency matrix is obtained by constructing the connectivity factor to calculate the connectivity of the river network in graph theory; second, based on the principle of hydraulics, the water flow resistance index is constructed and weighted to the adjacency matrix of the river network graph, and the connectivity of the river network is evaluated by calculating the weighted connectivity. However, there are still some problems in the actual calculation process of the above methods: on the one hand, the applicability of the above methods to different river networks is not the same. When the former calculates the connectivity of the river network with a slightly larger flow rate, its connectivity factor cannot obviously reflect the difference in the connectivity between nodes under each flow rate. Therefore, it has no reference value for the evaluation of the connectivity of the river network under large flow; when the latter calculates the connectivity of the river network with a long river channel, due to the small edge weight, the connectivity between nodes obtained by matrix multiplication operation is exponentially attenuated, resulting in the connectivity between two vertices connected by multiple intermediate nodes having almost no effect on the overall connectivity of the river network. On the other hand, the above two methods only consider the impact of a single factor on the connectivity of the river network, and do not reflect the comprehensive effect of factors such as river channel and water flow on the connectivity of the river network.
[0004] Therefore, there is still much room for improvement in the existing quantitative evaluation methods for the longitudinal connectivity of river networks. There is no method that can consider the comprehensive impact of multiple factors on connectivity and is generally applicable to different river networks. Summary of the invention
[0005] The present invention is made to solve the above-mentioned problems, and aims to provide a calculation and evaluation method and device for the connectivity of the longitudinal water system in a complex river network in a plain, taking into account the comprehensive influence of multiple factors on the connectivity and having strong applicability to different river networks.
[0006] In order to achieve the above purpose, the present invention adopts the following scheme:
[0007] <Calculation method>
[0008] The present invention provides a method for calculating the longitudinal connectivity of a complex river network in a plain, which is characterized by comprising the following steps:
[0009] Step 1. Construct a river network model;
[0010] Step 2. Characterize the connectivity level between nodes:
[0011] The edge weight of the river network graph G is characterized based on the water momentum in the river channel, which reflects the dynamic water delivery capacity and connectivity level of the river channel. The water momentum passing through a certain section per unit time is expressed as:
[0012] p=mv=ρQtv∝Qv (1)
[0013] Where Q is the flow through the section, v is the average flow velocity of the section; v velocity is represented by the relevant parameters reflecting the river slope, cross-sectional shape and river roughness as formula (2):
[0014]
[0015] Where n is the Manning roughness coefficient, R is the hydraulic radius of the river channel, S f is the friction slope;
[0016] Construct connectivity factor w ij ∈(0, 1) is used as the edge weight of the river network graph to characterize the level of connectivity between nodes. The larger the value, the better the connectivity between nodes. When the flow is 0, the connectivity factor is also 0 to avoid the situation where the nodes are connected but not connected. The calculation formula is formula (3):
[0017]
[0018] In the formula, Q ij is the average flow through the river network edge node i and node j, v ijis the average flow velocity passing through the edge node i and node j of the river network diagram, a is the flow sensitivity coefficient, which is adjusted according to the flow level of the design flood in the evaluation area and can generally be taken as the historical maximum flood flow;
[0019] Step 3. Calculate the weighted connectivity of the river network:
[0020] For nodes that are not directly connected by edges but can be indirectly connected by multiple edges, matrix multiplication is used to calculate the connectivity between nodes; the connectivity between any two river nodes is expressed by the average value of the connectivity between nodes; for the river network as a whole, the weighted connectivity of the river network is expressed by the average value of the connectivity of all nodes.
[0021] Preferably, the method for calculating the longitudinal connectivity of a complex river network in a plain provided by the present invention may also have the following characteristics: in step 1, for a general river network, the river intersection points, boundary points and hydraulic structures are regarded as nodes (d1, d2, d3, d4, d5) of the graph, the river channel is regarded as a hanging edge (e1), edge (e4, e5, e6, e7) or multiple edges (e2, e3) of the graph, the direction of water flow is represented by an arrow, and a river network directed graph model G is constructed as follows: Figure 1 As shown; the river network graph G is represented as the adjacency matrix W = (w ij ) n×n , where w ij Represents node d i and node d j The relationship between: When node d i and d j When there is an edge directly connected between them, w ij represents the edge weight ω between two points; when node d i and d j When there is no direct connection between them or i=j, w ij =0; when node d i and d j When there are multiple edges directly connected, w ij is the sum of weights.
[0022] Figure 1 The adjacency matrix of the river network model shown is:
[0023]
[0024] Preferably, the method for calculating the connectivity of the vertical water system of a complex river network in a plain provided by the present invention may also have the following characteristics: in step 3, for nodes that are not directly connected by edges but can be indirectly connected by multiple edges, matrix multiplication is used to calculate the connectivity between nodes:
[0025]
[0026] In the formula, Represents the slave node d i Go through m-1 intermediate nodes to reach d j The connectivity level of the water flow channel, k is the node number; if from node d i There are multiple paths to reach d j , its connectivity depends on the maximum value of the connectivity level of each path; establish the river network connectivity matrix:
[0027]
[0028] The connectivity between nodes u ij It is used to measure the connectivity between any two river nodes in the river network. i The connectivity U i Use u ij The average value is expressed as:
[0029]
[0030] For the river network as a whole, the weighted connectivity U of the river network is calculated by the connectivity U of all nodes. i The average value is expressed as:
[0031]
[0032] <Evaluation method>
[0033] Further, if Figure 2 As shown, the present invention also provides a method for evaluating the longitudinal connectivity of a complex river network in a plain, which is characterized by comprising the following steps:
[0034] Step I. Use the calculation method for the longitudinal connectivity of a complex river network in a plain as described in <Calculation Method> to calculate the weighted connectivity of the river network under each working condition;
[0035] Step II. Evaluation of river network connectivity:
[0036] The weighted connectivity of the river network during the largest flood process in the study area is determined and used as the standard value. The relationship between the weighted connectivity of the river network under various working conditions and the standard value is then compared to determine the level of river network connectivity under the working condition.
[0037] Preferably, the evaluation method for the connectivity of the longitudinal water system of a complex river network in a plain provided by the present invention may also have the following characteristics: in step II, based on the weighted connectivity of the river network under each working condition calculated in step I, the weighted connectivity of the river network corresponding to the maximum flood process in the actual operation of the river network is selected as the standard value, and the calculated index value of each working condition to be evaluated is standardized, and then the relationship between the weighted connectivity of the river network under each working condition and the standard value is compared to determine the connectivity level of the river network under the working condition: when the weighted connectivity of the river network U ≥ standard value × 75%, it indicates that the connectivity of the river network is very good and the connectivity level is excellent; when the standard value × 75% > the weighted connectivity of the river network U ≥ standard value × 50%, it indicates that the connectivity of the river network is relatively good and the connectivity level is good; when the standard value × 50% > the weighted connectivity of the river network U ≥ standard value × 25%, it indicates that the connectivity of the river network is average and the connectivity level is qualified; when the standard value × 50% > the weighted connectivity of the river network U ≥ standard value × 25%, it indicates that the connectivity of the river network is not good and the connectivity level is poor. The evaluation criteria corresponding to different evaluation levels are shown in Table 1.
[0038] Table 1 Evaluation criteria for river network connectivity
[0039]
[0040] <Computing Device>
[0041] Furthermore, the present invention also provides a device for calculating the vertical water system connectivity of a complex river network in a plain, which is characterized by comprising:
[0042] Model building department, building river network model;
[0043] Connectivity level characterization part, characterizing the connectivity level between nodes:
[0044] The edge weight of the river network graph G is characterized based on the water momentum in the river channel, which reflects the dynamic water delivery capacity and connectivity level of the river channel. The water momentum passing through a certain section per unit time is expressed as:
[0045] p=mv=ρQtv∝Qv (1)
[0046] Where Q is the flow through the section, v is the average flow velocity of the section; v velocity is represented by the relevant parameters reflecting the river slope, cross-sectional shape and river roughness as formula (2):
[0047]
[0048] Where n is the Manning roughness coefficient, R is the hydraulic radius of the river channel, S f is the friction slope;
[0049] Construct connectivity factor w ij∈(0, 1) is used as the edge weight of the river network graph to characterize the level of connectivity between nodes. The larger the value, the better the connectivity between nodes. When the flow is 0, the connectivity factor is also 0 to avoid the situation where the nodes are connected but not connected. The calculation formula is formula (3):
[0050]
[0051] In the formula, Q ij is the average flow through the river network edge node i and node j, v ij is the average flow velocity passing through the edge node i and node j of the river network graph, a is the flow sensitivity coefficient, which can generally be taken as the historical maximum flood flow;
[0052] The connectivity calculation part uses matrix multiplication to calculate the connectivity between nodes for nodes that are not directly connected by edges but can be indirectly connected by multiple edges; the connectivity between any two river nodes is represented by the average value of the connectivity between nodes; the weighted connectivity of the entire river network is represented by the average value of the connectivity of all nodes;
[0053] An input display unit, used to allow the user to input operation instructions and display them accordingly; and
[0054] The control unit is connected to the model building unit, the connectivity level representation unit, the connectivity calculation unit, and the input display unit to control their operations.
[0055] Preferably, the alluvial river resistance calculation device based on riverbed morphological parameters provided by the present invention may also have the following characteristics: the input display unit can display the river network map model constructed by the model construction unit according to the control instructions, and can display the calculation results of the connectivity level characterization unit and the connectivity calculation unit in graphical form.
[0056] <Scheduling device>
[0057] In addition, the present invention also provides a dispatching device based on the longitudinal water system connectivity of a complex river network in a plain, which is characterized by comprising:
[0058] Model building department, building river network model;
[0059] Connectivity level characterization part, characterizing the connectivity level between nodes:
[0060] The edge weight of the river network graph G is characterized based on the water momentum in the river channel, which reflects the dynamic water delivery capacity and connectivity level of the river channel. The water momentum passing through a certain section per unit time is expressed as:
[0061] p=mv=ρQtv∝Qv (1)
[0062] Where Q is the flow through the section, v is the average flow velocity of the section; v velocity is represented by the relevant parameters reflecting the river slope, cross-sectional shape and river roughness as formula (2):
[0063]
[0064] Where n is the Manning roughness coefficient, R is the hydraulic radius of the river channel, S f is the friction slope;
[0065] Construct connectivity factor w ij ∈(0, 1) is used as the edge weight of the river network graph to characterize the level of connectivity between nodes. The larger the value, the better the connectivity between nodes. When the flow is 0, the connectivity factor is also 0 to avoid the situation where the nodes are connected but not connected. The calculation formula is formula (3):
[0066]
[0067] In the formula, Q ij is the average flow through the river network edge node i and node j, v ij is the average flow velocity passing through the edge node i and node j of the river network graph, a is the flow sensitivity coefficient, which can generally be taken as the historical maximum flood flow;
[0068] The connectivity calculation part uses matrix multiplication to calculate the connectivity between nodes for nodes that are not directly connected by edges but can be indirectly connected by multiple edges; the connectivity between any two river nodes is represented by the average value of the connectivity between nodes; the weighted connectivity of the entire river network is represented by the average value of the connectivity of all nodes;
[0069] The dispatching department regulates the dispatching of reservoirs and dams according to the river network connectivity calculated by the connectivity calculation department;
[0070] An input display unit, used to allow the user to input operation instructions and display them accordingly; and
[0071] The control unit is connected to the model building unit, the connectivity level representation unit, the connectivity calculation unit, the scheduling unit, and the input display unit to control their operations.
[0072] Preferably, the scheduling device based on the connectivity of the longitudinal water system of a complex river network in a plain provided by the present invention may also include: a river network connectivity level evaluation unit, which is communicated with the control unit, determines the weighted connectivity of the river network during the maximum flood process in the study area, and uses this as the standard value; then compares the relationship between the weighted connectivity of the river network and the standard value under each working condition, and obtains the river network connectivity level evaluation result under the working condition; wherein the scheduling unit also regulates the scheduling of reservoirs and dams based on the evaluation result of the river network connectivity level evaluation unit.
[0073] Preferably, the alluvial river resistance calculation device based on riverbed morphological parameters provided by the present invention may also have the following characteristics: the input display unit can display the river network map model constructed by the model construction unit according to the control instructions, and can display the calculation results of the connectivity level characterization unit and the connectivity calculation unit in a graphical form, and can also display the dispatching measures of the dispatching unit and the operating status of reservoirs and dams.
[0074] Functions and Effects of the Invention
[0075] The calculation and evaluation method and device for the vertical water system connectivity of a complex river network in a plain provided by the present invention, starting from the perspective of water body momentum, weights the matrix by constructing connectivity factors including relevant characteristic parameters such as flow, river channel slope, longitudinal slope shape and river channel roughness, so as to reflect the dynamic functional characteristics of the river network, and can more accurately reflect the actual river network connectivity. The overall connectivity of the river network is further calculated using relevant calculation methods such as matrix multiplication, and the results are compared with standard values, so as to achieve the purpose of intuitively comparing and objectively evaluating the connectivity level of the river network under different working conditions. In addition, the scheme of the present invention has strong applicability to various complex river networks with different flow sizes and different river channel lengths, has good practical application value, and can provide reliable technical support for optimizing water resource allocation, river channel adjustment, improving the health of rivers and lakes, regional flood control, water supply, etc. BRIEF DESCRIPTION OF THE DRAWINGS
[0076] Figure 1 A schematic diagram for constructing a river network model involved in the present invention;
[0077] Figure 2 It is a flow chart of the method for evaluating the connectivity of the longitudinal water system of a complex river network in a plain involved in the present invention;
[0078] Figure 3 A river network diagram model involved in an embodiment of the present invention;
[0079] Figure 4 A comparison diagram of node connectivity between the working condition to be evaluated and the standard value involved in the embodiment of the present invention;
[0080] Figure 5 A diagram showing the evaluation result of the river network connectivity level of the working condition to be evaluated involved in the embodiment of the present invention;
[0081] Figure 6 A flood level variation diagram of a typical river section (nodes 6-10) involved in an embodiment of the present invention;
[0082] Figure 7 This is a flood level variation diagram of a typical section (node 6-10 river section 185,000 miles) involved in an embodiment of the present invention. DETAILED DESCRIPTION
[0083] The specific implementation scheme of the method and device for calculating and evaluating the longitudinal connectivity of a complex river network in a plain according to the present invention is described in detail below in conjunction with the accompanying drawings.
[0084] <Example>
[0085] This example takes a river network system in a certain basin as an example ( Figure 3 , the number of river chains is 18, the number of nodes is 17), and the following working conditions to be evaluated are set (Table 2).
[0086] Table 2 Working conditions to be evaluated in the embodiment
[0087]
[0088] Use Figure 2 The evaluation method for the connectivity of the vertical water system of a complex river network in a plain is shown in the figure. The connectivity of these two working conditions is evaluated. The calculation and evaluation method for each working condition includes the following steps:
[0089] Step 1. Build a river network model
[0090] According to the principles of graph theory, the digital river network is generalized, and the river intersections, boundary points and hydraulic structures are regarded as nodes of the graph, and the river channels are regarded as edges of the graph, forming the following Figure 3 The river network model of the basin is shown.
[0091] Step 2. Calculate the inter-node connectivity factor
[0092] In the present invention, the connectivity factor is characterized by parameters related to flow, channel slope, cross-sectional morphology and channel roughness. Data acquisition adopts a numerical simulation method. According to the channel cross-sectional data and river network hydrological data, the flow between each node under each working condition, the cross-sectional water depth and other related hydrodynamic data are calculated through a one-dimensional hydrodynamic mathematical model. On this basis, the connectivity factor w between each node under each working condition is calculated to form a weighted adjacency matrix W.
[0093] Step 3. Calculation of river network weighted connectivity
[0094] Based on the weighted adjacency matrix calculated in step 2, according to equations (4) and (5), matrix operations are performed with the help of MATLAB software to obtain the connectivity of all nodes and the weighted connectivity of the river network under each working condition. Figure 4 The calculated connectivity values of all nodes in each working condition to be evaluated in this embodiment are given.
[0095] Step 4. River network connectivity evaluation
[0096] Based on the weighted connectivity of the river network under each working condition calculated in step 3, the weighted connectivity of the river network corresponding to the maximum flood process in the actual use of the river network is selected as the standard value, and the calculated index values of each working condition to be evaluated in the embodiment are standardized. According to the judgment criteria in Table 1, the river network connectivity level is evaluated for each working condition to be evaluated. Figure 5 A graph of river network connectivity evaluation results of an implementation example of the present invention is given.
[0097] From the comparison of various working conditions in the embodiments, the method of the present invention can quantitatively evaluate the connectivity of the water system under the conditions of changes in river resistance and different dam scheduling for complex river networks. Compared with existing similar methods, it has a wider applicability and can not only evaluate structural connectivity such as whether the river is flooded, but also is more suitable for the evaluation of functional connectivity caused by changes in resistance and changes in dam scheduling. Taking the measured maximum flood working condition as the standard, the connectivity levels of the river network water system under working conditions 1 and 2 to be evaluated are excellent and good respectively, and the connectivity of the river network water system under working condition 2 to be evaluated is the weakest. Figure 7 The flood level changes of typical river sections (nodes 6-10) under each evaluation condition are given. Figure 6-7 ), it can be seen that with the different degrees of river network connectivity, its impact on the flow capacity of the river channel and the flood level is also different. The increase in resistance under the evaluation condition 1 and the non-use of the diversion channel under the evaluation condition 2 are both weaker than the water system connectivity under the evaluation condition 1, which may increase the flood control risk. Among them, the structural connectivity of the evaluation condition 1 is good, but the resistance change will affect its functional connectivity. Although the river network connectivity evaluation is still in the excellent range, it is worse than the standard condition. Its flood level has risen slightly, and the peak time has been delayed; the evaluation condition 2 does not use the diversion channel (nodes 6-7), its structural connectivity and functional connectivity have declined, the river network connectivity evaluation is good, and the flood level of the typical downstream river section has risen significantly, which is not conducive to flood control. The above evaluation results can provide technical references for regional water resources allocation, flood control and management.
[0098] Furthermore, this embodiment also provides a scheduling device that can automatically realize the above-mentioned connectivity calculation and perform corresponding scheduling, and the device includes a model building unit, a connectivity level characterization unit, a connectivity calculation unit, a scheduling unit, an input display unit and a control unit.
[0099] The model building unit builds a river network map model according to the above step 1.
[0100] The connectivity level characterization unit characterizes the connectivity level between nodes according to step 2 above.
[0101] The connectivity calculation unit calculates the connectivity according to the above step 3;
[0102] The river network connectivity level evaluation unit is connected to the control unit in communication, determines the weighted connectivity of the river network during the maximum flood process in the study area, and uses this as the standard value; then compares the relationship between the weighted connectivity of the river network under various working conditions and the standard value to obtain the river network connectivity level evaluation result under the working condition.
[0103] The dispatching unit controls the dispatching of reservoirs and dams based on the river network connectivity calculated by the connectivity calculation unit and the evaluation result of the river network connectivity level evaluation unit.
[0104] The input display unit is used to allow the user to input operation instructions and display accordingly. For example, the input display unit can display the river network model constructed by the model construction unit according to the control instructions, and can display the calculation results of the connectivity level representation unit and the connectivity calculation unit in a graphical form, and can also display the dispatching measures of the dispatching unit and the operating status of reservoirs and dams.
[0105] The control unit is connected to the model building unit, the connectivity level representation unit, the connectivity calculation unit, the scheduling unit, and the input display unit to control their operations.
[0106] The above embodiments are merely examples of the technical solutions of the present invention. The calculation, evaluation method and device for the connectivity of the vertical water system of a complex river network in a plain involved in the present invention are not limited to the contents described in the above embodiments, but are subject to the scope defined by the claims. Any modification, supplement or equivalent replacement made by a technician in the field of the present invention on the basis of this embodiment is within the scope of protection required by the claims of the present invention.
Claims
1. Calculation method of vertical water system connectivity of complex river networks in plains, It is characterized in that The following steps are involved: Step 1. Construct a river network model; Step 2. Characterize the connectivity level between nodes: The edge weight of the river network graph G is characterized based on the water momentum in the river channel, which reflects the dynamic water delivery capacity and connectivity level of the river channel. The water momentum passing through a certain section per unit time is expressed as: p=mv=ρQtv∝Qv (1) In the formula, Q is the flow rate through the section, v is the average flow velocity of the section; the flow velocity is represented by the relevant parameters reflecting the river slope, cross-sectional shape and river roughness as formula (2): Where n is the Manning roughness coefficient, R is the hydraulic radius of the river channel, S f is the friction slope; Construct connectivity factor w ij ∈(0, 1) is used as the edge weight of the river network graph to characterize the level of connectivity between nodes. The larger the value, the better the connectivity between nodes. When the flow is 0, the connectivity factor is also 0 to avoid the situation where the nodes are connected but not connected. The calculation formula is formula (3): In the formula, Q ij is the average flow through the river network edge node i and node j, v ij is the average flow velocity through the edge node i and node j of the river network graph, a is the flow sensitivity coefficient; Step 3. Calculate the weighted connectivity of the river network: For nodes that are not directly connected by edges but can be indirectly connected by multiple edges, matrix multiplication is used to calculate the connectivity between nodes; the connectivity between any two river nodes is expressed by the average value of the connectivity between nodes; for the river network as a whole, the weighted connectivity of the river network is expressed by the average value of the connectivity of all nodes.
2. The method for calculating the vertical water system connectivity of a complex river network in a plain according to claim 1, characterized in that: in, In step 1, the river intersection points, boundary points and hydraulic structures are taken as the vertices of the graph, the river is taken as the hanging edge, edge or multiple edge of the graph, the flow direction of the water body is represented by an arrow, and a river network directed graph model is constructed. The river network graph is represented by the adjacency matrix W = (w ij ) n×n , where w ij Represents node d i and node d j The relationship between.
3. The method for calculating the vertical water system connectivity of a complex river network in a plain according to claim 1, characterized in that: in, In step 3, for nodes that are not directly connected by edges but can be indirectly connected by multiple edges, matrix multiplication is used to calculate the connectivity between nodes: In the formula, Represents the slave node d i Go through m-1 intermediate nodes to reach d j The connectivity level of the water flow channel, k is the node number; if from node d i There are multiple paths to reach d j , its connectivity depends on the maximum value of the connectivity level of each path; establish the river network connectivity matrix: U=(u ij ) n×n , m=1,2,...,n-1 (5) The connectivity between nodes u ij It is used to measure the connectivity between any two river nodes in the river network. i The connectivity U i Use u ij The average value is expressed as: For the river network as a whole, the weighted connectivity U of the river network is calculated by the connectivity U of all nodes. i The average value is expressed as:
4. Evaluation method of vertical water system connectivity of complex river networks in plains, It is characterized in that The following steps are involved: Step I. using the method for calculating the longitudinal connectivity of a complex river network in a plain as described in any one of claims 1 to 3 to calculate the weighted connectivity of the river network under various working conditions; Step II. Evaluation of river network connectivity: The weighted connectivity of the river network during the largest flood process in the study area is determined and used as the standard value. The relationship between the weighted connectivity of the river network under various working conditions and the standard value is then compared to determine the level of river network connectivity under the working condition.
5. The method for evaluating the vertical connectivity of a complex river network in a plain according to claim 4 , Features: in, In step II, based on the weighted connectivity of the river network under each working condition calculated in step I, the weighted connectivity of the river network corresponding to the maximum flood process in the actual operation of the river network is selected as the standard value, and the calculated index values of each working condition to be evaluated are standardized, and then the relationship between the weighted connectivity of the river network under each working condition and the standard value is compared to determine the connectivity level of the river network under the working condition: when the weighted connectivity of the river network U ≥ standard value × 75%, it means that the connectivity of the river network is very good and the connectivity level is excellent; When the standard value × 75% > the weighted connectivity of the river network U ≥ the standard value × 50%, it means that the connectivity of the river network is relatively good and the connectivity level is good; when the standard value × 50% > the weighted connectivity of the river network U ≥ the standard value × 25%, it means that the connectivity of the river network is average and the connectivity level is qualified; when the standard value × 50% > the weighted connectivity of the river network U ≥ the standard value × 25%, it means that the connectivity of the river network is not good and the connectivity level is poor.
6. Calculation device for vertical water system connectivity of complex river networks in plains, It is characterized in that include: Model building department, building river network model; Connectivity level characterization part, characterizing the connectivity level between nodes: The edge weight of the river network graph G is characterized based on the water momentum in the river channel, which reflects the dynamic water delivery capacity and connectivity level of the river channel. The water momentum passing through a certain section per unit time is expressed as: p=mv=ρQtv∝Qv (1) In the formula, Q is the flow rate through the section, v is the average flow velocity of the section; the flow velocity is represented by the relevant parameters reflecting the river slope, cross-sectional shape and river roughness as formula (2): Where n is the Manning roughness coefficient, R is the hydraulic radius of the river channel, S f is the friction slope; Construct connectivity factor w ij ∈(0, 1) is used as the edge weight of the river network graph to characterize the level of connectivity between nodes. The larger the value, the better the connectivity between nodes. When the flow is 0, the connectivity factor is also 0 to avoid the situation where the nodes are connected but not connected. The calculation formula is formula (3): In the formula, Q ij is the average flow through the river network edge node i and node j, v ij is the average flow velocity through the edge node i and node j of the river network graph, a is the flow sensitivity coefficient; The connectivity calculation part uses matrix multiplication to calculate the connectivity between nodes for nodes that are not directly connected by edges but can be indirectly connected by multiple edges; the connectivity between any two river nodes is represented by the average value of the connectivity between nodes; the weighted connectivity of the entire river network is represented by the average value of the connectivity of all nodes; An input display unit, used to allow the user to input operation instructions and display them accordingly; and The control unit is connected to the model building unit, the connectivity level representation unit, the connectivity calculation unit, and the input display unit to control their operations.
7. The device for calculating the vertical water system connectivity of a complex river network in a plain according to claim 6, characterized in that: in, The input display unit can display the river network model constructed by the model construction unit according to the control instructions, and can display the calculation results of the connectivity level representation unit and the connectivity calculation unit in a graphical form.
8. A dispatching device based on the longitudinal connectivity of the complex river network in the plains. It is characterized in that include: Model building department, building river network model; Connectivity level characterization part, characterizing the connectivity level between nodes: The edge weight of the river network graph G is characterized based on the water momentum in the river channel, which reflects the dynamic water delivery capacity and connectivity level of the river channel. The water momentum passing through a certain section per unit time is expressed as: p=mv=ρQtv∝Qv (1) Where Q is the flow through the section, v is the average flow velocity of the section; v velocity is represented by the relevant parameters reflecting the river slope, cross-sectional shape and river roughness as formula (2): Where n is the Manning roughness coefficient, R is the hydraulic radius of the river channel, S f is the friction slope; Construct connectivity factor w ij ∈(0, 1) is used as the edge weight of the river network graph to characterize the level of connectivity between nodes. The larger the value, the better the connectivity between nodes. When the flow is 0, the connectivity factor is also 0 to avoid the situation where the nodes are connected but not connected. The calculation formula is formula (3): In the formula, Q ij is the average flow through the river network edge node i and node j, v ij is the average flow velocity through the edge node i and node j of the river network graph, a is the flow sensitivity coefficient; The connectivity calculation part uses matrix multiplication to calculate the connectivity between nodes for nodes that are not directly connected by edges but can be indirectly connected by multiple edges; the connectivity between any two river nodes is represented by the average value of the connectivity between nodes; the weighted connectivity of the entire river network is represented by the average value of the connectivity of all nodes; A dispatching unit, which regulates the dispatching of reservoirs and dams based on the river network connectivity calculated by the connectivity calculation unit; An input display unit, used to allow the user to input operation instructions and display them accordingly; and The control unit is connected to the model building unit, the connectivity level representation unit, the connectivity calculation unit, the scheduling unit, and the input display unit to control their operations.
9. The dispatching device based on the longitudinal water system connectivity of a complex river network in a plain according to claim 8, It is characterized in that Also includes: A river network connectivity level evaluation unit is connected to the control unit in communication, determines the weighted connectivity of the river network during the maximum flood process in the study area, and uses this as a standard value; Then, the relationship between the weighted connectivity of the river network under each working condition and the standard value is compared to obtain the evaluation result of the river network connectivity level under the working condition; Among them, the dispatching department also regulates the dispatching of reservoirs and dams based on the evaluation results of the river network connectivity level evaluation department.
10. The dispatching device based on the vertical water system connectivity of a complex river network in a plain according to claim 8, characterized in that: in, The input display unit can display the river network map model constructed by the model construction unit according to control instructions, and can display the calculation results of the connectivity level characterization unit and the connectivity calculation unit in a graphical form, and can also display the dispatching measures of the dispatching unit and the reservoir operation status.
