A heating control method, device, computer equipment and storage medium
By obtaining the required thermal energy of the substance to be heated in the heating equipment and the parameters of the heating components, determining the target enabling temperature, controlling the heating components to stop working, and using the waste heat to heat to the target temperature, the temperature overheating caused by the waste heat of the heating equipment in the existing technology is solved. It achieves precise temperature control and resource saving, and meets the water temperature needs of different drinks.
Patent Information
- Application Number
- CN202111614049.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-27
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-12-27
AI Technical Summary
After the existing heating technology reaches the set temperature, the residual heat of the heating equipment causes the temperature of the material to be heated to be too high, resulting in a waste of resources and the inability to meet the water temperature needs of different drinks, affecting the taste of the drinks.
By obtaining the required heat energy of the substance to be heated in the heating equipment, the target energy and target heat energy loss of the heating component, the target enabling temperature of the substance to be heated is determined, and the heating component is controlled to stop working when the temperature difference is less than the target enabling temperature. Use waste heat to heat to the target temperature to ensure precise temperature control and resource conservation.
It achieves precise control of the temperature of the material to be heated, avoids the final temperature being too high, meets the water temperature needs of different drinks, saves resources, and improves the taste of the drinks.
Smart Images

Figure CN114501698B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of material heating, and in particular to a heating control method, device, computer equipment and storage medium. Background Art
[0002] Heating materials with electricity through heating equipment is a common heating method in life. However, the residual heat of the heating equipment after the electrical heating often causes the temperature of the heated material to rise, causing the final temperature of the heated material to be higher than the set temperature. This will not only cause a waste of resources, but also fail to meet the needs of users. For example, different instant products have different requirements for water temperature. Only at the right temperature can the best taste of the drink be obtained. The existing heating technology generally cuts off the power until the set temperature is reached. The residual heat of the heating tube may cause water temperature deviation, making the taste of the drink not reach the best effect. Summary of the invention
[0003] The present application provides a heating control method, device, computer equipment and storage medium to solve the problems of poor temperature control and waste of resources in the prior art.
[0004] In a first aspect, a heating control method is provided, the method comprising the following steps:
[0005] Obtaining the required heat energy of the substance to be heated in the heating device, the target energy and target heat energy loss of the heating component in the heating device, wherein the target energy is the heat energy that the heating component can provide during the heat exchange process, the target heat energy loss is the heat energy lost by the heating component in the process of heat exchange with the substance to be heated so that the substance to be heated rises per unit temperature, and the required heat energy is the energy required for the temperature of the substance to be heated to rise per unit temperature;
[0006] Determining a target enabling temperature of the material to be heated according to the target energy, the required heat energy and the target heat energy loss, wherein the target enabling temperature is a temperature at which the residual heat of the heating component can actually cause the material to be heated to rise after the heating component stops working;
[0007] During the heating of the material to be heated, if it is monitored that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature, the heating component is controlled to stop working.
[0008] In this technical solution, when the heating component is working, the required heat energy of the material to be heated, the target energy of the heating component and the target heat energy loss are obtained, and the target enabling temperature of the material to be heated is determined according to the target energy, the required heat energy and the target heat energy loss, so as to determine how much the residual heat of the heating component can actually increase the temperature of the material to be heated after the heating component stops working, and is used for comparison with the difference between the current temperature of the material to be heated and the target temperature of the material to be heated, so as to determine the time when the heating component stops working. When it is monitored that the difference between the current temperature of the material to be heated and the target temperature of the material to be heated is less than the target enabling temperature, the heating component is stopped, and the material to be heated to the target temperature is heated with the target energy of the heating component. This not only achieves energy saving but also avoids the final temperature of the material to be heated from exceeding the target temperature, thus meeting the needs of users.
[0009] In combination with the first aspect, in a possible implementation, the above-mentioned acquisition of the target energy of the heating component includes: acquiring the unit thermal energy of the heating component, the unit thermal energy being the thermal energy released by the heating component when exchanging unit temperature during the heat exchange process; acquiring the operating temperature of the heating component and the critical temperature of the heat exchange of the heating component; and calculating the target energy of the heating component according to the unit thermal energy of the heating component and the difference between the operating temperature and the critical temperature. When the temperature is lower than the critical temperature, the heat exchange between the heating component and the material to be heated has almost no effect on the temperature of the material to be heated. Therefore, the difference between the operating temperature and the critical temperature is used to calculate the target energy in the technical solution, which can effectively ensure that the calculated target energy is the thermal energy that can be provided to increase the temperature of the material to be heated, thereby ensuring the accuracy of the calculation.
[0010] In combination with the first aspect, in a possible implementation method, the above-mentioned obtaining the target heat energy loss of the heating component includes: obtaining the working power and effective time of the heating component, the effective time being the time required for the temperature of the heated material to rise by unit temperature; calculating the target heat energy loss of the heating component according to the working power, effective time and required heat energy of the heating component.
[0011] In combination with the first aspect, in a possible implementation, the above-mentioned acquisition of the target heat energy loss of the heating component includes: after the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is greater than a first preset threshold, acquiring the heat energy loss of the heating component at at least two second temperatures, each of the second temperatures being not less than the first temperature and less than the target temperature; and determining the target heat energy loss of the heating component according to the heat energy loss of the heating component at at least two second temperatures. When the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is greater than the first preset threshold, the current heat energy loss of continuously increasing the unit temperature is calculated multiple times, and the target heat energy loss of the heating component is obtained based on multiple current heat energy losses, which can reduce the error between the calculated heat energy loss and the actual heat energy loss and ensure the authenticity of the calculated heat energy loss.
[0012] In combination with the first aspect, in a possible implementation, the first preset threshold is the sum of the ideal enabling temperature and the second preset threshold, and the ideal enabling temperature is the residual heat of the heating component after the heating component stops working, which is the temperature that can make the heated material rise under ideal conditions.
[0013] In combination with the first aspect, in a possible implementation method, the target enabling temperature of the material to be heated is determined based on the target energy, the heat energy loss and the required heat energy, including: calculating the sum of the target heat energy loss and the required heat energy to obtain the actual heat energy supplied; calculating the ratio of the target energy to the actual heat energy supplied to obtain the target enabling temperature of the material to be heated.
[0014] In combination with the first aspect, in a possible implementation, before stopping the heating component, the method further includes: obtaining historical temperature data of the material to be heated during the heating process when the current temperature of the material to be heated cannot be monitored, the historical temperature data including historical heating time and historical temperature values corresponding to the historical heating time; and determining the current temperature of the material to be heated according to the historical temperature data. The historical data can reflect the corresponding relationship between the heating time and the current temperature of the material to be heated during the heating process, and the trend of the current temperature of the material to be heated changing over time can be effectively obtained according to the historical temperature data.
[0015] In combination with the first aspect, in a possible implementation, the above-mentioned determination of the current temperature of the material to be heated based on the historical temperature data includes: performing surface fitting based on the historical temperature data to obtain a prediction curve of temperature and time, wherein the prediction curve is used to reflect the trend of the temperature of the material to be heated over time; and determining the current temperature of the material to be heated based on the current time and the prediction curve. The prediction curve can be used to determine the current temperature of the material to be heated based on the heating time when the current temperature cannot be monitored, thereby ensuring the orderly progress of temperature control.
[0016] In a second aspect, a heating device is provided, comprising the following steps:
[0017] A parameter acquisition module, used to acquire the required heat energy of the material to be heated in the heating device, the target energy of the heating component in the heating device, and the target heat energy loss;
[0018] a temperature calculation module, used to determine a target enabling temperature of the material to be heated according to the target energy, the required heat energy and the target heat energy loss;
[0019] The heating control module is used to control the heating component to stop working if it is monitored that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature during the heating process of the material to be heated.
[0020] In a third aspect, a computer device is provided, comprising a memory and one or more processors, wherein the one or more processors are used to execute one or more computer programs stored in the memory, and when the one or more processors execute the one or more computer programs, the computer device implements the heating control method of the first aspect.
[0021] In a fourth aspect, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, wherein the computer program includes program instructions, and when the program instructions are executed by a processor, the processor executes the heating control method of the first aspect.
[0022] The present application can achieve the following beneficial effects: the target enabling temperature of the material to be heated is determined by the target energy, the required heat energy and the target heat energy loss, so that the calculated value of the target enabling temperature of the material to be heated is more authentic, and in practical applications, the temperature can be controlled more accurately. In addition, when the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature, the heating component is stopped, so that the target energy of the heating component is used to heat the material to be heated to the target temperature, the waste heat of the heating component is effectively used, and resource energy saving is achieved. In addition, the final temperature of the material to be heated is avoided to be higher than the target temperature, which can better meet the needs of users. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 A schematic flow chart of a heating control method provided for an embodiment of the application;
[0024] Figure 2 A schematic diagram of the structure of a heating control device provided in an embodiment of the present application;
[0025] Figure 3 A schematic diagram of the structure of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application.
[0027] The technical solution of the present application can be applied to various material heating scenarios. Specifically, the technical solution of the present application can be applied to various heating devices that support heating functions (such as kettles, water heaters, water dispensers, etc.) or terminal devices that have a communication connection relationship with the heating devices (such as mobile phones, etc.). The heating control device in the present application can be the above-mentioned heating device, or it can also be the above-mentioned terminal device.
[0028] See also Figure 1 , Figure 1 A schematic diagram of a heating control method provided in an embodiment of the present application is shown in FIG. Figure 1 As shown, the method comprises the following steps:
[0029] Step S101, obtaining the required heat energy of a substance to be heated in a heating device, the target energy of a heating component in the heating device, and the target heat energy loss.
[0030] Among them, the heating component is a heat-generating component in a heating device with a heating function, which is used to heat the substance in the heating device, such as a heating tube, a heating wire, etc. The substance to be heated refers to the substance to be heated in the heating device, and can be water, food, and other substances that can be heated. The target energy is the thermal energy that the heating component can provide during the heat exchange process, which can be understood as the thermal energy generated by the operation of the heating component that can increase the temperature of the substance to be heated. The target heat energy loss is the heat energy lost by the heating component to increase the unit temperature of the substance to be heated during the process of heat exchange with the substance to be heated.
[0031] The following is an introduction to the acquisition of target energy:
[0032] In one possible implementation, before the material to be heated is powered on for heating, the heating control device may preset the target energy of the heating component. When the target energy is preset, the preset target energy may be directly substituted for the target enabling temperature of the material to be heated described below, so that the heating control device does not need to calculate repeatedly, thereby reducing the calculation complexity of the heating control device. Optionally, the target energy is calculated in advance based on the parameter information of the heating component. For the specific calculation method, reference may be made to the description in another possible implementation.
[0033] In another possible implementation, the heating control device calculates the target energy according to the parameter information of the heating component. During the heating process, the target energy is calculated in real time. Specifically, the target energy is calculated by obtaining the unit heat energy of the heating component, the working temperature of the heating component, and the critical temperature of the heat exchange of the heating component. The unit heat energy is the heat energy released by the heating component when exchanging the unit temperature during the heat exchange process, such as the heat energy released by the heating component when the heated material rises by 1°C. The working temperature of the heating component is the temperature when the heating component reaches a stable power (equivalent to the temperature of the heating component during normal heating). For example, when the heating component is a copper tube, the working temperature is the temperature when the copper tube reaches a stable power. The target energy is obtained by calculating the unit heat energy of the heating component and the product of the difference between the working temperature and the critical temperature. Furthermore, the target energy calculated by the parameter information of the heating component can be stored by the heating device after the first calculation or the first calculation within a period of time, and its value can continue to be used in subsequent heating, so as to avoid repeated calculations. In practical applications, when the operating temperature of the heating component is lower than the critical temperature, the heat exchange between the heating component and the material to be heated has little effect on the temperature of the material to be heated. Therefore, calculating the target energy of the heating component based on the critical temperature is more realistic, making the target enabling temperature calculated later using the target energy more accurate, thereby achieving a better effect of temperature control.
[0034] In some possible implementations, the unit heat energy can be obtained by multiplying the mass of the heating component by the specific heat capacity. For example, when the heating component is a copper tube, the mass of the heating copper tube is measured as M. cu , consult the data to obtain the specific heat capacity S of the copper tube cu , control the heating component to start heating, and the working temperature of the copper tube when it reaches stable power is T cu , then the total heat energy of the copper tube is:
[0035] H 总 =M cu ×S cu ×T cu
[0036] Among them, the working temperature can be preset in advance according to the parameter information of the heating component. For example, the working temperature of the copper tube when it reaches stable power is generally 1400°C.
[0037] Assuming that the critical temperature of the copper tube for heat exchange with the outside world is 100°C, it means that the temperature of the copper tube is below 100°C and heat exchange cannot be generated or heat less than the preset heat threshold is generated. Heat less than the preset heat threshold indicates that no heat exchange is generated for the heated material. This application does not limit the critical temperature of the heating component, so the target energy Δ H It can be obtained by the following formula:
[0038] Δ H =M cu ×S cu ×(T cu -100)
[0039] If the heating control device is a heating device, in one way, the target energy is calculated by the heating device, and the heating device can store the parameter information of the heating component in a parameter calculation module in advance, such as the mass of the heating component, the specific heat capacity and other parameters that can be used to calculate the operating temperature of the heating component when the stable power is reached. When the heating device calculates the target energy of the heating component, the parameter information of the heating component stored in the parameter calculation module can be called for calculation; or in another way, the heating device receives the target energy sent by the terminal device (wherein the target energy is calculated by the terminal device).
[0040] If the heating control device is a terminal device, in one way, the target energy is calculated by the terminal device. In one way, the heating device is connected to the terminal device, and the heating device can store the parameter information of the heating component in the parameter calculation module in advance, such as the mass, specific heat capacity and other parameter information of the heating component that can be used to calculate the working temperature when the heating component reaches stable power. The heating device sends the parameter information to the terminal device, and the terminal device calculates the target energy according to the parameter information. In another way, the terminal device has a parameter information input function, and the user can independently input the parameter information of the heating component, and the parameter information will be automatically saved, which is convenient for calculating the target energy when the heated material is heated next time, avoiding the parameter information input operation again, saving manpower. Furthermore, the user can also modify the parameter information. For example, when the heating component is used for too long, the parameter information may change, and the user can change the value of the parameter information to improve the accuracy of the target energy calculation. Or in another way, the terminal device receives the target energy sent by the heating device (wherein the target energy is calculated by the heating device).
[0041] The above describes how to obtain the target energy. The following describes how to calculate the required thermal energy of the substance to be heated:
[0042] The required thermal energy of the material to be heated is the energy required for each unit increase in the temperature of the material to be heated, such as the energy required for the temperature of the material to be heated to increase by 1°C from 35°C to 36°C. In a feasible implementation, the required thermal energy of the material to be heated can be calculated based on the mass and specific heat capacity of the material to be heated. Specifically, the required thermal energy of the material to be heated can be obtained by the following formula:
[0043] H 所需 =M×S×T 单位
[0044] Among them, H 所需 represents the required heat energy; M represents the mass of the substance to be heated; S represents the specific heat capacity of the substance to be heated, which can be obtained by searching for information; T 单位 It indicates the unit temperature of increase. It should be emphasized that the unit temperature is not necessarily based on 1°C, but can also be based on 2°C, 3°C, etc., and can be set according to needs.
[0045] If the heating control device is a heating device, the mass of the material to be heated is obtained through a water level sensor and can also be calculated through a pressure sensor; the unit temperature can be a default unit temperature; or the unit temperature can be a unit temperature sent by the terminal device to the heating device.
[0046] If the heating control device is a terminal device, the terminal device determines M based on the mass of the material to be heated sent by the heating device or the data detected by the water level sensor or the data detected by the pressure sensor; or the user determines M based on the type and volume of the material to be heated (for example, 1.2L) input by the user in the terminal device and the corresponding density; the unit temperature can be a default unit temperature or a user-defined unit temperature; or the unit temperature can be a unit temperature sent by the heating device to the terminal device.
[0047] In the actual heating process, the target energy of the heated component cannot be fully utilized, and part of the heat energy will be lost. Therefore, when calculating the target enabling temperature of the heated material, in addition to considering the required heat energy required by the heated material, the heat energy loss of the heating component also needs to be considered. The following introduces the method of calculating the heat energy loss of the heating component.
[0048] The heat energy loss of the heating component is obtained based on the working power, effective time and required heat energy of the heating component. The effective time is the time required for the temperature of the heated material to rise by a unit temperature. For example, assuming the unit temperature is 1°C, the time point when the temperature of the heated material is 35°C is 10:00:00, and the time point when the temperature of the heated material is 36°C is 10:00:30. The effective time is the difference between the two time points, 30s. Specifically, the total energy consumption of the heating component is obtained based on the product of the working power of the heating component and the effective time. The total energy consumption is the energy consumed by the working power and effective time of the heating component when the current temperature increases by a unit temperature. The heat energy loss J of the heating component is obtained based on the difference between the total energy consumption of the heating component and the required heat energy. 损耗 , calculated as follows:
[0049] W=P 工作 ×Δ t ;
[0050] J 损耗 =WH 所需 ;
[0051] Where W is the total energy consumption; P 工作 is the working power. It should be noted that when the heating component works at a fixed power, the fixed power can be taken as P 工作 If the heating component works at different working powers at different stages or temperatures, the working power of the heating component at the target temperature is taken as P 工作 ; Δt is the effective time required for the temperature of the heated material to rise by unit temperature. When the working efficiency is fixed power, the effective time can also be taken as a fixed value according to actual conditions.
[0052] If the heating control device is a heating device, the working power is obtained by preset, and the heating device has a temperature monitoring function, which can monitor the heating time point and the corresponding temperature of the material to be heated in real time. When calculating W, the heating time point of the material to be heated can be directly obtained to determine the effective time, so as to calculate W according to the working power and the effective time.
[0053] If the heating control device is a terminal device, in one implementation, the terminal device may receive the working power sent from the heating device and the monitored heating time point and corresponding temperature data of the material to be heated, calculate the effective time according to the received heating time point and corresponding temperature data of the material to be heated, and then calculate W according to the received working power and the calculated effective time. Alternatively, in another implementation, the heating device directly sends the working power and the calculated effective time to the terminal device, and the terminal device calculates W according to the received working power and effective time.
[0054] Furthermore, the target heat energy loss of the heating component can be determined based on multiple heat energy losses by obtaining the heat energy loss of the heating component at at least two second temperatures. Each second temperature is not less than the first temperature and less than the target temperature. For example, the heat energy loss from 30°C to 31°C, from 31°C to 32°C, from 32°C to 33°C, from 33°C to 34°C, and from 34°C to 35°C is calculated. The current first temperature of the material to be heated refers to the temperature at which the material to be heated is monitored in real time when the material to be heated is being heated. For example, when the material to be heated is water, when the water is heated, the water temperature is monitored to be 30°C, and the 30°C monitored at this time is the current first temperature of the water at the moment of monitoring. The second temperature refers to the temperature reached after rising from the current first temperature. For example, when calculating the heat energy loss from 30°C to 31°C, from 31°C to 32°C, from 32°C to 33°C, from 33°C to 34°C, and from 34°C to 35°C, 30°C is the current first temperature, and 31°C, 32°C, 33°C, 34°C and 35°C are the four second temperatures.
[0055] In one possible implementation, when the difference between the target temperature and the current first temperature is greater than the first preset threshold, the target heat energy loss of the heating component is determined by calculating the current heat energy loss of the heating component multiple times. The target temperature of the substance to be heated is the temperature that the substance to be heated finally reaches. For example, when the user wants to boil water to 80°C, the water temperature of 80°C is the target temperature of the water. In one case, the first preset threshold can be set to a fixed value, such as 10°C, 12°C, etc. In another case, the first preset threshold can be the sum of the ideal enabling temperature and the second preset threshold. The ideal enabling temperature is the residual heat of the heating component after the heating component stops working, and the temperature that can make the substance to be heated rise under ideal conditions. The second preset threshold can be determined according to the number of times the current heat energy loss of the heating component is calculated. For example, when the current heat energy loss is pre-calculated five times, the second preset threshold can be set to 5.
[0056] In one possible implementation, the ideal enabling temperature Δ T It can be obtained by the ratio of target energy to required thermal energy, that is, according to the following formula:
[0057]
[0058] In a possible embodiment, for example, when the heating component is a copper tube and the substance to be heated is water, the pressure sensor is used to calculate the water injection amount M in the kettle. 水 , consult the data to obtain the specific heat capacity S s , then the ideal enabling temperature ΔT can be obtained by the following formula:
[0059]
[0060] Get the current temperature of the copper pipe as T 当 、The target temperature is T 目 , the second preset threshold is set to 5 degrees Celsius, then the monitoring
[0061] T 目 -T 当 >Δ T +5
[0062] Afterwards, multiple current heat energy losses of the heating component are calculated according to the method of calculating a single heat energy loss, and the current heat energy losses are calculated five times in succession. For example, when the current first temperature is 30°C, based on the current first temperature of 30°C, the current heat energy losses from 30°C to 31°C, from 31°C to 32°C, from 32°C to 33°C, from 33°C to 34°C, and from 34°C to 35°C are calculated. The target heat energy loss of the copper tube can be obtained by taking the average value of the current heat energy loss.
[0063] If the heating control device is a heating device, the heating device presets the second preset threshold value. When judging whether the difference between the target temperature and the current first temperature is greater than the first preset threshold value, the second preset threshold value can be directly obtained for judgment.
[0064] If the heating control device is a terminal device, in one possible implementation, the terminal device presets a second preset threshold or the heating device sends the preset second preset threshold to the terminal device, and when judging whether the difference between the target temperature and the current first temperature is greater than the first preset threshold, the terminal device can directly obtain the second preset threshold for judgment. Alternatively, in another possible implementation, the heating device directly sends the result of judging whether the difference between the target temperature and the current first temperature is greater than the first preset threshold to the terminal device. In another possible implementation, the target heat energy loss can also be calculated according to different weight coefficients corresponding to different temperature segments, where the sum of the weight coefficients is 1. For example, the current heat energy loss is calculated five times in succession, and the current heat energy loss is calculated from 30°C to 31°C, from 31°C to 32°C, from 32°C to 33°C, from 33°C to 34°C, and from 34°C to 35°C. The weight coefficients of 30°C to 31°C are 0.1, 31°C to 32°C are 0.15, 32°C to 3°C are 0.25, 33°C to 34°C are 0.3, and 34°C to 35°C are 0.2. Then, multiple current heat energy losses of the heating component are calculated according to the single heat energy loss method, and the sum of the products of the current heat energy loss of each temperature segment and the weight coefficient of the corresponding temperature segment is taken as the target heat energy loss, which can be calculated as follows:
[0065] J 目标 =n1H1+n1H1+n1H1+n1H1+n1H1
[0066] n1+n2+n3+n4+n5=1
[0067] J 目标 is the target heat energy loss, n1, n2, n3, n4, n5 represent the weight coefficients corresponding to each temperature segment, and H1, H2, H3, H4, H5 represent the heat energy loss of each temperature segment.
[0068] If the heating control device is a heating device, the heating device pre-assigns a weight coefficient to each temperature segment. When calculating the target heat energy loss, the heating device can directly obtain the weight coefficient of the corresponding temperature segment for calculation.
[0069] If the heating control device is a terminal device, in one possible implementation, the terminal device pre-assigns a weight coefficient to each temperature segment, and when calculating the target heat energy loss, the terminal device can directly obtain the weight coefficient of the corresponding temperature segment for calculation. Alternatively, in another possible implementation, the heating device sends the weight coefficient pre-assigned to the temperature segment to the terminal device, and after the terminal device obtains the weight coefficient, it calculates the target heat energy loss according to the weight coefficient assigned to the temperature segment.
[0070] Among them, the current heat energy loss per unit temperature rise is calculated multiple times at multiple current temperatures in advance of the second preset threshold, and the multiple current heat energy losses obtained are averaged or calculated in combination with different weight coefficients corresponding to different temperature sections to obtain the heat energy loss of the heating component. Obtaining the target heat energy loss of the heating component based on the multiple current heat energy losses can reduce the error between the calculated target heat energy loss and the actual heat energy loss, and improve the accuracy of the calculated target heat energy loss.
[0071] Step S102, determining a target enabling temperature of the material to be heated according to the target energy, the required heat energy and the target heat energy loss.
[0072] The target enabling temperature is the residual heat of the heating component after the heating component stops working, which is the temperature that can actually make the heated material rise.
[0073] Specifically, for step S102, the target enabling temperature of the material to be heated is determined according to the target energy, the target heat energy loss and the required heat energy, the actual heat energy supplied is obtained by calculating the sum of the target heat energy loss and the required heat energy, and the target enabling temperature of the material to be heated is obtained according to the ratio of the target energy to the actual heat energy supplied.
[0074] In a possible implementation, when the heating element is a copper tube and the substance to be heated is water, the water injection amount M in the kettle is calculated using a pressure sensor. 水 , consult the data to obtain the specific heat capacity S s , and the target energy is calculated to be Δ H , then the target enabling temperature ΔT is actually calculated according to the following formula:
[0075]
[0076] The target enabling temperature of the material to be heated is determined based on the target energy, heat energy loss and required heat energy. When calculating the target enabling temperature, the influence of heat energy loss is taken into consideration, so that the calculated target enabling temperature can be more consistent with the actual temperature rise of the material to be heated, and the subsequent determination of the moment to stop powering on the material to be heated based on the target enabling temperature can be more accurate, so that the temperature of the material to be heated can be effectively controlled, achieving a better user experience.
[0077] Step S103, during the heating process of the material to be heated, if it is monitored that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature, the heating component is controlled to stop working.
[0078] In the above technical scheme, when the heating component is working, the required thermal energy of the material to be heated, the target energy of the heating component and the target thermal energy loss are obtained, and the target enabling temperature of the material to be heated is determined according to the target energy, the required thermal energy and the target thermal energy loss. Therefore, after it is determined that the residual heat of the heating component stops working, it is determined how much the temperature of the material to be heated can actually be raised, which is used for comparison with the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated, so as to determine the moment when the heating component stops working.
[0079] When it is monitored that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature, the heating control device controls the heating component to stop working, so that the residual heat of the heating component heats the material to be heated to the target temperature. This not only saves energy but also avoids the final temperature of the material to be heated exceeding the target temperature, thereby meeting the needs of users.
[0080] If the heating control device is a heating device, the heating device has an independent heating control module, and the heating device has a function that can be used to monitor the heating time and the current first temperature of the heated material. The heating time and the current first temperature of the heated material can be directly monitored by the heating device, and at the same time, the difference between the current first temperature of the heated material and the target temperature of the heated material and the size of the target enabling temperature are monitored. When it is monitored that the difference between the target temperature of the heated material and the current first temperature of the heated material is less than the target enabling temperature, the heating device controls the heating control module to stop the heating device from performing the heating work. For example, the heating device can disconnect the heating function by closing the circuit through the expansion of the copper tube. Alternatively, there is another possible way, the heating device is connected to the terminal device for communication, and during the heating process, the heating device can send the temperature data of the heated material to the terminal device in real time or at a fixed time interval during the heating process, and the terminal device saves the received temperature data, so that the terminal device monitors and displays the heating time and the current first temperature of the heated material, and monitors the temperature data of the heated material in real time. When it is detected that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature, the terminal device sends a command signal to the heating component, and after the heating device receives the command signal from the terminal device, it stops the operation of the heating device according to the command signal. For example, the heating device is a kettle and the material to be heated is water. When the difference between the target temperature of the water and the current first temperature of the material to be heated is less than the target enabling temperature, the terminal device sends a command signal to stop heating to the kettle. After the kettle receives the command signal from the terminal device, it disconnects the heating function of the kettle through a closed circuit.
[0081] If the heating control device is a terminal device, a communication connection is established between the heating device and the terminal device. During the heating process, the heating device can send the temperature data of the material to be heated during the heating process to the terminal device in real time or at fixed time intervals. The terminal device saves the received temperature data, so that the terminal device monitors and displays the heating time and the current first temperature of the material to be heated, and monitors the temperature data of the material to be heated in real time. When it is detected that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature, the terminal device directly controls the circuit to close, thereby disconnecting the power-on heating.
[0082] In possible situations, it is possible that the heating control device cannot detect in real time or cannot obtain the temperature of the material to be heated during the heating process. In the process of monitoring the temperature of the material to be heated, if the temperature of the material to be heated cannot be monitored in real time, the current first temperature of the material to be heated can also be determined based on the historical temperature data of the material to be heated. It should be understood that the historical temperature data of the material to be heated refers to the historical temperature data during a heating process, that is, the historical temperature data and the current first temperature belong to the same heating process. Optionally, when the heating time and the current first temperature of the material to be heated cannot be monitored by the heating device, the heating component or the terminal device can output a prompt message to remind the user that the material to be heated cannot be monitored, such as through voice prompts, voice playback "temperature detection failed", etc.
[0083] In view of the above possible situations, in a possible implementation, the heating control device is a heating device. For example, a voice prompt is given, and while the voice plays "temperature detection failed", the heating device obtains the historical temperature data of the material to be heated during the heating process that has been monitored and recorded. After the heating device obtains the historical temperature data, a surface fitting is performed on the historical temperature data to obtain a prediction curve of temperature and time. The prediction curve is used to reflect the trend of the temperature of the material to be heated changing with time. According to the current time and the prediction curve, the current first temperature of the material to be heated is determined.
[0084] In view of the above possible situation, in another possible implementation, the heating control device is a terminal device. For example, a voice prompt is given, and while the voice plays "temperature detection failed", the terminal device can directly obtain historical temperature data from the temperature data received from the heating device, or the heating device directly selects historical temperature data and sends it to the terminal device. After the historical temperature data is obtained, a surface fitting is performed on the historical temperature data to obtain a prediction curve of temperature and time. The prediction curve is used to reflect the trend of the temperature of the heated material changing over time. According to the current time and the prediction curve, the current temperature of the heated material is determined.
[0085] By performing surface fitting on the historical temperature data, a prediction curve of temperature and time is obtained. The current first temperature of the material to be heated is determined using the current time and the prediction curve, ensuring the orderly progress of temperature control. Secondly, the historical temperature data is the data monitored during the actual heating process of the material to be heated. The prediction curve determined based on the historical temperature data can better reflect the changing trend of the current first temperature of the material to be heated with the heating time, thereby improving the accuracy of the current first temperature obtained based on the prediction curve.
[0086] In a possible implementation, the prediction curve can be obtained according to the least squares ellipse fitting normalized expression. Specifically, according to the sampled heating time of the material to be heated, the historical temperature value corresponding to the sampled heating time, and the fitting coefficient, the preset surface fitting correlation is determined. The sampled heating time is obtained by sampling the historical heating time in the historical temperature data. The sampled temperature is the historical temperature value corresponding to the sampled heating time in the historical temperature data, such as (20s, 35°C), (30s, 45°C), etc. The fitting coefficient is the value to be solved. The preset surface fitting correlation is the preset least squares ellipse fitting normalized expression. The target surface fitting correlation is determined according to the preset surface fitting correlation. The target surface fitting correlation is used to obtain the prediction curve of the heating time of the material to be heated and the current first temperature. The target surface fitting correlation is the final least squares ellipse fitting normalized expression. The specific calculation is as follows:
[0087] Assume the least squares ellipse fitting normalized expression is:
[0088] K 20 t 2 +K 11 T+K 02 T 2 +K 10 t+K 01 T+K 00 =0
[0089] Where K 20 , K 11 , K 02 , K 10 , K 01 , K 00 is the fitting coefficient, t is the sampling heating time, T is the sampling temperature, written in matrix form: W T X=0. Where W=[K 20 K 11 K 02 K 10 K 01 K 00 ] T , X=[t 2 TT 2 t T 1] T ,
[0090]
[0091] There are n sets of data points (t i ,T i ),i=1,2,3...n, where t i is the sampling heating time, T i is the sampling temperature, and the data before the terminal device is disconnected (ti ,T i ),i=1,2...nSubstitute into x to get the corresponding column vector x i =[t i 2 t i T i T i 2 t i T i 1] T , let X=[x1 x2 ... x n ].
[0092] Let our estimate be W T X ~ ,in The fitting coefficients can be solved by the following optimization problem:
[0093]
[0094] wxya T HW>0
[0095] because These points are all on the ellipse, so W T X ~ =0, and the measured value W T X i (i=1,2,..n) These points are near the ellipse, but not necessarily on the ellipse. i refers to the X matrix value of each sampling point, so it can be written as:
[0096]
[0097] Construct Lagrangian function: L(W,λ)=W T XX T W-λ(W T HW-1), λ is the eigenvalue of this function.
[0098] Taking its derivative to zero gives: By solving the eigenvector, we can get W = [K 20 K 11 K 02 K 10 K 01 K 00 ] T , put the coefficient into the least squares ellipse fitting expression, and you can get the temperature and time prediction curve. For example, when W = [2 1 5 6 7 8], that is, K 20 =2, K 11 =1, K02 5, K 10 6, K 01 7, K 00 is 8, then the prediction curve is 2t 2 +tT+5T 2 +6t+7T+8=0, when the current time t is obtained in real time, the value of the current time t is substituted into the prediction curve to obtain the current first temperature T value of the material to be heated.
[0099] The method of the present application is introduced above. In order to better implement the method of the present application, the heating control device of the present application is introduced next.
[0100] See also Figure 2 , Figure 2 This is a schematic diagram of the structure of a heating control device provided in an embodiment of the present application. The device may be a part of the aforementioned application terminal. Figure 2 As shown, the heating control device 20 includes:
[0101] The parameter acquisition module 201 is used for the parameter acquisition module, and is used to acquire the required heat energy of the material to be heated in the heating device, the target energy of the heating component in the heating device, and the target heat energy loss;
[0102] A temperature calculation module 202, for determining a target enabling temperature of the material to be heated according to the target energy, the required heat energy and the target heat energy loss;
[0103] The heating control module 203 is used to control the heating component to stop working if it is monitored that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature during the heating process of the material to be heated.
[0104] In a possible design, the parameter acquisition module 201 is specifically used for:
[0105] Obtain unit thermal energy of the heating component, where the unit thermal energy is the thermal energy released by the heating component when exchanging unit temperature during heat exchange; obtain the operating temperature of the heating component and the critical temperature of heat exchange of the heating component; and calculate the target energy of the heating component according to the unit thermal energy of the heating component and the difference between the operating temperature and the critical temperature.
[0106] In a possible design, the parameter acquisition module 201 is specifically used to: obtain the working power and effective time of the heating component, the effective time being the time required for the temperature of the heated material to rise by a unit temperature; calculate the target heat energy loss of the heating component according to the working power, effective time and required heat energy of the heating component. In a possible design, the parameter calculation module 201 is specifically used to: obtain the heat energy loss of the heating component at at least two second temperatures after the difference between the target temperature of the heated material and the current first temperature of the heated material is greater than a first preset threshold, each of the second temperatures being not less than the first temperature and less than the target temperature; determine the target heat energy loss of the heating component according to the heat energy loss of the heating component at at least two second temperatures.
[0107] In a possible design, the parameter acquisition module 201 is specifically used to: calculate the sum of the target heat energy loss and the required heat energy to obtain the actual heat energy supplied; calculate the ratio of the target energy to the actual heat energy supplied to obtain the target enabling temperature of the material to be heated.
[0108] In a possible design, the heating control module 203 is specifically used to: when the current temperature of the material to be heated cannot be monitored, obtain historical temperature data of the material to be heated during the heating process, the historical temperature data including historical heating time and historical temperature values corresponding to the historical heating time; determine the current temperature of the material to be heated based on the historical temperature data.
[0109] In a possible design, the heating control module 203 is specifically used to: perform surface fitting based on the historical temperature data to obtain a prediction curve of temperature and time, wherein the prediction curve is used to reflect the trend of the temperature of the material to be heated over time; and determine the current temperature of the material to be heated based on the current time and the prediction curve.
[0110] In the above-mentioned device, the target energy is calculated by using the difference between the working temperature and the critical temperature, which can effectively ensure that the calculated target energy is the thermal energy that can be provided to increase the temperature of the material to be heated, thereby ensuring the accuracy of the calculation. Based on the fact that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is greater than the sum of the first preset threshold value, the thermal energy loss of the heating component at each current temperature is calculated according to the rated working power, effective time and the required thermal energy of the heating component, so as to obtain the average of the current thermal energy loss of the heating component at multiple current temperatures as the target thermal energy loss of the heating component, thereby reducing the error between the calculated target thermal energy loss and the actual thermal energy loss, thereby ensuring the authenticity of the calculated target thermal energy loss, thereby making the target enabling temperature of the material to be heated determined according to the target thermal energy loss of the heating component, the target energy and the required thermal energy of the material to be heated more in line with the actual situation, thereby improving the accuracy of determining the time when it is necessary to stop energizing the material to be heated, thereby effectively realizing temperature control. Furthermore, a surface fitting is performed on the historical temperature data to obtain a predicted curve of temperature and time, and the current temperature of the heating material is determined, so that when the heating device or the terminal device cannot receive the temperature data of the component to be heated, the current temperature of the material to be heated can still be monitored, ensuring the orderly progress of the temperature control work.
[0111] See also Figure 3 , Figure 3 3 is a schematic diagram of the structure of a computer device provided in an embodiment of the present application, wherein the computer device 30 includes a processor 301 and a memory 302. The processor 301 is connected to the memory 302, for example, the processor 301 can be connected to the memory 302 via a bus. The computer device can be the heating control device described in the above embodiment.
[0112] The processor 301 is configured to support the computer device 30 to perform the corresponding functions in the method in the above method embodiment. The processor 301 can be a central processing unit (CPU), a network processor (NP), a hardware chip or any combination thereof. The above hardware chip can be an application specific integrated circuit (ASIC), a programmable logic device (PLD) or a combination thereof. The above PLD can be a complex programmable logic device (CPLD), a field programmable gate array (FPGA), a generic array logic (GAL) or any combination thereof. Specifically, the processor 301 can be a processor in a single-chip microcomputer, and the memory 302 is used to store program codes, etc. The memory 302 may include a volatile memory (VM), such as a random access memory (RAM); the memory 302 may also include a non-volatile memory (NVM), such as a read-only memory (ROM), a flash memory, a hard disk drive (HDD) or a solid-state drive (SSD); the memory 302 may also include a combination of the above types of memory.
[0113] The processor 301 may call the program code to perform the following operations:
[0114] Obtaining the required heat energy of the substance to be heated in the heating device, the target energy and target heat energy loss of the heating component in the heating device, wherein the target energy is the heat energy that the heating component can provide during the heat exchange process, the target heat energy loss is the heat energy lost by the heating component in the process of heat exchange with the substance to be heated so that the substance to be heated rises per unit temperature, and the required heat energy is the energy required for the temperature of the substance to be heated to rise per unit temperature;
[0115] Determining a target enabling temperature of the material to be heated according to the target energy, the required heat energy and the target heat energy loss, wherein the target enabling temperature is a temperature at which the residual heat of the heating component can actually cause the material to be heated to rise after the heating component stops working;
[0116] During the heating of the material to be heated, if it is monitored that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature, the heating component is controlled to stop working.
[0117] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, wherein the computer program includes program instructions, and when the program instructions are executed by a computer, the computer executes the method described in the above embodiment.
[0118] A person skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. The storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.
[0119] The above disclosure is only the preferred embodiment of the present application, which certainly cannot be used to limit the scope of rights of the present application. Therefore, equivalent changes made according to the claims of the present application are still within the scope covered by the present application.
Claims
1. A heating control method, characterized in that: include: Obtaining the required thermal energy of the material to be heated in the heating device, the target energy and target thermal energy loss of the heating component in the heating device, wherein the target energy is the thermal energy that the heating component can provide during the heat exchange process, the target thermal energy loss is the thermal energy lost by the heating component when the material to be heated is raised by a unit temperature during the heat exchange process with the material to be heated, and the required thermal energy is the energy required for each unit temperature rise of the material to be heated; obtaining the target energy of the heating component includes: obtaining the unit thermal energy of the heating component, wherein the unit thermal energy is the thermal energy released by the heating component when exchanging a unit temperature during the heat exchange process; obtaining the operating temperature of the heating component and the critical temperature of the heat exchange of the heating component; calculating the target energy of the heating component according to the unit thermal energy of the heating component and the difference between the operating temperature and the critical temperature; Determining the target enabling temperature of the material to be heated according to the target energy, the required heat energy and the target heat energy loss, wherein the target enabling temperature is the temperature at which the residual heat of the heating component can actually cause the material to be heated to rise after the heating component stops working; determining the target enabling temperature of the material to be heated according to the target energy, the heat energy loss and the required heat energy comprises: calculating the sum of the target heat energy loss and the required heat energy to obtain the actual heat energy supplied; calculating the ratio of the target energy to the actual heat energy supplied to obtain the target enabling temperature of the material to be heated; During the heating of the material to be heated, if it is monitored that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature, the heating component is controlled to stop working.
2. The method according to claim 1, characterized in that The obtaining of the target heat energy loss of the heating component comprises: Obtaining the working power and effective time of the heating component, wherein the effective time is the time required for the temperature of the heated substance to rise by a unit temperature; The target heat energy loss of the heating component is calculated according to the working power, effective time and the required heat energy of the heating component.
3. The method according to claim 1, characterized in that The obtaining of the target heat energy loss of the heating component comprises: After the difference between the target temperature of the substance to be heated and the current first temperature of the substance to be heated is greater than a first preset threshold, obtaining the heat energy loss of the heating component at at least two second temperatures, each of the second temperatures being not less than the first temperature and less than the target temperature; A target heat energy loss of the heating component is determined according to the heat energy loss of the heating component at at least two second temperatures.
4. The method according to claim 3, characterized in that The first preset threshold is the sum of the ideal enabling temperature and the second preset threshold. The ideal enabling temperature is the residual heat of the heating component after the heating component stops working, which is a temperature that can cause the heated material to rise under ideal conditions.
5. The method according to claim 1, characterized in that Before stopping the heating component, the method further comprises: In the case where the current temperature of the substance to be heated cannot be monitored, obtaining historical temperature data of the substance to be heated during the heating process, wherein the historical temperature data includes historical heating time and historical temperature values corresponding to the historical heating time; The current temperature of the substance to be heated is determined according to the historical temperature data.
6. The method according to claim 5, characterized in that Determining the current temperature of the substance to be heated according to the historical temperature data includes: Performing surface fitting according to the historical temperature data to obtain a prediction curve of temperature and time, wherein the prediction curve is used to reflect the trend of the temperature of the heated material changing over time; The current temperature of the substance to be heated is determined according to the current time and the prediction curve.
7. A heating control device, characterized in that: include: A parameter acquisition module is used to acquire the required thermal energy of the material to be heated in the heating device, the target energy and target thermal energy loss of the heating component in the heating device, wherein the target energy is the thermal energy that the heating component can provide during the heat exchange process, the target thermal energy loss is the thermal energy lost by the heating component when the material to be heated is raised by a unit temperature during the heat exchange process with the material to be heated, and the required thermal energy is the energy required for each unit temperature rise of the material to be heated; acquiring the target energy of the heating component comprises: acquiring the unit thermal energy of the heating component, wherein the unit thermal energy is the thermal energy released by the heating component when exchanging a unit temperature during the heat exchange process; acquiring the operating temperature of the heating component and the critical temperature of the heat exchange of the heating component; calculating the target energy of the heating component according to the unit thermal energy of the heating component and the difference between the operating temperature and the critical temperature; a temperature calculation module, for determining a target enabling temperature of the material to be heated according to the target energy, the required heat energy and the target heat energy loss, wherein the target enabling temperature is a temperature at which the residual heat of the heating component can actually cause the material to be heated to rise after the heating component stops working; determining the target enabling temperature of the material to be heated according to the target energy, the heat energy loss and the required heat energy comprises: calculating the sum of the target heat energy loss and the required heat energy to obtain the actual heat energy supplied; calculating the ratio of the target energy to the actual heat energy supplied to obtain the target enabling temperature of the material to be heated; The heating control module is used to control the heating component to stop working if it is monitored that the difference between the target temperature of the material to be heated and the current first temperature of the material to be heated is less than the target enabling temperature during the heating process of the material to be heated.
8. A computer device, characterized in that: The method comprises a memory and one or more processors, wherein the one or more processors are used to execute one or more computer programs stored in the memory, and when the one or more processors execute the one or more computer programs, the computer device implements the method according to any one of claims 1 to 6.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program includes program instructions, and when the program instructions are executed by a processor, the processor is caused to perform the method according to any one of claims 1 to 6.