Segment conveying device and conveying method suitable for transporting full-ring segments at large slopes

By designing a segment transportation device with integral lifting, anti-slip and adjustment mechanisms during tunnel construction, the problem of large-slope transportation of the entire ring of segments was solved, efficient segment transportation was achieved, construction efficiency was improved and costs were reduced. .

CN114517699BActive Publication Date: 2024-10-29CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210238527.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-11
Publication Date
2024-10-29
Estimated Expiration
2042-03-11

AI Technical Summary

Technical Problem

In existing tunnel construction, the segment transportation device cannot simultaneously meet the large-slope transportation needs of the entire ring of segments, resulting in low construction efficiency and increased costs in long-distance large-slope tunnels.

Method used

A segment conveying device is designed that includes a chassis, a stepping unit, an integral lifting mechanism, an anti-slip mechanism and an adjustment mechanism. The integral lifting mechanism prevents the segment from sliding down, and the anti-slip mechanism prevents the segment from moving backward, and the segment is prevented from moving backward by the integral lifting mechanism. The adjustment mechanism adapts to different slopes to ensure that the segments are placed and transported horizontally.

Benefits of technology

It realizes efficient and continuous whole-circle segment transportation in large-slope tunnels, prevents the entire conveying device from sliding down, improves construction efficiency, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114517699B_ABST
    Figure CN114517699B_ABST
Patent Text Reader

Abstract

The present invention discloses a segment conveying device and a conveying method thereof adapted to the large-slope transportation of a whole ring of segments, comprising a chassis, a lifting frame and a sliding frame arranged on the chassis, the chassis being connected with an integral lifting unit, the integral lifting unit comprising a plurality of integral lifting mechanisms, one end of the integral lifting mechanism being connected with the chassis, and the other end being connected with a friction pad supported on the assembled segments in the tunnel; the sliding frame being provided with an anti-slip mechanism stopping at the rear side of the segments, the lifting height of the lifting frame being greater than the height of the anti-slip mechanism; the sliding frame being provided with an adjustment mechanism at the position of the sliding frame cooperating with the segment crane, the adjustment mechanism comprising a support beam, the rear end of the support beam being provided with a segment stopping structure, the front end of the support beam being hinged with the chassis or the sliding frame, the rear end of the support beam being hinged with an adjustment cylinder hinged with the chassis or the sliding frame, or the rear end of the support beam being lifted and lowered by a crane. The present invention can not only meet the requirements of segment conveying with a large slope, but also can convey a whole ring of segments.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pipe segment transportation in tunnel construction, and in particular to a pipe segment transportation device and a transportation method thereof suitable for large-slope transportation of a whole ring of pipe segments. Background Art

[0002] When transporting segments, the marshaling trolley in the tunnel transports the segments to the segment crane grabbing area of ​​the tunnel boring machine, and then the segment crane cooperates with the segment conveying device to complete the transfer of the segments to the segment assembly area. However, in the existing tunnel construction process, more and more tunnel excavation lines need to be excavated with large slopes due to environmental factors, and the slopes range from 0-20 degrees. In the construction of steep-slope tunnels, because of the large slope, the segments will slide downward due to their own weight, making it impossible to use conventional segment conveying devices to complete the transfer. The existing solution is that the segment conveying device transports single segments to adapt to the construction of steep-slope tunnels.

[0003] For example, a Chinese utility model patent with an authorization announcement date of 2020.08.07 and an authorization announcement number of CN 211202013 U discloses a segment transport device that is suitable for rapid transportation on large slopes, including a frame connected to a trailer or a main engine, the frame being provided with a power device and a rotating trolley for carrying the segments, the power device drives the rotating trolley to move along the frame; a rubber wheel assembly is symmetrically provided at the lower part of the frame. This technical solution transports the segments through a power device and a rotating trolley for carrying the segments, and the rapid transportation of the segments is achieved through sprocket chains, but only one segment can be transported at a time. Therefore, during use, the marshaling car that transports a whole ring of segments needs to wait in a designated area until the segment transport device has transported the segments multiple times and completed the transportation of the whole ring of segments, and then the marshaling car can leave. This technical solution is suitable for short-distance tunnels with slow excavation speeds. In long-distance and steep-slope tunnels, or steep-slope tunnels with fast excavation speeds, there may be a situation where the marshaling trolleys are not used to transport the segments in a timely manner, resulting in the excavation waiting for the segments to be assembled, which seriously affects the overall excavation period of the tunnel and increases construction costs.

[0004] In the excavation of long-distance tunnels, in order to meet the transportation time requirements of the marshaling, the segment conveying device needs to have the function of adapting to the transportation of the entire ring of segments at the same time. The Chinese invention patent with the authorization announcement date of 2017.03.29 and the authorization announcement number of CN 104775834 B discloses a segment conveying trolley with the functions of segment conveying and small curve excavation that can adapt to the transportation of the entire ring of segments at the same time, including a connecting seat and a trolley body, the connecting seat is connected to the trolley body through a hand hoist and a guide chain, and the trolley body includes at least two connected frames, and frame support wheels are arranged at the lower part of the front and rear of each frame, and a sliding bracket and a lifting bracket are arranged at the upper part of each frame; the lifting brackets are arranged in series, and the sliding brackets are arranged in series, and the sliding bracket at the front end extends out of the frame at the front end, and a support wheel is arranged at the lower part of the sliding bracket at the front end. Although this technical solution can adapt to the transportation of the entire ring of segments at the same time, it cannot adapt to the construction needs of tunnels with large slopes.

[0005] In summary, there is an urgent need for a new segment conveying device to meet the use requirements of large-slope tunnels and the transportation requirements of the entire ring of segments at the same time. Summary of the invention

[0006] In view of the deficiencies in the above-mentioned background technology, the present invention proposes a segment conveying device and a conveying method suitable for the large-slope transportation of a whole ring of segments, which solves the technical problem that the existing segment conveying device in the tunnel excavation construction process cannot simultaneously meet the large-slope transportation requirements of a whole ring of segments.

[0007] The technical solution of the present application is implemented as follows: a segment conveying device suitable for transporting a whole ring of segments on a large slope, comprising a chassis connected to a trailer or a main machine of a tunnel boring machine, on which a plurality of stepping units are sequentially arranged, each stepping unit comprising a lifting frame and a sliding frame, the sliding frame driving the segment to step under the action of a driving mechanism, the lifting frame pushes up the segment after the stepping up to make the sliding frame of the previous stepping unit retreat, the lifting frame descends to place the pushed-up segment on the sliding frame of the next stepping unit, characterized in that: the chassis is connected to an integral lifting unit, the integral lifting unit comprising a plurality of stepping units An integral lifting mechanism, one end of the integral lifting mechanism is connected to the base frame, and the other end is connected to a friction pad supported on the assembled pipe segment in the tunnel; the sliding frame is provided with a non-slip mechanism that stops at the rear side of the pipe segment, and the lifting height of the lifting frame is greater than the height of the non-slip mechanism; the sliding frame position cooperating with the pipe segment crane is provided with an adjustment mechanism, the adjustment mechanism includes a support beam, the rear end of the support beam is provided with a pipe segment stopping structure, the front end of the support beam is hinged to the base frame or the sliding frame, the rear end of the support beam is hinged to an adjustment cylinder hinged to the base frame or the sliding frame, or the rear end of the support beam is raised and lowered by a crane.

[0008] When the rear end of the support beam is lifted and lowered by a crane, a row of positioning holes is provided in the rear half of the support beam, and a vertical support member is selectively connected to any of the positioning holes, the vertical support member is connected to a first lifting ring, and the support beam is connected to a second lifting ring, and the upper end of the vertical support member is provided with a plug-in component that cooperates with the positioning hole, and the lower end is connected to a sixth ear seat.

[0009] The integral lifting mechanism comprises a first lifting cylinder hinged to the base frame and a connecting piece. The first lifting cylinder and the connecting piece are hingedly connected to one end away from the base frame through a first ear seat. The friction support pad is arranged at the bottom of the first ear seat.

[0010] The base frame is provided with a fixed ear seat, and the first lifting oil cylinder and the connecting piece are hinged to the base frame through the fixed ear seat, and the connecting piece is a fixed-length connecting piece or an oil cylinder connecting piece.

[0011] The first ear seat is provided with a first stopper for preventing the first lifting cylinder, the hinged structure between the connecting member and the first ear seat from moving horizontally.

[0012] The anti-slip mechanism includes a first horizontal member connected to the sliding frame, a first vertical member is connected to the upper rear side of the first horizontal member, and a protruding first buffer block is connected to the front side of the first vertical member; the pipe segment stopping structure includes a second vertical member arranged on the support beam, and a protruding second buffer block is connected to the front side of the second vertical member.

[0013] The sliding frame is fixedly connected with a fourth ear seat, the first transverse member is hinged to the fourth ear seat, and a third stopper is arranged on the fourth ear seat to prevent the adhesive structure between the first transverse member and the fourth ear seat from moving horizontally.

[0014] The lifting frame lifts the pipe segments on the sliding frame through the lifting mechanism of the lifting frame, and the lifting mechanism of the lifting frame includes a second lifting cylinder, and the two ends of the second lifting cylinder are respectively hinged with a second ear seat and a third ear seat, and the second ear seat and the third ear seat are both provided with a second stopper to prevent the structure from moving horizontally, the second ear seat is connected to the base frame, and the third ear seat is connected to the lifting frame.

[0015] The front end of the support beam is hinged with a fifth ear seat, and the fifth ear seat is provided with a fourth stopper for preventing the hinge structure from moving horizontally. The fifth ear seat is hinged with the base frame or the sliding frame.

[0016] The chassis is connected to the trailer or the host through a first towing structure and / or a second towing structure, and the length of the second towing structure is adjustable.

[0017] The conveying method of the segment conveying device adapted to the large-slope transportation of the whole ring segment: when excavating in a normal tunnel section or a section with a small slope, the overall lifting mechanism is retracted, the trailer or the main machine drags the chassis through the first dragging structure, the segment conveying device travels on the assembled segments, and the first dragging structure normally adjusts the position of the chassis;

[0018] During tunneling of a steeply sloped tunnel, the integral lifting mechanism is extended, so that the running wheels of the segment conveying device are separated from the assembled segments, and the friction pads are supported on the assembled segments; at this time, due to the slope, the first dragging structure cannot meet the dragging requirements for the chassis. At this time, the screw mechanism in the second dragging structure is adjusted to adjust the position of the chassis and the trailer or the main machine, so as to meet the dragging requirements for the chassis;

[0019] The support beam is lifted by a crane, and the vertical support member is lifted so that the vertical support member is hinged with the support beam at a suitable position. The support beam is in a horizontal or approximately horizontal position at a large slope. At this time, the segment crane drives the segment to be placed horizontally on the support beam, and then the support beam is lowered by the crane, so that the segment is in a reasonable position; or the support beam is lifted by adjusting the oil cylinder until the support beam is in a horizontal or approximately horizontal position at a large slope. At this time, the segment crane drives the segment to be placed horizontally on the support beam, and then the oil cylinder is adjusted to drive the support beam to retract, so that the segment is in a reasonable position;

[0020] The sliding frame drives the pipe segment to step forward under the action of the driving mechanism until it steps to the sliding frame position of the next stepping unit. The lifting frame of the stepping unit lifts the pipe segment after stepping, so that the sliding frame of the previous stepping unit retreats to its original position. Then the lifting frame descends to place the lifted pipe segment on the sliding frame of the next stepping unit. In this way, each stepping unit continuously transports each pipe segment forward. During the transportation process, the anti-slip mechanism and the pipe segment stopping structure continue to work to limit the backward movement of the pipe segment.

[0021] The overall lifting mechanism of the present invention satisfies the overall lifting of the segment conveying device, thereby preventing the overall sliding down under a large slope. The anti-skid mechanism is used to prevent the segments from sliding down, and the adjustment mechanism is used to adapt to the horizontal lowering of the segments under different slopes, while preventing the segments from sliding down. In the present invention, an overall lifting mechanism is fixed on the base frame, which can compress the assembled segments by telescoping, thereby lifting or lowering the entire segment conveying device, thereby increasing the friction between the segment conveying device and the assembled segments, and preventing the overall sliding down of the segment conveying device under a large slope. The present invention is provided with a second dragging structure, which is an adjustable screw connection structure, thereby meeting the dragging and adjustability of the segment conveying device under a large slope. The sliding frame of the present invention is designed with an anti-skid mechanism, which can meet the anti-skid of the segments under a large slope; the lifting mechanism of the lifting frame has a large lifting stroke, which can meet the requirement that the segments are not affected by the height direction of the anti-skid mechanism during the forward stepping process. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.

[0023] Figure 1 is a side view of the present invention;

[0024] Figure 2 A top view of the present invention;

[0025] Figure 3 is a cross-sectional view of the present invention;

[0026] Figure 4 It is an assembly relationship diagram of the lifting frame 2 and the lifting mechanism of the lifting frame;

[0027] Figure 5 To adjust the usage status diagram of the mechanism;

[0028] Figure 6 To adjust the mechanism and the top view;

[0029] Figure 7 It is a structural diagram of the overall lifting mechanism;

[0030] Figure 8 It is a structural schematic diagram of the lifting mechanism of the lifting frame;

[0031] Fig. 9 A schematic diagram of the structure of the anti-slip mechanism;

[0032] Fig.10 It is a structural diagram of the adjustment mechanism;

[0033] Fig.11 is an application state diagram of the present invention;

[0034] Due to the long length of the complete segment conveyor, its length is omitted in some views;

[0035] Numbers in the figure:

[0036] 1. Base frame; 2. Lifting frame; 3. Sliding frame; 4. First dragging structure; 5. Second dragging structure; 6. Overall lifting mechanism; 7. Lifting frame lifting mechanism; 8. Anti-slip mechanism; 9. Adjustment mechanism; 10. Segment; 11. Segment crane;

[0037] 601, first lifting cylinder; 602, first ear seat; 603, friction support pad; 604, fixed ear seat; 605, connecting piece; 606, first stopper;

[0038] 701, second lifting cylinder; 702, second ear seat; 703, third ear seat; 704, second stopper;

[0039] 801, first buffer block; 802, first vertical member; 803, first horizontal member; 804, fourth ear seat; 805, third stopper;

[0040] 901, fifth ear seat; 902, support beam; 903, second buffer block; 904, second vertical member; 905, vertical support member; 906, sixth ear seat; 907, first lifting ring; 908, fourth stopper; 909, second lifting ring. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] Embodiment 1, a segment conveying device adapted for transporting a whole ring of segments at a large slope, such as Figure 1-Figure 3 As shown, the underframe 1 is connected to the trailer or main machine of the tunnel boring machine, and the underframe 1 is connected to the trailer or main machine through a first traction structure 4 and / or a second traction structure 5. The first traction structure 4 is a traction structure commonly used in the prior art, and the second traction structure 5 includes a screw structure, and its length is adjustable. The underframe 1 includes a plurality of connected frames, and each frame can be rigidly connected or flexibly connected or hinged. When a flexible connection or handover is adopted, it is convenient to follow the trailer or main machine to achieve steering.

[0043] A plurality of stepping units are sequentially arranged on the base frame 1, each stepping unit comprises a lifting frame 2 and a sliding frame 3, the lifting frame 2 is connected to a lifting frame lifting mechanism 7, and the lifting frame lifting mechanism 7 can lift the lifting frame 2 to a height exceeding the sliding frame 3, and then lift the objects on the sliding frame 3 and detach them from the sliding frame 3. Each sliding frame 3 is provided with an oil cylinder driving mechanism, and driven by the oil cylinder driving mechanism, it can move forward and backward along the base frame 1, thereby realizing stepping.

[0044] The sliding frame 3 drives the segment 10 to move synchronously under the action of the oil cylinder driving mechanism. When the sliding frame 3 of the previous stepping unit drives the segment 10 to move forward to the top of the sliding frame 3 of the next stepping unit, the lifting frame 2 is controlled to rise, and the raised lifting frame 2 pushes up the segment 10 after the stepping, so that the sliding frame 3 of the previous stepping unit can be separated from the segment 10 and move backward. Then the lifting frame 2 is lowered, and the lifted segment 10 is placed on the sliding frame 3 of the next stepping unit. The adjacent stepping units work reciprocatingly in this way, and continuously transport the segment 10 forward.

[0045] Specifically, Figure 4 and Figure 8 As shown, the lifting frame 2 lifts the pipe segment 10 on the sliding frame 3 through the lifting frame lifting mechanism 7. The lifting frame lifting mechanism 7 includes a second lifting cylinder 701, and the two ends of the second lifting cylinder 701 are respectively hinged with a second ear seat 702 and a third ear seat 703, and the second ear seat 702 and the third ear seat 703 are both provided with a second stopper 704 that prevents the structure from moving horizontally, the second ear seat 702 is connected to the base frame 1, and the third ear seat 703 is connected to the lifting frame 2.

[0046] The base frame 1 is connected to an integral lifting unit, which includes a plurality of integral lifting mechanisms 6. The plurality of integral lifting mechanisms 6 are arranged on both sides of the base frame 1, and each side of the base frame 1 is provided with a plurality of integral lifting mechanisms. When the various frames of the base frame 1 are flexibly connected or hinged, by controlling different integral lifting mechanisms 6 to rise to different heights, the various frames of the base frame 1 can form different relative angles with the bottom surface of the tunnel, and a continuous large slope can be resolved into a plurality of small slope conveying sections.

[0047] Specifically, Figure 7 As shown, one end of the integral lifting mechanism 6 is connected to the base frame 1, and the other end is connected to a friction pad 603 supported on the assembled pipe segment in the tunnel. The integral lifting mechanism 6 includes a first lifting cylinder 601 hinged to the base frame 1 and a connecting member 605, wherein the connecting member 605 is a fixed-length connecting member or a cylinder connecting member. The first lifting cylinder 601 and the connecting member 605 are hingedly connected at one end away from the base frame 1 through a first ear seat 602, and the friction pad 603 is arranged at the bottom of the first ear seat 602.

[0048] Furthermore, the base frame 1 is provided with a fixed ear seat 604, and the first lifting cylinder 601 and the connecting member 605 are hinged to the base frame 1 through the fixed ear seat 604. The first ear seat 602 is provided with a first stopper 606 for preventing the first lifting cylinder 601, the connecting member 605 and the first ear seat 602 from horizontally moving, and the fixed ear seat 604 is also provided with a first stopper 606 for preventing the hinged structure between the first lifting cylinder 601 and the fixed ear seat 604 from horizontally moving, and the fixed ear seat 604 is also provided with a first stopper 606 for preventing the hinged structure between the connecting member 605 and the fixed ear seat 604 from horizontally moving.

[0049] like Figure 5 , Figure 6 , Fig. 9 As shown, the sliding frame 3 is provided with a non-slip mechanism 8 which stops at the rear side of the pipe segment 10, and the lifting height of the lifting frame 2 is greater than the height of the non-slip mechanism 8 to ensure no interference during stepping.

[0050] The anti-slip mechanism 8 includes a first horizontal member 803 connected to the sliding frame 3, a first vertical member 802 is connected to the upper rear side of the first horizontal member 803, and a protruding first buffer block 801 is connected to the front side of the first vertical member 802; the first buffer block 801 is a nylon block or a rubber block or other high-strength flexible block, and is fixed to the first vertical member 802 by bolts.

[0051] Furthermore, the sliding frame 3 is fixedly connected with a fourth ear seat 804, the first horizontal member 803 is hinged with the fourth ear seat 804, and the fourth ear seat 804 is provided with a third stopper 805 for preventing the adhesive structure between the first horizontal member 803 and the fourth ear seat 804 from horizontally moving. A reinforcing rib is provided on the side of the first vertical member 802 facing away from the pipe segment 10.

[0052] like Figure 5 , Figure 6 , Fig.10 As shown, since the segment crane cannot transport the segment 10 to the sliding frame 3 at an angle, an adjustment mechanism 9 is provided at the position of the sliding frame 3 that cooperates with the segment crane 11, so that the segment 10 can be transported smoothly and reliably without changing the segment crane 11 and the sliding frame 3.

[0053] The adjustment mechanism 9 includes a support beam 902 , a fifth ear seat 901 is hinged at the front end of the support beam 902 , a fourth stopper 908 is provided on the fifth ear seat 901 to prevent the hinge structure from moving horizontally, and the fifth ear seat 901 is hinged to the base frame 1 or the sliding frame 3 .

[0054] That is, the front end of the support beam 902 is hinged to the base frame 1 or the sliding frame 3, and the rear end of the support beam 902 is hinged to an adjustment cylinder hinged to the base frame 1 or the sliding frame 3, or the rear end of the support beam 902 is raised and lowered by a crane. When the adjustment cylinder is used to realize the lifting and lowering of the support beam 902, the response is fast and the efficiency is high; when the crane is used to realize the lifting and lowering of the support beam 902, the structure is simple, the cost is low, and the controllability is strong, and the lifting height of the support beam 902 can be conveniently adjusted according to the on-site conditions.

[0055] The rear end of the support beam 902 is provided with a pipe segment stopping structure to prevent the pipe segment 10 from sliding down when the support beam 902 falls. The pipe segment stopping structure includes a second vertical member 904 provided on the support beam 902, and a protruding second buffer block 903 is connected to the front side of the second vertical member 904. The second buffer block 903 is a nylon block or a rubber block or other high-strength flexible block, and is fixed to the second vertical member 904 by bolts. A reinforcing rib is provided on the side of the second vertical member 904 away from the pipe segment 10.

[0056] Furthermore, when the rear end of the support beam 902 is lifted and lowered by a crane, a row of positioning holes is provided on the rear half of the support beam 902, and a vertical support member 905 is selectively connected to any positioning hole, the vertical support member 905 is connected to a first lifting ring 907, and the support beam 902 is connected to a second lifting ring 909, and the upper end of the vertical support member 905 is provided with a plug-in component that cooperates with the positioning hole, and the lower end is connected to a sixth ear seat 906.

[0057] Furthermore, a stopper is provided on the sixth ear seat 906 to prevent the hinge structure between the vertical support member 905 and the sixth ear seat 906 from moving horizontally, and a stopper is provided on the vertical support member 905 to prevent the hinge structure between the vertical support member 905 and the support beam 902 from moving horizontally.

[0058] Embodiment 2, a conveying method of a pipe segment conveying device adapted for conveying a whole ring of pipe segments at a large slope, such as Fig.11 As shown, when excavating a normal tunnel section or a section with a smaller slope, the overall lifting mechanism 6 is retracted, the trailer or the main machine tows the chassis 1 through the first towing structure 4, the segment conveying device travels on the assembled segments, and the first towing structure 4 normally adjusts the position of the chassis 1.

[0059] During tunnel excavation with a large slope, the overall lifting mechanism 6 is extended, so that the running wheels of the segment conveying device are separated from the assembled segments, and the friction pads 603 are supported on the assembled segments; at this time, due to the slope, the first towing structure 4 cannot meet the towing requirements for the base frame 1. At this time, the screw mechanism in the second towing structure 5 is adjusted to adjust the position of the base frame 1 and the trailer or main machine, thereby meeting the towing requirements for the base frame 1.

[0060] The support beam 902 is lifted by a crane, and the vertical support member 905 is raised so that the vertical support member 905 is hinged to the support beam 902 at a suitable position, with the support beam 902 being in a horizontal or approximately horizontal position at a large slope as a standard. At this time, the segment crane 11 drives the segment 10 to be placed horizontally on the support beam 902, and then the support beam 902 is lowered by the crane, so that the segment 10 is in a reasonable position; or the support beam 902 is lifted by adjusting the cylinder until the support beam 902 is in a horizontal or approximately horizontal position at a large slope. At this time, the segment crane 11 drives the segment 10 to be placed horizontally on the support beam 902, and then the cylinder is adjusted to drive the support beam 902 to retract, so that the segment 10 is in a reasonable position.

[0061] The sliding frame 3 drives the pipe segment 10 to step forward under the action of the driving mechanism until it steps to the position of the sliding frame 3 of the next stepping unit. The lifting frame 2 of the stepping unit pushes up the pipe segment 10 after stepping, so that the sliding frame 3 of the previous stepping unit retreats to its original position, and then the lifting frame 2 descends to place the pushed-up pipe segment 10 on the sliding frame 3 of the next stepping unit. In this way, each stepping unit continuously transports each pipe segment 10 forward. During the transportation process, the anti-slip mechanism 8 and the pipe segment stopping structure continue to work to limit the backward movement of the pipe segment 10.

[0062] The structure of the segment conveying device in this embodiment that is suitable for transporting a whole ring of segments at a large slope can be the same as any scheme in Example 1.

[0063] The details not described in detail in the present invention are all conventional technical means known to those skilled in the art.

[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A segment conveying device adapted for transporting a whole ring of segments at a large slope, comprising a base frame (1) connected to a trailer or a main machine of a tunnel boring machine, a plurality of stepping units being arranged in sequence on the base frame (1), each stepping unit comprising a lifting frame (2) and a sliding frame (3), the sliding frame (3) driving the segment to step under the action of a driving mechanism, the lifting frame (2) pushing up the segment (10) after the stepping so that the sliding frame (3) of the previous stepping unit moves backward, the lifting frame (2) descends to place the pushed-up segment (10) on the sliding frame (3) of the next stepping unit, characterized in that: The base frame (1) is connected to an integral lifting unit, the integral lifting unit comprising a plurality of integral lifting mechanisms (6), one end of the integral lifting mechanism (6) being connected to the base frame (1) and the other end being connected to a friction support pad (603) supported on a pipe segment assembled in the tunnel; the sliding frame (3) is provided with an anti-slip mechanism (8) which stops at the rear side of the pipe segment (10), the lifting height of the lifting frame (2) being greater than the height of the anti-slip mechanism (8); the sliding frame (3) is provided with an adjustment mechanism (9) at a position cooperating with the pipe segment crane (11), the adjustment mechanism (9) comprising a support beam (902), the rear end of the support beam (902) being provided with a pipe segment stopping structure, the front end of the support beam (902) being hinged to the base frame (1) or the sliding frame (3), the rear end of the support beam (902) being hinged to an adjustment cylinder hinged to the base frame (1) or the sliding frame (3), or the rear end of the support beam (902) being raised and lowered by a crane; When the rear end of the support beam (902) is lifted or lowered by a crane, a row of positioning holes is provided at the rear half of the support beam (902), a vertical support member (905) is selectively connected to any positioning hole, the vertical support member (905) is connected to a first lifting ring (907), the support beam (902) is connected to a second lifting ring (909), the upper end of the vertical support member (905) is provided with a plug-in assembly matching the positioning hole, and the lower end is connected to a sixth ear seat (906); The integral lifting mechanism (6) comprises a first lifting cylinder (601) and a connecting member (605) which are hinged to the base frame (1); the first lifting cylinder (601) and the connecting member (605) are hingedly connected at one end away from the base frame (1) via a first ear seat (602); and the friction support pad (603) is arranged at the bottom of the first ear seat (602); The front end of the support beam (902) is hingedly connected to a fifth ear seat (901), the fifth ear seat (901) is provided with a fourth stopper (908) for preventing the hinged structure from moving horizontally, and the fifth ear seat (901) is hingedly connected to the base frame (1) or the sliding frame (3); The chassis (1) is connected to a trailer or a host machine via a first towing structure (4) and / or a second towing structure (5), and the second towing structure (5) is adjustable in length.

2. The segment conveying device adapted to transport a whole ring of segments at a large slope according to claim 1 is characterized in that: A fixed ear seat (604) is provided on the base frame (1); the first lifting cylinder (601) and the connecting piece (605) are hingedly connected to the base frame (1) via the fixed ear seat (604); the connecting piece (605) is a fixed-length connecting piece or a cylinder connecting piece.

3. The segment conveying device adapted to transport a whole ring of segments at a large slope according to claim 2 is characterized in that: The first ear seat (602) is provided with a first stopper (606) for preventing the first lifting cylinder (601), the hinged structure between the connecting member (605) and the first ear seat (602) from moving horizontally.

4. The segment conveying device adapted for transporting a full ring of segments at a large slope according to any one of claims 1 to 3, characterized in that: The anti-slip mechanism (8) comprises a first horizontal member (803) connected to the sliding frame (3); a first vertical member (802) is connected above the rear side of the first horizontal member (803); a protruding first buffer block (801) is connected to the front side of the first vertical member (802); and the segment retaining structure comprises a second vertical member (904) arranged on the support beam (902); a protruding second buffer block (903) is connected to the front side of the second vertical member (904).

5. The segment conveying device adapted to transport a whole ring of segments at a large slope according to claim 4 is characterized in that: The sliding frame (3) is fixedly connected to a fourth ear seat (804); the first transverse member (803) is hinged to the fourth ear seat (804); and a third stopper (805) is provided on the fourth ear seat (804) to prevent the adhesive structure between the first transverse member (803) and the fourth ear seat (804) from moving horizontally.

6. The segment conveying device adapted for transporting a whole ring of segments at a large slope according to any one of claims 1 to 3 and 5, characterized in that: The lifting frame (2) lifts the pipe segment (10) on the sliding frame (3) through a lifting frame lifting mechanism (7), wherein the lifting frame lifting mechanism (7) comprises a second lifting cylinder (701), and a second ear seat (702) and a third ear seat (703) are respectively hinged at both ends of the second lifting cylinder (701), and a second stopper (704) for preventing the structure from moving horizontally is arranged on the second ear seat (702) and the third ear seat (703), and the second ear seat (702) and the third ear seat (703) are connected to the lifting frame (2).

7. The method for transporting a segment conveying device adapted for transporting a full ring of segments at a large slope according to claim 1, characterized in that: When excavating a normal tunnel section or a section with a small slope, the overall lifting mechanism (6) is retracted, the trailer or the main machine drags the chassis (1) through the first dragging structure (4), the segment conveying device travels on the assembled segments, and the first dragging structure (4) normally adjusts the position of the chassis (1); During tunneling of a steeply sloped tunnel, the integral lifting mechanism (6) is extended, so that the running wheels of the segment conveying device are separated from the assembled segments, and the friction pads (603) are supported on the assembled segments; at this time, due to the slope, the first dragging structure (4) cannot meet the dragging requirements for the chassis (1), and at this time, the screw mechanism in the second dragging structure (5) is adjusted to adjust the position of the chassis (1) and the trailer or the main machine, thereby meeting the dragging requirements for the chassis (1); The support beam (902) is hoisted by a crane, and the vertical support member (905) is lifted, so that the vertical support member (905) and the support beam (902) are hinged at a suitable position, and the support beam (902) is in a horizontal or approximately horizontal position at a large slope as a standard. At this time, the segment crane (11) drives the segment (10) to be horizontally placed on the support beam (902), and then the support beam (902) is lowered by the crane, so that the segment (10) is in a reasonable position; or the support beam (902) is lifted by adjusting the oil cylinder until the support beam (902) is in a horizontal or approximately horizontal position at a large slope. At this time, the segment crane (11) drives the segment (10) to be horizontally placed on the support beam (902), and then the oil cylinder is adjusted to drive the support beam (902) to retract, so that the segment (10) is in a reasonable position; The sliding frame (3) drives the pipe segment (10) to step forward under the action of the driving mechanism until it steps to the position of the sliding frame (3) of the next stepping unit. The lifting frame (2) of the stepping unit pushes up the pipe segment (10) after the stepping, so that the sliding frame (3) of the previous stepping unit retreats to the original position. Then the lifting frame (2) descends to place the pushed-up pipe segment (10) on the sliding frame (3) of the next stepping unit. In this cycle, each stepping unit continuously transports each pipe segment (10) forward. During the transportation process, the anti-slip mechanism (8) and the pipe segment blocking structure continue to act to limit the backward movement of the pipe segment (10).

Citation Information

Patent Citations

  • Segment transfer trolley that can simultaneously adapt to the functions of integral ring segment transfer and small-curve tunneling

    CN104775834B

  • Tube segment transport trolley simultaneously adaptive to whole-ring tube segment transportation function and small-curve tunneling function

    CN104775834A

  • Duct piece transportation device suitable for large gradient and capable of rapidly transferring

    CN211202013U