A floating box type swing door tide gate

By introducing the door pier and wedge-shaped guide surface into the floating box swing door tide gate, the stress mode of the gate body is changed, the problems of large span force limitation and inaccurate positioning are solved, and the super-large span water barrier is achieved and Accurate positioning effect.

CN114575311BActive Publication Date: 2024-11-05SHANGHAI WATER ENG DESIGN & RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210172310.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-24
Publication Date
2024-11-05
Estimated Expiration
2042-02-24

AI Technical Summary

Technical Problem

The existing floating box swing door tide barrier is limited by the force mode under large spans, making it difficult to achieve excessive span water barrier, and the positioning of the gate door body is inaccurate during sinking and release.

Method used

The structure of the floating box gate door body and the gate bottom sill is adopted. By setting a door pier on the gate bottom sill and a wedge-shaped guide surface is designed at the gate pier and the gate bottom sill, the gate door body moves in the opposite direction of the water flow direction. , the force-bearing mode is converted into a gravity-type gate-dam mode, so that the horizontal thrust of the head is transferred from the gate pier to the gate bottom sill and the door pier to bear it.

Benefits of technology

The ultra-large span water barrier capability of the gate body is realized, avoiding span limitation, and improving the positioning accuracy and sinking stability of the gate body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114575311B_ABST
    Figure CN114575311B_ABST
Patent Text Reader

Abstract

The present invention discloses a floating box type swing gate tide gate, comprising a gate body, left and right gate piers and a gate bottom sill, wherein a gate pier is arranged on the top surface of the gate bottom sill, and the gate side of the gate pier is located at the front side of the water-facing side of the left and right gate piers in the opposite direction of the water flow direction, when the gate body rotates to the river channel tide blocking position, the left and right end sides of the gate body are abutted against the water-facing side of the left and right gate piers, and then water is injected into the gate body through the injection and drainage system, so that the gate body is slowly sunk onto the gate bottom sill, and during the sinking process, the gate body is moved in the opposite direction of the water flow direction, so that the gate body is away from the left and right gate piers and abuts against the gate pier. The tide gate of the present invention is no longer limited by span, and can achieve super-large span water blocking.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy engineering, and in particular to a buoy-type swing-door tide-blocking gate. Background Art

[0002] Tidal gates are sluices built in coastal areas or near river mouths to block tides, store fresh water, discharge floodwater, and drain waterlogging. The gates are closed at high tide to prevent the tide from flowing back into the river, to store inland fresh water, and to meet the needs of water diversion and shipping. At low tide, the tide level is lower than the river level, and the gates are opened to discharge floodwater, drain waterlogging, and flush out silt. As a coastal country, my country has a large number of rivers flowing into the sea, and the banks of the rivers are basically important cities, and the terrain is low-lying. As the global sea level continues to rise, ground subsidence continues to intensify, and the intrusion of storm surges seriously affects the safety of life and property of people in the surrounding areas of the river. Therefore, there is an urgent need to build tidal gates at the river mouths.

[0003] The pontoon-type swing-gate tide gate is a flat caisson structure that rotates around a vertical axis on one side of the river channel. It has the advantages of clever use of buoyancy and small engineering footprint. The gate rotates to the river channel closing position with the help of buoyancy, and then water is filled into the gate body through the water injection system to make it sink to the bottom sill of the gate to achieve waterway closure. When blocking the tide, the conventional pontoon-type swing-gate tide gate has both ends of the gate body 10 resting on the piers 20a and 20b on both sides. The horizontal thrust generated by the head difference is similar to a uniformly distributed load, which is transmitted to the piers 20a and 20b on both sides through the gate body 10. The horizontal thrust is mainly borne by the piers 20a and 20b on both sides. Figure 1 shown.

[0004] The gate of a conventional pontoon-type swing-gate tidal gate is subjected to a uniformly distributed load caused by the head difference inside the gate when blocking the tide. The force mode is a simply supported beam. Since the mid-span bending moment of a simply supported beam is the square of the span, and the mid-span deflection is the fourth power of the span. As the span of the gate increases, its mid-span bending moment and deflection will increase significantly, so this force mode limits the application span of the pontoon-type swing-gate tidal gate. At present, the commonly used span of this type of gate is between 50m and 70m.

[0005] Rivers where tidal gates are built usually have shipping needs. In order to reduce the impact of tidal gate construction on navigation, large tidal gates often require a single-hole clear span of more than 200 meters. At this time, the stress mode of conventional pontoon-type swing-door tidal gates is no longer applicable.

[0006] Therefore, the applicant has found a solution to the above-mentioned problem through beneficial exploration and research, and the technical solution to be introduced below is produced in this context. Summary of the invention

[0007] The technical problem to be solved by the present invention is to provide a buoy-type swing-door tide-blocking gate with good large-span stress conditions, convenient for accurate positioning of the gate body, and capable of assisting the gate body to be sunk to the gate bottom sill in view of the deficiencies of the prior art.

[0008] The technical problem to be solved by the present invention can be achieved by adopting the following technical solutions:

[0009] A buoyancy box type swing door tide gate, comprising:

[0010] A gate body, wherein the gate body adopts a pontoon structure and an injection and drainage system is arranged inside the gate body, the gate body can rotate around a vertical axis on one side of the river channel to a tide-blocking position in the river channel; left and right gate piers are arranged at the left and right banks of the river channel; and a gate bottom sill is arranged on the riverbed of the river channel and between the left and right gate piers; it is characterized in that a gate pier is arranged on the top surface of the gate bottom sill, and the gate-blocking side surface of the gate pier is located at the front side of the water-facing side surface of the left and right gate piers in the opposite direction of the water flow direction. When the gate body rotates to the tide-blocking position in the river channel, the left and right end sides of the gate body are abutted against the water-facing side surface of the left and right gate piers, and then water is injected into the gate body through the injection and drainage system, so that the gate body is slowly sunk onto the gate bottom sill. During the sinking process, the gate body is moved in the opposite direction of the water flow direction so that the gate body is away from the left and right gate piers and abuts against the gate pier.

[0011] In a preferred embodiment of the present invention, left and right wedge-shaped guide surfaces are formed at the inner bottom corners of the left and right gate piers, and the side surfaces of the retaining gate close to the gate pier are formed as wedge-shaped retaining gate sides, and the slope foot lines of the left and right wedge-shaped guide surfaces and the slope top lines of the wedge-shaped retaining gate sides are located in the same vertical plane; the bottom angle parts of the gate where the gate body fits with the left and right gate piers are right angles, and the bottom angle parts of the gate body where the gate bottom sill fits are wedge-shaped surfaces that cooperate with the wedge-shaped retaining gate sides.

[0012] In a preferred embodiment of the present invention, the left and right gate piers adopt hollow box reinforced concrete structures, and pile foundations are arranged underneath.

[0013] In a preferred embodiment of the present invention, the gate sill adopts a hollow box reinforced concrete structure, and a pile foundation is arranged below the hollow box reinforced concrete structure.

[0014] Due to the adoption of the above technical scheme, the beneficial effect of the present invention is that during the sinking process, the present invention makes the gate body move in the opposite direction of the water flow direction, so that the gate body is away from the left and right gate piers and abuts against the gate piers, thereby realizing the conversion of the gate body structure force mode, that is, its force mode is converted from the simply supported beam structure mode to the gravity dam mode, and the horizontal thrust generated by the head difference during tide blocking is no longer borne by the left and right gate piers, but is shared on the gate bottom sill, and is borne jointly by the frictional resistance generated by the deadweight of the gate body and the gate piers on the gate bottom sill. Therefore, the tide-blocking gate is no longer limited by the span, and ultra-large span water blocking can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a structural schematic diagram of a conventional pontoon-type swing-door tide gate.

[0017] Figure 2 It is a structural schematic diagram of the left and right gate piers and the gate bottom sill of the present invention.

[0018] Figure 3 It is a plan view of the left and right gate piers and the gate bottom sill of the present invention.

[0019] Figure 4 It is a cross-sectional schematic diagram of the left and right gate piers of the present invention.

[0020] Figure 5 It is a cross-sectional schematic diagram of a gate bottom sill of the present invention.

[0021] Figure 6 It is a schematic diagram of the three-dimensional structure of the gate body of the present invention.

[0022] Figure 7 It is a schematic diagram of the cooperation between the gate body of the present invention and the left and right gate piers when the gate body is rotated to the river channel tide blocking position.

[0023] Figure 8 It is a schematic diagram of the cooperation between the gate body and the gate bottom sill of the present invention when the gate body is rotated to the river channel tide blocking position.

[0024] Fig. 9 It is a schematic diagram of the coordination between the gate body and the left and right gate piers of the present invention when the gate body is in the gate body sinking state 1.

[0025] Fig.10It is a schematic diagram of the coordination between the gate body and the gate sill of the present invention when the gate body is in the gate body sinking state 1.

[0026] Fig.11 It is a schematic diagram of the coordination between the gate body and the left and right gate piers of the present invention when the gate body is in the gate body sinking state 2.

[0027] Fig.12 It is a schematic diagram of the coordination between the gate body and the gate sill of the present invention when the gate body is in the gate body sinking state 2.

[0028] Fig.13 It is a schematic diagram of the coordination between the gate body of the present invention and the left and right gate piers when the gate body is completely dropped.

[0029] Fig.14 It is a schematic diagram of the coordination between the gate body and the gate sill of the present invention when the gate body is completely dropped. DETAILED DESCRIPTION

[0030] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific diagrams.

[0031] See also Figures 2 to 6 , the figure shows a buoy-type swing-door tide-blocking gate, including a gate body 100, left and right gate piers 200a, 200b and a gate bottom sill 300.

[0032] The gate body 100 adopts a pontoon structure, specifically a box-shaped welded structure, and a flooding and drainage system is arranged inside the gate body 100. The cross-sectional structure of the gate body 100 can be determined according to design requirements. The gate body 100 can rotate around a vertical axis on one side of the river channel to a tide-blocking position in the river channel.

[0033] The left and right gate piers 200a and 200b are arranged at the left and right banks of the river channel. The left and right gate piers 200a and 200b adopt hollow box reinforced concrete structures, and pile foundations are arranged below them to improve structural stability.

[0034] The gate sill 300 is arranged on the riverbed and between the left and right gate piers 200a and 200b. The gate sill 300 adopts an empty box reinforced concrete structure, and a pile foundation is arranged below it to improve the structural stability. A gate pier 310 is arranged on the top surface of the gate sill 300. The gate pier 310 is a raised strip structure, which extends along the length direction of the gate sill 300, and its left and right ends are respectively against the side surfaces of the left and right gate piers 200a and 200b. The gate side of the gate pier 310 is located at the front side of the water-facing side of the left and right gate piers 200a and 200b in the opposite direction of the water flow direction.

[0035] When the gate body 100 rotates to the river channel tide blocking position, the left and right end sides of the gate body 100 are abutted against the water-facing sides of the left and right gate piers 200a and 200b, and then water is injected into the gate body 100 through the injection and drainage system, so that the gate body 100 is slowly sunk to the gate bottom sill. During the sinking process, the gate body 100 is moved in the opposite direction of the water flow direction, so that the gate body 100 is away from the left and right gate piers 200a and 200b and abuts against the gate pier 310. When blocking the tide, the horizontal thrust generated by the head difference is no longer borne by the left and right gate piers 200a and 200b, but is shared on the gate bottom sill 300, and is borne jointly by the frictional resistance generated by the deadweight of the gate body 100 and the gate pier 310 on the gate bottom sill 300. Therefore, the tide blocking gate is no longer limited by the span, and ultra-large span water blocking can be achieved.

[0036] More specifically, in order to realize the conversion of the force mode of the gate body 100, left and right wedge-shaped guide surfaces 210a and 210b are formed at the inner bottom corners of the left and right gate piers 200a and 200b, and a wedge-shaped gate side surface 311 is formed on the side of the gate close to the gate pier 310. The slope foot lines 211a and 211b of the left and right wedge-shaped guide surfaces 210a and 210b and the slope top line 311a of the wedge-shaped gate side surface 311 are located in the same vertical plane. The bottom angles of the gate where the gate body 100 fits with the left and right gate piers 200a and 200b are right angles 110a and 110b, and the bottom angles of the gate body 100 and the gate bottom sill 300 are wedge-shaped surfaces 120 that cooperate with the wedge-shaped retaining gate side 311. The wedge-shaped surfaces 120 and the wedge-shaped retaining gate side 311 have the same slope, height and width. When the gate body 100 falls completely on the gate bottom sill 300, the two can fit perfectly.

[0037] The gate body 100 is usually docked in the gate house. When it is needed to block the tide, the gate body 100 floats on the water surface and rotates around the vertical axis on one side of the river channel to the tide blocking position of the river channel. At this time, the two ends of the gate body 100 are tightly attached to the left and right gate piers 200a and 200b. By injecting water into the gate body 100, the gate body 100 slowly sinks to the gate bottom sill 300 to achieve water channel closure. Since the water injection and sinking process takes a certain amount of time, the gate body 100 is placed horizontally in the middle of the river channel to block water. As the tide outside the gate rises, the water level outside the gate will be higher than that inside the gate. At this time, under the action of the head difference, the force mode of the gate body 100 is a simply supported beam structure mode. The horizontal thrust generated by the head difference is similar to a uniformly distributed load, which is transmitted to the left and right gate piers 200a and 200b through the gate body 100. The horizontal thrust is mainly borne by the left and right gate piers 200a and 200b. However, the head difference is not large at this time, and the gate body 100 and the side piers are less stressed. The main function of the left and right gate piers 200a and 200b is to temporarily abut and position the gate body 100, and to assist the gate body 100 in sinking at the designed predetermined position. When the gate body 100 rotates to the center of the river channel and prepares to sink, the positional relationship between the left and right gate piers 200a and 200b and the gate body 100 is as follows: Figure 7 As shown, the positional relationship between the gate sill 300 and the gate body 100 is as shown in FIG. Figure 8 shown.

[0038] When the gate body 100 is filled with water and slowly sinks, the right angles 110a and 110b of the gate body 100 will contact the left and right wedge-shaped guide surfaces 210a and 210b of the left and right gate piers 200a and 200b. Fig. 9 At the same time, the lower edge of the wedge-shaped surface 120 of the gate body 100 contacts the upper edge of the wedge-shaped retaining gate side 311 of the gate pier 310 on the gate bottom sill 300, as shown in FIG. Fig.10 shown.

[0039] As the gate body 100 slowly sinks, the gate body 100 moves outward under the guidance of the left and right wedge-shaped guide surfaces 210a and 210b of the left and right gate piers 200a and 200b. Fig.11 and Fig.12 shown.

[0040] Finally, see Fig.13 and Fig.14 When the gate body 100 completely falls on the gate sill 300, the gate body 100 is completely separated from the left and right gate piers 200a and 200b. At this time, the horizontal thrust on the gate body 100 is no longer borne by the left and right gate piers 200a and 200b, but is shared on the gate sill 300. The frictional resistance generated by the deadweight of the gate body 100 and the gate piers 310 on the gate sill 300 are jointly borne. Therefore, the gate body 100 is no longer restricted by the span, and ultra-large span water retaining can be achieved.

[0041] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A buoyancy type swing door tide gate, comprising: The gate body adopts a pontoon structure and is provided with a water injection and drainage system inside. The gate body can rotate around a vertical axis on one side of the river channel to a tide-blocking position in the river channel; The left and right gate piers are set on the left and right banks of the river; as well as The gate bottom sill is arranged on the riverbed and located between the left and right gate piers; characterized in that: A gate pier is arranged on the top surface of the gate sill, and the gate-blocking side surface of the gate pier is located at the front side of the water-facing side surface of the left and right gate piers in the opposite direction of the water flow direction. When the gate body rotates to the river tide blocking position, the left and right end sides of the gate body are pressed against the water-facing side surfaces of the left and right gate piers, and then water is injected into the gate body through the injection and drainage system, so that the gate body is slowly sunk onto the gate sill. During the sinking process, the gate body is moved in the opposite direction of the water flow direction, so that the gate body is away from the left and right gate piers and presses against the gate pier; Left and right wedge-shaped guide surfaces are formed at the inner bottom corners of the left and right gate piers, and the side surfaces of the gate close to the gate piers are formed as wedge-shaped gate sides, and the slope foot lines of the left and right wedge-shaped guide surfaces and the slope top lines of the wedge-shaped gate sides are located in the same vertical plane; the bottom angle parts of the gate where the gate body fits with the left and right gate piers are right angles, and the bottom angle parts of the gate body where the gate bottom sill fits are wedge-shaped surfaces that cooperate with the wedge-shaped gate sides.

2. The buoy-type swing-door tide gate according to claim 1, characterized in that: The left and right gate piers are hollow box reinforced concrete structures, with pile foundations arranged underneath.

3. The buoy-type swing-door tide gate according to claim 1, characterized in that: The gate sill adopts a hollow box reinforced concrete structure, and a pile foundation is arranged below it.