Relay type multi-stage rock breaking method and device

Through the relay multi-stage rock breaking method, graded rock breaking technology and drilling tool assembly optimization, the problem of insufficient rock breaking energy of drill bits in hard formations has been solved, the mechanical penetration rate and drill bit life have been improved, and downhole vibration has been reduced.

CN114592793BActive Publication Date: 2024-10-22CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011404142.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-04
Publication Date
2024-10-22
Estimated Expiration
2040-12-04

AI Technical Summary

Technical Problem

In hard formations, it is difficult for drill bits to effectively break rock, leading to problems such as low mechanical drilling speed, short service life, and long drilling cycles. Existing technological improvements are still unable to meet the energy demand for rock breaking in hard formations.

Method used

Adopting a relay multi-stage rock breaking method, through graded rock breaking technology, using the combination of guide holes and reaming drill bits, the rock breaking energy requirements are broken down step by step, the drilling tool assembly and downhole tool parameters are optimized, and the rock breaking efficiency of each stage is coordinated to ensure that each Level rock breaking meets the threshold conditions.

Benefits of technology

It effectively reduces drill bit torque requirements, improves drill bit stability and mechanical drilling speed, reduces downhole vibration, and significantly improves drilling efficiency and drill bit life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114592793B_ABST
    Figure CN114592793B_ABST
Patent Text Reader

Abstract

The present invention provides a relay-type multi-stage rock breaking method, which includes: based on the working torque of the downhole power drill tool to be selected for the wellbore to be drilled and the threshold value of the rock breaking energy requirement, the rock breaking technology to be adopted is selected; if the graded rock breaking technology is adopted, the size of the pilot drill bit is changed, and the downhole power drill tool that meets the threshold value of the rock breaking energy requirement of the pilot drill bit is selected; based on the power of the impact-type auxiliary rock breaking tool that can be selected for the reaming drill bit and the threshold value of the rock breaking energy requirement, the number of grades of graded rock breaking, the reaming drill bit and the impact-type auxiliary rock breaking tool are selected; according to the restriction conditions, the drilling tool combination and the drilling parameters are optimized, and the rock breaking efficiency between the grades in the graded rock breaking is coordinated to obtain the optimal rock breaking solution. The present invention proposes a relay-type graded rock breaking drilling method, and proposes an optimized graded rock breaking drilling tool combination, and establishes a drilling optimization process, which can solve the problems of insufficient rock breaking energy supply of the drill bit in large-sized wellbores in hard-ultra-hard formations and unstable operation of downhole drilling tools.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological drilling and well drilling, and in particular to a relay-type multi-stage rock breaking method and device. Background Art

[0002] Common rock breaking methods for rotary drilling include: rotary table (or top drive) drilling; composite drilling of rotary table (or top drive) with downhole power drilling tools and auxiliary rock breaking tools.

[0003] For hard formations, the commonly used rock breaking methods have the following problems:

[0004] (1) The drill bit has difficulty penetrating into hard formations. The threshold values ​​of drilling pressure and drill bit torque required for efficient rock breaking are high, which exceeds the working capacity of current equipment, drilling tools or downhole tools, resulting in low mechanical drilling speed in hard formations.

[0005] (2) The drill bit cannot stably penetrate the formation or cannot continuously and stably obtain the drill bit torque required for breaking the rock. Downhole vibrations such as lateral vibration and torsional vibration will occur at the bottom of the well, which will induce vortex, stick-slip and other movements, causing early damage to the PDC drill bit. Therefore, in hard formations and complex formations such as soft and hard formations, the problems of slow mechanical drilling speed, short life and small footage of the drill bit greatly increase the drilling cycle and drilling costs.

[0006] The prior art discloses an efficient rock-breaking combination tool with a stepped action of percussion and scraping, which is composed of a front impact drill bit, a short section and a PDC drill bit. The length of the step structure between the front impact drill bit and the rear PDC drill bit can be adjusted by installing short sections of different series and lengths. The prior art mainly improves the drill bit, which can improve the mechanical drilling speed and drill bit stability, but it still has the problem of insufficient rock-breaking energy for hard formations.

[0007] The prior art discloses a drilling speed-up device with a composite drill bit, including a multifunctional joint, an outer shell and a screw drive assembly are respectively connected to the multifunctional joint, one end of the outer shell is connected to a reaming drill bit, and the screw drive assembly is connected to a pilot drill bit. The rotation speed of the pilot drill bit is higher than that of the reaming drill bit, which can improve the overall mechanical drilling speed. The prior art can reduce the energy demand of the reaming drill bit by drilling the pilot hole first and then reaming the hole. At the same time, the screw provides torque to the pilot drill bit, and the rotary table or top drive transmits the torque to the reaming drill bit through the drill string, which can increase the rock breaking energy. However, hard formations are not very sensitive to the drill bit rotation speed, and the high rotation speed has limited effect on the pilot drill bit speed-up.

[0008] Therefore, the present invention provides a relay-type multi-stage rock breaking method and device. Summary of the invention

[0009] The purpose of the present invention is to overcome the shortcomings of the prior art, optimize the drilling tool combination, and solve the problems of slow mechanical drilling speed and short drill bit life caused by insufficient rock breaking energy supply of the drill bit in large-sized wellbores in hard and extremely hard formations.

[0010] In order to solve the above problems, the present invention provides a relay-type multi-stage rock breaking method, characterized in that the method comprises the following steps:

[0011] Step 1: Based on the working torque of the downhole power drilling tool available for the size of the wellbore to be drilled and the threshold value of the rock breaking energy requirement, determine whether to use the graded rock breaking technology;

[0012] Step 2: If the graded rock breaking technology is adopted, the pilot hole is the first-level rock breaking, and the preferred auxiliary rock breaking tool is the downhole power drilling tool. The size of the pilot hole drill bit is changed, and the pilot hole size and the downhole power drilling tool used are determined according to the rock breaking energy requirement threshold value of the pilot hole drill bit and the matching downhole power drilling tool;

[0013] Step 3: The secondary rock-breaking tool is the reaming drill bit, and the preferred auxiliary rock-breaking tool is the impact-type auxiliary rock-breaking tool. Based on the power of the impact-type auxiliary rock-breaking tool that can be used for reaming and the rock-breaking energy requirement threshold of the reaming drill bit, the size of the reaming drill bit and the impact-type auxiliary rock-breaking tool used are determined, or the same method is used to increase the number of graded rock-breaking stages;

[0014] Step 4: Optimize the drill bit assembly and drilling parameters according to the constraints, coordinate the rock breaking efficiency between each level in the graded rock breaking, and obtain the optimal rock breaking solution.

[0015] According to an embodiment of the present invention, the rock breaking energy requirement threshold value includes a threshold torque and a threshold drilling pressure, and the step 1 includes the following steps:

[0016] The threshold torque and threshold drilling pressure required for the drill bit to break the rock are calculated according to rock mechanical parameters, wellbore size, formation lithology, drill bit type and diameter;

[0017] and / or,

[0018] Calculate the torque and bit pressure required to break the rock based on the expected mechanical penetration rate.

[0019] According to one embodiment of the present invention, the step 1 comprises the following steps:

[0020] Comparing the working torque of the downhole power drilling tool to be selected and the rock breaking energy requirement threshold value;

[0021] If the working torque of the downhole power drilling tool to be selected is not less than the rock breaking energy requirement threshold value, conventional rock breaking technology is adopted;

[0022] If the working torque of the downhole power drilling tool to be selected is less than the rock breaking energy requirement threshold value, the graded rock breaking technology is adopted.

[0023] According to one embodiment of the present invention, the step 2 comprises the following steps:

[0024] The pilot hole is a primary rock breaking tool, and the preferred auxiliary rock breaking tool is a downhole power drill. The wellbore size is reduced and a downhole power drill matching the reduced pilot hole drill bit is determined as an alternative group. The threshold torque and threshold drilling pressure required for the pilot hole drill bit to break the rock are calculated;

[0025] Compare the working torque of the downhole power drilling tool and the rock breaking energy requirement threshold of the pilot drill bit in the alternative group;

[0026] If the working torque of the downhole power drilling tool in the candidate group is not less than the rock breaking energy requirement threshold value of the pilot drill bit, the downhole power drilling tool for the pilot hole is selected, and the size of the pilot drill bit is determined;

[0027] If the working torque of the downhole power drill in the alternative group is less than the rock-breaking energy requirement threshold of the pilot drill bit, the size of the pilot drill bit is adjusted, or the downhole power drill is used in conjunction with other auxiliary rock-breaking tools until the working torque of the selected downhole power drill meets the requirements.

[0028] According to one embodiment of the present invention, step three comprises the following steps:

[0029] The secondary rock-breaking tool is a reaming drill bit, and the preferred auxiliary rock-breaking tool is an impact-type auxiliary rock-breaking tool. The power of the to-be-selected impact-type auxiliary rock-breaking tool and the rock-breaking energy requirement threshold of the reaming drill bit are compared;

[0030] If the power of the selected impact auxiliary rock breaking tool is not less than the rock breaking energy requirement threshold of the reaming drill bit, the secondary rock breaking technology is adopted;

[0031] If the power of the to-be-selected impact-type auxiliary rock-breaking tool is less than the rock-breaking energy requirement threshold value of the reaming drill bit, the size of the reaming drill bit is changed, the number of levels of graded rock-breaking technology is increased, and the preferred auxiliary rock-breaking tool is the impact-type auxiliary rock-breaking tool, until the power of the impact-type auxiliary rock-breaking tool selected in each level of reaming rock breaking is not less than the rock-breaking energy requirement threshold value of the corresponding reaming drill bit.

[0032] According to an embodiment of the present invention, the limiting conditions include but are not limited to hydraulic parameters and drill string stability.

[0033] According to one embodiment of the present invention, the drilling tool assembly is optimized by the following steps:

[0034] Preferably, a pilot drill bit, an reamer drill bit, a downhole power drill with a straight shell or a curved shell, an impact auxiliary rock breaking tool and their placement positions are selected.

[0035] According to one embodiment of the present invention, the drilling parameters include but are not limited to drilling pressure, rotary table torque, rotary table speed, drilling fluid displacement and pump pressure.

[0036] According to one embodiment of the present invention, the step 4 comprises the following steps:

[0037] The expected range of mechanical drilling speed is set so that the mechanical drilling speed of each level of rock breaking meets the expected range of mechanical drilling speed.

[0038] According to another aspect of the present invention, a relay-type multi-stage rock breaking device is further provided, wherein the device performs a relay-type multi-stage rock breaking by performing any of the above methods, and the device comprises:

[0039] The first module is used to select whether to use the graded rock breaking technology based on the working torque of the downhole power drilling tool that can be selected based on the size of the drilled wellbore and the rock breaking energy requirement threshold;

[0040] The second module is used for the case where the graded rock breaking technology is adopted, the pilot hole is the first-level rock breaking, and the preferred auxiliary rock breaking tool is the downhole power drilling tool. The size of the pilot hole drill bit is changed, and the pilot hole size and the downhole power drilling tool used are determined according to the rock breaking energy requirement threshold value of the pilot hole drill bit and the matching downhole power drilling tool;

[0041] The third module uses a reaming drill bit as the secondary rock-breaking tool, and the preferred auxiliary rock-breaking tool is an impact-type auxiliary rock-breaking tool. Based on the power of the impact-type auxiliary rock-breaking tool that can be used for reaming and the rock-breaking energy requirement threshold of the reaming drill bit, the size of the reaming drill bit and the impact-type auxiliary rock-breaking tool used are determined, or the same method is used to increase the number of graded rock-breaking stages;

[0042] The fourth module is used to optimize the drilling tool assembly and drilling parameters according to the constraints, coordinate the rock breaking efficiency between the various levels in the graded rock breaking, and obtain the optimal rock breaking solution.

[0043] The relay-type multi-stage drilling method and device provided by the present invention can solve the problem of insufficient rock breaking energy such as drilling pressure and drill bit torque in hard and extremely hard formations in large-sized wells. The main effects are as follows:

[0044] (1) By decomposing a rock breaking process into multiple stages, the energy demand for rock breaking can be decomposed step by step. Without changing the power of downhole tools (downhole power drilling tools, auxiliary rock breaking tools, etc.), each stage of rock breaking can be guaranteed to meet the rock breaking threshold conditions or even high-efficiency rock breaking conditions.

[0045] (2) Compared with the wellbore in the prior art, the rock breaking area of ​​each level of the wellbore in the present invention is smaller, the drill bit is easier to penetrate into the formation, the required drilling pressure and rock breaking torque are reduced, and under the premise that the output power of the existing tools remains unchanged, the rock breaking energy demand can be met through the optimized combination of the existing tools.

[0046] (3) After the guide hole is formed, the formation stress is released and the free interface of the wellbore wall is increased. The reaming drill bit combined with impact-type auxiliary rock-breaking tools can produce tensile splitting damage to the rock. The tensile strength of the rock is about 15% of the compressive strength. Conservative estimates show that the torque requirement of the drill bit can be reduced by about 50%, greatly reducing the difficulty of rock breaking.

[0047] (4) The multi-stage rock breaking design reduces the demand for rock breaking energy. The pilot drill bit and the reamer drill bit can enhance the straightening effect, enhance the working stability of the drill bit, reduce the probability of downhole vibration and adverse movement, and improve the anti-deflection effect of the drilling tool.

[0048] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0050] Figure 1 A flow chart of a relay-type multi-stage rock breaking method according to an embodiment of the present invention is shown;

[0051] Figure 2 A flow chart of a relay-type multi-stage rock breaking method according to another embodiment of the present invention is shown;

[0052] Figure 3 A schematic diagram showing a typical drilling tool assembly for secondary rock breaking according to an embodiment of the present invention; and

[0053] Figure 4 The structure block diagram of a relay-type multi-stage rock breaking device according to an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0054] To make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention are further described in detail below with reference to the accompanying drawings.

[0055] In the existing technology, insufficient rock-breaking energy such as drilling pressure and drill bit torque in hard and extremely hard formations in large-sized wellbores is the main reason for slow drilling speed and downhole vibration. Although the power of downhole power drill tools (screw drill tools are the most commonly used downhole power drill tools, which can be divided into straight screws and bent screws) and auxiliary rock-breaking tools has been greatly improved under current conditions, it still cannot meet the demand for efficient rock breaking in hard formations in large-sized wellbores. Moreover, given the limitations of wellbore size or tool size, it is difficult to achieve a significant speed-up effect simply by increasing the power of downhole power drill tools and auxiliary rock-breaking tools over a period of time.

[0056] Although there are technical solutions in the prior art that can form stepped wellbores, which partially solve the problem of slow drilling speed, it still fails to fundamentally solve the problem of insufficient rock-breaking energy of the drill bit.

[0057] Figure 1 A flow chart of a relay-type multi-stage rock breaking method according to an embodiment of the present invention is shown.

[0058] like Figure 1 In step S101, whether to use the graded rock breaking technology is determined based on the working torque of the downhole power drilling tool that can be selected according to the size of the drilled well and the rock breaking energy requirement threshold.

[0059] In one embodiment, the rock breaking energy requirement threshold value includes a threshold torque, a threshold bit pressure, and impact energy (including impact force and impact frequency).

[0060] Specifically, step S101 includes the following steps: calculating the threshold torque and threshold drilling pressure required for the drill bit to break rock according to rock mechanical parameters, wellbore size, formation lithology, drill bit type and diameter; and / or, calculating the torque and drilling pressure required for rock breaking according to the expected mechanical drilling speed.

[0061] Step S101 includes the following steps: comparing the working torque of the downhole power drilling tool to be selected and the rock breaking energy requirement threshold value.

[0062] Step S101 includes the following steps: if the working torque of the downhole power drilling tool to be selected is not less than the rock breaking energy requirement threshold value, conventional rock breaking technology is adopted.

[0063] Step S101 includes the following steps: if the working torque of the downhole power drilling tool to be selected is less than the rock breaking energy requirement threshold value, a graded rock breaking technology is adopted.

[0064] like Figure 1 In step S102, if the graded rock breaking technology is adopted, the pilot hole is the first-level rock breaking, and the preferred auxiliary rock breaking tool is the downhole power drill. The size of the pilot hole drill bit is changed, and the pilot hole size and the downhole power drill used are determined according to the rock breaking energy requirement threshold value of the pilot hole drill bit and the matching downhole power drill.

[0065] Specifically, if the graded rock breaking technology is used, the size of the pilot drill bit and the matching downhole power drill are changed until the downhole power drill or the auxiliary rock breaking tool meets the threshold value of the pilot drill bit's rock breaking energy requirement.

[0066] Step S102 includes the following steps: the pilot hole is the first-level rock breaking, the preferred auxiliary rock breaking tool is the downhole power drill, the wellbore size is reduced and the downhole power drill that matches the reduced pilot hole drill bit is determined as an alternative group, and the threshold torque and threshold drilling pressure required for the pilot hole drill bit to break the rock are calculated.

[0067] Step S102 includes the following steps: comparing the working torque of the downhole power drilling tool in the candidate group and the rock breaking energy requirement threshold value of the pilot drill bit.

[0068] Step S102 includes the following steps: if the working torque of the downhole power drill in the candidate group is not less than the rock breaking energy requirement threshold value of the pilot drill bit, the downhole power drill is selected as the pilot drill, and the size of the pilot drill bit is determined.

[0069] Step S102 includes the following steps: if the working torque of the downhole power drill in the alternative group is less than the rock-breaking energy requirement threshold value of the pilot drill bit, the size of the pilot drill bit is adjusted, or the downhole power drill is used in conjunction with other auxiliary rock-breaking tools until the working torque of the selected downhole power drill meets the requirement.

[0070] like Figure 1 In step S103, the secondary rock breaking tool is a reaming drill bit, and the preferred auxiliary rock breaking tool is an impact-type auxiliary rock breaking tool. Based on the power of the impact-type auxiliary rock breaking tool that can be selected for reaming and the rock breaking energy requirement threshold of the reaming drill bit, the size of the reaming drill bit and the impact-type auxiliary rock breaking tool used are determined, or the same method is used to increase the number of graded rock breaking stages.

[0071] Step S103 includes the following steps: the secondary rock breaking tool is a reaming drill bit, the preferred auxiliary rock breaking tool is an impact auxiliary rock breaking tool, and the power of the selected impact auxiliary rock breaking tool and the rock breaking energy requirement threshold of the reaming drill bit are compared.

[0072] Step S103 includes the following steps: if the power of the to-be-selected impact auxiliary rock breaking tool is not less than the rock breaking energy requirement threshold value of the reaming drill bit, the secondary rock breaking technology is adopted.

[0073] Step S103 includes the following steps: if the power of the to-be-selected impact-type auxiliary rock-breaking tool is less than the rock-breaking energy requirement threshold value of the reaming drill bit, the size of the reaming drill bit is changed, the number of levels of graded rock-breaking technology is increased, and the preferred auxiliary rock-breaking tool is the impact-type auxiliary rock-breaking tool, until the power of the impact-type auxiliary rock-breaking tool selected in each level of reaming rock-breaking is not less than the rock-breaking energy requirement threshold value of the corresponding reaming drill bit.

[0074] like Figure 1 In step S104, the drilling tool assembly and drilling parameters are optimized according to the restriction conditions, and the rock breaking efficiency between the various levels in the graded rock breaking is coordinated to obtain the optimal rock breaking solution.

[0075] In one embodiment, the constraints include but are not limited to hydraulic parameters and drill string stability. The optimization of the drilling tool assembly includes: optimizing the pilot drill bit, the reaming drill bit, the downhole power drill with a straight shell or a curved shell, the impact auxiliary rock breaking tool and its placement position. The drilling parameters include but are not limited to drilling pressure, rotary table torque, rotary table speed, drilling fluid displacement and pump pressure.

[0076] In one embodiment, the expected range of mechanical drilling speed is set so that the mechanical drilling speed of each level of rock breaking meets the expected range of mechanical drilling speed.

[0077] In response to the current bottleneck in speeding up, the relay-type graded rock breaking drilling method of the present invention decomposes one rock breaking into multiple rock breaking to form a stepped wellbore, combines mature technologies such as shear rock breaking, impact rock breaking, and graded eye expansion, and optimizes and connects them in series on the same drill bit combination. Under existing technical conditions, a relay method is adopted to ensure that the rock breaking of each step meets the threshold conditions of drilling pressure and torque, and even high-efficiency rock breaking conditions, thereby achieving optimization and coordination of each step and overall rock breaking, and realizing breakthroughs in hard formations in large-size wellbores.

[0078] In hard formations, 2-3 levels of rock breaking are generally recommended, and for some difficult-to-drill formations, more than 3 levels of rock breaking can be used. After a drilling or section is completed, a drill bit that matches the wellbore size is used to drill through the well, remove the stepped bottom, and form a wellbore of the same diameter.

[0079] According to the optimization results, in principle, downhole power drilling tools are preferred for pilot holes, and impact-type auxiliary rock-breaking tools are preferred for reaming stages. Of course, other types of auxiliary rock-breaking tools can also be used for pilot holes, and downhole power drilling tools or other types of auxiliary rock-breaking tools can also be used for reaming stages. According to actual conditions, downhole power drilling tools or auxiliary rock-breaking tools may not be used at a certain stage, or downhole power drilling tools and auxiliary rock-breaking tools may be used at the same time.

[0080] In summary, the present invention proposes a relay-type graded rock-breaking drilling method, proposes an optimized graded rock-breaking drill tool combination, and establishes a drilling optimization process. Based on existing mature technologies, it can solve the problems of insufficient rock-breaking energy supply of the drill bit in large-sized wellbores in hard-ultra-hard formations and unstable operation of downhole drilling tools, and significantly improve the mechanical drilling speed and drill bit life. The present invention can be applied to drilling technology fields such as oil, natural gas, shale gas, coalbed methane and geological drilling.

[0081] Figure 2 A flow chart of a relay-type multi-stage rock breaking method according to another embodiment of the present invention is shown.

[0082] Figure 2 The method flow chart shown takes the use of downhole power drilling tools for the pilot hole, which can be used in conjunction with impact-type auxiliary rock breaking tools when necessary, and the use of impact-type auxiliary rock breaking tools in the reaming stage as an example to illustrate the optimization process of the present invention:

[0083] Step 201, calculate the threshold value of the drill bit rock breaking energy requirement, especially the threshold torque value, according to the formation lithology, rock mechanics parameters, drill bit type, wellbore size and other parameters, or calculate the drill bit torque, drilling pressure and other parameters required for rock breaking according to the expected mechanical drilling speed.

[0084] Step 202, compare the working torque of the optional downhole power drill with the drill bit torque required for rock breaking. If the working torque of the downhole power drill is not less than the drill bit torque required for rock breaking in the drilled section, or the combined drilling of the downhole power drill and the impact auxiliary rock breaking tool can meet the rock breaking energy requirement, then the conventional rock breaking technology is adopted; if the above conditions are not met, then the graded rock breaking technology is adopted.

[0085] Step 203, reducing the size of the pilot drill bit, repeating the above step 202 until the downhole power drill used in the pilot hole or after being combined with the auxiliary rock breaking tool, the working torque of the downhole tool is not less than the drill bit torque required for rock breaking in the drilled section.

[0086] Step 204, compare the power of the optional impact auxiliary rock breaking tool with the energy required for rock breaking by the reaming drill bit (the mechanical drilling speed of the reaming section is basically the same as that of the pilot hole). If the rock breaking energy requirement threshold value is met, the level 2 rock breaking technology is adopted; if the rock breaking energy requirement cannot be met, the size of the reaming drill bit is reduced and the number of reaming stages is increased until each stage meets the rock breaking requirement.

[0087] Step 205, further optimize the drill tool assembly according to the hydraulic parameters, drill string stability and other constraints, select the pilot drill bit, reaming drill bit, downhole power drill (straight shell or curved shell can be used), impact auxiliary rock breaking tools and their placement positions, optimize the drilling parameters (bit pressure, rotary table torque, rotary table speed, drilling fluid displacement, pump pressure), coordinate the rock breaking efficiency between each level, and make the mechanical drilling speed of each level of rock breaking basically the same.

[0088] Step 206, forming an efficient rock breaking technical solution by optimizing the drilling system as a whole, and dynamically adjusting the technical solution according to the actual drilling situation.

[0089] Figure 3 A schematic diagram of a typical drilling tool assembly for secondary rock breaking according to an embodiment of the present invention is shown.

[0090] like Figure 3As shown, the secondary rock breaking drill tool combination includes: a pilot drill bit + a power drill (an auxiliary rock breaking tool can be added below or above the power drill, or an impact-type auxiliary rock breaking tool can be used to replace the power drill) + 1-2 drill collars (preferably 1) + an eye-reaming drill bit (or an eye-reamer, collectively referred to as an eye-reaming drill bit) + an impact-type auxiliary rock breaking tool (a power drill can be added above the impact-type auxiliary rock breaking tool) + several drill collars.

[0091] In one embodiment, a three-stage rock-breaking drill tool combination includes: a pilot drill bit + a power drill (an auxiliary rock-breaking tool may be added below or above the power drill, or an impact-type auxiliary rock-breaking tool may be used to replace the power drill) + several drill collars (preferably one) + an eye-reaming drill bit + an impact-type auxiliary rock-breaking tool (may not be installed depending on the situation) + several drill collars (preferably one) + an eye-reaming drill bit + an impact-type auxiliary rock-breaking tool (a power drill may be added above the impact-type auxiliary rock-breaking tool) + several drill collars.

[0092] The present invention can also be combined with other drilling tool combinations, such as reaming drill bits, power drilling tools, impact-type auxiliary rock-breaking tools (axial direction, torsional direction, composite direction) or other types of auxiliary rock-breaking tools. The size and placement of the tool can be changed, or stabilizers and other components can be added, which can also achieve the speed-up effect and will not be elaborated here.

[0093] Figure 4 The structure block diagram of a relay type multi-stage rock breaking device according to an embodiment of the present invention is shown. The relay type multi-stage rock breaking device 400 performs relay type multi-stage rock breaking by executing any of the above methods.

[0094] like Figure 4 The relay-type multi-stage rock breaking device 400 includes a first module 401 , a second module 402 , a third module 403 and a fourth module 404 .

[0095] Specifically, the first module is used to select whether to adopt the graded rock breaking technology based on the working torque of the downhole power drilling tool that can be selected based on the size of the wellbore to be drilled and the threshold value of the rock breaking energy requirement.

[0096] Specifically, the second module is used when the graded rock breaking technology is adopted. The guide hole is the first-level rock breaking, and the preferred auxiliary rock breaking tool is the downhole power drill. The size of the guide hole drill bit is changed, and the guide hole size and the downhole power drill used are determined according to the rock breaking energy requirement threshold of the guide hole drill bit and the matching downhole power drill.

[0097] Specifically, the third module is used for the secondary rock breaking tool, which is the reaming drill bit. The preferred auxiliary rock breaking tool is the impact-type auxiliary rock breaking tool. Based on the power of the impact-type auxiliary rock breaking tool that can be selected for reaming and the rock breaking energy requirement threshold of the reaming drill bit, the size of the reaming drill bit and the impact-type auxiliary rock breaking tool used are determined, or the same method is used to increase the number of graded rock breaking levels.

[0098] Specifically, the fourth module is used to optimize the drill bit assembly and drilling parameters according to the constraints, coordinate the rock breaking efficiency between the various levels in the graded rock breaking, and obtain the optimal rock breaking solution.

[0099] In a specific embodiment, the maximum compressive strength of the Permian system in a block of the Tarim Basin is 180MPa, a 444.5mm borehole is used, and the mechanical drilling speed is <1.4m / h. Conventional bottom hole assembly: 444.5mm PDC drill bit + 286mm screw + 1 279mm drill collar + 442mm stabilizer + several (228-203)mm drill collars.

[0100] At the current technical level, the maximum working torque of the 286mm screw is lower than the threshold torque for rock breaking, and the threshold torque required for rock breaking by the 444.5mm PDC drill bit exceeds the torque value that the current drilling tools and rotary table (or top drive) can withstand. Therefore, the insufficient supply of rock breaking torque for the 444.5mm PDC drill bit is a problem that is difficult to solve under current technical conditions.

[0101] In order to improve the mechanical drilling speed, according to the method proposed by the present invention, the following scheme is designed:

[0102] 215.9mm PDC drill bit + 172mm screw + 158.8mm drill collar + 333.38mm reamer bit + 178mm axial impactor + 1 228.6mm drill collar + 444.5mm reamer bit + 228mm axial impactor + several 228.6mm drill collars + several 203.2mm drill collars + several 178mm drill collars + 149.2mm drill pipe. Under the current drilling technology conditions, the 215.9mm wellbore can achieve the highest mechanical drilling speed. Using 333.38mm reamer bit and 444.5mm reamer bit for impact breaking of rock can achieve tensile splitting destruction.

[0103] As shown in Table 1, each step can meet the threshold torque requirement and can effectively improve the drilling speed in hard formations.

[0104] Table 1 Comparison of the advantages of relay rock breaking

[0105]

[0106] In summary, the relay multi-stage drilling method and device provided by the present invention can solve the problem of insufficient rock breaking energy such as drilling pressure and drill bit torque in hard and extremely hard formations in large-sized wells. The main effects are as follows:

[0107] (1) By decomposing a rock breaking process into multiple stages, the energy demand for rock breaking can be decomposed step by step. Without changing the power of downhole tools (downhole power drilling tools, auxiliary rock breaking tools, etc.), each stage of rock breaking can be guaranteed to meet the rock breaking threshold conditions or even high-efficiency rock breaking conditions.

[0108] (2) Compared with the wellbore in the prior art, the rock breaking area of ​​each level of the wellbore in the present invention is smaller, the drill bit is easier to penetrate into the formation, the required drilling pressure and rock breaking torque are reduced, and under the premise that the output power of the existing tools remains unchanged, the rock breaking energy demand can be met through the optimized combination of the existing tools.

[0109] (3) After the guide hole is formed, the formation stress is released and the free interface of the wellbore wall is increased. The reaming drill bit combined with impact-type auxiliary rock-breaking tools can produce tensile splitting damage to the rock. The tensile strength of the rock is about 15% of the compressive strength. Conservative estimates show that the torque requirement of the drill bit can be reduced by about 50%, greatly reducing the difficulty of rock breaking.

[0110] (4) The multi-stage rock breaking design reduces the demand for rock breaking energy. The pilot drill bit and the reamer drill bit can enhance the straightening effect, enhance the working stability of the drill bit, reduce the probability of downhole vibration and adverse movement, and improve the anti-deflection effect of the drilling tool.

[0111] It should be understood that the embodiments disclosed in the present invention are not limited to the specific structures, processing steps or materials disclosed herein, but should be extended to equivalent substitutions of these features understood by ordinary technicians in the relevant field. It should also be understood that the terms used herein are only used for the purpose of describing specific embodiments and are not meant to be limiting.

[0112] The "one embodiment" or "embodiment" mentioned in the specification means that the specific features, structures or characteristics described in conjunction with the embodiment are included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment" or "embodiment" appearing in various places throughout the specification do not necessarily refer to the same embodiment.

[0113] Although the embodiments disclosed in the present invention are as above, the contents described are only embodiments adopted for facilitating the understanding of the present invention and are not intended to limit the present invention. Any technician in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the patent protection scope of the present invention shall still be subject to the scope defined in the attached claims.

Claims

1. A relay type multi-stage rock breaking method, characterized in that: The method comprises the following steps: Step 1: Based on the working torque of the downhole power drilling tool corresponding to the borehole size and the rock breaking energy requirement threshold, determine whether to use the graded rock breaking technology; Step 2: If the graded rock breaking technology is adopted, the pilot hole is the first-level rock breaking, and the preferred auxiliary rock breaking tool is the downhole power drilling tool. The size of the pilot hole drill bit is changed, and the pilot hole size and the downhole power drilling tool used are determined according to the rock breaking energy requirement threshold value of the pilot hole drill bit and the matching downhole power drilling tool; Step 3: The secondary rock breaking tool is the reaming drill bit, and the preferred auxiliary rock breaking tool is the impact auxiliary rock breaking tool. Based on the power of the impact auxiliary rock breaking tool corresponding to the reaming and the rock breaking energy requirement threshold of the reaming drill bit, the size of the reaming drill bit and the impact auxiliary rock breaking tool used are determined, or the same method is used to increase the number of graded rock breaking stages; Step 4: Optimize the drilling tool assembly and drilling parameters according to the constraints, coordinate the rock breaking efficiency between each level in the graded rock breaking, and obtain the optimal rock breaking solution; The rock breaking energy requirement threshold value includes a threshold torque and a threshold drilling pressure, and the step 1 includes the following steps: The threshold torque and threshold drilling pressure required for the drill bit to break the rock are calculated according to rock mechanical parameters, wellbore size, formation lithology, drill bit type and diameter; and / or, Calculate the torque and drilling pressure required to break the rock based on the expected mechanical drilling speed; The step 1 comprises the following steps: comparing the working torque of the downhole power drill to be selected and the rock breaking energy requirement threshold value; if the working torque of the downhole power drill to be selected is not less than the rock breaking energy requirement threshold value, adopting conventional rock breaking technology; If the working torque of the downhole power drilling tool to be selected is less than the rock breaking energy requirement threshold value, the graded rock breaking technology is adopted.

2. The relay-type multi-stage rock breaking method according to claim 1, characterized in that: The step 2 comprises the following steps: The pilot hole is a primary rock breaking tool, and the preferred auxiliary rock breaking tool is a downhole power drill. The wellbore size is reduced and a downhole power drill matching the reduced pilot hole drill bit is determined as an alternative group. The threshold torque and threshold drilling pressure required for the pilot hole drill bit to break the rock are calculated; Compare the working torque of the downhole power drilling tool and the rock breaking energy requirement threshold of the pilot drill bit in the alternative group; If the working torque of the downhole power drilling tool in the candidate group is not less than the rock breaking energy requirement threshold value of the pilot drill bit, the downhole power drilling tool for the pilot hole is selected, and the size of the pilot drill bit is determined; If the working torque of the downhole power drill in the alternative group is less than the rock-breaking energy requirement threshold of the pilot drill bit, the size of the pilot drill bit is adjusted, or the downhole power drill is used in conjunction with other auxiliary rock-breaking tools until the working torque of the selected downhole power drill meets the requirements.

3. The relay-type multi-stage rock breaking method according to claim 1, characterized in that: The step three comprises the following steps: The secondary rock-breaking tool is the reaming drill bit, and the preferred auxiliary rock-breaking tool is the impact-type auxiliary rock-breaking tool. The power of the candidate impact-type auxiliary rock-breaking tools and the rock-breaking energy requirement threshold of the reaming drill bit are compared; If the power of the selected impact auxiliary rock breaking tool is not less than the rock breaking energy requirement threshold of the reaming drill bit, the secondary rock breaking technology is adopted; If the power of the to-be-selected impact-type auxiliary rock-breaking tool is less than the rock-breaking energy requirement threshold value of the reaming drill bit, the size of the reaming drill bit is changed, the number of levels of graded rock-breaking technology is increased, and the preferred auxiliary rock-breaking tool is the impact-type auxiliary rock-breaking tool, until the power of the impact-type auxiliary rock-breaking tool selected in each level of reaming rock breaking is not less than the rock-breaking energy requirement threshold value of the corresponding reaming drill bit.

4. The relay-type multi-stage rock breaking method according to claim 1, characterized in that: The constraints include hydraulic parameters and drill string stability.

5. The relay-type multi-stage rock breaking method according to claim 1, characterized in that: Optimize the drill tool assembly by following these steps: Preferably, a pilot drill bit, an reamer drill bit, a downhole power drill with a straight shell or a curved shell, an impact auxiliary rock breaking tool and their placement positions are selected.

6. The relay-type multi-stage rock breaking method according to claim 1, characterized in that: The drilling parameters include drilling pressure, rotary table torque, rotary table speed, drilling fluid displacement and pump pressure.

7. The relay-type multi-stage rock breaking method according to claim 1, characterized in that: The step 4 comprises the following steps: The expected range of mechanical drilling speed is set so that the mechanical drilling speed of each level of rock breaking meets the expected range of mechanical drilling speed.

8. A relay type multi-stage rock breaking device, characterized in that: The device performs relay-type multi-stage rock breaking by executing the method according to any one of claims 1 to 7, and the device comprises: The first module is used to select whether to use the graded rock breaking technology based on the working torque of the downhole power drilling tool corresponding to the size of the drilled wellbore and the rock breaking energy demand threshold value; The second module is used for the case where the graded rock breaking technology is adopted, the pilot hole is the first-level rock breaking, and the preferred auxiliary rock breaking tool is the downhole power drilling tool. The size of the pilot hole drill bit is changed, and the pilot hole size and the downhole power drilling tool used are determined according to the rock breaking energy requirement threshold value of the pilot hole drill bit and the matching downhole power drilling tool; The third module uses a reaming drill bit as the secondary rock breaking tool, and the preferred auxiliary rock breaking tool is an impact-type auxiliary rock breaking tool. Based on the power of the impact-type auxiliary rock breaking tool corresponding to the reaming and the rock breaking energy requirement threshold of the reaming drill bit, the size of the reaming drill bit and the impact-type auxiliary rock breaking tool used are determined, or the same method is used to increase the number of graded rock breaking stages; The fourth module is used to optimize the drilling tool assembly and drilling parameters according to the constraints, coordinate the rock breaking efficiency between the various levels in the graded rock breaking, and obtain the optimal rock breaking solution.