Construction device and construction method of EPS foam particle mixed light soil roadbed

Through the combined use of vibration device and shotcrete device, the liquefied powdery fine sand soil is injected into the EPS foam particle mixed cement slurry, which solves the problems of tedious construction process and long construction period of the traditional EPS particle mixed lightweight soil roadbed, achieving a fast and economical The roadbed is solidified and suitable for bridgehead embankment filling.

CN114606842BActive Publication Date: 2024-10-22ZHEJIANG COMM CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210285934.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-23
Publication Date
2024-10-22
Estimated Expiration
2042-03-23

AI Technical Summary

Technical Problem

The traditional EPS particle mixed lightweight soil roadbed construction method has complicated procedures, long construction period, is easily affected by weather, and has high cost. It is difficult to be used in bridgehead embankment filling on a large scale.

Method used

A construction device including a vibration device, a spraying device and a connecting sleeve is used to liquefy the fine sand soil and inject EPS foam particles mixed with cement slurry under vibration, and stir evenly to form a solidified lightweight soil embankment, simplifying the process and shortening the construction period.

Benefits of technology

It significantly shortens the construction period, reduces project costs, reduces the impact on weather, is suitable for solving settlement problems in soft foundation transition sections and at the junction of embankments and bridge abutments, and improves construction efficiency and project quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114606842B_ABST
    Figure CN114606842B_ABST
Patent Text Reader

Abstract

The invention discloses a construction device and a construction method for an EPS foam particle mixed lightweight soil roadbed, and belongs to the technical field of building construction. The invention can be combined with a vibration drainage device of an existing sand and gravel mixer, comprising a vibration device, a grouting device and a connecting sleeve, wherein the top of the connecting sleeve is welded to a telescopic arm, the vibration device is welded to the connecting sleeve, and the grouting device is built in the connecting sleeve; a detachable vibration hammer is installed on the top of the connecting sleeve to solve the problems caused by a rolling type solidified soil roadbed device, and there is no need to build a mud pool, thus saving land; the method of the invention controls a high-speed vibration device to vibrate and liquefy sand and soil; the EPS foam particles can be fully mixed with fine sand and soil to achieve overall uniformity; after the uniformity reaches a target value, a curing agent is added and stirred, and then maintained for a specified age to form an EPS foam particle mixed fine sand lightweight soil roadbed; the method has fewer processes, fast construction speed, and is less affected by weather factors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a construction device and a construction method for a roadbed of EPS foam particles mixed with lightweight soil. Background Art

[0002] With the development of highway construction, the problem of handling special roadbed sections has become increasingly prominent. When building embankments on soft foundations and other foundations with poor geological conditions, roadbed treatment is generally required due to the settlement and uneven settlement of the roadbed. When the bridgehead embankment is filled and spliced ​​with the road widening, the construction difficulty is particularly prominent. The key lies in the differential settlement problem with the existing roads or structures. The traditional process is to reinforce the foundation within the filling range (such as cement mixing piles, concrete pipe piles), or pre-load the foundation drainage (such as plastic drainage board treatment), but similar methods are costly and have a long construction period. It is also difficult to meet the ideal requirements in eliminating differential settlement. In addition to conventional soft foundation treatment methods such as drainage consolidation and pile foundation, lightweight mixed soil fillers have been deeply studied and applied at home and abroad in recent years. If lightweight fillers can be used instead of ordinary soil fillers, the additional load of light fill on the foundation can be greatly reduced, so that the stability requirements of the soft foundation for the embankment can be met more easily, and the construction costs such as reinforcement can be greatly reduced. Therefore, it is necessary to find a lightweight material to replace the traditional roadbed filler to reduce the roadbed load and the additional stress of the soft soil foundation.

[0003] The use of EPS foam particles mixed with lightweight soil as filler for bridgehead embankments is an important way to solve the above problems. Compared with ordinary soil, EPS foam particles mixed with lightweight soil has the characteristics of ultra-lightness, compression resistance, self-reliance, and high strength. These characteristics make the embankment have a higher rebound modulus, smaller settlement and deformation, which guarantees the stability of the embankment and provides good conditions for reducing the compaction requirements of the embankment. Therefore, it has been widely used in China, effectively solving the settlement and uneven settlement of the soft foundation transition section, and the differential settlement at the junction of the embankment and the abutment, with good results.

[0004] At present, EPS granules mixed with lightweight soil can be divided into two categories according to the construction method: ① Casting type EPS granules mixed with lightweight soil, this construction method first mixes the raw soil, EPS granules, curing materials and water into a fluid slurry, then uses a pump as a power supply device and a pipeline as a medium to transport the slurry to the construction site for pouring construction. Its characteristics are convenient and fast construction, and it is particularly suitable for silt and clay with high water content; ② Rolling type EPS granules mixed with lightweight soil, this construction method first mixes the raw soil, EPS granules, curing materials and water into a loose mixture, then uses a truck to transport the mixture to the construction site, and compacts it by layered rolling or tamping, and then solidifies it to form a whole with the required strength. Its key technology is the control of moisture content, which is suitable for sand and powder with low moisture content. However, according to the current roadbed filler test and detection method, it takes a long time for curing reaction to achieve the optimal moisture content, and requires complex processes such as paving and rolling. The construction period is long, the construction process is many, the control is difficult, the cost is high, and the construction period is significantly affected by the weather. The existence of these problems affects the large-scale application of EPS particles mixed with lightweight soil as bridgehead embankment filling.

[0005] Silt soil is composed of fine sand and silt particles, and has lower cohesion than fine clay fillers. At present, there is a technology that uses silt soil and water to make slurry and mix it with EPS foam particles. The specific construction method is to mix part of the raw material sand soil with water to make slurry and EPS foam particles into a mixer and mix them. At the same time, add the remaining raw material soil and curing agent, mix them, and then add them to the mixer and mix until they are uniform.

[0006] To sum up, in order to solve the problems of rolled EPS particle lightweight embankment with many construction processes, long construction period, susceptibility to weather influence and high cost, there is an urgent need for a construction method with fewer processes, simple control and better balance between construction period and project quality. Summary of the invention

[0007] Purpose of the invention: In order to solve the problems existing in the prior art, the present invention provides a construction device for an EPS foam particle mixed lightweight soil roadbed, which is suitable for solving the settlement and uneven settlement of the soft foundation transition section in highway engineering, the differential settlement of the junction of the embankment and the abutment, and other problems; another purpose of the present invention is to provide a construction method for a construction device for an EPS foam particle mixed lightweight soil roadbed.

[0008] Technical solution: In order to achieve the above-mentioned purpose of the invention, the construction device of the EPS foam particle mixed lightweight soil roadbed of the present invention includes a vibration device, a spraying device and a connecting sleeve. The top of the connecting sleeve is welded to the telescopic arm, the vibration device is welded to the connecting sleeve, and the spraying device is built into the connecting sleeve; a detachable vibration hammer is installed on the top of the connecting sleeve.

[0009] Furthermore, the vibration device includes a limit plate, a transverse vibration plate, a rib plate, a connecting plate, a connecting shaft, and a rotating guide; the transverse vibration plate and the connecting plate are hinged through a connecting shaft, the connecting plate is welded on the connecting sleeve at an angle of °, and the transverse vibration plate rotates in a vertical plane; the limit plate and the rib plate are welded between the connecting sleeve and the bottom of the transverse vibration plate to reinforce the connecting plate.

[0010] Furthermore, the spraying device includes a proportional valve assembly and a spraying pipe that are connected, and the spraying pipe includes a slurry inlet and an air outlet; the internal protruding part of the rotating guide is inserted into the concave part of the connecting sleeve for connection; the proportional valve assembly is welded to the inlet of the spraying pipe to control the switching of the slurry inlet and the air outlet.

[0011] Furthermore, the connecting sleeve comprises a necked sleeve and a fitting opening, and the fitting opening is welded to the connection of the necked sleeve.

[0012] Furthermore, there are four limit plates, which are respectively welded to the connecting sleeves, and the limit plates are hinged to the connecting shaft; there are four transverse vibration plates, which are evenly arranged on the same plane; there are four connecting plates, which are perpendicular to the telescopic arms, and the protruding parts of the transverse vibration plates are inserted into the concave parts of the connecting plates, and the connecting plates are connected with a rotating connecting shaft.

[0013] Furthermore, the surface material of the connecting sleeve is steel wire, non-woven geotextile and water-permeable filter membrane; the material of the transverse vibration plate is selected from any one of rectangular steel, steel bar and T-shaped steel.

[0014] Furthermore, the construction method of the construction device of the EPS foam particles mixed with lightweight soil roadbed comprises:

[0015] The shotcrete device is used for jet drilling, and the vibrating hammer drives the telescopic arm to insert the connecting sleeve into the soil;

[0016] liquefying the fine sand soil body by the vibration device;

[0017] By turning off the vibration function of the vibration device and injecting EPS foam particles mixed with cement slurry into the soil through the spraying device, turning on the rotation and stirring function of the vibration device to stir the mixed soil, and after stirring evenly, a solidified lightweight soil embankment in the area is formed.

[0018] Further, liquefying the fine sand body by the vibration device comprises:

[0019] Step 1: According to the spacing D designed for the internal mixer, select the length 1 / 2D of the transverse vibration plate, make a corresponding vibration device, and weld it to the connecting sleeve;

[0020] Step 2: Use an excavator to dig out the upper part of the soil;

[0021] Step 3: During the installation of the vibration device, a vibration hammer is used to hammer the sleeve, and a spraying device is used to spray air. Under the action of the vibration hammer, the entire device is installed to vibrate the soil, causing the soil to rapidly reduce or completely lose its shear strength, resulting in foundation liquefaction.

[0022] Step 4: After the fine sand body is liquefied, the telescopic arm is pulled up by 1 / 2D to fully expand the transverse vibration plate and make it perpendicular to the connecting sleeve;

[0023] Step 5: The spraying device injects EPS foam particles mixed with cement slurry, the vibration device starts the rotation function, and the horizontal vibration plate rotates at a low speed around the rotating connecting shaft to stir until the light soil is uniform;

[0024] Step 6: Stop spraying and pull up the connecting sleeve.

[0025] Furthermore, the connecting sleeve is a steel pipe with an outer diameter of 30 cm, an inner diameter of 27 cm, and a wall thickness of 15 mm; a necking sleeve is arranged at 50 cm from the bottom of the connecting sleeve, and the outer diameter of the bottom of the necking sleeve is 13 cm and the inner diameter is 10 cm; the vibration device is manufactured according to the design parameters of the connecting sleeve; the transverse vibration plate is 0.5 m long and has a cross-sectional size of 10 cm*2 cm; the connecting plate has a cross-sectional size of 5 cm*2 cm and a thickness of 2 cm, and is welded to the connecting sleeve; a steel shaft with a diameter of 1 cm and a length of 10 cm is used as a rotating connecting shaft, and the connecting shaft hinges the transverse vibration plate and the connecting plate.

[0026] Furthermore, after the silty sand body is liquefied, the telescopic arm is pulled up by a height of 0.5 m, so that the transverse vibration plate is fully unfolded and perpendicular to the connecting sleeve; the spraying device injects EPS foam particles mixed with cement slurry, the vibration device starts the rotation function, and the transverse vibration plate rotates around the connecting shaft at a low speed for stirring until the lightweight soil is uniform; then, the spraying is stopped and the telescopic arm is pulled up until the connecting sleeve is completely pulled out of the ground.

[0027] Beneficial effects: Compared with the prior art, the EPS foam particle mixed lightweight soil roadbed construction device of the present invention has

[0028] The vibrating drainage device can be combined with the existing sand and gravel mixer, including a vibrating device, a grouting device and a connecting sleeve. The top of the connecting sleeve is welded to the telescopic arm, the vibrating device is welded to the connecting sleeve, and the grouting device is built in the connecting sleeve. A detachable vibrating hammer is installed on the top of the connecting sleeve to solve the problems caused by the rolling type solidified soil roadbed device, and there is no need to build a mud pool, saving land. The construction method of the invention promotes the liquefaction of raw soil, and after the raw soil is liquefied, EPS foam particles and cement slurry are added and stirred on site to form a solidified soil roadbed. Compared with the rolling type solidified soil roadbed, the control method is simple, the construction period is short, and it is less affected by weather factors. It is suitable for solving the settlement and uneven settlement of the soft foundation transition section in highway engineering, the differential settlement of the junction between the embankment and the abutment, and other problems. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a front view of the vibration device (lateral vibration plate unfolded);

[0030] Figure 2 It is a front view of the vibration device (lateral vibration plate retracted);

[0031] Figure 3 is a cross-sectional view of the vibrating device (including the shotcrete pipe);

[0032] Figure 4 It is a front view of the connecting sleeve (including the shotcrete pipe);

[0033] Figure 5 It is a cross-sectional view of the connecting sleeve (including the shotcrete pipe);

[0034] Figure 6 This is a diagram of the construction process of the vibration liquefaction method for light silty sand foundation;

[0035] The accompanying drawings are marked as: 1-telescopic arm, 2-vibration device, 3-spraying device, 4-connecting sleeve, 5-limiting plate, 6-lateral vibration plate, 7-rib plate, 8-connecting plate, 9-connecting shaft, 10-rotational guide, 11-proportional valve assembly, 12-spraying pipe, 13-vibration hammer, 14-necked sleeve, 15-fitting mouth. DETAILED DESCRIPTION

[0036] The structure and performance of the present invention will be further described below in conjunction with the accompanying drawings.

[0037] It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, various equivalent modifications of the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

[0038] The purpose of the present invention is to make up for the shortcomings of traditional rolled solidified soil roadbed, which is easily affected by weather, has complicated procedures and a long construction period, and can significantly shorten the construction period, reduce the slope angle, and reduce the amount of earthwork.

[0039] The construction device of EPS foam particle mixed light soil roadbed comprises a vibrating device 2, a spraying device 3 and a connecting sleeve 4. The vibrating device 2 comprises a limit plate 5, a transverse vibrating plate 6, a rib plate 7, a connecting plate 8, a connecting shaft 9 and a rotating guide 10.

[0040] The spraying device 3 comprises a proportional valve assembly 11 and a spraying pipe 12 which are connected to each other. The spraying pipe 12 is provided with a slurry inlet and an air jet.

[0041] The bottom of the connecting sleeve 4 is composed of a necked sleeve 14 and a fitting opening 15 .

[0042] The top of the connecting sleeve 4 is welded to the telescopic arm 1, and the vibrating device 2 used in conjunction needs to be welded to the connecting sleeve 4, and the shotcrete device 3 is built in the connecting sleeve 4. The shotcrete device 3 is used to jet and drill holes, and the device is inserted into the soil under the action of the vibrating hammer 13, and the vibrating device 2 is turned on to liquefy the fine sand soil; then the vibration function of the vibrating device 2 is turned off and EPS foam particles mixed with cement slurry are injected into the soil through the shotcrete device 3, and the rotating stirring function of the vibrating device 2 is turned on to stir the mixed soil. After the soil is evenly stirred, a solidified lightweight soil embankment in the area is formed.

[0043] The vibrating hammer 13 is a high-speed vibrating hammer, 2.5 t, with a frequency of 30 Hz to 60 Hz, and a motor with a power of 3 kW is used to drive the electric hammer.

[0044] During the installation of the vibration device 2, the proportional valve assembly 11 of the shotcrete device 3 opens the jet port of the shotcrete pipe 12. Under the action of the vibrating hammer 13, the entire device is installed and the vibration is dispersed and transmitted to the surrounding soil through the transverse vibration plate 6, so that the soil vibrates fully. After the silt sand is affected by the vibration force, the soil volume is reduced and the pore pressure increases sharply, thereby reducing the effective pressure, causing the soil to rapidly reduce or completely lose its shear strength, so that the soil flows like liquid or sprays out of the ground, becoming foundation liquefaction; the telescopic arm 1 is pulled up to a certain height, The transverse vibration plate 6 will be unfolded under the resistance of the upper soil, and the top plate will be unfolded by the limiting plate 5 and the rib plate 7, and the transverse vibration plate 6 will be perpendicular to the connecting sleeve 4; in order to facilitate uniform mixing, during the process of plugging and unplugging the telescopic arm 1, the proportional valve assembly 11 of the spraying device 3 closes the air jet of the spraying pipe 12 and opens the slurry inlet, and EPS foam particles mixed with cement slurry are injected. The vibration device 2 starts the rotation function, and the transverse vibration plate 6 rotates and stirs at a low speed around the connecting shaft 9 under the guidance of the rotating guide 10 until the lightweight soil is uniform, and finally pulled up for recovery.

[0045] There are four transverse vibration plates 6, which are evenly arranged in the same plane and hinged with the connecting plate 8 through the connecting shaft 9. The connecting plate 8 is welded on the connecting sleeve 4 at an angle of 45 degrees, and the transverse vibration plate 6 can rotate in the vertical plane. The transverse vibration plate 6 is made of rectangular, reinforced, T-shaped steel and other steel materials.

[0046] The limiting plates 5, a total of four pieces, are respectively welded to the connecting sleeves 4 and hinged to the connecting shafts 9. The rib plates 7 are welded between the connecting sleeves 4 and the bottom of the transverse vibration plate 6 to reinforce the connecting plate 8.

[0047] The connecting plates 8, four in total, are perpendicular to the telescopic arm 1, and the protruding parts of the transverse vibration plates 6 are inserted into the concave parts of the connecting plates 8 and connected by a rotating connecting shaft 9. The ribs 7 are welded between the connecting sleeves 4 and the connecting plates 8 to reinforce the connecting plates 8.

[0048] The inner protruding portion of the rotating guide member 10 is inserted into the concave portion of the connecting sleeve 4 for connection.

[0049] The proportional valve assembly 11 is welded at the inlet of the spraying pipe 12 to control the switch of the slurry inlet and the air jet.

[0050] The connecting sleeve 4 is welded with the vibration device 2 and the telescopic arm 1 respectively, and a vibrating hammer 13 is installed on the top, which is detachable. The surface material is steel wire, non-woven geotextile and water-permeable filter membrane. The fitting port 15 is welded to the connection of the neck sleeve 14.

[0051] The vibration liquefaction stirring method using the vibration device 2 comprises the following steps:

[0052] Step 1: According to the spacing D designed for the internal mixer, select the length 1 / 2D of the transverse vibration plate 6, make the corresponding vibration device 2, and weld it to the connecting sleeve 4.

[0053] Step 2: Use an excavator to dig out the upper layer of soil.

[0054] Step 3: During the installation of the vibration device 2, a vibration hammer 13 is used to hammer the sleeve, and the spraying device 3 sprays air. Under the action of the vibration hammer 13, the entire device is installed to vibrate the soil, causing the soil to rapidly reduce or completely lose its shear strength, resulting in foundation liquefaction.

[0055] Step 4: After the fine sand body is liquefied, the telescopic arm 1 is pulled up by a height of 1 / 2D, so that the transverse vibration plate 6 is fully unfolded and perpendicular to the connecting sleeve 4.

[0056] Step 5: The spraying device 3 injects EPS foam particles mixed with cement slurry, the vibration device starts the rotation function, and the transverse vibration plate 6 rotates around the rotating connecting shaft 9 at a low speed to stir until the light soil is uniform.

[0057] Step 6: Stop spraying and pull up the connecting sleeve 4.

[0058] The EPS foam particle mixed silt sand lightweight soil roadbed includes the preparation of mud, the manufacture and construction method of the vibration device 2, the trapezoidal support frame, the high-speed vibrator, and the shotcrete device 3, and firstly the manufacture of the vertical formwork is carried out.

[0059] like Figure 1 As shown, the main structure of the vibration device 2 welded to the telescopic arm 1 is a connecting sleeve 4 with a transverse vibration plate 6, the transverse vibration plate 6 is hinged to the connecting plate 8 through a rotating connecting shaft 9, and the connecting plate 8 is welded to the connecting sleeve 4. The rib plate 7 is welded between the connecting sleeve 4 and the connecting plate 8 to reinforce the connecting plate 8.

[0060] like Figure 2 As shown, when the upper part of the transverse vibration plate 6 receives resistance, it will retract to Figure 4 The position of the transverse vibration plate 6 makes it easy to pull up the telescopic arm 1.

[0061] like Figure 3 As shown, the transverse vibration plate 6 can rotate in a vertical plane under the action of a limiting plate 5 perpendicular to the connecting sleeve 4.

[0062] like Figure 4 As shown, it includes surface materials: steel wire, non-woven geotextile and permeable filter membrane.

[0063] like Figure 5 As shown, the spraying pipe 12 is close to the inner wall of the connecting sleeve 4.

[0064] like Figure 6 As shown, the construction method of EPS foam particles mixed with silt sand lightweight soil roadbed includes the following steps:

[0065] (1) The connecting sleeve 4 is a steel pipe with an outer diameter of 30 cm, an inner diameter of 27 cm, and a wall thickness of 15 mm. At 50 cm from the bottom, there is a necked sleeve 14 with an outer diameter of 13 cm and an inner diameter of 10 cm. The surface material is steel wire, non-woven geotextile, and water-permeable filter membrane. According to the sleeve and design parameters, a vibration device 2 is manufactured. The transverse vibration plate 6 has a length of 0.5 m and a cross-sectional size of 10 cm*2 cm. The connecting plate 8 has a cross-sectional size of 5 cm*2 cm and a thickness of 2 cm and is welded to the connecting sleeve 4. The transverse vibration plate 6 and the connecting plate 8 are hingedly connected by a steel shaft with a diameter of 1 cm and a length of 10 cm as a rotating connecting shaft 9.

[0066] (2) Welding the vibration device 2 to the connecting sleeve 4; welding the connecting sleeve 4 to the telescopic arm 1 of the excavator;

[0067] (3) Locate the location of the vibrating device 2 and drive the vibrating device 2 into the foundation through the sleeve; the vibrating hammer is 2.5 tons, and the motor with a power of 3 kW is used to drive the electric hammer; the sleeve is hammered to drive it into the foundation, and at the same time, the horizontal vacuum plate will be expanded under the resistance of the lower soil, vibrating and liquefying the surrounding soil;

[0068] (4) The blower and vacuum pump are placed in advance at the slurry inlet of the shotcrete device 3 to mix the EPS foam particles with cement slurry;

[0069] After the above-mentioned equipment is manufactured, the construction of EPS foam particles mixed with silt and lightweight soil roadbed is carried out; a certain section to be constructed is selected, the design height of the embankment of this section is 2m, the section length is 200m, and the scale of a construction area is 5×5m.

[0070] The specific on-site construction process includes the following steps:

[0071] Step 1: Select the length of the transverse vibration plate 6 to be 0.5 m, make the corresponding vibration device 2, and weld it to the connecting sleeve 4;

[0072] Step 2: Use an excavator to dig out the upper part of the soil;

[0073] Step 3: During the installation of the vibration device 2, a vibration hammer 13 is used to hammer the sleeve, and the spraying device 3 sprays air. Under the action of the vibration hammer 13, the entire device is installed to vibrate the soil, causing the soil to rapidly reduce or completely lose its shear strength, resulting in foundation liquefaction;

[0074] Step 4: After the fine sand body is liquefied, the telescopic arm 1 is pulled up by 0.5m, so that the transverse vibration plate 6 is fully unfolded and perpendicular to the connecting sleeve 4;

[0075] Step 5: The spraying device 3 injects EPS foam particles mixed with cement slurry, the vibration device starts the rotation function, and the transverse vibration plate 6 rotates at a low speed around the rotating connecting shaft 9 to stir until the light soil is uniform;

[0076] Step 6: Stop spraying and pull up the telescopic arm 1 until the device is completely pulled out of the ground.

[0077] The invention enriches the EPS foam particle mixed silt sand lightweight soil foundation treatment method. Compared with the rolling type solidified soil roadbed control method, the soil fluidity is obvious, which is convenient for mixing with EPS foam particles; compared with the method of first mixing in the factory and then transporting, paving and rolling, the project cost can be greatly reduced and the construction period is shortened. During the construction process, it only needs to weld the connecting sleeve 4 with the vibration device 2 and the telescopic arm 1 respectively, and the construction is simple.

[0078] The present invention controls the high-speed vibration device 2 to vibrate and liquefy the sand; the EPS foam particles can be fully mixed with the fine sand soil to achieve overall uniformity; after the uniformity reaches the target value, a curing agent is added and mixed, and then cured for a specified age to form an EPS foam particle mixed with fine sand lightweight soil embankment; the method has fewer steps, fast construction speed, and little influence from weather factors. In addition to quickly completing the filling of embankments and dikes, reducing the slope angle, reducing the amount of earthwork, and better balancing the relationship between construction period, project quality and project investment, the vertical template of the method is recyclable and green and environmentally friendly.

[0079] The present invention treats the solidified soil that meets the requirements to be paved and rolled on the embankment. Compared with the EPS foam particle mixed lightweight soil embankment construction technology, the in-situ solidified roadbed of the present invention directly injects EPS and cement slurry into the roadbed cavity, does not require the construction of a mud pool, saves land, and can effectively increase the preloading period of the foundation. The present invention is suitable for solving the settlement and uneven settlement of the soft foundation transition section in highway engineering, and the differential settlement of the junction between the embankment and the abutment.

Claims

1. Construction device for EPS foam particles mixed with lightweight soil roadbed, characterized by: It comprises a vibration device (2), a grouting device (3) and a connecting sleeve (4); the top end of the connecting sleeve (4) is welded to the telescopic arm (1), the vibration device (2) is welded to the connecting sleeve (4), and the grouting device (3) is built into the connecting sleeve (4); a detachable vibration hammer (13) is installed on the top of the connecting sleeve (4); The vibration device (2) comprises a limit plate (5), a transverse vibration plate (6), a rib plate (7), a connecting plate (8), a connecting shaft (9), and a rotating guide (10); the transverse vibration plate (6) and the connecting plate (8) are hingedly connected via the connecting shaft (9); the connecting plate (8) is welded to the connecting sleeve (4) at an angle of 45°, and the transverse vibration plate (6) rotates in a vertical plane; the limit plate (5) and the rib plate (7) are welded between the connecting sleeve (4) and the bottom of the transverse vibration plate (6) to reinforce the connecting plate (8); the limit plate (5) is four pieces, and the limit plate (8) is welded to the connecting sleeve (4) at an angle of 45°. The position plates (5) are respectively welded to the connecting sleeves (4), and the position limiting plates (5) are hinged to the connecting shaft (9); the transverse vibration plates (6) are four pieces, which are evenly arranged in the same plane; the connecting plates (8) are four pieces, and the connecting plates (8) are perpendicular to the telescopic arm (1). The protruding parts of the transverse vibration plates (6) are inserted into the concave parts of the connecting plates (8), and the connecting plates (8) are connected by a rotating connecting shaft (9); the surface material of the connecting sleeve (4) is steel wire, non-woven geotextile and water-permeable filter membrane; the material of the transverse vibration plates (6) is selected from any one of rectangular steel, steel bars and T-shaped steel; The shotcrete device (3) comprises a proportional valve assembly (11) and a shotcrete pipe (12) which are connected to each other, and the shotcrete pipe (12) comprises a slurry inlet and an air jet; the internal protruding portion of the rotary guide (10) is inserted into the concave portion of the connecting sleeve (4) for connection; the proportional valve assembly (11) is welded to the inlet of the shotcrete pipe (12) to control the opening and closing of the slurry inlet and the air jet; The connecting sleeve (4) comprises a necked sleeve (14) and a fitting opening (15), wherein the fitting opening (15) is welded to the connection of the necked sleeve (14).

2. The construction method of the construction device for the EPS foam particles mixed with lightweight soil roadbed according to claim 1, characterized in that: include: The shotcrete device (3) is used for jet drilling, and the vibrating hammer (13) drives the telescopic arm (1) to insert the connecting sleeve (4) into the soil; liquefying the fine sand soil by means of the vibration device (2); By turning off the vibration function of the vibration device (2) and injecting EPS foam particles mixed with cement slurry into the soil through the spraying device (3), turning on the rotation and stirring function of the vibration device (2) to stir the mixed soil, and after the soil is evenly stirred, a solidified lightweight soil embankment in the area is formed.

3. The construction method of the construction device for the EPS foam particle mixed lightweight soil roadbed according to claim 2 is characterized in that: The liquefaction of fine sandy soil by the vibration device (2) comprises: Step 1: According to the spacing D designed for the internal mixer, select the length 1 / 2D of the transverse vibration plate (6), make a corresponding vibration device (2), and weld it to the connecting sleeve (4); Step 2: Use an excavator to dig out the upper part of the soil; Step 3: During the process of installing the vibration device (2), a vibration hammer (13) is used to hammer the sleeve, and the shotcrete device (3) sprays air. Under the action of the vibration hammer (13), the entire device is installed to vibrate the soil, causing the soil to rapidly reduce or completely lose its shear strength, thereby completing the liquefaction of the foundation; Step 4: After the fine sand body is liquefied, the telescopic arm (1) is pulled up by a height of 1 / 2D, so that the transverse vibration plate (6) is fully unfolded and perpendicular to the connecting sleeve (4); Step 5: The spraying device (3) injects EPS foam particles mixed with cement slurry, the vibration device starts the rotation function, and the transverse vibration plate (6) rotates around the rotating connecting shaft (9) to stir until the light soil is uniform; Step six: stop spraying and pull up the connecting sleeve (4).

4. The construction method of the construction device for the EPS foam particle mixed light soil roadbed according to claim 3 is characterized in that: The connecting sleeve (4) is a steel tube with an outer diameter of 30 cm, an inner diameter of 27 cm, and a wall thickness of 15 mm. A necking sleeve (14) is provided at 50 cm from the bottom of the connecting sleeve (4), and the bottom outer diameter of the necking sleeve (14) is 13 cm and the inner diameter is 10 cm. The vibration device (2) is manufactured according to the design parameters of the connecting sleeve (4). The transverse vibration plate (6) is 0.5 m long and has a cross-sectional size of 10 cm*2 cm. The connecting plate (8) has a cross-sectional size of 5 cm*2 cm and a thickness of 2 cm and is welded to the connecting sleeve (4). A steel shaft with a diameter of 1 cm and a length of 10 cm is used as a rotating connecting shaft (9), and the connecting shaft (9) hinges the transverse vibration plate (6) and the connecting plate (8).

5. The construction method of the construction device for the EPS foam particle mixed light soil roadbed according to claim 3 is characterized in that: After the silty sand body is liquefied, the telescopic arm (1) is pulled up to a height of 0.5 m, so that the transverse vibration plate (6) is fully unfolded, and the transverse vibration plate (6) is perpendicular to the connecting sleeve (4); the shotcrete device (3) injects EPS foam particles mixed with cement slurry, the vibration device starts the rotation function, and the transverse vibration plate (6) rotates around the rotating connecting shaft (9) to stir until the light soil body is uniform; then, the shotcrete is stopped and the telescopic arm (1) is pulled up until the connecting sleeve (4) is completely pulled out of the ground.