Factory-level spare parts planning automatic generation system

Through the factory-level spare parts planning automatic generation system, automatic collection and multi-level audit technology are used to solve the problem of spare parts declaration caused by manual audit loopholes, the accuracy of spare parts planning and effective use of funds are achieved, and the spare parts turnover rate is improved.

CN114677100BActive Publication Date: 2024-12-03YANGCHUN NEW STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210182032.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-26
Publication Date
2024-12-03
Estimated Expiration
2042-02-26

AI Technical Summary

Technical Problem

There are manual review loopholes in the management of spare parts in existing factory-level equipment, resulting in excessive and missed reports when reporting spare parts, and repeated declarations of general spare parts workshops, resulting in backlog of spare parts and occupation of procurement funds.

Method used

Design a factory-level spare parts plan automatic generation system, including project work order issuance module, maintenance execution module, consumption order generation module, automatic collection module, consumption statistics module, preliminary plan generation module, NC system database module, exceeding standard judgment module, workshop review module , spare parts plan generation module, secondary audit module and procurement module, automatically collect and statistical data, generate preliminary spare parts plans, and conduct excessive standards and multi-level audits to ensure the accuracy of the plan.

Benefits of technology

It improves the accuracy of spare parts planning, reduces human declaration errors, avoids spare parts backlog and capital occupation, improves the turnover rate of spare parts, and ensures the effective utilization of procurement funds.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114677100B_ABST
    Figure CN114677100B_ABST
Patent Text Reader

Abstract

The invention discloses a plant-level spare parts plan automatic generation system, which includes a project work order issuing module, a maintenance execution module, a consumption order generation module, an automatic collection module, a consumption statistics module, a preliminary plan generation module, an NC system database module, an over-standard judgment module, a plan cancellation module, a workshop review module, a spare parts plan generation module, a secondary review module and a procurement module. The plant-level spare parts plan automatic generation system is more convenient and fast in generating spare parts plans, and various data of spare parts plans are automatically collected and counted. The improved plant-level spare parts plan automatic generation system eliminates the loopholes of manual spare parts declaration as much as possible, and multiple data systems automatically generate spare parts plans according to the actual spare parts consumption generated last month, thereby reducing the capital occupation of spare parts and improving the turnover rate of spare parts. In addition, the accuracy of declaration is improved by using system audit and manual multi-level audit, and the error of manual declaration is effectively avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of plant-level equipment spare parts management, and in particular to a plant-level spare parts plan automatic generation system. Background Art

[0002] At present, the common plant-level equipment spare parts plan management in China is that each factory reviews and deletes the spare parts plan reported by the workshop level, and reports the spare parts purchase plan for the next month within the basic accounting amount of the cost per ton of steel, combined with the production estimate for the next month. The preparation of the existing plant-level spare parts plan is basically through manual reporting by inspectors at the workshop level, and manual review by engineers at the factory level. There are many loopholes in the spare parts reporting, which can easily lead to over-reporting and under-reporting when reporting spare parts plans, and repeated reporting of common spare parts by workshops, resulting in spare parts backlogs and occupation of procurement funds.

[0003] In response to the above problems, it is urgent to carry out innovative design based on the original factory-level equipment spare parts planning management. Summary of the invention

[0004] The purpose of the present invention is to provide a factory-level spare parts plan automatic generation system to solve the problem proposed in the above background technology that there are many spare parts declaration loopholes in manual review, which easily leads to over-reporting and under-reporting when declaring spare parts plans, and repeated declaration of common spare parts by various workshops, resulting in spare parts backlog and occupation of procurement funds.

[0005] To achieve the above object, the present invention provides the following technical solutions: a plant-level spare parts plan automatic generation system, comprising a project work order issuing module, a maintenance execution module, a consumption order generation module, an automatic collection module, a consumption statistics module, a preliminary plan generation module, an NC system database module, an over-standard judgment module, a plan cancellation module, a workshop review module, a spare parts plan generation module, a secondary review module and a procurement module;

[0006] The project work order issuing module is mainly used to issue maintenance tasks. Inspectors in each workshop issue maintenance project work orders on the network through the factory-level equipment intelligent system platform based on the equipment inspection results and the time nodes of equipment cycle replacement. All maintenance project work orders are automatically matched with the required tools and spare parts required for this project.

[0007] The maintenance execution module can receive the maintenance work order issued by the project work order issuing module on the plant-level equipment intelligent system platform, prepare spare parts according to the content of the maintenance work order, start equipment maintenance on time, scan the code to confirm the completed maintenance task, and upload the maintenance result to the equipment intelligent system platform;

[0008] The consumption list generation module will collect statistics on the maintenance data uploaded by the maintenance execution module to the equipment intelligent system platform, and automatically enter the spare parts consumed by the maintenance project into the system consumption ledger, and automatically enter the spare parts consumption table of the unit initiating the maintenance project. Then, the factory-level equipment room will integrate the maintenance project spare parts consumption tables of each workshop through the equipment intelligent system platform of the previous month, and automatically convert them into preliminary spare parts plans for each workshop next month.

[0009] The automatic collection module will automatically collect the completion status of all maintenance plan work orders in the factory last month;

[0010] The consumption statistics module can count the completion status of the maintenance plan work orders collected by the automatic collection module, count the spare parts consumption generated by the work orders, and sort and record the spare parts consumption to make a spare parts quota compilation table;

[0011] The preliminary plan generation module automatically generates a preliminary spare parts plan based on the spare parts quota table of each workshop approved by the factory-level statistics and matching the spare parts consumption of each workshop last month;

[0012] The NC system database module receives the preliminary plan generated by the preliminary plan generation module, and the NC system database module stores the actual inventory of various spare parts in the company's general warehouse and factory level;

[0013] The over-standard determination module checks the preliminary spare parts plan through the NC system machine-side spare parts inventory system to determine whether the preliminary plan exceeds the spare parts quota;

[0014] The plan cancellation module is one of the output results of the excess determination module. If the excess determination module determines that the preliminary plan exceeds the quota of the spare part, it will output an instruction to cancel the spare part plan, and the preliminary plan will be terminated.

[0015] The workshop review module is another output result of the excess determination module. If the excess determination module determines that the preliminary plan does not exceed the quota of the spare part, it will output a workshop review instruction and submit the preliminary spare parts plan to each workshop for review. Each workshop needs to check the number of spare parts for review.

[0016] The spare parts plan generation module generates the final spare parts plan according to the results of the workshop review module;

[0017] The secondary review module is to review the final spare parts plan submitted by the workshop, and submit the spare parts plan to the marketing department after passing the review;

[0018] The purchasing module refers to the marketing department receiving the spare parts plan and purchasing spare parts according to the content of the spare parts plan.

[0019] Preferably, the consumption statistics module includes general spare parts statistics and non-standard spare parts statistics, and the general spare parts statistics are statistics on the types and usage of general spare parts required by each workshop, and the non-standard spare parts statistics are statistics on the types and usage of non-standard spare parts required by each workshop.

[0020] Preferably, the workshop review module includes missing spare parts review and new spare parts declaration, and the missing spare parts review refers to each workshop verifying the types of spare parts and their usage recorded in the preliminary plan to avoid spare parts omissions and errors in the preliminary plan, and the new spare parts declaration refers to each workshop declaring the newly added spare parts plan as needed, and the missing spare parts review and new spare parts declaration do not affect each other and are carried out independently.

[0021] Preferably, the declaration of newly required spare parts includes spare parts coding application, spare parts quota application and spare parts plan declaration, and the spare parts coding application, spare parts quota application and spare parts plan declaration are carried out in sequence, that is, if each workshop has new spare parts to be declared, it is necessary to first apply for spare parts coding in the form of a report, then apply for spare parts quota, and finally make a spare parts plan declaration.

[0022] Preferably, the secondary audit module includes a factory and equipment room audit module and a company-level equipment engineering department audit module, and the result of the secondary audit module depends on the factory and equipment room audit module and the company-level equipment engineering department audit module.

[0023] Compared with the prior art, the present invention provides a plant-level spare parts plan automatic generation system, which has the following advantages:

[0024] Compared with the traditional generation system, the new generation system is more convenient and faster. Various data of the spare parts plan are automatically collected and counted to generate a preliminary spare parts plan, and the data information in the NC database is judged to be over-standard, so as to avoid over-standard application of spare parts. At the same time, a new spare parts plan is generated through the workshop review module. The new spare parts plan can be submitted to the marketing department for procurement after passing the review of the secondary review module. The improved factory-level spare parts plan automatic generation system eliminates the loopholes of manual spare parts declaration as much as possible, and multiple data systems automatically generate spare parts plans according to the actual spare parts consumption generated in the previous month, reducing the capital occupation of spare parts and improving the turnover rate of spare parts. The accuracy of declaration is improved by using system review and manual multi-level review, which effectively avoids errors in manual declaration. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall process of the present invention;

[0026] Figure 2 This is a flow chart of the consumption statistics module of the present invention;

[0027] Figure 3It is a flow chart of the workshop review module of the present invention;

[0028] Figure 4 This is a schematic diagram of the operation flow of the new spare parts declaration of the present invention;

[0029] Figure 5 It is a schematic diagram of the secondary review module flow of the present invention. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] See also Figure 1-5 The present invention provides a technical solution: a plant-level spare parts plan automatic generation system, which includes a project work order issuing module, a maintenance execution module, a consumption order generation module, an automatic collection module, a consumption statistics module, a preliminary plan generation module, an NC system database module, an over-standard judgment module, a plan cancellation module, a workshop review module, a spare parts plan generation module, a secondary review module and a procurement module.

[0032] The project work order issuing module is mainly used to issue maintenance tasks. Inspectors in each workshop issue maintenance project work orders on the network through the factory-level equipment intelligent system platform based on the equipment inspection results and the time nodes of equipment cycle replacement. All maintenance project work orders are automatically matched with the required tools and spare parts required for this project.

[0033] The maintenance execution module can receive the maintenance work order issued by the project work order issuing module on the plant-level equipment intelligent system platform, prepare spare parts according to the content of the maintenance work order, start equipment maintenance on time, scan the code to confirm the completed maintenance task, and upload the maintenance result to the equipment intelligent system platform;

[0034] The consumption list generation module will collect statistics on the maintenance data uploaded by the maintenance execution module to the equipment intelligent system platform, and automatically enter the spare parts consumed by the maintenance project into the system consumption ledger, and automatically enter the spare parts consumption table of the unit initiating the maintenance project. Then, the factory-level equipment room will integrate the maintenance project spare parts consumption tables of each workshop through the equipment intelligent system platform of the previous month, and automatically convert them into preliminary spare parts plans for each workshop next month.

[0035] The automatic collection module will automatically collect the completion status of all maintenance plan work orders in the factory last month;

[0036] The consumption statistics module can count the completion status of the maintenance plan work orders collected by the automatic collection module, count the spare parts consumption generated by the work orders, and sort and record the spare parts consumption to make a spare parts quota compilation table;

[0037] The preliminary plan generation module automatically generates a preliminary spare parts plan based on the spare parts quota table of each workshop approved by the factory-level statistics and matching the spare parts consumption of each workshop last month;

[0038] The NC system database module receives the preliminary plan generated by the preliminary plan generation module, and the NC system database module stores the actual inventory of various spare parts in the company's general warehouse and factory level;

[0039] The over-standard determination module checks the preliminary spare parts plan through the NC system machine-side spare parts inventory system to determine whether the preliminary plan exceeds the spare parts quota;

[0040] The plan cancellation module is one of the output results of the excess determination module. If the excess determination module determines that the preliminary plan exceeds the quota of the spare part, it will output an instruction to cancel the spare part plan, and the preliminary plan will be terminated.

[0041] The workshop review module is another output result of the excess determination module. If the excess determination module determines that the preliminary plan does not exceed the quota of the spare part, it will output a workshop review instruction and submit the preliminary spare parts plan to each workshop for review. Each workshop needs to check the number of spare parts for review.

[0042] The spare parts plan generation module generates the final spare parts plan according to the results of the workshop review module;

[0043] The secondary review module is to review the final spare parts plan submitted by the workshop, and submit the spare parts plan to the marketing department after passing the review;

[0044] The purchasing module refers to the marketing department receiving the spare parts plan and purchasing spare parts according to the content of the spare parts plan.

[0045] Specific as Figure 2 As shown, the consumption statistics module includes general spare parts statistics and non-standard spare parts statistics, and the general spare parts statistics are statistics on the types and usage of general spare parts required by each workshop, and the non-standard spare parts statistics are statistics on the types and usage of non-standard spare parts required by each workshop;

[0046] Specific as Figure 3As shown, the workshop review module includes missing spare parts review and new spare parts declaration. Missing spare parts review refers to each workshop verifying the types and usage of various spare parts recorded in the preliminary plan to avoid spare parts omissions and errors in the preliminary plan. New spare parts declaration refers to each workshop declaring the newly added spare parts plan as needed. Missing spare parts review and new spare parts declaration do not affect each other and are carried out independently.

[0047] Specific as Figure 4 As shown in the figure, the declaration of newly required spare parts includes the application of spare parts coding, spare parts quota and spare parts plan, and the application of spare parts coding, spare parts quota and spare parts plan shall be carried out in sequence, that is, if each workshop has a new spare part to be declared, it shall first apply for spare parts coding in the form of a report, then apply for spare parts quota, and finally make a spare parts plan declaration;

[0048] Specific as Figure 5 As shown, the secondary audit module includes a factory and equipment room audit module and a company-level equipment engineering department audit module, and the result of the secondary audit module depends on the factory and equipment room audit module and the company-level equipment engineering department audit module.

[0049] Working principle: When using the factory-level spare parts plan automatic generation system, according to Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5, the project work order issuing module is started, and the inspectors of each workshop issue project work orders through the factory-level equipment intelligent system platform according to the equipment inspection results and the time nodes of equipment cycle replacement. The maintenance execution module receives the maintenance work orders published on the platform by the project work order issuing module, and prepares spare parts according to the content of the maintenance work order, starts equipment maintenance on time, and then scans the code to confirm the completed maintenance tasks, uploads the maintenance results to the platform, and then the consumption order generation module counts the maintenance data, and the spare parts consumed by the maintenance project are automatically entered into the system consumption ledger, and automatically entered into this unit according to the initiator of the maintenance project. The spare parts consumption table is then collected by the plant-level equipment room through the equipment intelligent system platform of the previous month to integrate the spare parts consumption table of each workshop's maintenance items, and automatically convert it into the preliminary spare parts plan for the next month for each workshop. The automatic collection module is started to automatically collect the completion status of all maintenance plan work orders in the factory last month, and the spare parts consumption generated by the work order is counted through the consumption statistics module to make a spare parts quota compilation table. Then the preliminary plan generation module automatically generates a preliminary spare parts plan based on all spare parts quota compilation tables approved by each workshop based on the factory-level statistics, matching the spare parts consumption of each workshop last month, and compares the plan with the company's total database and the existing factory-level spare parts stored in the NC system database module. The actual inventory of various spare parts is passed to the over-standard judgment module, which can judge whether the preliminary plan exceeds the quota of this spare part. If the judgment result of the over-standard judgment module is that the preliminary plan exceeds the quota of this spare part, the plan cancellation module is executed and the preliminary plan is terminated. If the judgment result of the over-standard judgment module is that the preliminary plan does not exceed the quota of this spare part, the workshop review module is executed. The workshop review module includes the review of missing spare parts and the declaration of new spare parts, which are to verify the types of spare parts and their usage recorded in the preliminary plan, and to declare the newly added spare parts plan as needed. Among them, the declaration of new spare parts includes Spare parts coding application, spare parts quota application and spare parts plan declaration. If each workshop has new spare parts to be declared, it must first apply for spare parts coding in the form of a report, then apply for spare parts quota, and finally make a spare parts plan declaration. The spare parts plan generation module generates the final spare parts plan based on the results of the workshop review module. The final spare parts plan needs to be reviewed by the secondary review module, and the secondary review module is divided into two steps: the factory and equipment room review module and the company-level equipment engineering department review module. After the review is passed, the spare parts plan can be sent to the marketing department. After the marketing department receives the spare parts plan, it proceeds to the procurement module to purchase spare parts according to the contents of the spare parts plan.

[0050] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. Factory-level spare parts planning automatic generation system, characterized by: The plant-level spare parts plan automatic generation system includes a project work order issuing module, a maintenance execution module, a consumption order generation module, an automatic collection module, a consumption statistics module, a preliminary plan generation module, an NC system database module, an over-standard judgment module, a plan cancellation module, a workshop review module, a spare parts plan generation module, a secondary review module and a procurement module; The project work order issuing module is used to issue maintenance tasks. Inspectors in each workshop issue maintenance project work orders on the network through the factory-level equipment intelligent system platform based on the equipment inspection results and the time nodes of equipment cycle replacement. All maintenance project work orders are automatically matched with the required tools and spare parts required for this project. The maintenance execution module can receive the maintenance work order issued by the project work order issuing module on the plant-level equipment intelligent system platform, prepare spare parts according to the content of the maintenance work order, start equipment maintenance on time, scan the code to confirm the completed maintenance task, and upload the maintenance result to the equipment intelligent system platform; The consumption list generation module will collect statistics on the maintenance data uploaded by the maintenance execution module to the equipment intelligent system platform, and automatically enter the spare parts consumed by the maintenance project into the system consumption ledger, and automatically enter the spare parts consumption table of the unit initiating the maintenance project. Then, the factory-level equipment room will integrate the maintenance project spare parts consumption tables of each workshop through the equipment intelligent system platform of the previous month, and automatically convert them into preliminary spare parts plans for each workshop next month. The automatic collection module will automatically collect the completion status of all maintenance plan work orders in the factory last month; The consumption statistics module can count the completion status of the maintenance plan work orders collected by the automatic collection module, count the spare parts consumption generated by the work orders, and sort and record the spare parts consumption to make a spare parts quota compilation table; The preliminary plan generation module automatically generates a preliminary spare parts plan based on the spare parts quota table of each workshop approved by the factory-level statistics and matching the spare parts consumption of each workshop last month; The NC system database module receives the preliminary plan generated by the preliminary plan generation module, and the NC system database module stores the actual inventory of various spare parts in the company's general warehouse and factory level; The over-standard determination module checks the preliminary spare parts plan through the NC system machine-side spare parts inventory system to determine whether the preliminary plan exceeds the spare parts quota; The plan cancellation module is one of the output results of the excess determination module. If the excess determination module determines that the preliminary plan exceeds the quota of the spare part, it will output an instruction to cancel the spare part plan, and the preliminary plan will be terminated. The workshop review module is another output result of the excess determination module. If the excess determination module determines that the preliminary plan does not exceed the quota of the spare part, it will output a workshop review instruction and submit the preliminary spare parts plan to each workshop for review. Each workshop needs to check the number of spare parts for review. The spare parts plan generation module generates the final spare parts plan according to the results of the workshop review module; The secondary review module reviews the final spare parts plan submitted by the workshop, and submits the spare parts plan to the marketing department after passing the review; The purchasing module refers to the marketing department receiving the spare parts plan and purchasing spare parts according to the content of the spare parts plan; The workshop review module includes missing spare parts review and new spare parts declaration, and the missing spare parts review refers to each workshop verifying the types and usage of various spare parts recorded in the preliminary plan to avoid spare parts omissions and errors in the preliminary plan, and the new spare parts declaration refers to each workshop declaring the newly added spare parts plan as needed, and the missing spare parts review and the new spare parts declaration do not affect each other and are carried out independently; The declaration of newly required spare parts includes spare parts coding application, spare parts quota application and spare parts plan application, and the spare parts coding application, spare parts quota application and spare parts plan application are carried out in sequence. That is, if each workshop has new spare parts to be declared, it is necessary to first apply for spare parts coding in the form of a report, then apply for spare parts quota, and finally make a spare parts plan declaration.

2. The automatic generation system for plant-level spare parts planning according to claim 1 is characterized in that: The consumption statistics module includes general spare parts statistics and non-standard spare parts statistics, and the general spare parts statistics are statistics on the types and usage of general spare parts required by each workshop, and the non-standard spare parts statistics are statistics on the types and usage of non-standard spare parts required by each workshop.

3. The automatic generation system for plant-level spare parts planning according to claim 1 is characterized in that: The secondary audit module includes a factory and equipment room audit module and a company-level equipment engineering department audit module, and the result of the secondary audit module depends on the factory and equipment room audit module and the company-level equipment engineering department audit module.