A two-stage robust planning method for solar energy consumption equipment in regional electric-thermal integrated energy system

By adopting a two-stage robust planning method in the regional electric-thermal integrated energy system, the consumption of solar electricity and heat is optimized, the unreasonable problems and light abandonment in the planning and configuration of solar equipment are solved, and the system is realized under harsh lighting conditions. system safe operation and economic optimization.

CN114707783BActive Publication Date: 2024-10-18TIANJIN UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202111319653.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-09
Publication Date
2024-10-18
Estimated Expiration
2041-11-09

AI Technical Summary

Technical Problem

It is difficult for existing technology to effectively solve unreasonable problems in the planning and configuration of solar equipment, resulting in light abandonment. Moreover, a single absorption technology limits the full absorption of solar energy, and is affected by weather changes and uncertainty, posing risks to the safe operation of the system. .

Method used

The two-stage robust planning method of the regional electric-thermal integrated energy system is used, combined with the Distflow model and the quality regulation mode, to model the distribution network and heating network, taking into account the delay characteristics of the heating network and the uncertainty of solar energy, and optimizing the solar power system. , multi-energy collaborative absorption of heat, and find a conservative economic optimal solution that satisfies the safe operation of the system under harsh lighting conditions.

Benefits of technology

It achieves economic optimization to ensure safe operation of the system under harsh lighting conditions, provides a bottom line for economic optimization of solar energy consumption equipment investment projects, reduces investment risks, and improves the energy utilization efficiency and economy of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114707783B_ABST
    Figure CN114707783B_ABST
Patent Text Reader

Abstract

The present invention relates to a two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system. First, the components and structure of the regional electric-thermal integrated energy system are clarified; second, the system parameters are input and the initial values ​​of the algorithm are set; then, the main problem of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system is solved; then, the main problem of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system is solved; finally, it is determined whether the difference between the upper and lower bounds is less than the allowable error to obtain the final solar energy consumption equipment planning scheme. The present invention establishes an uncertainty set and adjusts the uncertainty of uncertain factors to find a conservative economic optimal solution that still meets the system safety operation constraints under the condition of uncertainty of harsh solar light intensity, and provides investors with an economic optimization bottom line for solar energy consumption equipment investment projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a regional integrated energy system in the technical field of electric power systems, and in particular to a two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system. Background Art

[0002] With the rapid development of economy, society and energy industry, the wave of promoting the development of renewable energy has swept all over the world. As one of the most promising renewable energy sources, solar energy will play an important role in the future energy landscape. However, with the rapid growth of solar energy equipment installation, most countries, including China, are facing a serious problem of abandoned solar energy. The reasons for the abandonment of solar energy can be roughly summarized as follows. First, the output of solar energy consumption equipment shows a certain law of change under the influence of climate, while the demand for electricity, heat and other energy shows another law of change under human production and life activities. The mismatch between the source and load change law may cause the planning and configuration of solar energy consumption equipment to be unreasonable. Secondly, the existing solar energy consumption projects are mostly limited to a single consumption technology, and less consideration is given to the multi-energy coordinated consumption of solar electricity and heat, which is easy to cause some single energy systems (such as regional distribution systems) to have excessive pressure in local periods, thereby limiting the full consumption of solar energy. In addition, affected by natural factors such as weather changes and cloud movement, there is a strong uncertainty in the output of solar energy consumption equipment. When the installed capacity of solar energy consumption equipment is large, certain abandonment measures may be taken to ensure the safe operation of the system.

[0003] Reasonable configuration of solar energy absorption equipment under the conditions of existing technical and economic parameters of solar energy equipment, energy price policy, and system and load levels to maximize economic and environmental protection goals has important research value. Therefore, a two-stage robust planning method for solar energy absorption equipment in regional electric-thermal integrated energy systems is urgently needed. Aiming at the planning problem of solar energy absorption equipment in regional electric-thermal integrated energy systems, the influence of heat network delay characteristics on source-load matching, solar energy uncertainty, and multi-energy coordinated absorption of solar electricity and heat are comprehensively considered to find a conservative economic optimal solution that still meets the system safety operation constraints under the condition of uncertainty of harsh solar light intensity, providing investors with the economic optimization bottom line of solar energy absorption equipment investment projects. Investors can judge whether to accept the "worst" planning results of the project caused by solar energy uncertainty based on their tolerance. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a two-stage robust planning method for solar energy absorption equipment in a regional electric-thermal integrated energy system, so as to find a conservative economic optimal solution that still meets the system safety operation constraints under severe conditions of uncertain solar light intensity, thereby providing investors with an economic optimization bottom line for solar energy absorption equipment investment projects.

[0005] The technical solution adopted by the present invention is:

[0006] Step 1: Determine the components and structure of the regional electric-thermal integrated energy system, and determine the regional electric-thermal integrated energy system model based on this, including the following steps:

[0007] Step 1-1: Use the Distflow model to model the distribution network, as follows:

[0008] At any time, for any node j in the regional power system, there is the following power balance relationship:

[0009]

[0010]

[0011]

[0012]

[0013]

[0014] Among them, e (j) represents the set of branch headend nodes with j as the terminal node; ξ e (j) represents the set of branch end nodes with j as the head node; are the active power (kW) and reactive power (kVar) flowing from node i to node j respectively; are the active and reactive injected powers of node i at time t; r ij 、x ij are the resistance and reactance of line ij respectively (Ω); is the square of the current amplitude on line ij at time t (A 2 ). are respectively the active and reactive power injected into the large power grid at node j at time t; are the active load and reactive load at load node j at time t respectively; are the active and reactive outputs of the CHP unit at node j at time t respectively; is the active power output of the photovoltaic at node j at time t; is the active power consumed by the electric boiler at node j at time t; are the charging and discharging power of the energy storage device at node j at time t respectively.

[0015] At any time, for any branch ij in the distribution network, the following relationship holds:

[0016]

[0017]

[0018]

[0019] in, is the square of the voltage amplitude at node i at time t (V 2 ); is the active power loss of branch ij at time t.

[0020] At any time t, the voltage of any node in the entire network and the current of any branch must be within the safe operating range:

[0021]

[0022]

[0023] Among them, u max 、u min are the upper and lower limits of the square voltage allowed at node i (V 2 );i max is the maximum current square allowed for line ij (A 2 ).

[0024] Step 1-2: Model the district heating network using the quality regulation mode. The specific steps include:

[0025] Step 1-2-1: Establish the heating network node temperature model. The specific steps are as follows:

[0026] The temperature mixing equation of node j in the water supply and return network can be expressed as:

[0027]

[0028]

[0029] Among them, m ij 、m loadj are the mass flow rate of pipeline ij and the load flow rate of node j (kg / s) respectively; are the outlet temperatures of the water supply pipe ij and the return pipe jk at time t (℃); are the supply and return water temperatures of node j at time t (℃); is the return water temperature of load j at time t (℃). s (j), ζ r (j) are the first node sets of the pipelines with node j as the terminal node in the supply and return pipe networks, ξ s (j), ξ r(j) are the sets of pipeline end nodes with node j as the first node in the supply and return pipe networks.

[0030] Divide both sides of the equation by the total injected mass flow rate of node j, and introduce the upstream mass flow rate proportion β of the supply and return pipe network s , β r , at the same time, let Then formulas (11)-(12) can be expressed as:

[0031]

[0032]

[0033]

[0034]

[0035]

[0036] The time delay characteristics of the pipe inlet temperature and outlet temperature can be processed by time discretization. Taking the water supply pipe ij as an example, assuming that the time interval is Δt and the length of the pipe ij is l ij (m), the pipeline ij can be approximately divided into τ according to Δt ij The length is Δl ij (m) units. Therefore, τ ij It can be calculated by the following formula:

[0037]

[0038]

[0039] Among them, D ij is the diameter of the pipe ij (m), ρ is the density of hot water (kg / m 3 ).

[0040] Since the thermal process of the regional heating network is transmitted at a mass flow rate, the delay time of the effect of the temperature of node i on the temperature of node j can be approximated by τ ij Therefore, after considering the time-delay characteristics of temperature, the outlet temperature of pipe ij at time t can be regarded as t-τ ij The temperature of the inlet node i at time Δt after the pipe dissipates heat:

[0041]

[0042] Where c is the specific heat capacity of hot water (kJ / (kg·K)); λ ij is the thermal conductivity of pipe ij (kW / (m·K)).

[0043] Substitute formula (20) into formula (13), and let The temperature calculation formula of node j in the water supply network at time t can be obtained:

[0044]

[0045] Similarly, the calculation formula for node j in the return water network at time t is:

[0046]

[0047] When t<τΔt, The initial supply water temperature of node i and the initial return water temperature of node k are respectively brought in.

[0048] Step 1-2-2: Establish the heat loss model of the heating network pipeline. The specific steps are as follows:

[0049] Assuming that the hot water temperature of each unit pipe in the pipe ij at time t is approximately represented by the average inlet and outlet temperature of the unit pipe at time t, the heat loss of the pipe ij at time t can be expressed as:

[0050]

[0051] Among them, node i is the inlet node of pipe ij. The above formula is applicable to both water supply network and return network.

[0052] Step 1-2-3: Establish the heat source and heat load thermal power model of the heat network. The specific steps are as follows:

[0053] For the heat source and heat load at node i, the heat power at time t is the thermal potential difference of the water supply and return network at time t:

[0054]

[0055]

[0056] in, are the heat source and heat load powers (kW) at node i respectively.

[0057] For the heat source at node i, its thermal power is the sum of the thermal outputs of all heating equipment:

[0058]

[0059] in, are the thermal outputs of the solar collector and CHP unit at node i at time t (kW); are the charging and discharging power (kW) of the heat storage device at node i at time t respectively.

[0060] Step 1-2-4: Establish the temperature operation model of the entire heating network. The specific steps are as follows:

[0061] For any node i in the supply and return water network, whether it is a heat source node, a heat load node or an ordinary node, the supply and return water temperatures have a specific operating range:

[0062] T s,min ≤T i s,t ≤T s,max (96)

[0063] T r,min ≤T i r,t ≤T r,max (97)

[0064] Among them, T s,min 、T r,min are the minimum operating temperatures of the supply and return pipe networks (°C), T s,max 、T r,max They are the maximum operating temperatures (°C) of the supply and return pipe networks respectively.

[0065] In addition, in order to prevent the delayed characteristics of the heating network from "accumulating recklessly" to the next day, at the last scheduling moment of each day, the heat source water supply temperature T i s,end The temperature T at the initial scheduling time of the day i s,init Stay consistent:

[0066] T i s,end =T i s,init (98)

[0067] Step 1-3: Establish a regional electric-thermal integrated energy system equipment model. The specific steps include:

[0068] Step 1-3-1: Establish a photovoltaic model, as follows:

[0069]

[0070]

[0071] in, is the active power (kW) actually produced by the photovoltaic power generation system at node i at time t, that is, the photovoltaic power actually consumed by the regional electric-thermal integrated energy system; is the abandoned light power of the photovoltaic power generation system (kW), which is The sum is the maximum electric power that the photovoltaic power generation system at node i can produce at time t. PV,iis the photovoltaic array installation area at node i (m 2 );η PV,i is the conversion efficiency of the photovoltaic power generation system at node i; is the light intensity at node i at time t (kW / m 2 ).

[0072] Step 1-3-2: Establish a solar collector model as follows:

[0073]

[0074]

[0075] in, is the solar collector heating power actually consumed by the system at node i at time t (kW), is the solar thermal power rejection of the system (kW), A SC,i is the solar collector installation area at node i (m 2 ), η SC,i is the thermal conversion efficiency of the solar collector.

[0076] In the study of solar collector performance, there are two types of thermal conversion efficiency: instantaneous efficiency and daily average efficiency. The instantaneous efficiency of the solar collector is related to the difference between the average temperature of the hot water in the solar collector and the ambient temperature. The change in the average temperature of the hot water has an extremely complex thermodynamic relationship with the heating conditions, the structure of the solar collector, the internal parameters, the ambient temperature, the light, etc., and is greatly affected by the external operating conditions. The daily average efficiency of the solar collector is usually the ratio of the total heat obtained by the working fluid passing through the collector throughout the day to the total solar radiation throughout the day. It takes into account the overall performance of the solar collector throughout the day and is less affected by random changes in operating conditions. It is suitable for scenarios that focus more on the coordination between the solar collector and the external system rather than the internal design of the solar collector. The present invention selects the daily average efficiency of the solar collector for research, and its calculation is as follows:

[0077]

[0078] in, is the initial temperature of the solar collector at node i (℃) equal to the average temperature of the day (℃) intercept efficiency; is the total solar radiation for the whole day (kW / m 2 );U loss / T,SC,i is the heat loss coefficient with respect to ambient temperature (kW / ℃ 2 ·m 2 ).

[0079] In addition, whether it is installed on a roof or in an open space, the installation area is often limited. When photovoltaic and solar thermal collectors are built in the same area, there will be competition between the two:

[0080]

[0081] Among them, A PV,i , A SC,i are the PV and SC installation areas at node i (m 2 ), is the maximum installable area of ​​solar energy consumption equipment at node i (m 2 ).

[0082] Step 1-3-3: Establish a gas turbine CHP unit model as follows:

[0083]

[0084]

[0085] Among them, α CHP,i is the thermal power ratio of the CHP unit at node i, is the thermal output power of the CHP unit at node i at time t (kW), is the electrical output power of the CHP unit at node i at time t (kW), is the maximum power supply power of the CHP unit at node i (kW).

[0086] Step 1-3-4: Establish an electric boiler model as follows:

[0087]

[0088]

[0089] Among them, η EB,i is the conversion efficiency of the electric boiler at node i, is the maximum heating power of the electric boiler at node i (kW).

[0090] Step 1-3-5: Establish a power storage device model, as follows:

[0091]

[0092]

[0093]

[0094]

[0095]

[0096] in, They are the maximum and minimum state of charge coefficients of the energy storage device. EES,i is the self-discharge rate of the storage device at node i; η EES,C,i , η EES,D,i are the charging and discharging efficiencies of the power storage device at node i, respectively; are the charging and discharging power of the storage device at node i at time t (kW). EES,C,i , γ EES,D,i are the maximum charge and discharge rates of the energy storage device at node i, respectively. is the charging and discharging state of the storage device at node i at time t, which is a 0-1 variable. When it is 0, it means that the power storage device at node i is in the charging state at time t; When it is 1, it means that the energy storage device at node i is in a discharging state at time t. is the initial state of charge coefficient of the energy storage device at node i.

[0097] Step 1-3-6: Establish a heat storage equipment model, as follows:

[0098]

[0099]

[0100]

[0101]

[0102]

[0103] Among them, Cap TES,i is the capacity of the thermal storage device at node i (kWh); are the heat storage capacity of the heat storage equipment at node i at time t, the initial time of the scheduling cycle, and the final time of the scheduling cycle (kWh); are the maximum and minimum state coefficients of the heat storage equipment at node i; σ TES,i is the self-heat release rate of the heat storage device at node i; are the heat absorption and release power of the heat storage device at node i at time t (kW); η TES,C,i , η TES,D,i are the heat absorption and release efficiencies of the heat storage equipment at node i; γ TES,C,i , γ TES,D,i are the maximum heat absorption and release rates of the heat storage equipment at node i, respectively; is the heat absorption and release state of the heat storage device at node i at time t, which is a 0-1 variable. When it is 0, it means that the heat storage device at node i is in a heat absorption state at time t; otherwise, it is in a heat release state. Initial heat storage state coefficient of the heat storage device at node i.

[0104] Step 2: Input system parameters and set the initial values ​​of the algorithm, where system parameters include distribution network system parameters, regional heating network parameters, regional electric-heat integrated energy system equipment parameters, typical daily load parameters, and environmental parameters. The initial values ​​of the algorithm include the upper / lower bounds of the robust model objective function, the current number of iterations, the feasible cut set, the allowable error, and the initial values ​​of uncertain parameters. Specifically, the following steps are included:

[0105] Step 2-1: Input the distribution network system parameters, including distribution network line parameters, load level, network topology connection relationship, bus voltage safety range and branch current limit.

[0106] Step 2-2: Input the regional heating network parameters, including the regional heating network pipeline parameters, load level, network topology connection relationship, heat source node initial temperature and node supply and return water temperature operating range limits.

[0107] Step 2-3: Input the equipment parameters of the regional electric-thermal integrated energy system, including the access location and capacity of each energy supply equipment and energy storage equipment, and the maximum installation area of ​​each solar equipment node that can be installed.

[0108] Step 2-4: Input the economic parameters of the regional electric-thermal integrated energy system, including the initial investment price of each equipment, operation and maintenance costs, energy prices and penalty coefficients.

[0109] Step 2-5: Input typical daily load parameters, including the electricity and heat load conditions for a typical day in winter, transition season, and summer for 24 hours.

[0110] Step 2-6: Input environmental parameters, including solar light intensity and ambient temperature

[0111] Step 2-7: Set the initial value of the algorithm, including the upper bound UB and lower bound LB of the robust model objective function, the current number of iterations, the feasible cut set, the allowable error, and the initial value of the uncertain parameters.

[0112] Step 3: Solve the main problem of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system, obtain the optimal solution and update the lower bound. It includes the following steps:

[0113] Step 3-1: Establish a two-stage robust planning model for the main problem, which specifically includes the following steps:

[0114] Step 3-1-1: Use a box uncertainty set to describe the uncertainty of the time dimension of solar radiation intensity:

[0115]

[0116] Among them, N t N is the set of all typical daily scheduling time intervals throughout the year; t is the total number of typical daily scheduling time intervals throughout the year, and its value is N day ×N Δt ; w represents the uncertain element vector of solar light intensity; w t,d is the solar intensity at time t on a typical day; I t,d is the predicted value of solar radiation intensity at time t on a typical day; ΔI t,d is the maximum fluctuation value of solar illumination intensity at time t on a typical day; Γ is the uncertainty budget, which is used to adjust the model uncertainty.

[0117] Step 3-1-2: Establish the main problem objective function based on the project economic benefits. To calculate the economic feasibility of installing solar energy absorption equipment, it is necessary to consider the investment cost of solar energy absorption equipment, the investment cost of energy storage equipment as a backup for solar energy absorption equipment, and the operation and maintenance costs, fuel costs, electricity purchase costs, penalty costs, etc. within the life of the entire system investment project. At the same time, considering the degradation of the target due to solar energy uncertainty, the main problem objective function is as follows:

[0118]

[0119] in, is the annualized investment cost of solar energy consumption equipment and energy storage equipment (yuan); is the annual operation and maintenance cost of the system (yuan); They are the annual fuel cost (yuan) and annual electricity purchase cost (yuan) of the system respectively; is the annual penalty fee of the system (yuan); χ is the introduced auxiliary variable. The five costs are calculated as follows:

[0120] (1) Annualized investment costs

[0121] The annualized investment cost of the system includes the annualized investment cost of photovoltaic solar energy absorption equipment and solar thermal collectors. (yuan), and the annualized investment cost of electrical and thermal energy storage equipment (Yuan):

[0122]

[0123] Among them, c ins,PV 、c ins,SC 、c ins,EES 、c ins,TES The investment costs of photovoltaic and solar thermal collectors (yuan / m 2 ) and investment cost of electricity storage equipment and heat storage equipment (yuan / kWh); A PV,i , A SC,iare the photovoltaic and solar thermal collector installation areas at node i (m 2 );Cap EES,i , Cap TES,i are the installed capacity of electrical and thermal energy storage equipment at node i (kWh); N bus 、N node are the number of distribution network buses and the number of regional heating network nodes respectively; r CR is the equipment capital recovery coefficient, which is calculated as follows:

[0124]

[0125] Where r is the system discount rate; L i is the expected operating life of equipment i (years).

[0126] (2) Annual operation and maintenance costs

[0127] During system operation, each device will incur operation and maintenance costs:

[0128]

[0129] in, are the annual operation and maintenance costs (yuan) of photovoltaic, solar thermal collector, CHP unit, electric boiler, power storage equipment and heat storage equipment respectively; c OM,PV 、c OM,SC 、c OM,CHP 、c OM,EB , c OM,EES 、c OM,TES They are the operation and maintenance costs of photovoltaic, solar thermal collector, CHP unit, electric boiler, power storage equipment, and heat storage equipment (yuan / kW); N day is the number of days in a year; N Δt The number of scheduling intervals in a day.

[0130] (3) Annual fuel costs

[0131] For a typical district electricity-heat integrated energy system as described in Chapter 2, the annual fuel cost refers to the annual gas consumption cost of CHP:

[0132]

[0133] Among them, c gas is the natural gas price (yuan / m 3 ).

[0134] (4) Annual electricity purchase cost

[0135] The annual electricity purchase cost refers to the total cost of the system purchasing electricity from the upper power grid:

[0136]

[0137] in, is the last power purchase price from the power grid at time t (yuan / kWh).

[0138] (5) Annual penalty fee

[0139] The annual penalty fee includes the distribution network loss, regional heating network heat loss and abandoned solar penalty fee:

[0140]

[0141] in, They are the penalty coefficients for distribution network loss, regional thermal network heat loss and abandoned solar power (yuan / kWh). ASEC is the annual abandoned solar power of the system (kWh). For details on the calculation, see formula (3-4).

[0142] In addition, in order to determine whether the optimized regional electric-thermal integrated energy system solar energy consumption equipment planning scheme is economically feasible, it is necessary to calculate whether the dynamic payback period of the planning scheme is within the investment project life. Dynamic payback period T P (Year) is calculated as follows

[92] :

[0143]

[0144] Among them, CI l , CO l are the cash inflow and outflow in the lth year (yuan) respectively; i0 is the benchmark rate of return.

[0145] If the system's net income is equal every year, then T P It can be calculated by the following formula:

[0146]

[0147] in, is the annual net income (yuan); C ins is the total investment cost (Yuan).

[0148] Step 3-1-3: Determine the optimization variables of the main problem. The optimization variables are divided into two categories: variables x before the uncertainty parameters are determined, that is, the variables of the first stage problem, and variables y after the uncertainty is determined, that is, the variables of the second stage problem:

[0149] (3) Planning optimization variables include:

[0150] ●The photovoltaic installation area A in each energy station PV 、Solar collector installation area A SC ;

[0151] ●Electricity storage equipment installation capacity Cap EES, Thermal storage equipment installation capacity Cap TES ;

[0152] ●Energy storage equipment operating status

[0153] (4) Operation optimization variables include:

[0154] ● Output of the upper power grid at each time on each typical day Heat source output

[0155] ● Distribution network bus voltage u at each time on each typical day t,d , branch current i t,d , branch power P t,d , Q t,d , busbar injection power

[0156] ● Supply and return water temperature T of regional heating network nodes at each time of each typical day s,t,d 、T r,t,d ;

[0157] ●The output of various energy conversion and energy storage devices at various times on typical days, including

[0158]

[0159] Step 3-1-4: Determine the main problem constraints:

[0160]

[0161] Among them, for constraints, Fx≥f includes (35); Ax+Ly≥a includes (9)-(10), (27)-(28), (31), (33), (37), (39)-(40), (45), and the left half constraints of (42)-(43), (47)-(48); J(x)x+Ry≥0 includes the right half constraints of (42)-(43), (47)-(48); Ey=H(x)d includes (30), (32); Including (6); the remaining constraints can be expressed by Bx+Ky=b.

[0162] Step 3-2: Solve the main problem and find the optimal solution And update the lower bound Among them, χ is an auxiliary variable. Specifically, the following steps are included:

[0163] In the main problem, the objective function is linear and the constraint J(x)x+Ry≥0 is bilinear. is a second-order cone form, and the remaining constraints are linear. To facilitate the solution of the model, this paper uses the Big M method to process the right half constraints of (42)-(43) and (47)-(48) as follows. Taking the right half constraints of (42)-(43) as an example, let The original constraint can be transformed into:

[0164]

[0165] Wherein, M is a sufficiently large positive real number.

[0166] Similarly, The right half constraint of (47)-(48) can be transformed into:

[0167]

[0168] At this point, the right half constraints of (42)-(43) and (47)-(48) are transformed into linear constraints (61)-(62), and the main problem is transformed into a 0-1 mixed integer second-order cone optimization problem, which can be solved using existing optimization software such as CPLEX and GUROBI.

[0169] Step 4: Solve the sub-problems of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system, obtain the optimal solution and the sub-problem objective function value, and update the upper bound. It includes the following steps:

[0170] Step 4-1: Establish a two-stage robust planning model for the main problem, including:

[0171]

[0172] in, is the optimal solution to the main problem.

[0173] Step 4-2: Based on the main problem Solve the subproblem and find the optimal solution w * and the sub-problem objective function value c2y * , update the lower bound The specific steps include:

[0174] Subproblem (63) is a max-min problem. The common solution is to dualize the inner min function to transform it into a dual problem in max form and merge it with the outer max problem. Since in the k-th iteration of the subproblem, is a known parameter, so the dual variable corresponding to the constraint of subproblem (63) can be set as follows:

[0175] ω1:

[0176] ω2:

[0177] ω3:

[0178] ω4, ω5:

[0179] Subproblem (63) is transformed into the following dual form:

[0180]

[0181] In the objective function of the subproblem dual problem (64), w T ω3 is a bilinear term. The optimal solution of this type of dual problem corresponds to w * It is obtained at the extreme point of its uncertainty set W. For the box uncertainty set W, its extreme point set W′ can be expressed as follows:

[0182]

[0183] Replacing the uncertain parameter w in the dual problem (64) with (65) yields:

[0184]

[0185] Among them, (θ + -θ-)ω3 is a bilinear term and can be processed by the big M method. Let V3 = θ + ω3, V4 = θ-ω3, problem (66) can be transformed into:

[0186]

[0187] At this point, subproblem (63) is transformed into a dual problem in the form of (67), which is a 0-1 mixed integer second-order cone optimization problem and can be solved using existing optimization software such as CPLEX and GUROBI.

[0188] Step 5: Determine whether the difference between the upper and lower bounds is less than the allowable error. If so, the solution is completed and the iteration is exited, and the robust optimal solution is returned. Otherwise, the main sub-problem is continued to be solved to obtain the final solar energy consumption equipment planning scheme. Specifically, the following steps are included:

[0189] If UB-LB≤δ, the solution is completed, the iteration is exited, and the robust optimal solution is returned. Otherwise, Regardless of whether the subproblem has a solution, the variable y is added to the main problem in the next iteration. k+1 , and add the following constraints:

[0190]

[0191] If the subproblem has a solution, update L = L ∪ {k + 1} and further add the following constraints to the main problem in the next iteration:

[0192]

[0193] Finally, regardless of whether the subproblem has a solution, update k=k+1 and return to step 3.

[0194] Compared with the prior art, the present invention has the following beneficial effects: the present invention proposes a two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system, which comprehensively considers the improvement effect of different solar thermal and electric consumption forms on the system solar energy consumption, the influence of the delay characteristics of the heat network on the source-load matching, and the non-negligible risks and challenges brought by solar energy uncertainty to the economic planning and operation of the system solar energy consumption equipment. Based on the robust optimization and column and constraint generation algorithm, by establishing an uncertainty set and adjusting the uncertainty of the uncertain factors, the conservative economic optimal solution that still meets the system safety operation constraints under the condition of bad solar energy intensity uncertainty is found, providing investors with the economic optimization bottom line of solar energy consumption equipment investment projects. Investors can judge whether to accept the "worst" planning results of the project caused by solar energy uncertainty according to their tolerance. BRIEF DESCRIPTION OF THE DRAWINGS

[0195] Figure 1 The figure is a schematic diagram of a method flow of an embodiment of the present invention.

[0196] Figure 2 It is a schematic diagram of the structure of a regional electric-thermal integrated energy system according to an embodiment of the present invention.

[0197] Figure 3 This is a typical solar and thermal load curve of an industrial park according to an embodiment of the present invention.

[0198] Figure 4 Graph showing light intensity and ambient temperature on a typical day according to an embodiment of the present invention.

[0199] Figure 5 This is a schematic diagram of the system economic optimization results in Example 1 of the calculation results of the embodiment of the present invention under the scenarios of no solar energy absorption equipment installed, only PV installed, only SC installed, and simultaneous installation of PV and SC.

[0200] Figure 6 This is a schematic diagram of the “worst” lighting scene results added by the C&CG algorithm under different fluctuation ranges in Example 2 of the calculation results of an embodiment of the present invention.

[0201] Figure 7 This is a schematic diagram of the “worst” lighting scene results added by the C&CG algorithm under different uncertainties in Example 2 of the calculation results of an embodiment of the present invention.

[0202] Figure 8 This is a schematic diagram of the results of the electrical and thermal optimization operation strategy when abandoning light in Example 3 of the calculation results of the embodiment of the present invention.

[0203] Fig. 9 This is a schematic diagram of the results of the electrical and thermal optimization operation strategy considering the energy storage device in Example 4 of the calculation results of the embodiment of the present invention. DETAILED DESCRIPTION

[0204] The following is a detailed description of a two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system of the present invention in conjunction with the embodiments and drawings.

[0205] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.

[0206] like Figure 1 As shown, the present invention provides a two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system, comprising the following steps:

[0207] Step 1: In this embodiment, the components and structure of the regional electric-thermal integrated energy system are determined, and the regional electric-thermal integrated energy system model is determined accordingly, including the following steps:

[0208] Step 1-1: Use the Distflow model to model the distribution network, as follows:

[0209] At any time, for any node j in the regional power system, there is the following power balance relationship:

[0210]

[0211]

[0212]

[0213]

[0214]

[0215] Among them, e (j) represents the set of branch headend nodes with j as the terminal node; ξ e (j) represents the set of branch end nodes with j as the head node; are the active power (kW) and reactive power (kVar) flowing from node i to node j respectively; are the active and reactive injected powers of node i at time t; r ij 、x ij are the resistance and reactance of line ij respectively (Ω); is the square of the current amplitude on line ij at time t (A 2 ). are respectively the active and reactive power injected into the large power grid at node j at time t; are the active load and reactive load at load node j at time t respectively; are the active and reactive outputs of the CHP unit at node j at time t respectively; is the active power output of the photovoltaic at node j at time t; is the active power consumed by the electric boiler at node j at time t; are the charging and discharging power of the energy storage device at node j at time t respectively.

[0216] At any time, for any branch ij in the distribution network, the following relationship holds:

[0217]

[0218]

[0219]

[0220] in, is the square of the voltage amplitude at node i at time t (V 2 ); is the active power loss of branch ij at time t.

[0221] At any time t, the voltage of any node in the entire network and the current of any branch must be within the safe operating range:

[0222]

[0223]

[0224] Among them, u max 、u min are the upper and lower limits of the square voltage allowed at node i (V 2 );i max is the maximum current square allowed for line ij (A 2 ).

[0225] Step 1-2: Model the district heating network using the quality regulation mode. The specific steps include:

[0226] Step 1-2-1: Establish the heating network node temperature model. The specific steps are as follows:

[0227] The temperature mixing equation of node j in the water supply and return network can be expressed as:

[0228]

[0229]

[0230] Among them, m ij 、m loadj are the mass flow rate of pipeline ij and the load flow rate of node j (kg / s) respectively; are the outlet temperatures of the water supply pipe ij and the return pipe jk at time t (℃); are the supply and return water temperatures of node j at time t (℃); is the return water temperature of load j at time t (℃). s (j), ζ r (j) are the first node sets of the pipelines with node j as the terminal node in the supply and return pipe networks, ξ s (j), ξ r (j) are the sets of pipeline end nodes with node j as the first node in the supply and return pipe networks.

[0231] Divide both sides of the equation by the total injected mass flow rate of node j, and introduce the upstream mass flow rate proportion β of the supply and return pipe network s , β r , at the same time, let Then formulas (11)-(12) can be expressed as:

[0232]

[0233]

[0234]

[0235]

[0236]

[0237] The time delay characteristics of the pipe inlet temperature and outlet temperature can be processed by time discretization. Taking the water supply pipe ij as an example, assuming that the time interval is Δt and the length of the pipe ij is l ij (m), the pipeline ij can be approximately divided into τ according to Δt ij The length is Δl ij (m) units. Therefore, τ ij It can be calculated by the following formula:

[0238]

[0239]

[0240] Among them, D ij is the diameter of the pipe ij (m), ρ is the density of hot water (kg / m 3 ).

[0241] Since the thermal process of the regional heating network is transmitted at a mass flow rate, the delay time of the effect of the temperature of node i on the temperature of node j can be approximated by τ ij Therefore, after considering the time-delay characteristics of temperature, the outlet temperature of pipe ij at time t can be regarded as t-τ ij The temperature of the inlet node i at time Δt after the pipe dissipates heat:

[0242]

[0243] Where c is the specific heat capacity of hot water (kJ / (kg·K)); λ ij is the thermal conductivity of pipe ij (kW / (m·K)).

[0244] Substitute formula (20) into formula (13), and let The temperature calculation formula of node j in the water supply network at time t can be obtained:

[0245]

[0246] Similarly, the calculation formula for node j in the return water network at time t is:

[0247]

[0248] When t<τΔt, The initial supply water temperature of node i and the initial return water temperature of node k are respectively brought in.

[0249] Step 1-2-2: Establish the heat loss model of the heating network pipeline. The specific steps are as follows:

[0250] Assuming that the hot water temperature of each unit pipe in the pipe ij at time t is approximately represented by the average inlet and outlet temperature of the unit pipe at time t, the heat loss of the pipe ij at time t can be expressed as:

[0251]

[0252] Among them, node i is the inlet node of pipe ij. The above formula is applicable to both water supply network and return network.

[0253] Step 1-2-3: Establish the heat source and heat load thermal power model of the heat network. The specific steps are as follows:

[0254] For the heat source and heat load at node i, the heat power at time t is the thermal potential difference of the water supply and return network at time t:

[0255]

[0256]

[0257] in, are the heat source and heat load powers (kW) at node i respectively.

[0258] For the heat source at node i, its thermal power is the sum of the thermal outputs of all heating equipment:

[0259]

[0260] in, are the thermal outputs of the solar collector and CHP unit at node i at time t (kW); are the charging and discharging power (kW) of the heat storage device at node i at time t respectively.

[0261] Step 1-2-4: Establish the temperature operation model of the entire heating network. The specific steps are as follows:

[0262] For any node i in the supply and return water network, whether it is a heat source node, a heat load node or an ordinary node, the supply and return water temperatures have a specific operating range:

[0263] T s,min ≤T i s,t ≤T s,max (165)

[0264] T r,min ≤T i r,t ≤T r,max (166)

[0265] Among them, T s,min 、T r,min are the minimum operating temperatures of the supply and return pipe networks (°C), T s,max 、T r,max They are the maximum operating temperatures (°C) of the supply and return pipe networks respectively.

[0266] In addition, in order to prevent the delayed characteristics of the heating network from "accumulating recklessly" to the next day, at the last scheduling moment of each day, the heat source water supply temperature T i s,end The temperature T at the initial scheduling time of the day i s,init Stay consistent:

[0267] T i s,end =T is,init (167)

[0268] Step 1-3: Establish a regional electric-thermal integrated energy system equipment model. The specific steps include:

[0269] Step 1-3-1: Establish a photovoltaic model, as follows:

[0270]

[0271]

[0272] in, is the active power (kW) actually produced by the photovoltaic power generation system at node i at time t, that is, the photovoltaic power actually consumed by the regional electric-thermal integrated energy system; is the abandoned light power of the photovoltaic power generation system (kW), which is The sum is the maximum electric power that the photovoltaic power generation system at node i can produce at time t. PV,i is the photovoltaic array installation area at node i (m 2 );η PV,i is the conversion efficiency of the photovoltaic power generation system at node i; is the light intensity at node i at time t (kW / m 2 ).

[0273] Step 1-3-2: Establish a solar collector model as follows:

[0274]

[0275]

[0276] in, is the solar collector heating power actually consumed by the system at node i at time t (kW), is the solar thermal power rejection of the system (kW), A SC,i is the solar collector installation area at node i (m 2 ), η SC,i is the thermal conversion efficiency of the solar collector.

[0277] In the study of solar collector performance, there are two types of thermal conversion efficiency: instantaneous efficiency and daily average efficiency. The instantaneous efficiency of the solar collector is related to the difference between the average temperature of the hot water in the solar collector and the ambient temperature. The change in the average temperature of the hot water has an extremely complex thermodynamic relationship with the heating conditions, the structure of the solar collector, the internal parameters, the ambient temperature, the light, etc., and is greatly affected by the external operating conditions. The daily average efficiency of the solar collector is usually the ratio of the total heat obtained by the working fluid passing through the collector throughout the day to the total solar radiation throughout the day. It takes into account the overall performance of the solar collector throughout the day and is less affected by random changes in operating conditions. It is suitable for scenarios that focus more on the coordination between the solar collector and the external system rather than the internal design of the solar collector. The present invention selects the daily average efficiency of the solar collector for research, and its calculation is as follows:

[0278]

[0279] in, is the initial temperature of the solar collector at node i (℃) equal to the average temperature of the day (℃) intercept efficiency; is the total solar radiation for the whole day (kW / m 2 );U loss / T,SC,i is the heat loss coefficient with respect to ambient temperature (kW / ℃ 2 ·m 2 ).

[0280] In addition, whether it is installed on a roof or in an open space, the installation area is often limited. When photovoltaic and solar thermal collectors are built in the same area, there will be competition between the two:

[0281]

[0282] Among them, A PV,i , A SC,i are the PV and SC installation areas at node i (m 2 ), is the maximum installable area of ​​solar energy consumption equipment at node i (m 2 ).

[0283] Step 1-3-3: Establish a gas turbine CHP unit model as follows:

[0284]

[0285]

[0286] Among them, α CHP,i is the thermal power ratio of the CHP unit at node i, is the thermal output power of the CHP unit at node i at time t (kW), is the electrical output power of the CHP unit at node i at time t (kW), is the maximum power supply power of the CHP unit at node i (kW).

[0287] Step 1-3-4: Establish an electric boiler model as follows:

[0288]

[0289]

[0290] Among them, η EB,i is the conversion efficiency of the electric boiler at node i, is the maximum heating power of the electric boiler at node i (kW).

[0291] Step 1-3-5: Establish a power storage device model, as follows:

[0292]

[0293]

[0294]

[0295]

[0296]

[0297] in, They are the maximum and minimum state of charge coefficients of the energy storage device. EES,i is the self-discharge rate of the storage device at node i; η EES,C,i , η EES,D,i are the charging and discharging efficiencies of the power storage device at node i, respectively; are the charging and discharging power of the storage device at node i at time t (kW). EES,C,i , γ EES,D,i are the maximum charge and discharge rates of the energy storage device at node i, respectively. is the charging and discharging state of the storage device at node i at time t, which is a 0-1 variable. When it is 0, it means that the power storage device at node i is in the charging state at time t; When it is 1, it means that the energy storage device at node i is in a discharging state at time t. is the initial state of charge coefficient of the energy storage device at node i.

[0298] Step 1-3-6: Establish a heat storage equipment model, as follows:

[0299]

[0300]

[0301]

[0302]

[0303]

[0304] Among them, Cap TES,i is the capacity of the thermal storage device at node i (kWh); are the heat storage capacity of the heat storage equipment at node i at time t, the initial time of the scheduling cycle, and the final time of the scheduling cycle (kWh); are the maximum and minimum state coefficients of the heat storage equipment at node i; σ TES,i is the self-heat release rate of the heat storage device at node i; are the heat absorption and release power of the heat storage device at node i at time t (kW); η TES,C,i , η TES,D,i are the heat absorption and release efficiencies of the heat storage equipment at node i; γ TES,C,i , γ TES,D,i are the maximum heat absorption and release rates of the heat storage equipment at node i, respectively; is the heat absorption and release state of the heat storage device at node i at time t, which is a 0-1 variable. When it is 0, it means that the heat storage device at node i is in a heat absorption state at time t; otherwise, it is in a heat release state. Initial heat storage state coefficient of the heat storage device at node i.

[0305] Step 2: Input system parameters and set the initial values ​​of the algorithm, where system parameters include distribution network system parameters, regional heating network parameters, regional electric-heat integrated energy system equipment parameters, typical daily load parameters, and environmental parameters. The initial values ​​of the algorithm include the upper / lower bounds of the robust model objective function, the current number of iterations, the feasible cut set, the allowable error, and the initial values ​​of uncertain parameters. Specifically, the following steps are included:

[0306] Step 2-1: Input the distribution network system parameters, including distribution network line parameters, load level, network topology connection relationship, bus voltage safety range and branch current limit.

[0307] Step 2-2: Input the regional heating network parameters, including the regional heating network pipeline parameters, load level, network topology connection relationship, heat source node initial temperature and node supply and return water temperature operating range limits.

[0308] Step 2-3: Input the equipment parameters of the regional electric-thermal integrated energy system, including the access location and capacity of each energy supply equipment and energy storage equipment, and the maximum installation area of ​​each solar equipment node that can be installed.

[0309] Step 2-4: Input the economic parameters of the regional electric-thermal integrated energy system, including the initial investment price of each equipment, operation and maintenance costs, energy prices and penalty coefficients.

[0310] Step 2-5: Input typical daily load parameters, including the electricity and heat load conditions for a typical day in winter, transition season, and summer for 24 hours.

[0311] Step 2-6: Input environmental parameters, including solar light intensity and ambient temperature

[0312] Step 2-7: Set the initial value of the algorithm, including the upper bound UB and lower bound LB of the robust model objective function, the current number of iterations, the feasible cut set, the allowable error, and the initial value of the uncertain parameters.

[0313] Step 3: Solve the main problem of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system, obtain the optimal solution and update the lower bound. It includes the following steps:

[0314] Step 3-1: Establish a two-stage robust planning model for the main problem, which specifically includes the following steps:

[0315] Step 3-1-1: Use a box uncertainty set to describe the uncertainty of the time dimension of solar radiation intensity:

[0316]

[0317] Among them, N t N is the set of all typical daily scheduling time intervals throughout the year; t is the total number of typical daily scheduling time intervals throughout the year, and its value is N day ×N Δt ; w represents the uncertain element vector of solar light intensity; w t,d is the solar intensity at time t on a typical day; I t,d is the predicted value of solar radiation intensity at time t on a typical day; ΔI t,d is the maximum fluctuation value of solar illumination intensity at time t on a typical day; Γ is the uncertainty budget, which is used to adjust the model uncertainty.

[0318] Step 3-1-2: Establish the main problem objective function based on the project economic benefits. To calculate the economic feasibility of installing solar energy absorption equipment, it is necessary to consider the investment cost of solar energy absorption equipment, the investment cost of energy storage equipment as a backup for solar energy absorption equipment, and the operation and maintenance costs, fuel costs, electricity purchase costs, penalty costs, etc. within the life of the entire system investment project. At the same time, considering the degradation of the target due to solar energy uncertainty, the main problem objective function is as follows:

[0319]

[0320] in, is the annualized investment cost of solar energy consumption equipment and energy storage equipment (yuan); is the annual operation and maintenance cost of the system (yuan); They are the annual fuel cost (yuan) and annual electricity purchase cost (yuan) of the system respectively; is the annual penalty fee of the system (yuan); χ is the introduced auxiliary variable. The five costs are calculated as follows:

[0321] (1) Annualized investment costs

[0322] The annualized investment cost of the system includes the annualized investment cost of photovoltaic solar energy absorption equipment and solar thermal collectors. (yuan), and the annualized investment cost of electrical and thermal energy storage equipment (Yuan):

[0323]

[0324] Among them, c ins,PV 、c ins,SC 、c ins,EES 、c ins,TES The investment costs of photovoltaic and solar thermal collectors (yuan / m 2 ) and investment cost of electricity storage equipment and heat storage equipment (yuan / kWh); A PV,i , A SC,i are the photovoltaic and solar thermal collector installation areas at node i (m 2 );Cap EES,i , Cap TES,i are the installed capacity of electrical and thermal energy storage equipment at node i (kWh); N bus 、N node are the number of distribution network buses and the number of regional heating network nodes respectively; r CR is the equipment capital recovery coefficient, which is calculated as follows:

[0325]

[0326] Where r is the system discount rate; L i is the expected operating life of equipment i (years).

[0327] (2) Annual operation and maintenance costs

[0328] During system operation, each device will incur operation and maintenance costs:

[0329]

[0330] in, are the annual operation and maintenance costs (yuan) of photovoltaic, solar thermal collector, CHP unit, electric boiler, power storage equipment and heat storage equipment respectively; c OM,PV 、c OM,SC 、c OM,CHP 、c OM,EB 、c OM,EES 、c OM,TES They are the operation and maintenance costs of photovoltaic, solar thermal collector, CHP unit, electric boiler, power storage equipment, and heat storage equipment (yuan / kW); N day is the number of days in a year; N Δt The number of scheduling intervals in a day.

[0331] (3) Annual fuel costs

[0332] For a typical district electricity-heat integrated energy system as described in Chapter 2, the annual fuel cost refers to the annual gas consumption cost of CHP:

[0333]

[0334] Among them, c gas is the natural gas price (yuan / m 3 ).

[0335] (4) Annual electricity purchase cost

[0336] The annual electricity purchase cost refers to the total cost of the system purchasing electricity from the upper power grid:

[0337]

[0338] in, is the last power purchase price from the power grid at time t (yuan / kWh).

[0339] (5) Annual penalty fee

[0340] The annual penalty fee includes the distribution network loss, regional heating network heat loss and abandoned solar penalty fee:

[0341]

[0342] in, They are the penalty coefficients for distribution network loss, regional thermal network heat loss and abandoned solar power (yuan / kWh). ASEC is the annual abandoned solar power of the system (kWh). For details on the calculation, see formula (3-4).

[0343] In addition, in order to determine whether the optimized regional electric-thermal integrated energy system solar energy consumption equipment planning scheme is economically feasible, it is necessary to calculate whether the dynamic payback period of the planning scheme is within the investment project life. Dynamic payback period T P (Year) is calculated as follows

[92] :

[0344]

[0345] Among them, CI l , CO l are the cash inflow and outflow in the lth year (yuan) respectively; i0 is the benchmark rate of return.

[0346] If the system's net income is equal every year, then T P It can be calculated by the following formula:

[0347]

[0348] in, is the annual net income (yuan); C ins is the total investment cost (Yuan).

[0349] Step 3-1-3: Determine the optimization variables of the main problem. The optimization variables are divided into two categories: variables x before the uncertainty parameters are determined, that is, the variables of the first stage problem, and variables y after the uncertainty is determined, that is, the variables of the second stage problem:

[0350] (5) Planning optimization variables include:

[0351] ●The photovoltaic installation area A in each energy station PV 、Solar collector installation area A SC ;

[0352] ●Electricity storage equipment installation capacity Cap EES , Thermal storage equipment installation capacity Cap TES ;

[0353] ●Energy storage equipment operating status

[0354] (6) Operation optimization variables include:

[0355] ● Output of the upper power grid at each time on each typical day Heat source output

[0356] ● Distribution network bus voltage u at each time on each typical day t,d , branch current i t,d , branch power P t,d , Q t,d , busbar injection power

[0357] ● Supply and return water temperature T of regional heating network nodes at each time of each typical day s,t,d 、T r,t,d ;

[0358] ●The output of various energy conversion and energy storage devices at various times on typical days, including

[0359]

[0360] Step 3-1-4: Determine the main problem constraints:

[0361]

[0362] Among them, for constraints, Fx≥f includes (35); Ax+Ly≥a includes (9)-(10), (27)-(28), (31), (33), (37), (39)-(40), (45), and the left half constraints of (42)-(43), (47)-(48); J(x)x+Ry≥0 includes the right half constraints of (42)-(43), (47)-(48); Ey=H(x)d includes (30), (32); Including (6); the remaining constraints can be expressed by Bx+Ky=b.

[0363] Step 3-2: Solve the main problem and find the optimal solution And update the lower bound Among them, χ is an auxiliary variable. Specifically, the following steps are included:

[0364] In the main problem, the objective function is linear and the constraint J(x)x+Ry≥0 is bilinear. is a second-order cone form, and the remaining constraints are linear. To facilitate the solution of the model, this paper uses the Big M method to process the right half constraints of (42)-(43) and (47)-(48) as follows. Taking the right half constraints of (42)-(43) as an example, let The original constraint can be transformed into:

[0365]

[0366] Wherein, M is a sufficiently large positive real number.

[0367] Similarly, The right half constraint of (47)-(48) can be transformed into:

[0368]

[0369] At this point, the right half constraints of (42)-(43) and (47)-(48) are transformed into linear constraints (61)-(62), and the main problem is transformed into a 0-1 mixed integer second-order cone optimization problem, which can be solved using existing optimization software such as CPLEX and GUROBI.

[0370] Step 4: Solve the sub-problems of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system, obtain the optimal solution and the sub-problem objective function value, and update the upper bound. It includes the following steps:

[0371] Step 4-1: Establish a two-stage robust planning model for the main problem, including:

[0372]

[0373] in, is the optimal solution to the main problem.

[0374] Step 4-2: Based on the main problem Solve the subproblem and find the optimal solution w * and the sub-problem objective function value c2y * , update the lower bound The specific steps include:

[0375] Subproblem (63) is a max-min problem. The common solution is to dualize the inner min function to transform it into a dual problem in max form and merge it with the outer max problem. Since in the k-th iteration of the subproblem, is a known parameter, so the dual variable corresponding to the constraint of subproblem (63) can be set as follows:

[0376] ω1:

[0377] ω2:

[0378] ω3:

[0379] ω4, ω5:

[0380] Subproblem (63) is transformed into the following dual form:

[0381]

[0382] In the objective function of the subproblem dual problem (64), w Tω3 is a bilinear term. The optimal solution of this type of dual problem corresponds to w * It is obtained at the extreme point of its uncertainty set W. For the box uncertainty set W, its extreme point set W′ can be expressed as follows:

[0383]

[0384] Replacing the uncertain parameter w in the dual problem (64) with (65) yields:

[0385]

[0386] Among them, (θ + -θ - )ω3 is a bilinear term and can be processed by the big M method. Let V3 = θ + ω3, V4 = θ-ω3, problem (66) can be transformed into:

[0387]

[0388] At this point, subproblem (63) is transformed into a dual problem in the form of (67), which is a 0-1 mixed integer second-order cone optimization problem and can be solved using existing optimization software such as CPLEX and GUROBI.

[0389] Step 5: Determine whether the difference between the upper and lower bounds is less than the allowable error. If so, the solution is completed and the iteration is exited, and the robust optimal solution is returned. Otherwise, the main sub-problem is continued to be solved to obtain the final solar energy consumption equipment planning scheme. Specifically, the following steps are included:

[0390] If UB-LB≤δ, the solution is completed, the iteration is exited, and the robust optimal solution is returned. Otherwise, Regardless of whether the subproblem has a solution, the variable y is added to the main problem in the next iteration. k+1 , and add the following constraints:

[0391]

[0392] If the subproblem has a solution, update L = L ∪ {k + 1} and further add the following constraints to the main problem in the next iteration:

[0393]

[0394] Finally, regardless of whether the subproblem has a solution, update k=k+1 and return to step 3.

[0395] Specific embodiments are given below:

[0396] In particular, such as Figure 2As shown, this embodiment selects a regional electric-thermal integrated energy system consisting of an IEEE33 regional power system and a 51-node regional thermal system, and its topology is as follows Figure 2 As shown. The system contains two energy stations, and the equipment in each energy station includes photovoltaic (PV), solar collector (SC), gas turbine combined heat and power (CHP) unit, and electrical boiler (EB). This embodiment is aimed at three typical days in winter (120 days, according to the number of days determined by the heating period), transition season (153 days), and summer (92 days), and verifies the two-stage robust planning method of solar energy consumption equipment in the regional electric-thermal integrated energy system based on the column and constraint generation algorithm.

[0397] This embodiment selects 4 groups of examples to verify the two-stage robust planning model of solar energy consumption equipment in the regional electric-thermal integrated energy system proposed in the present invention, explores the system economy of installing solar energy consumption equipment, and the influence of light uncertainty, abandoned light and energy storage on the planning of solar energy consumption equipment and system economy:

[0398] (1) Example 1: In order to focus on the impact of installing PV and SC on the system economy of a specific system, Example 1 compares the system economy optimization results under four scenarios: no solar energy absorption equipment installed, only PV installed, only SC installed, and solar energy absorption equipment installed, under the deterministic conditions that no solar energy abandonment is allowed, no energy storage equipment is considered, and no light intensity fluctuation is considered.

[0399] (2) Example 2: In order to explore the impact of illumination uncertainty on the planning of solar energy absorption equipment and the economic efficiency of the system, while excluding the impact of energy storage and abandoned solar power, Example 2 analyzes the planning results and economic efficiency of different fluctuation ranges (the fluctuation range is 0, 10%, 30%, and 50%, taking into account the uncertainty of the light intensity at different times of each typical day throughout the year) and different uncertainties (the uncertainty is 0, 2, 4, 6, 12, 18, 24, and 30, and the fluctuation range of illumination intensity is 10%) under the condition that abandoned solar power is not allowed and energy storage equipment is not considered.

[0400] (3) Example 3: In order to explore the impact of system curtailment on the planning of solar energy absorption equipment and system economics, while avoiding the impact of energy storage, Example 3 will compare the system economic optimization results under the conditions of not allowing curtailment and allowing curtailment without considering energy storage equipment and without considering the uncertainty of light intensity.

[0401] (4) Example 4: In order to explore the impact of energy storage equipment on the planning of solar energy absorption equipment and system economics, as well as the relationship between energy storage and solar curtailment on system economics, Example 4 will compare the system economic optimization results under four scenarios: not allowing solar curtailment and not installing energy storage, allowing solar curtailment and not installing energy storage, not allowing solar curtailment and installing energy storage, and allowing solar curtailment and installing energy storage, without considering the uncertainty of light intensity.

[0402] For the above system, the method of this embodiment specifically includes the following steps:

[0403] Step 1: Determine the components and structure of the regional electric-thermal integrated energy system, and determine the regional electric-thermal integrated energy system model based on this, including the following steps:

[0404] Step 1-1: Use the Distflow model to model the distribution network, as follows:

[0405] At any time, for any node j in the regional power system, there is the following power balance relationship:

[0406]

[0407]

[0408]

[0409]

[0410]

[0411] Among them, e (j) represents the set of branch headend nodes with j as the terminal node; ξ e (j) represents the set of branch end nodes with j as the head node; are the active power (kW) and reactive power (kVar) flowing from node i to node j respectively; are the active and reactive injected powers of node i at time t; r ij 、x ij are the resistance and reactance of line ij respectively (Ω); is the square of the current amplitude on line ij at time t (A 2 ). are respectively the active and reactive power injected into the large power grid at node j at time t; are the active load and reactive load at load node j at time t respectively; are the active and reactive outputs of the CHP unit at node j at time t respectively; is the active power output of the photovoltaic at node j at time t; is the active power consumed by the electric boiler at node j at time t; are the charging and discharging power of the energy storage device at node j at time t respectively.

[0412] At any time, for any branch ij in the distribution network, the following relationship holds:

[0413]

[0414]

[0415]

[0416] in, is the square of the voltage amplitude at node i at time t (V 2 ); is the active power loss of branch ij at time t.

[0417] At any time t, the voltage of any node in the entire network and the current of any branch must be within the safe operating range:

[0418]

[0419]

[0420] Among them, u max 、u min are the upper and lower limits of the square voltage allowed at node i (V 2 );i max is the maximum current square allowed for line ij (A 2 ).

[0421] Step 1-2: Model the district heating network using the quality regulation mode. The specific steps include:

[0422] Step 1-2-1: Establish the heating network node temperature model. The specific steps are as follows:

[0423] The temperature mixing equation of node j in the water supply and return network can be expressed as:

[0424]

[0425]

[0426] Among them, m ij 、m loadj are the mass flow rate of pipeline ij and the load flow rate of node j (kg / s) respectively; are the outlet temperatures of the water supply pipe ij and the return pipe jk at time t (℃); are the supply and return water temperatures of node j at time t (℃); is the return water temperature of load j at time t (℃). s (j), ζ r (j) are the first node sets of the pipelines with node j as the terminal node in the supply and return pipe networks, ξ s (j), ξ r (j) are the sets of pipeline end nodes with node j as the first node in the supply and return pipe networks.

[0427] Divide both sides of the equation by the total injected mass flow rate of node j, and introduce the upstream mass flow rate proportion β of the supply and return pipe network s , β r , at the same time, let Then formulas (11)-(12) can be expressed as:

[0428]

[0429]

[0430]

[0431]

[0432]

[0433] The time delay characteristics of the pipe inlet temperature and outlet temperature can be processed by time discretization. Taking the water supply pipe ij as an example, assuming that the time interval is Δt and the length of the pipe ij is l ij (m), the pipeline ij can be approximately divided into τ according to Δt ij The length is Δl ij (m) units. Therefore, τ ij It can be calculated by the following formula:

[0434]

[0435]

[0436] Among them, D ij is the diameter of the pipe ij (m), ρ is the density of hot water (kg / m 3 ).

[0437] Since the thermal process of the regional heating network is transmitted at a mass flow rate, the delay time of the effect of the temperature of node i on the temperature of node j can be approximated by τ ij Therefore, after considering the time-delay characteristics of temperature, the outlet temperature of pipe ij at time t can be regarded as t-τ ij The temperature of the inlet node i at time Δt after the pipe dissipates heat:

[0438]

[0439] Where c is the specific heat capacity of hot water (kJ / (kg·K)); λ ij is the thermal conductivity of pipe ij (kW / (m·K)).

[0440] Substitute formula (20) into formula (13), and let The temperature calculation formula of node j in the water supply network at time t can be obtained:

[0441]

[0442] Similarly, the calculation formula for node j in the return water network at time t is:

[0443]

[0444] When t<τΔt, The initial supply water temperature of node i and the initial return water temperature of node k are respectively brought in.

[0445] Step 1-2-2: Establish the heat loss model of the heating network pipeline. The specific steps are as follows:

[0446] Assuming that the hot water temperature of each unit pipe in the pipe ij at time t is approximately represented by the average inlet and outlet temperature of the unit pipe at time t, the heat loss of the pipe ij at time t can be expressed as:

[0447]

[0448] Among them, node i is the inlet node of pipe ij. The above formula is applicable to both water supply network and return network.

[0449] Step 1-2-3: Establish the heat source and heat load thermal power model of the heat network. The specific steps are as follows:

[0450] For the heat source and heat load at node i, the heat power at time t is the thermal potential difference of the water supply and return network at time t:

[0451]

[0452]

[0453] in, are the heat source and heat load powers (kW) at node i respectively.

[0454] For the heat source at node i, its thermal power is the sum of the thermal outputs of all heating equipment:

[0455]

[0456] in, are the thermal outputs of the solar collector and CHP unit at node i at time t (kW); are the charging and discharging power (kW) of the heat storage device at node i at time t respectively.

[0457] Step 1-2-4: Establish the temperature operation model of the entire heating network. The specific steps are as follows:

[0458] For any node i in the supply and return water network, whether it is a heat source node, a heat load node or an ordinary node, the supply and return water temperatures have a specific operating range:

[0459] T s,min ≤T i s,t ≤T s,max (234)

[0460] T r,min ≤T i r,t ≤T r,max (235)

[0461] Among them, T s,min 、T r,min are the minimum operating temperatures of the supply and return pipe networks (°C), T s,max 、T r,max They are the maximum operating temperatures (°C) of the supply and return pipe networks respectively.

[0462] In addition, in order to prevent the delayed characteristics of the heating network from "accumulating recklessly" to the next day, at the last scheduling moment of each day, the heat source water supply temperature T i s,end The temperature T at the initial scheduling time of the day i s,init Stay consistent:

[0463] T i s,end =T i s,init (236)

[0464] Step 1-3: Establish a regional electric-thermal integrated energy system equipment model. The specific steps include:

[0465] Step 1-3-1: Establish a photovoltaic model, as follows:

[0466]

[0467]

[0468] in, is the active power (kW) actually produced by the photovoltaic power generation system at node i at time t, that is, the photovoltaic power actually consumed by the regional electric-thermal integrated energy system; is the abandoned light power of the photovoltaic power generation system (kW), which is The sum is the maximum electric power that the photovoltaic power generation system at node i can produce at time t. PV,i is the photovoltaic array installation area at node i (m 2 );η PV,i is the conversion efficiency of the photovoltaic power generation system at node i; is the light intensity at node i at time t (kW / m 2 ).

[0469] Step 1-3-2: Establish a solar collector model as follows:

[0470]

[0471]

[0472] in, is the solar collector heating power actually consumed by the system at node i at time t (kW), is the solar thermal power rejection of the system (kW), A SC,i is the solar collector installation area at node i (m 2 ), η SC,i is the thermal conversion efficiency of the solar collector.

[0473] In the study of solar collector performance, there are two types of thermal conversion efficiency: instantaneous efficiency and daily average efficiency. The instantaneous efficiency of the solar collector is related to the difference between the average temperature of the hot water in the solar collector and the ambient temperature. The change in the average temperature of the hot water has an extremely complex thermodynamic relationship with the heating conditions, the structure of the solar collector, the internal parameters, the ambient temperature, the light, etc., and is greatly affected by the external operating conditions. The daily average efficiency of the solar collector is usually the ratio of the total heat obtained by the working fluid passing through the collector throughout the day to the total solar radiation throughout the day. It takes into account the overall performance of the solar collector throughout the day and is less affected by random changes in operating conditions. It is suitable for scenarios that focus more on the coordination between the solar collector and the external system rather than the internal design of the solar collector. The present invention selects the daily average efficiency of the solar collector for research, and its calculation is as follows:

[0474]

[0475] in, is the initial temperature of the solar collector at node i (℃) equal to the average temperature of the day (℃) intercept efficiency; is the total solar radiation for the whole day (kW / m 2 );U loss / T,SC,i is the heat loss coefficient with respect to ambient temperature (kW / ℃ 2 ·m 2 ).

[0476] In addition, whether it is installed on a roof or in an open space, the installation area is often limited. When photovoltaic and solar thermal collectors are built in the same area, there will be competition between the two:

[0477]

[0478] Among them, A PV,i , A SC,i are the PV and SC installation areas at node i (m 2 ), is the maximum installable area of ​​solar energy consumption equipment at node i (m 2 ).

[0479] Step 1-3-3: Establish a gas turbine CHP unit model as follows:

[0480]

[0481]

[0482] Among them, α CHP,i is the thermal power ratio of the CHP unit at node i, is the thermal output power of the CHP unit at node i at time t (kW), is the electrical output power of the CHP unit at node i at time t (kW), is the maximum power supply power of the CHP unit at node i (kW).

[0483] Step 1-3-4: Establish an electric boiler model as follows:

[0484]

[0485]

[0486] Among them, η EB,i is the conversion efficiency of the electric boiler at node i, is the maximum heating power of the electric boiler at node i (kW).

[0487] Step 1-3-5: Establish a power storage device model, as follows:

[0488]

[0489]

[0490]

[0491]

[0492]

[0493] in, They are the maximum and minimum state of charge coefficients of the energy storage device. EES,i is the self-discharge rate of the storage device at node i; η EES,C,i , η EES,D,i are the charging and discharging efficiencies of the power storage device at node i, respectively; are the charging and discharging power of the storage device at node i at time t (kW). EES,C,i , γ EES,D,i are the maximum charge and discharge rates of the energy storage device at node i, respectively. is the charging and discharging state of the storage device at node i at time t, which is a 0-1 variable. When it is 0, it means that the power storage device at node i is in the charging state at time t; When it is 1, it means that the energy storage device at node i is in a discharging state at time t. is the initial state of charge coefficient of the energy storage device at node i.

[0494] Step 1-3-6: Establish a heat storage equipment model, as follows:

[0495]

[0496]

[0497]

[0498]

[0499]

[0500] Among them, Cap TES,i is the capacity of the thermal storage device at node i (kWh); are the heat storage capacity of the heat storage equipment at node i at time t, the initial time of the scheduling cycle, and the final time of the scheduling cycle (kWh); are the maximum and minimum state coefficients of the heat storage equipment at node i; σ TES,i is the self-heat release rate of the heat storage device at node i; are the heat absorption and release power of the heat storage device at node i at time t (kW); η TES,C,i , η TES,D,iare the heat absorption and release efficiencies of the heat storage equipment at node i; γ TES,C,i , γ TES,D,i are the maximum heat absorption and release rates of the heat storage equipment at node i, respectively; is the heat absorption and release state of the heat storage device at node i at time t, which is a 0-1 variable. When it is 0, it means that the heat storage device at node i is in a heat absorption state at time t; otherwise, it is in a heat release state. Initial heat storage state coefficient of the heat storage device at node i.

[0501] Step 2: Input system parameters and set the initial values ​​of the algorithm, where system parameters include distribution network system parameters, regional heating network parameters, regional electric-heat integrated energy system equipment parameters, typical daily load parameters, and environmental parameters. The initial values ​​of the algorithm include the upper / lower bounds of the robust model objective function, the current number of iterations, the feasible cut set, the allowable error, and the initial values ​​of uncertain parameters. Specifically, the following steps are included:

[0502] Step 2-1: Input the distribution network system parameters, including distribution network line parameters, load level, and network topology connection relationship, as shown in Table 1. In addition, the bus voltage safety range is 0.9-1.1pu, and the branch current limit is 1000A.

[0503] Table 1 Regional power system parameters

[0504]

[0505]

[0506] Step 2-2: Input the regional heating network parameters, including the regional heating network pipeline parameters, load level, and network topology connection relationship, as shown in Table 2. In addition, the energy station water supply temperature range is 90-110℃, and the return water temperature range is 90-70℃. Assume that the initial temperature of the SC water tank on three typical days is 100℃.

[0507] Table 2 Regional thermal system parameters

[0508]

[0509]

[0510] Step 2-3: Input the equipment parameters of the regional electric-thermal integrated energy system, including the access location and capacity of each energy supply equipment and energy storage equipment, and the maximum installation area of ​​each solar equipment node that can be installed, as shown in Table 3.

[0511] Table 3 Equipment parameters of regional electric-thermal integrated energy system

[0512]

[0513] Step 2-4: Input the economic parameters of the regional electric-thermal integrated energy system, including the initial investment price of each equipment, operation and maintenance cost, energy price and penalty coefficient, as shown in Table 4.

[0514] Table 4 Economic parameters

[0515]

[0516] Step 2-5: Input typical daily load parameters, including the electricity and heat loads of typical days in winter, transition season, and summer for 24 hours. Figure 3 .

[0517] Step 2-6: Input environmental parameters, including solar light intensity and ambient temperature. Figure 4 .

[0518] Step 2-7: Set the initial value of the algorithm. Assume that the upper bound of the robust model objective function UB = +∞, the lower bound LB = -∞, the current iteration number k = 1, the feasible cut set L = {1}, and the allowable error δ = 10 -4 , initialize uncertain parameters

[0519] Step 3: Solve the main problem of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system, obtain the optimal solution and update the lower bound. It includes the following steps:

[0520] Step 3-1: Establish a two-stage robust planning model for the main problem, which specifically includes the following steps:

[0521] Step 3-1-1: Use a box uncertainty set to describe the uncertainty of the time dimension of solar radiation intensity:

[0522]

[0523] Among them, N t N is the set of all typical daily scheduling time intervals throughout the year; t is the total number of typical daily scheduling time intervals throughout the year, and its value is N day ×N Δt ; w represents the uncertain element vector of solar light intensity; w t,d is the solar intensity at time t on a typical day; I t,d is the predicted value of solar radiation intensity at time t on a typical day; ΔI t,d is the maximum fluctuation value of solar illumination intensity at time t on a typical day; Γ is the uncertainty budget, which is used to adjust the model uncertainty.

[0524] Step 3-1-2: Establish the main problem objective function based on the project economic benefits. To calculate the economic feasibility of installing solar energy absorption equipment, it is necessary to consider the investment cost of solar energy absorption equipment, the investment cost of energy storage equipment as a backup for solar energy absorption equipment, and the operation and maintenance costs, fuel costs, electricity purchase costs, penalty costs, etc. within the life of the entire system investment project. At the same time, considering the degradation of the target due to solar energy uncertainty, the main problem objective function is as follows:

[0525]

[0526] in, is the annualized investment cost of solar energy consumption equipment and energy storage equipment (yuan); is the annual operation and maintenance cost of the system (yuan); They are the annual fuel cost (yuan) and annual electricity purchase cost (yuan) of the system respectively; is the annual penalty fee of the system (yuan); χ is the introduced auxiliary variable. The five costs are calculated as follows:

[0527] (1) Annualized investment costs

[0528] The annualized investment cost of the system includes the annualized investment cost of photovoltaic solar energy absorption equipment and solar thermal collectors. (yuan), and the annualized investment cost of electrical and thermal energy storage equipment (Yuan):

[0529]

[0530] Among them, c ins,PV 、c ins,SC 、c ins,EES 、c ins,TES The investment costs of photovoltaic and solar thermal collectors (yuan / m 2 ) and investment cost of electricity storage equipment and heat storage equipment (yuan / kWh); A PV,i , A SC,i are the photovoltaic and solar thermal collector installation areas at node i (m 2 );Cap EES,i , Cap TES,i are the installed capacity of electrical and thermal energy storage equipment at node i (kWh); N bus 、N node are the number of distribution network buses and the number of regional heating network nodes respectively; r CR is the equipment capital recovery coefficient, which is calculated as follows:

[0531]

[0532] Where r is the system discount rate; L i is the expected operating life of equipment i (years).

[0533] (2) Annual operation and maintenance costs

[0534] During system operation, each device will incur operation and maintenance costs:

[0535]

[0536] in, are the annual operation and maintenance costs (yuan) of photovoltaic, solar thermal collector, CHP unit, electric boiler, power storage equipment and heat storage equipment respectively; c OM,PV 、c OM,SC 、c OM,CHP 、c OM,EB 、c OM,EES 、c OM,TES They are the operation and maintenance costs of photovoltaic, solar thermal collector, CHP unit, electric boiler, power storage equipment, and heat storage equipment (yuan / kW); N day is the number of days in a year; N Δt The number of scheduling intervals in a day.

[0537] (3) Annual fuel costs

[0538] For a typical district electricity-heat integrated energy system as described in Chapter 2, the annual fuel cost refers to the annual gas consumption cost of CHP:

[0539]

[0540] Among them, c gas is the natural gas price (yuan / m 3 ).

[0541] (4) Annual electricity purchase cost

[0542] The annual electricity purchase cost refers to the total cost of the system purchasing electricity from the upper power grid:

[0543]

[0544] in, is the last power purchase price from the power grid at time t (yuan / kWh).

[0545] (5) Annual penalty fee

[0546] The annual penalty fee includes the distribution network loss, regional heating network heat loss and abandoned solar penalty fee:

[0547]

[0548] in, They are the penalty coefficients for distribution network loss, regional thermal network heat loss and abandoned solar power (yuan / kWh). ASEC is the annual abandoned solar power of the system (kWh). For details on the calculation, see formula (3-4).

[0549] In addition, in order to determine whether the optimized regional electric-thermal integrated energy system solar energy consumption equipment planning scheme is economically feasible, it is necessary to calculate whether the dynamic payback period of the planning scheme is within the investment project life. Dynamic payback period T P (Year) is calculated as follows

[92] :

[0550]

[0551] Among them, CI l , CO l are the cash inflow and outflow in the lth year (yuan) respectively; i0 is the benchmark rate of return.

[0552] If the system's net income is equal every year, then T P It can be calculated by the following formula:

[0553]

[0554] in, is the annual net income (yuan); C ins is the total investment cost (Yuan).

[0555] Step 3-1-3: Determine the optimization variables of the main problem. The optimization variables are divided into two categories: variables x before the uncertainty parameters are determined, that is, the variables of the first stage problem, and variables y after the uncertainty is determined, that is, the variables of the second stage problem:

[0556] (7) Planning optimization variables include:

[0557] ●The photovoltaic installation area A in each energy station PV 、Solar collector installation area A SC ;

[0558] ●Electricity storage equipment installation capacity Cap EES , Thermal storage equipment installation capacity Cap TES ;

[0559] ●Energy storage equipment operating status

[0560] (8) Operation optimization variables include:

[0561] ● Output of the upper power grid at each time on each typical day Heat source output

[0562] ● Distribution network bus voltage u at each time on each typical day t,d , branch current i t,d , branch power P t,d , Q t,d , busbar injection power

[0563] ● Supply and return water temperature T of regional heating network nodes at each time of each typical day s,t,d 、T r,t,d ;

[0564] ●The output of various energy conversion and energy storage devices at various times on typical days, including

[0565]

[0566] Step 3-1-4: Determine the main problem constraints:

[0567]

[0568] Among them, for constraints, Fx≥f includes (35); Ax+Ly≥a includes (9)-(10), (27)-(28), (31), (33), (37), (39)-(40), (45), and the left half constraints of (42)-(43), (47)-(48); J(x)x+Ry≥0 includes the right half constraints of (42)-(43), (47)-(48); Ey=H(x)d includes (30), (32); Including (6); the remaining constraints can be expressed by Bx+Ky=b.

[0569] Step 3-2: Solve the main problem and find the optimal solution And update the lower bound Among them, χ is an auxiliary variable. Specifically, the following steps are included:

[0570] In the main problem, the objective function is linear and the constraint J(x)x+Ry≥0 is bilinear. is a second-order cone form, and the remaining constraints are linear. To facilitate the solution of the model, this paper uses the Big M method to process the right half constraints of (42)-(43) and (47)-(48) as follows. Taking the right half constraints of (42)-(43) as an example, let The original constraint can be transformed into:

[0571]

[0572] Wherein, M is a sufficiently large positive real number.

[0573] Similarly, The right half constraint of (47)-(48) can be transformed into:

[0574]

[0575] At this point, the right half constraints of (42)-(43) and (47)-(48) are transformed into linear constraints (61)-(62), and the main problem is transformed into a 0-1 mixed integer second-order cone optimization problem, which can be solved using existing optimization software such as CPLEX and GUROBI.

[0576] Step 4: Solve the sub-problems of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system, obtain the optimal solution and the sub-problem objective function value, and update the upper bound. It includes the following steps:

[0577] Step 4-1: Establish a two-stage robust planning model for the main problem, including:

[0578]

[0579] in, is the optimal solution to the main problem.

[0580] Step 4-2: Based on the main problem Solve the subproblem and find the optimal solution w * and the sub-problem objective function value c2y * , update the lower bound The specific steps include:

[0581] Subproblem (63) is a max-min problem. The common solution is to dualize the inner min function to transform it into a dual problem in max form and merge it with the outer max problem. Since in the k-th iteration of the subproblem, is a known parameter, so the dual variable corresponding to the constraint of subproblem (63) can be set as follows:

[0582] ω1:

[0583] ω2:

[0584] ω3:

[0585] ω4, ω5:

[0586] Subproblem (63) is transformed into the following dual form:

[0587]

[0588] In the objective function of the subproblem dual problem (64), w Tω3 is a bilinear term. The optimal solution of this type of dual problem corresponds to w * It is obtained at the extreme point of its uncertainty set W. For the box uncertainty set W, its extreme point set W′ can be expressed as follows:

[0589]

[0590] Replacing the uncertain parameter w in the dual problem (64) with (65) yields:

[0591]

[0592] Among them, (θ + -θ - )ω3 is a bilinear term and can be processed by the big M method. Let V3 = θ + ω3, V4 = θ-ω3, problem (66) can be transformed into:

[0593]

[0594] At this point, subproblem (63) is transformed into a dual problem in the form of (67), which is a 0-1 mixed integer second-order cone optimization problem and can be solved using existing optimization software such as CPLEX and GUROBI.

[0595] Step 5: Determine whether the difference between the upper and lower bounds is less than the allowable error. If so, the solution is completed and the iteration is exited, and the robust optimal solution is returned. Otherwise, the main sub-problem is continued to be solved to obtain the final solar energy consumption equipment planning scheme. Specifically, the following steps are included:

[0596] If UB-LB≤δ, the solution is completed, the iteration is exited, and the robust optimal solution is returned. Otherwise, Regardless of whether the subproblem has a solution, the variable y is added to the main problem in the next iteration. k+1 , and add the following constraints:

[0597]

[0598] If the subproblem has a solution, update L = L ∪ {k + 1} and further add the following constraints to the main problem in the next iteration:

[0599]

[0600] Finally, regardless of whether the subproblem has a solution, update k=k+1 and return to step 3.

[0601] The results of four examples are as follows, which verify the effectiveness of the proposed method:

[0602] The optimization results corresponding to Example 1 are shown in Table 5 and Figure 5. It can be seen that by making full use of the time-delay characteristics of the regional heating network, the limitation of heat load during the summer noon period can be broken. By reasonably configuring SC and optimizing the thermal output of the energy station, the output of the CHP unit is reduced, which greatly reduces the system's gas purchase cost, thereby effectively reducing the annual operating cost and total annualized cost, and realizing the economic planning and operation of the system. In addition, although the installation of solar energy absorption equipment will lead to an increase in the system's investment costs, since the unit cost of the solar energy absorption equipment is lower than that of the CHP unit and the electric boiler, the annual operating cost will be greatly reduced, resulting in a significant reduction in the total annualized cost of the system and a stronger system economy.

[0603] The optimization results corresponding to Example 2 are as follows: Figure 6-7 And Table 6. It can be seen that when considering the uncertainty at each time of each typical day, the "worst" lighting scenario of the system is that the light intensity at each time fluctuates downward according to the maximum fluctuation range. As the fluctuation range of light intensity increases, the proportion of SC installation area increases first and then decreases, and the proportion of PV installation area is the opposite. In actual planning, the installation proportion of PV and SC needs to be further determined according to the actual daily fluctuation of solar energy in the local area. In addition, when considering the uncertainty of light, it is not the case that the greater the light intensity, the greater the degradation effect of its lower bound on the economic target. It is not possible to simply determine the degradation effect according to the size of the uncertain parameters and plan the solar energy consumption equipment accordingly. It is necessary to use a robust planning model for system planning.

[0604] The optimization results corresponding to Example 3 are as follows: Figure 8 And Table 7. It can be seen that appropriately increasing the SC installation area and allowing appropriate abandonment can simultaneously improve the system economic benefits and solar energy absorption level. The optimal abandonment rate of solar energy economic efficiency of the system is generally different from the optimal abandonment rate of absorption capacity. The system needs to reasonably abandon solar energy within the abandonment range where both economic efficiency and absorption capacity can be improved according to the target tendency.

[0605] The optimization results corresponding to Example 4 are as follows: Fig. 9 and Table 8. It can be seen that due to the objective existence of the delay characteristics of the heating network and the influence of economic costs, compared with the combination of power storage equipment and PV, the configuration scheme under the combination of thermal storage equipment and SC is more economical. Thermal storage equipment can effectively improve the system's economic efficiency while improving the system's solar energy absorption capacity and solving the problem of abandoned light, and has a good development prospect in the regional electric-thermal integrated energy system.

[0606] Table 5 Optimization results under Example 1

[0607]

[0608] Table 6 Optimization results under different light intensity fluctuation ranges in Example 2

[0609]

[0610] Table 7 Optimization results of Example 3 when abandoning light is not allowed and when abandoning light is allowed

[0611]

[0612]

[0613] Table 8 Optimization results under the influence of abandoned solar power and energy storage in Example 4

[0614]

[0615] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0616] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0617] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0618] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0619] The above is only a preferred embodiment of the present invention, and does not limit the present invention in other forms. Any technician familiar with the profession may use the above disclosed technical content to change or modify it into an equivalent embodiment with equivalent changes. However, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the technical solution of the present invention still belongs to the protection scope of the technical solution of the present invention.

Claims

1. A two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system, characterized in that: The steps include: Step 1: Determine the components and structure of the regional electricity-heat integrated energy system, and determine the regional electricity-heat integrated energy system model accordingly; Step 2: Input system parameters and set the initial values ​​of the algorithm, where the system parameters include distribution network system parameters, regional heating network parameters, regional electric-thermal integrated energy system equipment parameters, typical daily load parameters, and environmental parameters. The initial values ​​of the algorithm include the upper / lower bounds of the robust model objective function, the current number of iterations, the feasible cut set, the allowable error, and the initial values ​​of uncertain parameters; Step 3: Solve the main problem of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system, obtain the optimal solution and update the lower bound; Step 4: Solve the sub-problems of the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system, obtain the optimal solution and the sub-problem objective function value, and update the upper bound; Step 5: Determine whether the difference between the upper and lower bounds is less than the allowable error. If so, the solution is completed and the iteration is exited, and the robust optimal solution is returned. Otherwise, continue to solve the main sub-problem to obtain the final solar energy consumption equipment planning scheme; The main problem of solving the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system in step 3 includes the following steps: Step 3-1: Establish a two-stage robust planning model for the main problem, which specifically includes the following steps: Step 3-1-1: Use a box uncertainty set to describe the uncertainty of the time dimension of solar radiation intensity: Among them, Ω t N is the set of all typical daily scheduling time intervals throughout the year; t is the total number of typical daily scheduling time intervals throughout the year, and its value is N day ×N Δt ; w represents the uncertain element vector of solar light intensity; w t,d is the solar intensity at time t on a typical day; is the predicted value of solar radiation intensity at time t on a typical day; ΔI t,d is the maximum fluctuation value of solar illumination intensity at time t on a typical day; Γ is the uncertainty budget, which is used to adjust the model uncertainty; Step 3-1-2: Based on the economic benefits of the project, establish the objective function of the main problem; in order to calculate the economic feasibility of installing solar energy absorption equipment, it is necessary to consider the investment cost of the solar energy absorption equipment, the investment cost of the energy storage equipment as a backup for the solar energy absorption equipment, and the operation and maintenance costs, fuel costs, electricity purchase costs, and penalty costs within the investment project life of the entire system; at the same time, considering the degradation of the target due to solar energy uncertainty, the objective function of the main problem is as follows: in, is the annualized investment cost of solar energy consumption equipment and energy storage equipment (yuan); is the annual operation and maintenance cost of the system (yuan); They are the annual fuel cost (yuan) and annual electricity purchase cost (yuan) of the system respectively; is the annual penalty fee of the system (yuan); χ is the introduced auxiliary variable; the five costs are calculated as follows: (1) Annualized investment costs The annualized investment cost of the system includes the annualized investment cost of photovoltaic solar energy absorption equipment and solar thermal collectors. (yuan), and the annualized investment cost of electrical and thermal energy storage equipment (Yuan): Among them, c ins,PV 、c ins,SC 、c ins,EES 、c ins,TES The investment costs of photovoltaic and solar thermal collectors (yuan / m 2 ) and investment cost of electricity storage equipment and heat storage equipment (yuan / kWh); A PV,i , A SC,i are the photovoltaic and solar thermal collector installation areas at node i (m 2 );Cap EES,i , Cap TES,i are the installed capacity of electric and thermal energy storage equipment at node i (kWh); N bus 、N node are the number of distribution network buses and the number of regional heating network nodes respectively; r CR is the equipment capital recovery coefficient, which is calculated as follows: Where r is the system discount rate; L i is the expected operating life of equipment i (years); (2) Annual operation and maintenance costs During system operation, each device will incur operation and maintenance costs: in, The annual operation and maintenance costs (yuan) of photovoltaic, solar thermal collector, CHP unit, electric boiler, power storage equipment and heat storage equipment respectively; c OM,PV 、c OM,SC 、c OM,CHP 、c OM,EB 、c OM,EES 、c OM,TES They are the operation and maintenance costs of photovoltaic, solar thermal collector, CHP unit, electric boiler, power storage equipment, and heat storage equipment (yuan / kW); N day is the number of days in a year; N Δt The number of scheduling intervals in a day; (3) Annual fuel costs Annual fuel cost refers to the annual gas consumption cost of CHP: Among them, c gas is the natural gas price (yuan / m 3 ); (4) Annual electricity purchase cost The annual electricity purchase cost refers to the total cost of the system purchasing electricity from the upper power grid: in, is the last power purchase price from the power grid at time t (yuan / kWh); (5) Annual penalty fee The annual penalty fee includes the distribution network loss, regional heating network heat loss and abandoned solar penalty fee: in, are the penalty coefficients for distribution network loss, regional heating network heat loss and abandoned solar power (yuan / kWh); ASEC is the annual abandoned solar power of the system (kWh), and the calculation is detailed in formula (3-4); In addition, in order to determine whether the optimized regional electric-thermal integrated energy system solar energy consumption equipment planning scheme is economically feasible, it is necessary to calculate whether the dynamic payback period of the planning scheme is within the investment project life; the dynamic payback period T P (year) is calculated as follows: Among them, CI l , CO l are the cash inflow and outflow in the first year (yuan) respectively; i0 is the benchmark rate of return; If the system's net income is equal every year, then T P It can be calculated by the following formula: in, is the annual net income (yuan); C ins is the total investment cost (yuan); Step 3-1-3: Determine the optimization variables of the main problem; the optimization variables are divided into two categories, the variables x before the uncertainty parameters are determined, that is, the variables of the first stage problem, and the variables y after the uncertainty is determined, that is, the variables of the second stage problem: (1) Planning optimization variables include: · Photovoltaic installation area A in each energy station PV 、Solar collector installation area A SC ; ·Electricity storage equipment installation capacity Cap EES , Thermal storage equipment installation capacity Cap TES ; Energy storage equipment operating status (2) Operation optimization variables include: Output of the upper power grid at each time on each typical day Heat source output · Distribution network bus voltage u at each time of each typical day t,d , branch current i t,d , branch power P t,d , Q t,d , busbar injection power · Supply and return water temperature T of regional heating network nodes at each time of each typical day s,t,d 、T r,t,d ; The output of various energy conversion and energy storage devices at various times on typical days, including Step 3-1-4: Determine the main problem constraints: Among them, for constraints, Fx≥f includes (35); Ax+Ly≥a includes (9)-(10), (27)-(28), (31), (33), (37), (39)-(40), (45), and the left half constraints of (42)-(43), (47)-(48); J(x)x+Ry≥0 includes the right half constraints of (42)-(43), (47)-(48); Ey=H(x)d includes (30), (32); Including (6); the remaining constraints can be expressed by Bx+Ky=b; Step 3-2: Solve the main problem and find the optimal solution And update the lower bound Among them, χ is an auxiliary variable; specifically, the following steps are included: In the main problem, the objective function is linear and the constraint J(x)x+Ry≥0 is bilinear. is a second-order cone form, and the remaining constraints are linear. To facilitate the solution of the model, the Big M method is used to perform the following processing on the right half constraints of (42)-(43) and (47)-(48). Taking the right half constraint of (42)-(43) as an example, let The original constraint can be transformed into: Wherein, M is a sufficiently large positive real number; Similarly, The right half constraint of (47)-(48) can be transformed into: At this point, the right half constraints of (42)-(43) and (47)-(48) are transformed into linear constraints (61)-(62), and the main problem is transformed into a 0-1 mixed integer second-order cone optimization problem, which can be solved using existing optimization software such as CPLEX and GUROBI.

2. According to claim 1, a two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system is characterized in that: The establishment of the regional electric-thermal integrated energy system model in step 1 includes the following steps: Step 1-1: Use the Distflow model to model the distribution network, as follows: At any time, for any node j in the regional power system, there is the following power balance relationship: Among them, e (j) represents the set of branch headend nodes with j as the terminal node; ξ e (j) represents the set of branch end nodes with j as the head node; are the active power (kW) and reactive power (kVar) flowing from node i to node j respectively; are the active and reactive injected powers of node i at time t; r ij 、x ij are the resistance and reactance of line ij respectively (Ω); is the square of the current amplitude on line ij at time t (A 2 ); are respectively the active and reactive power injected into the large power grid at node j at time t; are the active load and reactive load at load node j at time t respectively; are the active and reactive outputs of the CHP unit at node j at time t respectively; is the active power output of the photovoltaic at node j at time t; is the active power consumed by the electric boiler at node j at time t; are the charging and discharging power of the storage device at node j at time t respectively; At any time, for any branch ij in the distribution network, the following relationship holds: in, is the square of the voltage amplitude at node i at time t (V 2 ); is the active power loss of branch ij at time t; At any time t, the voltage of any node in the entire network and the current of any branch must be within the safe operating range: Among them, u max 、u min are the upper and lower limits of the square voltage allowed at node i (V 2 );i max is the maximum current square allowed for line ij (A 2 ); Step 1-2: Model the district heating network using the quality regulation mode. The specific steps include: Step 1-2-1: Establish the heating network node temperature model. The specific steps are as follows: The temperature mixing equation of node j in the water supply and return network can be expressed as: Among them, m ij 、m loadj are the mass flow rate of pipeline ij and the load flow rate of node j (kg / s) respectively; are the outlet temperatures of the water supply pipe ij and the return pipe jk at time t (℃); are the supply and return water temperatures of node j at time t (℃); is the return water temperature of load j at time t (℃); s (j), ζ r (j) are the first node sets of the pipelines with node j as the terminal node in the supply and return pipe networks, ξ s (j), ξ r (j) are the sets of pipeline end nodes with node j as the first node in the supply and return pipe networks; Divide both sides of the equation by the total injected mass flow rate of node j, and introduce the upstream mass flow rate proportion β of the supply and return pipe network s , β r , at the same time, let is the relative temperature (supply water temperature or return water temperature) of node j at time t, is the actual temperature of node j at time t, is the ambient temperature at time t, then formulas (11)-(12) can be expressed as: The time delay characteristics of the pipeline inlet temperature and outlet temperature can be processed by time discretization method; assuming that the time interval is Δt and the length of the pipeline ij is l ij (m), the pipeline ij can be approximately divided into τ according to Δt ij The length is Δl ij (m); hence, τ ij It can be calculated by the following formula: Among them, D ij is the diameter of the pipe ij (m), ρ is the density of hot water (kg / m 3 ); Since the thermal process of the regional heating network is transmitted at a mass flow rate, the delay time of the effect of the temperature of node i on the temperature of node j can be approximated by τ ij Δt represents; therefore, after considering the time delay characteristics of temperature, the outlet temperature of pipe ij at time t can be regarded as t-τ ij The temperature of the inlet node i at time Δt after the pipe dissipates heat: Where c is the specific heat capacity of hot water (kJ / (kg·K)); λ ij is the thermal conductivity of the pipeline ij (kW / (m·K)); Substitute formula (20) into formula (13), and let The temperature calculation formula of node j in the water supply network at time t can be obtained: Similarly, the calculation formula for node j in the return water network at time t is: When t<τΔt, The initial supply water temperature of node i and the initial return water temperature of node k are respectively brought in; Step 1-2-2: Establish the heat loss model of the heating network pipeline. The specific steps are as follows: Assuming that the hot water temperature of each unit pipe in the pipe ij at time t is approximately represented by the average inlet and outlet temperature of the unit pipe at time t, the heat loss of the pipe ij at time t can be expressed as: Among them, node i is the inlet node of pipe ij; the above formula is applicable to both the water supply network and the return network; Step 1-2-3: Establish the heat source and heat load thermal power model of the heat network. The specific steps are as follows: For the heat source and heat load at node i, the heat power at time t is the thermal potential difference of the water supply and return network at time t: in, are the heat source and heat load power (kW) at node i respectively; For the heat source at node i, its thermal power is the sum of the thermal outputs of all heating equipment: in, are the thermal outputs of the solar collector and CHP unit at node i at time t (kW); are the charging and discharging power of the heat storage device at node i at time t (kW); Step 1-2-4: Establish the temperature operation model of the entire heating network. The specific steps are as follows: For any node i in the supply and return water network, whether it is a heat source node, a heat load node or an ordinary node, the supply and return water temperatures have a specific operating range: T s,min ≤T i s,t ≤T s,max (27) T r,min ≤T i r,t ≤T r,max (28) Among them, T s,min 、T r,min are the minimum operating temperatures of the supply and return pipe networks (°C), T s,max 、T r,max are the maximum operating temperatures of the supply and return pipe networks, respectively (°C); In addition, in order to prevent the delayed characteristics of the heating network from "accumulating recklessly" to the next day, at the last scheduling moment of each day, the heat source water supply temperature T i s,end The temperature T at the initial scheduling time of the day i s,init Stay consistent: T i s,end =T i s,init (29) Step 1-3: Establish a regional electric-thermal integrated energy system equipment model. The specific steps include: Step 1-3-1: Establish a photovoltaic model, as follows: in, is the active power (kW) actually produced by the photovoltaic power generation system at node i at time t, that is, the photovoltaic power actually consumed by the regional electric-thermal integrated energy system; is the abandoned light power of the photovoltaic power generation system (kW), which is The sum is the maximum electric power that the photovoltaic power generation system at node i can produce at time t; A PV,i is the photovoltaic array installation area at node i (m 2 );η PV,i is the conversion efficiency of the photovoltaic power generation system at node i; is the light intensity at node i at time t (kW / m 2 ); Step 1-3-2: Establish a solar collector model as follows: in, is the solar collector heating power actually consumed by the system at node i at time t (kW), is the system's solar thermal power rejection (kW), A SC,i is the solar collector installation area at node i (m 2 ), η SC,i is the heat conversion efficiency of the solar collector; The average daily efficiency of the solar thermal collector is selected for study and is calculated as follows: in, is the initial temperature of the solar collector at node i Equal to the average temperature of the day The intercept efficiency when ; is the total solar radiation for the whole day (kW / m 2 );U loss / T,SC,i is the heat loss coefficient with respect to ambient temperature (kW / ℃ 2 ·m 2 ); In addition, whether it is installed on a roof or in an open space, the installation area is often limited. When photovoltaic and solar thermal collectors are built in the same area, there will be competition between the two: Among them, A PV,i , A SC,i are the PV and SC installation areas at node i (m 2 ), is the maximum installable area of ​​solar energy consumption equipment at node i (m 2 ); Step 1-3-3: Establish a gas turbine CHP unit model as follows: Among them, α CHP,i is the thermal power ratio of the CHP unit at node i, is the thermal output power of the CHP unit at node i at time t (kW), is the electrical output power of the CHP unit at node i at time t (kW), is the maximum power supply power of the CHP unit at node i (kW); Step 1-3-4: Establish an electric boiler model as follows: Among them, η EB,i is the conversion efficiency of the electric boiler at node i, is the maximum heating power of the electric boiler at node i (kW); Step 1-3-5: Establish a power storage device model, as follows: in, are the maximum and minimum state of charge coefficients of the power storage device respectively; σ EES,i is the self-discharge rate of the storage device at node i; η EES,C,i , η EES,D,i are the charging and discharging efficiencies of the energy storage device at node i, respectively; are the charging and discharging power of the storage device at node i at time t (kW); γ EES,C,i , γ EES,D,i are the maximum charge and discharge rates of the energy storage device at node i, respectively; is the charging and discharging state of the storage device at node i at time t, which is a 0-1 variable. When it is 0, it means that the power storage device at node i is in the charging state at time t; When it is 1, it means that the energy storage device at node i is in the discharging state at time t; is the initial state of charge coefficient of the power storage device at node i; Step 1-3-6: Establish a heat storage equipment model, as follows: Among them, Cap TES,i is the capacity of the thermal storage device at node i (kWh); are the heat storage capacity of the heat storage equipment at node i at time t, the initial time of the scheduling cycle, and the final time of the scheduling cycle (kWh); are the maximum and minimum state coefficients of the heat storage equipment at node i; σ TES,i is the self-heat release rate of the heat storage device at node i; are the heat absorption and release power of the heat storage device at node i at time t (kW); η TES,C,i , η TES,D,i are the heat absorption and release efficiencies of the heat storage equipment at node i; γ TES,C,i , γ TES,D,i are the maximum heat absorption and release rates of the heat storage equipment at node i, respectively; is the heat absorption and release state of the heat storage device at node i at time t, which is a 0-1 variable. When it is 0, it means that the heat storage device at node i is in the state of absorbing heat at time t; otherwise, it is in the state of releasing heat; Initial heat storage state coefficient of the heat storage device at node i.

3. According to claim 1, a two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system is characterized in that: The input system parameters in step 2 include the following steps: Step 2-1: Input the distribution network system parameters, including distribution network line parameters, load level, network topology connection relationship, bus voltage safety range and branch current limit; Step 2-2: Input the regional heating network parameters, including the regional heating network pipeline parameters, load level, network topology connection relationship, heat source node initial temperature and node supply and return water temperature operating range limit; Step 2-3: Input the equipment parameters of the regional electric-thermal integrated energy system, including the access location and capacity of each energy supply equipment and energy storage equipment, and the maximum installation area of ​​each solar equipment node that can be installed; Step 2-4: Input the economic parameters of the regional electric-thermal integrated energy system, including the initial investment price of each equipment, operation and maintenance cost, energy price and penalty coefficient; Step 2-5: Input typical daily load parameters, including the electricity and heat loads of typical days in winter, transition season, and summer for 24 hours; Step 2-6: Input environmental parameters, including solar light intensity and ambient temperature; Step 2-7: Set the initial value of the algorithm, including the upper bound UB and lower bound LB of the robust model objective function, the current number of iterations, the feasible cut set, the allowable error, and the initial value of the uncertain parameters.

4. According to claim 1, a two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system is characterized in that: The sub-problem of solving the two-stage robust planning method for solar energy consumption equipment in the regional electric-thermal integrated energy system in step 4 includes the following steps: Step 4-1: Establish a two-stage robust planning model for the main problem, including: in, is the optimal solution to the main problem; Step 4-2: Based on the main problem Solve the subproblem and find the optimal solution w * and the sub-problem objective function value c2y * , update the lower bound The specific steps include: Subproblem (63) is a max-min problem. The common solution is to dualize the inner min function to transform it into a dual problem in max form and merge it with the outer max problem. Since in the k-th iteration of the subproblem, is a known parameter, so the dual variable corresponding to the constraint of subproblem (63) can be set as follows: ·ω1: ·ω2: ·ω3: ·ω4,ω5: Subproblem (63) is transformed into the following dual form: In the objective function of the subproblem dual problem (64), w T ω3 is a bilinear term. The optimal solution of this type of dual problem corresponds to w * It is obtained at the extreme point of its uncertainty set W; for the box uncertainty set W, its extreme point set W′ can be expressed as follows: Replacing the uncertain parameter w in the dual problem (64) with (65) yields: Among them, (θ + -θ - )ω3 is a bilinear term, which can be processed by the big M method; let V3 = θ + ω3、V4=θ - ω3, problem (66) can be transformed into: At this point, subproblem (63) is transformed into a dual problem in the form of (67), which is a 0-1 mixed integer second-order cone optimization problem and can be solved using existing optimization software such as CPLEX and GUROBI.

5. According to claim 1, a two-stage robust planning method for solar energy consumption equipment in a regional electric-thermal integrated energy system is characterized in that: The error determination in step 5 comprises the following steps: If UB-LB≤δ, the solution is completed, the iteration is exited, and the robust optimal solution is returned. Otherwise, Regardless of whether the subproblem has a solution, the variable y is added to the main problem in the next iteration. k+1 , and add the following constraints: If the subproblem has a solution, update L = L ∪ {k + 1} and further add the following constraints to the main problem in the next iteration: Finally, regardless of whether the subproblem has a solution, update k=k+1 and return to step 3.

Citation Information

Patent Citations

  • Solar energy absorption capability evaluation method for regional comprehensive energy system

    CN110443467A

  • Joint optimization method and system for planning and operation of energy storage system in photovoltaic-containing power distribution network

    CN110556847A

  • Electric heating integrated system optimization scheduling method based on moment uncertainty distributed robustness

    CN113177323A

  • Active power distribution network planning model establishment method taking into consideration site selection and capacity determination of electric vehicle charging stations

    WO2021098352A1