A method for coal-fired power plant retirement and phase-converter configuration considering grid support capacity constraints

By obtaining the information of the coal power units in the power grid, determining the decommissioning path and strategy, and configuring the condenser through the dichotomy method, the power grid frequency and voltage stability problems caused by the decrease in the proportion of coal power installed capacity and the increase in DC capacity were solved, and the frequency and voltage stability of the power grid were realized. Optimization of voltage support capability.

CN114725931BActive Publication Date: 2024-10-22HUNAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210361319.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-07
Publication Date
2024-10-22
Estimated Expiration
2042-04-07

AI Technical Summary

Technical Problem

The decline in the proportion of coal power installed capacity and the increase in DC capacity outside the area have led to a decrease in the reactive power reserves of the power grid and weakened frequency adjustment capabilities, which can easily lead to the lowest frequency point being too low to trigger low-frequency load shedding in the third line of defense, and new energy units and DC outside the area. The inertia-free response characteristics of the equal power supply accelerate the frequency change of the system when there is an active power disturbance, which affects the static voltage stability of the power grid.

Method used

By obtaining the node information of coal power units in the power grid, the set of coal power units to be retired is determined, and the decommissioning path and strategy are determined based on the reactive power support coefficient and frequency support capacity constraints. The voltage support capacity is further considered, and the condenser is configured through the dichotomy method to meet the needs of the power grid. Multiple feed-in short-circuit ratio requirements ensure the stability of grid frequency and voltage.

Benefits of technology

Minimize the weakening of the power grid's voltage support capacity due to the retirement of coal power units and avoid frequency stability problems. By optimizing the condenser configuration strategy, we can meet the frequency and voltage support capacity requirements of the power grid and improve the overall stability of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114725931B_ABST
    Figure CN114725931B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of power system safety, and discloses a method for coal-fired power retirement and phase-shifting configuration considering the support capacity constraints of the power grid, including: obtaining information of relevant nodes of the power grid, determining a set of coal-fired power units to be retired; determining the retirement path of the set of coal-fired power units to be retired according to the reactive power support coefficient of the coal-fired power unit nodes to direct current; considering the frequency support capacity constraints of the receiving-end power grid, determining the maximum retirement capacity of the set of coal-fired power units, and then determining the retirement strategy of the coal-fired power units according to the retirement path; for the determined retirement strategy of the coal-fired power units, further considering the voltage support capacity constraints of the receiving-end power grid, determining the phase-shifting configuration strategy. The present invention minimizes the weakening effect of coal-fired power unit retirement on the voltage support capacity of the receiving-end power grid, avoids frequency stability problems caused by retiring too many coal-fired power units, and obtains the optimal phase-shifting configuration strategy, which can be used to guide the receiving-end power grid planners and decision-makers to retire coal-fired power units.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power system safety technology, and in particular to a method for decommissioning coal-fired power plants and configuring phase regulators taking into account power grid support capacity constraints. Background Art

[0002] The decrease in the proportion of coal-fired power installed capacity and the increase in out-of-region DC capacity will bring challenges to the safe and stable operation of the power system.

[0003] On the one hand, under the same installed capacity, the reactive power regulation range of coal-fired power units is larger than that of new energy units, and the reactive power reserve of the system decreases with the increase of new energy installed capacity. If the scale of coal-fired power units retired is too large, resulting in insufficient reactive power reserve of the system, it will further affect the static voltage stability of the system. On the other hand, new energy units and power sources such as DC outside the region are connected to the power grid through power electronic converters, and have no inertia response characteristics under conventional control. Therefore, after the coal-fired power units are retired, the rotational inertia of the system decreases relatively, and the inertia response capability weakens, which accelerates the frequency change speed under active disturbance and weakens the frequency regulation capability of the system. In the low-inertia system operation scenario, it is easy to cause the lowest frequency point to be too low, triggering the third line of defense low-frequency load reduction. Summary of the invention

[0004] In view of the deficiencies in the above-mentioned background technology, the present invention provides a method for coal-fired power decommissioning and phase-shifting configuration taking into account the constraints of power grid support capacity, which is used to guide receiving-end power grid planners and decision-makers to retire coal-fired power units.

[0005] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:

[0006] A method for decommissioning coal-fired power plants and configuring phase-shifting power plants considering the constraints of power grid support capacity, comprising:

[0007] S1: Obtain information on coal-fired power generation unit nodes in the power grid and determine the set of coal-fired power generation units to be retired;

[0008] S2: Determine the retirement path of the coal-fired power generation units to be retired based on the reactive power support coefficient of the coal-fired power generation unit nodes to DC;

[0009] S3: Considering the frequency support capacity constraints of the receiving power grid, determine the maximum retirement capacity of the coal-fired power units, and then determine the coal-fired power unit retirement strategy according to the retirement path;

[0010] S4: For the determined coal-fired power unit retirement strategy, further consider the voltage support capacity constraints of the receiving power grid and determine the phase-shifting phase configuration strategy.

[0011] Furthermore, the relevant node information acquired in step S1 includes: the benchmark capacity, moment of inertia level and actual output of each coal-fired power unit.

[0012] Further, step S2 is specifically as follows: firstly, the reactive power support coefficient of each coal-fired power unit node to DC is calculated; then, the retirement path of the set of coal-fired power units to be retired is determined in the order of the reactive power support coefficient from small to large;

[0013] The reactive power support coefficient of the coal-fired power unit node to DC is calculated as follows:

[0014]

[0015] Where: P dcj is the transmission capacity of DC j, P dc is the total capacity of each DC transmission, N is the number of DC in the power grid; P PV,i is the active power output of coal-fired power unit node i, ∑P G is the total active power output of the power grid; is the reactive power output Q of coal-fired power unit node i PV,i Sensitivity to active disturbances at the DC point j; is the reactive power output Q of coal-fired power unit node i PV,i Sensitivity to reactive disturbance at the point of direct current j.

[0016] Furthermore, when determining the retirement path of the set of coal-fired power units to be retired in step S2, when multiple coal-fired power units are connected to the same coal-fired power unit node, the coal-fired power units are sorted in order from long to short service life or from large to small total carbon emissions.

[0017] Furthermore, the frequency support capacity constraint in step S3 includes a frequency change rate constraint and a frequency deviation constraint; determining the maximum retirement capacity of the coal-fired power unit set specifically includes:

[0018] S3.1, determine the first maximum retirement capacity considering the frequency change rate constraint: only consider the inertial response of the synchronous generator set and the primary frequency regulation measure, and calculate the minimum system inertia H that meets the frequency change rate constraint min , and then determine the maximum inertia H of the coal-fired power unit set Lmax ; Finally, based on the maximum inertia and retirement path of the coal-fired power unit set, the maximum retirement capacity S1 of the coal-fired power unit set is obtained;

[0019] The minimum inertia of the system is H min and the maximum inertia H of the retired coal-fired power units Lmax The calculation formula is:

[0020]

[0021] H Lmax =H SYS -H min

[0022] In the formula, ΔP max is the maximum active disturbance of the system, f n is the system rated frequency; RoCoF max To ensure the maximum frequency change rate threshold value of the system to ensure safe and stable operation; H SYS is the equivalent inertia of the power system during operation;

[0023] S3.2, determine the second maximum retirement capacity considering the frequency deviation constraint: calculate the minimum power generation proportion of the coal-fired power generation unit set 5R (1 + σ% - D / 5), and then determine the second maximum retirement capacity S2 of the coal-fired power generation unit set; where the speed governor is simplified by pure gain 1 / R, σ% is the overshoot, and D is the active frequency response coefficient of the load;

[0024] S3.3, the smaller value of S1 and S2 is determined as the final maximum retirement capacity of the coal-fired power unit set.

[0025] Furthermore, step S4 is specifically as follows: first, the multi-feed short-circuit ratio of each DC in the power grid is calculated after the implementation of the coal-fired power unit retirement strategy, and then it is determined whether the multi-feed short-circuit ratio of each DC meets the voltage support capability requirement of the receiving-end power grid; if the multi-feed short-circuit ratio of each DC meets the requirement, there is no need to configure a phase regulator; if there is a DC whose multi-feed short-circuit ratio does not meet the requirement, a phase regulator with the optimal capacity is installed at the coal-fired power unit node based on the dichotomy method, so that the multi-feed short-circuit ratio of each DC in the receiving-end power grid meets the voltage support capability requirement of the receiving-end power grid.

[0026] Furthermore, satisfying the voltage support capability requirement of the receiving-end power grid means that the short-circuit ratio of the DC multi-infeed is greater than 3.

[0027] Furthermore, the calculation formula for the multi-infeed short-circuit ratio of each DC in the power grid is:

[0028]

[0029] Where: MSCR j is the short-circuit ratio index of multiple infeeds of DC j, S acj is the three-phase short-circuit capacity at the DC j commutation bus, P dNj is the rated transmission power of DC j, MIIF k,j It is the ratio of the voltage change of the DC k commutation bus to the voltage change of the DC j commutation bus when a reactive disturbance is applied to the DC j commutation bus.

[0030] Furthermore, the phase regulator with the optimal capacity is installed at the node of the coal-fired power unit based on the dichotomy method, specifically:

[0031] (1) Assume that the upper limit of the phase condenser capacity installed at node i is x, the lower limit is y, and the capacity accuracy is ε; [y, x] is taken as the initial phase condenser capacity interval of node i;

[0032] (2) Determine the middle value K of the current phase-shifting capacity range;

[0033] (3) Install a phase condenser with a capacity of K at node i. If, after the phase condenser is installed, the multi-infeed short-circuit ratio of each DC meets the requirements and the distance from the intermediate value K to the interval edge is less than the capacity accuracy ε, then K is used as the optimal capacity for installing the phase condenser at node i, and step (4) is executed; otherwise, the phase condenser capacity interval is updated: after the phase condenser with a capacity of K is installed, if the multi-infeed short-circuit ratio meets the requirements but does not meet the capacity accuracy requirements, the phase condenser capacity interval is updated to [y, K]; if the multi-infeed short-circuit ratio does not meet the requirements, the phase condenser capacity interval is updated to [K, x], and the process returns to step (2);

[0034] (4) Select the minimum capacity from the optimal capacity installed at each node, and install the minimum capacity at the node corresponding to the minimum capacity as the final phase-shifting configuration strategy.

[0035] Compared with the prior art, the present invention has the following beneficial effects:

[0036] First, by studying the reactive power support capacity of each coal-fired power unit for DC, the commissioning time of the unit, and the carbon emission level, the retirement path of the coal-fired power unit is determined. This method minimizes the weakening effect of coal-fired power unit retirement on the voltage support capacity of the receiving power grid. Then, based on the frequency support capacity constraint of the receiving power grid, the retirement strategy of the coal-fired power unit is determined to avoid frequency stability problems caused by retiring too many coal-fired power units. Finally, the voltage support capacity of the receiving power grid is constrained based on the multi-infeed short-circuit ratio indicator, and the optimal phase-shifting configuration strategy is formulated through the dichotomy method. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0038] Figure 1 A flowchart of the method according to an embodiment of the present invention;

[0039] Figure 2 This is a flow chart of the decommissioning strategy of the coal-fired power units in the receiving-end power grid according to an embodiment of the present invention;

[0040] Figure 3It is a flow chart of the configuration strategy of the phase regulator of the receiving-end power grid according to an embodiment of the present invention;

[0041] Figure 4 This is a schematic diagram of the improved IEEE39 node system described in an embodiment of the present invention. DETAILED DESCRIPTION

[0042] The following is a detailed description of an embodiment of the present invention. This embodiment is based on the technical solution of the present invention, and provides a detailed implementation method and a specific operation process to further explain the technical solution of the present invention.

[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] Take the improved IEEE39 node system as an example. Figure 4 As shown, the system includes 39 nodes, 34 transmission lines, 10 coal-fired power supply nodes, and 19 load nodes, among which the generator on the 31st node is a balancing machine with infinite reactive power regulation capability, and it is not included in the set of coal-fired power units to be retired. The present invention uses wind power new energy units as the power source after coal-fired power is retired, and nodes 5, 7, 9, 19, and 27 are areas with rich wind resources. At nodes 14 and 26, DC 1 and DC 2 with a capacity of 1500MW are fed in, and the original system is improved into a multi-feed DC system, while the load is increased to 1.48 times the original to maintain active balance.

[0045] The embodiment of the present invention provides a coal-fired power retirement and phase-shifting configuration strategy considering the power grid support capacity constraint. Referring to FIG. 1-3, the specific steps are as follows:

[0046] S1: Obtain information on coal-fired power generation unit nodes in the power grid and determine the set of coal-fired power generation units to be retired;

[0047] The information of the grid-related nodes includes the benchmark capacity, moment of inertia level and actual output of each coal-fired power unit as shown in Table 1, and determines the set L of coal-fired power units to be retired in the grid (nodes 30, 32, 33, 34, 35, 36, 37, 38, 39).

[0048] Table 1 Statistics of power grid related node information

[0049]

[0050] S2: Determine the retirement path of the coal-fired power units to be retired based on the reactive power support coefficient of the coal-fired power unit nodes to DC and related factors;

[0051] The reactive power support coefficient of the coal-fired power unit node to DC is calculated as follows:

[0052]

[0053] Where: P dcj is the transmission capacity of DC j, P dc is the total capacity of each DC transmission, N is the number of DC in the power grid; P PV,i is the active power output of coal-fired power unit node i, ∑P G is the total active power output of the power grid; is the reactive power output Q of coal-fired power unit node i PV,i Sensitivity to active disturbances at the DC point j; is the reactive power output Q of coal-fired power unit node i PV,i Sensitivity to reactive disturbance at the point of direct current j.

[0054] The relevant factors include the commissioning time of the coal-fired power units and the carbon emission level of the coal-fired power units. When multiple coal-fired power units are connected to the same coal-fired power unit node, they are sorted in order from long to short service life or from large to small total carbon emissions.

[0055] The improved IEEE39 node system in the embodiment is operated in step S2 to obtain the reactive support coefficient of each coal-fired power unit node as shown in Table 2.

[0056] Table 2 Reactive power support coefficient of coal-fired power unit node to DC

[0057]

[0058]

[0059] As shown in Table 2, the order of retirement paths for coal-fired power units determined according to the reactive support coefficient is: nodes 34, 36, 30, 33, 35, 37, 39, 32, and 38.

[0060] S3: Considering the frequency support capacity constraints of the receiving power grid, determine the maximum retirement capacity of the coal-fired power units, and then determine the coal-fired power unit retirement strategy according to the retirement path;

[0061] The frequency support capacity constraints of the receiving power grid include the rate of change of frequency (RoCoF) constraint and the frequency deviation constraint. The RoCoF constraint is the threshold value of the maximum frequency change rate to ensure the safe and stable operation of the system (generally -1Hz / s); the frequency deviation constraint is that the lowest frequency point of the system after the disturbance is higher than the first round action value of the third line of defense low-frequency load reduction (generally 49Hz).

[0062] (1) The calculation steps for determining the maximum retirement capacity of coal-fired power units under the RoCoF constraint are as follows: When only the inertial response of the synchronous generator set and the primary frequency regulation measures are considered, the dynamic response of the system inertial center frequency can be simplified by the equivalent generator set rotor motion equation:

[0063]

[0064] Where: H SYS is the equivalent inertia of the power system during operation; f n is the rated frequency of the system; Δf COI (t) is the system inertia center frequency; D is the load damping coefficient; ΔP G (t) is the primary frequency regulation active power adjustment of the unit; ΔP L is the active unbalance amount caused by the disturbance. At the initial moment of the power disturbance, the primary frequency modulation has not yet occurred. At this time, the active unbalance amount of the system is the largest, and the maximum frequency change rate is:

[0065]

[0066] From formula (4), we can deduce that RoCoF max The calculation formula for the minimum inertia of the safety-constrained system is:

[0067]

[0068] Where: ΔP max is the maximum active disturbance of the system (the receiving grid is generally a DC blocking fault); RoCoF max To ensure the safe and stable operation of the system, set the threshold value of the maximum frequency change rate (usually -1Hz / s).

[0069] Since the new energy units do not provide inertia support in the normal operation mode, the system's rotational inertia is provided by the coal-fired power units. According to the calculated minimum system inertia, the maximum inertia of the retired coal-fired power units can be obtained as:

[0070] H Lmax =H SYS -H min

[0071] Based on the maximum inertia of retired coal-fired power units and the retirement path of coal-fired power units, the maximum retirement capacity S1 of coal-fired power units can be further obtained.

[0072] (2) Determine the maximum retirement capacity S2 considering the frequency deviation constraint:

[0073] The frequency deviation constraint is that the power generation proportion of coal-fired power units should be greater than 5R (1 + σ% - D / 5). Among them, the speed regulator is simplified as a pure gain 1 / R, σ% is the overshoot, and D is the active frequency response coefficient of the load. Therefore, the maximum retirement capacity S2 of the coal-fired power unit can be obtained by first calculating the power generation proportion. Among them, the method of obtaining the maximum retirement capacity based on the power generation proportion belongs to the prior art, and can be specifically referred to the "Frequency Characteristics Analysis of Power Systems with High Penetration of New Energy" proposed by Zhang Jianyun et al.

[0074] (3) The smaller value of S1 and S2 is determined as the final maximum retirement capacity of the coal-fired power unit set. Finally, the coal-fired power retirement strategy can be determined based on the coal-fired power retirement path obtained in step S2.

[0075] The improved IEEE39 node system in the embodiment is operated in step S3, and the maximum retired capacities S1 and S2 are 2600MW and 3286MW respectively. Since the frequency support capacity constraint of the system needs to satisfy both the RoCoF constraint and the frequency deviation constraint, it is determined that the final retired capacity of the coal-fired power unit should be less than 2600MW. According to the coal-fired power unit retirement path determined in step S2 and the coal-fired power unit retirement capacity determined in step S3, the coal-fired power retirement strategy can be obtained as follows: retire the coal-fired power units on nodes 34, 36, 30, 33 and 35, with a total retirement capacity of 2600MW.

[0076] S4: For the determined coal-fired power unit retirement strategy, further consider the voltage support capacity constraints of the receiving power grid and determine the phase-shifting phase configuration strategy.

[0077] The voltage support capacity constraint is characterized by the multi-feed short-circuit ratio (the voltage support capacity of the system is strong when the multi-feed short-circuit ratio is greater than 3). If the multi-feed short-circuit ratio of each DC in the power grid is greater than 3 after the coal-fired power unit retirement strategy is implemented, the coal-fired power unit retirement strategy satisfies the frequency support capacity constraint of the receiving power grid while also satisfying the voltage support capacity constraint of the receiving power grid; if the multi-feed short-circuit ratio of the DC in the power grid is less than 3 after the coal-fired power unit retirement strategy is implemented, the coal-fired power retirement strategy only satisfies the frequency support capacity constraint of the receiving power grid.

[0078] Step S4 specifically includes:

[0079] S4.1: First, calculate the short-circuit ratio of multiple feeders of each DC in the power grid after the implementation of the coal-fired power unit retirement strategy;

[0080] The multi-infeed short-circuit ratio index is used to evaluate the voltage support capability of the receiving-end power grid to the DC system, and its calculation formula is:

[0081]

[0082] Where: MSCR j is the short-circuit ratio index of multiple infeeds of DC j, S acj is the three-phase short-circuit capacity at the DC j commutation bus, P dNj is the rated transmission power of DC j, MIIF k,j It is the ratio of the voltage change of the DC k commutation bus to the voltage change of the DC j commutation bus when a reactive disturbance is applied to the DC j commutation bus.

[0083] S4.2: Then determine whether the multi-feed short-circuit ratio of each DC meets the voltage support capability requirement of the receiving-end power grid;

[0084] S4.3: If the multi-infeed short-circuit ratio of each DC meets the requirements, there is no need to configure a phase regulator; if the multi-infeed short-circuit ratio of a DC does not meet the requirements, a phase regulator with the optimal capacity is installed at the coal-fired power unit node based on the dichotomy method, so that the multi-infeed short-circuit ratio of each DC in the receiving power grid meets the voltage support capacity requirements of the receiving power grid.

[0085] The phase regulator with the optimal capacity is installed at the node of the coal-fired power unit based on the dichotomy method, specifically:

[0086] (1) Assume that the upper limit of the phase condenser capacity installed at node i is x, the lower limit is y, and the capacity accuracy is ε; [y, x] is taken as the initial phase condenser capacity interval of node i;

[0087] (2) Determine the middle value K of the current phase-shifting capacity range;

[0088] (3) Install a phase condenser with a capacity of K at node i. If, after the phase condenser is installed, the multi-infeed short-circuit ratio of each DC meets the requirements and the distance from the intermediate value K to the interval edge is less than the capacity accuracy ε, then K is used as the optimal capacity for installing the phase condenser at node i, and step (4) is executed; otherwise, the phase condenser capacity interval is updated: after the phase condenser with a capacity of K is installed, if the multi-infeed short-circuit ratio meets the requirements but does not meet the capacity accuracy requirements, the phase condenser capacity interval is updated to [y, K]; if the multi-infeed short-circuit ratio does not meet the requirements, the phase condenser capacity interval is updated to [K, x], and the process returns to step (2);

[0089] (4) Select the minimum capacity from the optimal capacity installed at each node, and install the minimum capacity at the node corresponding to the minimum capacity as the final phase-shifting configuration strategy.

[0090] The improved IEEE39 node system in the embodiment is operated in step S4, and the multi-infeed short-circuit ratio calculated in the first step is shown in Table 3.

[0091] Table 3 Short-circuit ratio of multiple feeders in each DC system

[0092] DC Name Multi-infeed short circuit ratio DC 1 3.4149 DC2 2.8363

[0093] The second step is to determine whether the multi-infeed short-circuit ratio meets the voltage support capacity requirements of the receiving grid. The multi-infeed short-circuit ratio of DC 1 is greater than 3, which meets the requirements, while the multi-infeed short-circuit ratio of DC 2 is less than 3, which does not meet the requirements.

[0094] The third step is to set the upper limit of the capacity of each phase regulator to 300Mvar, the lower limit to 0Mvar, and the capacity accuracy to 1Mvar. The optimal capacity of the phase regulator (with an upper limit of 300Mvar) that needs to be installed at each node to meet the multi-infeed short-circuit ratio requirement is calculated, as shown in Table 4.

[0095] Table 4 Optimal capacity of phase regulators that meet the short-circuit ratio requirements of multiple infeeds

[0096]

[0097] The optimal configuration of the phase regulator of the improved IEEE39 node system is to install a phase regulator with a capacity of 28Mvar at node 26. At this time, the multi-infeed short-circuit ratio meets the strong system requirements, and the required phase regulator capacity is the smallest, with the best economy. If the capacity of the phase regulator is fixed at 300Mvar, nodes 25, 26, 27, 28, 29 and 38 can all be used as phase regulator construction nodes.

[0098] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for decommissioning coal-fired power plants and configuring phase-shifting units considering grid support capacity constraints, characterized in that: include: S1: Obtain information on coal-fired power generation unit nodes in the power grid and determine the set of coal-fired power generation units to be retired; S2: Determine the retirement path of the coal-fired power generation units to be retired based on the reactive power support coefficient of the coal-fired power generation unit nodes to DC; Step S2 specifically includes: firstly calculating the reactive power support coefficient of each coal-fired power unit node to DC; then determining the retirement path of the set of coal-fired power units to be retired in the order of reactive power support coefficient from small to large; The reactive power support coefficient of the coal-fired power unit node to DC is calculated as follows: Where: P dcj is the transmission capacity of DC j, P dc is the total capacity of each DC transmission, N is the number of DC in the power grid; P PV,i is the active power output of coal-fired power unit node i, ∑P G is the total active power output of the power grid; is the reactive power output Q of coal-fired power unit node i PV,i Sensitivity to active disturbances at the DC point j; is the reactive power output Q of coal-fired power unit node i PV,i Sensitivity to reactive disturbance at the point of direct current j; S3: Considering the frequency support capacity constraints of the receiving power grid, determine the maximum retirement capacity of the coal-fired power units, and then determine the coal-fired power unit retirement strategy according to the retirement path; The frequency support capacity constraint in step S3 includes a frequency change rate constraint and a frequency deviation constraint; determining the maximum retirement capacity of the coal-fired power unit set specifically includes: S3.1, determine the first maximum retirement capacity considering the frequency change rate constraint: only consider the inertial response of the synchronous generator set and the primary frequency regulation measure, and calculate the minimum system inertia H that meets the frequency change rate constraint min , and then determine the maximum inertia H of the coal-fired power unit set Lmax ; Finally, based on the maximum inertia and retirement path of the coal-fired power generation unit set, the maximum retirement capacity S1 of the coal-fired power generation unit set is obtained; The minimum inertia of the system is H min and the maximum inertia H of the retired coal-fired power units Lmax The calculation formula is: H Lmax =H SYS -H min Where ΔP max is the maximum active disturbance of the system, f n is the system rated frequency; RoCoF max To ensure the maximum frequency change rate threshold value of the system to ensure safe and stable operation; H SYS is the equivalent inertia of the power system during operation; S3.2, determine the second maximum retirement capacity considering the frequency deviation constraint: calculate the minimum power generation proportion of the coal-fired power generation unit set 5R (1 + σ% - D / 5), and then determine the second maximum retirement capacity S2 of the coal-fired power generation unit set; where the speed governor is simplified by pure gain 1 / R, σ% is the overshoot, and D is the active frequency response coefficient of the load; S3.3, the smaller value of S1 and S2 is determined as the final maximum retirement capacity of the coal-fired power unit set; S4: For the determined coal-fired power unit retirement strategy, further consider the voltage support capacity constraints of the receiving power grid and determine the phase-shifting phase configuration strategy.

2. The method according to claim 1, characterized in that: The relevant node information obtained in step S1 includes: the benchmark capacity, moment of inertia level and actual output of each coal-fired power unit.

3. The method according to claim 1, characterized in that When determining the retirement path of the set of coal-fired power units to be retired in step S2, when multiple coal-fired power units are connected to the same coal-fired power unit node, the coal-fired power units are sorted in order from long to short service life or from large to small total carbon emissions.

4. The method according to claim 1, characterized in that Step S4 is specifically as follows: first, calculate the multi-feed short-circuit ratio of each DC in the power grid after the implementation of the coal-fired power unit retirement strategy, and then determine whether the multi-feed short-circuit ratio of each DC meets the voltage support capability requirement of the receiving-end power grid; if the multi-feed short-circuit ratio of each DC meets the requirement, there is no need to configure a phase regulator; if there is a DC whose multi-feed short-circuit ratio does not meet the requirement, then install a phase regulator of the optimal capacity at the coal-fired power unit node based on the dichotomy method, so that the multi-feed short-circuit ratio of each DC in the receiving-end power grid meets the voltage support capability requirement of the receiving-end power grid.

5. The method according to claim 4, characterized in that Meeting the voltage support capability requirement of the receiving-end power grid means that the short-circuit ratio of the DC multi-infeed is greater than 3.

6. The method according to claim 4, characterized in that The calculation formula for the multi-infeed short-circuit ratio of each DC in the power grid is: Where: MSCR j is the short-circuit ratio index of multiple infeeds of DC j, S acj is the three-phase short-circuit capacity at the DC j commutation bus, P dNj is the rated transmission power of DC j, MIIF k,j It is the ratio of the voltage change of the DC k commutation bus to the voltage change of the DC j commutation bus when a reactive disturbance is applied to the DC j commutation bus.

7. The method according to claim 4, characterized in that The phase regulator with the optimal capacity is installed at the node of the coal-fired power unit based on the dichotomy method, specifically: (1) Assume that the upper limit of the phase condenser capacity installed at node i is x, the lower limit is y, and the capacity accuracy is ε; [y, x] is taken as the initial phase condenser capacity interval of node i; (2) Determine the middle value K of the current phase-shifting capacity range; (3) Install a phase condenser with a capacity of K at node i. If, after the phase condenser is installed, the multi-infeed short-circuit ratio of each DC meets the requirements and the distance from the intermediate value K to the interval edge is less than the capacity accuracy ε, then K is used as the optimal capacity for installing the phase condenser at node i, and step (4) is executed; otherwise, the phase condenser capacity interval is updated: after the phase condenser with a capacity of K is installed, if the multi-infeed short-circuit ratio meets the requirements but does not meet the capacity accuracy requirements, the phase condenser capacity interval is updated to [y, K]; if the multi-infeed short-circuit ratio does not meet the requirements, the phase condenser capacity interval is updated to [K, x], and the process returns to step (2); (4) Select the minimum capacity from the optimal capacity installed at each node, and install the minimum capacity at the node corresponding to the minimum capacity as the final phase-shifting configuration strategy.