A system and method for preheating raw materials entering a furnace

The furnace raw material preheating system uses blast furnace hot blast furnace flue gas to preheat the raw materials, which solves the problems of increased energy consumption and gas system instability caused by high moisture content of the blast furnace raw materials and large amounts of binders, and achieves reduced fuel consumption and system safety and stability. effect.

CN114737046BActive Publication Date: 2024-10-18SGIS SONGSHAN CO LTD

Patent Information

Application Number
CN202210448534.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-26
Publication Date
2024-10-18
Estimated Expiration
2042-04-26

AI Technical Summary

Technical Problem

The high moisture content and large amounts of adhesives in the raw materials entering the blast furnace lead to increased blast furnace energy consumption and carbon emissions, and affect the safe and stable operation of the gas system.

Method used

A system for preheating raw materials entering the furnace is designed, including a hot air module, a raw material screening device and a dust removal module. The flue gas of the blast furnace hot blast stove is used to preheat the raw materials. The flue gas is sprayed through the vibrating screen bed and dust is collected to achieve the preheating of the raw materials. Effective preheating.

Benefits of technology

It effectively reduces blast furnace fuel consumption, increases raw material temperature, ensures safe and stable operation of the gas system, and reduces flue gas energy loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114737046B_ABST
    Figure CN114737046B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of blast furnace smelting, and specifically discloses a system and method for preheating raw materials entering the furnace. The system for preheating raw materials entering the furnace includes a hot air module, a raw material screening device and a dust removal module; the hot air module includes a blast furnace hot blast furnace, a hot blast furnace flue gas pipeline, a conveying pipeline and a plurality of flue gas pipelines, the hot blast furnace flue gas pipeline is connected to the blast furnace hot blast furnace, and the hot blast furnace flue gas pipeline is selectively connected to the flue gas pipeline through the conveying pipeline; the raw material screening device is provided with a plurality of vibrating screen beds, the vibrating screen beds are used to screen the raw materials entering the furnace according to the particle size, and the flue gas pipeline is used to spray flue gas to the raw materials entering the furnace located on the vibrating screen beds; the dust removal module is used to absorb dust passing through the vibrating screen beds. By improving the structure of the hot air module, the excess heat in the blast furnace hot blast furnace can be transported to the raw material screening device for preheating, thereby avoiding the direct discharge of high-temperature flue gas, achieving the preheating effect of the raw materials entering the blast furnace, and ensuring the safe and stable operation of the gas system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of blast furnace smelting, and in particular to a system and method for preheating raw materials entering the furnace. Background Art

[0002] The raw materials entering the blast furnace generally include burnt ore, ball ore, raw ore and coke, etc. Raw ore usually includes multiple different varieties. Due to the different production and transportation links of various raw materials, the moisture percentage of the raw materials fluctuates greatly. Under normal circumstances, the temperature of directly delivered burnt ore can reach up to about 50°C, but most of it is room temperature, and the temperature of ball ore is also mostly room temperature. The moisture content of burnt ore and ball ore is relatively low, generally less than 0.5% or even zero (except for being wet by rain during the rainy season). For coke, the moisture content of commonly used dry quenching coke is generally less than 3%, while the moisture content of water quenching coke is generally 3-15%. A small amount of water quenching coke has a moisture content of more than 15% or even more than 20%. Raw ore cannot avoid the presence of mud, and it will also be affected by sea transportation, shipping and the environment. The moisture content generally fluctuates in the range of 1%-15% (including wet soil and sticky debris). Therefore, the raw materials under the blast furnace trough are affected by various factors, which will cause the temperature of the raw materials to be low when entering the furnace, generally the same as the atmospheric temperature or even lower than the atmospheric environment temperature.

[0003] At present, all kinds of blast furnaces are implementing enhanced smelting, with reducing fuel consumption and carbon emissions as important improvement directions. Affected by the technical difficulties of the moisture content, wet soil, and adhesives in the raw materials under the blast furnace trough that cannot be removed, the high moisture content and the impurities of the ore entering the blast furnace will inevitably lead to an increase in blast furnace energy consumption, thereby increasing carbon emissions and bringing adverse effects on the smooth operation of the blast furnace. Especially in winter when the temperature is low, the temperature of the ore entering the furnace is usually only about 5°C, and a large amount of heat is required after entering the top of the blast furnace.

[0004] With the intensive smelting of blast furnaces, raw materials with high moisture content and many adhesives enter the blast furnace, which will inevitably consume the gas heat energy in the furnace, resulting in a decrease in the furnace top temperature (generally below 80°C). The decrease in the furnace top gas temperature will inevitably lead to the clogging and adhesion of the bags of the gas dust removal system, causing a large drop in the pressure difference in the gas pipeline, affecting the safe operation of the gas system.

[0005] Under existing technical conditions, when the raw materials entering the blast furnace arrive at the silo below the trough, one silo is filled with at least 300 tons or even thousands of tons of ore, and one silo is filled with more than 200 tons of coke. The use cycle of one silo (the same type of ore is used alternately by multiple silos) is generally 8 hours, and it may even take several days to replace the furnace materials in some silos. Affected by factors such as temperature and atmospheric humidity, environmental leakage and rain, the furnace materials in the silo often become damp, which further reduces the temperature of the furnace materials.

[0006] Under existing technical conditions, there is no suitable technology for controlling the temperature of raw materials entering the blast furnace. For example, the temperature of coke cannot be higher than 200°C when it is directly sent to the blast furnace after dry quenching. High temperature can easily cause belt system failure, which in turn leads to safety accidents. Even when the 200°C coke is transported to the blast furnace bunker, in order to prevent the coke from spontaneously igniting in the bunker and to ensure the transportation safety of the coke, water spraying is used to cool it down, and the water quenching temperature is usually room temperature. Since the ore is mainly stacked on the site, the temperature of the ore is basically room temperature. Some blast furnace ball ore is directly sent to the blast furnace bunker after production, and the temperature of the ball ore is also high. However, in order to prevent the ball ore from spontaneously igniting when stacked, cooling measures are also taken to ensure that the temperature of the ball ore is within a safe and controllable range.

[0007] Therefore, under the current technical conditions, there is no more suitable technical means to increase the temperature of the raw materials entering the blast furnace under the trough, and thus it is impossible to reduce the impact of the raw materials under the blast furnace trough on the heat energy consumption of the blast furnace. Summary of the invention

[0008] The object of the present invention is to provide a system and method for preheating raw materials entering a furnace, so as to realize the preheating operation of raw materials entering the furnace and solve the problem of excessively high energy consumption of blast furnaces.

[0009] To achieve this object, the present invention adopts the following technical solutions:

[0010] A system for preheating incoming raw materials, comprising a hot blast module, a raw material screening device and a dust removal module; the hot blast module comprises a blast furnace hot blast furnace, a hot blast furnace flue gas duct, a conveying duct and a plurality of flue gas pipelines, the hot blast furnace flue gas duct is connected to the blast furnace hot blast furnace, the hot blast furnace flue gas duct and the flue gas pipeline are selectively connected through the conveying duct; the raw material screening device is provided with a plurality of vibrating screen beds, the vibrating screen beds are used for screening incoming raw materials according to particle size, the flue gas pipeline is used for spraying flue gas to the incoming raw materials located on the vibrating screen beds; the dust removal module is used for absorbing dust passing through the vibrating screen beds.

[0011] As a preferred technical solution for the raw material preheating system entering the furnace, a first valve is provided on the conveying pipeline, and the first valve can be used to connect or disconnect the hot blast furnace flue gas pipeline with each of the flue gas pipelines.

[0012] As a preferred technical solution of the system for preheating raw materials entering the furnace, the flue gas pipeline is provided with at least two flue gas injection nozzles, and the flue gas pipeline injects the flue gas through the flue gas injection nozzles.

[0013] As a preferred technical solution of the raw material preheating system entering the furnace, the flue gas pipeline is arranged above the vibrating screen bed, and the flue gas pipeline and the vibrating screen bed are spaced apart.

[0014] As an optimal technical solution for the raw material preheating system entering the furnace, the dust removal module includes a dust removal device body and a dust removal suction channel connected to the dust removal device body, the dust removal suction channel is provided with a suction port, and the suction port is arranged below the vibrating screen bed. The dust removal device body absorbs dust passing through the vibrating screen bed through the suction port.

[0015] As a preferred technical solution for the system for preheating raw materials entering the furnace, the system for preheating raw materials entering the furnace also includes a powder bin, which is arranged below the raw material screening device and is used to collect and absorb the raw materials entering the furnace that pass through the vibrating screen bed; there are two air suction ports, which are located between the raw material screening device and the powder bin and are symmetrical about the line connecting the powder bin and the raw material screening device.

[0016] As an optimal technical solution for the raw material preheating system entering the furnace, the flue gas pipeline is provided with a second valve, by which the conveying pipeline can be connected or disconnected with each of the flue gas pipelines; the dust removal suction channel is provided with a third valve, by which the dust removal device body can be connected or disconnected with the suction port.

[0017] As a preferred technical solution for the preheating system of raw materials entering the furnace, the preheating system of raw materials entering the furnace can switch back and forth between a screening state and a stop state. When the preheating system of raw materials entering the furnace is in the screening state, the raw material screening device keeps running to screen the raw materials entering the furnace on the sieve bed of the vibrating screen, the second valve connects the conveying pipeline with each of the flue gas pipelines, and the third valve connects the dust removal device body and the air suction port; when the preheating system of raw materials entering the furnace is in the stop state, the raw material screening device stops running, the second valve disconnects the conveying pipeline with each of the flue gas pipelines, and the third valve disconnects the dust removal device body and the air suction port.

[0018] As a preferred technical solution for the preheating system of raw materials entering the furnace, a flue gas temperature detector is also installed on the hot blast furnace flue gas duct, and the flue gas temperature detector is used to detect the temperature of the flue gas in the hot blast furnace flue gas duct.

[0019] A method for preheating raw materials entering a furnace is applied to the above-mentioned system for preheating raw materials entering a furnace, and comprises the following steps:

[0020] S10: Identify the type and preheating time of the raw materials entering the furnace, and then start the raw material screening device and the dust removal module;

[0021] S20: judging whether the blast furnace hot blast furnace is operating normally, if so, proceeding to S30, if not, disconnecting the hot blast furnace flue gas duct and the flue gas pipeline, thus ending the preheating;

[0022] S30: judging whether the temperature of the flue gas is less than or equal to the first temperature, if so, connecting the hot blast furnace flue gas pipe and the flue gas pipeline to preheat the raw materials entering the furnace, and then proceeding to S40, if not, disconnecting the hot blast furnace flue gas pipe and the flue gas pipeline to end the preheating;

[0023] S40: When the preheating time is reached, disconnect the hot blast furnace flue gas duct and the flue gas pipeline, and close the raw material screening device and the dust removal module.

[0024] Beneficial effects of the present invention:

[0025] This system for preheating raw materials entering the furnace uses the structural improvement of the hot air module to lead out the hot blast furnace flue gas pipeline from the hot blast furnace flue gas pipeline used to discharge the high-temperature flue gas of the blast furnace hot blast furnace. By using the hot blast furnace flue gas pipeline, the high-temperature flue gas can be guided to the raw material screening device to preheat the raw materials entering the furnace on the vibrating screen bed to reduce the moisture in the raw materials entering the furnace. In this way, the effective utilization of the flue gas heat energy in the blast furnace hot blast furnace is achieved, and the energy loss caused by the direct discharge of high-temperature flue gas into the atmosphere is avoided. Through the application of this technology, the preheating operation of the raw materials entering the blast furnace can be realized, which greatly solves the problem of low gas temperature at the top of the blast furnace caused by the rapid feeding of raw materials into the furnace under high smelting intensity, thereby ensuring the safe and stable operation of the gas system. Through the application of this technology, the moisture in raw materials such as coke and raw ore can be effectively reduced, and the temperature of raw materials such as sintered ore and ball ore when entering the furnace can be greatly increased, thereby playing a positive contribution to reducing the consumption of blast furnace fuel. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of a system for preheating raw materials entering a furnace provided by an embodiment of the present invention;

[0027] Figure 2 It is a flow chart of a method for preheating raw materials entering a furnace provided in an embodiment of the present invention.

[0028] In the figure:

[0029] 100, hot air module; 110, hot air furnace flue gas pipeline; 111, flue gas temperature detector; 120, delivery pipeline; 121, first valve; 130, flue gas pipeline; 131, flue gas injection nozzle; 132, second valve;

[0030] 200, raw material screening device; 210, vibrating screen bed; 220, screen bed frame; 221, vibrating screen outlet; 222, front support; 223, rear support; 224, front lifting assembly; 225, rear lifting assembly; 230, feeder hopper; 240, spring support;

[0031] 300, silo module; 301, silo outlet;

[0032] 400, dust removal module; 410, dust removal air suction channel; 420, dust removal device body; 430, third valve;

[0033] 500. Powder silo. DETAILED DESCRIPTION

[0034] In order to make the technical problems solved by the present invention, the technical solutions adopted and the technical effects achieved clearer, the technical solutions of the embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0035] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0036] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0037] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0038] like Figure 1As shown, this embodiment provides a system for preheating raw materials entering a furnace, including a hot air module 100, a raw material screening device 200 and a dust removal module 400; the hot air module 100 includes a blast furnace hot blast furnace, a hot blast furnace flue gas duct 110, a conveying duct 120 and a plurality of flue gas pipelines 130, the hot blast furnace flue gas duct 110 is connected to the blast furnace hot blast furnace, and the hot blast furnace flue gas duct 110 is selectively connected to the flue gas pipeline 130 through the conveying duct 120; the raw material screening device 200 is provided with a plurality of vibrating screen beds 210, the vibrating screen beds 210 are used to screen the raw materials entering the furnace according to the particle size, and the flue gas pipeline 130 is used to spray flue gas to the raw materials entering the furnace located on the vibrating screen beds 210; the dust removal module 400 is used to absorb dust passing through the vibrating screen beds 210.

[0039] The present system for preheating raw materials entering the furnace, by means of the structural improvement at the hot blast module 100, leads out the hot blast furnace flue gas pipeline 110 from the hot blast furnace flue gas pipeline 110 used for discharging high-temperature flue gas from the hot blast furnace (not shown in the figure), and utilizes the hot blast furnace flue gas pipeline 110 to guide the high-temperature flue gas to the raw material screening device 200, and preheat the raw materials entering the furnace located on the vibrating screen bed 210, so as to reduce the moisture in the raw materials entering the furnace. In this way, the effective utilization of the flue gas heat energy in the hot blast furnace of the blast furnace is achieved, and the energy loss caused by the direct discharge of high-temperature flue gas into the atmosphere is avoided. By applying this technology, the preheating operation of the raw materials entering the blast furnace can be realized, and the problem of low gas temperature at the top of the blast furnace caused by the rapid feeding of the raw materials entering the furnace under high smelting intensity is solved to a great extent, thereby ensuring the safe and stable operation of the gas system. By applying this technology, the moisture in raw materials such as coke and raw ore can be effectively reduced, and the temperature of raw materials such as sintered ore and ball ore when entering the furnace can be greatly increased, thereby playing a positive contribution to reducing the consumption of blast furnace fuel.

[0040] Specifically, the diameter of the delivery pipe 120 is 500 mm.

[0041] In this embodiment, a first valve 121 is provided on the conveying pipeline 120, and the first valve 121 can be used to connect or disconnect the hot blast furnace flue gas pipeline 110 with each flue gas pipeline 130. The setting of the first valve 121 ensures that the hot blast furnace flue gas pipeline 110 and the flue gas pipeline 130 can be selectively connected under the control of the operator. The above design is simple and reliable, so that the preheating operation of the raw material preheating system can be completed by manual control, thereby reducing the risk of accidents in the connection state of the hot blast furnace flue gas pipeline 110 and the flue gas pipeline 130, avoiding the situation where the preheating starts due to accidents when the blast furnace hot blast furnace is not working and the flue gas temperature is too high, thereby reducing the safety hazards in the working environment, and ensuring the stable operation of the raw material preheating system and the personal safety of the operators.

[0042] Preferably, the flue gas pipeline 130 is provided with at least two flue gas injection nozzles 131, and the flue gas pipeline 130 injects flue gas through the flue gas injection nozzles 131. The arrangement of the flue gas pipeline 130 ensures that the flue gas can be evenly and fully injected onto the raw materials on the vibrating screen bed 210, thereby improving the efficiency of the preheating operation, reducing the loss of flue gas heat, and ensuring sufficient preheating of the raw materials.

[0043] Specifically, 2-5 smoke pipes 130 are arranged above each vibrating screen bed 210 , the diameter of the smoke pipe 130 is 150 mm, and 3-5 smoke injection nozzles 131 are opened on each smoke pipe 130 , the diameter of the smoke injection nozzle 131 is 50-100 mm.

[0044] Furthermore, the flue gas pipeline 130 is arranged above the vibrating screen bed 210, and the flue gas pipeline 130 is spaced apart from the vibrating screen bed 210. The spaced apart arrangement can ensure that when the raw material screening device 200 is in operation, the vibration of the vibrating screen bed 210 will not cause the incoming raw materials on the vibrating screen bed 210 to directly contact the flue gas pipeline 130, and while ensuring the smooth operation of the hot air module 100 and the raw material screening device 200, it can also ensure that during the screening process of the vibrating screen bed 210, the flue gas can be sprayed onto the vibrating screen furnace charge.

[0045] Specifically, the distance between the flue gas pipeline 130 and the vibrating screen bed 210 is 150-200 mm. The above distance can ensure that the raw materials on the vibrating screen bed 210 will not accidentally collide with the flue gas pipeline 130, and can also make the flue gas pipeline 130 as close as possible to the raw materials on the vibrating screen bed 210, thereby improving the efficiency of the preheating operation.

[0046] In this embodiment, the dust removal module 400 includes a dust removal device body 420 and a dust removal suction channel 410 connected to the dust removal device body 420. The dust removal suction channel 410 is provided with a suction port, which is arranged below the vibrating screen bed 210. The dust removal device body 420 absorbs dust passing through the vibrating screen bed 210 through the suction port. The setting of the dust removal module 400 realizes the collection of dust passing through the vibrating screen bed 210, avoids the situation where dust spreads everywhere to pollute the working environment and affect the personal health of operators, ensures the cleanliness of the working environment, protects the personal health of operators, and also reduces the risk of damage to the raw material preheating system entering the furnace.

[0047] Specifically, the diameter of the dust removal suction channel 410 is 100-150 mm, and the shape of the suction port is a bell-shaped. The above structural design ensures that the dust removal module 400 can efficiently complete the dust collection work.

[0048] Furthermore, the furnace raw material preheating system also includes a powder bin 500, which is arranged below the raw material screening device 200 and is used to collect and absorb the furnace raw materials that pass through the vibrating screen bed 210; two air suction ports are provided, and the two air suction ports are located between the raw material screening device 200 and the powder bin 500 and are symmetrical about the line connecting the powder bin 500 and the raw material screening device 200. The design of the two air suction ports symmetrical about the line connecting the powder bin 500 and the raw material screening device 200 improves the dust collection capacity of the dust removal module 400, greatly reduces the possibility of dust diffusion, thereby further improving the cleanliness of the working environment and ensuring the personal safety of the operator. The setting of the powder bin 500 serves the purpose of collecting large particles of dust that pass through the vibrating screen bed 210, and provides space for the dust that is not collected by the dust removal module 400. The setting of the powder bin 500 facilitates the operator's work on dust, and reduces the difficulty of cleaning while also improving the cleanliness of the working environment.

[0049] After the flue gas is sprayed onto the surface of the raw materials entering the furnace, the raw materials are heated, and the remaining gas penetrates the raw material layer and enters the powder silo 500 area together with the dust. The large particles of dust fall to the bottom of the powder silo 500, and the remaining flue gas is drawn into the dust removal device body 420 through the dust removal suction channel 410.

[0050] Specifically, part of the space located on the vibration screen bed 210 and the space between the vibration screen bed 210 and the powder bin 500 are surrounded by a canvas net or a steel plate, and only a small number of observation holes are opened on the canvas net or the steel plate. The above design further limits the possibility of dust spreading everywhere, and further improves the cleanliness of the working environment.

[0051] In this embodiment, the raw material screening device further includes a screen bed frame 220 and a feeder hopper 230. The vibrating screen screen bed 210 is mounted on the screen bed frame 220, and the two ends of the screen bed frame 220 are supported by a front support 222 and a rear support 223, respectively, and the rear support 223 is higher than the front support 222. The front support 222 is connected to the screen bed frame 220 through a front lifting assembly 224, and is used to drive the screen bed frame 220 to rise and fall relative to the front support 222; the rear support 223 is connected to the screen bed frame 220 through a rear lifting assembly 225, and is used to drive the screen bed frame 220 to rise and fall relative to the rear support 223. The feeder hopper 230 is mounted above the end of the screen bed frame 220 connected to the rear support 223 through a spring support 240, and the spring support 240 can drive the feeder hopper 230 to rise and fall relative to the screen bed frame 220. A vibrating screen discharge nozzle 221 is provided at one end of the screen bed frame 220 connected to the front support 222 , and the incoming raw materials located on the vibrating screen bed 210 and meeting the required particle size requirements are separated from the raw material screening device 200 through the vibrating screen discharge nozzle 221 .

[0052] In this embodiment, the system for preheating raw materials entering the furnace further includes a silo module 300 , and a silo discharge port 301 is provided at the bottom of the silo module 300 . The silo discharge port 301 is located directly above the feeder receiving hopper 230 .

[0053] Preferably, the flue gas pipeline 130 is provided with a second valve 132, by which the delivery pipeline 120 can be connected or disconnected with each flue gas pipeline 130; the dust removal suction channel 410 is provided with a third valve 430, by which the dust removal device body 420 can be connected or disconnected with the suction port.

[0054] The setting of the second valve 132 reduces the risk of dust entering the flue gas pipeline 130 when the raw material preheating system is not in operation. The above design greatly reduces the risk of blockage of the flue gas pipeline 130, reduces the frequency of replacement and maintenance of the flue gas pipeline 130, and prolongs the service life of the flue gas pipeline 130, thereby improving the working efficiency of the raw material preheating system. The setting of the third valve 430 reduces the risk of dust entering the dust removal suction channel 410 when the raw material preheating system is not in operation. The above design greatly reduces the risk of blockage of the dust removal suction channel 410, reduces the frequency of replacement and maintenance of the dust removal module 400, and prolongs the service life of the flue gas pipeline 130, thereby improving the working efficiency of the raw material preheating system.

[0055] Specifically, the first valve 121 and the third valve 430 are both gate valves, and the second valve 132 is a ball valve.

[0056] Furthermore, the system for preheating raw materials entering the furnace can switch back and forth between a screening state and a stop state. When the system for preheating raw materials entering the furnace is in a screening state, the raw material screening device 200 keeps running to screen the raw materials entering the furnace on the vibrating screen bed 210, the second valve 132 connects the conveying pipeline 120 with each flue gas pipeline 130, and the third valve 430 connects the dust removal device body 420 and the air intake port; when the system for preheating raw materials entering the furnace is in a stop state, the raw material screening device 200 stops running, the second valve 132 disconnects the conveying pipeline 120 from each flue gas pipeline 130, and the third valve 430 disconnects the dust removal device body 420 from the air intake port. The above design enables the second valve 132 and the third valve 430 to automatically complete the corresponding opening and closing actions, thereby reducing the workload of the operator, reducing the risk of the valve opening and closing state error due to mistakes, and further ensuring that the work of the system for preheating raw materials entering the furnace can be completed smoothly and accurately.

[0057] In this embodiment, a flue gas temperature detector 111 is also installed on the hot blast furnace flue gas duct 110, and the flue gas temperature detector 111 is used to detect the temperature of the flue gas in the hot blast furnace flue gas duct 110. The provision of the flue gas temperature detector 111 facilitates the operator to monitor the temperature of the flue gas, and helps to avoid the spontaneous combustion of coke in the raw materials entering the furnace during the preheating operation under high temperature conditions.

[0058] Preferably, the second valve 132 and the third valve 430 are associated with the operation control signal of the raw material screening device 200. When the vibrating screen bed 210 is started, the third valve 430 and the corresponding second valve 132 above the vibrating screen bed 210 are opened, and when the vibrating screen bed 210 is stopped, the third valve 430 and the corresponding second valve 132 above the vibrating screen bed 210 are closed. Specifically, the start-up and closing actions of the second valve 132 and the third valve 430 are delayed by 1 second relative to the start-up and closing actions of the vibrating screen bed 210.

[0059] In this embodiment, the second valve 132 is also associated with the working condition of the hot blast furnace. When the hot blast furnace is working, the hot blast furnace sends a furnace burning signal, and the second valve 132 is opened; when the hot blast furnace stops, the hot blast furnace does not send a furnace burning signal, and the second valve 132 is closed. The first valve 121 can only be opened when the hot blast furnace is working, unless the operator manually controls the opening and closing of the first valve 121.

[0060] Preferably, the raw material preheating system is provided with a preheating start button. When the preheating start button is in the closed state, all valves on the raw material preheating system are in the closed state. Only when the raw material needs to be preheated, the operator activates the preheating start button, and then the raw material preheating system can perform the above-mentioned actions.

[0061] The above control systems belong to the blast furnace computer system, are associated with the blast furnace intelligent operation control system, and all data are shared.

[0062] like Figure 1 and Figure 2 As shown, this embodiment also provides a method for preheating raw materials entering a furnace, which is applied to the above-mentioned system for preheating raw materials entering a furnace, and includes the following steps:

[0063] Step 1: Identify the type and preheating time of the raw materials entering the furnace, and then start the raw material screening device 200 and the dust removal module 400.

[0064] Step 2: Determine whether the blast furnace hot blast stove is operating normally. If so, proceed to step 3. If not, keep the hot blast stove flue gas duct 110 and the flue gas pipeline 130 disconnected to end the preheating.

[0065] Step three: determine whether the temperature of the flue gas is less than or equal to the first temperature. If so, connect the hot blast furnace flue gas duct 110 and the flue gas pipeline 130 to preheat the raw materials entering the furnace, and then proceed to step four. If not, keep the hot blast furnace flue gas duct 110 and the flue gas pipeline 130 disconnected to end this preheating.

[0066] Step 4: When the preheating time is reached, disconnect the hot blast furnace flue gas duct 110 and the flue gas pipeline 130, and turn off the raw material screening device 200 and the dust removal module 400.

[0067] This method of preheating raw materials entering the furnace stabilizes the quality of the raw materials entering the furnace, ensures the temperature of the blast furnace top gas, helps promote the standardization and digitalization of blast furnace smelting, and creates conditions for supporting virtual foreman technology.

[0068] Before step 1, the following steps are also included: data recording and information sorting of the silo of the raw materials entering the furnace. The above steps facilitate the operator to determine and control the type and preheating time of the raw materials entering the furnace, realize the management of the type information of the raw materials entering the furnace and the preheating system of the raw materials entering the furnace; realize the management and utilization of the moisture data of the raw materials entering the furnace. Improve the work efficiency of the operators and ensure the accuracy and smoothness of the preheating operation. Specifically, the first temperature is 400 degrees Celsius.

[0069] The following are two actual production situations as examples:

[0070] Actual production situation

[0071] The temperature of a blast furnace roof was 72℃-75℃ for 30 minutes. According to the actual situation on site, the ambient temperature was 10℃, the ore temperature under the trough was room temperature, and the detection value was 8℃. The foreman on duty started the preheating system, the flue gas temperature of the hot blast furnace was 280℃, the first valve was opened, the flue gas flow was 400,000 cubic meters per hour, the 4# ore burning vibrating screen was started, the corresponding branch pipe was automatically opened, and the third valve on the dust removal suction channel was automatically opened. The temperature gun was used for on-site detection. The flue gas temperature reaching the vibrating screen area was 183℃ (the pipeline is long and the temperature drop is relatively large), the temperature at the entrance of the dust removal suction pipe under the vibrating screen was 78℃, and the surface temperature of the sintered ore was detected to be 36℃ when the sintered ore was transported to the conveyor belt. In this shift, five consecutive batches were preheated for the screening process of raw ore, sintered ore, ball ore and coke. When the smelting intensity in the furnace was reduced, the top temperature rose to 93℃ when the third batch of preheated materials was used, and to 102℃ in the fifth batch.

[0072] Actual production situation 2

[0073] Water is transported to the blast furnace to quench the coke, and the moisture content of the coke under the trough is 11.5%. At this time, the blast furnace starts the preheating process, sets the preheating branch pipes of sintered ore, ball ore and raw ore to manual control state, sets the preheating branch pipe of coke vibrating screen to automatic control state, and starts the preheating system. At this time, the flue gas temperature is 326℃, the coke screen is vibrated, the corresponding flue gas branch valve on the coke is opened, the corresponding dust removal suction pipe valve is opened, and the coke falls along the silo to the vibrating screen bed. The coke is preheated at a flue gas temperature of 220℃. The preheating process takes 3 minutes. After the coke is fully weighed, the moisture content of the coke is detected on the conveyor belt at 6.8%. During this period, the preheating system is continuously started to preheat the coke, and the moisture content of the coke is reduced by 5% on average. At this time, due to the fluctuation of the flue gas temperature, the preheating effect has deviated.

[0074] Obviously, the above embodiments of the present invention are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A system for preheating raw materials entering a furnace, characterized in that: include: A hot blast module (100) comprises a blast furnace hot blast furnace, a hot blast furnace flue gas pipeline (110), a delivery pipeline (120) and a plurality of flue gas pipelines (130), wherein the hot blast furnace flue gas pipeline (110) is connected to the blast furnace hot blast furnace, and the hot blast furnace flue gas pipeline (110) and the flue gas pipeline (130) are selectively connected via the delivery pipeline (120); A raw material screening device (200), wherein the raw material screening device (200) is provided with a plurality of vibrating screen beds (210), wherein the vibrating screen beds (210) are used to screen incoming raw materials according to particle sizes, and the flue gas pipeline (130) is used to spray flue gas onto the incoming raw materials located on the vibrating screen beds (210); A dust removal module (400) for absorbing dust passing through the vibrating screen bed (210); The dust removal module (400) comprises a dust removal device body (420) and a dust removal air suction channel (410) connected to the dust removal device body (420); the dust removal air suction channel (410) is provided with an air suction port, the air suction port is arranged below the vibrating screen bed (210), and the dust removal device body (420) absorbs dust passing through the vibrating screen bed (210) through the air suction port; The furnace raw material preheating system further comprises a powder bin (500), wherein the powder bin (500) is arranged below the raw material screening device (200) and is used to collect and absorb the furnace raw materials that pass through the vibrating screen bed (210); two air suction ports are provided, and the two air suction ports are located between the raw material screening device (200) and the powder bin (500) and are symmetrical about a line connecting the powder bin (500) and the raw material screening device (200).

2. The system for preheating raw materials according to claim 1, characterized in that: The delivery pipeline (120) is provided with a first valve (121), and the first valve (121) can be used to connect or disconnect the hot blast furnace flue gas pipeline (110) and each flue gas pipeline (130).

3. The system for preheating raw materials according to claim 1, characterized in that: The smoke pipeline (130) is provided with at least two smoke injection nozzles (131), and the smoke pipeline (130) injects the smoke through the smoke injection nozzles (131).

4. The system for preheating raw materials according to claim 3, characterized in that: The flue gas pipeline (130) is arranged above the vibrating screen bed (210), and the flue gas pipeline (130) and the vibrating screen bed (210) are arranged at a distance.

5. The system for preheating raw materials according to claim 1, characterized in that: The smoke pipeline (130) is provided with a second valve (132), and the second valve (132) can be used to connect or disconnect the conveying pipeline (120) with each of the smoke pipelines (130); the dust removal suction channel (410) is provided with a third valve (430), and the third valve (430) can be used to connect or disconnect the dust removal device body (420) with the suction port.

6. The system for preheating raw materials according to claim 5, characterized in that: The raw material preheating system for entering the furnace can be switched back and forth between a screening state and a stop state. When the raw material preheating system for entering the furnace is in the screening state, the raw material screening device (200) keeps running to screen the raw materials for entering the furnace located on the vibrating screen bed (210), the second valve (132) connects the conveying pipeline (120) with each of the flue gas pipelines (130), and the third valve (430) connects the dust removal device body (420) with the air suction port; when the raw material preheating system for entering the furnace is in the stop state, the raw material screening device (200) stops running, the second valve (132) disconnects the conveying pipeline (120) with each of the flue gas pipelines (130), and the third valve (430) disconnects the dust removal device body (420) with the air suction port.

7. The system for preheating raw materials according to any one of claims 1 to 6, characterized in that: A flue gas temperature detector (111) is also installed on the hot blast stove flue gas pipeline (110), and the flue gas temperature detector (111) is used to detect the temperature of the flue gas in the hot blast stove flue gas pipeline (110).

8. A method for preheating raw materials entering a furnace, characterized in that: The system for preheating raw materials for furnace according to any one of claims 1 to 7 comprises the following steps: S10: Identifying the type and preheating time of the raw materials entering the furnace, and then starting the raw material screening device (200) and the dust removal module (400); S20: judging whether the blast furnace hot blast furnace is operating normally, if so, proceeding to S30, if not, disconnecting the hot blast furnace flue gas duct (110) and the flue gas pipeline (130), thus terminating the preheating; S30: judging whether the temperature of the flue gas is less than or equal to the first temperature; if so, connecting the hot blast furnace flue gas pipeline (110) and the flue gas pipeline (130) to preheat the raw materials entering the furnace, and then proceeding to S40; if not, disconnecting the hot blast furnace flue gas pipeline (110) and the flue gas pipeline (130) to terminate the preheating; S40: When the preheating time is reached, the hot blast furnace flue gas duct (110) and the flue gas pipeline (130) are disconnected, and the raw material screening device (200) and the dust removal module (400) are closed.

Citation Information