A visual shield tunnel bottom grouting indoor test simulation device and method

By designing a visual indoor test simulation device for grouting at the bottom of a shield tunnel, it simulates the uniform, multi-point, small amount, and multiple grouting processes at the bottom of the shield tunnel. This solves the problem in the existing technology that grouting parameter selection relies on engineering experience, and improves In order to optimize the construction efficiency and grouting process, it also provides test data on the shape of the grout-soil mixture and the strength of the reinforcement.

CN114737981BActive Publication Date: 2024-10-11TONGJI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210414684.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-20
Publication Date
2024-10-11
Estimated Expiration
2042-04-20

AI Technical Summary

Technical Problem

It is difficult for existing tunnel grouting simulation devices to simulate the uniform, multi-point, small amount, and multiple grouting processes at the bottom of a shield tunnel. Moreover, grouting parameter selection mainly relies on engineering experience and on-site monitoring, making it difficult to observe soil reinforcement conditions.

Method used

A visual indoor test simulation device for grouting at the bottom of a shield tunnel is designed, including a model box, a model tunnel and a grouting device. By adjusting the grouting hole position, quantity and tube removal speed, the grouting process at the bottom of the shield tunnel is simulated. Observe the slurry diffusion law and the slurry-soil mixture shape to provide construction reference.

Benefits of technology

It realizes the scientific selection of grouting parameters at the bottom of shield tunnels, improves construction efficiency, optimizes the grouting process, can simulate the uniform, multi-point, small amount, and multiple grouting processes in the micro-perturbation grouting process, and provides grout soil Hybrid morphology and reinforced solid strength test data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114737981B_ABST
    Figure CN114737981B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of shield tunnel grouting, and proposes a visual shield tunnel bottom grouting indoor test simulation device and method. The device adopted by the method includes a model box, a model tunnel, and a grouting device. The present invention reasonably designs a model similar to an actual project, and has all or part of the characteristics of the actual project required for the research. The proposed model can simulate the morphology of the slurry-soil mixture after grouting at the bottom of the shield tunnel under different grouting control parameters, and can also simulate the uniform, multi-point, small amount, and multiple grouting process in the micro-disturbance grouting process, which plays an important role in improving on-site construction efficiency and optimizing the selection of grouting parameters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shield tunnel grouting, and in particular to a visual shield tunnel bottom grouting indoor test simulation device and method. Background Art

[0002] With the rapid development of social economy and production, the construction of urban subway networks has developed rapidly. Due to the complex engineering geological conditions and the influence of nearby construction disturbances, the deformation of tunnel structures has gradually increased. If the horizontal convergence deformation and longitudinal uneven settlement deformation generated during the operation of the tunnel are not promptly and effectively controlled, it will seriously affect the construction and operation safety of the tunnel. At present, the main measure to control the differential settlement deformation of operating subway tunnels is grouting reinforcement, but the determination of grouting parameters and the response of the stratum and structure during the grouting process cannot be observed on site. Therefore, the reasonable design of the tunnel grouting simulation device for grouting mechanism research is important for improving on-site construction efficiency and optimizing the selection of grouting parameters.

[0003] At present, there are mainly the following solutions for tunnel grouting simulation tests:

[0004] The Chinese patent with application number 202120832582.5 proposes a tunnel grouting simulation test device, which belongs to the field of tunnel detection technology. The device includes a grouting component, a slurry storage barrel, a test box and an inclination adjustment component. The slurry is arranged in the slurry storage barrel. The cavity between the liquid surface of the slurry and the top cover of the slurry storage barrel is the pressure chamber of the slurry storage barrel. The grouting component is connected to the pressure chamber at the top of the slurry storage barrel through an air pressure pipe. The slurry outlet at the bottom of the slurry storage barrel is connected to the end of the grouting pipe through a slurry delivery pipeline. The test box is tilted at the top of the inclination adjustment component, and the other end of the grouting pipe is inserted into the test box. The diffusion morphology of cement slurry at different burial angles of grouting pipes in the simulation project, as well as the spatiotemporal variation law of the seepage pressure field during the entire grouting process are detected.

[0005] The Chinese patent with application number 202020108322.9 proposes a test device for simulating grouting of a shield tunnel, including: a test chamber, a cover plate and a pouring system. The test chamber includes a bottom wall and a side wall fixedly connected. The test chamber forms a receiving cavity with an opening at the upper end. Grouting holes are provided on the bottom wall and the side walls for connecting the grouting system with the receiving cavity, thereby simulating the grouting conditions of the shield tunnel in different directions and angles and optimizing the grouting efficiency.

[0006] A Chinese patent with application number 202120466963.6 proposes a multifunctional tunnel seepage erosion and grouting model test device, including a barrel body, a front plate of the barrel body having a water inlet, a first mounting hole for installing a simulated tunnel, a second mounting hole for installing a hub, and a third mounting hole for a water pressure pipe to extend into the barrel body; the hub includes a pipe and a first clamp for clamping the pipe, one end of the pipe has a through hole and extends into the barrel body, a data cable is connected to a detection element in the barrel body through the through hole and the pipe, and the data cable is fixed to the through hole by glue; a pressure gauge is provided on the water pressure pipe.

[0007] At present, the main measure for the recovery of differential settlement deformation of operating tunnels is to open holes directly below or below the bottom of the tunnel for grouting to restore deformation. In order to ensure the normal operation and safety of the tunnel, the requirements for grouting technology are high. It is necessary to minimize the disturbance of the stratum to avoid large deformation of the tunnel after one grouting, which affects the stability of the tunnel line shape, so as to achieve the purpose of controlling tunnel deformation. The main principles of the micro-disturbance grouting reinforcement construction method for subway tunnels are "uniform, multi-point, small amount, and multiple times". Special equipment is used to open and install grouting holes on the bottom of the tunnel. The slurry is injected into the soil under pressure through the grouting core pipe. As the grouting core pipe is vertically lifted in the soil, a vein-like grouting body is formed, which has the effect of filling, compacting and reinforcing the soil under the tunnel, and controls the development of tunnel settlement deformation. However, the current selection of grouting parameters is mainly based on engineering experience and on-site monitoring of deformation. The on-site engineering geological conditions are complex, the tunnel lifting recovery process is unclear, and it is difficult to observe the actual reinforcement of the soil. However, the existing tunnel grouting simulation device rarely considers the simulation of the grouting process at the bottom of the shield tunnel, making it difficult to achieve "uniform, multi-point, small amount, and multiple times" grouting. Summary of the invention

[0008] The purpose of the present invention is to propose a visual indoor test simulation device and method for grouting at the bottom of a shield tunnel, which can perform tunnel bottom grouting for different strata, and simulate the uniform, multi-point, small-volume, and multiple grouting process at the bottom of the shield tunnel by changing grouting parameters such as grouting hole position, number, and pipe pulling speed, so as to obtain the slurry diffusion law and slurry-soil mixture morphology under different grouting parameters, and provide a reference for construction.

[0009] Technical solution of the present invention:

[0010] A visual shield tunnel bottom grouting indoor test simulation device, characterized by comprising a model box, a model tunnel, and a grouting device.

[0011] The model box is formed by assembling and connecting a plurality of model box walls 12; the upper part of the model box is hollow, and a semicircular notch is provided at the junction of the front and rear model box walls of the model box and the right model box wall, and the diameter of the semicircular notch is the same as the outer diameter of the model tunnel; an opening is provided along the semicircular notch on the right model box wall to divide the right model box wall into an upper part and a lower part, and the vertical spacing is smaller than the inner diameter of the model tunnel, so as to facilitate the up and down sliding of the model tunnel during the grouting process;

[0012] The model tunnel is a tunnel semi-structure, which is formed by connecting a plurality of segments, including a segment 14 and a segment support 1, wherein the segment 14 and the segment support 1 are fixedly connected; a grouting hole 2 is provided at the lower part of the segment 14; during grouting, a grouting pipe 3 is inserted into the grouting hole 2, and the grouting pipe 3 is connected to the grouting device through a grouting hose 4;

[0013] The grouting device comprises a grouting tank 9, a stirring device 7, a pressure gauge 5, a valve 11, and a pressure pump connecting pipe 6; the grouting tank 9 is a closed container with a tank cover, and slurry 8 is placed inside; the stirring device 7 is located in the grouting tank 9, and is used to maintain the stability of the slurry and reduce the slurry stratification; the pressure gauge 5 is placed on the tank cover surface of the grouting tank 9, and is used to display the pressure in the grouting tank and adjust the grouting pressure; one end of the pressure pump connecting pipe 6 is connected to the grouting tank 9, and the other end is connected to the pressure pump, and is used to supply pressure to the grouting tank; a slurry outlet is provided on the lower side wall of the grouting device, and the slurry outlet is connected to a grouting hose 4, and the slurry outlet is controlled by a valve 11; the grouting device also includes a platform scale 10, which is placed at the bottom of the grouting tank 9, and is used to weigh the change in slurry mass before and after grouting, so as to obtain the slurry injection amount.

[0014] Furthermore, the model box walls are connected and fixed by angle steel 15 and screws 16.

[0015] Furthermore, the model box walls 12 at the bottom and sides of the model box are made of organic glass, and the thickness is adjusted according to the model size and test conditions, and are used to observe soil layer changes and seepage conditions during the grouting process.

[0016] Furthermore, the upper and lower segments 14 are connected to the segment supports 1 by rivets 16, respectively. According to the symmetry of the tunnel and the deformation characteristics of the entire cross section, the segment supports are arranged to limit the rotation of the semi-structure; the width of the segment supports 1 is smaller than the width of the segment 14, so as to avoid the tunnel settlement deformation process being affected by the segment supports;

[0017] Furthermore, the grouting holes set at the bottom of the model tunnel segment simulate the reserved holes in the actual tunnel. The actual grouting holes of the project are located on both sides of the roadbed. The positions of the grouting holes in the model tunnel correspond to the project. The hole distance is converted using a similarity ratio, and the hole diameter is about 0.5 mm larger than the grouting pipe diameter.

[0018] A visual shield tunnel bottom grouting indoor test simulation method, characterized in that a visual shield tunnel bottom grouting indoor test simulation device is used, and the method comprises the following steps:

[0019] Step 1 Assemble the model box: The model box walls are connected and fixed by angle steel 15 and screws 16. If the model size is large, vertical or horizontal steel ribs can be added to the outside of the model box wall to improve the rigidity of the model box;

[0020] Step 2: Install the model tunnel: The upper and lower segments are connected to the segment supports by rivets, and several segments 14 are connected according to the characteristics of the shield tunnel to assemble the model tunnel; after the model tunnel is completed, it is erected at the semicircular opening of the model box wall; soil is filled into the model box to simulate the real tunnel environment in preparation for the next step of grouting;

[0021] Step 3: Grouting: insert the grouting pipe 3 into the grouting hole 2 set in the model tunnel, connect the upper end of the grouting pipe 3 to the grouting outlet of the grouting tank device through the grouting hose 4, adjust the pressure gauge to a certain grouting pressure, open the valve, and inject the slurry into the soil under pressure. Stop grouting when the value on the scale changes to the designed grouting amount, close the valve, and pull out the grouting pipe.

[0022] Furthermore, in step 2, the segments at both ends of the model tunnel are not connected to the segment supports 1, so as to be installed at the semicircular openings of the model box wall; the segments are connected by screws and PE plastic sheets; the model tunnel is placed from the top of the model box at a certain angle and installed at the semicircular openings of the side walls of the model box.

[0023] Furthermore, the specific process of grouting in step 3 is as follows:

[0024] 3.1 Place the prepared slurry 8 into the grouting tank 9 and record the initial value of the scale 10;

[0025] 3.2 Insert the grouting pipe 3 vertically from top to bottom into the reserved grouting hole 2, record the value of the platform scale 10, adjust the pressure gauge 5 to the designed grouting pressure value, open the valve 11, and start grouting;

[0026] 3.3 Grouting process Control the pulling speed to lift the grouting pipe 3 to simulate the grouting lifting process at the bottom of the tunnel;

[0027] 3.4 During the grouting process, the slurry 8 is kept uniform and stable by the stirring device 7;

[0028] 3.5 After the grouting of a single grouting hole 2 is completed, close the valve 11, record the value of the scale 10, and subtract it from the value before grouting to obtain the grouting mass of the single hole;

[0029] 3.6 According to the designed grouting hole positions, insert the grouting pipe 3 into the preset grouting hole 2 in sequence, repeat the grouting process from step 3.2 to step 3.5, and realize multi-point sequential grouting. The slurry is injected into the soil, squeezed into the gaps between the soil particles, and bonded and solidified to form a solid, that is, a slurry-soil mixture.

[0030] 3.7 After all grouting processes (injecting the designed grouting volume under a certain grouting pressure) are completed, the slurry-soil mixture in the model box is excavated and its shape is observed, which can be used for the reinforcement strength test.

[0031] Compared with the prior art, the present invention has the following beneficial effects:

[0032] The present invention reasonably designs a model similar to the actual project, and has all or part of the characteristics of the actual project required for the research. It can simulate the morphology of the slurry-soil mixture after grouting at the bottom of the shield tunnel under different grouting control parameters, and can also simulate the uniform, multi-point, small amount, and multiple grouting process in the micro-disturbance grouting process, which plays an important role in improving on-site construction efficiency and optimizing the selection of grouting parameters. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 This is a schematic diagram of the grouting work scene at the bottom of the tunnel pipe of the present invention;

[0034] Figure 2 This is a schematic diagram of the grouting model for the bottom of the tunnel pipe of the present invention;

[0035] Figure 3 This is a front view of the grouting model for the bottom of the tunnel pipe of the present invention;

[0036] Figure 4 It is a three-dimensional schematic diagram of the model box of the present invention;

[0037] Reference numerals:

[0038] 1-segment support, 2-grouting hole, 3-grouting pipe, 4-grouting connecting hose,

[0039] 5-pressure gauge, 6-pressure pump connecting pipe, 7-mixing device, 8-slurry, 9-grouting tank, 10-scale, 11-valve, 12-model box wall, 13-screw, 14-segment, 15-angle steel, 16-rivet. DETAILED DESCRIPTION

[0040] The technical solution provided by the present invention will be further described below in conjunction with specific embodiments and the accompanying drawings. The advantages and features of the present invention will become more apparent with reference to the following description.

[0041] In this embodiment, a tunnel semi-structure model is designed according to the tunnel cross-sectional geometry and the structural stress symmetry characteristics. PVC plastic and rivets are used to make sliding bearings to limit the rotational deformation of the tunnel semi-structure, which is consistent with the actual structural stress state. Holes are set at the bottom of the tunnel semi-structure model segments as grouting holes for pre-embedding or inserting grouting pipes. The grouting holes are used to perform tunnel grouting by setting different grouting parameters, and the slurry diffusion law and the slurry-soil mixture morphology under different grouting parameters are observed. This realizes uniform, multi-point, small-volume, and multiple grouting process simulation.

[0042] A visual shield tunnel bottom grouting indoor test simulation device comprises a model box, a model tunnel and a grouting device.

[0043] The model box is formed by assembling and connecting a plurality of model box walls 12; the upper part of the model box is hollow, and a semicircular notch is provided at the junction of the front and rear model box walls of the model box and the right model box wall, and the diameter of the semicircular notch is the same as the outer diameter of the model tunnel; an opening is provided along the semicircular notch on the right model box wall to divide the right model box wall into an upper part and a lower part, and the vertical spacing between the upper and lower parts is smaller than the inner diameter of the model tunnel, so as to facilitate the up and down sliding of the model tunnel during the grouting process. Figure 1 , Figure 4 As shown; further, the model box bottom and side wall 12 is made of plexiglass, the thickness of which is adjusted according to the model size and test conditions, and can be used to observe soil layer changes and seepage conditions during grouting;

[0044] As an embodiment, further, the model box walls are connected and fixed by using angle steel 15 and screws 16.

[0045] The model tunnel is a tunnel semi-structure, which is formed by connecting multiple segments, including segments 14 and segment supports 1; the segments 14 are connected to the segment supports 1 by rivets 16 at the top and bottom, respectively. According to the symmetry of the tunnel and the deformation characteristics of the entire section, the segment supports are set to limit the rotation of the semi-structure, such as Figure 2 As shown; the width of the segment support 1 is smaller than the width of the segment 14, so as to avoid the tunnel settlement deformation process being affected by the segment support; a grouting hole 2 is provided at the lower part of the segment 14; during grouting, a grouting pipe 3 is inserted into the grouting hole 2, and the grouting pipe 3 is connected to the grouting device through a grouting hose 4; further, the grouting holes provided at the bottom of the model tunnel segment simulate the reserved holes of the actual tunnel, the actual grouting holes of the project are located on both sides of the roadbed, the position of the grouting holes of the model tunnel corresponds to the project, the hole position distance is converted using a similarity ratio, and the hole diameter is about 0.5 mm larger than the grouting pipe diameter;

[0046] The grouting device comprises a grouting tank 9, a stirring device 7, a pressure gauge 5, a valve 11, and a pressure pump connecting pipe 6; the grouting tank 9 is a closed container with a tank cover, and slurry 8 is placed inside; the stirring device 7 is located in the grouting tank 9, and is used to maintain the stability of the slurry and reduce the slurry stratification; the pressure gauge 5 is placed on the tank cover surface of the grouting tank 9, and is used to display the pressure in the grouting tank and adjust the grouting pressure; one end of the pressure pump connecting pipe 6 is connected to the grouting tank 9, and the other end is connected to the pressure pump (not marked in the figure), and is used to supply pressure to the grouting tank; a slurry outlet is provided on the lower side wall of the grouting device, and the slurry outlet is connected to a grouting hose 4, and the slurry outlet is controlled by a valve 11; the grouting device also includes a platform scale 10, which is placed at the bottom of the grouting tank 9, and is used to weigh the change in slurry mass before and after grouting, so as to obtain the slurry injection amount.

[0047] A visual shield tunnel bottom grouting indoor test simulation method, using the visual shield tunnel bottom grouting indoor test simulation device, the method comprises the following steps:

[0048] Step 1: Assemble the model box: The bottom and sides of the model box are made of organic glass plates with a thickness of 2 cm (the thickness can be adjusted according to the model size and test conditions). The model box walls are fixed by angle steel and screws. If the model size is large, vertical or horizontal steel ribs can be added to the outside of the model box wall to improve the rigidity of the model box; the model box wall on the right side of the model box is divided into upper and lower parts, and the vertical spacing is less than the inner diameter of the designed model tunnel. It is recommended to be 2 cm smaller than the inner diameter of the model tunnel (1 cm each for the upper and lower parts) to facilitate the up and down sliding of the model tunnel during the grouting process;

[0049] Step 2: Install the model tunnel: The upper and lower segments are connected to the segment supports by rivets, and several segments 14 are connected according to the characteristics of the shield tunnel to assemble the model tunnel; after the model tunnel is completed, it is erected at the semicircular opening of the model box wall; soil is filled into the model box to simulate the real tunnel environment in preparation for the next step of grouting;

[0050] Step 3: Grouting: insert the grouting pipe 3 into the grouting hole 2 set in the model tunnel, connect the upper end of the grouting pipe 3 to the grouting outlet of the grouting tank device through the grouting hose 4, adjust the pressure gauge to a certain grouting pressure, open the valve, and inject the slurry into the soil under pressure. Stop grouting when the value on the scale changes to the designed grouting amount, close the valve, and pull out the grouting pipe.

[0051] In step 2, the segments at both ends of the model tunnel are not connected to the segment support 1, so as to facilitate installation at the semicircular opening of the model box wall. As an embodiment, the segments are connected by screws and PE plastic sheets. Because the model tunnel is a spliced ​​structure, the longitudinal stiffness is reduced and it is easy to deform. In the actual experiment, the model tunnel is placed in from the top of the model box at a certain angle and installed at the semicircular opening of the side wall of the model box.

[0052] The specific process of grouting in step 3 is as follows:

[0053] 3.1 Place the prepared slurry 8 into the grouting tank 9 and record the initial value of the scale 10;

[0054] 3.2 Insert the grouting pipe 3 vertically from top to bottom into the reserved grouting hole 2, record the value of the platform scale 10, adjust the pressure gauge 5 to the designed grouting pressure value, open the valve 11, and start grouting;

[0055] 3.3 Grouting process Control the pulling speed to lift the grouting pipe 3 to simulate the grouting lifting process at the bottom of the tunnel;

[0056] 3.4 During the grouting process, the slurry 8 is kept uniform and stable by the stirring device 7;

[0057] 3.5 After the grouting of a single grouting hole 2 is completed, close the valve 11, record the value of the scale 10, and subtract it from the value before grouting to obtain the grouting mass of the single hole;

[0058] 3.6 According to the designed grouting hole positions, insert the grouting pipe 3 into the preset grouting hole 2 in sequence, and repeat the grouting process from step 3.2 to step 3.5 to achieve multi-point sequential grouting. The slurry is injected into the soil, squeezed into the gaps between the soil particles, and bonded and solidified to form a solid, i.e., a slurry-soil mixture;

[0059] 3.7 After all grouting processes (injecting the designed grouting volume under a certain grouting pressure) are completed, the slurry-soil mixture in the model box is excavated and its shape is observed, and it can be used for the strength test of the reinforced body.

[0060] The device described in the present invention is mainly used for indoor test simulation of grouting at the bottom of a shield tunnel and does not involve the invention of a monitoring device. If soil pressure and pore water pressure are to be monitored, soil pressure boxes and pore pressure gauges can be placed at corresponding positions inside the soil. Displacement meters, micrometers, etc. can be used to monitor tunnel deformation. For semi-structures and plexiglass box walls, photogrammetry methods such as DIC can be used to obtain the overall displacement and strain of the structure.

[0061] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by any person skilled in the art based on the above disclosed technical contents shall be regarded as equivalent effective embodiments and shall fall within the scope of protection of the technical solution of the present invention.

Claims

1. A visual indoor test simulation method for grouting at the bottom of a shield tunnel. It is characterized in that The method is implemented by using a visual shield tunnel bottom grouting indoor test simulation device, which includes a model box, a model tunnel, and a grouting device, wherein: The model box is formed by assembling and connecting a plurality of model box walls (12); the upper part of the model box is hollow; a semicircular notch is provided at the junction of the front and rear model box walls of the model box and the right model box wall; the diameter of the semicircular notch is the same as the outer diameter of the model tunnel; an opening is provided along the semicircular notch on the right model box wall to divide the right model box wall into an upper part and a lower part; the vertical spacing is smaller than the inner diameter of the model tunnel, so as to facilitate the up and down sliding of the model tunnel during the grouting process; The model tunnel is a tunnel semi-structure, formed by connecting a plurality of pipe segments, including pipe segments (14) and pipe segment supports (1), wherein the pipe segments (14) and the pipe segment supports (1) are fixedly connected; a grouting hole (2) is provided at the lower portion of the pipe segment (14); during grouting, a grouting pipe (3) is inserted into the grouting hole (2), and the grouting pipe (3) is connected to a grouting device via a grouting hose (4); according to the symmetry of the tunnel and the deformation characteristics of the entire cross section, the pipe segment supports are provided to limit the rotation of the semi-structure; the width of the pipe segment supports (1) is smaller than the width of the pipe segment (14), so as to prevent the tunnel settlement deformation process from being affected by the pipe segment supports; The grouting device comprises a grouting tank (9), a stirring device (7), a pressure gauge (5), a valve (11), and a pressure pump connecting pipe (6); the grouting tank (9) is a closed container with a tank cover, and slurry (8) is placed inside; the stirring device (7) is located inside the grouting tank (9); the pressure gauge (5) is placed on the surface of the tank cover of the grouting tank (9), and is used to display the pressure inside the grouting tank and adjust the grouting pressure; one end of the pressure pump connecting pipe (6) is connected to the grouting tank (9), and the other end is connected to the pressure pump, and is used to supply pressure to the grouting tank; a slurry outlet is provided on the lower side wall of the grouting device, and the slurry outlet is connected to a grouting hose (4), and the slurry outlet is controlled by the valve (11); the grouting device also comprises a platform scale (10), which is placed at the bottom of the grouting tank (9) and is used to weigh the weight change of the slurry before and after grouting to obtain the slurry injection amount; The method comprises the following steps: Step 1: Assemble the model box: The walls of the model box are connected and fixed by angle steel (15) and screws (16), and vertical or horizontal steel ribs are added to the outside of the model box wall to improve the rigidity of the model box; Step 2 Install the model tunnel: The upper and lower segments are connected to the segment supports by rivets respectively. According to the characteristics of the tunnel, several segments (14) are connected to assemble the model tunnel, wherein the segments at both ends of the model tunnel are not connected to the segment supports (1) to facilitate installation at the semicircular opening of the model box wall; the segments are connected by screws and PE plastic sheets; after the model tunnel is completed, it is placed in the model box at an inclined angle from the top and installed at the semicircular opening of the model box wall; soil is filled into the model box to simulate the real tunnel environment in preparation for the next step of grouting; Step 3 Grouting: Insert the grouting pipe (3) into the grouting hole (2) set in the model tunnel. The upper end of the grouting pipe (3) is connected to the grouting outlet of the grouting tank device through the grouting hose (4). Adjust the pressure gauge to the grouting pressure, open the valve, and inject the slurry into the soil under pressure. When the value on the scale changes to the designed grouting amount, stop grouting, close the valve, and pull out the grouting pipe.

2. The visual shield tunnel bottom grouting indoor test simulation method as claimed in claim 1, It is characterized in that The visual shield tunnel bottom grouting indoor test simulation device has a model box bottom and a model box wall (12) on the side thereof made of organic glass, and the thickness is adjusted according to the model size and test conditions.

3. The visual shield tunnel bottom grouting indoor test simulation method as claimed in claim 1, It is characterized in that The visualized shield tunnel bottom grouting indoor test simulation device has grouting holes arranged at the bottom of the model tunnel segment simulating the reserved holes in the actual tunnel. The actual grouting holes of the project are located on both sides of the roadbed. The positions of the grouting holes in the model tunnel correspond to those of the project. The hole position distance is calculated using a similarity ratio, and the hole diameter is 0.5 mm larger than the grouting pipe diameter.

4. The visual shield tunnel bottom grouting indoor test simulation method as claimed in claim 1, It is characterized in that The specific process of grouting in step 3 is as follows: 3.1 Place the prepared slurry (8) into the grouting tank (9) and record the initial value of the scale (10); 3.2 Insert the grouting pipe (3) vertically from top to bottom into the reserved grouting hole (2), record the value on the scale (10), adjust the pressure gauge (5) to the designed grouting pressure value, open the valve (11), and start grouting; 3.3 Grouting process Control the pulling speed and lift the grouting pipe (3) to simulate the grouting lifting process at the bottom of the tunnel; 3.4 During the grouting process, the slurry (8) is kept uniform and stable by using a stirring device (7); 3.5 After grouting of a single grouting hole (2) is completed, close the valve (11), record the value on the scale (10), and subtract it from the value before grouting to obtain the grouting weight of the single hole; 3.6 According to the designed grouting hole positions, the grouting pipe (3) is inserted into the preset grouting holes (2) in sequence, and the grouting process from step 3.2 to step 3.5 is repeated to achieve multi-point sequential grouting; the slurry is injected into the soil, squeezed into the gaps between the soil particles, and bonded and solidified to form a solid, i.e., a slurry-soil mixture; 3.7 After all grouting processes are completed, the slurry-soil mixture in the model box is excavated, its shape is observed, and it is used for the reinforcement strength test.