A main chute structure layout and method for multiple middle mining areas in a metal mine
By designing the main chute structure of the multi-middle mining area in the metal mine, including a straight chute, an inclined chute and an arc gate funnel, the problems of inconvenient maintenance of the traditional main chute grid screen and temporary ore storage are solved, and the continuous use and production of the chute are realized. Adjustment reduces construction risks and production impact.
Patent Information
- Application Number
- CN202111497264.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-09
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-12-09
AI Technical Summary
The main chute screen of traditional metal mines is inconvenient to maintain and cannot temporarily store ore, which results in unfavorable production organization. Especially when the first middle section chute entrance grate screen is repaired, the main chute must stop operation, affecting production.
A multi-middle section main chute structure in the mining area is designed, including the first middle section straight chute, the second middle section straight chute and the third middle section straight chute. An inclined chute and an arc-shaped gate funnel are installed, and the arc shape is realized through a hydraulic push rod and auxiliary mechanism. The rapid disassembly and pre-fixing of the gate funnel ensures the independence of ore loading and temporary ore storage capacity of each middle section.
By setting up a multi-intermediate chute structure and auxiliary mechanisms, the difficulty and risk of construction are reduced, the continuous use of the main chute and the individual control of sections are realized, which facilitates maintenance and production adjustment, and ensures the normal operation of production.
Smart Images

Figure CN114738045B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of metal mine mining, in particular to a main chute structure arrangement and method for multiple middle mining areas of a metal mine. Background Art
[0002] Metal ore generally refers to minerals from which metal elements can be extracted after smelting. A chute refers to a tunnel that uses its own weight to slide ore from top to bottom. It is widely used in mines developed by horizontal or vertical shafts. There are two types of chutes commonly referred to: one is for transferring ore or waste rock from the upper stage to the lower stage or lower ore bin, serving one or more stages, called the main chute, which belongs to the auxiliary development tunnel; the other is for transferring ore within the mining area to the stage transportation tunnel.
[0003] In the traditional chute layout, the construction of the inclined chute is difficult, and the reverse construction is usually adopted during the construction of the main chute using the working disk. The working environment is harsh, the safety risk is high, and the specification and quality control are difficult. The gratings at each mine opening are subjected to a large amount of ore smashing and grinding for a long time, and blasting and crushing of large pieces are often carried out here, which is a high-incidence position for wear, desoldering, and damage. When any grating of a main chute needs to be repaired, the grating is usually repaired by filling the slag to the horizontal position of the grating. Then the main chute must stop operating, which has a great impact on production, especially the maintenance of the grating at the first middle section of the chute. The three middle sections of the main chute are mining at the same time, and the third middle section is often full of ore and cannot be discharged. If the ore accumulates in the chute to the level of the second middle section, the second middle section will also be unable to mine. In actual mining production, it is very unfavorable to the production organization of each level of the middle section of the mine, and the main chute cannot achieve the function of temporary ore storage. Summary of the invention
[0004] The purpose of the present invention is to provide a main chute structure layout and method for multiple middle mining areas of a metal mine in order to solve the problem that the existing main chute screens of mines are inconvenient to repair and cannot be used for temporary ore storage.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solution: a main chute structure arrangement and method for multiple middle mining areas in a metal mine, comprising:
[0006] The first middle section of the straight chute;
[0007] A second middle section straight chute, wherein the second middle section straight chute is arranged at the bottom end of the first middle section straight chute, and the second middle section straight chute is communicated with the discharge port of the first middle section straight chute, and an inclined chute is arranged at a corner of the second middle section straight chute, and both ends of the inclined chute penetrate into the interior of the second middle section straight chute;
[0008] A funnel retaining wall, the funnel retaining wall is installed inside the second middle section straight chute and is located on one side of the first middle section straight chute discharge port, a second connecting seat is installed on one side of the funnel retaining wall, an arc gate funnel is rotatably connected to the inner side of the second connecting seat, a connecting rod is fixedly connected to the outer wall of the arc gate funnel, a hydraulic push rod is rotatably connected to the outer wall of the connecting rod, and one end of the hydraulic push rod is rotatably connected to the first connecting seat;
[0009] A third middle section straight chute, wherein the third middle section straight chute is arranged at the bottom end of the second middle section straight chute, and the third middle section straight chute is communicated with a discharge port of the second middle section straight chute;
[0010] A grating screen, the grating screen being installed at the feed inlet of the first middle section straight chute;
[0011] Auxiliary mechanism, the auxiliary mechanism is distributed on the inner wall of the funnel retaining wall and one side of the second connecting seat and the first connecting seat, and is used to quickly disassemble and assemble the arc gate funnel from the funnel retaining wall.
[0012] As a further solution of the present invention: the auxiliary mechanism includes a first trapezoidal block, a second trapezoidal block, a rotating rod, a first ball rod, a first telescopic rod, a first bevel gear, a second bevel gear, a connecting rod, a third bevel gear, a first screw rod, a second telescopic rod, a second screw rod, a fourth bevel gear, a fifth bevel gear and a second ball rod. The first trapezoidal block is arranged on one side of the second connecting seat, and the second trapezoidal block is arranged on one side of the first connecting seat. The first screw rod is rotatably connected to the inner wall of the funnel retaining wall, the first telescopic rod is slidably connected to the inner wall of the funnel retaining wall and is sleeved on the outer wall of the first screw rod. The first ball rod is fixedly connected to the bottom end of the first telescopic rod. The third bevel gear is sleeved on the outer wall of the first screw rod and is located above the first telescopic rod. The rotating rod is rotatably connected to the inner wall of the funnel retaining wall. On the inner wall of the funnel retaining wall, and one end passes through the outer wall of one side of the funnel retaining wall, the first bevel gear is fixedly connected to one end of the rotating rod and meshed with the third bevel gear, the connecting rod is rotatably connected to the inner wall of the funnel retaining wall, and is located at both ends of the third bevel gear, the second bevel gear is fixedly connected to one end of the connecting rod, the second screw rod is fixedly connected to the other end of the connecting rod, the second screw rod is rotatably connected to the inner wall of the funnel retaining wall, and is located at the other end of the connecting rod, the fifth bevel gear is sleeved on the outer wall of the second screw rod, and meshed with the fourth bevel gear, the second telescopic rod is slidably connected to the inner wall of the funnel retaining wall, and is sleeved on the outer wall of the second screw rod, and the second ball rod is fixedly connected to the bottom end of the second telescopic rod.
[0013] As a further solution of the present invention: the output end and the bottom end of the hydraulic push rod are respectively rotatably connected with a rotating seat, the output end of the hydraulic push rod is fixedly connected to the connecting rod through the rotating seat, and the bottom end of the hydraulic push rod is fixedly connected to the first connecting seat through the rotating seat.
[0014] As a further solution of the present invention: one end of the first trapezoidal block and the second trapezoidal block are respectively fixedly connected with bolts, the first trapezoidal block is rotatably connected to the second connecting seat through one end bolt, and the second trapezoidal block is rotatably connected to the first connecting seat through one end bolt.
[0015] As a further solution of the present invention: the inner wall of the funnel retaining wall is provided with a mounting groove matching the first trapezoidal block and the second trapezoidal block, the top inner wall of the first trapezoidal block is provided with a fixing hole matching the second ball rod, the top inner wall of the second trapezoidal block is provided with a fixing hole matching the first ball rod, and one end of the first ball rod and the second telescopic rod respectively penetrate into a group of the mounting grooves.
[0016] As a further solution of the present invention: the outer walls of the first ball rod and the second telescopic rod are respectively provided with springs, one end of the spring on the outer wall of the first ball rod is fixedly connected to the bottom end of the first telescopic rod, and the other end is fixedly connected to the funnel retaining wall, one end of the spring on the outer wall of the second telescopic rod is fixedly connected to the outer wall at the top end of the second telescopic rod, and the other end is fixedly connected to the funnel retaining wall.
[0017] As a further solution of the present invention: the second telescopic rod and the top end of the first telescopic rod are fixedly connected with a threaded sleeve, the second telescopic rod is sleeved on the outer wall of the second screw rod through the top threaded sleeve, the first telescopic rod is sleeved on the outer wall of the first screw rod through the top threaded sleeve, the first telescopic rod and the second telescopic rod are hollow structures inside, the diameter of the hollow structure inside the first telescopic rod is larger than that of the first screw rod, and the diameter of the hollow structure inside the second telescopic rod is larger than that of the second screw rod.
[0018] As a further solution of the present invention: the first screw rod, the second screw rod and the outer wall of the connecting rod are fixedly connected with a bearing sleeve, and the first screw rod, the second screw rod and the connecting rod are rotatably connected to the funnel retaining wall through the outer wall bearing sleeve.
[0019] A main chute method for multiple middle mining areas in a metal mine comprises the following steps:
[0020] S1. First, the middle section of the main chute is divided into three parts: the first middle section straight chute, the second middle section straight chute and the third middle section straight chute. The ore level division is determined in the design stage according to the mining method and ore body distribution. The first middle section straight chute, the second middle section straight chute and the third middle section straight chute are constructed in sections. Usually, each section is constructed by the reverse drilling method, and then expanded from top to bottom to form the main chute specifications;
[0021] S2, then install a grating screen at each lower mine opening of the first middle section straight chute, the second middle section straight chute and the third middle section straight chute, then determine the size of the arc gate funnel for ore discharge according to the designed size of the grating screen, determine the support strength of the arc gate funnel and the funnel retaining wall according to the surrounding rock conditions, construct an inclined chute in the second middle section straight chute and the third middle section straight chute, and install the arc gate funnel and the funnel retaining wall for ore discharge inside;
[0022] S3. When it is necessary to assemble the arc gate funnel and the funnel retaining wall, rotate the first trapezoidal block and the second trapezoidal block respectively, install the first trapezoidal block to one side of the second connecting seat, install the second trapezoidal block to one side of the first connecting seat, and then install the arc gate funnel and the funnel retaining wall, so that the first trapezoidal block and the second trapezoidal block are respectively inserted into the mounting groove of the inner wall of the funnel retaining wall. When the first trapezoidal block contacts the second ball rod, the second ball rod is pushed to squeeze the second telescopic rod and move upward. When the second trapezoidal block contacts the first ball rod, the first ball rod is pushed to squeeze the first telescopic rod and move upward. When the first trapezoidal block and the second trapezoidal block are fully inserted into the mounting groove of the inner wall of the funnel retaining wall, the top of the first trapezoidal block and the second trapezoidal block are The fixing holes provided in the inner wall are respectively located below the second ball rod and the first ball rod, so that the second ball rod and the first ball rod are no longer reset by external squeezing force, the second ball rod is reset and inserted into the fixing hole of the inner wall of the first trapezoidal block, and the first ball rod is reset and inserted into the fixing hole of the inner wall of the second trapezoidal block, so that the first connecting seat and the second connecting seat are fixed to the outer wall of one side of the funnel retaining wall, thereby realizing the function of pre-fixing the first connecting seat and the second connecting seat to the funnel retaining wall, so as to facilitate the staff to quickly fix the first connecting seat and the second connecting seat to the funnel retaining wall by bolts, thereby fixing the outer wall of one side of the arc gate funnel, and realizing the function of quick installation of the arc gate funnel and the funnel retaining wall through the cooperation of the above multiple groups of parts;
[0023] S4. When the arc gate funnel and the funnel retaining wall need to be disassembled and assembled, the rotating rod drives the first bevel gear to drive the third bevel gear to rotate, thereby driving the first screw rod to drive the first telescopic rod to drive the first ball rod to move upward, and the first ball rod is pulled out of the fixing hole on the inner wall of the second trapezoidal block, so that the second trapezoidal block is no longer fixed to the funnel retaining wall. While the third bevel gear rotates, it drives the two sets of second bevel gears to rotate synchronously, thereby driving the fourth bevel gear to rotate through a set of connecting rods respectively, and the fourth bevel gear rotates to drive the fifth bevel gear to drive the second screw rod to rotate, driving the second telescopic rod to drive the second ball rod to move upward, so that the second ball rod is pulled out of the fixing hole on the inner wall of the first trapezoidal block, so that the first trapezoidal block is no longer fixed to the funnel retaining wall, so that the staff can disassemble the first connecting seat and the second connecting seat from the funnel retaining wall conveniently. The cooperation of the above multiple sets of parts realizes the function of quick disassembly of the first connecting seat and the second connecting seat, so that the staff can quickly disassemble the arc gate funnel from the funnel retaining wall conveniently.
[0024] S5. When the staff needs to repair the sieve at the mine entrance of the first middle section straight chute, the hydraulic push rod inside the second middle section straight chute is started to push the arc gate funnel to close, thereby filling the first middle section straight chute and the second middle section straight chute with ore, and the sieve at the mine entrance of the first middle section straight chute can be repaired, while the normal mining of the second middle section straight chute and the third middle section straight chute is not affected, thereby ensuring production.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] 1. By setting up the first middle section straight chute, the second middle section straight chute, the third middle section straight chute, the inclined chute, the arc gate funnel and the funnel retaining wall, the mine unloading in each middle section of the mine main chute is relatively independent and has a certain temporary ore storage and adjustment capacity, so as to optimize the production organization and achieve the effect of not losing all the functions of the main chute during maintenance;
[0027] 2. By setting up an auxiliary mechanism, the first trapezoidal block and the second trapezoidal block are rotated respectively, the first trapezoidal block is installed on one side of the second connecting seat, and the second trapezoidal block is installed on one side of the first connecting seat, and then the arc gate funnel and the funnel retaining wall are installed, so that the first trapezoidal block and the second trapezoidal block are respectively inserted into the mounting groove of the inner wall of the funnel retaining wall, the second ball rod is inserted into the fixing hole of the inner wall of the first trapezoidal block, and the first ball rod is inserted into the fixing hole of the inner wall of the second trapezoidal block, so that the first connecting seat and the second connecting seat are fixed to the outer wall of one side of the funnel retaining wall, thereby realizing the function of pre-fixing the first connecting seat and the second connecting seat to the funnel retaining wall, so as to facilitate the staff to quickly fix the first connecting seat and the second connecting seat to the funnel retaining wall by bolts, thereby fixing the outer wall of one side of the arc gate funnel, and realizing the function of quick installation of the arc gate funnel and the funnel retaining wall through the cooperation of the above multiple groups of parts. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural schematic diagram of the present invention;
[0029] Figure 2 It is a schematic diagram of the structure of the first middle section straight chute and the second middle section straight chute of the present invention;
[0030] Figure 3 It is a schematic diagram of the structure of the arc gate funnel and the funnel retaining wall of the present invention;
[0031] Figure 4 For the present invention Figure 3 Enlarged view of point A in the middle;
[0032] Figure 5 It is a cross-sectional view of the funnel retaining wall of the present invention;
[0033] Figure 6 For the present invention Figure 5 Enlarged view of point B in the middle;
[0034] Figure 7 For the present invention Figure 5 Enlarged view of point C in the middle;
[0035] Figure 8 It is a schematic diagram of the traditional main chute layout of the present invention.
[0036] In the figure: 1, first middle section straight chute; 2, grid screen; 3, arc gate funnel; 4, funnel retaining wall; 5, second middle section straight chute; 6, inclined chute; 7, third middle section straight chute; 8, connecting rod; 9, hydraulic push rod; 10, first connecting seat; 11, second connecting seat; 12, auxiliary mechanism; 1201, first trapezoidal block; 1202, second trapezoidal block; 1203, rotating rod; 1204, first ball rod; 1205, first telescopic rod; 1206, first bevel gear; 1207, second bevel gear; 1208, connecting rod; 1209, third bevel gear; 1210, first screw rod; 1211, second telescopic rod; 1212, second screw rod; 1213, fourth bevel gear; 1214, fifth bevel gear; 1215, second ball rod. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal connection of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. The following is an explanation of an embodiment of the present invention based on the overall structure of the present invention.
[0039] See also Figures 1 to 8 In an embodiment of the present invention, a main chute structure arrangement and method for multiple middle mining areas in a metal mine includes:
[0040] The first middle section straight chute 1;
[0041] A second middle section straight chute 5, which is arranged at the bottom end of the first middle section straight chute 1, and the second middle section straight chute 5 is communicated with the discharge port of the first middle section straight chute 1, and an inclined chute 6 is arranged at the corner of the second middle section straight chute 5, and both ends of the inclined chute 6 penetrate into the interior of the second middle section straight chute 5;
[0042] The funnel retaining wall 4 is installed inside the second middle section straight chute 5 and is located on one side of the discharge port of the first middle section straight chute 1. A second connecting seat 11 is installed on one side of the funnel retaining wall 4. The inner side of the second connecting seat 11 is rotatably connected to the arc gate funnel 3. The outer wall of the arc gate funnel 3 is fixedly connected to a connecting rod 8. The outer wall of the connecting rod 8 is rotatably connected to a hydraulic push rod 9. One end of the hydraulic push rod 9 is rotatably connected to the first connecting seat 10.
[0043] The third middle section straight chute 7 is arranged at the bottom end of the second middle section straight chute 5, and the third middle section straight chute 7 is communicated with the discharge port of the second middle section straight chute 5;
[0044] A grating 2, which is installed at the feed inlet of the first middle section straight chute 1;
[0045] The auxiliary mechanism 12 is distributed on the inner wall of the funnel retaining wall 4 and one side of the second connecting seat 11 and the first connecting seat 10 , and is used to quickly disassemble and assemble the arc gate funnel 3 from the funnel retaining wall 4 .
[0046] In this embodiment: by changing the existing inclined branch chute into an inclined chute 6, the construction difficulty and construction risk are greatly reduced during the construction process. By using the funnel retaining wall 4 and the arc gate funnel 3 for ore discharge in each middle section, the main chute can be used continuously and can be controlled separately in sections, which greatly facilitates production deployment and adjustment in production organization. In the traditional arrangement, once the main chute is blocked, it is difficult to determine the blockage position because of the large height of the main chute, and it is even more difficult to deal with the blockage, especially when the inclined branch chute is blocked, it takes a lot of time to detect, drill and blast. However, since the chutes at each stage are relatively independent, it is easy to find out the blockage position when any section is blocked, and the treatment does not affect the use of the chute at the next stage. The gate funnel mouth of each middle section is the best observation window and the best drilling and blasting treatment position. In the present invention, each middle section is independently managed. By opening and closing the arc gate funnel 3 of each middle section, the corresponding ore storage volume is retained in each section of the chute. When multiple middle sections are ore discharged at the same time, temporary ore storage can be used, which is conducive to coordinated production.
[0047] Please refer to Figures 3 to 7The auxiliary mechanism 12 includes a first trapezoidal block 1201, a second trapezoidal block 1202, a rotating rod 1203, a first ball rod 1204, a first telescopic rod 1205, a first bevel gear 1206, a second bevel gear 1207, a connecting rod 1208, a third bevel gear 1209, a first screw rod 1210, a second telescopic rod 1211, a second screw rod 1212, a fourth bevel gear 1213, a fifth bevel gear 1214 and a second ball rod 1215, and the first trapezoidal block 1 201 is arranged on one side of the second connecting seat 11, the second trapezoidal block 1202 is arranged on one side of the first connecting seat 10, the first screw rod 1210 is rotatably connected to the inner wall of the funnel retaining wall 4, the first telescopic rod 1205 is slidably connected to the inner wall of the funnel retaining wall 4, and is sleeved on the outer wall of the first screw rod 1210, the first ball rod 1204 is fixedly connected to the bottom end of the first telescopic rod 1205, the third bevel gear 1209 is sleeved on the outer wall of the first screw rod 1210, and is located at the first telescopic rod 1 205, the rotating rod 1203 is rotatably connected to the inner wall of the funnel retaining wall 4, and one end thereof penetrates to the outer wall of one side of the funnel retaining wall 4, the first bevel gear 1206 is fixedly connected to one end of the rotating rod 1203, and is meshed with the third bevel gear 1209, the connecting rod 1208 is rotatably connected to the inner wall of the funnel retaining wall 4, and is located at both ends of the third bevel gear 1209, the second bevel gear 1207 is fixedly connected to one end of the connecting rod 1208, and the second screw rod 1212 is fixedly connected to the inner wall of the funnel retaining wall 4. Fixedly connected to the other end of the connecting rod 1208, the second screw rod 1212 is rotatably connected to the inner wall of the funnel retaining wall 4 and is located at the other end of the connecting rod 1208, the fifth bevel gear 1214 is sleeved on the outer wall of the second screw rod 1212 and is meshed with the fourth bevel gear 1213, the second telescopic rod 1211 is slidably connected to the inner wall of the funnel retaining wall 4 and sleeved on the outer wall of the second screw rod 1212, and the second ball rod 1215 is fixedly connected to the bottom end of the second telescopic rod 1211.
[0048] In this embodiment, when the arc gate funnel 3 and the funnel retaining wall 4 need to be assembled, the first trapezoidal block 1201 and the second trapezoidal block 1202 are rotated respectively, the first trapezoidal block 1201 is installed on one side of the second connecting seat 11, and the second trapezoidal block 1202 is installed on one side of the first connecting seat 10, and then the arc gate funnel 3 and the funnel retaining wall 4 are installed, so that the first trapezoidal block 1201 and the second trapezoidal block 1202 are respectively inserted into the funnel. When the first trapezoidal block 1201 contacts the second ball rod 1215, the second ball rod 1215 is pushed to squeeze the second telescopic rod 1211 and move upward. When the second trapezoidal block 1202 contacts the first ball rod 1204, the first ball rod 1204 is pushed to squeeze the first telescopic rod 1205 and move upward. When the first trapezoidal block 1201 and the second trapezoidal block 1202 are fully inserted into the inner wall mounting groove of the funnel retaining wall 4, the first trapezoidal block 1202 is pushed to squeeze the first telescopic rod 1205 and move upward. The fixing holes opened on the inner walls of the top ends of the block 1201 and the second trapezoidal block 1202 are respectively located below the second ball rod 1215 and the first ball rod 1204, so that the second ball rod 1215 and the first ball rod 1204 are no longer reset by external squeezing force, and the second ball rod 1215 is reset and inserted into the fixing hole of the inner wall of the first trapezoidal block 1201, and the first ball rod 1204 is reset and inserted into the fixing hole of the inner wall of the second trapezoidal block 1202, thereby fixing the first connecting seat 10 and the second connecting seat 11 to the outer wall of one side of the funnel retaining wall 4, thereby realizing the function of pre-fixing the first connecting seat 10 and the second connecting seat 11 to the funnel retaining wall 4, so as to facilitate the staff to quickly fix the first connecting seat 10 and the second connecting seat 11 to the funnel retaining wall 4 by bolts, thereby fixing the outer wall of one side of the arc gate funnel 3, and realizing the function of quickly installing the arc gate funnel 3 and the funnel retaining wall 4 through the cooperation of the above multiple groups of parts;When the arc gate funnel 3 and the funnel retaining wall 4 need to be disassembled and assembled, the rotating rod 1203 is rotated to drive the first bevel gear 1206 to drive the third bevel gear 1209 to rotate, thereby driving the first screw rod 1210 to drive the first telescopic rod 1205 to drive the first ball rod 1204 to move upward, and the first ball rod 1204 is pulled out from the fixing hole on the inner wall of the second trapezoidal block 1202, so that the second trapezoidal block 1202 is no longer fixed to the funnel retaining wall 4, and the third bevel gear 1209 rotates while driving the two groups of second bevel gears 1207 to rotate synchronously, thereby driving the fourth bevel gear 1213 to rotate through a group of connecting rods 1208 respectively, and the fourth bevel gear 1213 rotates to drive the fifth bevel gear 121 4 drives the second screw rod 1212 to rotate, drives the second telescopic rod 1211 to drive the second ball rod 1215 to move upward, so that the second ball rod 1215 is pulled out from the fixing hole on the inner wall of the first trapezoidal block 1201, so that the first trapezoidal block 1201 is no longer fixed to the funnel retaining wall 4, which is convenient for the staff to disassemble the first connecting seat 10 and the second connecting seat 11 from the funnel retaining wall 4. The cooperation of the above multiple groups of parts realizes the function of quickly disassembling the first connecting seat 10 and the second connecting seat 11, so that it is convenient for the staff to quickly disassemble the arc gate funnel 3 from the funnel retaining wall 4; the cooperation of the above multiple groups of parts realizes the function of quickly disassembling and assembling the arc gate funnel 3 from the funnel retaining wall 4. ;
[0049] Please refer to Figure 2 The output end and the bottom end of the hydraulic push rod 9 are rotatably connected with a rotating seat respectively. The output end of the hydraulic push rod 9 is fixedly connected to the connecting rod 8 through the rotating seat, and the bottom end of the hydraulic push rod 9 is fixedly connected to the first connecting seat 10 through the rotating seat.
[0050] In this embodiment, the output end of the hydraulic push rod 9 is extended and retracted, and the arc gate funnel 3 is driven by the connecting rod 8 to realize the switch function, and the hydraulic push rod 9 is convenient for rotation through two sets of rotating seats.
[0051] Please refer to Figure 4 One end of the first trapezoidal block 1201 and the second trapezoidal block 1202 are respectively fixedly connected with bolts. The first trapezoidal block 1201 is rotatably connected to the second connecting seat 11 through one end bolt, and the second trapezoidal block 1202 is rotatably connected to the first connecting seat 10 through one end bolt.
[0052] In this embodiment: the staff can use the bolts that fix the first trapezoidal block 1201 and one end of the second trapezoidal block 1202 to quickly install the first trapezoidal block 1201 on the second connecting seat 11 and quickly install the second trapezoidal block 1202 on the first connecting seat 10.
[0053] Please refer to Figure 4 and Figure 6The inner wall of the funnel retaining wall 4 is provided with mounting grooves matching the first trapezoidal block 1201 and the second trapezoidal block 1202, the top inner wall of the first trapezoidal block 1201 is provided with a fixing hole matching the second ball rod 1215, the top inner wall of the second trapezoidal block 1202 is provided with a fixing hole matching the first ball rod 1204, and one end of the first ball rod 1204 and the second telescopic rod 1211 respectively penetrate into a group of mounting grooves.
[0054] In this embodiment: the first trapezoidal block 1201 and the second trapezoidal block 1202 are respectively inserted into the mounting grooves of the inner wall of the funnel retaining wall 4, and the first ball rod 1204 is inserted into the fixing hole of the inner wall of the second trapezoidal block 1202 to fix the second trapezoidal block 1202 to the funnel retaining wall 4, and the second ball rod 1215 is inserted into the fixing hole of the inner wall of the first trapezoidal block 1201 to fix the first trapezoidal block 1201 to the funnel retaining wall 4.
[0055] Please refer to Figure 4 and Figure 6 The outer walls of the first ball rod 1204 and the second telescopic rod 1211 are respectively provided with springs, one end of the spring on the outer wall of the first ball rod 1204 is fixedly connected to the bottom end of the first telescopic rod 1205, and the other end is fixedly connected to the funnel retaining wall 4, one end of the spring on the outer wall of the second telescopic rod 1211 is fixedly connected to the outer wall at the top end of the second telescopic rod 1211, and the other end is fixedly connected to the funnel retaining wall 4.
[0056] In this embodiment: when the first trapezoidal block 1201 contacts the second ball rod 1215, the second ball rod 1215 is pushed to squeeze the spring to push the second telescopic rod 1211 to move upward; when the second trapezoidal block 1202 contacts the first ball rod 1204, the first ball rod 1204 is pushed to squeeze the spring to push the first telescopic rod 1205 to move upward; when the first trapezoidal block 1201 and the second trapezoidal block 1202 are fully inserted into the mounting groove of the inner wall of the funnel retaining wall 4, the fixing holes opened on the inner walls of the top ends of the first trapezoidal block 1201 and the second trapezoidal block 1202 are respectively located below the second ball rod 1215 and the first ball rod 1204, so that the second ball rod 1215 and the first ball rod 1204 are no longer subjected to external squeezing force for reset; the second ball rod 1215 is reset and inserted into the fixing hole of the inner wall of the first trapezoidal block 1201; the first ball rod 1204 is reset and inserted into the fixing hole of the inner wall of the second trapezoidal block 1202.
[0057] Please refer to Figure 6-7The second telescopic rod 1211 is fixedly connected to the top of the first telescopic rod 1205 with a threaded sleeve. The second telescopic rod 1211 is sleeved on the outer wall of the second screw rod 1212 through the top threaded sleeve. The first telescopic rod 1205 is sleeved on the outer wall of the first screw rod 1210 through the top threaded sleeve. The interiors of the first telescopic rod 1205 and the second telescopic rod 1211 are hollow structures. The diameter of the hollow structure inside the first telescopic rod 1205 is larger than that of the first screw rod 1210, and the diameter of the hollow structure inside the second telescopic rod 1211 is larger than that of the second screw rod 1212.
[0058] In this embodiment: the first telescopic rod 1205 and the second telescopic rod 1211 are fixedly connected to a limiting slider on one side outer wall, and the first telescopic rod 1205 and the second telescopic rod 1211 are slidably connected to the funnel retaining wall 4 through the limiting slider fixedly connected to the outer wall on one side, so that the first screw rod 1210 can rotate to drive the first telescopic rod 1205 to slide on the inner wall of the funnel retaining wall 4, and the second screw rod 1212 can drive the second telescopic rod 1211 to slide on the inner wall of the funnel retaining wall 4.
[0059] Please refer to Figure 5-7 The first screw rod 1210, the second screw rod 1212 and the outer wall of the connecting rod 1208 are fixedly connected with a bearing sleeve, and the first screw rod 1210, the second screw rod 1212 and the connecting rod 1208 are rotatably connected to the funnel retaining wall 4 through the outer wall bearing sleeve.
[0060] In this embodiment: it is convenient for the first screw rod 1210, the second screw rod 1212 and the connecting rod 1208 to rotate so that the bearing sleeves fixedly connected through the outer wall respectively reduce the friction between them and the funnel retaining wall 4.
[0061] A main chute method for multiple middle mining areas in a metal mine comprises the following steps:
[0062] S1. First, the middle section of the main chute is divided into three parts: the first middle section straight chute 1, the second middle section straight chute 5 and the third middle section straight chute 7. The ore level division is determined in the design stage according to the mining method and the ore body distribution. The first middle section straight chute 1, the second middle section straight chute 5 and the third middle section straight chute are constructed in sections. Usually, each section is constructed by the reverse drilling method, and then expanded from top to bottom to form the main chute specifications;
[0063] S2, then install the grating 2 at the lower mine openings of the first middle section straight chute 1, the second middle section straight chute 5 and the third middle section straight chute 7, then determine the size of the arc gate funnel 3 for ore discharge according to the designed size of the grating 2, determine the support strength of the arc gate funnel 3 and the funnel retaining wall 4 according to the surrounding rock conditions, construct the inclined chute 6 in the second middle section straight chute 5 and the third middle section straight chute 7, and install the arc gate funnel 3 and the funnel retaining wall 4 for ore discharge therein;
[0064] S3. When the radial gate funnel 3 and the funnel retaining wall 4 need to be assembled, the first trapezoidal block 1201 and the second trapezoidal block 1202 are rotated respectively, the first trapezoidal block 1201 is installed on one side of the second connecting seat 11, and the second trapezoidal block 1202 is installed on one side of the first connecting seat 10, and then the radial gate funnel 3 and the funnel retaining wall 4 are installed, so that the first trapezoidal block 1201 and the second trapezoidal block 1202 are respectively inserted into the funnel retaining wall 4. In the inner wall mounting groove, when the first trapezoidal block 1201 contacts the second ball rod 1215, the second ball rod 1215 is pushed to squeeze the second telescopic rod 1211 and move upward. When the second trapezoidal block 1202 contacts the first ball rod 1204, the first ball rod 1204 is pushed to squeeze the first telescopic rod 1205 and move upward. When the first trapezoidal block 1201 and the second trapezoidal block 1202 are fully inserted into the inner wall mounting groove of the funnel retaining wall 4, the first trapezoidal block 1 The fixing holes opened on the inner wall of the top of 201 and the second trapezoidal block 1202 are respectively located below the second ball rod 1215 and the first ball rod 1204, so that the second ball rod 1215 and the first ball rod 1204 are no longer reset by external squeezing force, and the second ball rod 1215 is reset and inserted into the fixing hole of the inner wall of the first trapezoidal block 1201, and the first ball rod 1204 is reset and inserted into the fixing hole of the inner wall of the second trapezoidal block 1202, so that the first connecting seat 10 and the second connecting seat 11 are fixed to the outer wall of one side of the funnel retaining wall 4, thereby realizing the function of pre-fixing the first connecting seat 10 and the second connecting seat 11 to the funnel retaining wall 4, so as to facilitate the staff to quickly fix the first connecting seat 10 and the second connecting seat 11 to the funnel retaining wall 4 by bolts, thereby fixing the outer wall of one side of the arc gate funnel 3, and realizing the function of quickly installing the arc gate funnel 3 and the funnel retaining wall 4 through the cooperation of the above multiple groups of parts;
[0065] S4. When the arc gate funnel 3 and the funnel retaining wall 4 need to be disassembled and assembled, the rotating rod 1203 is rotated to drive the first bevel gear 1206 to drive the third bevel gear 1209 to rotate, thereby driving the first screw rod 1210 to drive the first telescopic rod 1205 to drive the first ball rod 1204 to move upward, and the first ball rod 1204 is pulled out from the fixing hole on the inner wall of the second trapezoidal block 1202, so that the second trapezoidal block 1202 is no longer fixed to the funnel retaining wall 4, and the third bevel gear 1209 rotates while driving the two groups of second bevel gears 1207 to rotate synchronously, thereby driving the fourth bevel gear 1213 to rotate through a group of connecting rods 1208 respectively, and the first bevel gear 1213 is driven to rotate. The four-bevel gear 1213 rotates to drive the fifth bevel gear 1214 to drive the second screw rod 1212 to rotate, and drives the second telescopic rod 1211 to drive the second ball rod 1215 to move upward, so that the second ball rod 1215 is pulled out from the fixing hole on the inner wall of the first trapezoidal block 1201, so that the first trapezoidal block 1201 is no longer fixed to the funnel retaining wall 4, which is convenient for the staff to disassemble the first connecting seat 10 and the second connecting seat 11 from the funnel retaining wall 4. The cooperation of the above multiple groups of parts realizes the function of quickly disassembling the first connecting seat 10 and the second connecting seat 11, so that it is convenient for the staff to quickly disassemble the arc gate funnel 3 from the funnel retaining wall 4;
[0066] S5. When the staff needs to repair the sieve screen 2 at the mine opening of the first middle section straight chute 1, the hydraulic push rod 9 inside the second middle section straight chute 5 is started to push the arc gate funnel 3 to close, so that the interior of the first middle section straight chute 1 and the second middle section straight chute 5 are filled with ore, and the sieve screen 2 at the mine opening of the first middle section straight chute 1 can be repaired, while the normal mining of the second middle section straight chute 5 and the third middle section straight chute 7 is not affected, thereby ensuring production.
[0067] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A main chute structure layout for multiple middle mining areas in a metal mine, characterized in that: include: The first middle section straight chute (1); a second middle section straight chute (5), the second middle section straight chute (5) being arranged at the bottom end of the first middle section straight chute (1), and the second middle section straight chute (5) being communicated with the discharge port of the first middle section straight chute (1), an inclined chute (6) being arranged at a corner of the second middle section straight chute (5), and both ends of the inclined chute (6) passing through the interior of the second middle section straight chute (5); A funnel retaining wall (4), the funnel retaining wall (4) being installed inside the second middle section straight chute (5) and located on one side of the discharge port of the first middle section straight chute (1), a second connecting seat (11) being installed on one side of the funnel retaining wall (4), a radial gate funnel (3) being rotatably connected to the inner side of the second connecting seat (11), a connecting rod (8) being fixedly connected to the outer wall of the radial gate funnel (3), a hydraulic push rod (9) being rotatably connected to the outer wall of the connecting rod (8), and one end of the hydraulic push rod (9) being rotatably connected to the first connecting seat (10); a third middle section straight chute (7), the third middle section straight chute (7) being arranged at the bottom end of the second middle section straight chute (5), and the third middle section straight chute (7) being in communication with a discharge port of the second middle section straight chute (5); A grating (2), the grating (2) being installed at the feed inlet of the first middle section straight chute (1); An auxiliary mechanism (12), the auxiliary mechanism (12) being distributed on the inner wall of the funnel retaining wall (4) and on one side of the second connecting seat (11) and the first connecting seat (10), and being used for quickly disassembling and assembling the arc gate funnel (3) and the funnel retaining wall (4); The auxiliary mechanism (12) comprises a first trapezoidal block (1201), a second trapezoidal block (1202), a rotating rod (1203), a first ball rod (1204), a first telescopic rod (1205), a first bevel gear (1206), a second bevel gear (1207), a connecting rod (1208), a third bevel gear (1209), a first screw rod (1210), a second telescopic rod (1211), a second screw rod (1212), a fourth bevel gear (1213), a fifth bevel gear (1214) and a second ball rod (1215), wherein the first trapezoidal block (1201) is arranged on the second The first connecting seat (11) is provided at one side of the second trapezoidal block (1202), the first screw rod (1210) is rotatably connected to the inner wall of the funnel retaining wall (4), the first telescopic rod (1205) is slidably connected to the inner wall of the funnel retaining wall (4) and sleeved on the outer wall of the first screw rod (1210), the first ball rod (1204) is fixedly connected to the bottom end of the first telescopic rod (1205), and the third bevel gear (1209) is sleeved on the outer wall of the first screw rod (1210) and is located at the first telescopic rod (1205). The rotating rod (1203) is rotatably connected to the inner wall of the funnel retaining wall (4), and one end thereof penetrates through the outer wall of one side of the funnel retaining wall (4); the first bevel gear (1206) is fixedly connected to one end of the rotating rod (1203) and meshedly connected to the third bevel gear (1209); the connecting rod (1208) is rotatably connected to the inner wall of the funnel retaining wall (4), and is located at both ends of the third bevel gear (1209); the second bevel gear (1207) is fixedly connected to one end of the connecting rod (1208); and the second screw rod (1212) is fixedly connected to the inner wall of the funnel retaining wall (4). The second screw rod (1212) is connected to the other end of the connecting rod (1208), the second screw rod (1212) is rotatably connected to the inner wall of the funnel retaining wall (4), and is located at the other end of the connecting rod (1208), the fifth bevel gear (1214) is sleeved on the outer wall of the second screw rod (1212), and is meshingly connected with the fourth bevel gear (1213), the second telescopic rod (1211) is slidably connected to the inner wall of the funnel retaining wall (4), and is sleeved on the outer wall of the second screw rod (1212), and the second ball rod (1215) is fixedly connected to the bottom end of the second telescopic rod (1211).
2. The main chute structure layout of multiple middle mining areas in a metal mine according to claim 1 is characterized in that: The output end and the bottom end of the hydraulic push rod (9) are rotatably connected to a rotating seat respectively, the output end of the hydraulic push rod (9) is fixedly connected to the connecting rod (8) via the rotating seat, and the bottom end of the hydraulic push rod (9) is fixedly connected to the first connecting seat (10) via the rotating seat.
3. The main chute structure layout of multiple middle mining areas in a metal mine according to claim 1 is characterized in that: One end of the first trapezoidal block (1201) and one end of the second trapezoidal block (1202) are respectively fixedly connected with bolts; one end of the first trapezoidal block (1201) is rotatably connected to the second connecting seat (11) via bolts; and one end of the second trapezoidal block (1202) is rotatably connected to the first connecting seat (10) via bolts.
4. The main chute structure layout of multiple middle mining areas in a metal mine according to claim 1 is characterized in that: The inner wall of the funnel retaining wall (4) is provided with mounting grooves matching the first trapezoidal block (1201) and the second trapezoidal block (1202); the top inner wall of the first trapezoidal block (1201) is provided with a fixing hole matching the second ball rod (1215); the top inner wall of the second trapezoidal block (1202) is provided with a fixing hole matching the first ball rod (1204); one end of the first ball rod (1204) and one end of the second telescopic rod (1211) respectively penetrate into a group of the mounting grooves.
5. The main chute structure layout of multiple middle mining areas in a metal mine according to claim 1 is characterized in that: The outer walls of the first ball rod (1204) and the second telescopic rod (1211) are respectively provided with springs; one end of the spring on the outer wall of the first ball rod (1204) is fixedly connected to the bottom end of the first telescopic rod (1205), and the other end is fixedly connected to the funnel retaining wall (4); one end of the spring on the outer wall of the second telescopic rod (1211) is fixedly connected to the outer wall at the top end of the second telescopic rod (1211), and the other end is fixedly connected to the funnel retaining wall (4).
6. The main chute structure layout of multiple middle mining areas in a metal mine according to claim 1 is characterized in that: The second telescopic rod (1211) and the top end of the first telescopic rod (1205) are fixedly connected by a threaded sleeve, the second telescopic rod (1211) is sleeved on the outer wall of the second screw rod (1212) through the threaded sleeve, and the first telescopic rod (1205) is sleeved on the outer wall of the first screw rod (1210) through the threaded sleeve, the first telescopic rod (1205) and the second telescopic rod (1211) are hollow structures inside, the diameter of the hollow structure inside the first telescopic rod (1205) is larger than the diameter of the first screw rod (1210), and the diameter of the hollow structure inside the second telescopic rod (1211) is larger than the diameter of the second screw rod (1212).
7. The main chute structure layout of multiple middle mining areas in a metal mine according to claim 1 is characterized in that: The first screw rod (1210), the second screw rod (1212) and the outer wall of the connecting rod (1208) are fixedly connected with a bearing sleeve, and the first screw rod (1210), the second screw rod (1212) and the connecting rod (1208) are rotatably connected to the funnel retaining wall (4) via the bearing sleeve.
8. A main chute method for multiple middle mining areas in a metal mine, characterized in that: The main chute structure arrangement of multiple middle mining areas of a metal mine according to any one of claims 1 to 7 is used, comprising the following steps: S1. First, the middle section of the main chute is divided into three parts: the first middle section straight chute (1), the second middle section straight chute (5) and the third middle section straight chute (7). The mine level division is determined in the design stage, and the first middle section straight chute (1), the second middle section straight chute (5) and the third middle section straight chute are constructed in sections. Each section is constructed by a reverse drilling method, and then expanded from top to bottom to form the specifications of the main chute; S2, then installing a grating screen (2) at each lower mine opening of the first middle section straight chute (1), the second middle section straight chute (5) and the third middle section straight chute (7), then determining the size of the arc gate funnel (3) according to the designed size of the grating screen (2), determining the support strength of the arc gate funnel (3) and the funnel retaining wall (4) according to the surrounding rock conditions, constructing an inclined chute (6) in the second middle section straight chute (5) and the third middle section straight chute (7), and installing the arc gate funnel (3) and the funnel retaining wall (4) therein; S3. When it is necessary to assemble the arc gate funnel (3) and the funnel retaining wall (4), the first trapezoidal block (1201) and the second trapezoidal block (1202) are rotated respectively, the first trapezoidal block (1201) is installed on one side of the second connecting seat (11), and the second trapezoidal block (1202) is installed on one side of the first connecting seat (10), and then the arc gate funnel (3) and the funnel retaining wall (4) are installed so that the first trapezoidal block (1201) and the second trapezoidal block (1202) are connected. (1202) are respectively inserted into the inner wall mounting groove of the funnel retaining wall (4); when the first trapezoidal block (1201) contacts the second ball rod (1215), the second ball rod (1215) is pushed to squeeze the second telescopic rod (1211) to move upwards; when the second trapezoidal block (1202) contacts the first ball rod (1204), the first ball rod (1204) is pushed to squeeze the first telescopic rod (1205) to move upwards; when the first trapezoidal block (1201) contacts the second trapezoidal block ( When the first trapezoidal block (1201) and the second trapezoidal block (1202) are fully inserted into the mounting groove of the inner wall of the funnel retaining wall (4), the fixing holes opened on the inner walls of the top ends of the first trapezoidal block (1201) and the second trapezoidal block (1202) are respectively located below the second ball rod (1215) and the first ball rod (1204), so that the second ball rod (1215) and the first ball rod (1204) are no longer subjected to external squeezing force and are reset. The second ball rod (1215) is reset and inserted into the fixing hole on the inner wall of the first trapezoidal block (1201). , the first ball rod (1204) is reset and inserted into the fixing hole on the inner wall of the second trapezoidal block (1202), thereby fixing the first connecting seat (10) and the second connecting seat (11) to the outer wall of one side of the funnel retaining wall (4), thereby realizing the function of pre-fixing the first connecting seat (10) and the second connecting seat (11) to the funnel retaining wall (4), thereby facilitating the staff to quickly fix the first connecting seat (10) and the second connecting seat (11) to the funnel retaining wall (4) by bolts; S4. When the arc gate funnel (3) and the funnel retaining wall (4) need to be disassembled and assembled, the rotating rod (1203) is rotated to drive the first bevel gear (1206) to drive the third bevel gear (1209) to rotate, thereby driving the first screw rod (1210) to drive the first telescopic rod (1205) to drive the first ball rod (1204) to move upward, and the first ball rod (1204) is pulled out from the fixing hole on the inner wall of the second trapezoidal block (1202), so that the second trapezoidal block (1202) is no longer fixed to the funnel retaining wall (4), and the third bevel gear (1209) rotates while driving the two sets of second bevel gears (1207) to rotate synchronously. The fourth bevel gear (1213) is rotated, thereby respectively driving the fourth bevel gear (1213) to rotate through a group of connecting rods (1208), and the fourth bevel gear (1213) rotates to drive the fifth bevel gear (1214) to drive the second screw rod (1212) to rotate, and drives the second telescopic rod (1211) to drive the second ball rod (1215) to move upward, so that the second ball rod (1215) is pulled out of the fixing hole on the inner wall of the first trapezoidal block (1201), so that the first trapezoidal block (1201) is no longer fixed to the funnel retaining wall (4), and it is convenient for the staff to disassemble the first connecting seat (10) and the second connecting seat (11) from the funnel retaining wall (4); S5. When the staff needs to repair the sieve (2) at the mine opening of the first middle section straight chute (1), the hydraulic push rod (9) inside the second middle section straight chute (5) is started to push the arc gate funnel (3) to close, thereby filling the first middle section straight chute (1) and the second middle section straight chute (5) with ore, and then the sieve (2) at the mine opening of the first middle section straight chute (1) can be repaired, while the normal mining of the second middle section straight chute (5) and the third middle section straight chute (7) is not affected, thereby ensuring production.
Citation Information
Patent Citations
Multi-middle-section production reshipment type main draw shaft system
CN105257336A
Main many middle sections of drop shaft simultaneous control ore drawing system is strutted to direct branch
CN206205930U
Draw shaft with buffer protection function
CN211202047U