A method for testing and evaluating unloading arm performance and LNG cryogenic unloading arm
By determining the stage alarm point and alarm area range in the performance test and evaluation method of LNG low-temperature unloading arm, combined with hydraulic control system and position safety monitoring, the problem of missing performance test of unloading arm in the existing technology is solved, and the unloading is improved The load-bearing performance and safety of the material arm provide guidance for the stable operation of the LNG receiving station.
Patent Information
- Application Number
- CN202210509615.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-11
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-05-11
AI Technical Summary
The performance testing and evaluation of existing LNG low-temperature unloading arms lacks strict and complete standards, resulting in insufficient load-bearing performance and safety, and lack of effective performance testing technical means and evaluation methods.
Provide a method for performance testing and evaluation of the discharge arm. By docking the test bench with the discharge arm main body under preset position parameters, the alarm point and alarm area range of multiple stages are determined, and the operation of the discharge arm main body to each point are controlled. Tests are carried out in the alarm area of the test, and evaluate and adjust them according to the test results. The method includes a discharge arm body, an outer arm pipeline, an emergency disengagement device and a quick connection device, combining a hydraulic control system and a position safety monitoring and an alarm system.
A systematic performance testing standard has been formed, which improves the design optimization of the unloading arm and the safe and stable operation of the LNG receiving station, and enhances the load-bearing performance and safety of the unloading arm.
Smart Images

Figure CN114789920B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of LNG cryogenic unloading, and in particular to a unloading arm performance testing and evaluation method and an LNG cryogenic unloading arm. Background Art
[0002] Liquefied natural gas (LNG) receiving terminals can be divided into offshore receiving terminals and land receiving terminals, also known as LNG receiving stations. Offshore LNG receiving terminals are a new type of receiving terminal proposed in recent years, and there are engineering examples in the world. Offshore LNG receiving terminals can be further divided into floating receiving terminals and fixed receiving terminals, among which fixed receiving terminals are similar to land receiving terminals. According to the different forms of LNG receiving terminals, the LNG unloading methods adopted are also different. Floating liquefied natural gas production storage and offloading unit FLNG (LNG Floating Production Storage and offloading Unit) is a floating production unit used for offshore natural gas field development. It is positioned at sea through a mooring system and has the functions of exploitation, processing, liquefaction, storage and loading and unloading of natural gas. It can also be used in conjunction with LNG ships to realize the exploitation and transportation of offshore natural gas fields. The use of FLNG for offshore gas field development has ended the single mode of offshore gas fields that can only be transported to shore by pipeline, saving transportation costs and not occupying land space. In addition, FLNG can also be used for a second time after the gas field is exploited and placed in other natural gas fields, with high economic performance.
[0003] Land receiving terminals have been widely used around the world and are still developing rapidly with the increase in natural gas demand. LNG unloading arm is a rigid articulated pipeline system installed on the land terminal dock or FLNG for LNG unloading. The main structure includes swivel joint, outer arm, inner arm, top swivel joint, base riser and swivel joint connecting the inner arm and the base riser, as well as other process pipelines and their supporting structures and accessories. The large LNG unloading arm stands at the front end of the LNG receiving station wharf. This behemoth, about 50m high and weighing 80 tons, is the key core equipment connecting the LNG ship with the onshore pipeline and storage facilities of the receiving station, and is the "throat" of the entire receiving station. When the LNG tanker arrives at the dedicated wharf of the receiving station, the LNG is sent into the storage tank of the receiving station through the liquid phase unloading arm and unloading pipeline using the cryogenic pump on board. At the same time, the BOG gas in the storage tank is returned to the LNG tanker through the return gas pipeline and gaseous return gas arm. During the operation of the LNG unloading arm, a traction line is used to guide the end of the unloading arm and the receiving end of the LNG ship to interconnect to ensure accurate docking under relative motion, and to control the hydraulic system of the unloading arm so that it can withstand the speed and acceleration caused by the movement of the hull.
[0004] In summary, the key technologies of LNG rigid unloading arm involve many links such as cryogenic material selection, molding and manufacturing, sealing, and test verification. Material selection and structural design are difficult, processing and manufacturing and system integration are difficult, ultra-low temperature sealing, connection and leakage monitoring are difficult, and the entire cryogenic unloading arm system has a complex structure and high safety requirements. Whether the performance of the unloading arm is inherently safe directly affects the reliable operation of the entire system of the LNG receiving station. Therefore, it is particularly important to conduct scientific and rigorous performance testing and evaluation of the LNG cryogenic unloading arm.
[0005] At present, the relevant standards and specifications for the performance test and evaluation of LNG cryogenic unloading arms are unclear, mainly relying on the experience of equipment manufacturers themselves, lacking strict and complete feasible solutions and reliable guidance methods. Therefore, the lack of performance test technical means and evaluation methods faced by the existing LNG cryogenic unloading arm system is a key problem that needs to be solved urgently. Summary of the invention
[0006] The purpose of the present invention is to provide a discharge arm performance test and evaluation method and an LNG cryogenic discharge arm to solve the problems of low load-bearing performance and low safety of the discharge arm in the prior art, and lack of performance test technical means and evaluation methods for the LNG cryogenic discharge arm system.
[0007] To achieve the above object, the present invention adopts the following technical solutions:
[0008] The present invention provides a method for testing and evaluating the performance of a discharge arm, comprising:
[0009] According to the preset initial position parameters, the unloading arm body and the docking test bench are arranged in the area, and the unloading arm body is docked with the docking test bench;
[0010] Keep the outer arm pipeline of the discharge arm body from rotating, move the docking test bench in a straight line to keep it away from the discharge arm body, and determine the multiple stage alarm points of the outer arm pipeline that are about to be separated in sequence within the moving distance of the docking test bench according to the alarm status of the discharge arm body;
[0011] At multiple stage alarm points, the docking test bench is kept stationary, and the outer arm pipeline of the discharge arm body is controlled to rotate. According to the alarm status of the discharge arm body, the trajectory line of the stage alarm point is used as the dividing line, and the position of the outer arm pipeline relative to the dividing line after rotation is used to determine the direction alarm point where the outer arm pipeline is about to detach.
[0012] According to the distance between the stage alarm point and the main body of the discharge arm, and the vertical distance between the direction alarm point and the dividing line, determine the alarm area range where the outer arm pipeline is about to leave at each point;
[0013] By controlling the unloading arm body to operate within the alarm area where the outer arm pipeline is about to be detached at each point, various performances of the unloading arm body are tested one by one, and based on the test results, the corresponding performance of the unloading arm body is evaluated and adjusted.
[0014] Furthermore, the arrangement method of the discharge arm body and the docking test bench includes:
[0015] Select a test area, and arrange the base, slide rails, and docking test bench in the test area so that the slide rails are on one side of the base and are collinear with the base;
[0016] The docking test bench is slidably arranged on the slide rail, and the discharge arm body is fixed on the base, so that the discharge arm body and the docking test bench are docked through a quick connection device.
[0017] Furthermore, the method for determining the alarm point includes:
[0018] According to the distance of the docking test bench gradually away from the main body of the unloading arm, the pre-alarm point, the first stage alarm point and the second stage alarm point are determined on the slide rail in sequence;
[0019] According to the position of the outer arm pipeline relative to the dividing line after rotation, the pre-alarm left side point and the pre-alarm right side point are determined at the pre-alarm point, the first-stage alarm left side point and the first-stage alarm right side point are determined at the first-stage alarm point, and the second-stage alarm left side point and the second-stage alarm right side point are determined at the second-stage alarm point.
[0020] Furthermore, the alarm areas where the outer arm pipeline is about to leave at each point are:
[0021] The range of the pre-alarm point is 18500-19050mm;
[0022] The range of the alarm points in the first stage is 19450-19550mm;
[0023] The range of the second stage alarm point is 20000-20080mm;
[0024] The range of the left point of the pre-alarm is 6600-6850mm;
[0025] The range area of the right point of the pre-alarm is 0mm;
[0026] The range of the left point of the first stage alarm is 7150-7320mm;
[0027] The range of the right point of the first stage alarm is 480-530mm;
[0028] The range of the left point of the second stage alarm is 1280-1330mm;
[0029] The range of the right side point of the second stage alarm is 8900-9000mm.
[0030] Furthermore, the various performances tested of the unloading arm main body include the operating performance of the unloading arm, the state of the locking mechanism, the balance performance of the unloading arm, the alarm range of the proximity switch, the operating speed of the unloading arm, the interference state between the moving parts of the unloading arm, the operating performance of the quick connecting device and the position of its flange, and the emergency disengagement performance.
[0031] Based on the above-mentioned unloading arm performance test and evaluation method, the present invention also provides an LNG low-temperature unloading arm, including an unloading arm body, an outer arm pipeline installed on the unloading arm body, and an emergency release device and a quick connection device;
[0032] The quick connection device is arranged downstream of the discharge arm body and docked with the LNG ship, the emergency detachment device is arranged between the outer arm pipeline and the quick connection device, and the emergency detachment device is connected to the end of the outer arm pipeline through a bend pipe, the emergency detachment device is connected to the quick connection device through a bend pipe, and the end of the bend pipe is connected to the corresponding equipment through a rotary joint;
[0033] Wherein, the quick connection device includes a plurality of claw actuators docked with the LNG ship, and the claw actuators are equipped with an electrical drive system.
[0034] Furthermore, the emergency disengagement device includes an upper disengagement part and a lower disengagement part, which are connected by a locking mechanism, an LNG inlet end is formed on the upper disengagement part, an LNG outlet end is formed on the lower disengagement part, and a rotating joint and a bent pipe connection are arranged on the end of the outer arm pipeline, the LNG inlet end and the quick connecting device, wherein the locking mechanism is connected to a hydraulic control system, and a position safety monitoring and alarm system is provided on the unloading arm body, and the hydraulic control system is linked to the position safety monitoring and alarm system.
[0035] Further, the discharge arm body includes a column, a balance transmission mechanism, an inner arm support, an outer arm support and an inner arm pipeline;
[0036] The column is arranged vertically, an LNG delivery pipeline is arranged inside the column, and a base is fixedly connected to the bottom end of the column;
[0037] The inner arm support is rotatably mounted on the top of the column through a slewing support, the balancing transmission mechanism includes driving wheels arranged at both ends of the inner arm support and a balancing driving wire rope sleeved on the two driving wheels, one end of the inner arm support is rotatably connected to the end of the outer arm support through the driving wheel at the end, and a counterweight module is arranged at the other end of the inner arm support, the length of the inner arm support from the slewing support to the outer arm support section is greater than the length of the inner arm support from the slewing support to the counterweight module, the inner arm pipeline is installed on the inner arm support, the outer arm pipeline is installed on the outer arm support, and the inner arm pipeline and the outer arm pipeline are connected through a bend pipe and a slewing joint;
[0038] A trunnion box is installed at the top of the column, the slewing bearing is installed on the trunnion box, and the inner arm pipeline is connected to the LNG transmission pipeline through a bend pipe and a swivel joint;
[0039] A vertical escalator is assumed to be provided on one side of the column, and a maintenance platform is installed on the top of the escalator, and the height of the maintenance platform is consistent with the height of the inner arm support in the vertical state.
[0040] Furthermore, a circle of metal mesh is arranged on the outer wall of the pipe body at the end of the outer arm pipeline.
[0041] The present invention adopts the above technical scheme, aims at the key problem that the existing LNG cryogenic unloading arm system faces, namely, the lack of performance testing technical means and evaluation methods, which needs to be solved urgently in the industry, and proposes a performance testing and evaluation method for LNG cryogenic unloading arms, so as to overcome the defects of the prior art and solve the key problems in the industry, which has guiding significance for the design optimization of LNG unloading arms and the safe and stable operation of the entire system of LNG receiving stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] By reading the detailed description of the preferred embodiment below, various other advantages and benefits will become clear to those of ordinary skill in the art. The accompanying drawings are only used to illustrate the purpose of the preferred embodiment and are not considered to be limitations of the present invention. In the entire drawings, the same reference numerals are used to represent the same components.
[0043] In the attached picture:
[0044] Figure 1 It is a schematic diagram of a stage alarm point test of a method for testing and evaluating the performance of a discharge arm provided by an embodiment of the present invention;
[0045] Figure 2 It is a schematic diagram of a directional alarm point test of a method for testing and evaluating the performance of a discharge arm provided by an embodiment of the present invention;
[0046] Figure 3 This is a schematic diagram of the overall structure of an LNG cryogenic unloading arm provided by an embodiment of the present invention;
[0047] Figure 4 It is a side view of an LNG cryogenic unloading arm provided in an embodiment of the present invention.
[0048] The symbols in the accompanying drawings are as follows:
[0049] 1. Discharge arm body; 11. Outer arm pipeline; 111. Metal mesh; 12. Column; 13. Balance transmission mechanism; 131. Driving wheel; 14. Inner arm support; 15. Outer arm support; 16. Inner arm pipeline; 17. Counterweight module; 18. Trunnion box; 19. Escalator; 191. Maintenance platform; 2. Docking test bench; 3. Base; 4. Slide rail; 5. Quick connection device; 6. Emergency release device; 7. Rotary joint. DETAILED DESCRIPTION
[0050] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0051] Since the relevant standards and specifications for the performance test and evaluation of LNG cryogenic unloading arms in the prior art are unclear, there is a lack of strict and complete implementable solutions and reliable guidance methods. The present invention provides a method for testing and evaluating the performance of an unloading arm and an LNG cryogenic unloading arm. Under an ideal environment, the alarm points of the LNG cryogenic unloading arm in various states are first tested, and the alarm area range where the outer arm pipeline is about to be separated at each point is determined. Then, by controlling the unloading arm body to operate within the alarm area where the outer arm pipeline is about to be separated at each point, the various performances of the unloading arm body are tested one by one to form a systematic test with a reference standard, and according to the test structure, the corresponding performance of the unloading arm body is evaluated and adjusted, so as to have guiding significance for the design optimization of the LNG unloading arm and the safe and stable operation of the entire system of the LNG receiving station.
[0052] The scheme of the present invention is described in detail below through examples.
[0053] Example
[0054] like Figure 1 and Figure 2 As shown, the present invention provides a method for testing and evaluating the performance of a discharge arm, comprising:
[0055] According to the preset initial position parameters, the material arm body 1 and the docking test bench 2 are arranged in the area, and the material arm body 1 is docked with the docking test bench 2;
[0056] Keep the outer arm pipeline 11 of the material arm body 1 from rotating, move the docking test bench 2 in a straight line to make the docking test bench 2 away from the material arm body 1, and determine the multiple stage alarm points of the outer arm pipeline 11 that are about to be separated in sequence within the moving distance range of the docking test bench 2 according to the alarm state of the material arm body 1;
[0057] At multiple stage alarm points, the docking test bench 2 is kept stationary, and the outer arm pipeline 11 of the material arm body 1 is controlled to rotate. According to the alarm state of the material arm body 1, the trajectory line of the stage alarm point is used as the dividing line, and the position of the outer arm pipeline 11 relative to the dividing line after the rotation is used to determine the direction alarm point where the outer arm pipeline 11 is about to be separated.
[0058] According to the distance between the stage alarm point and the material arm body 1, and the vertical distance between the direction alarm point and the dividing line, the alarm area range that the outer arm pipeline 11 is about to leave at each point is determined;
[0059] By controlling the arm body 1 to operate within the alarm area where the outer arm pipeline 11 is about to be separated at each point, various performances of the arm body 1 are tested one by one, and the corresponding performance of the LNG cryogenic unloading arm is evaluated and adjusted according to the test results.
[0060] in, Figure 1 The three docking test benches 2 in FIG. 2 indicate that a docking test bench 2 moves to three different position states.
[0061] As described above, the arrangement method of the material arm body 1 and the docking test bench 2 includes:
[0062] A test area is selected, and a base 3, a slide rail 4 and a docking test bench 2 are arranged in the test area, so that the slide rail 4 is arranged on one side of the base 3 and is collinear with the base 3;
[0063] The docking test bench 2 is slidably arranged on the slide rail 4 , and the material arm body 1 is fixed on the base 3 , so that the material arm body 1 and the docking test bench 2 are docked through the quick connection device 5 .
[0064] Furthermore, the method for determining the alarm point includes:
[0065] According to the distance that the docking test bench 2 is gradually away from the material arm body 1, the pre-alarm point (A), the first stage alarm point (B) and the second stage alarm point (C) are sequentially determined on the slide rail 4;
[0066] According to the position of the outer arm pipeline 11 relative to the dividing line after rotation, the pre-alarm left point (D) and the pre-alarm right point (E) are respectively determined at the pre-alarm point, the first stage alarm left point (F) and the first stage alarm right point (G) are respectively determined at the first stage alarm point, and the second stage alarm left point (H) and the second stage alarm right point (I) are respectively determined at the second stage alarm point. Preferably, the minimum connection distance limit point (M) between the outer arm pipeline 11 and the docking flange of the docking test bench 2 can be increased.
[0067] Based on the above scheme, after a lot of tests, the alarm area ranges of the above points are determined as follows:
[0068]
[0069]
[0070] Table 1 Range area table of each point
[0071] It can be seen from the contents of Table 1 that the alarm area ranges of the outer arm pipeline 11 that are about to be separated at various points are:
[0072] The alarm area range of the pre-alarm point is 18500-19050mm;
[0073] The alarm area range of the first stage alarm point is 19450-19550mm;
[0074] The alarm area range of the second stage alarm point is 20000-20080mm;
[0075] The alarm area range of the left point of the pre-alarm is 6600-6850mm;
[0076] The alarm area range of the right point of the pre-alarm is 0mm;
[0077] The alarm area range of the left point of the first stage alarm is 7150-7320mm;
[0078] The alarm area range of the right point of the first stage alarm is 480-530mm;
[0079] The alarm area range of the left point of the second stage alarm is 1280-1330mm;
[0080] The alarm area range of the right point of the second stage alarm is 8900-9000mm.
[0081] Furthermore, the various performances tested of the material arm body 1 include the operating performance of the unloading arm, the state of the locking mechanism, the balance performance of the unloading arm, the alarm range of the proximity switch, the operating speed of the unloading arm, the interference state between the moving parts of the unloading arm, the operating performance of the quick connecting device and the position of its flange, and the emergency release performance.
[0082] Specifically, the method for testing various performances of the material arm body 1 of the present invention is as follows:
[0083] 1. Operational performance test of unloading arm:
[0084] This test mainly uses the local control panel to check the action of the unloading arm to ensure the stability of the unloading arm during operation and the reliability of the electrical and hydraulic control system operation. The steps are as follows:
[0085] 1. Power supply;
[0086] 1) Supply power to the local control panel cabinet and test whether the power supply is normal;
[0087] 2. Start the hydraulic pump and test whether the hydraulic pump functions normally;
[0088] 1) Press the "Pump Start" button to start the pump;
[0089] 2) Press the "Pump Stop" button to turn off the pump;
[0090] 3) Check the pressure gauge of the hydraulic master station system and set the value to 24MPa;
[0091] 4) Check the pressure gauge of the accumulator package of the hydraulic main station, and set the value to 24MPa;
[0092] 5) Check the accumulator pressure gauge of the hydraulic substation emergency release system and set the value to 24MPa.
[0093] 2. Status test of locking mechanism:
[0094] 1. Check the storm lock proximity switch;
[0095] 1) Whether the unloading arm is in the normal position when it is retracted, that is, the inner arm is in the vertical position and the horizontal rotation drive mechanism is in the middle position;
[0096] 2) The handle of the mechanical locking mechanism (storm lock) under the column is in the locked position;
[0097] 3) Start the hydraulic pump, operate the unloading arm, and check whether the inner arm can move normally in the horizontal direction. It is sufficient to move a small distance of no more than 1m in the horizontal direction;
[0098] 2. Detect and manipulate the machine to the retracted position and lock it;
[0099] 1) Unlock the discharge arm, then readjust the discharge arm back to the retracted position, and operate the storm lock system to check whether the locking pin of the storm lock is in the predetermined position. In the locked state, the discharge arm moves completely still, and then check whether the locking proximity switch is in place;
[0100] 2) Close the outer arm locking ball valve outside the hydraulic substation, operate the outer arm movement of the unloading arm, and check whether the outer arm can be reliably locked.
[0101] 3. Balance performance test of discharge arm:
[0102] 1. Operate the unloading arm from the local control panel;
[0103] 1) Press the "Pump Start" button;
[0104] 2) Unlock the storm lock of the discharge arm and open the outer arm lock ball valve of the hydraulic substation;
[0105] 3) Select "Fast" in the "Slow / Fast" position switch (the mode configuration of the position switch is common in the industry, the same below);
[0106] 4) Select "Drive" in the gear switch "Drive / 0 / Float";
[0107] 5) Operate the conversion switches on the local control panel: "External arm extension / 0 / External arm retraction", "Inner arm up / 0 / Inner arm down", "Horizontal left turn / 0 / Horizontal right turn", and observe whether the operation of the unloading arm is consistent with the control buttons.
[0108] Note: In the driving mode, manually operate the unloading arm to the pre-alarm position. The pre-alarm position A is set to the range of 18500-19050mm. The control system will automatically prohibit continuous action and can only return to the working area;
[0109] 6) Press the "Pump Stop" button;
[0110] 2. Operate the unloading arm from the hydraulic substation;
[0111] 2.1 Preparation;
[0112] 1) Press the "Pump Start" button;
[0113] 2) Unlock the storm lock of the discharge arm and open the outer arm lock ball valve of the hydraulic substation;
[0114] 3) Select "Slow" in the "Slow / Fast" gear switch;
[0115] 4) Select "Drive" in the gear switch "Drive / 0 / Float";
[0116] 2.2 Hydraulic substation operates the unloading arm;
[0117] 1) Since the handle on the hydraulic solenoid valve is independent of the electrical control operation, be careful not to cross the alarm position during operation. Use the handle on the hydraulic solenoid valve to operate the unloading arm, and respectively operate the "inner arm up", "inner arm down", "outer arm extension", "outer arm retraction", "horizontal left turn", and "horizontal right turn" handles to check whether they are consistent with the actual actions;
[0118] 2) Operate the quick-connect device of the unloading arm to a position accessible to ground personnel, and hang a plumb bob on the quick-connect device;
[0119] 2.3 Check whether the unloading arm is in a balanced state;
[0120] 1) Select "Float" in the gear switch "Drive / 0 / Float";
[0121] 2) Check the distance the plumb bob moves within 1 minute (Note: the outer arm of the discharge arm should be basically balanced, but when there is no load, the outer arm should have a tendency to retract gently or remain stationary. The inner arm should be basically balanced, but when there is no load, the inner arm should have a tendency to rise slightly or remain stationary);
[0122] 4. Inspection scope of work;
[0123] After the operational test, the unloading arm should be tested to ensure its working range;
[0124] Check the maximum travel of the unloading arm.
[0125] Note: The unloading arm should be checked according to the design requirements of the envelope diagram to see whether it can reach the maximum envelope range, and consider whether the unloading arm can reach the docking flange of the ship when the ship is fully loaded or empty.
[0126] 5. Proximity switch alarm range test:
[0127] This aspect of the test is mainly to check the set points of the "pre-alarm", "first stage alarm" and "second stage alarm" proximity switches, where the first stage alarm point setting range is 19450-19550mm and the second stage alarm point setting range is 20000-20080mm to ensure that each proximity switch position is set at the specified angle of the design and provides the specified function through the logic system. During the alarm range check, the audio and visual alarms will be activated.
[0128] 1. Check the alarm steps with a proximity switch;
[0129] 1) Select the control method at the "0 / Maintenance Override" position switch on the local control cabinet panel, and select the "Maintenance Override" control position. The override control means that when the automatic control system receives abnormal signals such as accident alarm, deviation exceeding the limit, fault, etc., the override logic will immediately execute the automatic manual switch, priority increase, priority decrease, prohibition of increase, prohibition of decrease and other logical functions according to the cause of the accident, and convert the system to a pre-set safe state and send out an alarm signal;
[0130] 2) The manual release safety device in the hydraulic substation is in the unconnected position of the discharge arm. Operate the discharge arm within the working range;
[0131] 3) Operate the outer arm of the unloading arm to the pre-alarm position, check points:
[0132] The sound and light alarm is activated, and the sound can be turned off by pressing the "Mute" button on the local control panel. Or operate the unloading arm to return to the working area, the sound and light alarm will be automatically released, and the size mark can be checked on site;
[0133] 4) Operate the outer arm of the unloading arm to the first stage alarm, check points:
[0134] The sound and light alarm is activated, and the sound can be turned off by pressing the "Mute" button on the local control panel. Or operate the unloading arm to return to the working area, the sound and light alarm will be automatically released, and the size mark can be checked on site;
[0135] 5) Operate the outer arm of the unloading arm to the second stage alarm, check points:
[0136] The sound and light alarm is activated, and the light and sound start to alarm continuously. You can turn off the sound by pressing the "mute" button on the local control panel. Or operate the unloading arm to return to the working area, the sound and light alarm will be automatically released, and the size mark can be checked on site;
[0137] 6) Repeat the previous steps to test the left and right rotation of the discharge arm.
[0138] Note: In the override mode, the unloading arm can only enter the second alarm range at most. After the test is completed, select the "0" control at the gear switch "0 / Maintenance Override" on the local control cabinet panel.
[0139] 2. Check the location of the location monitoring system;
[0140] A position monitoring display screen is installed on the local control panel, and a computer is installed in the control room to display the position of the discharge arm in real time;
[0141] Operate the unloading arm to the pre-alarm position and check the pre-alarm distance and angle on the monitoring system display / computer;
[0142] Operate the unloading arm to the first-level alarm position and check the distance and angle of the first-level alarm on the monitoring system display screen / computer;
[0143] Operate the unloading arm to the secondary alarm position and check the distance and angle of the secondary alarm on the monitoring system display / computer.
[0144] 6. Operation speed test of discharge arm:
[0145] The test in this aspect is mainly to check whether the hydraulic control system can meet the two operating speed modes of the unloading arm, fast and slow.
[0146] Operate the unloading arm to turn left / right, the inner arm to raise / lower, and the outer arm to extend / retract.
[0147] Prepare a stopwatch and a measuring tape. Inspection method:
[0148] 1) Operate the unloading arm and start the pump;
[0149] 2) Select "Fast" in the "Slow / Fast" position switch, and the unloading arm will start to operate quickly;
[0150] 3) Select "Slow" in the "Slow / Fast" position switch, and the unloading arm will start to operate slowly;
[0151] 4) Operate the discharge arm to move the quick-connect device an appropriate distance, use a stopwatch to time it, and use a tape measure to measure the distance. Then divide the distance by the measured time to get the speed.
[0152] 5) The speed in fast mode is controlled to be approximately 0.15±0.05m / s;
[0153] 6) The speed in slow mode is controlled to be approximately 0.075±0.05m / s.
[0154] 7. Interference state test between moving parts of unloading arm:
[0155] The test in this aspect mainly involves visual inspection of the connections between all rotating parts of the LNG unloading arm, such as whether the high-pressure hose, nitrogen purge metal hose, cables, etc. interfere with the other parts of the unloading arm during the movement of the unloading arm, whether there is excessive fatigue bending, and ensure that the unloading arm and its components are not subject to any tension.
[0156] 8. Test on the operating performance of the quick-connect device and the position of its flange:
[0157] 1) Press the "Pump Start" button;
[0158] 2) Unlock the storm lock of the discharge arm and open the outer arm lock ball valve of the hydraulic substation;
[0159] 3) Operate the unloading arm quick connection device to reach the test connection flange, so that the quick connection device flange and the test connection flange are close to each other;
[0160] 4) Select "Quick Connector Release" in the gear switch "Quick Connector Connect / Release" and remove the blind flange on the quick connector;
[0161] 6) When the quick-connect device flange and the test connection flange are sufficiently tightened, select "quick-connect device connection" and record the clamping time of its claws to ensure that the relevant actions are completed within 15 to 20 seconds;
[0162] 7) After the inspection is completed, release the claw and reset the unloading arm.
[0163] Among them, the reset state of the unloading arm checks the flange position of the quick connection device.
[0164] The main purpose of the test is to check whether the vertical distance between the flange surface of the quick-connect device and the center of the column is less than the distance between the sidewall and the column when the unloading arm is in the storage position to ensure that no interference or collision occurs.
[0165] IX. Performance test of emergency release:
[0166] The emergency disengagement sequence includes pre-alarm, emergency disengagement (first level alarm) and emergency disengagement (second level alarm). The purpose of the pre-alarm is to remind the operator. Emergency disengagement (first level alarm) suggests that the on-site terminal stop loading and unloading, the hydraulic pump is started, and the double ball valve is closed at the same time. Emergency disengagement (second level alarm) opens the emergency disengagement system clamp, brakes the unloading arm, and automatically returns to the berth line, close to the reset state.
[0167] 1. Test the double ball valve of the emergency release system in override mode;
[0168] 1) Press the "Pump Start" button to operate the three-dimensional joint of the unloading arm to a position close to the ground operator's reach;
[0169] 2) Select the control method at the "0 / Maintenance Override" position switch on the local control cabinet panel, and select the "Maintenance Override" control position;
[0170] 3) Switch the local control cabinet panel’s self-reset “Emergency Disconnect System Ball Valve Closed / 0 / Emergency Disconnect System Ball Valve Opened” switch to “Emergency Disconnect System Ball Valve Closed” until the “Emergency Disconnect System Ball Valve Closed” indicator light turns on and then release it;
[0171] 4) Switch the local control cabinet panel’s self-reset “Emergency Disconnect System Ball Valve Closed / 0 / Emergency Disconnect System Ball Valve Opened” switch to “Emergency Disconnect System Ball Valve Opened”;
[0172] 5) After the test, set the local control cabinet panel position switch "0 / Maintenance Override" to "0";
[0173] 2. The hydraulic accumulator assembly undergoes emergency disengagement test;
[0174] Rotate the unloading arm to a position close to the ground operator. This test checks the emergency release operation of the emergency release system by releasing the pressure in the emergency release system accumulator in the event of a motor power failure.
[0175] 1) Check that the three connecting bolts between the contact surfaces of the double ball valves of the emergency release system are all connected to ensure that no real release occurs;
[0176] 2) Select the control method at the "0 / Maintenance Override" position switch on the local control cabinet panel, and select the "Maintenance Override" control position;
[0177] 3) The manual release safety device is in the discharge arm connection position;
[0178] 4) Remove the test pin on the emergency release;
[0179] 5) Check whether the pressure of the system accumulator and the emergency release system accumulator is 24MPa, and cut off the power supply of the main motor;
[0180] 6) Press the "Emergency Disconnect System Disconnect" button on the local control cabinet panel and check whether the following items are in a controllable state:
[0181] The sound and light alarm is activated;
[0182] The waiting time is required to be controlled within the range of 5s-7s;
[0183] Double ball valve closed, time set to about 5-10s adjustable range;
[0184] Emergency release system hydraulic cylinder release;
[0185] 7) Complete reset;
[0186] 3. Manual activation from the local control panel (dynamic release of the emergency disengagement system);
[0187] 1) Press the "Pump Start" button to operate the unloading arm quick connection device flange to connect to the flange of the movable docking test bench;
[0188] 2) Remove the connecting bolts between the double ball valves of the emergency release system and remove the pin;
[0189] 3) Select the control method at the "0 / maintenance override" position switch on the local control cabinet panel, and select the "0" control position;
[0190] 4) Select "Float" in the gear switch "Drive / 0 / Float", and the unloading arm will start to float;
[0191] 5) The manual release safety device is in the discharge arm connection position;
[0192] 6) Fill with liquid nitrogen and cool for 2h-3h;
[0193] 7) Press the "Emergency Disconnect System Disconnect" button on the local control cabinet panel and check and record the following items:
[0194] The hydraulic pump of the hydraulic power unit starts;
[0195] The sound and light alarm is activated;
[0196] The waiting time is required to be controlled within the range of 5s-7s;
[0197] Double ball valve closed, time set to about 5-10s adjustable range;
[0198] Emergency release system hydraulic cylinder release;
[0199] The unloading arm automatically retracts (close to the erection / storage position);
[0200] 8) Select the control method at the "0 / Maintenance Override" position switch on the local control cabinet panel, select the "Maintenance Override" control position, and operate the unloading arm to reconnect the emergency disconnection system;
[0201] 9) After the connection is completed, complete the overall reset of the unloading arm.
[0202] The present invention adopts the above technical scheme, and aims at the key problem that the existing LNG cryogenic unloading arm system faces, namely, the lack of performance testing technical means and evaluation methods, which needs to be solved urgently in the industry. An LNG cryogenic unloading arm and a performance testing and evaluation method thereof are proposed to overcome the defects of the prior art and solve the key problems in the industry, which has guiding significance for the design optimization of the LNG unloading arm and the safe and stable operation of the entire system of the LNG receiving station.
[0203] Based on the above unloading arm performance test and evaluation method, the present invention also provides an LNG cryogenic unloading arm, and the most preferred structural setting is determined by the above unloading arm performance test and evaluation method. Figure 3 and Figure 4 As shown, it includes a discharge arm body 1 , an outer arm pipeline 11 installed on the discharge arm body 1 , an emergency release device 6 and a quick connection device 5 .
[0204] The quick connection device 5 is arranged downstream of the discharge arm body 1 and docked with the LNG ship. The emergency detachment device 6 is arranged between the outer arm pipeline 11 and the quick connection device 5, and the emergency detachment device 6 is connected to the end of the outer arm pipeline 11 through a bend pipe, the emergency detachment device 6 is connected to the quick connection device 5 through a bend pipe, and the end of the bend pipe is connected to the corresponding equipment through a rotary joint 7. Specifically, the emergency detachment device 6 is usually arranged vertically, including an upper detachment part and a lower detachment part. The upper detachment part and the lower detachment part are connected by a locking mechanism, an LNG inlet end is formed on the upper detachment part, an LNG outlet end is formed on the lower detachment part, and a rotary joint 7 is respectively provided on the end of the outer arm pipeline 11, the LNG inlet end and the quick connection device 5 to connect with the bend pipe.
[0205] The main function of the rotary joint 7 is to allow the rigid structure pipeline to rotate through the rotary joint 7, so that the pipeline can not only realize the function of transporting cryogenic fluid but also realize 360° rotation on the connection surface. Before the unloading arm is put into use, the pipeline is purged through the nitrogen pipeline and the rotary joint for gas replacement and drying to ensure that there is no water vapor condensation inside. The design of the rotary joint 7 requires preventing the leakage of cryogenic liquid, being able to withstand loads and pressures, and requiring low friction loss during rotation. It can be seen from the above scheme that the end of the outer arm pipeline 11 of the present invention is composed of three rotary joints 7 and elbows. Among them, the elbow at the lower end of the emergency detachment device 6 is connected to the quick connection device 5 through the rotary joint 7, which can realize rapid docking with the flange of the transport ship. A corresponding rotary joint 7 is also installed at the upper end of the emergency detachment device 6 and the elbow position. Through the rotational cooperation between the rotary joint 7 and the components, it can adapt to the bumps, swaying and roll of the LNG transport ship.
[0206] As described above, the locking mechanism is a joint mechanism with interlocking emergency cut-off and emergency detachment, which is connected to a hydraulic control system and driven by the hydraulic control system. In addition, a position safety monitoring and alarm system is provided on the discharge arm body 1, and the hydraulic control system forms a linkage with the position safety monitoring and alarm system. Its operating principle is that the position safety monitoring and alarm system of the discharge arm starts the hydraulic control system, and the valve is shut off and the connecting mechanical joint is disconnected through mechanical or hydraulic interlocking. Generally, a backup power supply or other hydraulic system is equipped so that the emergency detachment system can also be started in the event of a power failure. If there is a hydraulic or power failure, the emergency detachment system has an automatic fault prevention device and maintains a safe lock. When the discharge arm exceeds the difference between the specified working range and the safety margin, the emergency detachment system of the locking mechanism will be automatically activated, and there are automatic movement measures in the control system so that the LNG discharge arm is quickly separated from the deck and the side of the LNG transport ship when the locking mechanism is opened. At the same time, during the detachment process of the emergency detachment system, the hydraulic system will automatically lock to prevent the discharge arm from moving under the action of wind load, so that the discharge arm will not collide with other equipment after detachment.
[0207] The quick connection device 5 includes a plurality of claw actuators docked with the LNG ship, and the claw actuators are equipped with an electrical drive system, and the disconnection or connection state of the quick connection device 5 is achieved by loosening or clamping the claw actuators. Preferably, the hydraulic control system, the position safety monitoring and alarm system, and the electrical drive system are all commonly used systems for existing unloading arms, and belong to conventional technical means in the field.
[0208] Furthermore, the discharge arm body 1 includes a column 12, a balancing transmission mechanism 13, an inner arm support 14, an outer arm support 15 and an inner arm pipeline 16. The column 12 is arranged vertically and is a vertical steel structure supporting the discharge arm. An LNG transmission pipeline is arranged inside the column 12, and a base is fixedly connected to the bottom end of the column 12, through which the column 12 can be installed at a dock or a floating dock. The inner arm support 14 is rotatably mounted on the top of the column 12 through a slewing bearing. The balancing transmission mechanism 13 includes a driving wheel 131 arranged at both ends of the inner arm support 14 and a balancing driving steel wire rope sleeved on the two driving wheels 131. One end of the inner arm support 14 is rotatably connected to the end of the outer arm support 15 through the driving wheel 131 at the end, and a counterweight module 17 is arranged at the other end of the inner arm support 14, so that the length of the inner arm support 14 from the slewing bearing to the outer arm support 15 is greater than the length of the inner arm support 14 from the slewing bearing to the counterweight module 17. The inner arm pipeline 16 is installed on the inner arm support 14, the outer arm pipeline 11 is installed on the outer arm support 15, and the inner arm pipeline 16 and the outer arm pipeline 11 are connected through an elbow and a rotary joint. A trunnion box 18 is installed on the top of the column 12, the slewing support is installed on the trunnion box 18, and the inner arm pipeline 16 is connected to the LNG transmission pipeline through an elbow and a rotary joint.
[0209] Furthermore, a vertical ladder 19 is assumed to be provided on one side of the column 11, and a maintenance platform 191 is installed on the top of the ladder 19, and the height of the maintenance platform 191 is consistent with the height of the inner arm support 14 in the vertical state. Through the arrangement of this structure, the operator can reach the maintenance platform 191 on the top through the ladder 19, which is convenient for online inspection and maintenance of the LNG unloading arm status.
[0210] Furthermore, a circle of metal mesh 111 is arranged on the outer wall of the pipe body at the end of the outer arm pipeline 11. By installing an additional circle of metal mesh 111 on the outer arm pipeline 11 near the emergency release device 6, it is possible to prevent the ice layer condensed on the outer arm from falling and injuring the operator, the ship and the equipment on the dock during the low-temperature operation.
[0211] The present invention arranges a connection assembly consisting of three swivel joints 7 and bent pipes at the outer arm end of the unloading arm, and realizes rapid docking with the flange of the transport ship by a quick connection device 5, so that the pipeline of the rigid structure can be rotated through the swivel joint 7, that is, the pipeline can not only realize the function of conveying cryogenic fluid but also realize 360° rotation on the connection surface. Through the rotational coordination between the swivel joint 7 and the components, it can adapt to the bumps, swaying and roll of the LNG transport ship, prevent the leakage of cryogenic liquid, and withstand loads and pressures, so as to improve the bearing performance of the unloading arm. Through the emergency release device 6 and the quick connection device 5, when the unloading arm exceeds the difference between the specified working range and the safety margin, the LNG unloading arm can be quickly separated from the deck and the side of the LNG transport ship, and the unloading arm will not collide with other equipment after separation, thereby ensuring the safety of the unloading arm.
[0212] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for testing and evaluating the performance of a discharge arm, characterized in that: include: According to the preset initial position parameters, the unloading arm body and the docking test bench are arranged in the area, and the unloading arm body is docked with the docking test bench; Keep the outer arm pipeline of the discharge arm body from rotating, move the docking test bench in a straight line to keep it away from the discharge arm body, and determine the multiple stage alarm points of the outer arm pipeline that are about to be separated in sequence within the moving distance of the docking test bench according to the alarm status of the discharge arm body; At multiple stage alarm points, the docking test bench is kept stationary, and the outer arm pipeline of the discharge arm body is controlled to rotate. According to the alarm status of the discharge arm body, the trajectory line of the stage alarm point is used as the dividing line, and the position of the outer arm pipeline relative to the dividing line after rotation is used to determine the direction alarm point where the outer arm pipeline is about to detach. According to the distance between the stage alarm point and the main body of the discharge arm, and the vertical distance between the direction alarm point and the dividing line, determine the alarm area range where the outer arm pipeline is about to leave at each point; By controlling the unloading arm body to operate within the alarm area where the outer arm pipeline is about to be detached at each point, various performances of the unloading arm body are tested one by one, and based on the test results, the corresponding performance of the unloading arm body is evaluated and adjusted.
2. A method for testing and evaluating the performance of a discharge arm according to claim 1, characterized in that: The arrangement method of the discharge arm body and the docking test bench includes: Select a test area, and arrange the base, slide rails, and docking test bench in the test area so that the slide rails are on one side of the base and are collinear with the base; The docking test bench is arranged on the slide rail by sliding, and the discharge arm body is fixed on the base, so that the discharge arm body and the docking test bench are docked through a quick connection device.
3. A method for testing and evaluating the performance of a discharge arm according to claim 2, characterized in that: The method for determining the alarm point includes: According to the distance of the docking test bench gradually away from the main body of the unloading arm, the pre-alarm point, the first stage alarm point and the second stage alarm point are determined on the slide rail in sequence; According to the position of the outer arm pipeline relative to the dividing line after rotation, the pre-alarm left side point and the pre-alarm right side point are determined at the pre-alarm point, the first-stage alarm left side point and the first-stage alarm right side point are determined at the first-stage alarm point, and the second-stage alarm left side point and the second-stage alarm right side point are determined at the second-stage alarm point.
4. A method for testing and evaluating the performance of a discharge arm according to claim 3, characterized in that: The alarm areas where the outer arm pipeline is about to leave at each point are as follows: The range of the pre-alarm point is 18500-19050mm; The range of the alarm points in the first stage is 19450-19550mm; The range of the second stage alarm point is 20000-20080mm; The range of the left point of the pre-alarm is 6600-6850mm; The range area of the right point of the pre-alarm is 0mm; The range of the left point of the first stage alarm is 7150-7320mm; The range of the right point of the first stage alarm is 480-530mm; The range of the left point of the second stage alarm is 1280-1330mm; The range of the right side point of the second stage alarm is 8900-9000mm.
5. A method for testing and evaluating the performance of a discharge arm according to claim 1, characterized in that: The various performances tested on the main body of the unloading arm include the operating performance of the unloading arm, the status of the locking mechanism, the balance performance of the unloading arm, the alarm range of the proximity switch, the operating speed of the unloading arm, the interference status between the moving parts of the unloading arm, the operating performance of the quick connection device and the position of its flange, and the emergency release performance.
Citation Information
Patent Citations
Combined movable loading and unloading equipment for wharf
CN102730615A
LNG large-caliber shore-based intelligent loading and unloading system
CN111664354A
Performance testing device and method for rotary joint of LNG conveying system with vertical structure
CN112857778A
LNG (Liquefied Natural Gas) loading / unloading device of overwater natural gas filling station
CN203784631U
LNG (Liquefied Natural Gas) low-temperature unloading arm
CN217229529U