10kV bus voltage control method, system and medium capable of alleviating power supply tension

By reducing the voltage of the 10kV busbar during peak grid load periods, identifying the target busbar, and adjusting voltage control, the problem of power supply shortage in the grid was solved. This achieved automatic control of load reduction and voltage compliance, resulting in low cost and high efficiency.

CN114844040BActive Publication Date: 2024-11-12STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210609067.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-31
Publication Date
2024-11-12
Estimated Expiration
2042-05-31

AI Technical Summary

Technical Problem

Existing technologies are insufficient to effectively alleviate power shortages during peak grid load periods. Increasing power sources or energy storage methods is costly and uneconomical, while orderly electricity use results in losses of industrial and commercial electricity load and triggers social problems.

Method used

By reducing the 10kV bus voltage in urban areas during peak load periods, identifying target buses and prioritizing them, adjusting voltage control target values ​​to reduce electricity load, and ensuring that user voltage is qualified, automatic control is achieved using a microprocessor and memory system.

Benefits of technology

Without affecting the voltage quality of users, it effectively reduces the power load, alleviates power supply shortages, and has the advantages of low cost and high efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114844040B_ABST
    Figure CN114844040B_ABST
Patent Text Reader

Abstract

The present invention discloses a 10kV bus voltage control method, system and medium that can alleviate power supply tension. The method of the present invention comprises determining a target 10kV bus that can reduce load; determining the maximum load that can be reduced for each target 10kV bus and sorting them to determine the priority; and determining a power supply gap ΔP when there is a power supply gap during the peak load period. g When the voltage control target value of each target 10kV bus is adjusted according to the sorted priority to reduce the power load and reduce the power supply gap; after the load peak period, the voltage control target value of each target 10kV bus is restored to the value before adjustment. The present invention can adjust the 10kV bus voltage target value during the load peak period while ensuring that the user voltage is qualified, reduce the power load, and relieve the pressure of power supply shortage. It can be used to reduce the peak power load and alleviate the problem of power supply shortage during the load peak period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a power grid dispatching optimization technology, and in particular to a 10kV bus voltage control method, system and medium capable of alleviating power supply tension. Background Art

[0002] In recent years, the load of power grids has reached new highs. In many places, there is a certain power supply gap during the peak load period. The peak load period every year will bring severe challenges to the operation of the power grid, and the pressure of orderly power consumption is becoming increasingly prominent. How to effectively alleviate the power supply shortage during the peak load period is a difficult problem in power grid operation that needs to be solved urgently.

[0003] At present, the method of increasing power supply points or increasing power supply capacity is a fundamental measure to solve the problem of power supply shortage. However, due to the construction period of power plants, coal / gas primary energy supply, the impact of rainfall on hydropower and the instability of wind / photovoltaic output, the method of increasing power supply cannot solve the problem of power supply shortage in the short term. Moreover, the current power supply shortage only occurs for a short period of time during the period of highest load. The period of load gap throughout the year is less than 100 hours, and the existing power supply fully meets the load demand during other periods. The method of increasing power supply points is not economically cost-effective. The use of energy storage also has problems such as high investment cost and low return. The orderly use of electricity to ensure the electricity consumption of residents, although the implementation of technical difficulties and investment is low, but the loss of industrial and commercial electricity load will also cause some social problems. Summary of the invention

[0004] Technical problem to be solved by the present invention: In view of the above-mentioned problems in the prior art, a 10kV bus voltage control method, system and medium are provided to alleviate power supply tension. The present invention can be used to reduce peak power load and alleviate the problem of power supply tension during peak load periods. While ensuring that the user voltage is qualified, the 10kV bus voltage target value is adjusted during peak load periods to reduce the power load and alleviate the pressure of power supply tension.

[0005] The load is generally equivalent to a combination of a constant impedance load and a constant power load. Within the allowable operating voltage range, the constant impedance load characteristic is that the load is proportional to the square of the voltage, and the equivalent impedance value is relatively constant; the constant power load characteristic is that the load is relatively constant, and the equivalent impedance value is proportional to the square of the voltage. According to many years of operating experience, the equivalent constant impedance load of residential household loads and ordinary commercial loads accounts for a large proportion, exceeding 50%. Therefore, based on the above findings, the 10kV bus voltage in the urban area can be reduced during peak load periods, and the power load can be reduced without user induction, thereby achieving the purpose of alleviating power supply tension. Based on the above findings, in order to solve the problem of power supply tension during peak load periods, the technical solution adopted by the present invention is:

[0006] A 10kV bus voltage control method for alleviating power supply tension comprises:

[0007] S1, determine the target 10kV busbar where load can be reduced;

[0008] S2, determining the maximum load that can be reduced for each target 10kV bus and sorting them to determine the priority;

[0009] S3, there is a power supply gap ΔP during the peak load period g When the voltage control target value of each target 10kV bus is adjusted according to the sorted priority to reduce the power load and reduce the power supply gap; after the load peak period, the voltage control target value of each target 10kV bus is restored to the value before adjustment.

[0010] Optionally, the conditions for determining the target 10kV bus for load reduction in step S1 include: there are no industrial or commercial loads with voltage requirements in the power supply load of the 10kV bus; there are no low-voltage substations in the power supply area of ​​the 10kV bus; and there are no 10kV grid-connected distributed power sources on the 10kV bus lines.

[0011] Optionally, the calculation function expression of the maximum load that can be reduced in step S2 is:

[0012]

[0013] In the above formula, ΔP Li is the maximum load reduction of the target 10kV bus, K i is the ratio of pure impedance load to total load in the power supply load of the i-th target 10kV bus, V Li is the bus voltage corresponding to the historical maximum load of the i-th target 10kV bus, V 0i is the minimum allowable voltage of the ith target 10kV busbar, P Li is the historical maximum load of the i-th target 10kV bus.

[0014] Optionally, when sorting to determine the priority in step S2, the target 10kV bus with a larger maximum load that can be reduced has a higher priority; and in step S3, adjusting the voltage control target value of each target 10kV bus according to the sorted priority to reduce the load includes:

[0015] S3.1, initialize loop variable j, select the target 10kV bus with the highest priority as the initial current bus j;

[0016] S3.2, calculate the current load reduction ΔP of the current bus j j ;

[0017] S3.3, if the power supply gap ΔP g Satisfy the condition ΔPg ≥ΔP j Then jump to S3.5; otherwise jump to S3.4;

[0018] S3.4, according to the power supply gap ΔP g Calculate the voltage control target value V of the current bus j kj , keep the voltage control target values ​​of the remaining target 10kV buses unchanged, and jump to step S3.8;

[0019] S3.5, based on the current minimum allowable voltage V of bus j 0j Determine the voltage control target value V of the current bus j kj ;

[0020] S3.6, according to the current bus j can reduce the load ΔP j Calculate the remaining power supply gap ΔP′ g ;

[0021] S3.7, among the remaining target 10kV buses, select the target 10kV bus with the highest priority as the initial current bus j; set the remaining power supply gap ΔP′ g As the new supply gap ΔP g ; Jump to S3.2; If there is no remaining target 10kV bus, it is determined that the traversal selection is completed and jump to step S3.8;

[0022] S3.8, controlling the voltage control target value of each target 10kV bus according to the calculated voltage control target value to reduce the power load and thus reduce the power supply gap.

[0023] Optionally, in step S3.2, the current load ΔP may be reduced j The calculation function expression is:

[0024]

[0025] In the above formula, K j is the ratio of pure impedance load to total load in the current power supply load of bus j, V j is the bus voltage of the current bus j, V 0j is the current minimum allowable voltage of bus j, P j is the current load of the current bus j.

[0026] Optionally, in step S3.4, the voltage control target value V kj The calculation function expression is:

[0027]

[0028] In the above formula, V j is the bus voltage of the current bus j, ΔPg is the power supply gap, K j is the ratio of pure impedance load to total load in the current power supply load of bus j, P j is the current load of the current bus j.

[0029] Optionally, in step S3.5, according to the current minimum allowable voltage V of bus j 0j Determine the voltage control target value V of the current bus j kj Specifically, it means that the current minimum allowable voltage V 0j As the current bus voltage control target value V kj .

[0030] Optionally, the remaining power supply gap ΔP′ in step S3.5 g The calculation function expression is:

[0031] ΔP′ g =ΔP g -ΔP j

[0032] In the above formula, ΔP g is the power supply gap, ΔP j is the current load reduction of bus j.

[0033] In addition, the present invention also provides a 10kV bus voltage control system capable of alleviating power supply shortage, comprising a microprocessor and a memory connected to each other, wherein the microprocessor is programmed or configured to execute the steps of the 10kV bus voltage control method capable of alleviating power supply shortage.

[0034] In addition, the present invention also provides a computer-readable storage medium, in which a computer program is stored, and the computer program is used to be programmed or configured by a microprocessor to execute the steps of the 10kV bus voltage control method that can alleviate power supply tension.

[0035] Compared with the prior art, the present invention has the following advantages: the method of the present invention comprises determining the target 10kV busbars for load reduction, determining the maximum load that can be reduced for each target 10kV busbar and sorting them to determine the priority, and determining the power supply gap ΔP when there is a load peak period. gWhen adjusting the voltage control target value of each target 10kV bus according to the sorted priority, the power load is reduced to reduce the power supply gap; after the load peak period, the voltage control target value of each target 10kV bus is restored to the value before adjustment. The present invention uses the 10kV bus in the substation as the control target to alleviate the power supply tension, reduces the 10kV bus voltage in the urban area during the load peak period, and reduces the power load without user perception, so as to achieve the purpose of alleviating the power supply tension. While ensuring that the user voltage is qualified, the 10kV bus voltage target value is adjusted during the load peak period to reduce the power load to alleviate the pressure of power supply tension, and has the advantages of low investment cost and great effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 Schematic diagram of the basic flow of the method of the embodiment of the present invention.

[0037] Figure 2 The flowchart of adjusting the voltage control target value of each target 10kV bus according to an embodiment of the present invention. DETAILED DESCRIPTION

[0038] like Figure 1 As shown, the 10kV bus voltage control method of this embodiment that can alleviate power supply tension includes:

[0039] S1, determine the target 10kV busbar where load can be reduced;

[0040] S2, determining the maximum load that can be reduced for each target 10kV bus and sorting them to determine the priority;

[0041] S3, there is a power supply gap ΔP during the peak load period g When the voltage control target value of each target 10kV bus is adjusted according to the sorted priority to reduce the power load and reduce the power supply gap; after the load peak period, the voltage control target value of each target 10kV bus is restored to the value before adjustment.

[0042] When determining the target 10kV bus for load reduction in step S1, the 10kV bus for which the control method of this embodiment can be implemented can be selected based on the load, power type and voltage history data. Specifically, the conditions for determining the target 10kV bus for load reduction in step S1 include: there are no industrial or commercial loads with voltage requirements in the power supply load of the 10kV bus; there are no low-voltage substations in the power supply area of ​​the 10kV bus; there are no 10kV grid-connected distributed power sources on the 10kV bus. Through the above conditions, it is possible to ensure that the user voltage is qualified and the power load is reduced in a non-sensing state for the user, and then the elastic space for reducing the load on each 10kV bus under the premise of ensuring the basic power supply quality can be used to make up for the power supply gap ΔP during the peak load period. g , thereby alleviating the pressure of power supply shortage.

[0043] In this embodiment, the calculation function expression of the maximum load that can be reduced in step S2 is:

[0044]

[0045] In the above formula, ΔP Li is the maximum load reduction of the target 10kV bus, K i is the ratio of pure impedance load to total load in the power supply load of the i-th target 10kV bus, V Li is the bus voltage corresponding to the historical maximum load of the i-th target 10kV bus, V 0i is the minimum allowable voltage of the ith target 10kV busbar, P Li is the historical maximum load of the i-th target 10kV bus.

[0046] In this embodiment, when sorting in step S2 to determine the priority, the target 10kV bus with a larger maximum load reduction has a higher priority; Figure 2 As shown, in step S3, adjusting the voltage control target value of each target 10kV busbar according to the sorted priority to reduce the load includes:

[0047] S3.1, initialize loop variable j, select the target 10kV bus with the highest priority as the initial current bus j;

[0048] S3.2, calculate the current load reduction ΔP of the current bus j j ;

[0049] S3.3, if the power supply gap ΔP g Satisfy the condition ΔP g ≥ΔP j Then jump to S3.5; otherwise jump to S3.4;

[0050] S3.4, according to the power supply gap ΔP g Calculate the voltage control target value V of the current bus j kj , keep the voltage control target values ​​of the remaining target 10kV buses unchanged, and jump to step S3.8;

[0051] S3.5, based on the current minimum allowable voltage V of bus j 0j Determine the voltage control target value V of the current bus j kj ;

[0052] S3.6, according to the current bus j can reduce the load ΔP j Calculate the remaining power supply gap ΔP′ g ;

[0053] S3.7, among the remaining target 10kV buses, select the target 10kV bus with the highest priority as the initial current bus j; set the remaining power supply gap ΔP′ g As the new supply gap ΔP g ; Jump to S3.2; If there is no remaining target 10kV bus, it is determined that the traversal selection is completed and jump to step S3.8;

[0054] S3.8, controlling the voltage control target value of each target 10kV bus according to the calculated voltage control target value to reduce the power load and thus reduce the power supply gap.

[0055] In this embodiment, the current load that can be reduced in step S3.2 is ΔP j The calculation function expression is:

[0056]

[0057] In the above formula, K j is the ratio of pure impedance load to total load in the current power supply load of bus j, V j is the bus voltage of the current bus j, V 0j is the current minimum allowable voltage of bus j, P j is the current load of the current bus j.

[0058] In this embodiment, the voltage control target value V in step S3.4 kj The calculation function expression is:

[0059]

[0060] In the above formula, V j is the bus voltage of the current bus j, ΔP g is the power supply gap, K j is the ratio of pure impedance load to total load in the current power supply load of bus j, P j is the current load of the current bus j.

[0061] In this embodiment, in step S3.5, the minimum allowable voltage V of the current bus j is 0j Determine the voltage control target value V of the current bus j kj Specifically, it means that the current minimum allowable voltage V 0j As the current bus voltage control target value V kj .

[0062] In this embodiment, the remaining power supply gap ΔP′ in step S3.5 g The calculation function expression is:

[0063] ΔP′ g =ΔPg -ΔP j

[0064] In the above formula, ΔP g is the power supply gap, ΔP j is the current load reduction of bus j.

[0065] In summary, the method of this embodiment uses the 10kV bus in the substation as the control target to alleviate power supply tension. By determining the target 10kV bus that can reduce the load, the maximum load that can be reduced for each target 10kV bus is determined and sorted to determine the priority. There is a power supply gap ΔP during the peak load period. g When adjusting the voltage control target value of each target 10kV bus according to the sorted priority, the power load is reduced to reduce the power supply gap; after the peak load period, the voltage control target value of each target 10kV bus is restored to the value before adjustment, so as to ensure that the user voltage is qualified while reducing the power load by adjusting the 10kV bus voltage target value during the peak load period to ease the pressure of power supply shortage, which has the advantages of low investment cost and great effect.

[0066] In addition, this embodiment also provides a 10kV bus voltage control system that can alleviate power supply tension, including a microprocessor and a memory connected to each other, and the microprocessor is programmed or configured to execute the steps of the aforementioned 10kV bus voltage control method that can alleviate power supply tension.

[0067] In addition, this embodiment also provides a computer-readable storage medium, in which a computer program is stored. The computer program is used to be programmed or configured by a microprocessor to execute the steps of the aforementioned 10kV bus voltage control method that can alleviate power supply tension.

[0068] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application may take the form of a computer program product implemented on one or more computer-readable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes. The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, may be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the functions in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing device to work in a specific way, so that the instructions stored in the computer-readable memory produce a product including an instruction device, which implements the functions specified in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be loaded onto a computer or other programmable data processing device, so that a series of operation steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide for implementing the process in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0069] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. A 10kV bus voltage control method that can alleviate power supply tension. It is characterized in that include: S1, determine the target 10kV busbar where load can be reduced; S2, determine the maximum load that can be reduced for each target 10kV bus and sort them to determine the priority. The target 10kV bus with a larger maximum load that can be reduced has a higher priority. The calculation function expression of the maximum load that can be reduced in step S2 is: In the above formula, Δ P Li For the i The maximum load reduction of the 10kV busbar is: K i For the i The ratio of pure impedance load to total load in the power supply load of the 10kV busbar. V Li For the i The bus voltage corresponding to the historical maximum load of the 10kV bus is V 0i For the i The minimum allowable voltage of the 10kV busbar is P Li For the i The historical maximum load of the 10kV busbar; S3, there is a power supply gap Δ during the peak load period P g When the voltage control target value of each target 10kV bus is adjusted according to the sorted priority to reduce the power load and reduce the power supply gap; after the load peak period, the voltage control target value of each target 10kV bus is restored to the value before adjustment.

2. The 10kV bus voltage control method for alleviating power supply tension according to claim 1, It is characterized in that The conditions for determining the target 10kV bus for load reduction in step S1 include: there are no industrial or commercial loads with voltage requirements in the power supply load of the 10kV bus; there are no low-voltage substations in the power supply area of ​​the 10kV bus; and there are no 10kV distributed power sources connected to the grid on the 10kV bus.

3. The 10kV bus voltage control method for alleviating power supply tension according to claim 1, It is characterized in that In step S3, adjusting the voltage control target value of each target 10kV busbar according to the sorted priority to reduce the load includes: S3.1, Initialize loop variables j , select the target 10kV bus with the highest priority as the initial current bus j ; S3.2, calculate the current bus j The current load can be reduced by Δ P j ; S3.3, if the power supply gap Δ P g Satisfy the condition Δ P g ≥Δ P j Then jump to S3.5; otherwise jump to S3.4; S3.4, according to the power supply gap Δ P g Calculate the current bus j Voltage control target value V kj , keep the voltage control target values ​​of the remaining target 10kV buses unchanged, and jump to step S3.8; S3.5, according to the current bus j The minimum allowable voltage V 0j Determine the current bus j Voltage control target value V kj ; S3.6, according to the current bus j The current load can be reduced by Δ P j Calculate the remaining power supply gap Δ P´ g ; S3.7, among the remaining target 10kV buses, select the target 10kV bus with the highest priority as the initial current bus j ; The remaining power supply gap Δ P´ g As a new power supply gap Δ P g ; Jump to S3.2; If there is no remaining target 10kV bus, it is determined that the traversal selection is completed and jump to step S3.8; S3.8, controlling the voltage control target value of each target 10kV bus according to the calculated voltage control target value to reduce the power load and thus reduce the power supply gap.

4. The 10kV bus voltage control method for alleviating power supply tension according to claim 3, It is characterized in that The current load reduction in step S3.2 is Δ P j The calculation function expression is: In the above formula, K j For the current bus j The ratio of pure impedance load to the total load in the power supply load. V j For the current bus j The bus voltage, V 0j For the current bus j The minimum allowable voltage, P j For the current bus j The current load.

5. The 10kV bus voltage control method for alleviating power supply tension according to claim 3, It is characterized in that Voltage control target value in step S3.4 V kj The calculation function expression is: In the above formula, V j For the current bus j The bus voltage, Δ P g To address the power supply gap, K j For the current bus j The ratio of pure impedance load to the total load in the power supply load. P j For the current bus j The current load.

6. The 10kV bus voltage control method for alleviating power supply tension according to claim 3, It is characterized in that In step S3.5, according to the current bus j The minimum allowable voltage V 0j Determine the current bus j Voltage control target value V kj Specifically, it means that the current bus j The minimum allowable voltage V 0j As current bus j Voltage control target value V kj .

7. The 10kV bus voltage control method for alleviating power supply tension according to claim 3, It is characterized in that The remaining power supply gap Δ in step S3.5 P´ g The calculation function expression is: In the above formula, Δ P g is the power supply gap, Δ P j For the current bus j The current can reduce the load.

8. A 10kV bus voltage control system capable of alleviating power supply shortage, comprising a microprocessor and a memory connected to each other, It is characterized in that The microprocessor is programmed or configured to execute the steps of the 10kV bus voltage control method for alleviating power supply shortage as described in any one of claims 1 to 7.

9. A computer-readable storage medium having a computer program stored therein. It is characterized in that The computer program is used to be programmed or configured by a microprocessor to execute the steps of the 10kV bus voltage control method for alleviating power supply shortage as described in any one of claims 1 to 7.