Negative ring grille construction method and underground passage construction method

By dividing the negative ring grille into multiple construction layers and installing it layer by layer, the problem of difficulty and risk of grille installation at the horse head door in the circular shaft is solved, and a more stable and safe construction process is achieved.

CN114876523BInactive Publication Date: 2024-12-03CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210446833.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-26
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the construction of underground passages, at the horse-head door between the vertical shaft with a circular radial cross-section and the horizontal passage, the installation process of the negative ring grille must occupy the inner space on the arc well wall. When installing from top to bottom, The bottom ends of the top and middle section grilles are in a suspended state, which increases installation difficulty and construction risks.

Method used

The construction section corresponding to the horse head door is divided into multiple construction layers, and the negative ring grille to be installed is divided into multiple layers. The well wall breaks and grille installation is carried out layer by layer along the depth direction of the shaft to ensure that each layer is The grille is spliced ​​in the pre-installed position to form an annular grille to avoid hanging at the bottom.

Benefits of technology

The construction difficulty and construction risks of negative ring grilles are reduced, the construction efficiency is improved, and the bottom end of the grille is prevented from hanging by layer by layer, which improves installation stability and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114876523B_ABST
    Figure CN114876523B_ABST
Patent Text Reader

Abstract

The present invention provides a negative ring grille construction method and an underground passage construction method, and relates to the technical field of underground passage construction. The negative ring grille construction method comprises: dividing the construction section corresponding to the horse head gate between the horizontal passage and the vertical shaft with a circular radial cross section into a plurality of construction layers distributed along the depth direction of the vertical shaft; dividing the annular negative ring grille into a plurality of negative ring grille layers corresponding to the plurality of construction layers one by one; performing intra-layer construction on the plurality of construction layers layer by layer from bottom to top, and the intra-layer construction comprises: breaking the shaft wall in the construction layer where the intra-layer construction is being carried out; installing the negative ring grille layer corresponding to the construction layer where the intra-layer construction is being carried out at a pre-installed position in the construction layer, so that the plurality of negative ring grille layers can be spliced ​​to form a negative ring grille. The negative ring grille construction method can enable the upper negative ring grille layer to be supported by the lower negative ring grille layer by installing the negative ring grille layers layer by layer from bottom to top, thereby reducing the construction risk and improving the construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground passage construction, and in particular to a negative ring grille construction method and an underground passage construction method. Background Art

[0002] During the dark excavation construction of underground passages such as subways, it is necessary to first dig a vertical shaft from the ground to the underground, and then dig horizontally on the side wall of the vertical shaft to form a horizontal passage, where the intersection of the vertical shaft and the horizontal passage is the horse head gate. Before excavating the horizontal passage, it is necessary to break the wall of the vertical shaft first, and then take the starting position of the horizontal passage as the starting point, gradually excavate the soil along the length of the horizontal passage, and install the grille after each step of soil excavation, so that multiple grilles can be installed to form a stable support for the horizontal passage. Among them, since the height of the horse head gate is usually high, it is difficult to install each grille in place at once. At present, when installing each grille, the grille is first divided into multiple sections along the height direction of the horse head gate, and the soil at the horizontal passage is divided into multiple layers, and then the soil is excavated layer by layer from top to bottom, and a section of the grille is installed after each layer of soil is excavated.

[0003] For construction locations with better terrain conditions, a vertical shaft with a square radial cross-section is usually used. In this case, the horse head gate is the longitudinal section of the connection between the vertical shaft and the cross passage, and the starting position of the cross passage is located at the horse head gate. Therefore, the installation process of the grille can be directly completed by directly excavating the soil behind the horse head gate and then following the above-mentioned grille installation method.

[0004] However, under special terrain conditions, the forces on the shaft are complex, and a shaft with a circular radial cross section is required. Figure 1 As shown, for the vertical shaft 1 with a circular radial cross-section, the broken shaft wall of the vertical shaft 1 is an arc surface. Correspondingly, the horse head gate between the vertical shaft 1 and the transverse passage 2 is a construction section covered by the inner side of the arc surface shaft wall 10 and extending along the length direction of the transverse passage 2. The starting position of the transverse passage 2 is the position of the horse head gate close to the side of the vertical shaft 1. Therefore, a grille needs to be installed in the above-mentioned construction section. To distinguish it from the grille 3 in the transverse passage 2 behind the horse head gate, the grille 3 at the horse head gate is also called a negative ring grille 4.

[0005] Since the horse head door between the vertical shaft and the horizontal passage with a circular radial cross-section is a construction section covered by the inner side of the curved shaft wall and extending along the length direction of the horizontal passage, the installation process of the negative ring grille needs to occupy the shaft space inside the curved shaft wall. When the negative ring grille is installed section by section from top to bottom according to the existing grille installation method, the bottom end of the top section negative ring grille and the bottom end of the middle section negative ring grille are located on the inner side of the curved shaft wall. At this time, the bottom end of the top section negative ring grille and the bottom end of the middle section negative ring grille are in a suspended state, which not only increases the difficulty of installation, but also has a high construction risk. Summary of the invention

[0006] The purpose of the present invention is to provide a negative ring grille construction method and an underground passage construction method to alleviate the technical problem in the prior art that, for a vertical shaft with a circular radial cross-section, the negative ring grille at the horse head door between the vertical shaft and the horizontal passage needs to occupy the shaft space inside the curved shaft wall during the installation process, and when the negative ring grille is installed section by section from top to bottom, the bottom end of the top section negative ring grille and the bottom end of the middle section negative ring grille are located inside the curved shaft wall and are in a suspended state, which not only increases the difficulty of installation but also increases the technical problem of high construction risk.

[0007] In a first aspect, the present invention provides a negative ring grille construction method, comprising:

[0008] Divide the construction section corresponding to the horse head gate between the transverse passage and the vertical shaft with a circular radial cross section into a plurality of construction layers distributed along the depth direction of the vertical shaft;

[0009] Dividing the annular negative ring grille to be installed at the horse head gate into a plurality of negative ring grille layers corresponding to the plurality of construction layers one by one;

[0010] Along the depth direction of the shaft, multiple construction layers are subjected to intra-layer construction from bottom to top, wherein the intra-layer construction includes a shaft wall breaking step and a negative ring grid installation step;

[0011] The shaft wall breaking step comprises: breaking the shaft wall of the vertical shaft within the construction layer where the construction in the layer is being carried out;

[0012] The negative ring grille installation step is: install the negative ring grille layer corresponding to the construction layer under construction in the layer at a pre-installation position in the construction layer, so that the negative ring grille layers in multiple construction layers can be spliced ​​to form a ring-shaped negative ring grille.

[0013] In an optional embodiment, there are multiple negative ring grilles, and the multiple negative ring grilles are installed in the construction section at intervals along the length direction of the construction section corresponding to the horse head gate.

[0014] In an optional embodiment, when performing the in-layer construction on any of the construction layers, the construction layer is first divided into a plurality of construction sections sequentially distributed along its length direction, and then in-segment construction is performed on the plurality of construction sections one by one along a direction away from the shaft, wherein the in-segment construction includes the step of breaking the shaft wall and the step of installing the negative ring grille performed sequentially;

[0015] During the in-segment construction, the shaft wall breaking step is: breaking the shaft wall of the vertical shaft within the scope of the construction section where the in-segment construction is being carried out;

[0016] During the in-segment construction, the negative ring grille installation step is: installing the negative ring grille layer corresponding to the construction segment undergoing in-segment construction at a pre-installation position within the construction segment.

[0017] In an optional embodiment, the in-segment construction further includes a reinforcement step after the negative ring grille installation step:

[0018] Spray concrete onto the negative ring grid layer.

[0019] In an optional embodiment, the in-layer construction further includes a frame installation step before the well wall breaking step:

[0020] A frame is constructed on the inner side of the shaft wall within the construction layer where construction is being carried out.

[0021] In an optional embodiment, among the plurality of construction layers, the negative ring grille layers of the remaining construction layers located below the top construction layer each include two oppositely and vertically arranged strip-shaped negative ring grille segments;

[0022] Among the plurality of construction layers, in the remaining construction layers located below the top construction layer, the in-layer construction further includes a first support member installation step located after the negative ring grille installation step:

[0023] A first support member is installed on the top of the construction layer where the inner layer construction is being carried out, and the first support member is connected between the tops of the two negative ring grid segments.

[0024] In an optional embodiment, the in-layer construction further includes a second support member installation step after the well wall breaking step:

[0025] The construction layer in which construction is being carried out is divided into a first construction layer and a second construction layer located on both sides of its central axis in the length direction; a second support member is installed at the junction of the first construction layer and the second construction layer, and the second support member is abutted between the top and bottom of the construction layer.

[0026] In an optional embodiment, the in-layer construction further includes a soil excavation step after the well wall breaking step and before the negative ring grid installation step:

[0027] The soil within the construction layer where construction is being carried out in the layer is excavated outside the construction layer.

[0028] In an optional embodiment, the in-layer construction further includes a soil reinforcement step after the negative ring grid installation step:

[0029] At the end of the construction layer far from the shaft where the in-layer construction is being carried out, an anchor pipe is driven into the soil on the end surface of the end and concrete is sprayed.

[0030] In a second aspect, the present invention provides an underground passage construction method, including the negative ring grille construction method described in any one of the aforementioned embodiments.

[0031] The negative ring grille construction method provided by the present invention includes: dividing the construction section corresponding to the horse head door between the horizontal passage and the vertical shaft with a circular radial cross section into a plurality of construction layers distributed along the depth direction of the vertical shaft; dividing the annular negative ring grille to be installed at the horse head door into a plurality of negative ring grille layers corresponding to the plurality of construction layers one by one; along the depth direction of the vertical shaft, from bottom to top, the plurality of construction layers are subjected to layer-by-layer construction, and the layer-by-layer construction includes a shaft wall breaking step and a negative ring grille installation step; the shaft wall breaking step is: breaking the shaft wall within the scope of the construction layer in which the layer-by-layer construction is being carried out; the negative ring grille installation step is: installing the negative ring grille layer corresponding to the construction layer in which the layer-by-layer construction is being carried out at a pre-installed position in the construction layer, so that the negative ring grille layers in the plurality of construction layers can be spliced ​​to form an annular negative ring grille. The negative ring grille construction method provided by the present invention is applicable to a vertical shaft with a circular radial cross section, and is particularly applicable to a situation where the radial cross section of the horizontal passage is large (such as a cross section height of 16.2 meters and a width of 8.9 meters), and it is difficult to install each annular negative ring grille in place at one time. When the negative ring grille construction method is used to construct the negative ring grille, the construction section corresponding to the horse head gate between the vertical shaft and the horizontal passage to be excavated can be divided into multiple construction layers distributed along the depth direction of the vertical shaft according to the construction method. Correspondingly, each annular negative ring grille to be installed at the horse head gate is divided into multiple negative ring grille layers corresponding to the multiple construction layers one by one. Then, along the depth direction of the vertical shaft, the multiple construction layers are subjected to layer-by-layer construction from bottom to top, and each layer-by-layer construction includes a shaft wall breaking step and a negative ring grille installation step. Among them, in the negative ring grille installation step in each construction layer, the negative ring grille layer corresponding to the construction layer needs to be installed at the pre-installation position in the construction layer, and the pre-installation position is the design position of the negative ring grille. After the layer-by-layer construction of the top construction layer is completed, the multiple negative ring grille layers in the multiple construction layers can be spliced ​​to form an annular negative ring grille. Therefore, when multiple construction layers are constructed layer by layer from bottom to top, the installation process of the upper negative ring grid layer can be supported by the lower negative ring grid layer, thereby preventing the bottom end of the negative ring grid layer from being suspended in the air.

[0032] Compared with the prior art, the negative ring grille construction method provided by the present invention breaks down the well wall layer by layer from bottom to top and installs the negative ring grille layer, so that the upper negative ring grille layer can be supported by the lower negative ring grille layer, preventing the bottom end of the negative ring grille layer from being suspended in the air, thereby reducing the construction difficulty of the negative ring grille, improving construction efficiency, and reducing construction risks.

[0033] The underground passage construction method provided by the present invention includes the above-mentioned negative ring grille construction method, and thus the underground passage construction method provided by the present invention has the same beneficial effects as the above-mentioned negative ring grille construction method. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0035] Figure 1 It is a top view of the existing vertical shaft, horizontal channel and negative ring grille with circular radial cross section;

[0036] Figure 2 A schematic diagram of a process flow of a negative ring grille construction method provided by an embodiment of the present invention;

[0037] Figure 3 Another schematic diagram of the process of constructing a negative ring grille according to an embodiment of the present invention;

[0038] Figure 4 A cross-sectional view of a vertical shaft, a horizontal channel and a negative ring grille with a circular radial cross section provided in an embodiment of the present invention;

[0039] Figure 5 A longitudinal cross-sectional view of the connection between the vertical shaft and the starting position of the horizontal passage provided in an embodiment of the present invention;

[0040] Figure 6 Another longitudinal cross-sectional view of the connection between the vertical shaft and the starting position of the horizontal passage provided by the embodiment of the present invention;

[0041] Figure 7 Another longitudinal cross-sectional view of the connection between the vertical shaft and the starting position of the horizontal passage provided by the embodiment of the present invention;

[0042] Figure 8 Another longitudinal cross-sectional view of the connection between the vertical shaft and the starting position of the horizontal channel provided in an embodiment of the present invention.

[0043] Icons: 1-vertical shaft; 10-arc shaft wall; 2-horizontal passage; 3-grating; 4-negative ring grille; 40-negative ring grille layer; 400-negative ring grille segment; 5-construction layer; 50-first construction layer; 51-second construction layer; 6-frame; 7-diagonal brace; 8-first support member; 9-second support member. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0045] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] Some embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.

[0047] Example:

[0048] like Figure 2 and Figure 3 As shown, the negative ring grille construction method provided in this embodiment includes:

[0049] Step S1: Divide the construction section corresponding to the horse head gate between the transverse passage 2 and the vertical shaft 1 with a circular radial cross section into a plurality of construction layers 5 distributed along the depth direction of the vertical shaft 1;

[0050] Step S2: dividing the annular negative ring grille 4 to be installed at the horse head gate into a plurality of negative ring grille layers 40 corresponding to the plurality of construction layers 5 one by one;

[0051] Step S3: along the depth direction of the shaft 1, multiple construction layers 5 are subjected to intra-layer construction from bottom to top, wherein the intra-layer construction includes a shaft wall breaking step (step S30) and a negative ring grid installation step (step S31);

[0052] Among them, step S30 is: breaking the shaft wall of the vertical shaft 1 within the construction layer 5 where the construction is being carried out; step S31 is: installing the negative ring grille layer 40 corresponding to the construction layer 5 where the construction is being carried out at the pre-installation position in the construction layer 5, so that the negative ring grille layers 40 in multiple construction layers 5 can be spliced ​​to form a ring-shaped negative ring grille 4.

[0053] The negative ring grille construction method provided in this embodiment is applicable to a shaft 1 with a circular radial cross section, and is particularly applicable to a horizontal channel 2 with a large radial cross section (e.g., a cross section height of 16.2 meters and a width of 8.9 meters), where it is difficult to install each annular negative ring grille 4 in place at one time. When the negative ring grille construction method is used to construct the negative ring grille 4, the construction method can be used as follows, such as Figure 4 As shown, the construction section corresponding to the horse head gate between the vertical shaft 1 and the horizontal passage 2 to be excavated is first divided into a plurality of construction layers 5 distributed along the depth direction of the vertical shaft 1. Figure 5-Figure 8 As shown, each annular negative ring grille 4 to be installed at the horse head gate is divided into a plurality of negative ring grille layers 40 corresponding to a plurality of construction layers 5, and then the plurality of construction layers 5 are subjected to layer-by-layer construction from bottom to top along the depth direction of the shaft 1, and each layer-by-layer construction includes a shaft wall breaking step and a negative ring grille installation step.

[0054] Among them, in the negative ring grille installation step in each construction layer 5, the negative ring grille layer 40 corresponding to the construction layer 5 needs to be installed at the pre-installation position in the construction layer 5. The pre-installation position is the designed position of the negative ring grille 4. When the construction in the uppermost construction layer 5 is completed, Figure 8 As shown, multiple negative ring grid layers 40 in multiple construction layers 5 can be spliced ​​to form an annular negative ring grid 4. Therefore, when multiple construction layers 5 are constructed layer by layer from bottom to top, the installation process of the upper negative ring grid layer 40 can be supported by the lower negative ring grid layer 40, thereby preventing the bottom end of the negative ring grid layer 40 from being suspended in the air.

[0055] Compared with the prior art, the negative ring grille construction method provided in the present embodiment breaks down the well wall layer by layer from bottom to top and installs the negative ring grille layer 40, so that the upper negative ring grille layer 40 can be supported by the lower negative ring grille layer 40, preventing the bottom end of the negative ring grille layer 40 from being suspended in the air, thereby reducing the construction difficulty of the negative ring grille 4, improving construction efficiency, and reducing construction risks.

[0056] It should be noted that in the existing installation process of the negative ring grille 4, it is necessary to first build a scaffold inside the curved shaft wall 10 of the shaft 1, and then use the scaffold to break the curved shaft wall 10, and then occupy the shaft space inside the curved shaft wall 10 to install the negative ring grille 4. However, the scaffold is located between the corresponding positions of the top and bottom of the curved shaft wall 10, so the scaffold is very high, which will hinder the process of installing the negative ring grille 4 from top to bottom, thereby increasing the difficulty of installation.

[0057] However, in this embodiment, even if it is necessary to erect a scaffolding in the construction layer 5 to support the step of breaking the well wall, the above-mentioned scaffolding is erected layer by layer from bottom to top, so the scaffolding has limited impact on the negative ring grille installation step. The negative ring grille construction method provided in this embodiment can further reduce the construction difficulty and improve construction efficiency.

[0058] In this embodiment, there are multiple negative ring grilles 4, and the multiple negative ring grilles 4 are installed at intervals in the construction section along the length direction of the construction section corresponding to the horse head gate.

[0059] A plurality of negative ring grilles 4 can provide effective and stable support to the construction section corresponding to the horse head gate, and therefore, in this embodiment, a plurality of negative ring grilles 4 are preferably used.

[0060] like Figure 4 As shown, the number of negative ring grilles 4 may be 6.

[0061] In practical applications, after the negative ring grille 4 is installed, when the dark excavation of the transverse channel 2 is continued, the grille 3 can be installed after the soil is excavated in the transverse channel 2. In this case, the grille 3 is different from the negative ring grille 4. Figure 4 As shown, the grille 3 is located behind the horse head door in the horizontal passage 2.

[0062] Furthermore, when performing the intra-layer construction on any construction layer 5 in step S3, the construction layer 5 is first divided into a plurality of construction sections distributed in sequence along its length direction, and then the intra-layer construction is performed on the plurality of construction sections one by one along the direction away from the shaft 1, and the intra-layer construction includes the shaft wall breaking step (step S30) and the negative ring grille installation step (step S31) performed successively;

[0063] During the in-segment construction, step S30 is: breaking the shaft wall of the vertical shaft 1 within the construction section where the in-segment construction is being carried out;

[0064] During the in-segment construction, step S31 is: installing the negative ring grid layer 40 corresponding to the construction section where the in-segment construction is being carried out at a pre-installation position in the construction section.

[0065] Each construction layer 5 is divided into a plurality of construction sections distributed along the length direction of the construction section. Then, during the construction within each layer, steps S30 and S31 are performed section by section on the plurality of construction sections in the construction layer 5 undergoing the intra-layer construction. This can effectively improve the stability of the intra-layer construction within each construction layer 5, and further improve the stability of the installation process of the plurality of negative ring grilles 4 in the construction section corresponding to the horse head gate.

[0066] Furthermore, the in-segment construction also includes a reinforcement step after the negative ring grid installation step (step S31 ): spraying concrete onto the negative ring grid layer 40 .

[0067] The concrete sprayed in the above reinforcement step can further play a reinforcement effect and improve the supporting stability of the negative ring grille 4.

[0068] like Figure 3 As shown, the in-layer construction also includes a frame 6 installation step (step S20) located before the well wall breaking step (step S30):

[0069] Step S20: constructing a frame 6 on the inner side of the shaft wall of the shaft 1 within the construction layer 5 where the construction is being carried out.

[0070] The frame 6 in step S20 may be the aforementioned scaffolding, and the frame 6 is used to support the well wall breaking process in step S30.

[0071] Among them, the frame 6 can be a double-row scaffolding, which refers to a scaffolding with two rows of columns spaced apart along the length direction of the construction layer 5. The double-row scaffolding has better supporting stability, so in this embodiment, the frame 6 is preferably a double-row scaffolding.

[0072] In addition, diagonal braces 7 may be installed on the frame 6 in the construction layer 5 where the construction is being carried out. The diagonal braces 7 are used to support the scaffolding and further improve the construction safety.

[0073] like Figure 5 , Figure 6 and Figure 7 As shown, among the multiple construction layers 5, the negative ring grid layers 40 of the remaining construction layers 5 located below the top construction layer 5 each include two oppositely and vertically arranged strip-shaped negative ring grid segments 400;

[0074] like Figure 3 As shown, in the remaining construction layers 5 located below the top construction layer 5 among the multiple construction layers 5, the intra-layer construction also includes a first support member 8 installation step (step S32) located after the negative ring grille installation step (step S31):

[0075] Step S32 : installing a first support member 8 on the top of the construction layer 5 where the in-layer construction is being performed, and connecting the first support member 8 between the tops of the two negative ring grid segments 400 .

[0076] In order to make the negative ring grid layers 40 in the multiple construction layers 5 be spliced ​​to form an annular negative ring grid 4, as Figure 5 As shown, the negative ring grid layer 40 in the bottom construction layer 5 not only includes two opposite and vertically arranged strip-shaped negative ring grid segments 400, but also an arched bottom negative ring grid segment 400 is connected between the two negative ring grid segments 400. Figure 8 As shown, the negative ring grid layer 40 located in the topmost construction layer 5 includes an arched top negative ring grid segment 400 .

[0077] The first support member 8 can support the upper construction layer 5 of two adjacent construction layers 5 and play the role of an inverted arch, thereby ensuring the stability of the upper construction layer 5 .

[0078] Moreover, the first support member 8 can remain in the soil after the construction of the negative ring grille 4 is completed, so as to form an effective support in the construction section at the horse head gate, so that subsequent construction personnel can excavate the soil behind the horse head gate after passing through the above-mentioned construction section to continue the excavation construction of the cross passage 2.

[0079] The first support member 8 may be a strip structure made of steel, such as a strip structure made of I-beams.

[0080] Furthermore, the first support member 8 can be installed horizontally on the top of the construction layer 5 .

[0081] like Figure 3 As shown, the in-layer construction also includes a second support member 9 installation step (step S33) after the well wall breaking step (step S30):

[0082] Step S33: Divide the construction layer 5 which is undergoing intra-layer construction into a first construction layer 50 and a second construction layer 51 located on both sides of its central axis in the length direction; install a second support member 9 at the junction of the first construction layer 50 and the second construction layer 51, and make the second support member 9 abut between the top and the bottom of the construction layer 5.

[0083] The second support member 9 can not only strengthen the support for the top of the construction layer 5, but also divide each construction layer 5 into a first construction layer 50 and a second construction layer 51. Figure 5-Figure 8 As shown, the first support member 8 and the second support member 9 can be interconnected with the negative ring grille layer 40. After each construction layer 5 has completed the construction within the layer, the first construction layer 50 and the second construction layer 51 in the construction layer 5 can respectively use the first support member 8, the second support member 9 and the negative ring grille layer 40 to cooperate with each other in time to form a ring structure. The timely formed ring structure can provide stable support for the construction section at the horse head gate, thereby reducing the disturbance of the soil behind the horse head gate during the subsequent installation of the negative ring grille 4, and effectively ensuring construction safety.

[0084] The second support member 9 may be a partition.

[0085] Furthermore, a partition board may be erected at the junction of the first construction layer 50 and the second construction layer 51 .

[0086] like Figure 3 As shown, the in-layer construction also includes a soil excavation step (step S300) located after the well wall breaking step (step S30) and before the negative ring grid installation step (step S31):

[0087] Step S300: excavating the soil within the construction layer 5 where the construction is being carried out to the outside of the construction layer 5.

[0088] Since the inner shaft space of the curved side wall of the shaft 1 only occupies part of the space at the horse head gate, the rest of the space of the horse head gate is covered with soil. Therefore, in order to prevent the soil from obstructing the progress of step S31, step S300 needs to be performed before step S31 to remove the above soil.

[0089] like Figure 3 As shown, the in-layer construction also includes a soil reinforcement step (step S34) after the negative ring grid installation step (step S31):

[0090] Step S34: at the end of the construction layer 5 far from the shaft 1 where the in-layer construction is being carried out, anchor pipes are driven into the soil on the end surface of the end and concrete is sprayed.

[0091] Both the installation of rough pipes and shotcrete can further reinforce the soil behind the horse head gate, thereby further preventing the soil from being disturbed and effectively improving construction safety.

[0092] Furthermore, a grouting anchor pipe may be used in step S34. Compared with an anchor pipe that is not filled with slurry, a grouting anchor pipe has a better anchoring effect on the soil, and can further reinforce the soil and prevent the soil from being disturbed.

[0093] In addition, in step S34, a mesh may be hung on the soil on the end face of the construction layer 5 away from the shaft 1, and the mesh may also play a role in reinforcing the soil.

[0094] This embodiment also provides an underground passage construction method, including the aforementioned negative ring grille construction method.

[0095] Since the underground passage construction method provided in this embodiment includes the aforementioned negative ring grille construction method, the underground passage construction method provided in this embodiment and the aforementioned negative ring grille construction method can solve the same technical problems and achieve the same technical effects.

[0096] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A negative ring grille construction method, characterized in that: include: Dividing the construction section corresponding to the horse head gate between the transverse passage (2) and the vertical shaft (1) having a circular radial cross section into a plurality of construction layers (5) distributed along the depth direction of the vertical shaft (1); Dividing the annular negative ring grille (4) to be installed at the horse head gate into a plurality of negative ring grille layers (40) corresponding one-to-one to the plurality of construction layers (5); Along the depth direction of the shaft (1), multiple construction layers (5) are subjected to layer-by-layer construction from bottom to top, wherein the layer-by-layer construction includes a shaft wall breaking step and a negative ring grid installation step; The step of breaking the shaft wall comprises: breaking the shaft wall of the vertical shaft (1) within the scope of the construction layer (5) where the construction in the layer is being carried out; The negative ring grille installation step comprises: installing the negative ring grille layer (40) corresponding to the construction layer (5) being constructed in the layer at a pre-installation position in the construction layer (5), so that the negative ring grille layers (40) in multiple construction layers (5) can be spliced ​​to form an annular negative ring grille (4).

2. The negative ring grille construction method according to claim 1, characterized in that: There are a plurality of negative ring grilles (4), and the plurality of negative ring grilles (4) are installed at intervals in the construction section along the length direction of the construction section corresponding to the horse head gate.

3. The negative ring grille construction method according to claim 2, characterized in that: When performing the in-layer construction on any of the construction layers (5), the construction layer (5) is first divided into a plurality of construction sections distributed in sequence along its length direction, and then in-segment construction is performed on the plurality of construction sections one by one in a direction away from the shaft (1), wherein the in-segment construction includes the step of breaking the shaft wall and the step of installing the negative ring grille, which are performed in sequence; During the in-segment construction, the shaft wall breaking step comprises: breaking the shaft wall of the vertical shaft (1) within the scope of the construction section where the in-segment construction is being carried out; During the in-segment construction, the negative ring grille installation step is: installing the negative ring grille layer (40) corresponding to the construction segment being constructed in the segment at a pre-installation position in the construction segment.

4. The negative ring grille construction method according to claim 3, characterized in that: The in-segment construction also includes a reinforcement step after the negative ring grille installation step: Concrete is sprayed onto the negative ring grid layer (40).

5. The negative ring grille construction method according to any one of claims 1 to 4, characterized in that: The in-layer construction also includes a frame (6) installation step located before the well wall breaking step: A frame (6) is built on the inner side of the shaft wall of the vertical shaft (1) within the scope of the construction layer (5) where the construction in the layer is being carried out.

6. The negative ring grille construction method according to any one of claims 1 to 4, characterized in that: Among the plurality of construction layers (5), the negative ring grille layers (40) of the remaining construction layers (5) located below the top construction layer (5) each include two oppositely and vertically arranged strip-shaped negative ring grille segments (400); In the remaining construction layers (5) located below the top construction layer (5) among the plurality of construction layers (5), the intra-layer construction further comprises the step of installing a first support member (8) located after the step of installing the negative ring grille: A first support member (8) is installed on the top of the construction layer (5) where the construction in the layer is being carried out, and the first support member (8) is connected between the tops of the two negative ring grid segments (400).

7. The negative ring grille construction method according to any one of claims 1 to 4, characterized in that: The in-layer construction further comprises a second support member (9) installation step after the well wall breaking step: The construction layer (5) in which the construction is being carried out is divided into a first construction layer (50) and a second construction layer (51) located on both sides of the central axis in the longitudinal direction thereof; a second support member (9) is installed at the intersection of the first construction layer (50) and the second construction layer (51), and the second support member (9) is abutted between the top and the bottom of the construction layer (5).

8. The negative ring grille construction method according to any one of claims 1 to 4, characterized in that: The in-layer construction also includes a soil excavation step after the well wall breaking step and before the negative ring grid installation step: The soil within the construction layer (5) where construction is being carried out is excavated outside the construction layer (5).

9. The negative ring grille construction method according to claim 8, characterized in that: The in-layer construction also includes a soil reinforcement step after the negative ring grid installation step: At the end of the construction layer (5) far from the shaft (1) where the construction in the layer is being carried out, anchor pipes are driven into the soil on the end surface of the end and concrete is sprayed.

10. A method for constructing an underground passage, characterized in that: The invention comprises the negative ring grille construction method as described in any one of claims 1 to 9.