A correction method for calculating coal consumption of coal-fired power generation units

By fitting the functional relationship between the steam turbine heat consumption, boiler efficiency and plant power consumption rate at the load point in the coal power unit, and taking into account actual operating differences, the calculation of power supply coal consumption is corrected, solving the problem of peak shaving and low-load operation in the existing technology. The calculation deviation problem of time period improves the calculation accuracy and representativeness, and provides more accurate guidance for unit energy saving.

CN114881449BActive Publication Date: 2024-10-29GUODIAN NANJING ELECTRIC POWER TEST RES CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210477634.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-28
Publication Date
2024-10-29
Estimated Expiration
2042-04-28

AI Technical Summary

Technical Problem

The existing coal consumption calculation method for power supply of coal power units has large deviations during peak load regulation and low-load operation periods, and cannot accurately represent actual operating conditions. Moreover, there is a large difference between conventional test conditions and actual operating conditions, resulting in inaccurate calculation results.

Method used

By conducting routine performance tests at multiple load points, the functional relationship between steam turbine heat consumption, boiler efficiency, and plant power consumption rate and load are fitted, and the corrected power supply coal consumption is calculated based on the actual operating load and differential factors to improve calculation accuracy and representativeness.

Benefits of technology

It improves the accuracy of coal consumption calculation for power supply of coal power units, brings the correction factors closer to the actual operating status, provides more accurate guidance on energy conservation and consumption reduction, and provides a solid foundation for carbon peaking and carbon neutrality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114881449B_ABST
    Figure CN114881449B_ABST
Patent Text Reader

Abstract

The present invention proposes a correction method for calculating the coal consumption of coal-fired power generation units in operation. According to the existing performance test results, the method performs fitting and weighted correction calculations on the coal consumption of each load point in the full load section; on this basis, the difference factors in the test process and daily operation are respectively corrected for the steam turbine heat consumption, boiler efficiency, plant power consumption rate, and pipeline efficiency, and the influence of these factors on the coal consumption of the unit is calculated, and then the correction calculation results of the coal consumption of the unit in operation are obtained. This method can not only improve the accuracy of the test coal consumption, verify the actual coal consumption of the unit in daily operation, but also provide a more accurate direction for energy saving and consumption reduction of coal-fired power generation units.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal consumption calculation of thermal power units, and in particular to a correction method for calculating coal consumption of coal power units during operation and power supply. Background Art

[0002] At present, the calculation of coal consumption for power supply of conventional coal-fired power units adopts the counter-balance method, which calculates the coal consumption under a certain load condition by testing the heat consumption of the steam turbine, boiler efficiency, plant power consumption rate, pipeline efficiency, etc. During the test process, there are many requirements for the operation mode and operating conditions of the unit, and the test process only represents an ideal state of the unit during this period. However, there are many differences between the actual operation state and the test process, including the fixed discharge and continuous discharge of the boiler, soot blowing, condenser water replenishment, system leakage, pipeline heat dissipation, auxiliary machine operation mode, etc. Many influencing factors in actual operation are difficult to fully consider in the test. At the same time, in the calculation process, the pipeline efficiency is generally taken as a constant, while the actual operation process is affected by various factors such as load and operating parameters, and the pipeline efficiency is a variable. Therefore, there is a certain difference between the coal consumption calculated by the test test and the actual operation coal consumption.

[0003] There are generally two methods for calculating the coal consumption of the unit's operating power supply. The first calculation method is the direct average method: through load statistics, the average load of the unit in a certain period of time is selected, and the turbine heat consumption, boiler efficiency, and plant power consumption rate under the average load are tested. The calculated coal consumption represents the coal consumption of the unit in the operating period. The second method is the simple weighted method: by selecting three to five operating load points to calculate the corresponding coal consumption, each load coal consumption represents the result of one load segment, and the weighted power supply coal consumption of the unit in a certain period of time is counted. The weighted power supply coal consumption represents the coal consumption of the unit in the operating period. The first method is a commonly used test method, which is simple and easy to implement, but the energy consumption of each load point is not a simple linear relationship. Therefore, the results calculated by this method will have a large deviation. The second method is relatively rarely used, and is generally only carried out when the energy consumption diagnosis of the whole plant is carried out. It has more test conditions and a large amount of data statistics. In the medium and high load operation period, the results of its test calculation have a certain accuracy.

[0004] However, with the flexibility requirements of the power grid, the load changes of the unit operation are gradually increasing. According to the requirements of the power grids in different regions, the peak load must meet at least 40% of the rated load, and some areas reach 30% of the rated load or even lower. The coal consumption of 50% rated load is about 10% higher than that of 100% rated load, and the coal consumption of 30% rated load and 50% rated load is also 10% or more higher. At present, few units consider the economy under peak load conditions, and performance test conditions are rarely carried out under less than 50% rated load. Through the above two conventional calculation methods, the deviation between the test results and the actual power supply coal consumption will become larger and larger. Conventional tests, the results of test calculations cannot fully represent the power supply coal consumption of the unit in the operating load section.

[0005] At the same time, no matter which calculation method is used, conventional test tests have high requirements for unit operating conditions, while there are many differences between actual operating conditions and the test process. The changes in power supply coal consumption caused by these differences are rarely considered during the test process, resulting in a further increase in the deviation between the test coal consumption and the actual coal consumption during operation. Summary of the invention

[0006] The purpose of the present invention is to solve the above problems and improve the calculation accuracy of energy consumption indicators of coal-fired power generation units. The present invention provides a correction method for calculating coal consumption of coal-fired power generation units in operation and power supply.

[0007] The technical solution of the present invention:

[0008] A correction method for calculating coal consumption during operation of a coal-fired power generation unit comprises the following steps:

[0009] Step 1: The coal-fired power unit is subjected to conventional performance tests at several load points, and the steam turbine heat rate H, boiler efficiency η, and plant power rate L at each load point are tested. The steam turbine heat rate H, boiler efficiency η, and plant power rate L are fitted to obtain a functional relationship between the steam turbine heat rate H, boiler efficiency η, and plant power rate L and the unit load;

[0010] Step 2: Query the actual operating load of the coal-fired power unit in a certain operating period. If the actual operating load is less than 50%, proceed to step 3. If the actual operating load is greater than or equal to 50%, proceed to step 4.

[0011] Step 3: Take 50% load as the reference point load, and determine a load point p every time the reference point load decreases by 5%. m , until it is reduced to the minimum load p of the actual operation min , get the minimum load p min All load points within the 50% operating load range p m , and the corresponding steam turbine heat consumption Boiler efficiency Factory power consumption rate Go to step 5;

[0012] Step 4: Assume that 100% load is p0, and the difference in heat rate of the steam turbine at adjacent load points is K, where K is an arbitrary fixed constant. Calculate all load points p within the 50%--100% load range n , and each load point p n Corresponding turbine heat consumption Boiler efficiency Factory power consumption rate Go to step 5;

[0013] Step 5: The actual minimum load p of the computer group min Power supply coal consumption at each load point within the full operating load range to 100% B p ;

[0014] Step 6: The actual minimum load p of the computer group min Test power supply coal consumption B of the unit within the 100% full operating load range;

[0015] Step 7, calculating the impact ΔB of the difference factors between the conventional performance test process and the daily operation on the unit power supply coal consumption;

[0016] Step 8: Calculate the actual power supply coal consumption B of the unit through the test power supply coal consumption B and the influence of the difference factors on the power supply coal consumption of the unit ΔB t .

[0017] Furthermore, in step 1, 3 to 5 load points are selected to conduct conventional performance tests on the coal-fired power unit, and the 3 to 5 load points include 100%, 75%, and 50% loads.

[0018] Furthermore, in step 1, through function fitting, the functional relationship between the turbine heat consumption H, boiler efficiency η, plant power consumption rate L and unit load is obtained as follows:

[0019] H=H(p)

[0020] η=η(p)

[0021] L=L(p)

[0022] In the formula: H is the heat consumption of the steam turbine; η is the boiler efficiency; L is the plant power consumption rate; p is the unit load.

[0023] Furthermore, in step 5, the minimum load p is included min All load points within the 50% operating load range p m The calculation of power supply coal consumption under the load range of 50%-100% is as follows: n The calculation formula for power supply coal consumption is:

[0024]

[0025] Among them, μ is the calorific value of standard coal, θ is the pipeline efficiency, H(p) is the function between any unit load p in the full load section and the turbine heat consumption H, η(p) is the function between any unit load p in the full load section and the boiler efficiency η, L(p) is the function between any unit load p in the full load section and the plant power consumption rate L;

[0026] make:

[0027] The calculation formula of power supply coal consumption is simplified to: p =f(p)·θ.

[0028] Further, step 6 specifically includes the following steps:

[0029] Step 61, set any load point p in the full operation load range of the unit i The corresponding steam turbine heat consumption, boiler efficiency, plant power consumption rate, and power supply coal consumption are the load point p i In (p i +p i-1 ) / 2 to (p i +p i+1 ) / 2 calculation results of the load section;

[0030] Step 62: Count the load points p i In (p i +p i-1 ) / 2 to (p i +p i+1 ) / 2The proportion of load segment operation time to total operation time T pi ;

[0031] Step 63, calculating the test power supply coal consumption B of the unit in the full operation load section by the following formula;

[0032] B=∫f(p)·θdT

[0033] After fitting and weighting, the test power supply coal consumption of the unit can be changed into:

[0034] B=∑f(p)·T pi ·θ

[0035] Where: T is the total operating time, and the pipeline efficiency θ is a constant.

[0036] Further, in step 7, the difference factors between the conventional performance test process and the daily operation include the factor λ affecting the pipeline efficiency, the factor α affecting the turbine heat consumption, the factor β affecting the boiler efficiency, and the factor κ affecting the plant power consumption rate.

[0037] Furthermore, the factor λ that affects pipeline efficiency includes the following sub-factors: fixed and continuous discharge of boilers, boiler soot blowing, condenser water supplement, system leakage, plant heat use, and pipeline heat dissipation;

[0038] The factor α that affects the heat consumption of the steam turbine includes the following sub-factors: the operation mode of the feed water pump, condensate pump, circulating water pump, and vacuum pump;

[0039] The factor β that affects boiler efficiency includes the following sub-factors: the operation mode of the coal mill, forced draft fan, induced draft fan, primary fan, and secondary fan;

[0040] The factor κ that affects the plant power consumption rate includes the following sub-factors: the operation mode of the feed water pump, condensate pump, circulating water pump, vacuum pump, coal mill, forced draft fan, induced draft fan, primary fan, and secondary fan.

[0041] Further, step 7 specifically includes the following steps:

[0042] Step 71, calculating the influence of the factor λ affecting pipeline efficiency on power supply coal consumption;

[0043] Step 72, calculating the influence of the factor α affecting the heat consumption of the steam turbine on the power supply coal consumption;

[0044] Step 73, calculating the influence of the factor β affecting boiler efficiency on power supply coal consumption;

[0045] Step 74, calculating the influence of the factor κ affecting the power consumption rate of the power plant on the power supply coal consumption;

[0046] Step 75, calculating the impact ΔB of the difference factor on the coal consumption of the power supply unit through the calculation results of steps 71 to 74.

[0047] Further, step 71 specifically includes the following steps:

[0048] Step 711: Calculate a sub-factor λ n Impact on power supply coal consumption The calculation formula is as follows:

[0049] The formula simplifies to: is the sub-factor λ n Impact of changes on pipeline efficiency;

[0050] Step 712: During the entire operation period of the unit, After correcting the calculation, The amount of change for:

[0051] in is the sub-factor λ n The proportion of the corresponding load operation time to the total operation time;

[0052] Step 713: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor λ that affects the pipeline efficiency, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is:

[0053] Further, step 72 specifically includes the following steps:

[0054] Step 721: Calculate a sub-factor α n Impact on power supply coal consumption The calculation formula is as follows:

[0055] make The formula becomes:

[0056] The formula is further simplified to: in is the sub-factor α n Heat consumption of steam turbine under corresponding load;

[0057] Step 722: During the entire operation period of the unit, After correcting the calculation, The amount of change for:

[0058] is the sub-factor α n The change in heat consumption of the steam turbine under the corresponding load is: is the sub-factor α n The proportion of the corresponding load operation time to the total operation time;

[0059] Step 723: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor α that affects the heat consumption of the steam turbine, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is:

[0060] Further, step 73 specifically includes the following steps:

[0061] Step 731: Calculate a sub-factor β n Impact on power supply coal consumption The calculation formula is as follows:

[0062]

[0063] make

[0064] After substituting, the formula becomes:

[0065] in Sub-factor β n Boiler efficiency under corresponding load;

[0066] The formula simplifies to:

[0067] in, Sub-factor β n Changes in boiler efficiency under corresponding load;

[0068] Step 732: During the entire operation period of the unit, After correcting the calculation, The amount of change for:

[0069] in, Sub-factor β n The proportion of the corresponding load operation time to the total operation time;

[0070] Step 733: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor β that affects the boiler efficiency, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is:

[0071] Further, step 74 specifically includes the following steps:

[0072] Step 741: Calculate a sub-factor κ n Impact on power supply coal consumption The calculation formula is as follows:

[0073]

[0074] make:

[0075] After substituting, the formula becomes:

[0076] in, The sub-factor κ n The power consumption rate of the plant under the corresponding load;

[0077] The formula simplifies to:

[0078]

[0079] Step 742: During the entire operation period of the unit, After correcting the calculation, The amount of change for:

[0080] in, The sub-factor κ n The change value of the power consumption rate of the corresponding load, The sub-factor κ n The proportion of the corresponding load operation time to the total operation time;

[0081] Step 733: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor κ that affects the plant power consumption rate, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is:

[0082] Further, in step 75, the influence ΔB of the difference factor on the power supply coal consumption of the unit is calculated by the following formula:

[0083]

[0084] Furthermore, the actual power supply coal consumption B of the unit in step 8 is t Calculated by the following formula: t =B+ΔB.

[0085] Beneficial effects of the invention: The invention proposes a correction method for calculating the coal consumption of coal-fired power generation units in operation. According to the existing performance test results, the method performs fitting and weighted correction calculation on the coal consumption of each load point in the full load section to improve the representativeness of the test results. On this basis, considering the differences between daily operation and the test process, the influence of various difference factors on the coal consumption of the unit is corrected and calculated, thereby improving the accuracy of the calculation of the coal consumption of the unit in operation.

[0086] The calculation correction method of the present invention can not only improve the accuracy of the experimental power supply coal consumption, but also the correction factors are closer to the actual operating status. The corrected calculated power supply coal consumption is also more representative, which provides more accurate guidance for energy conservation and consumption reduction of the unit, and lays a more solid foundation for coal-fired power units to achieve carbon peak and carbon neutrality. BRIEF DESCRIPTION OF THE DRAWINGS

[0087] Figure 1 Schematic diagram of the process of the present invention in the embodiment;

[0088] Figure 2 This is a schematic diagram comparing the calculation results of the conventional test method and the revised method for the unit power supply coal consumption in the implementation case. DETAILED DESCRIPTION

[0089] The following is a further detailed description of the specific implementation of the present invention, such as the shape, structure, mutual position and connection relationship between the various components involved, the function and working principle of each part, the manufacturing process and the operation method, etc., through the description of the embodiments with reference to the accompanying drawings, so as to help those skilled in the art to have a more complete, accurate and in-depth understanding of the concept and technical solution of the present invention:

[0090] like Figure 1 As shown, an embodiment of the present invention provides: a method for correcting the calculation of coal consumption for power supply of a coal-fired power unit, comprising the following steps:

[0091] Step 1: The coal-fired power unit is subjected to conventional performance tests at several load points, and the steam turbine heat rate H, boiler efficiency η, and plant power rate L at each load point are tested. The steam turbine heat rate H, boiler efficiency η, and plant power rate L are fitted to obtain a functional relationship between the steam turbine heat rate H, boiler efficiency η, and plant power rate L and the unit load;

[0092] Step 2: Query the actual operating load of the coal-fired power unit in a certain operating period. If the actual operating load is less than 50%, proceed to step 3. If the actual operating load is greater than or equal to 50%, proceed to step 4.

[0093] Step 3: Take 50% load as the reference point load, and determine a load point p every time the reference point load decreases by 5%. m , until it is reduced to the minimum load p of the actual operation min , get the minimum load p min All load points within the 50% operating load range p m , and the corresponding steam turbine heat consumption Boiler efficiency Factory power consumption rate Go to step 5;

[0094] Step 4: Assume that 100% load is p0, and the difference in heat rate of the steam turbine at adjacent load points is K, where K is an arbitrary fixed constant. Calculate all load points p within the 50%--100% load range n , and each load point p n Corresponding turbine heat consumption Boiler efficiency Factory power consumption rate Go to step 5;

[0095] Step 5: The actual minimum load p of the computer group min Power supply coal consumption at each load point within the full operating load range to 100% B p ;

[0096] Step 6: The actual minimum load p of the computer groupmin Test power supply coal consumption B of the unit within the 100% full operating load range;

[0097] Step 7, calculating the impact ΔB of the difference factors between the conventional performance test process and the daily operation on the unit power supply coal consumption;

[0098] Step 8: Calculate the actual power supply coal consumption B of the unit through the test power supply coal consumption B and the influence of the difference factors on the power supply coal consumption of the unit ΔB t .

[0099] In this embodiment, in step 1, 3 to 5 load points are selected to conduct a conventional performance test of the coal-fired power unit, and the 3 to 5 load points include 100%, 75%, and 50% load.

[0100] In this embodiment, in step 1, the functional relationship between the steam turbine heat consumption H, boiler efficiency η, plant power consumption rate L and unit load is obtained by function fitting:

[0101] H=H(p)

[0102] η=η(p)

[0103] L=L(p)

[0104] In the formula: H is the heat consumption of the steam turbine; η is the boiler efficiency; L is the plant power consumption rate; p is the unit load.

[0105] In this embodiment, step 5 includes the minimum load p min All load points within the 50% operating load range p m The calculation of coal consumption for power supply under the load range of 50%--100% is as follows: n The calculation formula for power supply coal consumption is:

[0106]

[0107] Among them, μ is the calorific value of standard coal, θ is the pipeline efficiency, H(p) is the function between any unit load p in the full load section and the turbine heat consumption H, η(p) is the function between any unit load p in the full load section and the boiler efficiency η, L(p) is the function between any unit load p in the full load section and the plant power consumption rate L;

[0108] make:

[0109] The calculation formula of power supply coal consumption is simplified to: p =f(p)·θ.

[0110] In this embodiment, step 6 specifically includes the following steps:

[0111] Step 61, set any load point p in the full operation load range of the unit i The corresponding steam turbine heat consumption, boiler efficiency, plant power consumption rate, and power supply coal consumption are the load point p i In (p i +p i-1 ) / 2 to (p i +p i+1 ) / 2 calculation results of the load section;

[0112] Step 62: Count the load points p i In (p i +p i-1 ) / 2 to (p i +p i+1 ) / 2The proportion of load segment operation time to total operation time T pi ;

[0113] Step 63, calculating the test power supply coal consumption B of the unit in the full operation load section by the following formula;

[0114] B=∫f(p)·θdT

[0115] After fitting and weighting, the test power supply coal consumption of the unit can be changed into:

[0116] B=∑f(p)·T pi ·θ

[0117] Where: T is the total operating time, and the pipeline efficiency θ is a constant.

[0118] In this embodiment, in step 7, the difference factors between the conventional performance test process and daily operation include the factor λ affecting pipeline efficiency, the factor α affecting turbine heat consumption, the factor β affecting boiler efficiency, and the factor κ affecting plant power consumption rate.

[0119] In this embodiment, the factor λ affecting the pipeline efficiency includes the following sub-factors: fixed and continuous discharge of the boiler, boiler soot blowing, condenser water supplement, system leakage, plant heat use, and pipeline heat dissipation;

[0120] The factor α that affects the heat consumption of the steam turbine includes the following sub-factors: the operation mode of the feed water pump, condensate pump, circulating water pump, and vacuum pump;

[0121] The factor β that affects boiler efficiency includes the following sub-factors: the operation mode of the coal mill, forced draft fan, induced draft fan, primary fan, and secondary fan;

[0122] The factor κ that affects the plant power consumption rate includes the following sub-factors: the operation mode of the feed water pump, condensate pump, circulating water pump, vacuum pump, coal mill, forced draft fan, induced draft fan, primary fan, and secondary fan.

[0123] In this embodiment, step 7 specifically includes the following steps:

[0124] Step 71, calculating the influence of the factor λ affecting pipeline efficiency on power supply coal consumption;

[0125] Step 72, calculating the influence of the factor α affecting the heat consumption of the steam turbine on the power supply coal consumption;

[0126] Step 73, calculating the influence of the factor β affecting boiler efficiency on power supply coal consumption;

[0127] Step 74, calculating the influence of the factor κ affecting the power consumption rate of the power plant on the power supply coal consumption;

[0128] Step 75, calculating the impact ΔB of the difference factor on the coal consumption of the power supply unit through the calculation results of steps 71 to 74.

[0129] In this embodiment, step 71 specifically includes the following steps:

[0130] Step 711: Calculate a sub-factor λ n Impact on power supply coal consumption The calculation formula is as follows:

[0131] The formula simplifies to: is the sub-factor λ n Impact of changes on pipeline efficiency;

[0132] Step 712: During the entire operation period of the unit, After correcting the calculation, The amount of change for:

[0133] in is the sub-factor λ n The proportion of the corresponding load operation time to the total operation time;

[0134] Step 713: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor λ that affects the pipeline efficiency, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is:

[0135] Further, step 72 specifically includes the following steps:

[0136] Step 721: Calculate a sub-factor α n Impact on power supply coal consumption The calculation formula is as follows:

[0137] make The formula becomes:

[0138] The formula is further simplified to: in is the sub-factor α n Heat consumption of steam turbine under corresponding load;

[0139] Step 722: During the entire operation period of the unit, After correcting the calculation, The amount of change for:

[0140] is the sub-factor α n The change in heat consumption of the steam turbine under the corresponding load, is the sub-factor α n The proportion of the corresponding load operation time to the total operation time;

[0141] Step 723: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor α that affects the heat consumption of the steam turbine, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is:

[0142] In this embodiment, step 73 specifically includes the following steps:

[0143] Step 731: Calculate a sub-factor β n Impact on power supply coal consumption The calculation formula is as follows:

[0144]

[0145] make

[0146] After substituting, the formula becomes:

[0147] in Sub-factor β n Boiler efficiency under corresponding load;

[0148] The formula simplifies to:

[0149] in, Sub-factor β n Changes in boiler efficiency under corresponding load;

[0150] Step 732: During the entire operation period of the unit, After correcting the calculation, The amount of change for:

[0151] in Sub-factor β n The proportion of the corresponding load operation time to the total operation time

[0152] Step 733: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor β that affects the boiler efficiency, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is:

[0153] In this embodiment, step 74 specifically includes the following steps:

[0154] Step 741: Calculate a sub-factor κ n Impact on power supply coal consumption The calculation formula is as follows:

[0155]

[0156] make:

[0157] After substituting, the formula becomes:

[0158] in, The sub-factor κ n The power consumption rate of the plant under the corresponding load;

[0159] The formula simplifies to:

[0160]

[0161] Step 742: During the entire operation period of the unit, Correction calculation start, The amount of change for:

[0162] in The sub-factor κ n The change value of the power consumption rate of the corresponding load, The sub-factor κ n The proportion of the corresponding load operation time to the total operation time;

[0163] Step 733: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor κ that affects the plant power consumption rate, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is:

[0164] In this embodiment, in step 75, the influence ΔB of the difference factor on the power supply coal consumption of the unit is calculated by the following formula:

[0165]

[0166] In this embodiment, the actual power supply coal consumption B of the unit in step 8 is t Calculated by the following formula: t =B+ΔB.

[0167] Another embodiment provided by the present invention is: a correction method for calculating coal consumption in operation of a coal-fired power unit according to the present invention. In order to better understand the correction method of the present invention, further explanation is given below in conjunction with an application implementation case.

[0168] 1) A conventional performance test was carried out on a 300MW subcritical reconstruction unit. The corresponding turbine heat consumption, boiler efficiency and plant power consumption rate were tested at 100%, 75% and 50% load, as shown in Table 1 below.

[0169] Table 1 Unit routine performance test data results

[0170] Parameter name unit 100% 75% 50% load MW 300 225 150 Steam turbine heat consumption kJ / (kW·h) 7866.2 7985 8334 Boiler efficiency % 93.35 93.49 93.51 Factory power consumption rate % 5.34 5.94 7.22

[0171] Through function fitting, the relationship between the main test results and the unit load can be obtained, namely:

[0172] H(p)=0.0205×p 2 -12.327×p+9722.6

[0173] η(p)=-0.96×(p / 300) 2 +1.12×(p / 300)+93.19

[0174] L(p)=5.4994×p 2 -12.02×p+11.859

[0175] 2) The operating load section is a certain day operation period, with the minimum load being 50%. Taking 100% load as the reference point, the heat consumption difference between two adjacent loads is calculated at 60 kJ / (kW·h), and all characteristic load points p in the entire operating load section can be obtained. n , the pipeline efficiency is taken as a constant of 0.985, and the corresponding steam turbine heat consumption at the load point is Boiler efficiency Factory power consumption rate Power supply coal consumption B p As shown in Table 2 below.

[0176] Table 2 Calculated results of various indicators when the heat rate difference K = 60

[0177]

[0178]

[0179] 3) To simplify the calculation, p n The steam turbine heat consumption, boiler efficiency and plant power consumption rate corresponding to the characteristic load point are expressed as (p n +p n-1 ) / 2 to (p n +p n+1 ) / 2 load segment corresponding to each parameter result, the proportion of this load segment in the total operating time is calculated as As shown in Table 3 below.

[0180] Table 3 Load segment ratio corresponding to characteristic load point when heat rate difference K=60

[0181] serial number Load point Corresponding load segment Corresponding load segment duration Corresponding load segment ratio unit MW MW h % P0 300 273.5-300 2.5 10.42 P1 247 236-273.5 3.6 15.00 P2 225 216-236 3.85 16.04 P3 207 199.5-216 1.8 7.50 P4 192 185.5-199.5 1.3 5.42 P5 179 173.5-185.5 0.95 3.96 P6 168 162.5-173.5 1.65 6.88 P7 157 153.5-162.5 1.95 8.13 P8 150 150-153.5 6.4 26.67

[0182] 4) After fitting and weighting 9 load segments, the test power supply coal consumption of the computer group was 321.52g / (kW·h) by using the fitting weighting method. The power supply coal consumption calculated by the direct average method at the average load (66.72%) was 319.33g / (kW·h), and the power supply coal consumption calculated by the simple weighting method at three load points (100%, 75%, 50%) was 320.86g / (kW·h).

[0183] 5) In this operating load section, the five influencing factors of boiler blowdown, boiler soot blowing, system leakage, and plant heat use are used for correction. Among them, boiler blowdown (co-operation), system leakage, and plant heat use are carried out continuously during the operating period, while boiler soot blowing is carried out twice in the morning and evening when the load is above 70%, and each blowing lasts for two hours.

[0184] Table 4 Influence of various factors on coal consumption

[0185] Influencing factors unit Leakage loss Steam for plant use Wastewater loss Sootblowing loss 100% impact on coal consumption g / (kW·h) 1.59 1.44 1.73 2.88 75% affects coal consumption g / (kW·h) 1.84 1.93 1.86 2.90 50% impact on coal consumption g / (kW·h) 2.61 2.95 2.65 0.00

[0186] The corrected calculation result of the influence of various influencing factors on power supply coal consumption is 6.85g / (kW·h).

[0187] 6) In this operating load section, at 50% load, the unit's circulating water pump operation mode changes from one pump to two pumps, and the dual pump operation time is about 4 hours, resulting in changes in turbine heat consumption and plant power consumption rate. The impact on the unit's operating coal consumption is shown in Table 5 below.

[0188] Table 5 The influence of various factors on coal consumption

[0189] Influencing factors unit Circulation pump operation mode Steam turbine heat consumption affects coal consumption g / (kW·h) -2.43 The power consumption rate of the plant affects the coal consumption g / (kW·h) 3.08

[0190] The revised calculation result of the effect of the change in the operating mode of the circulating water pump on the power supply coal consumption is 0.12g / (kW·h).

[0191] In this operating load section, due to the difference between the test and operation, these factors caused the unit's operating coal consumption to be affected by 6.97g / (kW·h). After corrected calculation, the actual power supply coal consumption of the unit was 328.49g / (kW·h).

[0192] The above embodiments are preferred implementation modes of the present invention, but the implementation modes of the present invention are not limited to the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications made without departing from the spirit and principles of the present invention shall be equivalent replacement methods and shall be included in the protection scope of the present invention.

Claims

1. A correction method for calculating coal consumption of coal-fired power generation units, characterized in that: The following steps are involved: Step 1: The coal-fired power unit is subjected to conventional performance tests at several load points, and the steam turbine heat rate H, boiler efficiency η, and plant power rate L at each load point are tested. The steam turbine heat rate H, boiler efficiency η, and plant power rate L are fitted to obtain a functional relationship between the steam turbine heat rate H, boiler efficiency η, and plant power rate L and the unit load; Step 2: Query the actual operating load of the coal-fired power unit in a certain operating period. If the actual operating load is less than 50%, proceed to step 3. If the actual operating load is greater than or equal to 50%, proceed to step 4. Step 3: Take 50% load as the reference point load, and determine a load point p every time the reference point load decreases by 5%. m , until it is reduced to the minimum load p of the actual operation min , get the minimum load p min All load points within the 50% operating load range p m , and the corresponding steam turbine heat consumption Boiler efficiency Factory power consumption rate Go to step 5; Step 4: Assume that 100% load is p0, and the difference in heat rate of the steam turbine at adjacent load points is K, where K is an arbitrary fixed constant. Calculate all load points p within the 50%-100% load range n , and each load point p n Corresponding turbine heat consumption Boiler efficiency Factory power consumption rate Go to step 5; Step 5: The actual minimum load p of the computer group min Power supply coal consumption at each load point within the full operating load range to 100% B p ; Step 6: The actual minimum load p of the computer group min Test power supply coal consumption B of the unit within the 100% full operating load range; Step 7, calculate the influence of the difference factors in the routine performance test process and daily operation on the coal consumption of the unit power supply △B; In step 7, the difference factors between the conventional performance test process and the daily operation include the factor λ affecting the pipeline efficiency, the factor α affecting the turbine heat consumption, the factor β affecting the boiler efficiency, and the factor κ affecting the plant power consumption rate; The factors that affect pipeline efficiency include the following sub-factors: boiler fixed discharge, continuous discharge, boiler soot blowing, condenser water supply, system leakage, plant heat use, and pipeline heat dissipation; The factor α that affects the heat consumption of the steam turbine includes the following sub-factors: the operation mode of the feed water pump, condensate pump, circulating water pump, and vacuum pump; The factor β that affects boiler efficiency includes the following sub-factors: the operation mode of the coal mill, forced draft fan, induced draft fan, primary fan, and secondary fan; The factor k that affects the power consumption rate of the plant includes the following sub-factors: the operation mode of the feed water pump, condensate pump, circulating water pump, vacuum pump, coal mill, blower, induced draft fan, primary fan, and secondary fan; Step 7 specifically includes the following steps: Step 71, calculating the influence of the factor λ affecting pipeline efficiency on power supply coal consumption; specifically includes the following steps: Step 711: Calculate a sub-factor λ n Impact on power supply coal consumption The calculation formula is as follows: The formula simplifies to: is the sub-factor λ n Impact of changes on pipeline efficiency; Step 712: During the entire operation period of the unit, After correcting the calculation, The amount of change for: in is the sub-factor λ n The proportion of the corresponding load operation time to the total operation time; Step 713: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor λ that affects the pipeline efficiency, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is: Step 72, calculating the influence of the factor α affecting the heat consumption of the steam turbine on the power supply coal consumption; specifically includes the following steps: Step 721: Calculate a sub-factor α n Impact on power supply coal consumption The calculation formula is as follows: make The formula becomes: The formula is further simplified to: in is the sub-factor α n Heat consumption of steam turbine under corresponding load; Step 722: During the entire operation period of the unit, After correcting the calculation, The amount of change for: is the sub-factor α n The change in heat consumption of the steam turbine under the corresponding load, is the sub-factor α n The proportion of the corresponding load operation time to the total operation time; Step 723: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor α that affects the heat consumption of the steam turbine, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is: Step 73, calculating the influence of the factor β affecting boiler efficiency on power supply coal consumption; specifically includes the following steps: Step 731: Calculate a sub-factor β n Impact on power supply coal consumption The calculation formula is as follows: make After substituting, the formula becomes: in Sub-factor β n Boiler efficiency under corresponding load; The formula simplifies to: in, Sub-factor β n Changes in boiler efficiency under corresponding load; Step 732: During the entire operation period of the unit, After correcting the calculation, The amount of change for: in, Sub-factor β n The proportion of the corresponding load operation time to the total operation time; Step 733: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor β that affects the boiler efficiency, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is: Step 74, calculating the influence of the factor κ affecting the power consumption rate of the power plant on the power supply coal consumption; specifically includes the following steps: Step 741: Calculate a sub-factor κ n Impact on power supply coal consumption The calculation formula is as follows: make: After substituting, the formula becomes: in, The sub-factor κ n The power consumption rate of the plant under the corresponding load; The formula simplifies to: Step 742: During the entire operation period of the unit, After correcting the calculation, The amount of change for: in, The sub-factor κ n The change value of the power consumption rate of the plant under the corresponding load, The sub-factor κ n The proportion of the corresponding load operation time to the total operation time; Step 743: During the entire operation period of the unit, after correcting and calculating all sub-factors of the factor κ that affects the plant power consumption rate, calculate the pipeline efficiency impact on the power supply coal consumption. The calculation formula is: Step 75, calculating the influence △B of the difference factor on the power supply coal consumption of the unit through the calculation results of steps 71 to 74; in step 75, the influence △B of the difference factor on the power supply coal consumption of the unit is calculated by the following formula: Step 8: Calculate the actual power supply coal consumption B of the unit through the test power supply coal consumption B and the influence of the difference factors on the power supply coal consumption △B t , the actual power supply coal consumption of the unit operation is B t Calculated by the following formula: t =B+ΔB.

2. A correction method for calculating coal consumption of coal-fired power generation units according to claim 1, characterized in that: In step 1, 3 to 5 load points are selected to conduct conventional performance tests on the coal-fired power unit, wherein the 3 to 5 load points include 100%, 75%, and 50% loads.

3. The correction method for calculating coal consumption of coal-fired power generation units according to claim 1 is characterized in that: In step 1, through function fitting, the functional relationship between the turbine heat consumption H, boiler efficiency η, plant power consumption rate L and unit load is obtained as follows: H=H(p) η=η(p) L=L(p) In the formula: H is the heat consumption of the steam turbine; η is the boiler efficiency; L is the plant power consumption rate; p is the unit load.

4. A correction method for calculating coal consumption of coal-fired power generation units according to claim 3, characterized in that: In step 5, the minimum load p is included min All load points within the 50% operating load range p m The calculation of power supply coal consumption under the load range of 50%-100% is as follows: n The calculation formula for power supply coal consumption is: Among them, μ is the calorific value of standard coal, θ is the pipeline efficiency, H(p) is the function between any unit load p in the full load section and the turbine heat consumption H, η(p) is the function between any unit load p in the full load section and the boiler efficiency η, L(p) is the function between any unit load p in the full load section and the plant power consumption rate L; make: The calculation formula of power supply coal consumption is simplified to: p =f(p)·θ.

5. The correction method for calculating coal consumption of coal-fired power generation units according to claim 1 is characterized in that: Step 6 specifically includes the following steps: Step 61, set any load point p in the full operation load range of the unit i The corresponding steam turbine heat consumption, boiler efficiency, plant power consumption rate, and power supply coal consumption are the load point p i In (p i +p i-1 ) / 2 to (p i +p i+1 ) / 2 calculation results of the load segment; Step 62: Count the load points p i In (p i +p i-1 ) / 2 to (p i +p i+1 ) / 2The proportion of load segment operation time to total operation time T pi ; Step 63, calculating the test power supply coal consumption B of the unit in the full operation load section by the following formula; B=∫f(p)·θdT After fitting and weighting, the test power supply coal consumption of the unit can be changed into: B=Σf(p)·T pi ·i Where: T is the total operating time, and the pipeline efficiency θ is a constant.

Citation Information

Patent Citations

  • Assessment method of energy saving quantity of improved steam turbine

    CN104408540A

  • Energy saving potential analysis method for thermal power plant steam turbine

    CN104504458A