A conveying system and a conveying method thereof
By designing an automated panel conveying system, using belt conveyors, chain conveyors and elevators, the problem of inefficiency of traditional placement methods has been solved, and panels can be automatically loaded into shelves, improving production efficiency and saving manpower. .
Patent Information
- Application Number
- CN202210488091.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-06
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-05-06
AI Technical Summary
The traditional PCB board placement method is inefficient, especially in mass production where manual vertical stacking is required, causing efficiency problems.
A conveying system including a panel conveyor, a chain conveyor, an elevator and a manipulator assembly is designed. The panels are automatically transported and loaded into the shelves through the belt conveyor and chain conveyor, and the pushing mechanism and elevator are used. Achieve automated loading.
It realizes the automatic loading of panels into shelves, improves production efficiency, saves manpower, and is suitable for efficient transportation and loading of PCB boards and other board parts.
Smart Images

Figure CN114906562B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of article conveying, and in particular relates to a conveying system and a method thereof. Background Art
[0002] During the PCB processing process, the finished or semi-finished PCB boards need to be placed. The current traditional placement method is to manually stack them vertically on a shelf with grooves to control the distance between the PCBs. This method is inefficient when faced with mass production. Summary of the invention
[0003] The object of the present invention is to provide a plate conveying system which is convenient for placing plates into shelves.
[0004] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a conveying system, including a plate conveying device for conveying plates backward, a first chain plate conveyor correspondingly arranged at the rear side of the plate conveying device and used for conveying shelves forward, a second chain plate conveyor correspondingly arranged on the left or right side of the first chain plate conveyor, a first elevator for driving the shelves on the upper side of the first chain plate conveyor to rise upward, a manipulator assembly for grabbing the shelves lifted by the first elevator to the top of the second chain plate conveyor, and a manipulator assembly for holding the shelves above the second chain plate conveyor and during the descent A second elevator that drops the shelf onto the second chain conveyor; the plate conveying device includes two belt conveyors spaced apart on the left and right, the belt conveyors include conveyor belts, and the left and right ends of the plate can be placed on the conveyor belts of the two belt conveyors respectively; the shelf includes a plurality of shelves spaced apart from top to bottom, the shelves are fixed with a front support member whose front end can extend into between the rear ends of the two belt conveyors, and both the shelves and the front support member can support the plate; a pushing mechanism for pushing the upper side plate of the front part of the front support member backwards to the shelves is provided above the rear sides of the two belt conveyors.
[0005] Two front supporting members are fixedly arranged at intervals on the left and right sides of the shelf, and the pushing mechanism is provided with a telescopic end which can be extended into between the two front supporting members on the shelf, and the telescopic end of the pushing mechanism can be extended forward and retracted backward.
[0006] The front support member is a strip-shaped plate member that is vertically bent twice. The front and rear parts of the front support member extend horizontally front and back, and the front part of the front support member is higher than the rear part. The telescopic end of the pushing mechanism can extend between the rear parts of the two front support members.
[0007] The belt conveyor, the first chain conveyor and the second chain conveyor are all arranged longitudinally front to back, and supports are provided on the left and right sides of the front side of the first chain conveyor and the left and right sides of the front side of the second chain conveyor. The two first elevators are respectively arranged on the upper sides of the left and right supports of the front side of the first chain conveyor, and the two second elevators are respectively arranged on the upper sides of the left and right supports of the front side of the second chain conveyor; lifting supports are fixed on the left and right sides of the shelf, the two first elevators can respectively lift the two lifting supports of the shelf, and the two second elevators can respectively support the two lifting supports of the shelf.
[0008] The manipulator assembly includes a gripper seat that can move left and right under the drive of a linear reciprocating movement mechanism, a pair of mutually meshing gears are provided on the gripper seat, two symmetrically arranged swing rods are respectively fixedly connected to the two gears, arc-shaped curved grabbers are fixedly provided at the ends of the two swing rods, one end of a telescopic rod is hingedly connected to the gripper seat, and the other end is hingedly connected to one of the swing rods; two grabber ears are fixedly provided on the shelf at intervals on the left and right, and the two grabber rods can hook the two grabber ears respectively.
[0009] A plurality of protrusions are fixedly arranged on the outer surface of the conveyor belt at intervals in sequence along the longitudinal direction of the conveyor belt.
[0010] The conveying method realized by the conveying system is that the workstation corresponding to the rear side of the pushing mechanism is the upper workstation, and the workstation below the upper workstation is the lower workstation. The front end of the front support member at the lower workstation extends into between the rear ends of the two belt conveyors; the first chain plate conveyor conveys the empty shelf on it to the position corresponding to the rear ends of the two belt conveyors, and each layer of the shelf and its fixed front support member first complete the front feeding step at the lower workstation, and then rise to the upper workstation to complete the subsequent pushing step. The front feeding step is: the two belt conveyors convey the panels backwards, and the panels closest to the shelves are The front end moves to the upper front side of the front support at the lower station, and the rear end moves to the upper side of the shelf at the lower station; the subsequent advancement steps are: the pushing mechanism pushes the plate at the upper station backward and makes the front end of the plate also fall on the upper side of the shelf; the first elevator drives the shelf to rise, so that the shelf and its fixed front support are raised from the lower station to the upper station; the manipulator assembly grabs the fully loaded shelf to the top of the second chain conveyor, and after the second elevator supports the shelf, the manipulator assembly opens, and the shelf falls on the second chain conveyor as the second elevator descends, and is output by the second chain conveyor.
[0011] Whenever the first elevator drives the shelf to rise a certain distance, the shelves, front supports and the plates on the upper sides of the two that have completed the pre-feeding step at the lower station are lifted to the upper station together, and at the same time, the shelves adjacent to the lower station and its fixed front supports are lifted to the lower station; then the shelves and front supports at the lower station complete the pre-feeding step, and at the same time, the shelves and front supports at the upper station complete the subsequent advancement step; the first elevator continuously drives the shelf to rise until the bottom shelf of the shelf and its fixed front supports arrive at the upper station and complete the subsequent advancement step, and the shelf is fully loaded.
[0012] The conveying system and conveying method described in the present invention are suitable for conveying panels and automatically loading the panels into shelves, with a high degree of automation and labor saving. The panels can be PCB boards, wooden boards, stainless steel boards, plastic boards and other board parts, and the PCB boards can be bare boards or finished boards with electronic components welded on them. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a front view of the present invention;
[0014] Figure 2 yes Figure 1 AA view in;
[0015] Figure 3 yes Figure 1 The enlarged view of point B in the figure;
[0016] Figure 4 yes Figure 1 Right view of;
[0017] Figure 5 yes Figure 4 The enlarged view of point C in the figure;
[0018] Figure 6 yes Figure 4 DD view in;
[0019] Figure 7 yes Figure 6 The enlarged view of point E in the figure;
[0020] Figure 8 It is a schematic diagram of the structure when the protrusion is turned to the lower side of the plate;
[0021] Fig. 9 It is a schematic diagram of the structure when the two-layer rack enters the upper working station and the lower working station respectively;
[0022] Fig.10 It is a structural schematic diagram when the propulsion mechanism pushes the plate to the upper side of the shelf;
[0023] Fig.11 yes Fig.10 A top view of
[0024] Fig.12 It is a schematic diagram of the structure when the preceding feeding step and the subsequent advancing step are completed simultaneously;
[0025] Fig.13 It is a structural schematic diagram of the electric push rod a and the half clamp;
[0026] Fig.14 It is a schematic diagram of the structure of two active rollers;
[0027] Fig.15 It is a schematic diagram of the structure of two redirection rollers;
[0028] Fig.16 yes Figure 1 A top view of
[0029] Fig.17 It is a structural schematic diagram of two trays supporting two lifting supports respectively;
[0030] Fig.18 This is a schematic diagram of the structure of the bottom shelf;
[0031] Fig.19 It is a schematic diagram of the structure when the two grab bars are opened;
[0032] Fig. 20 It is a schematic diagram of the structure when the bottom shelf is raised to the upper workstation;
[0033] Fig.21 yes Fig. 20 The enlarged view of G in the figure;
[0034] Fig. 22 yes Fig. 20 FF view in;
[0035] Fig.23 yes Fig. 22 The enlarged view of H in the figure;
[0036] Fig.24 It is a schematic diagram of the manipulator assembly grabbing the shelf above the first chain conveyor;
[0037] Fig.25 yes Fig.24 The enlarged view at position I in FIG.
[0038] Fig.26 It is a schematic diagram of the robot assembly grabbing the shelf to the top of the second chain conveyor;
[0039] Fig. 27 It is a schematic diagram of the structure when the second lift holds up the shelf;
[0040] Fig.28 yes Fig. 27 The enlarged view of point J in the figure;
[0041] Fig.29 This is a schematic diagram of the structure when the shelf falls on the second chain conveyor;
[0042] In the figure: active roller 1, roller 2, straight section part 3, plate 4, belt conveyor 5, pushing mechanism 6, bracket b7, beam 8, manipulator assembly 9, shelf 10, fixed pipe 11, telescopic mechanism 12, correction seat 13, servo motor b14, first chain plate conveyor 15, first elevator 16, tray 17, grab ear 18, belt conveyor frame 19, slide 20, double linear rail ball screw slide module 21, support leg 22, second chain plate conveyor 23, second elevator 24, frame 25, column 26, electric push rod c27, connecting seat 28, linear guide rail 29, slider 291, guide rail 292, support 30, vertical plane 31, conveyor belt 32, protrusion 33, redirection Drum 34, front frame edge 35, rear frame edge 36, guard plate 37, electric push rod a38, mounting seat 39, half hoop 40, top plate 41, upper station 42, lower station 43, shelf 44, front part 45, middle part 46, rear part 47, strip vertical plate 48, angle steel 49, straight edge 491, side frame edge 50, rib plate 51, strip plate a52, strip plate b53, servo motor a54, rotating shaft a55, retaining edge 56, bending edge 57, front support 58, connecting plate 59, gripper seat 60, module seat 61, module motor 62, rotating shaft b63, vertical plate 64, gear 65, rocker arm 66, grab bar 67, electric push rod b68, pin b69, pin a70, travel switch 71. DETAILED DESCRIPTION
[0043] Embodiment 1:
[0044] like Figure 1-Figure 29 A conveying system shown, comprising a plate conveying device for conveying a plate 4 backward, a first chain plate conveyor 15 correspondingly arranged at the rear side of the plate conveying device and for conveying a shelf 10 forward, a second chain plate conveyor 23 correspondingly arranged at the left or right side of the first chain plate conveyor 15, a first elevator 16 for driving the shelf 10 on the upper side of the first chain plate conveyor 15 to rise upward, a manipulator assembly 9 for grabbing the shelf 10 raised by the first elevator 16 to the upper side of the second chain plate conveyor 23, and a second elevator 24 for holding the shelf 10 above the second chain plate conveyor 23 and making the shelf 10 fall on the upper side of the second chain plate conveyor 23 during the descending process;
[0045] The plate conveying device includes two belt conveyors 5 arranged at intervals on the left and right. The belt conveyor 5 is also called a belt conveyor or a rubber belt conveyor, which is a prior art. The belt conveyor 5 is arranged longitudinally in the front and rear direction and can convey the plate 4 backward. The belt conveyor 5 includes an active roller 1, a redirecting roller 34, a conveyor belt 32, a plurality of rollers 2 and a driving device. The active roller 1, the redirecting roller 34, the rollers 2 and the driving device are all arranged on the belt conveyor frame 19. The active roller 1 and the redirecting roller 34 are arranged in parallel with the same height at intervals on the front and rear and both are arranged horizontally on the left and right. The rollers 2 are also arranged horizontally on the left and right. Between the active roller 1 and the redirecting roller 34, a plurality of rollers 2 are arranged in parallel in sequence from front to back. The conveyor belt 32 is wound around In the closed loop body on the redirecting roller 34 and the active roller 1, the portion of the conveyor belt 32 between the redirecting roller 34 and the active roller 1 is two straight segments 3 spaced apart from each other, the straight segment 3 extends horizontally frontward and rearward, and a plurality of rollers 2 are supported on the lower side of the upper straight segment 3. More preferably, the active rollers 1 of the two belt conveyors 5 are both arranged on the same rotating shaft a55 extending horizontally leftward and rightward, and the redirecting rollers 34 of the two belt conveyors 5 are both arranged on the same rotating shaft b63 extending horizontally leftward and rightward. The two belt conveyors 5 share a set of driving devices, which are servo motors a54, and the servo motors a54 drive the rotating shaft a55, so that the conveyor belts 32 of the two belt conveyors 5 can run synchronously at the same speed;
[0046] The conveyor belts 32 of the two belt conveyors 5 are arranged at intervals on the left and right. On the outer surface of the conveyor belts 32, a plurality of protrusions 33 are fixedly arranged at intervals in the longitudinal direction of the conveyor belts 32. The upper surface of the upper straight section 3 of the conveyor belt 32 and the lower surface of the lower straight section 3 are fixedly arranged with a plurality of said protrusions 33 at intervals from front to back. The protrusions 33 extend left and right and have a semicircular cross-section. The several protrusions 33 on the left conveyor belt 32 correspond to the several protrusions 33 on the right conveyor belt 32 one by one. They are respectively located on the two conveyor belts 32 and the corresponding two protrusions 33 are located on the same straight line extending horizontally left and right. The left and right ends of the plate 4 can be respectively placed on the two conveyor belts 32 of the left and right belt conveyors 5, that is, the left and right ends of the plate 4 can be respectively placed on the upper straight section 3 of the left and right conveyor belts 32, and the left and right ends of the plate 4 are respectively blocked at the rear sides of the corresponding two protrusions, and the protrusions 33 can push the plate 4.
[0047] The structure of the shelf 10 is as follows: it includes a plurality of shelves 44 arranged at equal intervals from top to bottom, the shelves 44 include two parallel strips a52 arranged at intervals on the left and right, and two parallel strips b53 arranged at intervals on the front and back, the strips a52 are arranged horizontally on the front and back, the left end of the left strip a52 is provided with a bent edge 57 bent vertically upward, the right end of the right strip a52 is provided with a bent edge 57 bent vertically upward, the strips b53 are arranged horizontally on the left and right, the strips b53 are fixed between the two strips a52, the front strips b53 are fixed between the middle parts of the two strips a, and the rear strips b53 are fixed between the rear ends of the two strips a52; The shelf 44 is fixed with a front support member 58, and both the shelf 44 and the front support member 58 can support the plate member 4. The front end of the front support member 58 can extend forward between the rear ends of the two belt conveyors 5, and two front support members 58 are fixedly arranged on the shelf 44 at intervals on the left and right. There is an empty area between the two front support members 58 for the push rod a38 and its upper guard plate 37 to pass through. The front support member 58 is a strip plate member 4 that is vertically bent twice. The front support member 58 is divided into a front part 45, a middle part 46 and a rear part 47 from front to back. The front part 45 and the rear part 47 of the front support member 58 both extend horizontally front and back, and the front part 45 of the front support member 58 is higher than the rear part 47. The front end of the front portion 45 (i.e., the front end of the front support member 58) can extend forward to the vertical plane 31 passing through the central axis of the redirecting roller 34 (the central axis of the redirecting roller 34 extends horizontally to the left and right), and the vertical plane 31 passes through the central axes of the two redirecting rollers 34. The middle portion 46 of the front support member 58 extends vertically, and the top end of the middle portion 46 is integrally fixedly connected to the rear end of the front portion 45, and the bottom end is integrally fixedly connected to the front end of the rear portion 47. A rib plate 51 is fixedly arranged between the front portion 45 and the middle portion 46, and the rear end of the front support member 58 (i.e., the rear end of the rear portion 47) is fixedly arranged on the front side of the front strip plate b53, that is, the two front support members 58 are fixedly arranged on the front strip plate b53 at intervals to the left and right. On the front side of the shaped plate b53, two front support members 58 are arranged between the two shaped plates a52, and the front support members 58 and the two shaped plates a52 are spaced apart. A connecting plate 59 is fixedly arranged between the rear portion 47 of the left front support member 58 and the front end of the left strip plate a52, and a connecting plate 59 is also fixedly arranged between the rear portion 47 of the right front support member 58 and the front end of the right strip plate a52. The connecting plates 59 are arranged horizontally on the left and right sides; the spacing between any two upper and lower adjacent shelves 44 is equal, and the spacing between any two upper and lower adjacent front support members 58 is also equal, and the spacing between the two upper and lower adjacent shelves 44 is equal to the spacing between the two upper and lower adjacent front support members 58;The shelf 10 also includes two strip-shaped vertical plates 48 spaced apart from each other and two angle steels 49 spaced apart from each other. The strip-shaped vertical plates 48 and the angle steels 49 are both vertically arranged. The two angle steels 49 are spaced apart behind the two strip-shaped vertical plates 48, respectively. A plurality of shelves 44 are spaced apart from each other in the area surrounded by the two strip-shaped vertical plates 48 and the two angle steels 49 from top to bottom. Each shelf 44 is fixedly connected to the two strip-shaped vertical plates 48, and each shelf 44 is fixedly connected to the two angle steels 49. The left strip-shaped vertical plate 48 is fixedly arranged on the left side of the front end of the bent edge 57 of the left strip-shaped plate a52 in each shelf 44, and the right strip-shaped vertical plate 48 is fixedly arranged on the right side of the front end of the bent edge 57 of the right strip-shaped plate a52 in each shelf 44. The angle steel 49 is composed of two straight edges 49 perpendicular to each other. 1, the left angle steel 49 is fixedly connected to the rear end of the left strip plate a52 in each layer frame 44, a straight edge 491 of the left angle steel 49 is fixedly arranged on the rear side of the left strip plate a52 in each layer frame 44, and the other straight edge 491 is fixedly arranged on the left side of the rear end of the bent edge 57 of the left strip plate a52 in each layer frame 44, and the right angle steel 49 is fixedly connected to the rear end of the right strip plate a52 in each layer frame 44, a straight edge 491 of the right angle steel 49 is fixedly arranged on the rear side of the right strip plate a52 in each layer frame 44, and the other straight edge 491 is fixedly arranged on the right side of the rear end of the bent edge 57 of the right strip plate a52 in each layer frame 44; the front parts of the two front support members are located at the front side between the two strip plates a, and at the same time, the front parts of the two front support members are also located At the front side between the two strip vertical boards, lifting supports are fixedly provided on the left and right sides of the middle part (referring to the middle part in the height direction) of the shelf 10. The two lifting supports are symmetrical on the left and right. The lifting supports include two fixed pipes 11 arranged in parallel and at the same height with a front-back interval. The fixed pipes 11 are arranged horizontally on the left and right sides. The end of one fixed pipe 11 in the left lifting support is fixedly connected to the left side of the middle part 46 of the left strip vertical board 48, and the end of the other fixed pipe 11 is fixedly connected to the left side of the middle part 46 of the left angle steel 49. The end of one fixed pipe 11 in the right lifting support is fixedly connected to the right side of the middle part 46 of the right strip vertical board 48, and the end of the other fixed pipe 11 is fixedly connected to the right side of the middle part 46 of the right angle steel 49. A rib is fixedly provided between the strip vertical board 48 and the fixed pipe 11 thereon. Plate 51, rib plate 51 is also fixed between angle steel 49 and the fixed tube 11 thereon, and the rib plate is fixed on the upper side of the corresponding fixed tube; the shelf 10 also includes a horizontally arranged rectangular top plate 41 and four legs 22 distributed in a rectangular shape, the top plate 41 covers the upper sides of the two shaped vertical plates and the two angle steels, the top plate 41 is fixedly connected to the top ends of the two shaped vertical plates 48, and the top plate 41 is also fixedly connected to the top ends of the two angle steels, the top plate 41 is spaced above the topmost shelf 44, and the four legs 22 are all fixedly arranged on the lower side of the bottommost shelf, that is, two of the legs 22 are respectively fixedly arranged on the lower sides of the front and rear ends of the left strip plate a52 in the bottommost shelf, and the other two legs 22 are respectively fixedly arranged on the lower sides of the front and rear ends of the right strip plate a52 in the bottommost shelf 44;The shelf 10 is fixed with two gripping ears 18 at intervals on the left and right corresponding to the manipulator assembly 9, and the two gripping ears are fixed on the upper side of the top plate of the shelf at intervals on the left and right, and the gripping ears are U-shaped parts bent in a "U" shape with the U-shaped opening facing downward (the U-shaped opening faces the top plate 41). ;
[0048] A pushing mechanism 6 is provided above the rear side of the two belt conveyors 5. The workstation corresponding to the rear side of the pushing mechanism 6 is the upper workstation 42, and the workstation below the upper workstation 42 is the lower workstation 43. The shelf 44 at the upper workstation 42 is adjacent to the shelf 44 at the lower workstation 43 at upper and lower intervals. The front support member 58 fixed to the shelf 44 at the upper workstation 42 is also located at the upper workstation 42. The pushing mechanism 6 is used to push the front end of the upper side plate 4 of the front part of the front support member 58 at the upper workstation 42 backward to the shelf 44 at the upper workstation 42. The pushing mechanism 6 is provided with a telescopic end that can be extended into between the rear parts 47 of the two front support members 58 at the upper workstation 42. The telescopic end of the pushing mechanism 6 The end can be extended forward and retracted backward, so that the plate 4 is blocked at the rear side of the middle part 46 of the front support member 58 and placed on the upper side of the layer frame 44 and the rear part 47 of the front support member 58, that is, the layer frame 44 and the rear parts 47 of the two front support members 58 jointly support the plate 4; the pushing mechanism 6 is an electric push rod a38 horizontally arranged on the bracket a front and back, and the bracket a includes a horizontally arranged rectangular frame and four columns 26 respectively fixed on the lower side of the four corner points of the rectangular frame, and the columns 26 are arranged vertically, two of which are arranged at intervals on the left side of the left belt conveyor 5, and the other two columns 26 are arranged at intervals on the right side of the right belt conveyor 5. The rectangular frame includes a front frame edge 35 and a rear frame edge 36 which are arranged in parallel at a front-to-back interval, and two side frame edges 50 which are arranged in parallel at a left-to-right interval. The front frame edge 35 and the rear frame edge 36 are both arranged horizontally at left and right, and the side frame edges 50 are arranged horizontally at front and back. One side frame edge 50 is fixed between the left end of the front frame edge 35 and the left end of the rear frame edge 36, and the other side frame edge 50 is fixed between the right end of the front frame edge 35 and the right end of the rear frame edge 36. The electric push rod a38 is horizontally installed at the lower side of the rectangular frame at front and back. The lower side of the front frame edge 35 is fixed with an electric push rod mounting seat 39. The base of the electric push rod a38 is fixedly connected to the front side of the electric push rod mounting seat 39. The rear end of the sleeve is fixed to the lower side of the rear frame edge 36 through a half hoop 40. The middle part of the half hoop 40 is U-shaped and surrounds the outer periphery of the lower half of the rear end of the sleeve of the electric push rod a38. The left and right ends of the half hoop 40 are bolted to the rear frame edge 36. The push rod of the electric push rod a extends horizontally backward and retracts horizontally forward. A vertical guard plate 37 is fixed on the front side of the push rod of the electric push rod a. The guard plate 37 is the telescopic end of the pushing mechanism. The electric push rod a and its upper guard plate 37 correspond to the area between the two front support members 58 of the shelf 44 at the upper work station 42. The guard plate 37 can extend backward to between the front ends of the rear parts 47 of the two front support members 58 of the shelf at the upper work station 42.
[0049] The first chain conveyor 15 and the second chain conveyor 23 are both arranged horizontally in the front-to-back longitudinal direction. The first chain conveyor 15 is correspondingly arranged at the rear side of the two belt conveyors 5. The conveyor belt 32 of the belt conveyor 5 is higher than the first chain conveyor 15 and the second chain conveyor 23. In this embodiment, the front end of the first chain conveyor 15 is arranged below the rear ends of the two belt conveyors 5, and the second chain conveyor 23 is arranged parallel to the right side of the first chain conveyor 15. The first chain conveyor 15 and the second chain conveyor 23 are both chain-type horizontal conveyors. The chain-type horizontal conveyor has chains extending horizontally to the left and right, and its own driving device is a servo motor b14. The chain-type horizontal conveyor is a prior art, so it is not described in detail. The first chain conveyor 15 is used to transport empty shelves 10 forward, and the second chain conveyor 23 is used to transport fully loaded shelves 10 backward.
[0050] A travel switch 71 is provided on the upper front of the first chain conveyor 15 , and the travel switch 71 is used to detect whether the shelf reaches a preset position.
[0051] The two telescopic mechanisms 12 are symmetrically arranged on the left and right sides of the rear side of the first chain conveyor 15, respectively. The telescopic mechanism 12 includes a frame 25, two electric push rods c27 arranged in parallel with each other at an upper and lower interval, a vertically arranged correction seat 13 driven by the two electric push rods c27, and two linear guide rails 29 arranged between the frame 25 and the correction seat 13. The two electric push rods c27 are both horizontally installed on the frame 25, the base of the electric push rods c27 is fixedly connected to the frame 25, and the push rod ends of the two electric push rods c27 are fixedly connected to the correction seat 13. The main seat 13, two linear guide rails 29 are arranged in parallel at intervals in front and back, the linear guide rails 29 include guide rails 292 fixedly arranged on the frame 25 horizontally left and right and sliders 291 slidably connected to the guide rails 292, the sliders 291 can move horizontally left and right along the guide rails 292, the correction seat 13 is plate-shaped, and two connecting seats 28 are fixedly arranged at intervals in front and back at the bottom of the back side of the correction seat 13 (the side of the correction seat 13 facing away from the first chain conveyor 15), and the two connecting seats 28 are respectively fixedly connected to the upper sides of the two sliders 291 of the two linear guide rails 29;
[0052] The two correction seats 13 of the two telescopic mechanisms 12 are arranged opposite to each other at a left-right interval. The electric push rod c27 of the left telescopic mechanism 12 and the electric push rod c27 of the right telescopic mechanism 12 are extended toward each other at the same time and retracted back to each other at the same time. Therefore, the correction seats 13 of the two telescopic mechanisms 12 are also extended toward each other at the same time and retracted back to each other at the same time under the drive of their respective electric push rods c27. That is, when the push rods of the two electric push rods c27 of the left telescopic mechanism 12 and the correction seat 13 are extended to the right horizontally, the push rods of the two electric push rods c27 of the right telescopic mechanism 12 and The correction seat 13 extends horizontally to the left; while the push rods of the two electric push rods c27 of the left telescopic mechanism 12 and the correction seat 13 retract horizontally to the left, the push rods of the two electric push rods c27 of the right telescopic mechanism 12 and the correction seat 13 retract horizontally to the right; the correction seat is higher than the first chain plate conveyor. Initially, the electric push rods c of the two telescopic mechanisms 12 are in a retracted state. The two correction seats of the left and right telescopic mechanisms are respectively located outside the left and right sides of the first chain plate conveyor. The two correction seats 13 are respectively extended toward each other at the same time driven by their respective electric push rods c27. The two correction seats are extended toward each other at the same time, and the left correction seat pushes the shelf to the right or the right correction seat pushes the shelf to the left. When the push rods of all the electric push rods c27 of the two telescopic mechanisms are fully extended, the two correction seats are extended to the top of the first chain conveyor, and the shelf is clamped between the two correction seats and located on the first chain conveyor. A relatively central position in the horizontal direction of the conveyor (the lifting support of the shelf is higher than the correction seat) is made to correspond to the two first lifts 16, and to correspond to the rear ends of the two belt conveyors 5, so that the front part of the front support 58 of the shelf can extend between the rear ends of the two belt conveyors 5; then the two correction seats 13 are retracted back to back at the same time under the drive of their respective electric push rods c27, so that the upper side shelf 10 of the first chain conveyor 15 and the two correction seats 13 are spaced apart and can pass forward between the two correction seats 13 under the drive of the first chain conveyor 15.
[0053] Supports 30 are provided on the left and right sides of the front side of the first chain conveyor 15 and the left and right sides of the front side of the second chain conveyor 23. The two first elevators 16 are respectively arranged on the upper sides of the left and right sides of the supports 30 on the front side of the first chain conveyor 15, and the two second elevators 24 are respectively arranged on the upper sides of the left and right sides of the supports 30 on the front side of the second chain conveyor 23. There are four supports 30 in total. In this way, the two first elevators 16 are respectively located on the left and right sides of the front side of the first chain conveyor 15, and the two second elevators 24 are respectively located on the left and right sides of the front side of the second chain conveyor 23. In this embodiment, the first elevator 16 is higher than the first chain conveyor 15, and the second elevator 24 is higher than the second chain conveyor 23; the two first elevators 16 can respectively lift up the two lifting supports of the upper shelf 10 of the first chain conveyor 15, and the two second elevators can respectively support the two lifting supports of the upper shelf of the second chain conveyor 23.
[0054] The first elevator 16 and the second elevator 24 are both scissor-type elevators. The scissor-type elevator is a prior art and is not described in detail. A pallet 17 is fixedly provided on the upper side of the first elevator and the upper side of the second elevator. A retaining edge 56 is fixedly provided on the upper sides of the front and rear ends of the pallet 17. The pallet 17 is used to be supported on the lower side of the corresponding lifting support. The pallets on the upper sides of the two first elevators 16 can be supported on the lower sides of the two lifting supports of the shelf 10 on the first chain conveyor 15 respectively. The pallets 17 on the upper sides of the two second elevators 24 can be supported on the lower sides of the two lifting supports of the shelf 10 above the second chain conveyor 23 respectively. When the pallet 17 is supported on the lower side of the corresponding lifting support, the two fixed pipes 11 of the lifting support are placed on the upper side of the pallet 17, and the two retaining edges 56 respectively block the front and rear sides of the lifting support. Furthermore, the right end of the pallet 17 on the upper side of the left first elevator extends rightward to the left side of the front side of the first chain conveyor The left end of the upper pallet 17 of the first elevator on the right side extends to the left to the upper right end of the front side of the first chain conveyor, the right end of the upper pallet of the second elevator on the left side extends to the right to the upper left end of the front side of the second chain conveyor, and the left end of the upper pallet of the second elevator on the right side extends to the left to the upper right end of the front side of the second chain conveyor; the two first elevators 16 are lifted and lowered simultaneously, and the pallets 17 on the two first elevators are also lifted and lowered simultaneously; the two second elevators 24 are lifted and lowered simultaneously, and the pallets 17 on the two second elevators are also lifted and lowered simultaneously; when the first elevator 16 drives the upper pallet 17 to the lower limit position (that is, the first elevator is fully retracted, the top of the first elevator and its upper pallet are both at the lower limit position), the pallet of the first elevator 16 (including the side guard 56) is lower than the lifting support (that is, the two fixed pipes 11) of the upper shelf of the first chain conveyor 15.
[0055] The manipulator assembly 9 includes two brackets b7 spaced apart from each other, a crossbeam 8 fixed between the top ends of the two brackets b7, and a gripper seat 60 that can move left and right under the drive of a linear reciprocating mechanism. The linear reciprocating mechanism is a double-line rail ball screw slide module 21. The double-line rail ball screw slide module 21 includes a module seat 61 fixed to the lower side of the crossbeam 8, a ball screw mechanism provided on the module seat 61, a module motor 62 provided on the module seat 61 and driving the ball screw mechanism, two linear guide rails and a slide 20, a screw in the ball screw mechanism, and two linear guide rails. The guide rails in the guide rails are all arranged horizontally left and right, and all three extend horizontally from the upper front side of the first chain plate conveyor 15 to the upper front side of the second chain plate conveyor 23. The nut in the ball screw mechanism and the slider in the linear guide are fixedly connected to the slide 20, and the slide 20 is fixedly arranged on the lower side of the nut and the slider. The module motor 62 is a servo motor, and the module motor 62 drives the screw to rotate, and the nut can reciprocate along the screw left and right straight line, and the slide 20 can reciprocate left and right straight line under the drive of the nut. The double-line rail ball screw slide module 21 is a prior art, so it is not described in detail;
[0056] The gripper seat 60 is arranged below the slide 20 at intervals, and two vertical plates 64 are fixed between the slide 20 and the gripper seat 60. The two vertical plates 64 are arranged at intervals in front and behind. A pair of mutually meshing gears 65 are arranged on the upper side of the gripper seat 60, and the gear 65 is arranged between the gripper seat 60 and the slide 20. The two gears 65 are arranged left and right, and the axle of the gear 65 is arranged horizontally front and back. Two swing rods 66 symmetrically arranged at intervals in the left and right are respectively fixed on the rear sides of the two gears 65, and the gears 65 and the corresponding swing rods 66 are fixedly connected by welding or several screws. The left swing rod 66 extends obliquely upward from left to right, and the right swing rod 66 extends obliquely downward from left to right. The bottom ends of the two swing rods 66 are fixed with arc-shaped curved grab rods 67, and the two grab rods 67 at the bottom ends of the two swing rods 66 are also symmetrically arranged at intervals in the left and right. The left grab rod 67 is curved in an arc shape around the central axis of the axle of the left gear 65 and can be rotated around the left The central axis of the side gear 65 axle rotates, and the right grab bar 67 is curved in an arc shape around the central axis of the right gear 65 axle and can rotate around the central axis of the right gear 65 axle, and the bottom ends of the two grab bars can be rotated to the lower side of the gripper seat 60; one end of a telescopic rod is hingedly connected to the gripper seat 60, and the other end is hingedly connected to one of the swing rods 66. In this embodiment, the telescopic rod is an electric push rod b68 arranged obliquely downward from left to right, and the push rod of the electric push rod b68 can be extended to the upper left. The electric push rods a38, b68 and c27 are all electric push rods. The electric push rods include a base, a sleeve fixed on the base, and a push rod with one end extending into the sleeve and being retractable. The base of the electric push rod b68 is hingedly connected to the gripper seat 60 through a pin a70, and the end of the push rod of the electric push rod b is hingedly connected to the left swing rod 66 through a pin b69.
[0057] The two grab bars 67 can respectively hook the two grab ears 18 of the shelf 10. When the push rod of the electric push rod b68 is retracted, the left swing bar 66 and the left grab bar 67 rotate counterclockwise around the gear shaft of the left gear 65, and then drive the left gear 65 to rotate counterclockwise, and the right gear 65 rotates clockwise accordingly, and the right swing bar 66 and the right grab bar 67 rotate clockwise around the gear shaft of the right gear 65, and the left and right grab bars 67 rotate towards each other, and the bottom ends of the two grab bars 67 move towards each other, and the bottom end of the left grab bar 67 can move along the arc to the lower right and pass through the U-shaped opening of the left grab ear 18, and the bottom end of the right grab bar 67 can move along the arc to the lower left and pass through the U-shaped opening of the right grab ear 18. After that, when the push rod of the electric push rod b68 extends, the two grab bars 67 open in the opposite direction, the left swing rod 66 and the left grab bar 67 rotate clockwise around the gear shaft of the left gear 65, the right swing rod 66 and the right grab bar 67 rotate counterclockwise around the gear shaft of the right gear 65, the bottom end of the left grab bar 67 moves to the upper left side along the arc, the left grab bar 67 rotates to the upper left side of the left grab ear 18 and the two are spaced apart, the bottom end of the right grab bar 67 moves to the upper right side along the arc, the right grab bar 67 rotates to the upper right side of the right grab ear 18 and the two are spaced apart, so that the two grab bars 67 are separated from the two grab ears 18 respectively. Under normal conditions, the two grab bars 67 are open.
[0058] Embodiment 2:
[0059] The conveying method implemented by the conveying system described in the present invention comprises the following steps: (1) placing an empty shelf (a shelf without panels) on the upper side of the rear side of the first chain conveyor manually or by other means and positioning it between two correction seats, the bottom surface of the shelf legs contacts the upper surface of the chain of the first chain conveyor, the two correction seats are respectively extended toward each other at equal distances driven by their respective electric push rods c, and after clamping the shelf once, they are respectively retracted back to their respective sides driven by their respective electric push rods c, and the two correction seats correct the shelf after clamping it. The left and right positions of the rack are arranged so that the rack is located in the horizontal middle of the first chain conveyor and corresponds to the rear ends of the two belt conveyors, so that the front support of the rack corresponds to the area between the rear ends of the two belt conveyors, and the two lifting supports of the rack correspond to the upper trays of the two first elevators respectively. At this time, the first elevator is fully retracted, the upper trays of the first elevator are located at the lower limit position, the two lifting supports of the rack are respectively higher than the upper trays of the two first elevators, the push rod of the electric push rod a of the pushing mechanism is fully retracted, and the guard plate is located at the front limit position, that is, the initial position of the guard plate;
[0060] (ii) The first chain conveyor is started, the servo motor b of the first chain conveyor rotates, and stops after conveying the empty shelf on it forward to a position corresponding to the rear ends of the two belt conveyors, that is, the servo motor b of the first chain conveyor stops. In this embodiment, when the first chain conveyor conveys the empty shelf on it forward to the front end limit position that the shelf can reach, the front end of one of the front support members on the bottom shelf of the shelf triggers the travel switch, and the first chain conveyor stops. The shelf stays on the upper side of the front end limit position of the first chain conveyor and corresponds to the rear ends of the two belt conveyors. At this time, the shelf is correspondingly located at the rear side of the two belt conveyors, and the two pallets on the upper sides of the two first elevators are respectively located directly below the two lifting supports of the shelf;
[0061] The workstation corresponding to the rear side of the pushing mechanism is the upper workstation, and the workstation corresponding to the lower side of the upper workstation is the lower workstation. The shelf and its fixed front support are located at the same workstation. If a shelf is located at the upper workstation, the two front support members fixed to the shelf are also located at the upper workstation; if a shelf is located at the lower workstation, the two front support members fixed to the shelf are also located at the lower workstation; the shelf and the two front support members located at the upper workstation are both used to complete the subsequent pushing steps, and the shelf and the two front support members located at the lower workstation are both used to complete the front feeding steps. The shelf located at the upper workstation and the shelf located at the lower workstation are adjacently arranged with a vertical interval, and the front support member located at the upper workstation and the front support member located at the lower workstation are also adjacently arranged with a vertical interval;
[0062] At this time, if Figure 7 As shown, the upper station is vacant, the first shelf from the top to the bottom (i.e., the top shelf) and its two fixed front supports are both located at the lower station, the front ends of the two front supports at the lower station are both extended between the rear ends of the two belt conveyors, the front supports are spaced apart from the two belt conveyors, the front top surface of the front supports at the lower station is flush with the top surfaces of the conveyor belts of the two belt conveyors or lower than the top surfaces of the conveyor belts, the top surface of the conveyor belts refers to the upper surface of the upper straight line segment, in this embodiment, the front top surface of the front supports at the lower station is flush with the top surface of the conveyor belts of the belt conveyors, and the front end of the front supports at the lower station reaches the vertical plane passing through the central axis of the redirecting roller;
[0063] (III) Several panels are laid flat on the conveyor belts of the two belt conveyors from front to back in sequence, and the left and right ends of the panels are placed on the two conveyor belts of the left and right conveyors respectively. The servo motor a rotates, and the two belt conveyors run synchronously at the same speed and convey the panels backward, so that the shelf and the front support at the lower station are forward-fed. Step: The panel closest to the shelf (i.e., the last panel on the two belt conveyors) moves backward under the drive of the conveyor belts of the two belt conveyors, and blocks the corresponding two protrusions on the front sides of the left and right ends of the panel respectively. After reaching the upper side of the top of the two redirecting rollers, the plate is pushed backward for a distance until the two protrusions rotate around the two redirecting rollers to the lower side of the plate, and the two protrusions no longer push the plate, so that the front end of the plate closest to the shelf moves to the upper side of the front part of the two front support members at the lower station, and the rear end passes through the middle of the front support members to the upper side of the layer shelf at the lower station and the rear part of the two front support members, and is spaced from the layer shelf at the lower station and the rear part of the two front support members, thus completing the front feeding step of the plate; the two belt conveyors are suspended, and the servo motor a stops rotating;
[0064] (IV) The two first lifts drive the shelf to rise a certain distance: The two first lifts 16 lift the two lifting supports of the shelf 10 through their respective pallets, and then lift the shelf. Specifically, in the process of the two first lifts driving their respective pallets to rise synchronously, the two pallets are first supported on the lower sides of the two lifting supports of the shelf, and the two first lifts drive their respective pallets to continue to rise. Then, the two lifting supports of the shelf and the entire shelf are raised along with the pallets of the two first lifts, so that the layer shelf, the two front supports and the plates on the upper sides of the three that have completed the pre-feeding step at the lower station are lifted to the upper station together, and at the same time, the layer shelf adjacent to the lower side of the lower station (i.e., the second layer of the shelf from the top to the bottom) and its two fixed front supports are lifted to the lower station, the two first lifts stop rising, and the pallets and the shelves also stop rising. At this time, the layer shelf, the two front supports and the plates on the three at the upper station are correspondingly arranged at intervals behind the pushing mechanism, and the guard plate fixed at the end of the electric push rod a corresponds to the front-to-back interval of the front end of the plate at the upper station; the layer shelf and the two front supports at the upper station While the support members are performing the subsequent advancement step, the shelf at the lower station and the two front support members are performing the front feeding step. The subsequent advancement step is: the pushing mechanism pushes the plate at the upper station backward and makes its front end fall on the upper side of the shelf at the upper station, that is, the push rod of the electric push rod a of the pushing mechanism extends backward and drives the guard plate to move backward, and the rear end of the push rod of the electric push rod a and its upper guard plate pass between the two front support members at the upper station and push the plate on the upper side of the front of the two front support members at the upper station backward, and the guard plate and the plate The front end of the plate contacts the front end of the two front support members at the upper station, and the guard plate is driven by the push rod of the electric push rod a to move downward to between the front ends of the rear parts of the two front support members at the upper station, and then retracts forward to the initial position, so that the front end of the plate at the upper station also falls on the upper side of the shelf at the upper station and the rear part of the two front support members, and the entire plate is placed on the upper side of the shelf at the upper station and the rear part of the two front support members and is blocked at the rear side of the middle part of the two front support members, thus completing the subsequent advancement step of the plate; in this embodiment, the subsequent advancement step and the front feeding step start and end at the same time;
[0065] (V) Whenever the shelf at the lower station and its two fixed front supports complete the pre-feeding step, and the shelf at the upper station and its two fixed front supports complete the subsequent pushing step, the two first elevators drive the shelves to rise a certain distance, so that the shelf, the two front supports and the upper panels of the three that have completed the pre-feeding step at the lower station are lifted to the upper station together, and at the same time, the shelf adjacent to the lower side of the lower station and its two fixed front supports are lifted to the lower station, and then the shelf and the two front supports at the lower station carry out and complete the pre-feeding step, and at the same time, the shelf and the two front supports at the upper station carry out and complete the subsequent pushing step; whenever the two first elevators drive the shelves to rise, the two belt conveyors stop and the servo motor a stops.
[0066] (six) repeat step (five) until the bottom shelf and its two fixed front supports arrive at the upper station and complete the subsequent advancement step, that is, the two first elevators continuously drive the shelf to rise, so that each shelf and its two fixed front supports first complete the pre-feeding step at the lower station, and then rise to the upper station together to complete the subsequent advancement step, until the bottom shelf and its two upper front supports arrive at the upper station and complete the subsequent advancement step, at this point, there are panels on each shelf, the shelf is fully loaded, and at this time, the lower station is vacant, the top of the first elevator rises to the highest, the pallet on the upper side of the first elevator also reaches the upper limit position, the slide of the manipulator assembly is at the left limit position of the double-track ball screw slide module, the corresponding interval of the gripper seat is located directly above the shelf, the two gripping rods are opened, the corresponding interval of the left gripping rod is set at the upper left side of the left gripping ear of the shelf, and the corresponding interval of the right gripping rod is set at the upper right side of the right gripping ear of the shelf;
[0067] (VII) The manipulator assembly grabs the shelf to the top of the second chain conveyor, specifically: the push rod of the electric push rod b is retracted, and the two grab bars rotate toward each other around the gear shafts of the two gears respectively, and the bottom ends of the two grab bars pass through the U-shaped openings of the two grab ears (i.e., the area between the grab ears and the top plate) respectively. At this time, the two grab bars are spaced apart from the two grab ears respectively, and then the two first elevators drive their respective pallets to descend to the lower limit position, that is, the two first elevators are fully retracted, so that the shelf is higher than the two pallets on the upper side of the two first elevators. During the descent of the two first elevators, the two grab bars respectively hook the two grab ears of the shelf, and the two grab bars are in contact with the two grab ears respectively, and the shelf is suspended under the gripper seat, and the module motor drives the lead screw to rotate, so that the slide moves to the right, and the slide drives the gripper seat and the shelf to move to the right accordingly, until the slide moves to the right to the right limit position of the double-line rail ball screw slide module, and the module motor stops, and the slide, the gripper seat and the shelf all stay just above the front side of the second chain conveyor, and the shelf is spaced apart from the second chain conveyor;
[0068] (8) The two second lifts drive their respective pallets to rise, and the pallets on the upper sides of the two second lifts continue to rise after respectively supporting the two lifting supports of the shelves above the second chain conveyor, which drives the shelves to rise accordingly. When the top of the second lift rises to the highest point, the pallets on the second lift also reach the upper limit position, and the second lift stops moving. At this time, although the ends of the two grab bars pass through the U-shaped openings of the two grab ears respectively, the two grab bars are spaced apart from the two grab ears respectively. Then, the push rod of the electric push rod b extends out, driving the two grab bars to open again, the left grab bar rotates to the upper left of the left grab ear, and the right grab bar rotates to the upper right of the right grab ear. The two grab bars are separated from the two grab ears respectively, and the pallets of the two second lifts respectively support the two lifting supports, thereby lifting the shelves; then the two second lifts drive The respective pallets descend at the same time, and the shelves also descend accordingly. During the descent process, the shelves are placed on the upper side of the front side of the second chain conveyor, that is, the shelves fall on the upper side of the second chain conveyor, and the bottom surface of the shelf's legs contacts the upper surface of the chain of the second chain conveyor. The two second elevators continue to drive their respective pallets to descend until the tops of the two second elevators are both reduced to the lowest position, that is, the second elevators are fully retracted, and the pallets are reduced to the lower limit position. At this time, the shelf on the second chain conveyor is located between the two pallets of the two second elevators, and the two lifting supports are respectively higher than the two pallets of the two second elevators, and the lifting supports are spaced above the corresponding pallets and their retaining edges; the module motor drives the screw to rotate, so that the slide drives the gripper seat to move left to the left limit position of the double-track ball screw slide module to return to the initial state;
[0069] (IX) The second chain conveyor starts and conveys the fully loaded shelf backwards, and finally removes the fully loaded shelf from the second chain conveyor manually or by other means.
[0070] In this embodiment, the travel switch is electrically connected to an external host computer or an industrial computer, and the external host computer or the industrial computer controls the operation and stop of various servo motors, various electric push rods, the first elevator and the second elevator. In this embodiment, the board is a finished PCB board or a semi-finished PCB board with electronic components welded on it. Of course, the board can also be other board parts such as a bare PCB board, a wooden board, a stainless steel board or a plastic board.
Claims
1. A conveying system, characterized in that: The invention comprises a plate conveying device for conveying a plate (4) backward, a first chain conveyor (15) correspondingly arranged at the rear side of the plate conveying device and for conveying a shelf (10) forward, a second chain conveyor (23) correspondingly arranged at the left or right side of the first chain conveyor (15), a first elevator (16) for driving the shelf (10) on the first chain conveyor (15) to rise upward, a manipulator assembly (9) for grabbing the shelf (10) raised by the first elevator (16) to the top of the second chain conveyor (23), and a second elevator (24) for holding the shelf (10) above the second chain conveyor (23) and making the shelf (10) fall onto the second chain conveyor (23) during the descending process; The plate conveying device comprises two belt conveyors (5) arranged at intervals on the left and right, the belt conveyors (5) comprising conveyor belts (32), and the left and right ends of the plate (4) can be respectively placed on the conveyor belts (32) of the two belt conveyors (5); The shelf (10) comprises a plurality of shelves (44) arranged in sequence from top to bottom, each shelf (44) being provided with a front support member (58) whose front end can extend into between the rear ends of two belt conveyors (5), and both the shelf (44) and the front support member (58) can support the plate member (4); A pushing mechanism (6) is provided above the rear side portions of the two belt conveyors (5) for pushing the upper side plate (4) of the front portion (45) of the front support member (58) backward onto the shelf (44); Two front support members (58) are fixedly arranged at intervals on the left and right sides of the shelf (44); the pushing mechanism (6) is provided with a telescopic end which can be extended into between the two front support members (58) on the shelf (44); the telescopic end of the pushing mechanism (6) can be extended forward and retracted backward; The front support member (58) is a strip-shaped plate member that is vertically bent twice. The front portion (45) and the rear portion (47) of the front support member (58) both extend horizontally forward and backward, and the front portion (45) of the front support member (58) is higher than the rear portion (47). The telescopic end of the pushing mechanism (6) can extend between the rear portions (47) of the two front support members (58). The belt conveyor (5), the first chain plate conveyor (15) and the second chain plate conveyor (23) are all arranged longitudinally in the front and rear direction. The left and right sides of the front side of the first chain plate conveyor (15) and the left and right sides of the front side of the second chain plate conveyor (23) are provided with supports (30). The two first elevators (16) are respectively arranged on the upper sides of the left and right supports (30) of the front side of the first chain plate conveyor (15), and the two second elevators (24) are respectively arranged on the upper sides of the left and right supports (30) of the front side of the second chain plate conveyor (23); the left and right sides of the shelf (10) are fixedly provided with lifting supports. The two first elevators (16) can respectively lift up the two lifting supports of the shelf (10), and the two second elevators (24) can respectively support the two lifting supports of the shelf (10); A plurality of protrusions (33) are fixedly provided on the outer surface of the conveyor belt (32) at intervals in the longitudinal direction of the conveyor belt (32); The two telescopic mechanisms (12) are symmetrically arranged on the left and right sides of the rear side of the first chain conveyor (15), respectively. The telescopic mechanism (12) comprises a frame (25), two electric push rods c (27) arranged in parallel with each other at an upper and lower interval, a vertically arranged correction seat (13) driven by the two electric push rods c (27), and two linear guide rails (29) arranged between the frame (25) and the correction seat (13). The two correction seats (13) of the two telescopic mechanisms (12) are arranged opposite to each other at an upper and lower interval.
2. A conveying system according to claim 1, characterized in that: The manipulator assembly (9) comprises a gripper seat (60) which can move left and right under the drive of a linear reciprocating movement mechanism, a pair of mutually meshing gears (65) are provided on the gripper seat (60), two swing rods (66) symmetrically arranged on the left and right are respectively fixedly connected to the two gears (65), arc-shaped curved gripper rods (67) are fixedly provided at the ends of the two swing rods (66), one end of a telescopic rod is hingedly connected to the gripper seat (60), and the other end is hingedly connected to one of the swing rods (66); the shelf (10) is fixedly provided with two gripper ears (18) at intervals on the left and right, and the two gripper rods (67) can respectively hook the two gripper ears (18).
3. The conveying method implemented by the conveying system according to claim 1, characterized in that: The workstation corresponding to the rear side of the pushing mechanism (6) is the upper workstation (42), and the workstation below the upper workstation (42) is the lower workstation (43). The front end of the front support member (58) at the lower workstation (43) extends between the rear ends of the two belt conveyors (5); the first chain plate conveyor (15) conveys the unloaded shelf (10) thereon to a position corresponding to the rear ends of the two belt conveyors (5), and each layer of the shelf (44) and its fixed front support member (58) first complete the front feeding step at the lower workstation (43), and then rise to the upper workstation (42) to complete the subsequent pushing step. The front feeding step is as follows: the two belt conveyors (5) convey the plate member (4) backwards, and move the front end of the plate member (4) closest to the shelf (10) to the front support member (58) at the lower workstation (43). 58) moves the front upper side and the rear end to the upper side of the shelf (44) at the lower station (43); the subsequent advancement steps are: the pushing mechanism (6) pushes the plate at the upper station backward and causes the front end of the plate (4) to also fall on the upper side of the shelf (44); the first elevator (16) drives the shelf (10) to rise, so that the shelf (44) and its fixed front support (58) are raised from the lower station (43) to the upper station (42); the manipulator assembly (9) grabs the fully loaded shelf (10) to the top of the second chain conveyor (23), and after the second elevator (24) supports the shelf (10), the manipulator assembly (9) opens, and the shelf (10) falls on the second chain conveyor (23) during the process of descending with the second elevator (24), and is output by the second chain conveyor (23).
4. The conveying method according to claim 3, characterized in that: Whenever the first elevator (16) drives the shelf (10) to rise a certain distance, the shelf (44) and the front support (58) that have completed the pre-feeding step at the lower station (43) and the plate (4) on the upper side of the two are raised to the upper station (42), and at the same time, the shelf (44) and the front support (58) below the lower station (43) and the adjacent shelf (44) and the front support (58) fixed thereto are raised to the lower station (43); then the shelf (44) and the front support (58) at the lower station (43) complete the pre-feeding step, and at the same time, the shelf (44) and the front support (58) at the upper station (42) complete the subsequent advancement step; the first elevator (16) continuously drives the shelf (10) to rise until the bottom shelf (44) of the shelf (10) and the front support (58) fixed thereto arrive at the upper station (42) and complete the subsequent advancement step, and the shelf is fully loaded.
Citation Information
Patent Citations
Automatic blanking device
CN204508227U
Automatic pile device of heated board
CN206915364U
