A reliability assessment method for integrated energy system considering gas-thermal inertia
By considering the gas-thermal inertia characteristics, a comprehensive energy system reliability assessment method is established, which solves the problem of increased complexity and uncertainty of multi-energy coupling, improves the safety, reliability and economy of the system, and clarifies the importance of key equipment. Operational risks are reduced.
Patent Information
- Application Number
- CN202210449203.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-04-26
AI Technical Summary
Multi-energy coupling in integrated energy systems increases operational complexity and uncertainty, leading to system safety and reliability challenges. In particular, the slow dynamic characteristics of gas-thermal systems are not fully utilized, which affects system operational reliability.
This paper proposes a comprehensive energy system reliability assessment method that considers gas-thermal inertia, including establishing gas-thermal inertia characteristic extraction, proposing two reliability assessment model objective functions with different objectives, setting constraints based on actual operating conditions, and passing load and photovoltaic Annual data generation, component annual status generation, optimal load shedding optimization and reliability evaluation index calculation are performed to analyze the impact of gas-thermal inertia on system reliability.
By considering gas-thermal inertia, the total annual load shedding of the system is reduced, the maximum energy supply is increased, operating costs are reduced, economics is optimized, and the importance of each key equipment is clarified to improve long-term stable and reliable operation of the system.
Smart Images

Figure CN114925501B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of integrated energy systems, and in particular to a reliability assessment method for integrated energy systems taking into account gas thermal inertia. Background Art
[0002] The integrated energy system has the complementary characteristics of electricity and heat, which can promote efficient energy utilization and improve the capacity of renewable energy consumption. However, the multi-energy coupling in the integrated energy system increases the complexity and uncertainty of operation, bringing challenges to the safe and reliable operation of the system. Therefore, it is necessary to fully tap the flexibility of the integrated energy system and ensure the reliability and safety of operation through coordinated optimization. Compared with the traditional power system, the slow dynamic characteristics of the gas-heat system in the multi-energy coupled integrated energy system contain rich flexibility, which will help improve the reliability of system operation. Summary of the invention
[0003] The present invention provides a reliability assessment method for an integrated energy system taking into account gas thermal inertia, which provides a new idea for reliability assessment of an integrated energy system.
[0004] In order to solve the above technical problems, the present invention provides a comprehensive energy system reliability assessment method considering gas thermal inertia, comprising the following steps:
[0005] (1) Establish a comprehensive energy system reliability assessment model taking into account gas-thermal inertia, including:
[0006] 1) Extract the gas-thermal inertia characteristics of the integrated energy system;
[0007] 2) Propose the objective function of the reliability evaluation model under two different pursuit objectives;
[0008] 3) According to the actual operation of the integrated energy system, the constraints of the reliability assessment model are proposed;
[0009] (2) Establish a comprehensive energy system reliability assessment process that takes into account thermal inertia, including:
[0010] 1) Generation of annual load and photovoltaic data;
[0011] 2) Generation of component annual status;
[0012] 3) Optimal load shedding optimization;
[0013] 4) Calculation of reliability evaluation indicators;
[0014] (3) Analyze the impact of gas-thermal inertia on the reliability assessment results of the integrated energy system, including:
[0015] 1) Reliability assessment and analysis of integrated energy system based on thermal inertia with minimum load shedding as the goal;
[0016] 2) Analysis of the impact of thermal inertia on comprehensive energy reliability assessment with the lowest operating cost as the goal;
[0017] 3) Study the importance of different key equipment nodes for the long-term stable and reliable operation of the integrated energy system;
[0018] Further, step (1) is specifically as follows:
[0019] 1) Extraction of gas-thermal inertia characteristics of integrated energy system:
[0020] Thermal energy in the integrated energy system has inertial characteristics. On the one hand, due to the long transmission pipeline, there is a thermal time lag of several minutes to several hours between the heat source and the heat load; on the other hand, the heat load can operate within the comfort range, and even if the heat source stops supplying heat, the heat load can maintain a comfortable temperature for a long time. Therefore, when the heat source heat supply changes instantly, due to the time lag of the heat pipeline and the inertia of the heat load, the temperature change of the heat load is relatively delayed, and the comfortable temperature can be maintained for a certain period of time.
[0021] Natural gas in the integrated energy system has inertial characteristics, and natural gas pipeline storage has negative feedback regulation characteristics: when the gas load increases / decreases, the transmission pipeline releases / stores pipeline storage, the pipeline pressure drops / rises, the pipeline storage decreases / increases, and the input flow increases / decreases. The pressure at the end of the gas pipeline is analogous to the temperature of the heat load, and the gas pipeline storage is analogous to the time lag of the heat pipeline and the inertia of the heat load. When the load demand changes instantly, due to the existence of the gas pipeline, the pressure change at the end of the pipeline is relatively delayed, and the appropriate pressure can be maintained for a certain period of time.
[0022] In summary, when the external supply and demand of the integrated energy system changes instantaneously, due to the existence of buffer space, the system state changes relatively slowly and can maintain an acceptable state for a certain period of time. The gas-thermal inertia can provide external power support for a certain time scale.
[0023] 2) Propose the objective function of the reliability assessment model under two different pursuit objectives:
[0024] In the first case, the goal is to minimize the amount of load cut. The objective function is to maximize the total energy supply and minimize the load cut within the evaluation period (1 day is a complete scheduling period, divided into 24 time periods), where k represents the number of time periods.
[0025]
[0026]
[0027] Where: P L Total energy supply for IES; is the total power supply energy of the comprehensive energy system in time period k; P is the total heating energy of the comprehensive energy system in period k;LC is the total load shedding capacity of the integrated energy system; Output for forecasting the electric load of the integrated energy system for time period k; It is the heat load forecast output of the integrated energy system in time period k.
[0028] In the second case, the load reduction compensation cost and gas heat inertia output cost are included in the cost to pursue the lowest operating cost. The objective function is to minimize the system operating cost within the evaluation period (1 day is a complete scheduling period, divided into 24 time periods), where k represents the number of time periods.
[0029]
[0030] Where: C is the total cost of the comprehensive energy system; C E , C G , C GR , C HR , C EC , C HC They are grid output cost, gas grid output cost, gas inertia output cost, thermal inertia output cost, electric load reduction compensation cost, and thermal load reduction compensation cost; c G 、c GR 、c HR 、c EC 、c HC They are the unit output cost of the power grid, the unit output cost of the gas grid, the unit output cost of gas inertia, the unit output cost of thermal inertia, the unit reduction compensation cost of electric load, and the unit reduction compensation cost of thermal load.
[0031] 3) According to the actual operation of the integrated energy system, the constraints of the reliability assessment model are proposed:
[0032] a. Electric heating power constraints
[0033] The electrical power balance is as follows:
[0034]
[0035]
[0036] Where: is the predicted output of photovoltaic power generation in time period k, η T is the transformer operating efficiency, Supply energy to the external grid for time period k, The electric energy provided by the combined heat and power generation unit (CHP) in time period k, The energy storage and release for time period k is: is the actual power load supplied by the integrated energy system in time period k, The output of the electric load forecast for the integrated energy system in time period k is: The electric energy input to the electric boiler in period k, Charge the energy storage for time period k, They are external grid energy supply status, CHP working status, power storage discharge status, electric boiler working status, and power storage supply status.
[0037] The thermal power balance is as follows:
[0038]
[0039]
[0040] Where: is the heat energy output of the electric boiler in period k, is the heat energy provided by CHP in period k, is the heat output of the gas boiler in period k, The heat storage and energy release in time period k, is the actual heat load supplied by the integrated energy system in period k, The heat load forecast output of the integrated energy system for time period k is: Charge the energy storage for time period k, is the thermal inertia power support for time period k; They are respectively the electric boiler working state, the gas boiler working state, the heat storage and energy release state, and the heat storage and energy supply state.
[0041] b. Energy supply side constraints
[0042] The power supply constraints are as follows:
[0043]
[0044] Where: and They are the minimum and maximum values of the external power grid input respectively; and They are respectively the up and down ramp rate limits of the external power grid input.
[0045] The gas supply constraints are as follows:
[0046]
[0047] Where: and Enter the minimum and maximum values for the external gas network respectively; and They are respectively the upper and lower ramp rate limits of the external gas grid input.
[0048] c. Energy conversion and energy storage constraints
[0049] The CHP constraints are as follows:
[0050]
[0051] Where: Supply energy to the external grid for time period k; is the k-gas inertial power support for the period; The power of CHP input for time period k; Enter the power of the gas boiler for time period k; are the efficiencies of the CHP unit in generating electrical energy and thermal energy, respectively; and They are the upper and lower limits of CHP input power respectively; and They are respectively the upper and lower ramp rate limits of CHP input power.
[0052] The constraints of electric boilers are as follows:
[0053]
[0054] Where: η EB is the efficiency of electric boiler; and They are the upper and lower limits of electric boiler input power respectively; and They are respectively the upper and lower ramp rate limits of the electric boiler input power.
[0055] Gas boiler constraints are as follows:
[0056]
[0057] Where: η GB For gas boiler efficiency; and They are the upper and lower limits of gas boiler input power respectively; and They are respectively the upper and lower ramp rate limits of the gas boiler input power.
[0058] The power storage constraints are as follows:
[0059]
[0060] Where: They are the upper and lower limits of the electric energy storage discharge power respectively; They are the upper and lower limits of the electric energy storage charging power respectively; is the electrical energy storage capacity; ES is the energy loss rate of electric energy storage; η ES,charge and η ES,discharge They are the charging and discharging efficiency of electric energy storage; They are the upper and lower limits of the electric energy storage capacity respectively.
[0061] The heat storage constraints are as follows:
[0062]
[0063] Where: They are the upper and lower limits of thermal energy storage heat release power respectively; They are the upper and lower limits of thermal energy storage charging power respectively; is the thermal energy storage capacity; HS is the thermal energy storage energy loss rate; η HS,charge and η HS,discharge and are the thermal energy storage charging and discharging efficiencies, respectively; are the upper and lower limits of thermal energy storage capacity respectively.
[0064] d. Gas-thermal inertia confinement
[0065] The gas inertia constraint is as follows:
[0066]
[0067] Where: is a 0-1 variable, Indicates that the k-gas inertia is put into standby during the period. Indicates that the k-gas inertia during the period is not put into standby; It is the maximum value of the gas inertia that can be put into reserve; The continuous running time of the gas inertia standby during the k period; max_ON G The maximum continuous operation time for gas inertia standby; for Time interval of gas inertia standby; min_OFF G It is the shortest interval time for gas inertia backup.
[0068] The thermal inertia constraints are as follows:
[0069]
[0070] Where: is a 0-1 variable, Indicates that the thermal inertia of time period k is put into standby mode. Indicates that the thermal inertia of time period k is not put into standby; The maximum value of thermal inertia that can be put into reserve; The continuous operation time of thermal inertia standby from time period k; max_ON H The maximum continuous operation time for thermal inertia standby; for Thermal inertia standby interval time from the time period; max_OFF H It is the shortest interval time for thermal inertia backup.
[0071] Further, step (2) is specifically as follows:
[0072] 1) Generation of load and photovoltaic annual data:
[0073] A year is divided into 8760 periods, each of which is one hour. From the actual historical data of the integrated energy system park (sampled every 15 minutes), the required hourly electric load, thermal load and photovoltaic annual data are captured as follows, and the results will be used as data input parameters.
[0074]
[0075] Where: is the electric load power of the 4k integrated energy system at the sampling point, is the heat load power of the 4k integrated energy system at the sampling point, It is the photovoltaic power generation output of the 4k integrated energy system at the sampling point.
[0076] 2) Generation of component annual status:
[0077] The component annual status is generated based on the Markov two-state model, and the Monte Carlo method is used to simulate the state change behavior of the integrated energy system components within one year. The results will be used as the input parameters of the availability state variable to obtain the system component status.
[0078] The component annual state is generated based on the Markov two-state model. Assuming that the component repair rate is μ, the outage model of component i is:
[0079] p i (t) = 1-e -μt
[0080] The equipment status of component i at time t on day α is expressed as Indicates that random numbers are generated randomly in the uniformly distributed [0,1] interval Then we have:
[0081]
[0082] The overall status of the system components can be obtained as follows:
[0083] p i (t)=(f t CHP ,f t GB ,f t EB ,f t ES,charge ,f t HS,charge )
[0084] 3) Optimal load shedding optimization:
[0085] The main steps of optimal load shedding are: ① Set the initial value of the Monte-Carlo random simulation times n = 1, and the total number of random simulations N = 1000; ② Set the initial value of the annual optimal load shedding calculation block m = 1, and the total number of random simulations M = 365; ③ Select the mth 24h block, based on the generated source and load data and component status, comprehensively consider the electric and thermal power balance, various energy supply equipment, and energy conversion equipment operation constraints, and perform the optimal load shedding calculation with 24h as the full cycle; ④ If m = 365, the annual optimal load shedding process ends, and go to step ⑤; if m < 365, go to step ③, m = m + 1; ⑤ If n = 1000, the Monte-Carlo random simulation process ends; if n < 1000, go to step ②, n = n + 1.
[0086] 4) Calculation of reliability evaluation index:
[0087] The overall reliability evaluation index of the integrated energy system can be obtained by taking the average value of the optimal load shedding under multiple Monte-Carlo random simulations, where the annual total load shedding Annual total power cut-off load Annual total heat load It can be expressed as:
[0088]
[0089] Annual energy deficiency time Annual energy deficiency probability It can be expressed as:
[0090]
[0091] Where: is the number of hours with insufficient energy in the year in the nth Monte-Carlo random simulation.
[0092] Importance evaluation index s of energy conversion equipment i i It is expressed as follows: the larger the importance evaluation index is, the greater the impact of the energy conversion device on the system reliability is.
[0093]
[0094] Where: It is the total annual load shedding of the system when only the energy conversion device i fails.
[0095] Further, step (3) is specifically as follows:
[0096] 1) Reliability evaluation and analysis of integrated energy system based on thermal inertia with minimum load shedding as the goal:
[0097] With the goal of minimizing load shedding, a one-year long-term reliability assessment was conducted with or without considering the gas-thermal inertia of the integrated energy system. The power support effect taking into account the gas-thermal inertia effectively reduced the total annual load shedding of the system and increased the maximum total energy supply, with the maximum power supply and heat supply both increasing, while the annual energy shortage time and annual energy shortage probability were significantly reduced.
[0098] 2) Analysis of the impact of thermal inertia on comprehensive energy reliability assessment with the goal of minimizing operating costs:
[0099] With the goal of minimizing operating costs, a one-year long-term reliability assessment was conducted with or without considering the gas-thermal inertia of the integrated energy system. Taking into account the power support effect of gas-thermal inertia, the annual operating cost of the system was significantly reduced, and the economy was optimized. At the same time, the maximum energy supply of the system was increased, the magnitude, time, and frequency of load reduction were reduced accordingly, and the reliability of the integrated energy system was significantly improved.
[0100] 3) Study the importance of different key equipment nodes for the long-term stable and reliable operation of the integrated energy system:
[0101] Taking into account the power support role of gas thermal inertia, the importance of each key equipment is ranked as follows: cogeneration unit > electric boiler > gas boiler > heat storage > electricity storage. On the one hand, the importance of different key equipment is related to the equipment failure rate. The higher the failure rate of the equipment itself, the greater the threat to the overall reliability. On the other hand, the importance of different key equipment is related to the criticality of the equipment. The greater the importance assessment index of the energy conversion equipment, the greater its impact on the system reliability. It is a weak node that the system needs to focus on and implement protection to reduce the risk of system operation.
[0102] Key equipment with a larger importance assessment index is a weak node that the system operator needs to focus on protecting. The difference is that when the gas-thermal inertia is not taken into account, the importance assessment index of each key equipment is larger. The reason is that in this case, due to the weak power support capacity of the system and poor reliability, even if a single failure of a key equipment occurs, it may cause serious load reduction consequences. This proves that taking gas-thermal inertia into account is conducive to the long-term reliable and stable operation of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0103] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.
[0104] Figure 1 A flowchart of the reliability assessment steps;
[0105] Figure 2 It is a schematic diagram of the gas-thermal inertia of the integrated energy system;
[0106] Figure 3 This is a schematic diagram for comparing the load shedding between Case 7 and Case 21;
[0107] Figure 4 This is a diagram showing the comparative analysis of the annual output costs of Case 14 and Case 28. DETAILED DESCRIPTION
[0108] The technical solution provided by the present invention will be described in detail below in conjunction with specific examples. It should be understood that the following specific implementation methods are only used to illustrate the present invention and are not used to limit the scope of the present invention.
[0109] A reliability assessment method for integrated energy systems considering gas-thermal inertia, such as Figure 1 As shown, the following steps are included:
[0110] (1) Establish a comprehensive energy system reliability assessment model taking into account gas-thermal inertia, including:
[0111] 1) Extraction of gas-thermal inertia characteristics of integrated energy system:
[0112] Thermal energy in the integrated energy system has inertial characteristics, such as Figure 2 As shown in (a), on the one hand, due to the long transmission pipeline, there is a thermal time lag of several minutes to several hours between the heat source and the heat load; on the other hand, the heat load can operate within the comfort range. Even if the heat source stops supplying heat, the heat load can maintain a comfortable temperature for a long time due to thermal inertia. Therefore, when the heat supply of the heat source changes instantly, due to the time lag of the heat pipeline and the inertia of the heat load, the temperature change of the heat load is relatively delayed, and the comfortable temperature can be maintained for a certain period of time.
[0113] Similarly, natural gas in the integrated energy system has inertial characteristics, such as Figure 2 As shown in (b), the natural gas pipeline storage has negative feedback regulation characteristics: when the gas load increases, the transmission pipeline releases part of the pipeline storage to the load, the pipeline pressure decreases, the pipeline storage decreases, and the input flow increases; when the gas load decreases, the transmission pipeline stores part of the natural gas supplied by the gas source, the pipeline pressure rises, the pipeline storage increases, and the input flow decreases. Considering the similarity of the principles, the pressure at the end of the gas pipeline is analogous to the heat load temperature, and the gas pipeline storage is analogous to the heat pipeline time lag and heat load inertia. It can be obtained that when the load demand changes instantly, due to the existence of the gas pipeline, the pressure change at the end of the pipeline is relatively delayed, and the appropriate pressure can be maintained for a certain period of time.
[0114] In summary, when the external supply and demand of the integrated energy system changes instantaneously, due to the existence of buffer space, the system state changes relatively slowly and can maintain an acceptable state for a certain period of time. Therefore, gas-thermal inertia can provide external power support for a certain time scale.
[0115] 2) Propose the objective function of the reliability assessment model under two different pursuit objectives:
[0116] In the first case, the amount of various loads to be reduced is the minimum.
[0117]
[0118]
[0119] Where: P L Total energy supply for IES; is the total power supply energy of the comprehensive energy system in time period k; P is the total heating energy of the comprehensive energy system in period k; LC is the total load shedding capacity of the integrated energy system; Output for forecasting the electric load of the integrated energy system for time period k; It is the heat load forecast output of the integrated energy system in time period k.
[0120] In the second case, the load reduction compensation costs and gas and heat inertia output costs are included in the costs to pursue the lowest operating costs.
[0121]
[0122] Where: C is the total cost of the comprehensive energy system; C E , C G , C GR , C HR , C EC , C HC They are grid output cost, gas grid output cost, gas inertia output cost, thermal inertia output cost, electric load reduction compensation cost, and thermal load reduction compensation cost; c G 、c GR 、c HR 、c EC 、c HC They are the unit output cost of the power grid, the unit output cost of the gas grid, the unit output cost of gas inertia, the unit output cost of thermal inertia, the unit reduction compensation cost of electric load, and the unit reduction compensation cost of thermal load.
[0123] 3) According to the actual operation of the integrated energy system, the constraints of the reliability assessment model are proposed:
[0124] b. Electric heating power constraints
[0125] The electrical power balance is as follows:
[0126]
[0127]
[0128] Where: is the predicted output of photovoltaic power generation in time period k, η T is the transformer operating efficiency, Supply energy to the external grid for time period k, The electric energy provided by the combined heat and power generation unit (CHP) in time period k, The energy storage and release for time period k is: is the actual power load supplied by the integrated energy system in time period k, The output of the electric load forecast for the integrated energy system in time period k is: The electric energy input to the electric boiler in period k, Charge the energy storage for time period k, They are external grid energy supply status, CHP working status, power storage energy release status, electric boiler working status, and power storage energy supply status;
[0129] The thermal power balance is as follows:
[0130]
[0131]
[0132] Where: is the heat energy output of the electric boiler in period k, is the heat energy provided by CHP in period k, is the heat output of the gas boiler in period k, The heat storage and energy release in time period k, is the actual heat load supplied by the integrated energy system in period k, The heat load forecast output of the integrated energy system for time period k is: Charge the energy storage for time period k, is the thermal inertia power support for time period k; They are respectively the electric boiler working state, the gas boiler working state, the heat storage and energy release state, and the heat storage and energy supply state.
[0133] c. Energy supply side constraints
[0134] The power supply constraints are as follows:
[0135]
[0136] Where: and They are the minimum and maximum values of the external power grid input respectively; and They are respectively the up and down ramp rate limits of the external power grid input.
[0137] The gas supply constraints are as follows:
[0138]
[0139] Where: and Enter the minimum and maximum values for the external gas network respectively; and They are respectively the upper and lower ramp rate limits of the external gas grid input.
[0140] d. Energy conversion and energy storage constraints
[0141] The CHP constraints are as follows:
[0142]
[0143] Where: Supply energy to the external grid for time period k; is the k-gas inertial power support for the period; The power of CHP input for time period k; Enter the power of the gas boiler for time period k; are the efficiencies of the CHP unit in generating electrical energy and thermal energy, respectively; and They are the upper and lower limits of CHP input power respectively; and They are respectively the upper and lower ramp rate limits of CHP input power.
[0144] The constraints of electric boilers are as follows:
[0145]
[0146] Where: η EB is the efficiency of electric boiler; and They are the upper and lower limits of electric boiler input power respectively; and They are respectively the upper and lower ramp rate limits of the electric boiler input power.
[0147] Gas boiler constraints are as follows:
[0148]
[0149] Where: η GB For gas boiler efficiency; and They are the upper and lower limits of gas boiler input power respectively; and They are respectively the upper and lower ramp rate limits of the gas boiler input power.
[0150] The power storage constraints are as follows:
[0151]
[0152] Where: They are the upper and lower limits of the electric energy storage discharge power respectively; They are the upper and lower limits of the electric energy storage charging power respectively; is the electrical energy storage capacity; ES is the energy loss rate of electric energy storage; η ES,charge and η ES,discharge They are the charging and discharging efficiency of electric energy storage; They are the upper and lower limits of the electric energy storage capacity respectively.
[0153] The heat storage constraints are as follows:
[0154]
[0155] Where: They are the upper and lower limits of thermal energy storage heat release power respectively; They are the upper and lower limits of thermal energy storage charging power respectively; is the thermal energy storage capacity; HS is the thermal energy storage energy loss rate; η HS,charge and η HS,discharge and are the thermal energy storage charging and discharging efficiencies, respectively; are the upper and lower limits of thermal energy storage capacity respectively.
[0156] e. Gas-thermal inertia restraint
[0157] The gas inertia constraint is as follows:
[0158]
[0159] Where: is a 0-1 variable, Indicates that the k-gas inertia is put into standby during the period. Indicates that the k-gas inertia during the period is not put into standby; It is the maximum value of the gas inertia that can be put into reserve; The continuous running time of the gas inertia standby during the k period; max_ON G The maximum continuous operation time for gas inertia standby; for Time interval of gas inertia standby; min_OFF G It is the shortest interval time for gas inertia backup.
[0160] The thermal inertia constraints are as follows:
[0161]
[0162] Where: is a 0-1 variable, Indicates that the thermal inertia of time period k is put into standby mode. Indicates that the thermal inertia of time period k is not put into standby; The maximum value of thermal inertia that can be put into reserve; The continuous operation time of thermal inertia standby from time period k; max_ON H The maximum continuous operation time for thermal inertia standby; for Thermal inertia standby interval time from the time period; max_OFF H It is the shortest interval time for thermal inertia backup.
[0163] (2) Establish a comprehensive energy system reliability assessment process that takes into account thermal inertia, including:
[0164] 1) Generation of load and photovoltaic annual data:
[0165] From the actual historical data of the integrated energy system park (sampled every 15 minutes), the required hourly electric load, thermal load and photovoltaic annual data are captured as follows, and the results will be used as data input parameters.
[0166]
[0167] Where: is the electric load power of the 4k integrated energy system at the sampling point, is the heat load power of the 4k integrated energy system at the sampling point, It is the photovoltaic power generation output of the 4k integrated energy system at the sampling point.
[0168] 2) Generation of component annual status:
[0169] The component annual state is generated based on the Markov two-state model. Assuming that the component repair rate is μ, the outage model of component i is:
[0170] p i (t) = 1-e -μt
[0171] The equipment status of component i at time t on day α is expressed as Indicates that random numbers are generated randomly in the uniformly distributed [0,1] interval Then we have:
[0172]
[0173] The overall status of the system components can be obtained as follows:
[0174] p i (t)=(f t CHP ,f t GB ,ft EB ,f t ES,charge ,f t HS,charge )
[0175] 3) Optimal load shedding optimization:
[0176] The main steps of optimal load shedding are: ① Set the initial value of the Monte-Carlo random simulation times n = 1, and the total number of random simulations N = 1000; ② Set the initial value of the annual optimal load shedding calculation block m = 1, and the total number of random simulations M = 365; ③ Select the mth 24h block, based on the generated source and load data and component status, comprehensively consider the electric and thermal power balance, various energy supply equipment, and energy conversion equipment operation constraints, and perform the optimal load shedding calculation with 24h as the full cycle; ④ If m = 365, the annual optimal load shedding process ends, and go to step ⑤; if m < 365, go to step ③, m = m + 1; ⑤ If n = 1000, the Monte-Carlo random simulation process ends; if n < 1000, go to step ②, n = n + 1.
[0177] 4) Calculation of reliability evaluation index:
[0178] The overall reliability evaluation index of the integrated energy system can be obtained by taking the average value of the optimal load shedding under multiple Monte-Carlo random simulations, where the annual total load shedding Annual total power cut-off load Annual total heat load It can be expressed as:
[0179]
[0180] Annual energy deficiency time Annual energy deficiency probability It can be expressed as:
[0181]
[0182] Importance evaluation index s of energy conversion equipment i i It is expressed as follows: the larger the importance evaluation index is, the greater the impact of the energy conversion device on the system reliability is.
[0183]
[0184] Where: is the total annual load shedding of the system when only energy conversion device i fails
[0185] (3) Analyze the impact of gas-thermal inertia on the reliability assessment results of the integrated energy system, including:
[0186] All 21 cases of this method are listed in Table 1, and the failure rates of different key equipment nodes are shown in Table 2:
[0187] Table 1 Description of different cases
[0188]
[0189] Table 2 Description of different cases
[0190]
[0191] 1) Reliability evaluation and analysis of integrated energy system based on thermal inertia with minimum load shedding as the goal:
[0192] With the goal of minimizing load shedding, taking into account / not taking into account the thermal inertia of the integrated energy system, a one-year long-term reliability assessment was carried out. The results are shown in Table 3 and Figure 3 shown.
[0193] Table 3 Comparison of Case 7 and Case 21 results
[0194]
[0195] Taking into account / not taking into account the gas-thermal inertia characteristics of the system, the typical annual status of components is selected. During the year, when the total electric heat load is high, energy supply shortage events are more likely to occur. Compared with the power support effect of gas-thermal inertia not being taken into account, the number of load shedding actions when gas-thermal inertia is taken into account is significantly reduced, and the load shedding amplitude is reduced to a certain extent. It can be seen that considering the power support effect of gas-thermal inertia of the integrated energy system can reduce the size and frequency of load shedding at the same time, effectively alleviate the system operation risks brought by heavier loads, and improve the long-term operation reliability of the system.
[0196] 2) Analysis of the impact of thermal inertia on comprehensive energy reliability assessment with the goal of minimizing operating costs:
[0197] With the goal of minimizing operating costs, a one-year long-term reliability assessment was conducted with or without considering the thermal inertia of the integrated energy system. The results are shown in Table 4 and Figure 4 shown.
[0198] Table 4 Comparison of Case 14 and Case 28 results
[0199]
[0200] Taking into account / not taking into account the gas-thermal inertia characteristics of the system, the typical component annual state is selected and compared with the power support effect of gas-thermal inertia not taken into account, the operating cost is significantly reduced when gas-thermal inertia is taken into account due to the reduction of compensation costs for electric heat load reduction. It can be seen that considering the power support effect of gas-thermal inertia of the integrated energy system can reduce the system operating cost and improve the economic efficiency of system operation.
[0201] 3) Study the importance of different key equipment nodes for the long-term stable and reliable operation of the integrated energy system:
[0202] Taking into account the power support effect of gas thermal inertia, according to the results of Case 2-Case 6, the annual total load shedding of each case and the importance evaluation index of each key equipment are shown in Table 5. It is known that in Case 7, the annual total load shedding is 77049kW.
[0203] Table 5 Comparison of Case 2-Case 6 results
[0204]
[0205] Based on the above results, the importance of each key equipment is ranked as follows: cogeneration unit > electric boiler > gas boiler > heat storage > electricity storage. On the one hand, the importance of different key equipment is related to the equipment failure rate. The higher the failure rate of the equipment itself, the greater the threat to the overall reliability. On the other hand, the importance of different key equipment is related to the criticality of the equipment. For example, the cogeneration unit is responsible for both power supply and gas supply. The equipment has a high degree of coupling and a large supply power. Therefore, when it fails, it is difficult for the remaining equipment to fully provide power support, which has a greater impact on the system reliability. As a typical gas heating equipment, the gas boiler has a low degree of coupling and a small supply power. Therefore, when it fails, the coordinated adjustment of the cogeneration unit, heat storage, gas inertia, and thermal inertia can buffer its impact on system reliability. The greater the importance evaluation index of the energy conversion equipment, the greater its impact on the system reliability. It is a weak node that the system needs to focus on and implement protection to reduce the risk of system operation.
[0206] Ignoring the power support of gas thermal inertia, based on the results of Case15-Cse21, the total annual load shedding of each case and the importance evaluation indicators of each key equipment are as follows. It is known that in Case21, the total annual load shedding is 85548kW.
[0207] Table 6 Case 16-Case 20 results
[0208]
[0209]
[0210] Affected by the equipment failure rate and criticality, the importance ranking of each key equipment remains unchanged when taking into account / not taking into account the gas-thermal inertia characteristics. It can be seen that the key equipment with a larger importance assessment index is indeed the weak node that the system operator needs to focus on protecting. The difference is that when the gas-thermal inertia is not taken into account, the importance assessment index of each key equipment is even greater. The reason is that in this case, due to the weak power support capacity of the system and poor reliability, even if a single failure of a key equipment occurs, it may cause more serious load reduction consequences. It can be proved that taking into account the gas-thermal inertia is conducive to the long-term reliable and stable operation of the system.
[0211] The technical means disclosed in the scheme of the present invention are not limited to the technical means disclosed in the above-mentioned implementation mode, but also include technical schemes composed of any combination of the above-mentioned technical features. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications are also regarded as the protection scope of the present invention.
Claims
1. A reliability assessment method for integrated energy systems considering gas-thermal inertia, It is characterized in that The steps include: (1) Establish a comprehensive energy system reliability assessment model taking into account gas-thermal inertia, including: 1) Extract the gas-thermal inertia characteristics of the integrated energy system; 2) Propose the objective function of the reliability evaluation model under two different pursuit objectives; 3) According to the actual operation of the integrated energy system, the constraints of the reliability assessment model are proposed; (2) Establish a comprehensive energy system reliability assessment process that takes into account thermal inertia, including: 1) Generation of annual load and photovoltaic data; 2) Generation of component annual status; 3) Optimal load shedding optimization; 4) Calculation of reliability evaluation indicators; (3) Analyze the impact of gas-thermal inertia on the reliability assessment results of the integrated energy system, including: 1) Reliability assessment and analysis of integrated energy system based on thermal inertia with minimum load shedding as the goal; 2) Analysis of the impact of thermal inertia on comprehensive energy reliability assessment with the lowest operating cost as the goal; 3) Study the importance of different key equipment nodes for the long-term stable and reliable operation of the integrated energy system; Step (1) is specifically as follows: 1) Extraction of gas-thermal inertia characteristics of integrated energy system: Thermal energy in the integrated energy system has inertial characteristics. On the one hand, due to the long transmission pipeline, there is a thermal time lag of several minutes to several hours between the heat source and the heat load; on the other hand, the heat load can operate within the comfort range. When the heat source heat supply changes instantly, due to the time lag of the heat pipeline and the inertia of the heat load, the temperature change of the heat load is relatively delayed, and the comfortable temperature can be maintained for a certain period of time. In the integrated energy system, natural gas has inertial characteristics, and natural gas pipeline storage has negative feedback regulation characteristics: when the gas load increases / decreases, the transmission pipeline releases / stores pipeline storage, the pipeline pressure drops / rises, the pipeline storage decreases / increases, the input flow increases / decreases, the pressure at the end of the gas pipeline is analogous to the temperature of the heat load, and the gas pipeline storage is analogous to the time lag of the heat pipeline and the inertia of the heat load. When the load demand changes instantly, due to the existence of the gas pipeline, the pressure change at the end of the pipeline is relatively delayed, and the appropriate pressure can be maintained for a certain period of time; In summary, when the external supply and demand of the integrated energy system changes instantaneously, due to the existence of buffer space, the system state changes relatively lags behind and can maintain an acceptable state for a certain period of time. The gas-thermal inertia can provide power support for a certain time scale to the outside. 2) Propose the objective function of the reliability assessment model under two different pursuit objectives: In the first case, the goal is to minimize the amount of load cuts of all types, with the maximum total energy supply and the minimum load cut within the evaluation period as the objective function, where k represents the number of time periods; Where: P L Total energy supply for IES; is the total power supply energy of the comprehensive energy system in time period k; P is the total heating energy of the comprehensive energy system in period k; LC is the total load shedding capacity of the integrated energy system; Output for forecasting the electric load of the integrated energy system for time period k; The output of heat load forecast for the integrated energy system in time period k; In the second case, the load reduction compensation costs and gas-heat inertia output costs are included in the cost, and the lowest operating cost is pursued, with the lowest system operating cost within the evaluation period as the objective function, where k represents the number of time periods; Where: C is the total cost of the comprehensive energy system; C E , C G , C GR , C HR , C EC , C HC They are grid output cost, gas grid output cost, gas inertia output cost, thermal inertia output cost, electric load reduction compensation cost, and thermal load reduction compensation cost; c G 、c GR 、c HR 、c EC 、c HC They are the unit output cost of the power grid, the unit output cost of the gas grid, the unit output cost of gas inertia, the unit output cost of thermal inertia, the unit reduction compensation cost of electric load, and the unit reduction compensation cost of thermal load; 3) According to the actual operation of the integrated energy system, the constraints of the reliability assessment model are proposed: a. Electric heating power constraints The electrical power balance is as follows: Where: is the predicted output of photovoltaic power generation in time period k, η T is the transformer operating efficiency, Supply energy to the external grid for time period k, The electric energy provided by the combined heat and power generation unit in time period k, The energy storage and release for time period k is: is the actual power load supplied by the integrated energy system in time period k, The output of the electric load forecast for the integrated energy system in time period k is: The electric energy input to the electric boiler in period k, Charge the energy storage for time period k, They are the external grid energy supply status, the combined heat and power generation unit working status, the power storage and energy release status, the electric boiler working status, and the power storage and energy supply status; The thermal power balance is as follows: Where: is the heat energy output of the electric boiler in period k, is the heat energy provided by CHP in period k, is the heat output of the gas boiler in period k, The heat storage and energy release in time period k, is the actual heat load supplied by the integrated energy system in period k, The heat load forecast output of the integrated energy system for time period k is: Charge the energy storage for time period k, is the thermal inertia power support for time period k; They are respectively the working state of electric boiler, the working state of gas boiler, the state of heat storage and energy release, and the state of heat storage and energy supply; b. Energy supply side constraints The power supply constraints are as follows: Where: and They are the minimum and maximum values of the external power grid input respectively; and They are respectively the up and down ramp rate limits of the external power grid input; The gas supply constraints are as follows: Where: and Enter the minimum and maximum values for the external gas network respectively; and They are respectively the upper and lower ramp rate limits of the external gas grid input; c. Energy conversion and energy storage constraints The constraints of the combined heat and power generation unit are as follows: Where: Supply energy to the external grid for time period k; is the k-gas inertial power support for the period; Enter the power of the combined heat and power generation unit for time period k; Enter the power of the gas boiler for time period k; are the efficiencies of the combined power and heat generation units in generating electricity and heat, respectively; and They are the upper and lower limits of the input power of the combined heat and power generation unit respectively; and They are respectively the upper and lower ramp rate limits of CHP input power; Electric boiler constraints are as follows: Where: η EB is the efficiency of electric boiler; and They are the upper and lower limits of electric boiler input power respectively; and They are respectively the upper and lower ramp rate limits of the electric boiler input power; Gas boiler constraints are as follows: Where: η GB For gas boiler efficiency; and They are the upper and lower limits of gas boiler input power respectively; and They are respectively the upper and lower ramp rate limits of the gas boiler input power; The power storage constraints are as follows: Where: They are the upper and lower limits of the electric energy storage discharge power respectively; They are the upper and lower limits of the electric energy storage charging power respectively; is the electrical energy storage capacity; ES is the energy loss rate of electric energy storage; η ES,charge and η ES,discharge They are the charging and discharging efficiency of electric energy storage; They are the upper and lower limits of the electric energy storage capacity respectively; The heat storage constraints are as follows: Where: They are the upper and lower limits of thermal energy storage heat release power respectively; They are the upper and lower limits of thermal energy storage charging power respectively; is the thermal energy storage capacity; η HS is the thermal energy storage energy loss rate; η HS,charge and η HS,discharge and are the thermal energy storage charging and discharging efficiencies, respectively; are the upper and lower limits of thermal energy storage capacity, respectively; d. Gas-thermal inertia confinement The gas inertia constraint is as follows: Where: is a 0-1 variable, Indicates that the k-gas inertia is put into standby during the period. Indicates that the k-gas inertia during the period is not put into standby; The maximum value of the gas inertia that can be used as a reserve; The continuous running time of the gas inertia standby during the k period; max_ON G The maximum continuous operation time for gas inertia standby; for Time interval of gas inertia standby; min_OFF G The shortest interval time for gas inertia backup; The thermal inertia constraints are as follows: Where: is a 0-1 variable, Indicates that the thermal inertia of time period k is put into standby mode. Indicates that the thermal inertia of time period k is not put into standby; The maximum value of thermal inertia that can be put into reserve; The continuous operation time of thermal inertia standby from time period k; max_ON H The maximum continuous operation time for thermal inertia standby; for Thermal inertia standby interval time from the time period; max_OFF H It is the shortest interval time for thermal inertia backup.
2. According to claim 1, a comprehensive energy system reliability assessment method considering gas thermal inertia, It is characterized in that Step (2) is specifically as follows: 1) Generation of load and photovoltaic annual data: A year is divided into 8760 periods, each period is one hour. From the actual historical data of the integrated energy system park, samples are taken every 15 minutes to capture the required hourly electric load, thermal load and photovoltaic annual data as follows. The results will be used as data input parameters; Where: is the electric load power of the 4k integrated energy system at the sampling point, is the heat load power of the 4k integrated energy system at the sampling point, Provide photovoltaic power generation output for the 4k integrated energy system at the sampling point; 2) Generation of component annual status: Generate component annual status based on Markov two-state model, and use Monte Carlo method to simulate the state change behavior of integrated energy system components within one year. The result will be used as the input parameter of availability state variable to obtain the system component status; The component annual state is generated based on the Markov two-state model. Assuming that the component repair rate is μ, the outage model of component i is: p i (t)=1-e -μt The equipment status of component i at time t on day α is expressed as Indicates that random numbers are generated randomly in the uniformly distributed [0,1] interval Then we have: The overall status of the system components can be obtained as follows: p i (t)=(f t CHP ,f t GB ,f t EB ,f t ES,charge ,f t HS,charge ) 3) Optimal load shedding optimization: The optimal load shedding steps are mainly as follows: ① Set the initial value of the Monte-Carlo random simulation times n = 1, and the total number of random simulations N = 1000; ② Set the initial value of the annual optimal load shedding calculation block m = 1, and the total number of random simulations M = 365; ③ Select the mth 24h block, based on the generated source and load data, component status, and comprehensively consider the electric and thermal power balance, various energy supply equipment, and energy conversion equipment operation constraints, and perform the optimal load shedding calculation with 24h as the full cycle; ④ If m = 365, the annual optimal load shedding process ends, and go to step ⑤; if m < 365, go to step ③, m = m + 1; ⑤ If n = 1000, the Monte-Carlo random simulation process ends; if n < 1000, go to step ②, n = n + 1; 4) Calculation of reliability evaluation index: The overall reliability evaluation index of the integrated energy system can be obtained by taking the average value of the optimal load shedding under multiple Monte-Carlo random simulations, where the annual total load shedding Annual total power cut-off load Annual total heat load It can be expressed as: Annual energy deficiency time Annual energy deficiency probability It can be expressed as: Where: is the number of hours with insufficient energy in the year in the nth Monte-Carlo random simulation; Importance evaluation index s of energy conversion equipment i i It is expressed as follows: the larger the importance evaluation index is, the greater the impact of the energy conversion equipment on the system reliability is; Where: It is the total annual load shedding of the system when only the energy conversion device i fails.
3. According to the reliability assessment method of a comprehensive energy system considering gas thermal inertia according to claim 1, It is characterized in that Step (3) is specifically as follows: 1) Reliability evaluation and analysis of integrated energy system based on thermal inertia with minimum load shedding as the goal: With the goal of minimizing load shedding, a one-year long-term reliability assessment was conducted with or without considering the gas-thermal inertia of the integrated energy system. The power support effect of the gas-thermal inertia was taken into account to effectively reduce the total annual load shedding of the system and increase the maximum total energy supply. The maximum power supply and heat supply were increased, while the annual energy shortage time and annual energy shortage probability were significantly reduced. 2) Analysis of the impact of thermal inertia on comprehensive energy reliability assessment with the goal of minimizing operating costs: With the goal of minimizing operating costs, a one-year long-term reliability assessment was conducted with or without considering the gas-thermal inertia of the integrated energy system. Taking into account the power support effect of the gas-thermal inertia, the annual operating cost of the system was significantly reduced, and the economy was optimized. At the same time, the maximum energy supply of the system was increased, and the magnitude, time, and frequency of load reduction were reduced accordingly, and the reliability of the integrated energy system was significantly improved; 3) Study the importance of different key equipment nodes for the long-term stable and reliable operation of the integrated energy system: Taking into account the power support effect of gas thermal inertia, the importance of each key equipment is ranked as follows: cogeneration unit > electric boiler > gas boiler > heat storage > electricity storage. On the one hand, the importance of different key equipment is related to the equipment failure rate. The higher the failure rate of the equipment itself, the greater the threat to the overall reliability. On the other hand, the importance of different key equipment is related to the criticality of the equipment. The greater the importance assessment index of the energy conversion equipment, the greater its impact on the system reliability. It is a weak node that the system needs to focus on and implement protection to reduce the risk of system operation. When gas-thermal inertia is not taken into account, the importance assessment index of each key equipment is greater. The reason is that in this case, due to the weak power support capacity and poor reliability of the system, even if a single failure of a key equipment occurs, it may cause serious load reduction consequences. Therefore, taking gas-thermal inertia into account is conducive to the long-term reliable and stable operation of the system.