Flexibility optimization scheduling method of cogeneration units based on heat storage characteristics of district heating system
Through the flexibility optimization dispatching method of cogeneration units based on the centralized heating system, the problem of insufficient flexibility of cogeneration units is solved, the effective utilization of wind power and the complementation of electric and thermal energy are realized, and the peak shaving capacity and economy of the system are improved. efficiency.
Patent Information
- Application Number
- CN202210286544.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-22
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-03-22
AI Technical Summary
Existing combined heat and power units have insufficient flexibility in adjusting electrical and thermal output, resulting in poor peak-shaving capabilities of the system and inability to effectively utilize wind power, resulting in wind curtailment.
A flexibility optimization dispatching method for combined heat and power units based on the heat storage characteristics of the central heating system is adopted. By collecting the temperature and water flow of the heating network nodes, a thermal system dispatching model is constructed, and combined with multi-time scale constraints and power balance, the overall power system is optimized. For the cost target, use a commercial solver to solve the upper and lower limits of the output to achieve flexible scheduling of CHP units.
Fully exploit the adjustment flexibility of CHP units, expand the space for wind power grid access, improve the utilization rate of renewable energy, achieve complementary and mutual benefits of integrated electric and thermal energy, and achieve optimal economic efficiency.
Smart Images

Figure CN114997457B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a method for optimizing the flexibility of a cogeneration unit, and in particular to a method for optimizing the flexibility of a cogeneration unit based on the heat storage characteristics of a centralized heating system. Background Art
[0002] The principle of combined heat and power (CHP) is to generate electricity and heat at the same time. It is a reliable and effective way to produce electricity and heat from a single fuel source, which can improve the operating efficiency of the unit and reduce costs.
[0003] Cogeneration units are mainly divided into extraction type and back pressure type. Most of the thermal power units used in my country today are large extraction type units.
[0004] Back-pressure thermal power units provide heat through the waste heat discharged by back pressure. Their comprehensive thermal power efficiency is relatively high, reaching 80% to 85%. However, since the heat-to-electricity ratio is fixed, the electrical output is completely determined by the thermal output, and it has no adjustment capability, and its installed capacity accounts for a relatively small proportion in the power system.
[0005] Therefore, compared with back-pressure units, extraction steam units have greater flexibility and adjustment capabilities, and can adjust electrical output and thermal output within a larger range at the same time. However, the overall thermal efficiency is low, and they are generally suitable for thermal power plants with frequent load changes and large fluctuations.
[0006] However, the larger the steam extraction, the smaller the proportion of condensing steam for power generation, which plays a regulating role, so the unit adjustment range is smaller. In winter, there is a large amount of heat load that needs to be met. Therefore, this situation will inevitably lead to the unit's "heat-based power" constraint forcing the unit to increase the minimum output during the low-load period at night. As a result, the system's peak-shaving capacity is poor, a large amount of wind power cannot be connected to the grid, and serious wind abandonment occurs. Summary of the invention
[0007] The above technical problems of the present invention are mainly solved by the following technical solutions:
[0008] A method for optimizing the flexibility of cogeneration units based on the heat storage characteristics of a central heating system, characterized by comprising:
[0009] Step 1: Collect the temperature of each node of the pipeline of the heat network, as well as the water supply temperature and return water temperature of the pipeline, collect the water flow of the pipeline, consider the multi-time scale flexibility constraints of the CHP unit, and use the output of the conventional unit and the CHP unit and the standby of each unit as decision variables in the scheduling model. Based on the thermal system scheduling objective function of the CHP unit and its constraints, the upper and lower limits of the output of the CHP unit are obtained;
[0010] Step 2: Taking the total operation and standby cost and the minimum wind power abandonment as the optimization goal, comprehensively considering the power balance, power system constraints and the multi-time and multi-time scale flexibility output constraints of the CHP unit, the total cost optimization objective function can be solved using a commercial solver; finally, the flexibility scheduling of the CHP unit is obtained, that is, the specific output value of the CHP unit is obtained.
[0011] In the above-mentioned method for optimizing the flexibility of cogeneration units based on the heat storage characteristics of a central heating system, in step 1, the thermal system scheduling objective function of the CHP unit is based on the following formula:
[0012]
[0013] Where T is the total number of time periods, are the thermal output fuel costs of cogeneration units and other heat-generating devices, is the heat storage loss cost, and are the penalty costs for the upper and lower bound deviations of the thermal output of the CHP unit, respectively.
[0014] In the above-mentioned method for optimizing the flexibility scheduling of a cogeneration unit based on the heat storage characteristics of a centralized heating system, in step 1,
[0015]
[0016]
[0017]
[0018] μ b and μ c are the fuel costs of heating equipment and CHP units, and are the fuel consumption rates of heating equipment and CHP units, ρ s is the heat loss coefficient of the heat storage device during storage;
[0019]
[0020]
[0021] Among them, μ + and μ - is the deviation penalty function of the CHP unit, is the intermediate variable constructed.
[0022] In the above-mentioned method for optimizing the flexibility scheduling of a cogeneration unit based on the heat storage characteristics of a centralized heating system, in step 1, the constraints include:
[0023] Temperature constraints:
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032] Output constraints:
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
[0040] S s,T =S s,0
[0041] Among them, S s,t is the heat storage at time t, S s,0 The heat storage at time 0; and is the decision variable consisting of the upper and lower bounds of the operating range of the CHP unit thermal output, represents the temperature of the water supply node at time t, represents the temperature of the return water node at time t, represents the inlet temperature of the pipe, represents the outlet temperature of the pipe, Indicates the actual temperature of the water supply node during actual operation. Indicates the inlet temperature of the pipeline during actual operation. Indicates the outlet temperature of the pipeline during actual operation. It indicates the temperature change value that measures the heat storage capacity of the heat network pipeline; all the values with subscripts min and max indicate the minimum and maximum values of the corresponding parameters, which can be set manually;
[0042] Indicates the thermal output of the CHP unit, and They represent the upper and lower bounds obtained in the previous text respectively; is an intermediate variable; Indicates the heat supply of the radiator, S s,t is the heat storage at time t; The heat output of other heating equipment set up for the system.
[0043] In the above-mentioned method for optimizing the flexibility scheduling of a cogeneration unit based on the heat storage characteristics of a centralized heating system, in step 2, the total cost optimization objective function is based on the following formula:
[0044]
[0045] Among them, C is the total cost of system coordination operation, C CON (t) and C CHP (t) are the operating costs of thermal power units and cogeneration units during period t, respectively, C CUT (t) is the penalty cost of wind curtailment during period t, C s (t) is the heat dissipation cost of the radiator during period t.
[0046] In the above-mentioned method for optimizing the flexibility of cogeneration units based on the heat storage characteristics of the central heating system,
[0047] Operating costs of thermal power units:
[0048] C CON (t) = μ coal (aP con (t) 2 +bP con (t)+c)
[0049] Among them, μ coal is the coal price, P con (t) is the power output of the thermal power unit in period t, a, b, c are the fitting coefficients of the thermal power unit operation cost;
[0050] C CHP (t) = μ coal (f0D2+f1P CHP D+f2P C 2 HP +f3D+f4P CHP+f5)
[0051] f0 to f5 are the fitting coefficients
[0052] P CHP is the electrical power of the CHP unit; D is the air extraction volume;
[0053] C CUT (t) = [P WT,y(t) -P WT,s(t) ]·ε
[0054] Among them, P WT,y(t) and P WT,s(t) are the predicted value and actual output power of wind power, respectively, and ε is the wind abandonment penalty coefficient;
[0055] C s (t) = c·Q s,t
[0056] Where c is the heat dissipation cost coefficient; Q s,t The heat released by the radiator.
[0057] In the above-mentioned method for optimizing the flexibility of cogeneration units based on the heat storage characteristics of the central heating system, the constraints include:
[0058] Power Constraints:
[0059] P CHP (t)+P CON (t)+P WT,S (t) = P load (t)
[0060] Heat Constraints:
[0061] Q CHP (t)+Q HS (t) = Q load (t)
[0062] Heat dissipation and building temperature constraints:
[0063]
[0064] Δt is the scheduling time interval, and is the indoor and outdoor temperature at time t, k1, k2, k3 are the corresponding coefficients; C is the specific heat capacity; s is the heating area, is the indoor heat loss coefficient, Q s Indicates the heat supply of the radiator;
[0065] Pipeline thermal delay and temperature drop constraints:
[0066]
[0067]
[0068] Where, ΔT t is the temperature loss at time t, is the water supply temperature at the beginning of the pipeline at time t, is the external temperature of the pipe at time t, k loss is the temperature loss coefficient, λ is the heat transfer efficiency per unit length of the pipeline;
[0069] So the temperature at the end of the pipe at time t can be obtained as:
[0070]
[0071] Unit output constraints:
[0072]
[0073] Temperature constraints:
[0074]
[0075]
[0076]
[0077]
[0078] Among them, P CHP Indicates the electrical output of the CHP unit, P CON Represents the power output of thermal power units, P WT Indicates the power output of the wind turbine; other words with min and max are the upper and lower limits of the corresponding parameters, which can be set manually by the actual model; represents the temperature of the water supply node at time t, represents the temperature of the return water node at time t, represents the inlet temperature of the pipe, Indicates the outlet temperature of the pipe.
[0079] Therefore, the present invention has the following advantages: 1. It can fully tap the adjustment flexibility of CHP units, expand the space for wind power to be connected to the grid, and increase the utilization rate of renewable energy. 2. It can achieve the complementary and mutual benefit of electric and thermal comprehensive energy and achieve optimal economic performance. BRIEF DESCRIPTION OF THE DRAWINGS
[0080] Attached Figure 1 This is the working range of the CHP unit of the present invention.
[0081] Attached Figure 2 It is a flow chart of a method of the present invention. DETAILED DESCRIPTION
[0082] The technical solution of the present invention is further specifically described below through embodiments and in conjunction with the accompanying drawings.
[0083] Example:
[0084] In the embodiment of the present invention, the operation of CHP can first be expressed by a set of inequalities:
[0085] P gt >rQ gt
[0086]
[0087] 0≤Q gt ≤Q gmax
[0088] Where g represents the CHP unit, t represents the dispatch time, P gt is the unit power output, Q gt is the thermal output, r is the elastic coefficient of the electrical output and thermal output under back pressure conditions, Q gmax is the maximum heat output, β e and β h are the fuel consumption rates for electrical and thermal outputs, respectively. F and Represent the maximum and minimum fuel consumption respectively. That is: r is the slope of line segment BC, and the slopes of line segments AB and CD are β h / β e .
[0089] In the traditional heat-to-electricity mode, when the CHP operates at Q0, the power output range floats between E1E2. At this time, the power output of the unit is P0, which is greater than the minimum power output of the unit P min If the proportion of CHP units is relatively large, it will seriously affect the power system's ability to absorb wind power and also affect the flexibility of system operation.
[0090] In areas where the proportion of wind power connected to the grid is relatively large, due to the operating constraints of traditional cogeneration units, the regulation capacity is poor, resulting in insufficient space for wind power to be connected to the grid, resulting in a large amount of wind power being abandoned. In order to increase the regulation capacity of cogeneration units and increase the space for wind power to be connected to the grid, it is necessary to decouple the constraints of "heat-based electricity" for thermal power units. Configuring heat storage for cogeneration units has become an effective measure to solve this problem.
[0091] For example, after adding a heat storage device, the heat supply of CHP can be reduced and the heat storage device can be used to supplement the heat. In this way, the power output range of CHP can be increased, the minimum power output can be reduced, and the wind power absorption capacity can be improved. At this time, CHP is running in Q1, and the power output range is E3E6. Compared with the traditional mode, the unit obtains a part of the space for dispatching power output E5E6, which can be used for wind power absorption. This part can be called the dispatch flexibility of CHP. When the unit is actually running, it coordinates with the heat network system and can obtain a part of the adjustment output space E9E in the form of standby. 10 , located in Q2.
[0092] During the dispatching phase, the thermal balance of CHP unit dispatching at time t includes the heat source exchange node and the heat load exchange node:
[0093]
[0094]
[0095]
[0096]
[0097]
[0098] in, is the heat output of the CHP unit, For the heat output of other heating equipment, is the heat load of node i, and are the inlet and outlet temperatures of the heat load exchange node, and are the supply water temperature and return water temperature of the heat source exchange node respectively. ij is the temperature transfer factor of water supply node j to heat load flowing into node i, η ij is the transfer factor of heat exchange node i to heat source return water temperature j. Indicates the number of heat source exchange stations connected to other thermal equipment, Indicates the number of heat source exchange stations connected to the CHP unit. Ω hes Represents a collection of heat load nodes.
[0099] The heating network system itself has certain heat storage characteristics. The so-called heat storage characteristics of the heating network system means that the fluctuation of heat source output can be compensated by adjusting the overall temperature change of the heating network system. Under the quality adjustment mode, the pipeline node temperature of the heating network system can be divided into two categories. One is the temperature of the water supply pipeline node connected to the heat source node. This type of temperature is controllable under the influence of the heat source. The other is the temperature of other water supply and return water nodes. This type of temperature can change within a certain temperature range. The coordination between the heat network storage characteristics and the CHP units involves the relationship between the temperatures of the heating network, which has the following three characteristics:
[0100] (1) The heat output is proportional to the difference between the supply water temperature and the return water temperature;
[0101] Changes in heat output only affect the delivery water temperature;
[0102] (2) The supply water temperature is also affected by the return water temperature.
[0103] Therefore, when the CHP unit participates in real-time regulation, assuming that the actual thermal output is Without considering the influence of return water temperature, the heat balance at time t can be expressed as:
[0104]
[0105] in, is the water supply temperature affected by the output of the CHP unit. Since the change in heat output will cause the heat imbalance of the thermal system, this part of the unbalanced heat will be borne by the temperature change of the entire heating network. The temperature change reflected at each heat source node can be expressed as:
[0106]
[0107]
[0108] in, is the overall temperature change of the heat source exchange node, and are the actual water supply temperature and return water temperature respectively, so the world heat balance equation at time t becomes:
[0109]
[0110] From this we can get
[0111]
[0112]
[0113]
[0114]
[0115] in, and are the actual inlet and outlet temperatures of the heat load exchange node, respectively.
[0116] The above formula represents the impact of the change in the thermal output of the CHP unit on the node temperature of the heating network. It represents the coordination of the heat storage characteristics of the heat network with the random changes in the output of the CHP units, and can quantify the heat storage level of the heat network that supports the flexibility release of the CHP units. It can ensure that the flexibility of CHP units and the heat storage and release capacity of the heat network will not be over-utilized. It can be seen that the temperature of the heat source nodes of other non-CHP equipment will also be affected by the output changes of the CHP units. Therefore, by controlling each node It can also reduce the impact of CHP units' participation in power system dispatching and control on other heat source equipment.
[0117] Since the allowable thermal output range of the CHP unit is determined by the heat storage characteristics, the dispatch flexibility and regulation flexibility of the CHP unit both depend on the coordination with the heat storage characteristics of the heating network. However, the heat storage characteristics of the heating network cannot be quantified, and it is difficult to determine the maximum allowable operating range of the CHP unit's thermal output, which will directly affect the dispatch and allocation of the CHP unit's multi-time scale flexibility.
[0118] The thermal system scheduling objectives are:
[0119]
[0120] Where T is the total number of time periods, are the thermal output fuel costs of cogeneration units and other heat-generating devices, is the heat storage loss cost, and are the penalty costs for the upper and lower bound deviations of the thermal output of the CHP unit, respectively.
[0121] in,
[0122]
[0123]
[0124]
[0125] μ b and μ c are the fuel costs of heating equipment and CHP units, and are the fuel consumption rates of heating equipment and CHP units, ρ s is the heat loss coefficient of the heat storage device during storage.
[0126]
[0127]
[0128] Among them, μ + and μ - is the deviation penalty function of the CHP unit, is the intermediate variable constructed.
[0129] Temperature constraints:
[0130]
[0131]
[0132]
[0133]
[0134]
[0135]
[0136]
[0137]
[0138] Output constraints:
[0139]
[0140]
[0141]
[0142]
[0143]
[0144]
[0145]
[0146] S s,T =S s,0
[0147] Among them, S s,t is the heat storage at time t, S s,0 is the heat storage at time 0. and It is the decision variable consisting of the upper and lower bounds of the operating range of the CHP unit's thermal output.
[0148] By solving the above problem, the upper and lower limits of the CHP unit output can be obtained.
[0149] On the basis of considering the multi-time-scale flexibility constraints of CHP units, the dispatch model takes the output of conventional units and CHP units and the reserve of each unit as decision variables, and takes the total operation and reserve cost and the minimum wind power abandonment as the optimization goal, comprehensively considering the power balance and power system constraints as well as the multi-time and multi-time-scale flexibility output constraints of CHP units.
[0150] The electric-heat coordination optimization under multiple thermal inertias is to make full use of the characteristics of multiple inertias of the heating system, reasonably adjust the output of each unit, and realize the economic operation of the combined heat and power system. The optimization objective can be expressed as:
[0151]
[0152] Among them, C is the total cost of system coordination operation, C CON (t) and C CHP (t) are the operating costs of thermal power units and cogeneration units during period t, respectively, C CUT (t) is the penalty cost of wind curtailment during period t, C s (t) is the heat dissipation cost of the radiator during period t.
[0153] Operating costs of thermal power units:
[0154] C CON (t) = μ coal (aP con (t) 2 +bP con (t)+c)
[0155] Among them, μ coal is the coal price, P con (t) is the power output of the thermal power unit in period t, and a, b, and c are the fitting coefficients of the operating cost of the thermal power unit.
[0156]
[0157] f0 to f5 are the fitting coefficients
[0158] P CHP is the electrical power of the CHP unit. D is the air extraction volume.
[0159] C CUT (t) = [P WT,y(t) -P WT,s(t) ]·ε
[0160] Among them, P WT,y(t)and P WT,s(t) are the predicted value and actual output power of wind power respectively, and ε is the penalty coefficient for wind abandonment.
[0161] C s (t) = c·Q s,t
[0162] Where c is the heat dissipation cost coefficient. s,t The heat released by the radiator.
[0163] Power Constraints:
[0164] P CHP (t)+P CON (t)+P WT,S (t) = P load (t)
[0165] Heat Constraints:
[0166] Q CHP (t)+Q HS (t) = Q load (t)
[0167] Heat dissipation and building temperature constraints:
[0168]
[0169] Δt is the scheduling time interval, and is the indoor and outdoor temperature at time t, k1, k2, k3 are the corresponding coefficients, C is the specific heat capacity, s is the heating area, and is the indoor heat loss coefficient.
[0170] Pipeline thermal delay and temperature drop constraints:
[0171]
[0172]
[0173] Where, ΔT t is the temperature loss at time t, is the water supply temperature at the beginning of the pipeline at time t, is the external temperature of the pipe at time t, k loss is the temperature loss coefficient, and λ is the heat transfer efficiency per unit length of the pipeline.
[0174] So the temperature at the end of the pipe at time t can be obtained as:
[0175]
[0176] Unit output constraints:
[0177]
[0178] Temperature constraints:
[0179]
[0180]
[0181]
[0182]
[0183] Finally, the problem is transformed into a quadratic programming problem, which can be solved using a commercial solver. Finally, the flexible scheduling of the CHP unit is obtained, which means the specific output value of the CHP unit is obtained.
[0184] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.
Claims
1. A method for optimizing the flexibility of cogeneration units based on the heat storage characteristics of a central heating system, characterized in that: include: Step 1: Collect the temperature of each node of the pipeline of the heat network, as well as the water supply temperature and return water temperature of the pipeline, collect the water flow of the pipeline, consider the multi-time scale flexibility constraints of the CHP unit, and use the output of the conventional unit and the CHP unit and the standby of each unit as decision variables in the scheduling model. Based on the thermal system scheduling objective function of the CHP unit and its constraints, the upper and lower limits of the output of the CHP unit are obtained; Step 2: Taking the total operation and standby cost and the minimum wind power abandonment as the optimization target, comprehensively considering the power balance and power system constraints and the multi-time and multi-time scale flexibility output constraints of the CHP unit, the total cost optimization objective function can be solved using a commercial solver; finally, the flexibility dispatch of the CHP unit is obtained, that is, the specific output value of the CHP unit is obtained; In step 1, the thermal system scheduling objective function of the CHP unit is based on the following formula: Where T is the total number of time periods, are the thermal output fuel costs of cogeneration units and other heat-generating devices, is the heat storage loss cost, and are the penalty costs for the deviation of the upper and lower bounds of the thermal output of the CHP unit, respectively; In the step 1, μ b and μ c The fuel costs for heating equipment and CHP units are and are the fuel consumption rates of heating equipment and CHP units, is the heat loss coefficient of the heat storage device during storage; Among them, μ + and μ - is the deviation penalty function of the CHP unit is the intermediate variable constructed; In step 1, the constraints include: Temperature constraints: Output constraints: Among them, S s,t is the heat storage at time t, S s,0 The heat storage at time 0; and is the decision variable consisting of the upper and lower bounds of the operating range of the CHP unit thermal output, represents the temperature of the water supply node at time t, represents the temperature of the return water node at time t, represents the inlet temperature of the pipe, represents the outlet temperature of the pipe, Indicates the actual temperature of the water supply node during actual operation. Indicates the inlet temperature of the pipeline during actual operation. Indicates the outlet temperature of the pipeline during actual operation. It indicates the temperature change value that measures the heat storage capacity of the heat network pipeline; all the values with subscripts min and max indicate the minimum and maximum values of the corresponding parameters, which can be set manually; Indicates the thermal output of the CHP unit, and They represent the upper and lower bounds obtained in the previous text respectively; is an intermediate variable; Indicates the heat supply of the radiator, S s,t is the heat storage at time t; The heat output of other heating equipment set up for the system; In step 2, the total cost optimization objective function is based on the following formula: Among them, C is the total cost of system coordination operation, C CON (t) and C CHP (t) are the operating costs of thermal power units and cogeneration units during period t, respectively, C CUT (t) is the penalty cost of wind curtailment during period t, C s (t) is the heat dissipation cost of the radiator during period t; The operating costs of thermal power units; C CON (t)=μ coal (aP con (t) 2 +bP con (t)+c) Among them, μ coal is the coal price, P con (t) is the power output of the thermal power unit in period t, a, b, c are the fitting coefficients of the thermal power unit operation cost; f0 to f5 are fitting coefficients; P CHP is the electrical power of the CHP unit; D is the air extraction volume; C CUT (t)=[P WT,y(t) -P WT,s(t) ]·ε Among them, P WT,y(t) and P WT,s(t) are the predicted value and actual output power of wind power, is the wind abandonment penalty coefficient; C s (t)=c·Q s,t Where c is the heat dissipation cost coefficient; Q s,t The heat released by the radiator; The constraints include: Power Constraints: P CHP (t)+P CON (t)+P WT,S (t)=P load (t) Heat Constraints: Q CHP (t)+Q HS (t)=Q load (t) Heat dissipation and building temperature constraints: Δt is the scheduling time interval, and is the indoor and outdoor temperature at time t, k1, k2, k3 are the corresponding coefficients; C is the specific heat capacity; s is the heating area, is the indoor heat loss coefficient, Q s Indicates the heat supply of the radiator; Pipeline thermal delay and temperature drop constraints: in, is the temperature loss at time t, is the water supply temperature at the beginning of the pipeline at time t, is the external temperature of the pipe at time t, is the temperature loss coefficient, λ is the heat transfer efficiency per unit length of the pipeline; So the temperature at the end of the pipe at time t can be obtained as: Unit output constraints: Temperature constraints: Among them, P CHP Indicates the electrical output of the CHP unit, P CON Represents the power output of thermal power units, P WT Indicates the power output of the wind turbine; other characters with min and max are the upper and lower limits of the corresponding parameters, which can be set manually by the actual model; represents the temperature of the water supply node at time t, represents the temperature of the return water node at time t, represents the inlet temperature of the pipe, Indicates the outlet temperature of the pipe.