A construction engineering quality detector and detection method

By designing a construction project quality detector with lifting mechanism and adsorption mechanism, the measurement error and stability problems caused by manual push in the prior art are solved, and high accuracy and efficient steel bar spacing detection are achieved.

CN115016028BActive Publication Date: 2025-01-03TAIHE COUNTY HERUI CONSTR ENG CONSULTING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210702653.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-21
Publication Date
2025-01-03
Estimated Expiration
2042-06-21

AI Technical Summary

Technical Problem

When used, the existing integrated steel bar scanners are manually pushed, resulting in large errors in measurement results, low accuracy, and poor stability in handheld mode, which increases measurement errors.

Method used

A construction project quality detector is designed, including the scanner body, installation frame, lifting mechanism, movement control mechanism, measurement mechanism and adsorption mechanism. The motor drives the threaded rod to drive the movable push block to realize the detection of the scanner body against the wall. And use lifts and suction cups to ensure detection accuracy and stability.

Benefits of technology

The measurement error problem caused by manual push is solved, the accuracy and stability of detection is improved, the convenience of measurement and suction cup adsorption at different heights is achieved, the detection time is shortened and the working efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115016028B_ABST
    Figure CN115016028B_ABST
Patent Text Reader

Abstract

A construction project quality detector and detection method, belonging to the field of construction project technology, in order to solve the problem that an integrated steel bar scanner is manually pushed for measurement during use and cannot maintain linear motion during pushing, resulting in large measurement error and low accuracy, the present invention has a center connecting rod fixedly connected between the output ends of a first screw lift and a second screw lift, the upper end of the first screw lift is threadedly connected to a first push rod having one end fixedly connected to a mounting frame, the upper end of the second screw lift is threadedly connected to a second push rod having one end fixedly connected to the mounting frame, the output end of the motor is fixedly connected to a threaded rod, one end of the threaded rod is rotatably connected to the inner wall of the mounting frame, the outer wall of the threaded rod is threadedly connected to a movable push block, the upper end of the movable push block is fixedly connected to the scanner body, thereby achieving the purpose of high-stability linear measurement, small measurement error and high accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction engineering, and in particular to a construction engineering quality detector and a detection method. Background Art

[0002] Construction engineering refers to the engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, living, learning, and public activities. As we all know, after the construction of construction projects, it is generally necessary to inspect their construction quality. Among them, it is necessary to judge the spacing and position of steel bars to ensure the construction quality.

[0003] Most of the devices currently used to determine the spacing position of steel bars are generally integrated steel bar scanners. However, the integrated steel bar scanners are manually pushed for measurement during use, and cannot maintain linear motion during pushing, resulting in large errors in the measurement results and low accuracy. In addition, during detection, the manual hand-held method has poor stability, which can easily lead to further increases in the errors in the measurement results.

[0004] To solve the above problems, a construction engineering quality detector and a detection method are proposed. Summary of the invention

[0005] The purpose of the present invention is to provide a construction engineering quality detector and a detection method to solve the problems in the background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a construction engineering quality detector, comprising a scanner body, and a control terminal installed at one end of the scanner body, a mounting frame is provided at the lower end of the scanner body, a support block is provided at the lower end of the mounting frame, a shift wheel is installed at the lower end of the support block, a lifting mechanism is installed between the support block and the mounting frame, a mobile control mechanism is provided at one end of the mounting frame, a measuring mechanism is installed at the upper end of the mounting frame, and a marking mechanism is provided at one end of the scanner body;

[0007] The lifting mechanism includes a first screw lift and a second screw lift installed at the upper end of the support block, a central connecting rod is fixedly connected between the output ends of the first screw lift and the second screw lift, the upper end of the first screw lift is threadedly connected to a first push rod having one end fixedly connected to the mounting frame, and the upper end of the second screw lift is threadedly connected to a second push rod having one end fixedly connected to the mounting frame;

[0008] The mobile control mechanism includes a motor installed at one end of the mounting frame, the output end of the motor is fixedly connected to a threaded rod, one end of the threaded rod is rotatably connected to the inner wall of the mounting frame, the outer wall of the threaded rod is threadedly connected to a movable push block, and the upper end of the movable push block is fixedly connected to the scanner body.

[0009] Furthermore, the measuring mechanism includes a measuring ruler body installed on the upper end of the mounting frame, the inner wall of the measuring ruler body is slidably connected with a sliding rod, the end of the sliding rod away from the measuring ruler body is axially connected with an indicating rod, the end of the indicating rod away from the sliding rod is installed with a marking plate, the outer wall of the indicating rod is axially connected with a mounting plate, the end of the mounting plate away from the indicating rod is hinged with a storage outer rod, the inner wall of the storage outer rod is slidably connected with a telescopic inner rod, the end of the telescopic inner rod away from the storage outer rod is slidably connected to the measuring ruler body, and a reset spring is fixedly connected to the sliding rod and the outer wall of the indicating rod.

[0010] Furthermore, the marking mechanism includes a first electric push rod and a second electric push rod installed on the inner wall of the scanner body opening, the lower end of the first electric push rod is fixedly connected to a first mounting clamp, the lower end of the second electric push rod is fixedly connected to a second mounting clamp, and marking ink strips are installed on the inner walls of the first mounting clamp and the second mounting clamp.

[0011] Furthermore, the control terminal includes a steel bar detection module, the steel bar detection module is electrically connected to an alarm module for emitting a warning sound when steel bars are detected, the alarm module is electrically connected to a single-chip microcomputer, and the single-chip microcomputer is electrically connected to a signal emitting module.

[0012] Furthermore, the signal sending module is wirelessly connected to the signal receiving module, the signal receiving module is electrically connected to the signal analyzing module, the signal analyzing module is electrically connected to the executing module, and the executing module is electrically connected to the motor and the electric push rod.

[0013] Furthermore, an outer wall of the installation frame is provided with an adsorption mechanism, which includes a connecting frame arranged on the outer wall of the installation frame, and a first suction cup and a second suction cup are overlapped at one end of the connecting frame away from the installation frame.

[0014] Furthermore, an active screw is slidably connected at the center of the connecting frame, and a first driven screw and a second driven screw are respectively provided on both sides of the active screw, and the first driven screw and the second driven screw are both slidably connected to the connecting frame, an outer wall of the active screw is threadedly connected to an active pressure block, an outer wall of the first driven screw is threadedly connected to the first driven pressure block, and an outer wall of the second driven screw is threadedly connected to the second driven pressure block, and an outer wall of the active pressure block is fixedly connected to a fixed connecting rod, and the active pressure block is respectively fixedly connected to the first driven pressure block and the second driven pressure block through the fixed connecting rod, a driving wheel is fixedly connected to the outer wall of the active screw, a first driven wheel is fixedly connected to the outer wall of the first driven screw, and a second driven wheel is fixedly connected to the outer wall of the second driven screw, and the driving wheel, the first driven wheel and the second driven wheel are all transmission connected.

[0015] Furthermore, a receiving plate is installed at one end of the first driven screw rod and the second driven screw rod passing through the connecting frame, and a supporting spring is fixedly connected to one end of the receiving plate.

[0016] Furthermore, a transmission mechanism is provided on the inner wall of the mounting frame, and the transmission mechanism includes a rotating rod rotatably connected to the mounting frame, a rotating gear is fixedly connected to the outer wall of the rotating rod, one end of the rotating gear is meshedly connected to a fixed rack, the fixed rack is fixedly installed on one side of the movable push block, a first bevel gear is provided at the lower end of the rotating gear, the first bevel gear is fixedly installed on the outer wall of the rotating rod, the lower end of the first bevel gear is meshedly connected to a second bevel gear, and one end of the second bevel gear is fixedly connected to the active screw.

[0017] Another technical solution proposed by the present invention is to provide a detection method of a construction engineering quality detector, comprising the following steps:

[0018] S1: First, when testing, the first screw lifter is connected to an external motor to drive the output shaft of the first screw lifter to rotate, and the output shaft of the second screw lifter can be driven to rotate by cooperating with the central connecting rod, so that the first push rod and the second push rod push the installation frame upward to adjust the height, and the threaded rod is driven actively by starting the motor, so that the movable push block drives the scanner body to detect the wall;

[0019] S2: Then, when the movable push block moves to one end and drives the scanner body to perform detection, it can drive the fixed rack to move at the same time. Therefore, when the fixed rack moves, it can drive the rotating gear to rotate clockwise, and the rotating gear drives the first bevel gear to rotate through the rotating rod, and then drives the second bevel gear to rotate through the first bevel gear, and uses the second bevel gear to drive the active screw to rotate clockwise, so as to achieve the purpose of the connecting frame squeezing the first suction cup and the second suction cup, so that the first suction cup and the second suction cup are adsorbed on the wall. When the scanner body returns after the detection, it will drive the rotating gear to rotate counterclockwise through the fixed rack, and through the cooperation of the rotating rod, the first bevel gear and the second bevel gear, drive the active screw to rotate counterclockwise, so as to achieve the purpose of the connecting frame releasing the squeezing of the first suction cup and the second suction cup, so that it is convenient for the staff to cut off the adsorption of the first suction cup and the second suction cup on the wall;

[0020] S3: Then, when the scanner body detects the position of the steel bar through the steel bar detection module, an alarm will be issued through the alarm module after detection. At this time, the single chip trigger signal sending module sends a signal, and then the signal receiving module receives the signal. The signal analysis module triggers the execution module to stop the motor, and at the same time, the first electric push rod and the second electric push rod are started. The first electric push rod and the second electric push rod are used to drive the first mounting clamp and the second mounting clamp to move closer to the wall, thereby driving the marking ink strip to mark the wall;

[0021] S4: Finally, when the movable push block drives the scanner body to move, the slide bar will move at the same time driven by the scanner body. After the scanner body finishes measuring the steel bar spacing and marks the line, the staff can roughly estimate the distance through the indicator rod and the measuring ruler body. If it exceeds the qualified line by too much, the staff can directly understand the test result. If it is close to the qualified line, they can wait for the test result of the scanner body and the test is completed.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] 1. A construction engineering quality detector and detection method, when inspecting a wall, bring the installation frame close to the wall, start the motor to drive the threaded rod actively, so that the movable push block drives the scanner body to inspect the wall, so as to solve the problem that the integrated steel bar scanner is manually pushed for measurement during use, and cannot maintain linear motion during pushing, resulting in large measurement error and low accuracy. The first screw lifter is connected to an external motor to drive the output shaft of the first screw lifter to rotate, and the output shaft of the second screw lifter can be driven to rotate through cooperation with the center connecting rod, so that the first push rod and the second push rod push the installation frame upward, so as to achieve the purpose of changing the measurement height, and can measure different heights of the same wall, and can detect whether the internal steel bars are bent, thereby ensuring the quality of the inspection.

[0024] 2. A construction project quality detector and detection method, the scanner body detects the position of the steel bar through the steel bar detection module, and after detection, an alarm will be issued through the alarm module. At this time, the single-chip microcomputer triggers the signal sending module to send a signal, and then the signal receiving module receives the signal. The signal analysis module triggers the execution module to stop the motor, and at the same time, the first electric push rod and the second electric push rod are started. The first electric push rod and the second electric push rod are used to drive the first mounting clamp and the second mounting clamp to move closer to the wall, thereby driving the marking ink stick to mark the wall, which is convenient for marking after measurement.

[0025] 3. A construction engineering quality detector and detection method. When the movable push block drives the scanner body to move, the mounting plate will move through the slide bar driven by the scanner body, and the slide bar will drive the indicator rod, the mounting plate, the storage outer rod and the telescopic inner rod to move. At this time, the power of the scanner body during movement will drive the mounting plate to pull the indicator rod into a bent state. After the scanner body stops moving, the reset spring will drive the bent indicator rod to return to its original position, so that the marking plate fits the wall surface and leaves a mark. After the scanner body finishes measuring the steel bar spacing and draws the line mark, the staff can roughly visually estimate the distance through the indicator rod and the measuring ruler body. If it exceeds the qualified line by too much, the detection result can be directly understood without waiting for the scanner body to give the result. The detection speed is fast, and the line mark can be compared with the mark left by the marking plate, thereby improving the work efficiency of the staff.

[0026] 4. A construction engineering quality detector and detection method, when the installation frame is close to the wall before detection, the first suction cup and the second suction cup are driven to overlap the wall, and the active screw is rotated. The active screw drives the first driven screw and the second driven screw to rotate through the organic cooperation of the active wheel, the first driven wheel and the second driven wheel, so that the active pressure block drives the first driven pressure block and the second driven pressure block to move to one end at the same time through the fixed connecting rod, and drives the connecting frame to squeeze the first suction cup and the second suction cup, and discharge the internal air of the first suction cup and the second suction cup, so that they are adsorbed on the wall, and the reaction force of the supporting spring can drive the first suction cup and the second suction cup to be further close to the wall, which solves the problem that the manual hand-held method has poor stability, which easily leads to further increase in the error of the measurement result. When the movable push block moves to one end, the first and second driven pressure blocks are driven to move to one end. When the scanner body is moving for detection, it can drive the fixed rack to move at the same time. Therefore, when the fixed rack moves, it can drive the rotating gear to rotate clockwise, and the rotating gear drives the first bevel gear to rotate through the rotating rod, and then drives the second bevel gear to rotate through the first bevel gear. The second bevel gear drives the active screw to rotate clockwise, so as to achieve the purpose of the connecting frame squeezing the first suction cup and the second suction cup, so that the first suction cup and the second suction cup are adsorbed on the wall. When the scanner body returns after the detection, it will drive the rotating gear to rotate counterclockwise through the fixed rack, and through the cooperation of the rotating rod, the first bevel gear and the second bevel gear, drive the active screw to rotate counterclockwise, so as to achieve the purpose of the connecting frame releasing the squeezing of the first suction cup and the second suction cup, so that the staff can cut off the adsorption of the first suction cup and the second suction cup on the wall, and improve the convenience of suction cup adsorption. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the construction engineering quality detector of the present invention;

[0028] Figure 2 It is a schematic diagram of the structure of the lifting mechanism and the measuring mechanism of the construction engineering quality detector of the present invention;

[0029] Figure 3 It is a schematic diagram of the structure of the mobile control mechanism of the construction engineering quality detector of the present invention;

[0030] Figure 4 It is a schematic diagram of the structure of the measuring mechanism of the construction engineering quality detector of the present invention;

[0031] Figure 5 It is a structural schematic diagram of the marking mechanism of the construction engineering quality detector of the present invention;

[0032] Figure 6 This is a diagram showing the internal structure of the control terminal of the construction engineering quality detector of the present invention;

[0033] Figure 7It is a schematic diagram of the internal operation structure of the control terminal of the construction engineering quality detector of the present invention;

[0034] Figure 8 It is a schematic diagram of the three-dimensional structure of the adsorption mechanism of the construction engineering quality detector of the present invention;

[0035] Fig. 9 It is a schematic diagram of the explosion of the adsorption mechanism of the construction engineering quality detector of the present invention;

[0036] Fig.10 The construction engineering quality detector of the present invention Figure 3 A magnified image of point A;

[0037] Fig.11 It is a schematic diagram of the transmission mechanism structure of the construction engineering quality detector of the present invention.

[0038] In the figure: 1. Scanner body; 2. Control terminal; 21. Rebar detection module; 22. Alarm module; 23. Single chip microcomputer; 24. Signal sending module; 25. Signal receiving module; 26. Signal analysis module; 27. Execution module; 3. Mounting frame; 4. Support block; 5. Shifting wheel; 6. Lifting mechanism; 61. First screw lifter; 62. Second screw lifter; 63. Center connecting rod; 64. First push rod; 65. Second push rod; 7. Moving control mechanism; 71. Motor; 72. Threaded rod; 73. Movable push block; 8. Measuring mechanism; 81. Measuring ruler body; 82. Sliding rod; 83. Indicating rod; 84. Marking plate; 85. Mounting plate; 86. Storage outer rod; 87. Telescopic inner rod; 88. Reset spring; 9. Marking mechanism; 9 1. First electric push rod; 92. Second electric push rod; 93. First mounting clamp; 94. Second mounting clamp; 95. Marking ink strip; 10. Adsorption mechanism; 101. Connecting frame; 102. First suction cup; 103. Second suction cup; 104. Active screw; 105. First driven screw; 106. Second driven screw; 107. Active pressure block; 108. First driven pressure block; 109. Second driven pressure block; 1010. Fixed connecting rod; 1011. Active wheel; 1012. First driven wheel; 1013. Second driven wheel; 1014. Receiving plate; 1015. Support spring; 11. Transmission mechanism; 111. Rotating rod; 112. Rotating gear; 113. Fixed rack; 114. First bevel gear; 115. Second bevel gear. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] In order to solve the problem that the integrated steel bar scanner is manually pushed for measurement during use, and cannot maintain linear motion during pushing, resulting in large measurement errors and low accuracy, such as Figure 1-Figure 3 As shown, the following preferred technical solutions are provided:

[0041] A construction project quality detector comprises a scanner body 1 and a control terminal 2 installed at one end of the scanner body 1, a mounting frame 3 is arranged at the lower end of the scanner body 1, a support block 4 is arranged at the lower end of the mounting frame 3, a shift wheel 5 is installed at the lower end of the support block 4, a lifting mechanism 6 is installed between the support block 4 and the mounting frame 3, a moving control mechanism 7 is arranged at one end of the mounting frame 3, a measuring mechanism 8 is installed at the upper end of the mounting frame 3, a marking mechanism 9 is arranged at one end of the scanner body 1, the lifting mechanism 6 comprises a first screw lift 61 and a second screw lift 62 installed at the upper end of the support block 4, a center connecting rod 63 is fixedly connected between the output ends of the first screw lift 61 and the second screw lift 62, the upper end of the first screw lift 61 is threadedly connected to a first push rod 64 having one end fixedly connected to the mounting frame 3, and the upper end of the second screw lift 62 is threadedly connected to a second push rod 65 having one end fixedly connected to the mounting frame 3.

[0042] The mobile control mechanism 7 includes a motor 71 installed at one end of the mounting frame 3, the output end of the motor 71 is fixedly connected to a threaded rod 72, one end of the threaded rod 72 is rotatably connected to the inner wall of the mounting frame 3, the outer wall of the threaded rod 72 is threadedly connected to a movable push block 73, and the upper end of the movable push block 73 is fixedly connected to the scanner body 1.

[0043] Specifically, when inspecting the wall, the installation frame 3 is brought close to the wall, and the threaded rod 72 is driven actively by starting the motor 71, so that the movable push block 73 drives the scanner body 1 to detect the wall, so as to solve the problem that the integrated steel bar scanner is manually pushed for measurement during use, and cannot maintain linear motion during pushing, resulting in large measurement error and low accuracy. The first screw lift 61 is connected to an external motor to drive the output shaft of the first screw lift 61 to rotate, and the output shaft of the second screw lift 62 can be driven to rotate by cooperating with the center connecting rod 63, so that the first push rod 64 and the second push rod 65 push the installation frame 3 upward, so as to achieve the purpose of changing the measurement height, and can measure different heights of the same wall, and can detect whether the internal steel bars are bent, thereby ensuring the quality of detection.

[0044] In order to improve the work efficiency of staff, Figure 2 As shown, the following preferred technical solutions are provided:

[0045] The measuring mechanism 8 includes a measuring ruler body 81 installed at the upper end of the mounting frame 3, the inner wall of the measuring ruler body 81 is slidably connected with a slide bar 82, the end of the slide bar 82 away from the measuring ruler body 81 is axially connected with an indicating rod 83, the end of the indicating rod 83 away from the slide bar 82 is installed with a marking plate 84, the outer wall of the indicating rod 83 is axially connected with a mounting plate 85, one end of the mounting plate 85 is overlapped with the scanner body 1, the end of the mounting plate 85 away from the indicating rod 83 is hinged with a storage outer rod 86, the inner wall of the storage outer rod 86 is slidably connected with a telescopic inner rod 87, the end of the telescopic inner rod 87 away from the storage outer rod 86 is slidably connected to the measuring ruler body 81, and a return spring 88 is fixedly connected to the outer wall of the slide bar 82 and the indicating rod 83.

[0046] Specifically, when the movable push block 73 drives the scanner body 1 to move, the mounting plate 85 will move through the slide bar 82 driven by the scanner body 1, and the slide bar 82 will drive the indicator rod 83, the mounting plate 85, the storage outer rod 86 and the telescopic inner rod 87 to move. At this time, the power of the scanner body 1 during movement will drive the mounting plate 85 to pull the indicator rod 83 into a bent state. After the scanner body 1 stops moving, the reset spring 88 will drive the bent indicator rod 83 to return to its original position, so that the marking plate 84 fits the wall and leaves a mark. After the scanner body 1 finishes measuring the steel bar spacing and draws the line mark, the staff can roughly visually estimate the distance through the indicator rod 83 and the measuring ruler body 81. If it exceeds the qualified line by too much, the detection result can be directly understood without waiting for the scanner body 1 to give the result. The detection speed is fast, and the line mark can be compared with the mark left by the marking plate 84, thereby improving the work efficiency of the staff.

[0047] To facilitate measurement, the following markings are made: Figure 4-Figure 6 As shown, the following preferred technical solutions are provided:

[0048] The marking mechanism 9 includes a first electric push rod 91 and a second electric push rod 92 installed on the inner wall of the opening of the scanner body 1. The lower end of the first electric push rod 91 is fixedly connected to a first mounting clamp 93, and the lower end of the second electric push rod 92 is fixedly connected to a second mounting clamp 94. The inner walls of the first mounting clamp 93 and the second mounting clamp 94 are installed with a marking ink strip 95.

[0049] The control terminal 2 includes a steel bar detection module 21, the steel bar detection module 21 is electrically connected to an alarm module 22 for emitting a warning sound when steel bars are detected, the alarm module 22 is electrically connected to a single-chip computer 23, the single-chip computer 23 is electrically connected to a signal sending module 24, the signal sending module 24 is wirelessly connected to a signal receiving module 25, the signal receiving module 25 is electrically connected to a signal analysis module 26, the signal analysis module 26 is electrically connected to an execution module 27, and the execution module 27 is electrically connected to a motor 71 and an electric push rod.

[0050] Specifically, the scanner body 1 detects the position of the steel bar through the steel bar detection module 21, and after detection, an alarm will be issued through the alarm module 22. At this time, the signal sending module 24 is triggered by the single-chip computer 23 to send a signal, and then the signal receiving module 25 receives the signal, and the execution module 27 is triggered by the signal analysis module 26 to stop the motor 71. At the same time, the first electric push rod 91 and the second electric push rod 92 are started, and the first electric push rod 91 and the second electric push rod 92 are used to drive the first mounting clamp 93 and the second mounting clamp 94 to move closer to the wall, thereby driving the marking ink strip 95 to mark the wall, which is convenient for marking after measurement.

[0051] In order to solve the problem that the manual hand-held method has poor stability, which easily leads to further increase in the error of the measurement results, such as Figure 7-Figure 8 As shown, the following preferred technical solutions are provided:

[0052] The outer wall of the mounting frame 3 is provided with an adsorption mechanism 10, which includes a connecting frame 101 arranged on the outer wall of the mounting frame 3, and the first suction cup 102 and the second suction cup 103 are overlapped at one end of the connecting frame 101 away from the mounting frame 3, and an active screw 104 is slidably connected through the center of the connecting frame 101, and a first driven screw 105 and a second driven screw 106 are respectively arranged on both sides of the active screw 104, and the first driven screw 105 and the second driven screw 106 are both slidably connected through the connecting frame 101, and the outer wall of the active screw 104 is threadedly connected with an active pressure block 107, and the outer wall of the first driven screw 105 is threadedly connected with a first The driven pressure block 108 and the outer wall of the second driven screw 106 are threadedly connected to the second driven pressure block 109, the outer wall of the active pressure block 107 is fixedly connected to the fixed connecting rod 1010, and the active pressure block 107 is fixedly connected to the first driven pressure block 108 and the second driven pressure block 109 through the fixed connecting rod 1010 respectively, the outer wall of the active screw 104 is fixedly connected to the driving wheel 1011, the outer wall of the first driven screw 105 is fixedly connected to the first driven wheel 1012, and the outer wall of the second driven screw 106 is fixedly connected to the second driven wheel 1013, and the driving wheel 1011, the first driven wheel 1012 and the second driven wheel 1013 are all transmission connected.

[0053] A receiving plate 1014 is installed at one end of the first driven screw 105 and the second driven screw 106 that pass through the connecting frame 101 , and a supporting spring 1015 is fixedly connected to one end of the receiving plate 1014 .

[0054] Specifically, when the installation frame 3 is close to the wall before detection, the first suction cup 102 and the second suction cup 103 are driven to overlap the wall, and the active screw 104 is rotated. The active screw 104 drives the first driven screw 105 and the second driven screw 106 to rotate through the organic cooperation of the active wheel 1011, the first driven wheel 1012 and the second driven wheel 1013, so that the active pressure block 107 drives the first driven pressure block 108 and the second driven pressure block 109 to move to one end at the same time through the fixed connecting rod 1010, and drives the connecting frame 101 to squeeze the first suction cup 102 and the second suction cup 103, and discharge the internal air of the first suction cup 102 and the second suction cup 103, so that they are adsorbed on the wall, and the reaction force of the support spring 1015 can drive the first suction cup 102 and the second suction cup 103 to be further close to the wall, thereby solving the problem that the manual hand-held method has poor stability and is prone to further increase the error of the measurement result.

[0055] In order to improve the convenience of suction cup adsorption, Figure 9-10 As shown, the following preferred technical solutions are provided:

[0056] A transmission mechanism 11 is provided on the inner wall of the mounting frame 3, and the transmission mechanism 11 includes a rotating rod 111 rotatably connected to the mounting frame 3, a rotating gear 112 is fixedly connected to the outer wall of the rotating rod 111, one end of the rotating gear 112 is meshedly connected to a fixed rack 113, and the fixed rack 113 is fixedly installed on one side of the movable push block 73, and a first bevel gear 114 is provided at the lower end of the rotating gear 112, and the first bevel gear 114 is fixedly installed on the outer wall of the rotating rod 111, and the lower end of the first bevel gear 114 is meshedly connected to a second bevel gear 115, and one end of the second bevel gear 115 is fixedly connected to the active screw 104.

[0057] Specifically, when the movable push block 73 moves to one end and drives the scanner body 1 to perform detection, the fixed rack 113 can be driven to move at the same time. Therefore, when the fixed rack 113 moves, the rotating gear 112 can be driven to rotate clockwise. The rotating gear 112 drives the first bevel gear 114 to rotate through the rotating rod 111, and then drives the second bevel gear 115 to rotate through the first bevel gear 114. The second bevel gear 115 drives the active screw 104 to rotate clockwise, so that the connecting frame 101 squeezes the first suction cup 102 and the second suction cup 103. The purpose is to make the first suction cup 102 and the second suction cup 103 adsorb on the wall. When the scanner body 1 returns after the detection, the fixed rack 113 will drive the rotating gear 112 to rotate counterclockwise, and the cooperation of the rotating rod 111, the first bevel gear 114 and the second bevel gear 115 will drive the active screw 104 to rotate counterclockwise, so that the connecting frame 101 releases the squeezing of the first suction cup 102 and the second suction cup 103, which is convenient for the staff to cut off the adsorption of the first suction cup 102 and the second suction cup 103 on the wall, thereby improving the convenience of suction cup adsorption.

[0058] Another technical solution proposed by the present invention is to provide a detection method of a construction engineering quality detector, comprising the following steps:

[0059] Step 1: First, when testing, the first screw lift 61 is connected to an external motor to drive the output shaft of the first screw lift 61 to rotate, and the output shaft of the second screw lift 62 can be driven to rotate by cooperating with the central connecting rod 63, so that the first push rod 64 and the second push rod 65 push the mounting frame 3 upward to adjust the height, and the threaded rod 72 is driven actively by starting the motor 71, so that the movable push block 73 drives the scanner body 1 to detect the wall;

[0060] Step 2: Then, when the movable push block 73 moves to one end and drives the scanner body 1 to perform detection, the fixed rack 113 can be driven to move at the same time. Therefore, when the fixed rack 113 moves, the rotating gear 112 can be driven to rotate clockwise. The rotating gear 112 drives the first bevel gear 114 to rotate through the rotating rod 111, and then drives the second bevel gear 115 to rotate through the first bevel gear 114. The second bevel gear 115 drives the active screw 104 to rotate clockwise, so that the connecting frame 101 squeezes the first suction cup 102 and the second suction cup 102. The purpose of the second suction cup 103 is to make the first suction cup 102 and the second suction cup 103 adsorb on the wall. When the scanner body 1 returns after the detection, the fixed rack 113 drives the rotating gear 112 to rotate counterclockwise, and the active screw 104 is driven to rotate counterclockwise through the cooperation of the rotating rod 111, the first bevel gear 114 and the second bevel gear 115, so as to achieve the purpose of releasing the squeezing of the first suction cup 102 and the second suction cup 103 by the connecting frame 101, so as to facilitate the staff to cut off the adsorption of the first suction cup 102 and the second suction cup 103 on the wall;

[0061] Step 3: Next, when the scanner body 1 detects the position of the steel bar through the steel bar detection module 21, an alarm will be issued through the alarm module 22 after detection. At this time, the single chip computer 23 triggers the signal issuing module 24 to send a signal, and then the signal receiving module 25 receives the signal, and the signal analysis module 26 triggers the execution module 27 to stop the motor 71, and at the same time, the first electric push rod 91 and the second electric push rod 92 are started, and the first electric push rod 91 and the second electric push rod 92 are used to drive the first mounting clamp 93 and the second mounting clamp 94 to move closer to the wall, thereby driving the marking ink strip 95 to mark the wall;

[0062] Step 4: Finally, when the movable push block 73 drives the scanner body 1 to move, the slide bar 82 will move simultaneously driven by the scanner body 1. After the scanner body 1 completes the measurement of the steel bar spacing and draws the line mark, the staff can roughly estimate the distance through the indicator rod 83 and the measuring ruler body 81. If it exceeds the qualified line by too much, the staff can directly understand the test result. If it is close to the qualified line, they can wait for the test result of the scanner body 1 and the test is completed.

[0063] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0064] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A construction engineering quality detector, comprising a scanner body (1), and a control terminal (2) mounted at one end of the scanner body (1), a mounting frame (3) being disposed at the lower end of the scanner body (1), a support block (4) being disposed at the lower end of the mounting frame (3), and a shift wheel (5) being mounted at the lower end of the support block (4), characterized in that: A lifting mechanism (6) is installed between the support block (4) and the mounting frame (3); a movement control mechanism (7) is provided at one end of the mounting frame (3); a measuring mechanism (8) is installed at the upper end of the mounting frame (3); and a marking mechanism (9) is provided at one end of the scanner body (1); The lifting mechanism (6) comprises a first screw lift (61) and a second screw lift (62) mounted on the upper end of the support block (4); a central connecting rod (63) is fixedly connected between the output ends of the first screw lift (61) and the second screw lift (62); the upper end of the first screw lift (61) is threadedly connected to a first push rod (64) having one end fixedly connected to the mounting frame (3); the upper end of the second screw lift (62) is threadedly connected to a second push rod (65) having one end fixedly connected to the mounting frame (3); The mobile control mechanism (7) comprises a motor (71) mounted at one end of the mounting frame (3); the output end of the motor (71) is fixedly connected to a threaded rod (72); one end of the threaded rod (72) is rotatably connected to the inner wall of the mounting frame (3); the outer wall of the threaded rod (72) is threadably connected to a movable push block (73); the upper end of the movable push block (73) is fixedly connected to the scanner body (1); The outer wall of the installation frame (3) is provided with a suction mechanism (10), the suction mechanism (10) comprising a connecting frame (101) provided on the outer wall of the installation frame (3), and a first suction cup (102) and a second suction cup (103) overlapped at one end of the connecting frame (101) away from the installation frame (3); A driving screw (104) is slidably connected to the center of the connecting frame (101), and a first driven screw (105) and a second driven screw (106) are respectively arranged on both sides of the driving screw (104). The first driven screw (105) and the second driven screw (106) are both slidably connected to the connecting frame (101). The outer wall of the driving screw (104) is threadedly connected to an active pressure block (107), the outer wall of the first driven screw (105) is threadedly connected to a first driven pressure block (108), and the outer wall of the second driven screw (106) is threadedly connected to a second driven pressure block (109). The outer wall of the driving screw (104) is fixedly connected to a driving wheel (1011), the outer wall of the first driven screw (105) is fixedly connected to a first driven wheel (1012), the outer wall of the second driven screw (106) is fixedly connected to a second driven wheel (1013), and the driving wheel (1011), the first driven wheel (1012) and the second driven wheel (1013) are all connected in a transmission manner.

2. A construction engineering quality detector as claimed in claim 1, characterized in that: The measuring mechanism (8) comprises a measuring ruler body (81) mounted on the upper end of the mounting frame (3); a sliding rod (82) is slidably connected to the inner wall of the measuring ruler body (81); an end of the sliding rod (82) away from the measuring ruler body (81) is axially connected to an indicating rod (83); an end of the indicating rod (83) away from the sliding rod (82) is mounted with a marking plate (84); an outer wall of the indicating rod (83) is axially connected to a mounting plate (85); an end of the mounting plate (85) away from the indicating rod (83) is hingedly connected to a receiving outer rod (86); an inner wall of the receiving outer rod (86) is slidably connected to a telescopic inner rod (87); an end of the telescopic inner rod (87) away from the receiving outer rod (86) is slidably connected to the measuring ruler body (81); and a return spring (88) is fixedly connected between the sliding rod (82) and the outer wall of the indicating rod (83).

3. A construction engineering quality detector as claimed in claim 2, characterized in that: The marking mechanism (9) comprises a first electric push rod (91) and a second electric push rod (92) mounted on the inner wall of the opening of the scanner body (1); a first mounting clamp (93) is fixedly connected to the lower end of the first electric push rod (91); a second mounting clamp (94) is fixedly connected to the lower end of the second electric push rod (92); and marking ink strips (95) are mounted on the inner walls of the first mounting clamp (93) and the second mounting clamp (94).

4. A construction engineering quality detector as claimed in claim 3, characterized in that: The control terminal (2) comprises a steel bar detection module (21), the steel bar detection module (21) being electrically connected to an alarm module (22) for emitting a warning sound when a steel bar is detected, the alarm module (22) being electrically connected to a single-chip computer (23), and the single-chip computer (23) being electrically connected to a signal emitting module (24).

5. A construction engineering quality detector as claimed in claim 4, characterized in that: The signal sending module (24) is wirelessly connected to the signal receiving module (25), the signal receiving module (25) is electrically connected to the signal analysis module (26), the signal analysis module (26) is electrically connected to the execution module (27), and the execution module (27) is electrically connected to the motor (71) and the electric push rod.

6. A construction engineering quality detector as claimed in claim 1, characterized in that: A receiving plate (1014) is installed at one end of the first driven screw rod (105) and the second driven screw rod (106) that pass through the connecting frame (101), and a supporting spring (1015) is fixedly connected to one end of the receiving plate (1014).

7. A construction engineering quality detector as claimed in claim 6, characterized in that: The inner wall of the mounting frame (3) is provided with a transmission mechanism (11), the transmission mechanism (111) comprising a rotating rod (111) rotatably connected to the mounting frame (3), the outer wall of the rotating rod (111) being fixedly connected to a rotating gear (112), one end of the rotating gear (112) being meshingly connected to a fixed rack (113), the fixed rack (113) being fixedly mounted on one side of the movable push block (73), the lower end of the rotating gear (112) being provided with a first bevel gear (114), the first bevel gear (114) being fixedly mounted on the outer wall of the rotating rod (111), the lower end of the first bevel gear (114) being meshingly connected to a second bevel gear (115), one end of the second bevel gear (115) being fixedly connected to the active screw rod (104).

8. A detection method of a construction engineering quality detector according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1: First, when performing the inspection, the first screw lift (61) is driven to rotate its output shaft by an external motor connected to the first screw lift (61), and the output shaft of the second screw lift (62) is driven to rotate by cooperating with the central connecting rod (63), so that the first push rod (64) and the second push rod (65) push the mounting frame (3) upward to adjust the height, and the threaded rod (72) is driven to move actively by starting the motor (71), so that the movable push block (73) drives the scanner body (1) to inspect the wall surface; S2: Then, when the movable push block (73) moves toward one end and drives the scanner body (1) to perform detection, the fixed rack (113) can be driven to move simultaneously. Therefore, when the fixed rack (113) moves, the rotating gear (112) can be driven to rotate clockwise. The rotating gear (112) drives the first bevel gear (114) to rotate through the rotating rod (111), and then drives the second bevel gear (115) to rotate through the first bevel gear (114). The second bevel gear (115) drives the active screw (104) to rotate clockwise, so that the connecting frame (101) squeezes the first suction cup (102) and the second suction cup (102). The purpose of the suction cup (103) is to make the first suction cup (102) and the second suction cup (103) adsorb on the wall. When the scanner body (1) returns after detection, the fixed rack (113) drives the rotating gear (112) to rotate counterclockwise. Through the cooperation of the rotating rod (111), the first bevel gear (114) and the second bevel gear (115), the active screw (104) is driven to rotate counterclockwise, so that the connection frame (101) releases the squeezing of the first suction cup (102) and the second suction cup (103), which facilitates the staff to cut off the adsorption of the first suction cup (102) and the second suction cup (103) on the wall. S3: Then, when the scanner body (1) detects the position of the steel bar through the steel bar detection module (21), an alarm is issued through the alarm module (22) after detection. At this time, the single chip computer (23) triggers the signal issuing module (24) to send a signal, and then the signal receiving module (25) receives the signal. The signal analysis module (26) triggers the execution module (27) to stop the motor (71), and at the same time, the first electric push rod (91) and the second electric push rod (92) are started. The first electric push rod (91) and the second electric push rod (92) are used to drive the first mounting clamp (93) and the second mounting clamp (94) to move closer to the wall, thereby driving the marking ink strip (95) to mark the wall; S4: Finally, when the movable push block (73) drives the scanner body (1) to move, the slide bar (82) will move simultaneously under the drive of the scanner body (1). After the scanner body (1) has finished measuring the steel bar spacing and marked the line, the staff can roughly visually estimate the distance through the indicator rod (83) and the measuring ruler body (81). If it exceeds the qualified line by too much, the staff can directly understand the test result. If it is close to the qualified line, the staff can wait for the test result of the scanner body (1) and the test is completed.

Citation Information

Patent Citations

  • Integrated steel bar scanner

    CN216012120U

  • Auxiliary device of steel bar scanner

    CN216770518U