A method for obtaining the maximum power supply capacity of a diamond-shaped distribution network

By constructing the grid structure model of the diamond distribution network and the Distflow optimal power flow model, the problem of calculating the maximum power supply capacity after large-scale renewable energy is connected is solved, and the accurate maximum power supply capacity analysis of the diamond distribution network is realized. And the load transfer strategy in a short time ensures the stable operation of the system.

CN115021267BActive Publication Date: 2024-10-18STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210593359.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-27
Publication Date
2024-10-18
Estimated Expiration
2042-05-27

AI Technical Summary

Technical Problem

The existing technology is difficult to accurately calculate the maximum power supply capacity of the diamond-shaped distribution network after large-scale renewable energy is connected, especially in the analysis of the maximum power supply capacity in a short period of time and the load transfer strategy after the N-1 accident.

Method used

Construct a regional diamond distribution network structure model, generate the network reconstruction strategy during normal operation, feeder N-1 and upstream transformer N-1, and build a maximum power supply capacity calculation model based on the Distflow optimal power flow model, taking into account different time periods Load differentiation and energy storage discharge strategy.

Benefits of technology

It improves the accuracy and authenticity of the maximum power supply capacity calculation, ensures the reliability of the maximum power supply capacity analysis in a short time under large-scale renewable energy access and N-1 fault conditions, and meets the new structure of the diamond-shaped distribution network. need.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115021267B_ABST
    Figure CN115021267B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for obtaining the maximum power supply capacity of a diamond-shaped distribution network, the method comprising the following steps: step 1, constructing a regional diamond-shaped distribution network grid structure model; step 2: generating a network reconstruction strategy for normal operation, feeder N‑1 and upper transformer N‑1; step 3: constructing a maximum power supply capacity calculation model based on Distflow optimal power flow; step 4: dividing a day into multiple time periods, and obtaining the maximum power supply capacity of each time period through the maximum power supply capacity calculation model based on Distflow optimal power flow. Compared with the prior art, the present invention has the advantages of ensuring the accuracy of the maximum power supply capacity calculation while taking into account the efficiency of the algorithm and solving the problem that the prior art does not consider the maximum power supply capacity calculation problem in a short period after the N‑1 accident.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power distribution of electric power systems, and in particular to a method for obtaining the maximum power supply capacity of a diamond-shaped power distribution network. Background Art

[0002] The distribution system is the terminal link of power supply to users, and it is also a key facility to ensure the power supply to users. The continuous development of new distribution systems has led to more and more renewable energy being connected to the power grid. While distributed power sources can alleviate energy pressure, protect the environment, and generate electricity flexibly, the randomness, volatility, and time-varying nature of renewable energy also have an impact on the distribution network. With the application of new technologies such as power electronics technology, the distribution system is transforming into an intelligent grid that accepts a large number of distributed power sources, microgrids, and other new user-side loads. Recently, Shanghai has summarized the structure of a diamond-type distribution network based on the development of its own distribution network. The diamond-type distribution network is a primary and secondary layered distribution network. The main network is centered on the switch station, and the secondary network is centered on the ring station. Through load transfer between stations, the power supply to users is guaranteed.

[0003] The access of large-scale renewable energy to the distribution system poses a challenge to the safe and stable operation of the distribution system. In the current analysis of the distribution system with large-scale renewable energy access, the calculation of the maximum power supply capacity for a specific period of time is a major difficulty. Traditional maximum power supply capacity calculations often do not take into account the access of large-scale renewable energy and energy storage, and do not consider the analysis of maximum power supply capacity in a short period of time. The present invention proposes the calculation of the maximum power supply capacity of a diamond-shaped distribution network with large-scale photovoltaic energy storage access, which takes into account the calculation of the maximum power supply capacity in a short period of time after an N-1 accident occurs in the diamond-shaped distribution network. Summary of the invention

[0004] The purpose of the present invention is to provide a method for obtaining the maximum power supply capacity of a diamond-shaped distribution network in order to overcome the defects of the above-mentioned prior art.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] A method for obtaining the maximum power supply capacity of a diamond-shaped distribution network, the method comprising the following steps:

[0007] Step 1, construct a regional diamond-shaped distribution network grid structure model;

[0008] Step 2: Generate network reconstruction strategy for normal operation, feeder N-1 and upstream transformer N-1;

[0009] Step 3: Construct a maximum power supply capacity calculation model based on Distflow optimal power flow;

[0010] Step 4: Divide a day into multiple periods, and obtain the maximum power supply capacity of each period through the maximum power supply capacity calculation model based on Distflow optimal power flow;

[0011] In the step 1, the regional diamond-shaped distribution network grid structure model is specifically:

[0012] The grid structure model of the regional diamond-shaped distribution network is a square grid. The upper-level substations are distributed at the four corners of the square grid. Four K-type stations are connected in series between two adjacent upper-level substations. The square grid is divided into 16 small power supply grids. Each small grid includes a switch station, namely a K-type station. Each K-type station includes two busbars. The two busbars are interconnected by a tie switch. The two feeder segments connecting the two K-type stations drawn out from the upper-level substation form a feeder. The tie line connects the feeders belonging to two different substations. There are 4 upper-level substations, 16 K-type stations, 16 feeders, 32 feeder segments and 8 tie lines in the square grid area. Each K-type station is equipped with distributed photovoltaic and energy storage. The photovoltaic power generation power is all connected to the grid to discharge the energy storage after a fault occurs, thereby maintaining the maximum power supply capacity.

[0013] Furthermore, in step 2, the normal network reconstruction strategy is specifically as follows:

[0014] During normal operation, each feeder carries two K-type station busbars, and the connecting lines between the second and third K-type stations between the upper-level substations are disconnected. At this time, each upper-level substation carries 4 feeders and 8 sections of switch station busbars. Each feeder carries two sections of switch station busbars, the first section of the feeder carries two sections of busbars, and the second section carries one section of busbar.

[0015] Furthermore, in step 2, the network reconstruction strategy for feeder N-1 is specifically as follows:

[0016] Since the most serious situation for feeder N-1 is the failure of the first section of feeder, only the first section of feeder N-1 is considered. There are 16 situations corresponding to 16 feeders, and the network reconstruction results corresponding to each situation are different. The two switch station busbars carried by the feeder with the first section of feeder failure are transferred to another feeder of the same substation and a busbar of another substation. The first section of another feeder of the same substation carries 3 switch station busbars, and the second section carries 1 switch station busbar. The first section of the feeder of another substation carries 3 switch station busbars, the second section carries 2 switch station busbars, and the tie line carries 1 switch station busbar.

[0017] Furthermore, in step 2, the network reconstruction strategy for the upper transformer N-1 is specifically as follows:

[0018] There are 4 cases for the upper transformer N-1, and the network reconstruction results are different in each case. After the upper substation transformer N-1 occurs, the 8 switch station busbars carried by the substation will be distributed to the other two substations. The substation that accepts the transferred load carries a total of 12 switch station busbars, including 4 switch station busbars with load transfer. Each substation has two feeders to accept the transferred load. The first section of the feeder that accepts the transferred load carries 4 busbars, the second section carries 3 busbars, and the connecting line carries 2 busbars.

[0019] Furthermore, in step 3, the process of constructing a maximum power supply capacity calculation model based on Distflow optimal power flow specifically includes the following steps:

[0020] Step 301: Setting an objective function that considers the maximum power supply capacity during a specific period of time within a day. The expression of the objective function is:

[0021]

[0022] Among them, E(α) is the power supply capacity, α t is the load magnification factor of time period t in the area, t is the time period in a day, each time period is 1 hour, and T is the time period set included in a specific time period in a day;

[0023] Step 302: setting various constraints of the maximum power supply capability calculation model based on the Distflow optimal power flow, which are node power balance constraint, line voltage drop constraint, branch power balance constraint and energy storage maximum charge and discharge constraint;

[0024] Step 303: Perform second-order quasi-relaxation on the branch power balance constraint.

[0025] Furthermore, in step 302, the expression of the node power balance constraint is:

[0026]

[0027] Where, f represents the N-1 scenario, φ(i) represents the set of the first-end nodes of the line with node i as the terminal node, ψ(i) represents the set of the terminal nodes of the line with node i as the first-end node, and They represent the active power and reactive power flowing from node j to node i at the end of the AC line ij, and They represent the active power and reactive power injected into node i, respectively. and They represent the active power injected by distributed generation and transformer respectively, and Represents the reactive power injected by distributed generation and transformer respectively. The active power and reactive power of nodes and lines are hourly data. L,i and Q L,i Respectively represent the active load and reactive load of node i, α t is the load magnification factor for this period, R represents the square of the current in line ij. ji and X ji They represent the resistance and reactance of line ji respectively, is the charging and discharging power of the energy storage installed at the i-th node.

[0028] Furthermore, in step 302, the expression of the line voltage drop constraint is:

[0029]

[0030] Among them, R ji and X ji They represent the resistance and reactance of line ji respectively, represents the square of the voltage at node i, represents the square of the voltage at node j, Represents the square of the current in line ij.

[0031] Furthermore, in step 302, the expression of the branch power balance constraint is:

[0032]

[0033] in, represents the square of the voltage at node i, It represents the square of the current in line ij, and They represent the active power and reactive power flowing from node i to node j at the end of the AC line ij;

[0034] The second-order quasi-relaxation of the branch power balance constraint is performed to obtain the second-order cone constraint of the line. The expression of the second-order cone constraint of the line is:

[0035]

[0036] Furthermore, in step 302, the expression of the maximum charge and discharge constraint of energy storage is:

[0037]

[0038] in, is the energy storage charging and discharging power installed at the i-th node, which is negative when charging and positive when discharging, P discharge,i is the maximum discharge power of the energy storage at the i-th node, Pcharge,i is the maximum charging power of the energy storage at the i-th node, and the maximum charging and discharging power is related to the energy storage configuration capacity.

[0039] Compared with the prior art, the present invention has the following beneficial effects:

[0040] 1. In the existing research on the maximum power supply capacity of the distribution system, the traditional maximum power supply capacity research often does not consider the impact of the access of large-scale renewable energy and energy storage. The present invention considers the new structure of the diamond distribution network based on the characteristics of large-scale renewable energy access in the new distribution system, constructs the load transfer strategy after different N-1 faults, and constructs the maximum power supply capacity calculation model of the diamond distribution network considering large-scale renewable energy access based on the Distflow optimal power flow model, which ensures the accuracy and authenticity of the maximum power supply capacity calculation.

[0041] 2. Existing research on the maximum power supply capacity of distribution systems often does not consider the time-varying nature of loads, the flexibility of energy storage and renewable energy. This invention targets diamond-shaped distribution networks, considers the differences in loads at different time periods, considers the network reconstruction of regional distribution systems after N-1 faults and the use of energy storage to maintain short-term power supply, and conducts a maximum power supply capacity analysis in a short period of time. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 The present invention is a flow chart of the method.

[0043] Figure 2 This is a schematic diagram of the regional diamond-shaped distribution network grid structure model. DETAILED DESCRIPTION

[0044] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0045] like Figure 1 As shown, the present invention provides a method for obtaining the maximum power supply capacity of a diamond-type distribution network considering large-scale photovoltaic energy storage access, and the method comprises the following steps:

[0046] Step 1: Construct a regional diamond-shaped distribution network grid structure model. The regional diamond-shaped distribution network grid structure model is as follows:

[0047] like Figure 2As shown in the figure, the regional diamond-shaped distribution network grid structure model is a square grid, which is divided into 16 small power grids. Each small grid includes a switch station, which is referred to as a K-type station below. Each K-type station includes two busbar sections. The two busbar sections can be interconnected through a tie switch. The tie line connects the feeders of two different substations. Each feeder is divided into two feeder sections. There are 4 upper-level substations, 16 K-type stations, 16 feeders, 32 feeder sections and 8 tie lines in the region.

[0048] Since the secondary main network failure has little impact on the maximum power supply capacity of the region, only the main network is considered in the regional diamond distribution network model, that is, the N-1 situation in each power supply grid under the K-type station is not considered, and each K-type station is regarded as a whole. In the regional diamond distribution network grid structure model, the upper-level substations are distributed in the four corners of the region, and 4 K-type stations are connected in series between two adjacent substations. In normal operation, open-loop operation is carried out, and the interconnection line between the second and third K-type stations is disconnected. After N-1 occurs, the changes in the network structure transfer the load and restore power supply through the interconnection line or the interconnection switch in the K-type station. Each K-type station is equipped with distributed photovoltaic and energy storage, and the photovoltaic power generation power is all connected to the grid. After a fault occurs, the energy storage is discharged to maintain the maximum power supply capacity.

[0049] Step 2: Generate the network reconstruction strategy for normal operation, feeder N-1 and transformer N-1, specifically:

[0050] During normal operation, each feeder carries two K-type station (switch station) busbars, and the tie line between the 2nd and 3rd switch stations between the upper substations is disconnected. At this time, each upper substation carries 4 feeders and 8 sections of switch station busbars, and each feeder carries two sections of switch station busbars. The first section of the feeder carries two sections of busbars, and the second section carries one section of busbars.

[0051] Since the most serious situation for feeder N-1 is the failure of the first section feeder, only the first section feeder N-1 is considered. There are 16 situations corresponding to 16 feeders, and the network reconstruction results corresponding to each situation are different. The two sections of switch station bus carried by the feeder with the first section feeder failure are transferred to another feeder of the same substation and a bus of another substation. The first section of another feeder of the same substation carries 3 sections of switch station bus, and the second section carries 1 section of switch station bus. The first section of the feeder of another substation carries 3 sections of switch station bus, the second section carries 2 sections of switch station bus, and the tie line carries 1 section of switch station bus.

[0052] There are 4 cases for the upper transformer N-1, and the network reconstruction results are different in each case. After the upper substation transformer N-1 occurs, the 8 switch station busbars carried by the substation will be distributed to the remaining two substations. The substation that accepts the transferred load carries a total of 12 switch station busbars, including 4 switch station busbars for load transfer. Each substation has two feeders that accept the transferred load. The first section of the feeder that accepts the transferred load carries 4 busbars, the second section carries 3 busbars, and the tie line carries 2 busbars.

[0053] Step 3: Construct a maximum power supply capacity calculation model based on Distflow optimal power flow. The process of constructing a maximum power supply capacity calculation model based on Distflow optimal power flow specifically includes the following steps:

[0054] Step 301: Setting an objective function that considers the maximum power supply capacity in a specific period of time within a day, that is, the maximum power supply capacity provided by the area through network reconstruction and energy storage discharge after an N-1 accident occurs in the line or transformer. The expression of the objective function is:

[0055]

[0056] Among them, α t is the load magnification factor of time period t in the area, t is the time period in a day, each time period is 1 hour, and T is the time period set included in a specific time period in a day;

[0057] Step 302: Setting various constraints of the maximum power supply capability calculation model based on the Distflow optimal power flow, which are node power balance constraint, line voltage drop constraint, branch power balance constraint and energy storage maximum charge and discharge constraint.

[0058] Step 303: Perform second-order quasi-relaxation on the branch power balance constraint.

[0059] In step 302, the node power balance constraint is:

[0060]

[0061] Where, f represents the N-1 scenario, φ(i) represents the set of the first-end nodes of the line with node i as the terminal node, ψ(i) represents the set of the terminal nodes of the line with node i as the first-end node, and They represent the active power and reactive power flowing from node j to node i at the end of the AC line ij, and They represent the active power and reactive power injected into node i, respectively. and They represent the active power injected by distributed generation and transformer respectively, and Represents the reactive power injected by distributed generation and transformer respectively. The active power and reactive power of nodes and lines are hourly data. L,i and Q L,i Respectively represent the active load and reactive load of node i, α t is the load magnification factor for this period, R represents the square of the current in line ij. ji and X ji They represent the resistance and reactance of line ji respectively, is the charging and discharging power of the energy storage installed at the i-th node;

[0062] The line voltage drop constraint is:

[0063]

[0064] Among them, R ji and X ji They represent the resistance and reactance of line ji respectively, represents the square of the voltage at node i, It represents the square of the current in line ij;

[0065] The branch power balance constraint is:

[0066]

[0067] in, represents the square of the voltage at node i, It represents the square of the current in line ij, and They represent the active power and reactive power injected by node i respectively;

[0068] Perform second-order quasi-relaxation on the branch power balance constraints:

[0069] The relationship between the power flowing through a line and the voltage and current at its head end is P 2 +Q 2 =U 2 I 2 , such constraints are non-convex and nonlinear constraints, the feasible domain is the surface of the second-order cone, which is a non-convex optimization model. and Replace the quadratic term U 2 and I 2 Perform linearization and relax the condition to some extent:

[0070]

[0071] At this point, the feasible domain becomes the entire second-order cone (convex feasible domain), and the problem is easy to solve. The expression of the second-order cone is:

[0072]

[0073] The maximum charge and discharge constraints of energy storage are:

[0074]

[0075] in, is the energy storage charging and discharging power installed at the i-th node, which is negative when charging and positive when discharging, P discharge,i is the maximum discharge power of the energy storage at the i-th node, P charge,i is the maximum charging power of the energy storage at the i-th node, and the maximum charging and discharging power is related to the energy storage configuration capacity.

[0076] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. A method for obtaining the maximum power supply capacity of a diamond-type distribution network, characterized in that: The method comprises the following steps: Step 1, construct a regional diamond-shaped distribution network grid structure model; Step 2: Generate network reconstruction strategy for normal operation, feeder N-1 and upstream transformer N-1; Step 3: Construct a maximum power supply capacity calculation model based on Distflow optimal power flow; Step 4: Divide a day into multiple periods, and obtain the maximum power supply capacity of each period through the maximum power supply capacity calculation model based on Distflow optimal power flow; In the step 1, the regional diamond-shaped distribution network grid structure model is specifically: The grid structure model of the regional diamond-shaped distribution network is a square grid. The upper-level substations are distributed at the four corners of the square grid. Four K-type stations are connected in series between two adjacent upper-level substations. The square grid is divided into 16 small power supply grids. Each small grid includes a switch station, namely a K-type station. Each K-type station includes two busbars. The two busbars are interconnected by a tie switch. The two feeder segments connecting the two K-type stations drawn out from the upper-level substation form a feeder. The tie line connects the feeders belonging to two different substations. There are 4 upper-level substations, 16 K-type stations, 16 feeders, 32 feeder segments and 8 tie lines in the square grid area. Each K-type station is equipped with distributed photovoltaic and energy storage. The photovoltaic power generation power is all connected to the grid to discharge the energy storage after a fault occurs, thereby maintaining the maximum power supply capacity.

2. A method for obtaining the maximum power supply capacity of a diamond-shaped distribution network according to claim 1, characterized in that: In step 2, the normal network reconstruction strategy is specifically as follows: During normal operation, each feeder carries two K-type station busbars, and the connecting lines between the second and third K-type stations between the upper-level substations are disconnected. At this time, each upper-level substation carries 4 feeders and 8 sections of switch station busbars. Each feeder carries two sections of switch station busbars, the first section of the feeder carries two sections of busbars, and the second section carries one section of busbar.

3. A method for obtaining the maximum power supply capacity of a diamond-shaped distribution network according to claim 1, characterized in that: In step 2, the network reconstruction strategy for feeder N-1 is specifically as follows: Since the most serious situation for feeder N-1 is the failure of the first section of feeder, only the first section of feeder N-1 is considered. There are 16 situations corresponding to 16 feeders, and the network reconstruction results corresponding to each situation are different. The two switch station busbars carried by the feeder with the first section of feeder failure are transferred to another feeder of the same substation and a busbar of another substation. The first section of another feeder of the same substation carries 3 switch station busbars, and the second section carries 1 switch station busbar. The first section of the feeder of another substation carries 3 switch station busbars, the second section carries 2 switch station busbars, and the tie line carries 1 switch station busbar.

4. A method for obtaining the maximum power supply capacity of a diamond-shaped distribution network according to claim 1, characterized in that: In step 2, the network reconstruction strategy when the upper transformer is N-1 is specifically: There are 4 cases for the upper transformer N-1, and the network reconstruction results are different in each case. After the upper substation transformer N-1 occurs, the 8 switch station busbars carried by the substation will be distributed to the other two substations. The substation that accepts the transferred load carries a total of 12 switch station busbars, including 4 switch station busbars with load transfer. Each substation has two feeders to accept the transferred load. The first section of the feeder that accepts the transferred load carries 4 busbars, the second section carries 3 busbars, and the connecting line carries 2 busbars.

5. The method for obtaining the maximum power supply capacity of a diamond-shaped distribution network according to claim 1, characterized in that: In step 3, the process of constructing a maximum power supply capacity calculation model based on Distflow optimal power flow specifically includes the following steps: Step 301: Setting an objective function that considers the maximum power supply capacity during a specific period of time within a day. The expression of the objective function is: Among them, E(α) is the power supply capacity, α t is the load magnification factor of time period t in the area, t is the time period in a day, each time period is 1 hour, and T is the time period set included in a specific time period in a day; Step 302: setting various constraints of the maximum power supply capability calculation model based on the Distflow optimal power flow, which are node power balance constraint, line voltage drop constraint, branch power balance constraint and energy storage maximum charge and discharge constraint; Step 303: Perform second-order quasi-relaxation on the branch power balance constraint.

6. A method for obtaining the maximum power supply capacity of a diamond-shaped distribution network according to claim 5, characterized in that: In step 302, the expression of the node power balance constraint is: Where, f represents the N-1 scenario, φ(i) represents the set of the first-end nodes of the line with node i as the terminal node, ψ(i) represents the set of the terminal nodes of the line with node i as the first-end node, and They represent the active power and reactive power flowing from node j to node i at the end of the AC line ij, and They represent the active power and reactive power injected into node i, respectively. and They represent the active power injected by distributed generation and transformer respectively, and Represents the reactive power injected by distributed generation and transformer respectively. The active power and reactive power of nodes and lines are hourly data. L,i and Q L,i Respectively represent the active load and reactive load of node i, α t is the load magnification factor for this period, R represents the square of the current in line ij. ji and X ji They represent the resistance and reactance of line ji respectively, is the charging and discharging power of the energy storage installed at the i-th node.

7. A method for obtaining the maximum power supply capacity of a diamond-shaped distribution network according to claim 6, characterized in that: In step 302, the expression of the line voltage drop constraint is: Among them, R ji and X ji They represent the resistance and reactance of line ji respectively, represents the square of the voltage at node i, represents the square of the voltage at node j, Represents the square of the current in line ij.

8. A method for obtaining the maximum power supply capacity of a diamond-shaped distribution network according to claim 6, characterized in that: In step 302, the expression of the branch power balance constraint is: in, represents the square of the voltage at node i, It represents the square of the current in line ij, and They represent the active power and reactive power flowing from node i to node j at the end of the AC line ij; The second-order quasi-relaxation of the branch power balance constraint is performed to obtain the second-order cone constraint of the line. The expression of the second-order cone constraint of the line is:

9. A method for obtaining the maximum power supply capacity of a diamond-shaped distribution network according to claim 6, characterized in that: In step 302, the expression of the maximum charge and discharge constraint of energy storage is: in, is the energy storage charging and discharging power installed at the i-th node, which is negative when charging and positive when discharging, P discharge,i is the maximum discharge power of the energy storage at the i-th node, P charge,i is the maximum charging power of the energy storage at the i-th node, and the maximum charging and discharging power is related to the energy storage configuration capacity.

Citation Information

Patent Citations

  • Maximum supply capacity evaluation method of distribution networks based on mixed integer linear programming

    CN109066654A

  • Calculation method for maximum power supply capacity of power distribution network based on distributed new energy site selection

    CN109980679A

  • Diamond type power distribution network-based power grid reliability evaluation method

    CN114418357A