UCI multiplexing on PUSCH for multi-panel uplink transmission
By realizing the time domain resource overlap between PUCCH and PUSCH in user equipment, the problem of UCI multiplexing in multi-panel transmission scenarios is solved, and the resource utilization efficiency and UCI reporting capabilities of uplink transmission are improved.
Patent Information
- Application Number
- CN202080095091.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-02-05
- Publication Date
- 2024-12-10
- Estimated Expiration
- 2040-02-05
AI Technical Summary
The existing multiple access technology is difficult to efficiently multiplex physical uplink control information (UCI) in uplink transmission, especially in multi-panel transmission scenarios, resulting in low time and frequency resource utilization efficiency.
Multiplexing of UCI is achieved by determining in a user equipment (UE) the time domain resource overlap for the physical uplink control channel (PUCCH) and the physical uplink shared channel (PUSCH), the specific method includes the selection The UCI associated with the PUCCH transmission opportunity is multiplexed on the PUSCH transmission opportunity, and time and cell index resources are shared using multiple PUSCH transmission opportunities.
The time and frequency resource utilization efficiency in uplink transmission is improved, uplink transmission is realized simultaneously on multiple panels, and UCI's reporting capabilities are enhanced.
Smart Images

Figure CN115023989B_ABST
Abstract
Description
Technical Field
[0001]
[0006] In general, some aspects of the present disclosure relate to wireless communications and to techniques and apparatus for uplink control information (UCI) multiplexing on a physical uplink shared channel (PUSCH) for multiple panel ("multi-panel") uplink transmissions. Background Art
[0002] Wireless communication systems are widely deployed to provide a variety of telecommunication services such as telephony, video, data, messaging, and broadcasts. Typical wireless communication systems may utilize multiple access technologies that are capable of supporting communication with multiple users by sharing available system resources (e.g., bandwidth, transmit power, etc.). Examples of these multiple access technologies include code division multiple access (CDMA) systems, time division multiple access (TDMA) systems, frequency division multiple access (FDMA) systems, orthogonal frequency division multiple access (OFDMA) systems, single carrier frequency division multiple access (SC-FDMA) systems, time division synchronous code division multiple access (TD-SCDMA) systems, and long term evolution (LTE). LTE / LTE-Advanced is a set of enhancements to the Universal Mobile Telecommunications System (UMTS) mobile standard promulgated by the Third Generation Partnership Project (3GPP).
[0003] A wireless communication network may include multiple base stations (BS) that support communications for multiple user equipments (UEs). A UE may communicate with a base station (BS) via a downlink and an uplink. A downlink (or forward link) refers to a communication link from a BS to a UE, while an uplink (or reverse link) refers to a communication link from a UE to a BS. As will be described in more detail herein, a BS may be referred to as a Node B, gNB, access point (AP), radio head, transmit receive point (TRP), new radio (NR) BS, 5G Node B, and the like.
[0004] The above-mentioned multiple access technologies have been adopted in various telecommunication standards to provide a common protocol that enables different user devices to communicate at the city, country, region and even global level. New Radio (NR) (also known as 5G) is a set of enhancements to the LTE mobile standard released by the Third Generation Partnership Project (3GPP). NR is designed to better integrate with other open standards using orthogonal frequency division multiplexing (OFDM) (CP-OFDM) with cyclic prefix (CP) on the downlink (DL), CP-OFDM and / or SC-FDM (e.g., also known as discrete Fourier transform spread OFDM (DFT-s-OFDM)) on the uplink (UL), and support beamforming, multiple input multiple output (MIMO) antenna technology, and carrier aggregation to better support mobile broadband Internet access. However, as the demand for mobile broadband access continues to increase, further improvements to LTE and NR technologies are needed. Preferably, these improvements should be applicable to other multiple access technologies and telecommunication standards that use these technologies. Summary of the invention
[0005] In some aspects, a method of wireless communication performed by a user equipment (UE) may include: determining a resource allocation indication for a physical uplink control channel (PUCCH) transmission opportunity that overlaps with time domain resources of a first resource allocation for a first physical uplink shared channel (PUSCH) transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity; and multiplexing uplink control information (UCI) associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity including at least one of the following: the first PUSCH transmission opportunity, the second PUSCH transmission opportunity, or a combination thereof.
[0006] In some aspects, a UE for wireless communication may include a memory and one or more processors operably coupled to the memory. The memory and the one or more processors may be configured to: determine that a resource allocation for a PUCCH transmission opportunity indicates time domain resources that overlap with time domain resources of a first resource allocation for a first PUSCH transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity; and multiplex UCI associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity including at least one of the following: the first PUSCH transmission opportunity, the second PUSCH transmission opportunity, or a combination thereof.
[0007] In some aspects, a non-transitory computer-readable medium may store one or more instructions for wireless communication. The one or more instructions, when executed by one or more processors of a UE, may cause the one or more processors to: determine that a resource allocation for a PUCCH transmission opportunity indicates time domain resources that overlap with time domain resources of a first resource allocation for a first PUSCH transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity; and multiplex UCI associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity including at least one of the following: the first PUSCH transmission opportunity, the second PUSCH transmission opportunity, or a combination thereof.
[0008] In some aspects, an apparatus for wireless communication may include: a unit for determining that a resource allocation indication for a PUCCH transmission opportunity overlaps with time domain resources of a first resource allocation for a first PUSCH transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity; and a unit for multiplexing UCI associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, wherein the selected PUSCH transmission opportunity includes at least one of the following: the first PUSCH transmission opportunity, the second PUSCH transmission opportunity, or a combination thereof.
[0009] Aspects generally include methods, apparatuses, systems, computer program products, non-transitory computer-readable media, user equipment, base stations, wireless communication devices, and / or processing systems as generally described herein with reference to the accompanying drawings and as illustrated in the drawings and the description.
[0010] In order to better understand the specific embodiments below, the foregoing broadly summarizes the features and technical advantages of the examples according to the present disclosure. Additional features and advantages will be described below. The disclosed concepts and specific examples can be easily used as a basis for modifying or designing other structures for achieving the same purpose as the present disclosure. These equivalent structures do not depart from the scope of the attached claims. When considered in conjunction with the accompanying drawings, the characteristics of the concepts disclosed herein (their organizational structures and methods of operation) and related advantages will be better understood from the following description. Each of the drawings is provided for the purpose of illustration and description, and not as a definition of the scope of the claims. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to be able to understand the above-mentioned features of the present disclosure in detail, the brief summary given above can be described in more detail with reference to some aspects, some of which are shown in the accompanying drawings. However, it should be noted that the accompanying drawings only show certain typical aspects of the present disclosure and therefore should not be considered as limiting the scope of the present disclosure, because the description herein allows other equivalent aspects. The same symbols in different drawings may identify the same or similar elements.
[0012] Figure 1 is a block diagram conceptually illustrating an example of a wireless communication network in accordance with various aspects of the present disclosure.
[0013] Figure 2 is a block diagram conceptually illustrating an example of a base station communicating with a UE in a wireless communication network according to various aspects of the present disclosure.
[0014] Figure 3 is a diagram illustrating an example of multi-panel uplink transmission in accordance with various aspects of the present disclosure.
[0015] Figure 4-Figure 6 is a diagram illustrating an example of UCI multiplexing on a PUSCH for multi-panel uplink transmission in accordance with various aspects of the present disclosure.
[0016] Figure 7 is a diagram illustrating an example process, for example, performed by a user device, according to various aspects of the present disclosure. DETAILED DESCRIPTION
[0017] The various aspects of the present disclosure are described more fully below with reference to the accompanying drawings. However, the present disclosure can be implemented in a variety of different forms and should not be interpreted as being limited to any specific structure or function given throughout the present disclosure. Instead, these aspects are provided so that the present disclosure will be thorough and complete, and the scope of the present disclosure will be fully conveyed to those skilled in the art. Based on the teachings herein, it should be understood by those skilled in the art that the scope of the present disclosure is intended to cover any aspect of the content disclosed herein, whether it is implemented independently of any other aspect of the present disclosure or combined with any other aspect of the present disclosure. For example, any number of aspects set forth herein can be used to implement a device or implementation method. In addition, the scope of the present application is intended to cover such a device or method implemented using other structures, functions, or structures and functions other than or different from the various aspects of the disclosure given herein. It should be understood that any aspect of the disclosure disclosed herein can be embodied by one or more elements in the claims.
[0018] Several aspects of telecommunication systems will now be presented with reference to various devices and techniques. These devices and techniques will be described in the following detailed description and illustrated in the accompanying drawings by various blocks, modules, components, circuits, steps, processes, algorithms, etc. (collectively referred to as "elements"). These elements can be implemented using hardware, software, or a combination thereof. Whether these elements are implemented as hardware or software depends on the specific application and the design constraints imposed on the overall system.
[0019] It should be noted that although various aspects may be described herein using terms generally associated with 3G and / or 4G wireless technologies, aspects of the present disclosure may be applied to other generation-based communication systems (such as 5G and later versions), including NR technology.
[0020] Figure 1 is a diagram of a wireless network 100 in which aspects of the present disclosure may be implemented. The wireless network 100 may be an LTE network or some other wireless network, such as a 5G or NR network. The wireless network 100 may include multiple BSs 110 (shown as BS 110a, BS 110b, BS 110c, and BS 110d) and other network entities. A BS is an entity that communicates with a user equipment (UE) and may also be referred to as a base station, NR BS, Node B, gNB, 5G Node B (NB), access point, transmit receive point (TRP), and the like. Each BS may provide communication coverage for a specific geographic area. In 3GPP, the term "cell" may refer to a coverage area of a BS and / or a BS subsystem serving the coverage area, depending on the context in which the term is used.
[0021] A BS may provide communication coverage for a macro cell, a pico cell, a femto cell, and / or another type of cell. A macro cell may cover a relatively large geographic area (e.g., a radius of several kilometers) and allow unrestricted access by UEs with service subscription. A pico cell may cover a relatively small geographic area and allow unrestricted access by UEs with service subscription. A femto cell may cover a relatively small geographic area (e.g., a home) and allow restricted access by UEs associated with the femto cell (e.g., UEs in a closed subscriber group (CSG)). A BS for a macro cell may be referred to as a macro BS. A BS for a pico cell may be referred to as a pico BS. A BS for a femto cell may be referred to as a femto BS or a home BS. In Figure 1In the example shown, BS 110a may be a macro BS of macro cell 102a; BS 110b may be a pico BS of pico cell 102b; and BS 110c may be a femto BS of femto cell 102c. A BS may support one or more (e.g., three) cells. The terms "eNB", "base station", "NR BS", "gNB", "TRP", "AP", "Node B", "5G NB", and "cell" may be used interchangeably herein.
[0022] In some aspects, the cell may not necessarily be stationary, and the geographic area of the cell may move depending on the location of the mobile BS. In some aspects, the BSs may be interconnected to each other and / or one or more other BSs or network nodes (not shown) in the wireless network 100 through various types of backhaul interfaces (e.g., direct physical connections, virtual networks, etc.) using any suitable transport network.
[0023] The wireless network 100 may also include a relay station. A relay station is an entity that can receive data transmissions from an uplink station (e.g., a BS or a UE) and send data transmissions to a downlink station (e.g., a UE or a BS). A relay station may also be a UE that can relay transmissions for other UEs. Figure 1 In the example shown in , a relay station 110d may communicate with a macro BS 110a and a UE 120d to facilitate communication between the BS 110a and the UE 120d. A relay station may also be referred to as a relay BS, a relay base station, a relay, or the like.
[0024] The wireless network 100 may be a heterogeneous network including different types of BSs (e.g., macro BSs, pico BSs, femto BSs, relay BSs, etc.). These different types of BSs may have different transmit power levels, different coverage areas, and different effects on interference in the wireless network 100. For example, a macro BS may have a higher transmit power level (e.g., 5 to 40 watts), while a pico BS, a femto BS, and a relay BS may have a lower transmit power level (e.g., 0.1 to 2 watts).
[0025] The network controller 130 may be coupled to a group of BSs and may provide coordination and control for the BSs. The network controller 130 may communicate with the BSs via a backhaul. The BSs may also communicate with each other, for example, directly or indirectly via a wireless or wired backhaul.
[0026] UE 120 (e.g., 120a, 120b, 120c) can be dispersed throughout the wireless network 100, and each UE can be fixed or mobile. UE can also be referred to as a terminal, a mobile station, a subscriber unit, a station, etc. UE can be a cellular phone (e.g., a smart phone), a personal digital assistant (PDA), a wireless modem, a wireless communication device, a handheld device, a laptop computer, a cordless phone, a wireless local loop (WLL) station, a tablet computer, a camera, a gaming device, a netbook, a smartbook, an ultrabook, a medical device or equipment, a biometric sensor / device, a wearable device (smart watch, smart clothing, smart glasses, smart wristband, smart jewelry (e.g., smart ring, smart bracelet)), an entertainment device (e.g., a music or video device, or a satellite radio), a vehicle component or sensor, a smart meter / sensor, an industrial manufacturing device, a global positioning system device, or any other suitable device configured to communicate via a wireless or wired medium.
[0027] Some UEs may be considered machine type communication (MTC) or evolved or enhanced machine type communication (eMTC) UEs. MTC and eMTC UEs include, for example, robots, drones, remote devices, sensors, meters, monitors, location tags, and the like that can communicate with a base station, another device (e.g., a remote device), or some other entity. A wireless node may provide, for example, a connection to a network or to a network (e.g., a wide area network such as the Internet or a cellular network) via a wired or wireless communication link. Some UEs may be considered Internet of Things (IoT) devices, and / or may be implemented as NB-IoT (narrowband Internet of Things) devices. Some UEs may be considered customer premises equipment (CPE). UE 120 may be included in a housing that houses components of UE 120 (such as a processor component, a memory component, etc.).
[0028] In general, any number of wireless networks can be deployed in a given geographic area. Each wireless network can support a specific radio access technology (RAT) and can operate on one or more frequencies. RAT can also be referred to as radio technology, air interface, etc. Frequency can also be referred to as carrier, frequency channel, etc. Each frequency can support a single RAT in a given geographic area to avoid interference between wireless networks of different RATs. In some cases, NR or 5G RAT networks can be deployed.
[0029] In some aspects, two or more UEs 120 (e.g., shown as UE 120a and UE 120e) may communicate directly (e.g., without using base station 110 as an intermediary to communicate with each other) using one or more side link channels. For example, UE 120 may communicate using peer-to-peer (P2P) communication, device-to-device (D2D) communication, vehicle-to-everything (V2X) protocols (e.g., which may include vehicle-to-vehicle (V2V) protocols, vehicle-to-infrastructure (V2I) protocols, etc.), mesh networks, etc. In this case, UE 120 may perform scheduling operations, resource selection operations, and / or other operations described elsewhere herein performed by base station 110.
[0030] As mentioned above, providing Figure 1 As an example. Other examples may be different from the Figure 1 Examples described.
[0031] Figure 2 A block diagram of a design 200 of a base station 110 and a UE 120 is shown, which may be Figure 1 Base station 110 may be equipped with T antennas 234a through 234t, and UE 120 may be equipped with R antennas 252a through 452r, where in general T≧1 and R≧1.
[0032] At base station 110, transmit processor 220 may receive data for one or more UEs from data source 212, select one or more modulation and coding schemes (MCS) for each UE based at least in part on a channel quality indicator (CQI) received from the UE, process (e.g., encode and modulate) the data for each UE based at least in part on the MCS selected for the UE, and provide data symbols for all UEs. Transmit processor 220 may also process system information (e.g., for semi-static resource partitioning information (SRPI), etc.) and control information (e.g., CQI requests, grants, upper layer signaling, etc.), and provide overhead symbols and control symbols. Transmit processor 220 may also generate reference symbols for reference signals (e.g., cell-specific reference signals (CRS)) and synchronization signals (e.g., primary synchronization signals (PSS) and secondary synchronization signals (SSS)). If applicable, the transmit (TX) multiple-input multiple-output (MIMO) processor 230 can perform spatial processing (e.g., precoding) on data symbols, control symbols, overhead symbols, and / or reference symbols, and can provide T output symbol streams to T modulators (MOD) 232a to 232t. Each modulator 232 can process its own output symbol stream (e.g., for OFDM, etc.) to obtain an output sample stream. Each modulator 232 can further process (e.g., convert to analog, amplify, filter, and up-convert) the output sample stream to obtain a downlink signal. The T downlink signals from modulators 232a to 232t can be sent out via T antennas 234a to 234t, respectively. According to various aspects described in more detail below, position coding can be used to generate synchronization signals to transmit additional information.
[0033] At UE 120, antennas 252a to 252r may receive downlink signals from base station 110 and / or other base stations and may provide received signals to demodulators (DEMODs) 254a to 254r, respectively. Each demodulator 254 may condition (e.g., filter, amplify, downconvert, and digitize) the received signal to obtain input samples. Each demodulator 254 may further process the input samples (e.g., for OFDM, etc.) to obtain received symbols. MIMO detector 256 may obtain received symbols from all R demodulators 254a to 254r, perform MIMO detection on the received symbols if applicable, and provide detected symbols. Receive processor 258 may process (e.g., demodulate and decode) the detected symbols, provide decoded data for UE 120 to data sink 260, and provide decoded control information and system information to controller / processor 280. The channel processor may determine reference signal received power (RSRP), received signal strength indicator (RSSI), reference signal received quality (RSRQ), channel quality indicator (CQI), etc. In some aspects, one or more components of UE 120 may be included in a housing.
[0034] On the uplink, at the UE 120, a transmit processor 264 may receive and process data from a data source 262 and control information from a controller / processor 280 (e.g., for reports including RSRP, RSSI, RSRQ, CQI, etc.). The transmit processor 264 may also generate reference symbols for one or more reference signals. The symbols from the transmit processor 264 may be precoded by a TX MIMO processor 266 if applicable, further processed by modulators 254a through 254r (e.g., for DFT-s-OFDM, CP-OFDM, etc.), and transmitted to the base station 110. At the base station 110, uplink signals from the UE 120 and other UEs may be received by the antenna 234, processed by the demodulator 232, detected by the MIMO detector 236 if applicable, and further processed by the receive processor 238 to obtain decoded data and control information transmitted by the UE 120. The receive processor 238 may provide decoded data to a data sink 239 and decoded control information to the controller / processor 240. The base station 110 may include a communication unit 244 and communicate to the network controller 130 via the communication unit 244. The network controller 130 may include a communication unit 294, a controller / processor 290, and a memory 292.
[0035] As described in more detail elsewhere herein, the controller / processor 240 of the base station 110, the controller / processor 280 of the UE 120, and / or any other component of FIG2 may perform one or more techniques associated with multiplexing uplink control information (UCI) on a physical uplink shared channel (PUSCH) for multi-panel uplink transmissions. For example, the controller / processor 240 of the base station 110, the controller / processor 280 of the UE 120, and / or Figure 2 Any other component may perform or direct e.g. Figure 7 The operations of process 700 and / or other processes as described herein. Memories 242 and 282 may store data and program codes for base station 110 and UE 120, respectively. In some aspects, memory 242 and / or memory 282 may include a non-transitory computer-readable medium storing one or more instructions for wireless communication. For example, when one or more instructions are executed by one or more processors of base station 110 and / or UE 120, they may perform or direct, for example, Figure 7 The scheduler 246 may schedule UEs for data transmission on the downlink and / or uplink.
[0036] In some aspects, the UE 120 may include means for determining that a resource allocation indication for a physical uplink control channel (PUCCH) transmission opportunity overlaps time domain resources of a first resource allocation for a first PUSCH transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity; and means for multiplexing UCI associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity including at least one of the following: the first PUSCH transmission opportunity, the second PUSCH transmission opportunity, or a combination thereof, etc. In some aspects, such means may include combining Figure 2 One or more components of UE 120 are depicted, such as controller / processor 280, transmit processor 264, TX MIMO processor 266, MOD 254, antenna 252, DEMOD 254, MIMO detector 256, receive processor 258, and the like.
[0037] As mentioned above, providing Figure 2 As an example. Other examples may be different from the Figure 2 Examples described.
[0038] Figure 33 is a diagram illustrating an example 300 of multi-panel uplink transmission according to various aspects of the present disclosure. UE 120 and BS 110 may communicate in conjunction with uplink multi-panel transmission of UE 120. UE 120 may employ multiple transmit antenna panels. An antenna panel may be a group of antenna ports or an antenna group. Uplink multi-panel transmission may use space division multiplexing, time division multiplexing, or frequency division multiplexing.
[0039] Figure 3 Spatial division multiplexing (SDM) 310 of the first PUSCH transmission opportunity 320 and the second PUSCH transmission opportunity 330, time division multiplexing (TDM) 340 of the PUSCH transmission opportunities 320 and 330, and frequency division multiplexing (FDM) 350 of the PUSCH transmission opportunities 320 and 330 are shown.
[0040] According to SDM 310 (e.g., non-coherent joint transmission), UE 120 may send a first PUSCH transmission opportunity 320 (shown as a first layer) and a second PUSCH transmission opportunity 330 (shown as a second layer overlaid on the first layer) in the same time and frequency resources but in different spatial resources. According to TDM 340, UE 120 may send a first PUSCH transmission opportunity 320 and a second PUSCH transmission opportunity 330 in the same frequency resources but in different time resources. According to FDM 350, UE 120 may send a first PUSCH transmission opportunity 320 and a second PUSCH transmission opportunity 330 in the same time resources but in different frequency resources.
[0041] In some aspects, UE 120 may transmit a first PUSCH transmission opportunity 320 using a first antenna panel 360, and UE 120 may transmit a second PUSCH transmission opportunity 330 using a second antenna panel 370. In other words, UE 120 may form a first beam on the first antenna panel 360 and UE 120 may form a second beam on the second antenna panel 370.
[0042] For codebook-based MIMO, the transmitted precoding matrix indicator (TPMI) index of each antenna panel can be identified by DCI, the uplink transmission configuration indicator (TCI) of each antenna panel can be identified by DCI, and the codebook sounding reference signal (SRS) set for each panel can be configured via radio resource control (RRC). For non-codebook-based MIMO, the SRS resource indicator (SRI) index of each antenna panel can be identified by DCI, the uplink TCI of each antenna panel can be identified by DCI, and the non-codebook SRS set for each panel can be configured by RRC. The uplink TCI is used to indicate the beam used for the antenna panel, which can be a beam associated with the indicated reference signal ID. And the SRS set ID can be used to indicate the antenna panel ID, where each antenna panel is associated with an SRS set.
[0043] 3GPP TS 38.213 Section 9 specifies that if a UE sends multiple PUSCH transmission opportunities in a timeslot on each serving cell and the PUCCH resource allocation overlaps with the PUSCH resource allocation, the UE multiplexes the UCI in the PUSCH transmission opportunity with the smallest cell index. Section 9 also specifies that if a UE sends multiple PUSCH transmission opportunities in a timeslot on the serving cell with the smallest cell index, the UE multiplexes the UCI in the earliest PUSCH transmission opportunity in which the UE transmits in that timeslot.
[0044] However, MIMO communication technology can implement multi-panel ("multi-panel") transmission, in which a UE (e.g., UE 120) sends multiple PUSCH transmission opportunities in a time slot on a serving cell using overlapping time resources, so that there is no earliest PUSCH transmission opportunity in the time slot, and so that the PUCCH transmission opportunity carrying UCI also uses overlapping time resources. 3GPP TS38.213 does not address this situation.
[0045] In some aspects described herein, techniques are provided for selecting PUSCH transmission opportunities for multiplexing UCI, where multiple PUSCH transmission opportunities share time and cell index resources. In this way, UCI can be reported during uplink transmissions from multiple panels simultaneously, thereby enabling more efficient use of time and frequency resources.
[0046] As mentioned above, providing Figure 3 As an example. Other examples may be different from the Figure 3 Examples described.
[0047] Figure 4is a diagram illustrating an example 400 of UCI multiplexing on a PUSCH for multi-panel uplink transmissions in accordance with various aspects of the present disclosure. As shown, a base station 110 and a UE 120 may communicate with each other.
[0048] As indicated by reference numeral 405, the base station 110 may transmit and the UE 120 may receive a DCI including a resource allocation 410 for uplink communication. The UE 120 may determine that the resource allocation for a physical uplink control channel (PUCCH) transmission opportunity 415 indicates time domain resources that overlap with the time domain resources of the first resource allocation for a first PUSCH transmission opportunity 420 (shown as PUSCH 1) and the second resource allocation for a second PUSCH transmission opportunity 425 (shown as PUSCH 2). The indication of the resource allocation for the first and second PUSCH transmission opportunities 420 and 425 may be sent in a single DCI transmission, multiple DCI transmissions, etc.
[0049] The first resource allocation may indicate a first start time of the first PUSCH transmission opportunity 420 and a first cell index of the first PUSCH transmission opportunity 420. The second resource allocation may indicate a second start time of the second PUSCH transmission opportunity 425 and a second cell index of the second PUSCH transmission opportunity 425. Figure 4 As shown, the first start time is the second start time, and the first cell index is the second cell index.
[0050] As shown, PUCCH transmission opportunity 415 may be scheduled for transmission in first serving cell 430, and PUSCH transmission opportunities 420 and 425 may be scheduled for transmission in second serving cell 435. PUCCH transmission opportunity 415 and first PUSCH transmission opportunity 420 may be scheduled for transmission using first antenna panel 440. Second PUSCH transmission opportunity 425 may be scheduled for transmission using second antenna panel 445.
[0051] As indicated by reference numeral 450, UE 120 may transmit and BS 110 may receive a multi-panel uplink (UL) transmission. UE 120 may multiplex a first PUSCH transmission opportunity 420 with a second PUSCH transmission opportunity 425 using FDM. UE 120 may multiplex UCI associated with PUCCH transmission opportunity 415 on a selected PUSCH transmission opportunity. The selected PUSCH transmission opportunity may include the first PUSCH transmission opportunity 420, the second PUSCH transmission opportunity 425, or a combination thereof.
[0052] As indicated by reference numeral 455, for example, the selected PUSCH transmission opportunity may include the first PUSCH transmission opportunity 420. Figure 4 As shown, the selected PUSCH transmission opportunity may include a lowest frequency domain resource allocation index among a plurality of frequency domain resource allocation indexes associated with the plurality of PUSCH transmission opportunities 420 and 425. The lowest frequency domain allocation index may include a lowest resource block (RB) index.
[0053] In some aspects, the selected PUSCH transmission opportunity may include a lowest beam identifier among a plurality of beam identifiers associated with the plurality of PUSCH transmission opportunities 420 and 425. The lowest beam identifier may include a lowest UL transmission configuration indicator (TCI) identifier (ID). In some aspects, the lowest beam identifier may include a lowest sounding reference signal (SRS) set ID.
[0054] In some aspects, the selected PUSCH transmission opportunity may include a first transmitted precoding matrix indicator (TPMI) of a plurality of TPMIs associated with the plurality of PUSCH transmission opportunities 420 and 425. The selected PUSCH transmission opportunity may include a lowest SRS resource indicator (SRI) ID of a plurality of SRI IDs associated with the plurality of PUSCH transmission opportunities 420 and 425. The selected PUSCH transmission opportunity may correspond to a panel ID associated with the PUCCH transmission opportunity 415.
[0055] As indicated by reference numeral 460 , in some aspects the selected PUSCH transmission opportunities may include a first PUSCH transmission opportunity 420 and a second PUSCH transmission opportunity 425 .
[0056] As mentioned above, providing Figure 4 As an example. Other examples may be different from the Figure 4 Examples described.
[0057] Figure 5 is a diagram illustrating another example 500 of UCI multiplexing on PUSCH for multi-panel uplink transmissions in accordance with various aspects of the present disclosure. As shown, a base station 110 and a UE 120 may communicate with each other.
[0058] As indicated by reference numeral 505, the base station 110 may transmit and the UE 120 may receive a DCI including a resource allocation 510 for uplink communication. The UE 120 may determine that the resource allocation for the PUCCH transmission opportunity 515 indicates a time domain resource that overlaps with a first resource allocation for a first PUSCH transmission opportunity 520 (shown as PUSCH 1) and a second resource allocation for a second PUSCH transmission opportunity 525 (shown as PUSCH 2). The indication of the resource allocation for the first and second PUSCH transmission opportunities 520 and 525 may be sent in a single DCI transmission, multiple DCI transmissions, etc.
[0059] The first resource allocation may indicate a first start time of the first PUSCH transmission opportunity 520, a first cell index of the first PUSCH transmission opportunity 520, and a first frequency domain resource allocation of the first PUSCH transmission opportunity 520. The second resource allocation may indicate a second start time of the second PUSCH transmission opportunity 525, a second cell index of the second PUSCH transmission opportunity 525, and a second frequency domain resource allocation of the second PUSCH transmission opportunity 525. Figure 5 As shown, the first start time is the second start time, the first cell index is the second cell index, and the first frequency domain resource allocation is the second frequency domain resource allocation.
[0060] As shown, PUCCH transmission opportunity 515 may be scheduled for transmission in first serving cell 530, and PUSCH transmission opportunities 520 and 525 may be scheduled for transmission in second serving cell 535. PUCCH transmission opportunity 515 and first PUSCH transmission opportunity 520 may be scheduled for transmission using first antenna panel 540. Second PUSCH transmission opportunity 525 may be scheduled for transmission using second antenna panel 545.
[0061] As indicated by reference numeral 550, UE 120 may transmit and BS 110 may receive UL transmissions. UE 120 may multiplex the first PUSCH transmission opportunity 520 with the second PUSCH transmission opportunity 525 using SDM. UE 120 may multiplex the UCI associated with PUCCH transmission opportunity 515 on the selected PUSCH transmission opportunity. The selected PUSCH transmission opportunity may include the first PUSCH transmission opportunity 520, the second PUSCH transmission opportunity 525, or a combination thereof.
[0062] As indicated by reference numeral 555, for example, the selected PUSCH transmission opportunities may include the first PUSCH transmission opportunity 520. As shown, the selected PUSCH transmission opportunity 520 may correspond to the panel ID associated with the PUCCH transmission opportunity 515.
[0063] In some aspects, the selected PUSCH transmission opportunity may include a lowest beam identifier among a plurality of beam identifiers associated with the plurality of PUSCH transmission opportunities 520 and 525. The lowest beam identifier may include a lowest UL TCI ID. In some aspects, the lowest beam identifier may include a lowest SRS ID. In some aspects, the selected PUSCH transmission opportunity may include a first TPMI of a plurality of TPMIs associated with the plurality of PUSCH transmission opportunities 520 and 525. The selected PUSCH transmission opportunity may include a lowest SRI ID among a plurality of SRI IDs associated with the plurality of PUSCH transmission opportunities 520 and 525.
[0064] In some aspects, the selected PUSCH transmission opportunity may include a lowest demodulation reference signal (DMRS) code division multiplexing (CDM) group ID among multiple DMRS CDM group IDs associated with the multiple PUSCH transmission opportunities 520 and 525, wherein each PUSCH transmission opportunity 520 and 525 is associated with at least one DMRS CDM group, and different PUSCH transmission opportunities 520 and 525 may be associated with different DMRS CDM groups. In some aspects, the selected PUSCH transmission opportunity may include a lowest DMRS port ID among multiple DMRS port IDs associated with the multiple PUSCH transmission opportunities 520 and 525.
[0065] As indicated by reference numeral 560 , in some aspects the selected PUSCH transmission opportunity may include a first PUSCH transmission opportunity 520 and a second PUSCH transmission opportunity 525 .
[0066] As mentioned above, providing Figure 5 As an example. Other examples may be different from the Figure 5 Examples described.
[0067] Figure 6 is a diagram illustrating another example 600 of UCI multiplexing on PUSCH for multi-panel uplink transmissions in accordance with various aspects of the present disclosure. As shown, a base station 110 and a UE 120 may communicate with each other.
[0068] As indicated by reference numeral 605, the base station 110 may transmit and the UE 120 may receive a DCI including a resource allocation 610 for UL communication. The UE 120 may determine that the resource allocation for a PUCCH transmission opportunity 615 (shown as PUCCH 1) indicates time domain resources that overlap with the time domain resources of the first resource allocation for a first PUSCH transmission opportunity 620 (shown as PUSCH 1) and the second resource allocation for a second PUSCH transmission opportunity 625 (shown as PUSCH 2). The UE 120 may determine that another resource allocation for another PUCCH transmission opportunity 630 (shown as PUCCH 2) indicates time domain resources that overlap with the time domain resources of the resource allocation 610. As shown, the PUCCH transmission opportunity 615 may correspond to a first antenna panel 635 and the another PUCCH transmission opportunity 630 may correspond to a second antenna panel 640.
[0069] like Figure 6 As shown, resource allocation 610 may indicate a shared start time for a first PUSCH transmission opportunity 620 and a second PUSCH transmission opportunity 625, a shared cell index 645 for the first PUSCH transmission opportunity 620 and the second PUSCH transmission opportunity 625, and a shared frequency domain resource allocation for the first PUSCH transmission opportunity 620 and the second PUSCH transmission opportunity 625. As shown, PUCCH transmission opportunities 615 and 630 may share a start time and a cell index 650.
[0070] As indicated by reference numeral 655, UE 120 may transmit and BS 110 may receive UL transmissions. UE 120 may multiplex the first PUSCH transmission opportunity 620 with the second PUSCH transmission opportunity 625 using SDM. UE 120 may multiplex UCI associated with PUCCH transmission opportunities 615 and 630 on one or more selected PUSCH transmission opportunities. The selected PUSCH transmission opportunities may include the first PUSCH transmission opportunity 620, the second PUSCH transmission opportunity 625, or a combination thereof.
[0071] As indicated by reference numeral 660, for example, the PUSCH transmission opportunities selected for each PUCCH transmission opportunity 615 and 630 may include a PUSCH transmission opportunity having the same panel ID as the corresponding PUCCH transmission opportunity. UCI associated with the PUCCH transmission opportunity 615 corresponding to the first antenna panel 635 is multiplexed on the first PUSCH transmission opportunity 620 also corresponding to the first antenna panel 635. Similarly, UCI associated with the PUCCH transmission opportunity 630 corresponding to the second antenna panel 640 is multiplexed on the second PUSCH transmission opportunity 625 also corresponding to the second antenna panel 640. In some aspects, the PUCCH transmission opportunities 615 and 630 may be multiplexed with the corresponding PUSCH transmission opportunities 620 and 625 before the PUSCH transmission opportunities 620 and 625 are multiplexed with each other.
[0072] As indicated by reference numeral 665, in some aspects, the selected PUSCH transmission opportunity may include the following: Figure 5 The selection criteria described select the PUSCH transmission opportunity regardless of the antenna panel ID.
[0073] As mentioned above, providing Figure 6 As an example. Other examples may be different from the Figure 6 Examples described.
[0074] Figure 7 is a diagram illustrating an example process 700 performed, for example, by a UE, in accordance with various aspects of the present disclosure. Example process 700 is an example of operations in which a UE (eg, UE 120, etc.) performs UCI multiplexing on a PUSCH for multi-panel uplink transmissions.
[0075] like Figure 7 As shown, in some aspects, process 700 may include determining that a resource allocation indication for a PUCCH transmission opportunity overlaps time-domain resources of a first resource allocation for a first PUSCH transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity (block 710). For example, the UE (e.g., using receive processor 258, controller / processor 280, memory 282, etc.) may determine that a resource allocation indication for a PUCCH transmission opportunity overlaps time-domain resources of a first resource allocation for a first PUSCH transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity.
[0076] like Figure 7As further shown in , in some aspects, process 700 may include: multiplexing UCI associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity including at least one of the following: a first PUSCH transmission opportunity, a second PUSCH transmission opportunity, or a combination thereof (block 720). For example, the UE (e.g., using the transmit processor 264, the controller / processor 280, the memory 282, etc.) may multiplex UCI associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity including at least one of the following: a first PUSCH transmission opportunity, a second PUSCH transmission opportunity, or a combination thereof, as described above.
[0077] Process 700 may include additional aspects, such as any single aspect or any combination of aspects described below and / or in conjunction with one or more other processes described elsewhere herein.
[0078] In a first aspect, the first resource allocation indicates a first start time of the first PUSCH transmission opportunity and a first cell index of the first PUSCH transmission opportunity, and the second resource allocation indicates a second start time of the second PUSCH transmission opportunity and a second cell index of the second PUSCH transmission opportunity, wherein the first start time is the second start time and the first cell index is the second cell index.
[0079] In a second aspect, either alone or in combination with the first aspect, the selected PUSCH transmission opportunity comprises a lowest frequency domain resource allocation index among a plurality of frequency domain resource allocation indexes associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities comprising the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0080] In a third aspect, alone or in combination with one or more of the first and second aspects, the lowest frequency domain allocation index comprises a lowest RB index.
[0081] In a fourth aspect, either alone or in combination with one or more of the first to third aspects, the selected PUSCH transmission opportunity comprises a lowest beam identifier among multiple beam identifiers associated with multiple PUSCH transmission opportunities, wherein the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0082] In a fifth aspect, alone or in combination with one or more of the first to fourth aspects, the lowest beam identifier comprises a lowest UL TCI ID.
[0083] In a sixth aspect, alone or in combination with one or more of the first to fifth aspects, the lowest beam identifier comprises a lowest SRS set ID.
[0084] In the seventh aspect, alone or in combination with one or more of the first to sixth aspects, the selected PUSCH transmission opportunity includes a first TPMI among multiple TPMIs associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0085] In the eighth aspect, alone or in combination with one or more of the first to seventh aspects, the selected PUSCH transmission opportunity includes the lowest SRI ID among multiple SRI IDs associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0086] In a ninth aspect, alone or in combination with one or more of the first to eighth aspects, the selected PUSCH transmission opportunity corresponds to a panel ID associated with the PUCCH transmission opportunity.
[0087] In the tenth aspect, alone or in combination with one or more of the first to ninth aspects, the selected PUSCH transmission opportunity includes the lowest DMRS CDM group ID among multiple DMRS CDM group IDs associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0088] In the eleventh aspect, alone or in combination with one or more of the first to tenth aspects, the selected PUSCH transmission opportunity includes the lowest DMRS port ID among multiple DMRS port IDs associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0089] In a twelfth aspect, either alone or in combination with one or more of the first to eleventh aspects, the process 700 includes multiplexing the first PUSCH transmission opportunity and the second PUSCH transmission opportunity using FDM.
[0090] In the thirteenth aspect, alone or in combination with one or more of the first to twelfth aspects, the selected PUSCH transmission opportunity includes the lowest frequency domain resource allocation index among multiple frequency domain resource allocation indexes associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0091] In a fourteenth aspect, alone or in combination with one or more of the first to thirteenth aspects, the lowest frequency domain allocation index comprises a lowest RB index.
[0092] In the fifteenth aspect, alone or in combination with one or more of the first to fourteenth aspects, the selected PUSCH transmission opportunity includes the lowest beam identifier among multiple beam identifiers associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0093] In a sixteenth aspect, alone or in combination with one or more of the first to fifteenth aspects, the lowest beam identifier comprises a lowest UL TCI ID.
[0094] In a seventeenth aspect, alone or in combination with one or more of the first to sixteenth aspects, the lowest beam identifier comprises a lowest SRS set ID.
[0095] In the eighteenth aspect, alone or in combination with one or more of the first to seventeen aspects, the selected PUSCH transmission opportunity includes a first TPMI among multiple TPMIs associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0096] In the nineteenth aspect, alone or in combination with one or more of the first to eighteenth aspects, the selected PUSCH transmission opportunity includes the lowest SRIID among multiple SRI IDs associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0097] In a twentieth aspect, either alone or in combination with one or more of the first to nineteenth aspects, the selected PUSCH transmission opportunity corresponds to a panel ID associated with the PUCCH transmission opportunity.
[0098] In a twenty-first aspect, either alone or in combination with one or more of the first to twentieth aspects, process 700 includes multiplexing the first PUSCH transmission opportunity and the second PUSCH transmission opportunity using SDM.
[0099] In aspect twenty-second, either alone or in combination with one or more of aspects one to twenty-first, the selected PUSCH transmission opportunity comprises a lowest beam identifier among multiple beam identifiers associated with multiple PUSCH transmission opportunities, wherein the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0100] In a twenty-third aspect, either alone or in combination with one or more of the first to twenty-second aspects, the lowest beam identifier comprises a lowest UL TCI ID.
[0101] In a twenty-fourth aspect, alone or in combination with one or more of the first to twenty-third aspects, the lowest beam identifier comprises a lowest SRS set ID.
[0102] In the twenty-fifth aspect, alone or in combination with one or more of the first to twenty-fourth aspects, the selected PUSCH transmission opportunity includes a first TPMI among multiple TPMIs associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0103] In the twenty-sixth aspect, either alone or in combination with one or more of the first to twenty-fifth aspects, the selected PUSCH transmission opportunity comprises the lowest SRI ID among multiple SRI IDs associated with multiple PUSCH transmission opportunities, wherein the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0104] In the twenty-seventh aspect, alone or in combination with one or more of the first to twenty-sixth aspects, the selected PUSCH transmission opportunity includes the lowest DMRS CDM group ID among multiple DMRS CDM group IDs associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0105] In the twenty-eighth aspect, either alone or in combination with one or more of the first to twenty-seventh aspects, the selected PUSCH transmission opportunity comprises the lowest DMRS port ID among multiple DMRS port IDs associated with multiple PUSCH transmission opportunities, wherein the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
[0106] In a twenty-ninth aspect, either alone or in combination with one or more of the first to twenty-eighth aspects, the selected PUSCH transmission opportunity corresponds to a panel ID associated with the PUCCH transmission opportunity.
[0107] In the thirtieth aspect, alone or in combination with one or more of the first to twenty-ninth aspects, process 700 includes: determining another resource allocation indication for another PUCCH transmission opportunity that overlaps with the time domain resources of the resource allocation, wherein the PUCCH transmission opportunity corresponds to a first panel, and the another PUCCH transmission opportunity corresponds to a second panel, and the selected PUSCH transmission opportunity corresponds to the first panel; and multiplexing UCI associated with the another PUCCH transmission opportunity on another selected PUSCH opportunity, and the other selected PUSCH opportunity corresponds to the second panel.
[0108] In the thirty-first aspect, alone or in combination with one or more of the first to thirtieth aspects, process 700 includes: determining another resource allocation indication for another PUCCH transmission opportunity that overlaps with the time domain resources of the resource allocation, wherein the PUCCH transmission opportunity corresponds to a first panel and the another PUCCH transmission opportunity corresponds to a second panel; and multiplexing UCI associated with the another PUCCH transmission opportunity on the selected PUSCH transmission opportunity, wherein the selected PUSCH transmission opportunity corresponds to the first panel, the second panel or a third panel.
[0109] In aspect 32, either alone or in combination with one or more of aspects 1 to 31, an indication of the first resource allocation is received in a first DCI transmission, and an indication of the second resource allocation is received in a second DCI transmission.
[0110] In aspect thirty-third, either alone or in combination with one or more of aspects one to thirty-second, the first DCI transmission is a second DCI transmission.
[0111] Although Figure 7 Example blocks of process 700 are shown, but in some aspects, process 700 may include Figure 7 Additional blocks, fewer blocks, different blocks, or blocks arranged in a different manner than those shown. Additionally or alternatively, two or more of the blocks of process 700 may be performed in parallel.
[0112] The foregoing disclosure provides illustration and description, but is not intended to be exhaustive or to limit the various aspects to the precise forms disclosed. Modifications and changes may be made based on the above disclosure, or may be obtained from the practice of these aspects.
[0113] As used herein, the term "component" is intended to be broadly interpreted as hardware, firmware, and / or a combination of hardware and software. As used herein, a processor is implemented in hardware, firmware, and / or a combination of hardware and software.
[0114] As used herein, satisfying a threshold may refer to being greater than a threshold, greater than or equal to a threshold, less than a threshold, less than or equal to a threshold, equal to a threshold, not equal to a threshold, etc., depending on the context.
[0115] It is apparent that the systems and / or methods described herein can be implemented in various forms of hardware, firmware, and / or combinations of hardware and software. The actual dedicated control hardware or software code used to implement these systems and / or methods is not a limitation of these aspects. Therefore, the operation and behavior of the systems and / or methods are described herein without reference to specific software code, it being understood that software and hardware can be designed to implement the systems and / or methods based at least in part on the description herein.
[0116] Although specific combinations of features are listed in the claims and / or disclosed in the specification, these combinations are not intended to limit the disclosure of various aspects. In fact, many of these features can be combined in a manner that is not specifically listed in the claims and / or disclosed in the specification. Although each dependent claim listed below can directly rely on only one claim, the disclosure of various aspects includes the combination of each dependent claim with each other claim in the claim set. The phrase "at least one" mentioned in the list of items refers to any combination of these items, including single members. As an example, "at least one of a, b or c" is intended to cover a, b, c, ab, ac, bc and abc, as well as any combination of multiple identical elements (e.g., aa, aaa, aab, aac, abb, acc, bb, bbb, bbc, cc and ccc, or any other ordering of a, b and c.
[0117] Unless explicitly described, any element, behavior or instruction used in this article should not be interpreted as critical or necessary. And, as used in this article, the articles "one" and "an" are intended to include one or more items and can be used interchangeably with "one or more". In addition, as used in this article, the terms "set" and "group" are intended to include one or more items (e.g., related items, unrelated items, combinations of related items and unrelated items, etc.), and can be used interchangeably with "one or more". In the case of meaning only one item, the phrase "only one" or similar language is used. Moreover, as used in this article, the terms "have", "have", "have" and / or similar expressions are intended to be open terms. In addition, unless otherwise explicitly stated, the phrase "based on" is intended to mean "based at least in part on".
Claims
1. A method of wireless communication performed by a user equipment (UE), comprising: determining that a resource allocation for a physical uplink control channel (PUCCH) transmission opportunity indicates time domain resources that overlap with time domain resources of a first resource allocation for a first physical uplink shared channel (PUSCH) transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity; and multiplexing uplink control information (UCI) associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity comprising at least one of: the first PUSCH transmission opportunity, the second PUSCH transmission opportunity, or a combination thereof; wherein the selected PUSCH transmission opportunity includes a lowest frequency domain resource allocation index among multiple frequency domain resource allocation indexes associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity; and The lowest frequency domain resource allocation index includes a lowest resource block (RB) index.
2. The method according to claim 1, wherein: The first resource allocation indicates a first start time of the first PUSCH transmission opportunity and a first cell index of the first PUSCH transmission opportunity, and wherein the second resource allocation indicates a second start time of the second PUSCH transmission opportunity and a second cell index of the second PUSCH transmission opportunity, wherein the first start time is the second start time, and wherein the first cell index is the second cell index.
3. The method according to claim 1, wherein: The selected PUSCH transmission opportunity comprises a lowest beam identifier among a plurality of beam identifiers associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities comprising the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
4. The method according to claim 3, wherein: The lowest beam identifier includes a lowest uplink (UL) transmission configuration indicator (TCI) identifier (ID).
5. The method according to claim 3, wherein: The lowest beam identifier includes a lowest sounding reference signal (SRS) set identifier (ID).
6. The method according to claim 1, wherein: The selected PUSCH transmission opportunity includes a first TPMI among a plurality of transmitted precoding matrix indicators (TPMIs) associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities including the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
7. The method according to claim 1, wherein: The selected PUSCH transmission opportunity includes a lowest Sounding Reference Signal (SRS) Resource Indicator (SRI) ID among a plurality of SRI IDs associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities including the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
8. The method according to claim 1, wherein: The selected PUSCH transmission opportunity corresponds to a panel identifier (ID) associated with the PUCCH transmission opportunity.
9. The method according to claim 1, wherein: The selected PUSCH transmission opportunity includes a lowest demodulation reference signal (DMRS) code division multiplexing (CDM) group identifier (ID) among multiple DMRS CDM group identifiers (IDs) associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
10. The method according to claim 1, wherein: The selected PUSCH transmission opportunity includes a lowest demodulation reference signal (DMRS) port identifier (ID) among a plurality of DMRS port identifiers (IDs) associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities including the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
11. The method according to claim 1, further comprising: The first PUSCH transmission opportunity is multiplexed with the second PUSCH transmission opportunity using frequency division multiplexing (FDM).
12. The method according to claim 11, wherein: The selected PUSCH transmission opportunity includes a lowest frequency domain resource allocation index among a plurality of frequency domain resource allocation indexes associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities including the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
13. The method according to claim 12, wherein: The lowest frequency domain allocation index includes a lowest resource block (RB) index.
14. The method according to claim 11, wherein: The selected PUSCH transmission opportunity comprises a lowest beam identifier among a plurality of beam identifiers associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities comprising the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
15. The method according to claim 14, wherein: The lowest beam identifier includes a lowest uplink (UL) transmission configuration indicator (TCI) identifier (ID).
16. The method according to claim 14, wherein: The lowest beam identifier includes a lowest sounding reference signal (SRS) set identifier (ID).
17. The method according to claim 11, wherein: The selected PUSCH transmission opportunity includes a first TPMI among a plurality of transmitted precoding matrix indicators (TPMIs) associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities including the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
18. The method according to claim 11, wherein: The selected PUSCH transmission opportunity includes a lowest Sounding Reference Signal (SRS) Resource Indicator (SRI) ID among a plurality of SRI IDs associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities including the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
19. The method according to claim 11, wherein: The selected PUSCH transmission opportunity corresponds to a panel identifier (ID) associated with the PUCCH transmission opportunity.
20. The method of claim 1, further comprising: The first PUSCH transmission opportunity is multiplexed with the second PUSCH transmission opportunity using spatial division multiplexing (SDM).
21. The method according to claim 20, wherein: The selected PUSCH transmission opportunity comprises a lowest beam identifier among a plurality of beam identifiers associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities comprising the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
22. The method according to claim 21, wherein: The lowest beam identifier includes a lowest uplink (UL) transmission configuration indicator (TCI) identifier (ID).
23. The method according to claim 21, wherein: The lowest beam identifier includes a lowest sounding reference signal (SRS) set identifier (ID).
24. The method according to claim 20, wherein: The selected PUSCH transmission opportunity includes a first TPMI among a plurality of transmitted precoding matrix indicators (TPMIs) associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities including the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
25. The method according to claim 20, wherein: The selected PUSCH transmission opportunity includes a lowest Sounding Reference Signal (SRS) Resource Indicator (SRI) ID among a plurality of SRI IDs associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities including the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
26. The method of claim 20, wherein: The selected PUSCH transmission opportunity includes a lowest demodulation reference signal (DMRS) code division multiplexing (CDM) group ID among multiple demodulation reference signal (DMRS) code division multiplexing (CDM) group identifiers (IDs) associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
27. The method according to claim 20, wherein: The selected PUSCH transmission opportunity includes a lowest demodulation reference signal (DMRS) port identifier (ID) among a plurality of DMRS port identifiers (IDs) associated with a plurality of PUSCH transmission opportunities, the plurality of PUSCH transmission opportunities including the first PUSCH transmission opportunity and the second PUSCH transmission opportunity.
28. The method of claim 20, wherein: The selected PUSCH transmission opportunity corresponds to a panel identifier (ID) associated with the PUCCH transmission opportunity.
29. The method of claim 1, further comprising: determining another resource allocation indication for another PUCCH transmission opportunity that overlaps with the time domain resources of the resource allocation, wherein the PUCCH transmission opportunity corresponds to a first panel, and the another PUCCH transmission opportunity corresponds to a second panel, and the selected PUSCH transmission opportunity corresponds to the first panel; and The UCI associated with the another PUCCH transmission opportunity is multiplexed on another selected PUSCH opportunity, the another selected PUSCH opportunity corresponding to the second panel.
30. The method of claim 1, further comprising: determining another resource allocation indication for another PUCCH transmission opportunity corresponding to the first panel and the another PUCCH transmission opportunity corresponding to the second panel, time domain resources overlapping with the time domain resources of the resource allocation; and The UCI associated with the another PUCCH transmission opportunity is multiplexed on the selected PUSCH transmission opportunity, wherein the selected PUSCH transmission opportunity corresponds to the first panel, the second panel, or a third panel.
31. The method of claim 1, wherein: The indication of the first resource allocation is received in a first download control information (DCI) transmission, and wherein the indication of the second resource allocation is received in a second DCI transmission.
32. The method according to claim 31, wherein: The first DCI transmission is the second DCI transmission.
33. A user equipment (UE) for wireless communication, comprising: Memory; as well as one or more processors operably coupled to the memory, the memory and the one or more processors being configured to: determining that a resource allocation for a physical uplink control channel (PUCCH) transmission opportunity indicates time domain resources that overlap with time domain resources of a first resource allocation for a first physical uplink shared channel (PUSCH) transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity; and multiplexing uplink control information (UCI) associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity comprising at least one of: the first PUSCH transmission opportunity, the second PUSCH transmission opportunity, or a combination thereof; wherein the selected PUSCH transmission opportunity includes a lowest frequency domain resource allocation index among multiple frequency domain resource allocation indexes associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity; and The lowest frequency domain resource allocation index includes a lowest resource block (RB) index.
34. A non-transitory computer readable medium storing one or more instructions for wireless communication, the one or more instructions comprising: One or more instructions that, when executed by one or more processors of a user equipment (UE), cause the one or more processors to: determining that a resource allocation for a physical uplink control channel (PUCCH) transmission opportunity indicates time domain resources that overlap with time domain resources of a first resource allocation for a first physical uplink shared channel (PUSCH) transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity; and multiplexing uplink control information (UCI) associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity comprising at least one of: the first PUSCH transmission opportunity, the second PUSCH transmission opportunity, or a combination thereof; wherein the selected PUSCH transmission opportunity includes a lowest frequency domain resource allocation index among multiple frequency domain resource allocation indexes associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity; and The lowest frequency domain resource allocation index includes a lowest resource block (RB) index.
35. An apparatus for wireless communication, comprising: means for determining that a resource allocation for a physical uplink control channel (PUCCH) transmission opportunity indicates time domain resources that overlap with time domain resources of a first resource allocation for a first physical uplink shared channel (PUSCH) transmission opportunity and a second resource allocation for a second PUSCH transmission opportunity; as well as means for multiplexing uplink control information (UCI) associated with the PUCCH transmission opportunity on a selected PUSCH transmission opportunity, the selected PUSCH transmission opportunity comprising at least one of: the first PUSCH transmission opportunity, the second PUSCH transmission opportunity, or a combination thereof; wherein the selected PUSCH transmission opportunity includes a lowest frequency domain resource allocation index among multiple frequency domain resource allocation indexes associated with multiple PUSCH transmission opportunities, and the multiple PUSCH transmission opportunities include the first PUSCH transmission opportunity and the second PUSCH transmission opportunity; and The lowest frequency domain resource allocation index includes a lowest resource block (RB) index.
