A simulation experimental device based on step-by-step pressure reduction of gas reservoirs

By designing a simulation experimental device for step-by-step depressurization of gas reservoirs, including core selection, gas reservoir simulation and shaft simulation devices, the problem of inaccurate simulation in the existing technology is solved and more efficient gas reservoir mining is achieved.

CN115030709BActive Publication Date: 2024-10-11SHAANXI YANCHANG PETROLEUM GRP +1

Patent Information

Application Number
CN202210563763.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-23
Publication Date
2024-10-11
Estimated Expiration
2042-05-23

AI Technical Summary

Technical Problem

Existing simulation experimental devices are difficult to accurately simulate the status of gas reservoirs, and the experimental models built are usually only applicable to a single gas reservoir, resulting in large data errors and affecting production efficiency.

Method used

A simulation experimental device based on step-by-step depressurization of gas reservoirs is designed, including a core selection device, a gas reservoir simulation device and a shaft simulation device. It is divided into a solid gas reservoir chamber and a free gas reservoir chamber to simulate the real situation of underground gas reservoirs. situation, and set up a stirring device to accelerate the generation of water compounds, monitor the outlet air flow and cumulative air flow, and find the optimal mining plan.

Benefits of technology

This device can more accurately simulate the real situation of the gas reservoir, reduce the accident rate, and improve the mining efficiency of the gas reservoir.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115030709B_ABST
    Figure CN115030709B_ABST
Patent Text Reader

Abstract

The present invention discloses a simulation experiment device based on step-by-step pressure reduction exploitation of gas reservoirs, comprising: a device base; a first motor, which is coaxially fixed on the upper side surface of the device base, and a core selection device is coaxially fixedly assembled on the output shaft at its upper end; a fixed arm, which is horizontally bolted to the right side surface of the device base, and a simulation experiment table is fixedly assembled on the upper surface of the simulation experiment table; a gas reservoir simulation device, which is fixedly assembled on the upper surface of the simulation experiment table; a vertical shaft simulation device, which is fixedly assembled on a protruding platform on the right side of the upper surface of the simulation experiment table, and the horizontal center planes of the vertical shaft simulation device and the gas reservoir simulation device coincide.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of gas reservoir exploitation, and in particular to a simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs. Background Art

[0002] Like crude oil, natural gas is also buried in closed geological structures underground. Some are stored in the same layer as crude oil, and some exist separately. For natural gas stored in the same layer as crude oil, it will be mined together with crude oil. For those with only single-phase gas, we call it a gas reservoir. The pressure reduction method refers to a mining method that controls the reservoir pressure and thus controls the decomposition of hydrates by adjusting the extraction rate of natural gas. Usually, drilling is done with low-density drilling fluid, or when there is free gas or other fluids below the natural gas hydrate layer and the natural gas hydrate reservoir is located near the temperature and pressure equilibrium boundary, the reservoir pressure is reduced by pumping out the fluid below the hydrate layer to achieve mining.

[0003] In order to reduce the accident rate of mining and improve mining efficiency, it is usually necessary to conduct a simulation experiment on a gas reservoir. However, the existing simulation experiment equipment requires professional technicians to build the simulation according to the actual situation. The built experimental model is often only applicable to a single gas reservoir, and it is difficult to simulate the state of the gas reservoir in real time. This method is not only time-consuming and labor-intensive, but the data obtained often have large errors, which greatly affects the mining efficiency of the gas reservoir.

[0004] Therefore, it is necessary to provide a simulation experimental device based on step-by-step pressure reduction of gas reservoirs to solve the above problems. Summary of the invention

[0005] To achieve the above object, the present invention provides the following technical solution, a simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs, comprising:

[0006] Device base;

[0007] A first motor is coaxially fixed on the upper side of the device base, and a core selection device is coaxially fixed on the output shaft at the upper end thereof;

[0008] A fixed arm, which is fixed with horizontal bolts on the right side of the base of the device, and a simulation test bench is fixedly mounted on its upper surface;

[0009] A gas reservoir simulation device, fixedly mounted on the surface of the simulation test bench;

[0010] The vertical shaft simulation device is fixedly mounted on a protruding platform on the right side of the upper surface of the simulation test bench, and the horizontal center plane of the vertical shaft simulation device coincides with that of the gas reservoir simulation device.

[0011] Further, preferably, the core selection device comprises:

[0012] A rotating table, coaxially fixed on the output shaft of the first motor;

[0013] There are six groups of rotating arms in an array along the circumference of the rotating table, all of which are rotatably mounted on the rotating table, a pre-tightening plate is fixedly mounted on the outer side of the rotating arm, and a core fixing shell is fixedly mounted between the pre-tightening plate and the rotating arm;

[0014] A porous vertical shaft pipe is fixedly mounted in the middle of each group of core fixing shells, and cores of different materials are filled between each group of core fixing shells and the porous vertical shaft pipes.

[0015] Further, as a preference, an adjustment cylinder is coaxially fixed on the upper surface of the rotating table, and six groups of return spring groups are fixed in a circular array on the outer cylindrical surface of the adjustment cylinder, each group of return spring groups is symmetrically provided with two return springs, and the other ends of the two return springs of each group of return spring groups are fixed on a group of rotating arms.

[0016] Further, preferably, the gas reservoir simulation device comprises:

[0017] The gas reservoir simulation shell is fixedly mounted on the upper surface of the simulation test bench, and its interior is divided into two parts, namely, a solid gas reservoir chamber located on the upper side and a free gas reservoir chamber located on the lower side of the displacement;

[0018] The air inlet pipe is fixedly mounted on the outer wall of the right side of the gas reservoir simulation shell, and a pressure monitoring valve is coaxially fixed on the main trunk thereof, and two branches lead into the solid gas reservoir chamber and the free gas reservoir chamber respectively.

[0019] Further, preferably, the solid gas storage chamber comprises:

[0020] A second motor is fixedly mounted on the outer wall of the upper left end of the gas reservoir simulation shell;

[0021] A control device is placed inside the gas reservoir simulation shell, with its upper end rotatably embedded in the center of the upper surface of the gas reservoir simulation shell, and its left end coaxially fixed on the output shaft of the second motor;

[0022] A temperature regulator is fixedly mounted on the outer wall of the upper right end of the gas reservoir simulation shell;

[0023] The water inlet pipe is fixedly mounted on the outer wall of the upper right end of the gas reservoir simulation shell, and the water inlet pipe is located in front of the temperature regulator.

[0024] Further, preferably, the control device comprises:

[0025] A fixed shell is placed inside the solid gas storage chamber, and its upper and lower end surfaces are respectively fixed to the inner walls of the upper and lower ends of the solid gas storage chamber;

[0026] A first gear is placed on the left side of the fixed housing and is coaxially fixed on the output shaft of the second motor;

[0027] The second gear is mirror-imaged into two groups, which are respectively rotatably embedded in the upper end surface of the gas reservoir simulation shell and the middle of the middle dividing surface.

[0028] Further, as a preference, the first gear is meshed with two sets of second gears at the same time, an iris opening and closing door is fixedly mounted on one end face of the second gear, and a stirring blade is fixedly mounted on the upper surface of the lower iris opening and closing door.

[0029] Further, preferably, the free gas reservoir chamber comprises:

[0030] The vacuum pump is placed in the middle of the free gas reservoir chamber, and its lower end is fixedly mounted on the inner wall of the bottom surface of the gas reservoir simulation shell, and the exhaust port at its upper end is coaxially fixed with an air pipe that passes through the solid gas reservoir chamber.

[0031] Further, preferably, the shaft simulation device comprises:

[0032] A fixed column, fixedly mounted on a protruding platform on the right side of the upper surface of the simulation experimental table, and a protective shell is rotatably mounted on the upper end thereof;

[0033] A hydraulic rod, the lower end of which is rotatably mounted on the left side of the fixing column, and the upper end of which is rotatably mounted on the right end of the lower side of the protective shell;

[0034] The vertical shaft pipe is fixedly installed at the center position inside the protective shell, and an exhaust pipe and an air outlet pipe are fixedly installed inside the vertical shaft pipe.

[0035] Furthermore, preferably, the exhaust pipe and the outlet pipe are externally connected to a monitoring system to monitor and record the outlet air flow and the accumulated air flow in real time.

[0036] Compared with the prior art, the present invention provides a simulation experimental device based on step-by-step pressure reduction of gas reservoirs, which has the following beneficial effects:

[0037] In the present invention, a core selection device is provided, on which cores of various different materials are arranged, so that scientific researchers can select cores of corresponding materials for different positions of the gas reservoir. At the same time, the gas reservoir simulation device is divided into a solid gas reservoir chamber and a free gas reservoir chamber according to actual conditions, and gas is continuously injected into the two gas reservoir chambers to make the atmospheric pressure inside them reach the atmospheric pressure of the simulated gas reservoir. At the same time, a certain percentage of water is injected into the solid gas reservoir chamber, and then the temperature of the solid gas reservoir chamber is adjusted to make the gas and water in the solid gas reservoir chamber gradually form a water compound. A stirring device is provided to fully combine water and gas to accelerate the generation of water compounds and simulate the real situation of the underground gas reservoir as much as possible. At the same time, a vertical shaft simulation device is provided to simulate the real mining scene to a certain extent and reduce the accident rate. Finally, the outlet gas flow rate and the cumulative gas flow rate in the exhaust pipe and the outlet pipe are monitored and recorded to find the optimal solution and improve the mining efficiency of the gas reservoir. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a schematic diagram of the structure of a simulation experimental device based on step-by-step pressure reduction of gas reservoirs;

[0039] Figure 2 It is a schematic diagram of the structure of a core selection device of a simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs;

[0040] Figure 3 It is a schematic diagram of the structure of a gas reservoir simulation device, which is a simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs;

[0041] Figure 4 It is a schematic diagram of the control device structure of a simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs;

[0042] Figure 5 It is a structural schematic diagram of a vertical shaft simulation device of a simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs;

[0043] Figure 6 It is a schematic diagram of the gas state of a simulation experimental device based on step-by-step pressure reduction of gas reservoirs;

[0044] In the figure: 1, device base; 2, first motor; 3, fixed arm; 4, simulation test bench; 5, core selection device; 6, gas reservoir simulation device; 7, shaft simulation device; 51, rotating table; 52, rotating arm; 53, preload plate; 54, core fixing shell; 55, pore shaft pipe; 56, adjusting cylinder; 57, reset spring; 61, gas reservoir simulation shell; 62, solid gas reservoir chamber; 63, free gas reservoir chamber; 64, air inlet pipe; 65, Air pressure monitoring valve; 621, second motor; 622, control device; 623, temperature regulator; 624, water inlet pipe; 631, vacuum pump; 632, air pipe; 6221, fixed shell; 6222, first gear; 6223, second gear; 6224, iris opening and closing door; 6225, stirring blade; 71, fixed column; 72, hydraulic rod; 73, protective shell; 74, shaft pipe; 75, exhaust pipe; 76, outlet pipe. DETAILED DESCRIPTION

[0045] See also Figures 1 to 6 The present invention provides a simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs, comprising:

[0046] Device base 1;

[0047] The first motor 2 is coaxially fixed on the upper side of the device base 1, and the core selection device 5 is coaxially fixed on the output shaft at the upper end thereof;

[0048] A fixed arm 3, which is fixed with horizontal bolts on the right side of the device base 1, and a simulation test bench 4 is fixedly mounted on its upper surface;

[0049] A gas reservoir simulation device 6, fixedly mounted on the upper surface of the simulation test bench 4;

[0050] The vertical shaft simulation device 7 is fixedly mounted on a protruding platform on the right side of the upper surface of the simulation test bench 4 , and the horizontal center plane of the vertical shaft simulation device 7 coincides with the horizontal center plane of the gas reservoir simulation device 6 .

[0051] Further, the core selection device 5 comprises:

[0052] A rotating platform 51 is coaxially fixed on the output shaft of the first motor 2;

[0053] There are six groups of rotating arms 52 arranged in an array along the circumference of the rotating platform 51, all of which are rotatably mounted on the rotating platform 51. A pre-tightening plate 53 is fixedly mounted on the outer side of the rotating arm 52, and a core fixing shell 54 is fixedly mounted between the pre-tightening plate 53 and the rotating arm 52;

[0054] A pore shaft pipe 55 is fixedly installed in the middle of each group of core fixing shells 54, and cores of different materials are filled between each group of core fixing shells 54 and the pore shaft pipe 55;

[0055] As a preferred embodiment, cores of different materials have different water saturation levels. When the gas reservoir is depressurized and decomposed, water compounds will decompose into water and gas. Because the decomposition of water compounds is an endothermic reaction, the temperature in the device will decrease, and the separated water may re-condense, thereby blocking the gas outlet and reducing the extraction efficiency of the gas reservoir. The core will absorb a certain amount of water, thereby improving the extraction efficiency to a certain extent. However, cores of different materials have different water saturation levels. Selecting corresponding cores according to the actual gas reservoir can eliminate the influence of the environment to a great extent and improve the accuracy of the experiment. The provision of the pore shaft pipe 55 allows a portion of the gas that moves into the gap between the cores to move horizontally, reach the shaft through the pores, and then be discharged from the device, thereby preventing a portion of the gas from being blocked inside the core and affecting the actual gas output.

[0056] Furthermore, an adjustment cylinder 56 is coaxially fixed on the upper surface of the rotating table 51, and six groups of return spring groups are fixed in a circumferential array on the outer cylindrical surface of the adjustment cylinder 56, each group of return spring groups is symmetrically provided with two return springs 57, and the other ends of the two return springs 57 of each group of return spring groups are fixed on a group of rotating arms 52;

[0057] As a preferred embodiment, in order to prevent the rotating table 51 from causing unnecessary damage to the air pipe 632 during the rotation process, the rotating arm 52 is raised during the rotation process to form a certain inclination angle, and the size of the inclination angle is adjusted by adjusting the connection position of the adjustment cylinder 56 and the reset spring group. At the same time, the purpose of the reset spring 57 is to help the rotating arm return to the initial position after completing the experiment.

[0058] Further, the gas reservoir simulation device 6 comprises:

[0059] The gas reservoir simulation shell 61 is fixedly mounted on the upper surface of the simulation test bench 4, and its interior is divided into two parts, namely, a solid gas reservoir chamber 62 located on the upper side and a free gas reservoir chamber 63 located on the lower side;

[0060] The air inlet pipe 64 is fixedly mounted on the outer wall of the right side of the gas reservoir simulation shell 61, and a pressure monitoring valve 65 is coaxially fixed on the main trunk thereof, and two branches are respectively connected to the solid gas reservoir chamber 62 and the free gas reservoir chamber 63;

[0061] As a preferred embodiment, the gas reservoir simulation shell 61 is made of thermal insulation material and has good airtightness to prevent the internal atmospheric pressure from leaking out or being affected by external temperature, thereby preventing deviations in the experimental results.

[0062] Further, the solid gas storage chamber 62 comprises:

[0063] The second motor 621 is fixedly mounted on the outer wall of the upper left end of the gas reservoir simulation shell 61;

[0064] The control device 622 is placed inside the gas reservoir simulation shell 61, with its upper end rotatably embedded in the center of the upper surface of the gas reservoir simulation shell 61, and its left end coaxially fixed on the output shaft of the second motor 621;

[0065] A temperature regulator 623 is fixedly mounted on the outer wall of the upper right end of the gas reservoir simulation shell 61;

[0066] A water inlet pipe 624 is fixedly mounted on the outer wall of the upper right end of the gas reservoir simulation shell 61, and the water inlet pipe 624 is located in front of the temperature regulator 623;

[0067] As a preferred embodiment, according to the actual situation of the gas reservoir and the volume of the solid gas reservoir chamber 62, a certain amount of water is injected into the water inlet pipe 624, and then the air inlet pipe 64 is opened to continuously inject gas into the solid gas reservoir chamber 62. When the value of the air pressure monitoring valve reaches the pressure value of the actual gas reservoir, it is stopped, and the temperature regulator 623 is opened to maintain the temperature in the solid gas reservoir chamber 62 at the temperature value of the actual gas reservoir, waiting for the water and gas in the solid gas reservoir chamber 62 to form a solid water compound.

[0068] Further, the control device 622 includes:

[0069] The fixed shell 6221 is placed inside the solid gas storage chamber 62, and its upper and lower end surfaces are respectively fixed to the inner walls of the upper and lower ends of the solid gas storage chamber 62;

[0070] The first gear 6222 is placed on the left side of the fixed housing 6221 and is coaxially fixed on the output shaft of the second motor 621;

[0071] The second gear 6223 is mirror-imaged and arranged in two groups, which are respectively rotatably embedded in the upper end surface of the gas reservoir simulation shell 61 and the middle of the middle dividing surface;

[0072] As a preferred embodiment, the fixed shell 6221 covers the gear part of the control device 622 to prevent the gas and water in the solid gas storage chamber 62 from getting stuck in the gears during the crystallization process, causing gear damage and affecting the subsequent operation of the device.

[0073] Furthermore, the first gear is meshed with two sets of second gears 6223 at the same time, an iris opening and closing door 6224 is fixedly mounted on one end surface of the second gear 6223, and a stirring blade 6225 is fixedly mounted on the upper surface of the iris opening and closing door 6224 at the lower side;

[0074] As a preferred embodiment, the gear portion of the second gear 6223 is annular, and in the initial state, the two sets of iris opening and closing doors 6224 are in a closed state, and the upper iris opening and closing door 6224 rotates clockwise to close and counterclockwise to open, while the lower iris opening and closing door 6224 is opposite. When the second motor 621 rotates clockwise, the upper iris opening and closing door 6224 rotates clockwise, and the lower iris opening and closing door 6224 rotates counterclockwise. Because both sets of iris opening and closing doors 6224 are in a closed state, Therefore, under the drive of the second motor 621, the two groups of second gears 6223 rotate as a whole, and at the same time drive the stirring blade 6225 to rotate, thereby accelerating the mixing of water and gas and improving the generation efficiency of water compounds. When the water compounds in the solid gas storage chamber 62 are crystallized to a certain extent, the second motor 621 is turned off. When the water compounds in the solid gas storage chamber 62 are basically crystallized, the second motor 621 is started to reverse, and the two groups of iris opening and closing doors 6224 are opened. When the two groups of iris opening and closing doors 6224 are completely opened, they stop.

[0075] Further, the free gas reservoir 63 comprises:

[0076] The vacuum pump 631 is placed in the middle of the free gas reservoir chamber 63, and its lower end is fixedly mounted on the inner wall of the bottom surface of the gas reservoir simulation shell 61, and its upper end exhaust port is coaxially fixed with an air pipe 632 that penetrates the solid gas reservoir chamber;

[0077] As a preferred embodiment, since the depths of the strata are basically the same, the air pressure values ​​in the free gas reservoir chamber 63 and the solid gas reservoir chamber 62 remain consistent. When the two sets of iris opening and closing doors in the solid gas reservoir chamber 62 are opened, the vacuum pump 631 is started to extract the gas in the free gas reservoir chamber 63, thereby reducing the overall air pressure value in the gas reservoir simulation chamber 6, and further decomposing the water compounds in the solid gas reservoir chamber 62 to achieve the purpose of gas reservoir exploitation.

[0078] Further, the shaft simulation device 7 comprises:

[0079] A fixed column 71, fixedly mounted on a protruding platform on the right side of the upper surface of the simulation test bench 4, and a protective shell 73 is rotatably mounted on the upper end thereof;

[0080] A hydraulic rod 72, the lower end of which is rotatably mounted on the left side of the fixing column 71, and the upper end of which is rotatably mounted on the right end of the lower side of the protective shell 73;

[0081] A vertical shaft pipe 74 is fixedly mounted at the center of the protective shell 73, and an exhaust pipe 75 and an outlet pipe 76 are fixedly mounted therein;

[0082] As a preferred embodiment, in the initial state, the hydraulic rod 72 is in an extended state. When the designated core fixing shell 54 moves to just above the gas reservoir simulation device 6, the hydraulic rod 72 is started to contract, and the protective shell 73 gradually becomes horizontal. During this process, the protective shell 73 will contact the core fixing shell 54 and continue to rotate under the drive of the hydraulic rod 72 until the protective shell 73 and the core fixing shell 54 both reach a horizontal state, and then stop contracting. At this time, the shaft pipe 74 and the exhaust pipe 75 are respectively mounted on the pore shaft pipe 55 and the air pipe 632. To ensure air tightness, sealing gaskets are provided at the connections between the shaft pipe 74 and the pore shaft pipe 55 and the exhaust pipe 75 and the air pipe 632.

[0083] Furthermore, the exhaust pipe 75 and the outlet pipe 76 are externally connected to a monitoring system to monitor and record the outlet air flow and the accumulated air flow in real time.

[0084] During specific implementation, the following steps are included: adjusting the inclination angle of the core fixing shell 54 according to the length of the air pipe 632, starting the first motor 2, when the designated core fixing shell 54 moves to the top of the gas reservoir simulation device 6, stopping and starting the hydraulic rod 72 to shrink, until the protective shell 73 and the core fixing shell 54 are both in a horizontal state, stopping the shrinkage, opening the water inlet pipe 624 and the air inlet pipe 64, when the value of the air pressure monitoring valve reaches the pressure value of the actual gas reservoir, and the water in the solid gas reservoir chamber 62 reaches a certain level, closing the water inlet pipe 624 and the air inlet pipe 64, opening the temperature regulator 623, so that the temperature in the solid gas reservoir chamber 62 is maintained at the temperature value of the actual gas reservoir, turning on the second motor 621, making it rotate forward to drive the stirring blade 6225 to rotate, when the water compound in the solid gas reservoir chamber 62 crystallizes to a certain extent, the stirring blade 6225 will be stuck, and this When the water compound in the solid gas reservoir chamber 62 is basically crystallized, the second motor 621 is started to reverse, and the two sets of iris opening and closing doors 6224 are opened. When the two sets of iris opening and closing doors 6224 are completely opened, they are stopped. When the two sets of iris opening and closing doors in the solid gas reservoir chamber 62 are opened, the vacuum pump 631 is started to extract the gas in the free gas reservoir chamber 63, thereby reducing the overall air pressure value in the gas reservoir simulation chamber 6, and then decomposing the water compound in the solid gas reservoir chamber 62, until the water compound in the solid gas reservoir chamber 62 is completely decomposed, a set of simulation experiments is completed, the extraction speed of the vacuum pump 631 is adjusted, and multiple sets of simulation experiments are carried out continuously. The outlet gas flow rate and the cumulative gas flow rate values ​​recorded by the monitoring system in each set of simulation experiments are compared, and then the optimal extraction speed of the vacuum pump 631 is obtained, the optimal exploitation plan is found, and the exploitation simulation experiment of the gas reservoir is completed.

[0085] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A simulation experimental device based on step-by-step pressure reduction of gas reservoirs, characterized in that: include: Device base (1); A first motor (2) is coaxially fixed on the upper side of the device base (1), and a core selection device (5) is coaxially fixed on the output shaft at the upper end thereof; A fixed arm (3) is fixed to the right side of the device base (1) with horizontal bolts, and a simulation test bench (4) is fixedly mounted on the upper surface of the fixed arm (3); A gas reservoir simulation device (6) fixedly mounted on the upper surface of the simulation test bench (4); A vertical shaft simulation device (7) is fixedly mounted on a protruding platform on the right side of the upper surface of the simulation test bench (4), and the horizontal center plane of the vertical shaft simulation device (7) coincides with that of the gas reservoir simulation device (6); The core selection device (5) comprises: A rotating table (51) coaxially fixed on the output shaft of the first motor (2); There are six groups of rotating arms (52) arranged in an array along the circumference of the rotating platform (51), all of which are rotatably mounted on the rotating platform (51); a pre-tightening plate (53) is fixedly mounted on the outer side of the rotating arm (52); and a core fixing shell (54) is fixedly mounted between the pre-tightening plate (53) and the rotating arm (52); A porous vertical shaft pipe (55) is fixedly mounted in the middle of each group of core fixing shells (54), and cores of different materials are filled between each group of core fixing shells (54) and the porous vertical shaft pipe (55); The gas reservoir simulation device (6) comprises: A gas reservoir simulation shell (61) is fixedly mounted on the upper surface of the simulation test bench (4), and its interior is divided into two parts, namely a solid gas reservoir chamber (62) located on the upper side and a free gas reservoir chamber (63) located on the lower side; An air inlet pipe (64) is fixedly mounted on the outer wall of the right side of the gas reservoir simulation shell (61), and a gas pressure monitoring valve (65) is coaxially fixed on the main trunk thereof, and two branches lead into the solid gas reservoir chamber (62) and the free gas reservoir chamber (63) respectively.

2. The simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs according to claim 1 is characterized in that: An adjustment cylinder (56) is coaxially fixed on the upper surface of the rotating table (51), and six groups of return spring groups are fixed in a circumferential array on the outer cylindrical surface of the adjustment cylinder (56), each group of return spring groups is symmetrically provided with two return springs (57), and the other ends of the two return springs (57) in each group of return spring groups are fixed on a group of rotating arms (52).

3. The simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs according to claim 1 is characterized in that: The solid gas storage chamber (62) comprises: A second motor (621) is fixedly mounted on the outer wall of the upper left end of the gas reservoir simulation shell (61); A control device (622) is placed inside the gas reservoir simulation shell (61), with its upper end rotatably embedded in the center of the upper surface of the gas reservoir simulation shell (61), and its left end coaxially fixed on the output shaft of the second motor (621); A temperature regulator (623) is fixedly mounted on the outer wall of the upper right end of the gas reservoir simulation shell (61); The water inlet pipe (624) is fixedly mounted on the outer wall of the upper right end of the gas reservoir simulation shell (61), and the water inlet pipe (624) is located in front of the temperature regulator (623).

4. The simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs according to claim 3 is characterized in that: The control device (622) comprises: A fixed shell (6221) is placed inside the solid gas storage chamber (62), and its upper and lower end surfaces are respectively fixed to the inner walls of the upper and lower ends of the solid gas storage chamber (62); A first gear (6222) is placed on the left side inside the fixed housing (6221) and is coaxially fixed on the output shaft of the second motor (621); The second gear (6223) is arranged in two sets in a mirror image and is respectively rotatably embedded in the upper end surface of the gas reservoir simulation shell (61) and the middle part of the middle dividing surface; The first gear is meshed with two sets of second gears (6223) at the same time; an iris opening and closing door (6224) is fixedly mounted on one end surface of the second gear (6223); and a stirring blade (6225) is fixedly mounted on the upper surface of the iris opening and closing door (6224) at the lower side.

5. The simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs according to claim 1 is characterized in that: The free gas reservoir (63) comprises: The vacuum pump (631) is placed in the middle of the free gas reservoir chamber (63), and its lower end is fixedly mounted on the inner wall of the bottom surface of the gas reservoir simulation shell (61), and its upper end exhaust port is coaxially fixed with an air pipe (632) that passes through the solid gas reservoir chamber.

6. The simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs according to claim 1 is characterized in that: The shaft simulation device (7) comprises: A fixed column (71) is fixedly mounted on a protruding platform on the right side of the upper surface of the simulation test bench (4), and a protective shell (73) is rotatably mounted on the upper end thereof; A hydraulic rod (72), the lower end of which is rotatably mounted on the left side surface of the fixing column (71), and the upper end of which is rotatably mounted on the right end of the lower side surface of the protective shell (73); The vertical shaft pipe (74) is fixedly mounted at the center position inside the protective shell (73), and an exhaust pipe (75) and an exhaust pipe (76) are fixedly mounted inside the vertical shaft pipe (74).

7. The simulation experimental device based on step-by-step pressure reduction exploitation of gas reservoirs according to claim 6 is characterized in that: The exhaust pipe (75) and the outlet pipe (76) are externally connected to a monitoring system to monitor and record the outlet gas flow rate and the accumulated gas flow rate in real time.

Citation Information

Patent Citations

  • Natural gas hydrate depressurization exploration simulation experiment device and work method

    CN106593370A

  • Physical simulation experiment method for gas reservoir step-by-step depressurization production mode

    CN108593877A

  • Natural gas hydrate reservoir remodeling and depressurization mining simulation device and method for underlying gas

    CN111707800A

  • Gas reservoir water control simulation experiment device and method

    CN112593918A

  • Multi-gas commingled production simulation device and method for marine natural gas hydrate system

    CN112855129A

Cited By

  • Simulation experiment device and method for co2 displacement and storage in natural gas reservoir

    CN119412000B