A laying-out method capable of effectively controlling the formation of tunnels during rock drilling
By using marking and control line drawing methods in rock drilling and excavation, the problem of tunnel forming control is solved, high-precision and simple excavation direction control is achieved, which is suitable for long-distance excavation and significantly reduces deviations and operation time.
Patent Information
- Application Number
- CN202210299414.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-25
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-03-25
AI Technical Summary
The existing technology is difficult to effectively control the tunnel formation during rock drilling and excavation, resulting in problems such as hole opening formation, unformed hole bottom, high residual hole rate, and unshaped tunnel. In addition, the installation and use of laser pointers have reduced accuracy and cumbersome operations. etc. questions.
Use the methods of preparation marking, central control line drawing, side wall line drawing, waist line drawing, supply line and vault drawing, and auxiliary line marking, using tools such as measuring instruments and reflective reference objects, and through the collaborative work of operators to ensure that For accurate calibration and drawing of the tunnel centerline and waistline, use hard poles to support the central control line to reduce wind and dust interference and improve accuracy.
It achieves easy-to-operate, high-precision tunnel forming control, reduces deviations, and improves the accuracy of the tunneling direction. It is suitable for long-distance tunneling. The time to complete the auxiliary line marking is shortened to 10 minutes, and the deviation is controlled within 0.1 meters.
Smart Images

Figure CN115045665B_ABST
Abstract
Description
Technical Field
[0001] This method is applicable to all rock drilling tunnels with technical parameters, especially a square line method to ensure tunnel excavation forming. Background Art
[0002] There are two main methods for controlling the excavation direction and slope in general shaft and tunnel excavation:
[0003] The first is to use the top plate hanging line to determine the center line, and the waistline base point to determine the waistline, and then extend it to the working surface to determine the center line and waistline of the positive palm face.
[0004] The second method is to use a laser pointer to determine the center line and waist line, and emit a laser beam to the work surface to determine the center line and waist line.
[0005] The first method in the above methods only marks the position of the center line and waistline on the tunnel face, and can only mark the position of the drill rod entering the hole on the plane, and cannot well solve the control of the left and right, up and down deviation of the drill rod after entering the hole. It is easy to cause the hole opening to be formed, the hole bottom to be unformed, and the hole to be umbrella-shaped, resulting in a large residual eye rate and an unformed tunnel.
[0006] In the second method, the installation of the laser pointer must meet the required safety distance. After the laser pointer is installed, it is easily affected by vibration and smoke, which reduces its accuracy. In addition, the installation and adjustment of the laser pointer are more troublesome, time-consuming and labor-intensive. Summary of the invention
[0007] The present invention provides a laying-out method capable of effectively controlling the formation of a tunnel during rock drilling and excavation. Aiming at the characteristics of the existing method such as being difficult to control, complicated to operate, and requiring high application conditions, the present invention has the characteristics of simple operation and high precision, and effectively solves the problem of tunnel excavation and forming.
[0008] The technical solution to solve the technical problem of the present invention is a method for effectively controlling the laying out of lines to ensure the formation of tunnels during rock drilling and excavation, including preparation marking, center control line drawing, side wall line drawing, waist line drawing, supply line and vault drawing, and auxiliary line marking;
[0009] The preparation mark is to use a surveying instrument to perform a centerline layout operation on the construction tunnel according to the design parameters, make at least two hanging line holes on the top of the tunnel, and use a total station to calibrate the waistline base point of the construction tunnel;
[0010] The center control line is drawn by setting hanging lines on two adjacent hanging line eyes and sealing heavy objects at the lower ends of the hanging lines. Two operators stand on the outer sides of the two adjacent hanging lines respectively. One operator places a reflective reference object and enables the light irradiator to illuminate the reflective reference object to form a reflection. The other operator observes with one eye. The two adjacent hanging lines overlap. The other operator observes with one eye and guides the operator to move the reflective reference object to the left and / or right. The two adjacent hanging lines still overlap when observed with one eye. The projection points of the center points of the heavy objects at the lower ends of the two adjacent hanging lines on the ground of the mine are connected with a straight line to form a center control line, i.e., a guide line. At the same time, at least two hard poles are used to vertically support the center control line and the roof.
[0011] The side wall line drawing is to draw the side wall guide lines on both sides of the mine hole perpendicular to the guide lines and equal in width, and check the width of the formed tunnel at the rear;
[0012] The waistline drawing is to use the waistline base point piles to draw the waistlines on both sides of the mine tunnel, and the front end of the side wall line is extended on the working surface through the horizontal water pipe to intersect with the waistline on the same side to form an intersection point;
[0013] The starting line and the arch are drawn, and the starting point and the top eye are determined and marked at the intersection using a guide rod;
[0014] The auxiliary line marks connect the two intersection points as the upper and lower control lines, connect the intersection point and the starting point on the left as the left control line, connect the intersection point and the starting point on the right as the right control line, and the guide line extends vertically to the upper and lower control lines as the center line.
[0015] Furthermore, the guide rod includes a bottom rod with the same height as the side of the mine tunnel and a retractable top rod head arranged at the upper end of the bottom rod. The top end of the bottom rod is used to draw the arch point position, and the top rod head is pulled out to the highest point to draw the top eye position.
[0016] Furthermore, during the drawing process of the center control line, another operator observing with one eye guides the operator to move the reflective reference object to the left and / or right, and observes with one eye that the two adjacent suspension lines do not overlap. The operator then swings the suspension line close to the work surface to the left or right so that the two adjacent suspension lines overlap when the other operator observes with one eye.
[0017] The advantages of the present invention are:
[0018] 1) Easy to operate. This method can be used as long as the tunnel has centerline and waistline control points, and can be applied to long-distance tunneling. Only two people are needed to complete the operation. It only takes 10 minutes to set all the auxiliary lines in each tunnel.
[0019] 2) High precision. For shaft and tunnel excavation, this method can well ensure the direction of excavation. Generally, when excavation is guided by this method, the deviation of the center line and waist line does not exceed 0.1 meter.
[0020] 3) Effective control. This method can effectively control the excavation direction of the surrounding holes and ensure the formation of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the process of drawing the center control line of the present invention.
[0022] Figure 2 Draw a schematic diagram for the sidewall line.
[0023] Figure 3 Draw for a side junction.
[0024] Figure 4 This is a schematic diagram for auxiliary line marking.
[0025] Figure 5 for Figure 1 Schematic diagram of the middle supporting rigid rod.
[0026] Figure 6 for Figure 1 Schematic diagram of the top formed in the tunnel after the center control line is drawn.
[0027] Figure 7 To derive the schematic diagram of the upper space reference line.
[0028] Figure 8 Schematic diagram of the guide rod structure.
[0029] As shown in the figure, there are hanging line 1, reflective reference object 2, lighting device 3, hard pole 5, guide rod 6, bottom rod 61, top rod head 62, center control line A, upper space reference line A1, side wall guide line B, intersection point D, upper and lower control lines U, starting point Q, top eye position M, left control line Y1, upper and lower control lines are center line X, and right control line Y2. DETAILED DESCRIPTION
[0030] A layout method capable of effectively controlling the formation of a tunnel during rock drilling includes preparation marking, drawing a center control line, drawing a side wall line, drawing a waist line, drawing a starting line and a vault, and marking auxiliary lines;
[0031] The preparation mark is to use a total station to lay out the center line of the construction tunnel according to the parameters designed by the design institute, mark the center line, make at least two hanging line eyes at the top of the tunnel, and use the total station to calibrate the waistline base point of the construction tunnel;
[0032] The center control line is drawn as Figure 1As shown in , a hanging line 1 is set on two adjacent hanging line eyes (the distance between the two is greater than 8 meters), and a heavy object (usually a cone) is sealed at the lower end of the hanging line 1. Two operators stand on the outside of the two adjacent hanging lines respectively. One of the operators places a reflective reference object 2 (the reflective reference object is close to the working surface) and enables the light irradiator 3 to illuminate the reflective reference object 2 to form a reflection. The other operator observes with one eye. The two adjacent hanging lines 1 overlap. The other operator observes with one eye and guides the operator to move the reflective reference object 2 to the left and / or right. The two adjacent hanging lines 1 still overlap when observed with one eye. Figure 6 In the process, the projection points of the weight center points at the lower ends of the two adjacent suspension lines 1 on the ground of the mine are connected by a straight line to form the action center control line A, i.e. the guide line, and extended to the working surface, such as Figure 5 As shown in , at least two hard poles 5 are used to vertically support the center control line A and the roof at the same time. The two hard poles 5 can replace two adjacent suspension wires 1 as a three-dimensional mark of the center control line A. The center control line A is the key line that determines the direction of the mine tunnel and needs to be confirmed repeatedly. However, in the current technology, the center control line A is mostly placed on the ground without leaving the ground. At the same time, the suspension wire 1 is a soft line and is easily affected by wind. Replacing it with a hard pole 5 can effectively reduce the influence of wind in the mine tunnel on the accuracy of the center control line A. The reflection formed by the reflective reference object 2 on the light irradiator 3 and the moving position is used to verify whether the two hard poles 5 overlap, which effectively improves the accuracy of the center control line A and minimizes the interference of dust in the mine tunnel on the line of sight;
[0033] Preferably, during the drawing process of the center control line, another operator observing with one eye guides the operator to move the reflective reference object 2 to the left and / or right, and when observing with one eye that the two adjacent suspension lines 1 do not overlap, the operator holds the suspension line 1 1.5 meters below the lower end close to the working surface with his hand as a moving point to swing the suspension line 1 1.5 meters below the lower end to the left or right, and whether to the left or right is determined according to the on-site deviation, so that the two adjacent suspension lines overlap when another operator (sitting or squatting) observes with one eye. After the lower ends of the suspension lines 1 overlap, a hard pole 5 is placed at the center point of the projection point of the center point of the weight at the lower end of the suspension line 1.
[0034] The side wall line is drawn as follows: Figure 2 Draw the side wall guide lines B on both sides of the mine tunnel perpendicular to the guide line (i.e. the center control line A) and check the width of the formed tunnel at the rear. Figure 7 As shown, two hard rods 5 are used to draw the upper space reference line A1 of the center control line A at the same height, and the reference side wall guide line is drawn by using the space reference line as the center line and the same width as the side wall guide line B of the mine tunnel. When observing whether the reference side wall guide line and the side wall guide line B coincide with each other or there is a large deviation, if they coincide or the deviation is within 2 cm, it is qualified and there is no need to repeat the side wall line drawing;
[0035] The waistline drawing is to use the waistline base point piles to draw the waistline C on both sides of the mine tunnel, and the front end of the side wall line B is extended on the working surface through a horizontal water pipe F (the horizontal water pipe F is generally a hard plastic pipe of about 1 meter in level, and the shorter the pipe, the higher the accuracy. The waistline C and the side wall line B are horizontal and will not intersect, but the horizontal pipe F is laid along the working surface, so that the side wall line B can intersect with the waistline C on the same side. The principle is that the hard plastic pipe is laid along the working surface to become an arc similar to the working surface, so as to improve the accuracy of the intersection point D and reduce the influence of the shape change of the working surface on the intersection point D. This is another inventive point of the present invention, which reduces the deviation of the intersection point D due to the shape change of the working surface, which affects the accuracy of the left and right sides.) Intersect the waistline C on the same side of the working surface to form the intersection point D;
[0036] The starting line is drawn with the arch top, and the starting point position and the top eye are determined and marked with a guide rod 6 at the intersection D. Preferably, as Figure 8 As shown, the guide rod 6 includes a bottom rod 61 with the same height as the side of the mine hole and a retractable top rod head 62 arranged at the upper end of the bottom rod 61. The bottom rod 61 takes the bottom of the mine hole as the base surface, passes through the intersection D, and the point where its upper end is projected on the working surface is drawn as the arch point Q position. The bottom rod 61 takes the bottom of the mine hole as the base surface and passes through the middle point of the two intersection points D. The top rod head 62 is pulled out to the highest point and projected on the working surface is drawn as the top eye position M.
[0037] The auxiliary line marks, such as Figure 4 As shown, the upper and lower control lines U are connected between the two intersection points D, the left intersection point D and the starting point Q are connected to form the left control line Y1, the right intersection point D and the starting point Q are connected to form the right control line Y2, and the guide line extending vertically to the upper and lower control lines is the center line X.
[0038] During construction, the upper and lower control lines U control the drill rods on the working surface to drill up and down, the left control line Y1 and the right control line Y2 control the left or right drilling boundary of the drill rod, and the center line X controls the direction of mine excavation.
[0039] The above method was used in the 4-meter-wide and 819-meter-long K1012-K1830 section of Yuhuaping Phosphate Mine in Yiling District. During the excavation process, the average deviation on the left was 4 cm, the average deviation on the right was 3.7 cm, and the average deviation of the guide line was 2.4 cm. The measurement time for every 10 meters was compressed to 10 minutes. Compared with the prior art, not only the average measurement time was reduced, but also the accuracy was higher. In K105-K1830, the method of "determining the center line with the top plate hanging line and determining the waistline with the waistline base point" was adopted in the background technology. The average deviation on the left was 13.2 cm, the average deviation on the right was 12.8 cm, and the average deviation of the guide line was 11.5 cm. The measurement time for every ten meters was about half an hour. There were two deviations to the right exceeding 50 cm, and the deviation of the guide line exceeded 20 cm, which had seriously affected the construction work. In order to avoid excessive measurement errors, it is generally necessary to use two measurement methods for repeated measurement correction.
Claims
1. A laying-out method capable of effectively controlling the formation of a tunnel during rock drilling, characterized by: The method includes preparation marking, drawing of center control line, drawing of side wall line, drawing of waist line, drawing of starting line and vault, and marking of auxiliary line; The preparation mark is to use a surveying instrument to perform a centerline layout operation on the construction tunnel according to the design parameters, make at least two hanging line holes on the top of the tunnel, and use a total station to calibrate the waistline base point of the construction tunnel; The center control line is drawn by setting hanging lines on two adjacent hanging line eyes and sealing heavy objects at the lower ends of the hanging lines. Two operators stand on the outer sides of the two adjacent hanging lines respectively. One operator places a reflective reference object and enables the light irradiator to illuminate the reflective reference object to form a reflection. The other operator observes with one eye. The two adjacent hanging lines overlap. The other operator observes with one eye and guides the operator to move the reflective reference object to the left and / or right. The two adjacent hanging lines still overlap when observed with one eye. The projection points of the center points of the heavy objects at the lower ends of the two adjacent hanging lines on the ground of the mine are connected with a straight line to form a center control line, i.e., a guide line. At the same time, at least two hard poles are used to vertically support the center control line and the roof. The side wall line drawing is to draw the side wall guide lines on both sides of the mine hole perpendicular to the guide lines and equal in width, and check the width of the formed tunnel at the rear; The waistline drawing is to use the waistline base point piles to draw the waistlines on both sides of the mine tunnel, and the front end of the side wall line is extended on the working surface through the horizontal water pipe to intersect with the waistline on the same side to form an intersection point; The starting line and the arch are drawn, and the starting point and the top eye are determined and marked at the intersection using a guide rod; The auxiliary line marks connect the two intersection points as the upper and lower control lines, connect the intersection point and the starting point on the left as the left control line, connect the intersection point and the starting point on the right as the right control line, and the guide line extends vertically to the upper and lower control lines as the center line.
2. A laying-out method capable of effectively controlling the formation of a tunnel during rock drilling according to claim 1, characterized in that: The guide rod comprises a bottom rod of the same height as the side of the mine hole and a retractable top rod head arranged at the upper end of the bottom rod. The top end of the bottom rod is used to draw the arch point position, and the top rod head is pulled out to the highest point to draw the top eye position.
3. A laying-out method capable of effectively controlling the formation of a tunnel during rock drilling according to claim 1, characterized in that: During the process of drawing the center control line, another operator observing with one eye guides the operator to move the reflective reference object to the left and / or right, and when the operator observes with one eye that the two adjacent suspension lines do not overlap, the operator swings the suspension line close to the work surface to the left or right so that the two adjacent suspension lines overlap when the other operator observes with one eye.
Citation Information