A method for replacing boiler small-diameter water-cooled wall tube panels

By setting up positioning lines during the replacement of boiler water-cooled wall pipes, combining L-shaped fracture protection and soluble paper protection measures, combined with manual and fire welding cutting, circulating water flushing and film detection, small pipes are solved The problems of blockage of foreign objects and difficulty in ensuring cleanliness during the replacement of diameter water-cooled wall pipes have achieved safe and efficient pipeline replacement.

CN115059909BActive Publication Date: 2024-11-26HUANENG HUNAN YUEYANG POWER GENERATION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210593895.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-27
Publication Date
2024-11-26
Estimated Expiration
2042-05-27

AI Technical Summary

Technical Problem

During the replacement of boiler water-cooled wall pipes, it is difficult to ensure the cleanliness of pipelines and welding quality, especially small-pipe pipes, which are prone to leakage due to blockage of foreign objects, affecting equipment safety and production.

Method used

By setting a positioning line before the pipe mouth fins are trimmed, the fin holes are formed, and after cutting, the protection measures of combining L-shaped fracture protection and soluble paper are used to reduce the fall of foreign objects; manual cutting machine and fire Combining welding and cutting methods ensure the pipes are clean; rinse the circulating water and take a picture to remove foreign objects.

Benefits of technology

It effectively reduces the chance of foreign objects falling into the pipe, improves welding efficiency and equipment safety, ensures the cleanliness and safety of the pipeline replacement process, and avoids ultra-temperature pipe burst accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115059909B_ABST
    Figure CN115059909B_ABST
Patent Text Reader

Abstract

The present invention provides a method for replacing a small-diameter water-cooled wall tube panel of a boiler, and relates to the technical field of boiler pipeline replacement and maintenance. The method includes positioning the tube panel to be replaced; trimming the fins; cutting off the lower tube opening of the tube panel, inserting the fracture protection piece, and cutting the upper tube opening of the tube panel; removing the tube panel to be replaced, taking out the fracture protection piece, inserting the soluble paper, and covering the lower tube opening with a cover plate; preparing the groove, hoisting and welding the new tube panel; restoring the tube panel fins and accessories; soaking and circulatory flushing the water-cooled wall in turn, and cooperating with X-ray film detection; and finally performing a water pressure test. This method can ensure that the cut-off tube opening is shielded and protected in time, thereby greatly reducing the probability of foreign matter falling into the tube, especially avoiding the process of using flame to cut the fins after the pipeline is cut, and at the same time, the foreign matter in the tube can be flushed away as much as possible by circulating water flushing to ensure the safety of the equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of boiler pipeline replacement and maintenance, and in particular to a method for replacing a boiler small-diameter water-cooled wall tube panel. Background Art

[0002] The "four tubes" of a boiler refer to the economizer, water wall, superheater, and reheater. Once a "four tube" leak occurs in a boiler, the only option is to shut down the boiler, which seriously affects the normal production of thermal power plants and causes huge economic losses. The wear and explosion prevention of boiler pressure-bearing parts has always been a top priority for power generation companies. In the prevention and treatment of "four tube" leaks, pipe replacement is often necessary. Due to the high temperature and high pressure working characteristics of the "four tubes", there are special requirements for welding technology, pipe cleanliness, etc. during the pipe replacement process, especially for small-diameter water-cooled wall pipes with throttling holes.

[0003] The water-cooled wall tubes in power plants have small diameters, and the inlet header outlet tubes are embedded with throttle rings with even smaller diameters. Such throttle holes are prone to hanging and residual foreign matter, which can easily cause the water-cooled wall throttle rings to become blocked and intercepted, ultimately leading to overheating of the pipes or even bursting and leaking. When replacing and overhauling water-cooled wall tubes, the area is large. How to ensure the cleanliness of the pipes during replacement, prevent foreign matter from falling into or remaining in the pipes, and ensure the welding quality of the pipes has become a difficulty that the maintenance work faces and must overcome.

[0004] In view of this, this application is hereby filed. Summary of the invention

[0005] The purposes of the present invention include, for example, providing a method for replacing a small-diameter water-cooled wall tube panel of a boiler, which can ensure that the cut tube opening is shielded and protected in time, thereby greatly reducing the probability of foreign matter falling into the tube, and especially avoiding the process of using flame to cut fins after the pipeline is cut. The process of using flame to cut fins is most likely to produce larger foreign matter and burn and melt soluble paper; at the same time, foreign matter in the tube can be washed away as much as possible by circulating water flushing to ensure the safety of the equipment.

[0006] The embodiments of the present invention can be implemented as follows:

[0007] In a first aspect, the present invention provides a method for replacing a small-diameter water-cooled wall tube panel of a boiler, comprising:

[0008] Distinguish the old tube panels that need to be replaced and those that do not need to be replaced, and set positioning lines;

[0009] trimming and cutting the fins used to connect two adjacent tube panels along the positioning line to form fin holes;

[0010] Cutting off the lower pipe opening of the tube panel to be replaced along the positioning line, inserting a cutoff protection member for preventing foreign matter from entering the tube into the lower pipe opening, and then cutting off the upper pipe opening of the tube panel to be replaced along the positioning line;

[0011] After the upper pipe opening is cut, the pipe panel to be replaced is removed, and the fracture protection piece is taken out, and soluble paper is inserted into the lower pipe opening, and the lower pipe opening is covered with a cover plate;

[0012] Prepare grooves at the upper and lower tube openings of the tube panel that does not need to be replaced, hoist the new tube panel, weld the grooves of the new tube panel and the tube panel that does not need to be replaced, and perform radiographic inspection on the welds;

[0013] Restore tube panel fins and accessories;

[0014] The water-cooled wall is subjected to the immersion flushing stage and the circulation flushing stage in sequence, and film inspection is carried out to handle the pipes with foreign matter;

[0015] Finally, a water pressure test is carried out.

[0016] In an optional embodiment, trimming the fins includes trimming the fins using an efficient flame welding cutting method.

[0017] In an optional embodiment, the lower pipe opening is cut by a manual cutter, and the upper pipe opening is cut by flame welding.

[0018] In an optional embodiment, the flame welding is an oxygen-acetylene flame welding cutter.

[0019] In an optional embodiment, the fracture protection member is an L-shaped thin iron plate, and the thickness of the L-shaped thin iron plate is 1-1.5 mm.

[0020] In an optional embodiment, the cover plate is a U-shaped thin iron plate, and the thickness of the L-shaped thin iron plate is 1-1.5 mm.

[0021] In an optional embodiment, the immersion and flushing stage includes: supplying water to the water-cooled wall to the top of the cutting site, soaking to dissolve the soluble paper; then draining water from the water-cooled wall to allow foreign matter mixed in the soluble paper and the furnace tube to fall into a specific area at the bottom of the water-cooled wall, then taking an X-ray of the specific area to check for cleanliness, and processing the pipes with foreign matter.

[0022] In an optional embodiment, the circulating flushing stage includes: simulating normal operating conditions of the boiler, supplying water to the economizer and passing through the economizer, water-cooled wall, ceiling superheater, wall superheater, steam-water separator, water storage tank, and then returning to the inlet of the economizer through the boiler water circulating pump to form a water system circulation, then draining the water-cooled wall, discharging foreign matter in the water system or depositing it in the specific area, then taking an X-ray to check the cleanliness of the specific area, and processing the pipes with foreign matter.

[0023] In an optional embodiment, the specific area includes elbows, trifurcated pipes and throttling holes of the furnace bottom pipes corresponding to all replaced water-cooled walls.

[0024] In an optional embodiment, the film detection is a X-ray film.

[0025] The beneficial effects of the embodiments of the present invention include, for example:

[0026] The embodiment of the present invention provides a method for replacing a small-diameter water-cooled wall tube panel of a boiler. By optimizing the construction process, the fin trimming of the tube mouth is set before the tube panel cutting, which can ensure that the cut tube mouth is shielded and protected in time, thereby greatly reducing the probability of foreign matter falling into the tube, especially avoiding the process of using flame to cut the fins after the pipeline is cut, and the process of using flame to cut the fins is most likely to produce large foreign matter and burn and melt soluble paper; and the tube panel cutting is also improved. First, a manual cutting machine is used to cut the lower tube mouth. When the lower tube mouth is cut, a gap is formed, and an L-shaped fracture protection piece is inserted into the gap. The L-shaped thin iron plate can be inserted into the lower tube mouth and the lower tube mouth is blocked, effectively preventing foreign matter from entering the pipeline. Then, the upper tube mouth is cut by fire welding, which can greatly improve work efficiency. In addition, the present application also optimizes the tube mouth protection process, and adopts a combination of L-shaped fracture protection pieces, soluble paper and cover plates, which greatly reduces the probability of foreign matter falling into the tube. Furthermore, in the present application, foreign matter in the pipe can be flushed away as much as possible through circulating water flushing to ensure the safety of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0028] Figure 1 A schematic diagram of marking positioning lines in the method for replacing a small-diameter water-cooled wall tube panel of a boiler provided in this embodiment;

[0029] Figure 2 A schematic diagram of the fin trimming of the tube orifice in the method for replacing a small-diameter water-cooled wall tube panel of a boiler provided in this embodiment;

[0030] Figure 3 This is a schematic diagram of the boiler small-diameter water-cooled wall tube panel replacement method provided in this embodiment after the tube panel is cut.

[0031] Icons: 110-old tube screen; 111-tube screen that needs to be replaced; 112-tube screen that does not need to be replaced; 120-fin; 121-fin hole; 130-positioning line. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0033] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0035] In the description of the present invention, it should be noted that if the terms "upper", "lower", "inside", "outside", etc. appear to indicate an orientation or position relationship, they are based on the orientation or position relationship shown in the accompanying drawings, or are the orientation or position relationship in which the product of the invention is usually placed when used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0036] In addition, the terms “first”, “second”, etc., if used, are merely used to distinguish between the descriptions and should not be understood as indicating or implying relative importance.

[0037] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention may be combined with each other.

[0038] Example

[0039] This embodiment provides a method for replacing a small-diameter water-cooled wall tube panel of a boiler, which comprises the following steps:

[0040] (1) Positioning.

[0041] like Figure 1 As shown, the tube panels 111 that need to be replaced and the tube panels 112 that do not need to be replaced in the old tube panels 110 are distinguished, and positioning lines 130 are set.

[0042] The tube panels are connected to each other through fins 120 , wherein the remaining areas except the area of ​​the tube panel 111 that needs to be replaced are all tube panels 112 that do not need to be replaced. At this time, the positioning line 130 is set along the tube panel 111 that needs to be replaced.

[0043] (2) Trim the fins at the tube mouth 120.

[0044] like Figure 2 As shown, the fin 120 used to connect two adjacent tube panels is trimmed along the positioning line 130 to form a fin hole 121; the opening of the fin hole 121 facilitates the subsequent preparation of the welding groove. The trimming of the tube mouth fin 120 includes trimming the tube mouth fin 120 by using an efficient flame welding method. The flame welding is an oxygen acetylene flame welding cutter, which effectively avoids using flame welding to cut the fin after the tube panel is cut.

[0045] In the prior art, the trimming of the tube mouth fins 120 is arranged after the tube screen is cut, while in the present application, the trimming of the tube mouth fins 120 is arranged before the tube screen is cut. This can avoid the process of using flame welding to trim the tube mouth fins 120 after the tube screen is cut. The process of using flame to cut fins is most likely to produce large foreign matter and burn and melt soluble paper. Therefore, in the present application, the trimming of the tube mouth fins is arranged before the tube screen is cut, which can ensure that the cut tube mouth is shielded and protected in time, thereby greatly reducing the probability of foreign matter falling into the tube.

[0046] (3) Tube screen cutting.

[0047] like Figure 3 As shown, the lower pipe opening of the tube panel 111 to be replaced is cut off along the positioning line 130, and a cutoff protection member for preventing foreign matter from entering the tube is inserted into the lower pipe opening, and then the upper pipe opening of the tube panel 111 to be replaced is cut off along the positioning line 130;

[0048] Specifically, in the present application, a manual cutting machine is used to cut the lower pipe mouth. The manual cutting machine can cut the lower pipe mouth more finely, effectively avoiding the situation where foreign matter falls into the pipeline during the cutting process. When the lower pipe mouth is cut, a gap is formed, and a fracture protection piece is inserted into the gap. The fracture protection piece is an L-shaped thin iron plate. Since the mechanical cutting gap is small, the thickness of the L-shaped thin iron plate in the present application is 1-1.5mm. The L-shaped thin iron plate can be inserted into the lower pipe mouth and the lower pipe mouth is blocked, effectively preventing foreign matter from entering the pipeline. Then, fire welding (oxygen acetylene fire welding cutting knife) is used to cut the upper pipe mouth. Since the opening direction of the upper pipe mouth is downward, the upper pipe mouth does not need to be protected.

[0049] (4) Pipe mouth protection.

[0050] After the upper pipe opening is cut, the pipe panel 111 that needs to be replaced is removed, and the fracture protection piece is taken out, and the soluble paper is inserted into the lower pipe opening, and the lower pipe opening is covered with a cover plate. Since the fracture protection piece is mainly used for temporary protection when the upper pipe opening is cut, after the pipe panel 111 that needs to be replaced is removed, the fracture protection piece can be taken out, and then the soluble paper and the cover plate are used together to further effectively protect the lower pipe opening. The setting of the cover plate ensures that during the subsequent bevel preparation, even if the soluble paper melts and falls off, foreign matter will not fall into the lower pipe opening under the protection of the cover plate.

[0051] The cover plate in the present application is a U-shaped thin iron plate, and the thickness of the U-shaped thin iron plate is 1-1.5 mm. The U-shaped structure can be well covered at the end of the lower pipe opening to effectively protect the lower pipe opening.

[0052] (5) Bevels are prepared at the upper and lower pipe openings of the tube panel 112 that does not need to be replaced, the new tube panel is hoisted, and the bevels of the new tube panel and the tube panel 112 that does not need to be replaced are welded, and the welds are subjected to radiographic inspection.

[0053] The specific preparation method of the groove, the hoisting method of the new tube panel, the welding method and the X-ray detection method of the weld can all be referred to the prior art and will not be elaborated in detail in this application.

[0054] (6) Restore the fins 120 and accessories of the tube panel.

[0055] Since the fins 120 are trimmed before cutting the tube panel, after the new tube panel is installed, the previously trimmed fins 120 need to be restored. The restoration here can directly use the fins 120 trimmed in step (2), or directly prepare fins 120 corresponding to the size of the fin holes 121 in advance, and then repair and install them. The accessories in this application include various rigid beams for supporting the tube panel and hole door accessories, etc.

[0056] (7) Rinse.

[0057] During the tube screen replacement process, there is still a certain probability that welding slag, iron filings and other foreign matter will enter the tube, and the soluble paper used in the welding process cannot be completely dissolved, which will block and reduce the flow area, thereby causing the risk of over-temperature and tube explosion during operation. Therefore, in this application, the water-cooled wall is subjected to an immersion flushing stage and a circulation flushing stage in sequence, and X-ray film detection is combined to process the pipes with foreign matter to achieve the purpose of improving the cleanliness of the furnace tube and eliminating over-temperature and tube explosion accidents.

[0058] The flushing in this application is divided into two stages, the first stage is the immersion flushing stage, and the second stage is the circulation flushing stage.

[0059] Among them, the soaking and flushing stage includes: supplying water to the water-cooled wall to the top that overflows the cutting site (for example, the inlet of the intermediate header), soaking to dissolve the soluble paper; the specific soaking time can be selected according to the actual situation, and then the water is drained from the water-cooled wall to make the foreign matter mixed in the soluble paper and the furnace tube fall into the specific area of ​​the lower part of the water-cooled wall. The specific area includes but is not limited to the elbows, trifurcated pipes and throttle holes of the furnace bottom pipes corresponding to all replaced water-cooled walls. Foreign matter is easily deposited in these areas under the impact of water flow. The selection of the above-mentioned specific areas can also be selected according to the specific structure of the water-cooled wall, mainly targeting the places where foreign matter is easily deposited as the selection of the above-mentioned specific areas.

[0060] Then, a radiograph is taken to check the cleanliness of the specific area, and the pipes with foreign matter are processed. The immersion and flushing stage in the present application can be performed multiple times, which can ensure a more complete flushing.

[0061] The circulating flushing stage includes: simulating the normal operating conditions of the boiler, supplying water to the economizer and passing through the economizer, water-cooled wall, ceiling superheater, wall superheater, steam-water separator, water storage tank, and then returning to the inlet of the economizer through the boiler water circulating pump to form a water system circulation, then draining the water-cooled wall, expelling foreign matter in the water system or depositing it in a specific area, then taking X-rays to check the cleanliness of the specific area, and handling the pipes with foreign matter.

[0062] (8) Water pressure test.

[0063] Use a pressure pump to add water to the water-cooled wall to detect leakage of the water-cooled wall.

[0064] (9)Completion.

[0065] According to the method for replacing the small-diameter water-cooled wall tube panel of a boiler provided in this embodiment, by optimizing the construction process, the trimming of the tube mouth fin 120 is set before the tube panel cutting, and the tube panel cutting is also improved. First, a manual cutting machine is used to cut the lower tube mouth. When the lower tube mouth is cut, a gap is formed, and an L-shaped fracture protection piece is inserted into the gap. The L-shaped thin iron plate can be inserted into the lower tube mouth and the lower tube mouth is blocked, effectively preventing foreign matter from entering the pipeline. Then, the upper tube mouth is cut by fire welding, which can greatly improve work efficiency. In addition, the present application also optimizes the tube mouth protection process, and adopts a combination of L-shaped fracture protection pieces, soluble paper and cover plates to greatly reduce the probability of foreign matter falling into the tube. Furthermore, the present application also uses circulating water flushing to flush away foreign matter in the tube as much as possible to ensure the safety of the equipment.

[0066] Practice has also proved that the replacement and maintenance of large-scale water-cooled wall tubes has no secondary impact on the safe and stable operation of the unit, and plays an important guiding role in the replacement of water-cooled wall tubes and other boiler tubes. Only by formulating strict organizational and implementation measures and investing manpower, material resources and energy can we effectively improve the quality of the anti-wear and explosion inspection and maintenance of the "four tubes" of the boiler, prevent and control leakage incidents, and ensure the safe and stable operation of the generator set.

[0067] In summary, the embodiment of the present invention provides a method for replacing a small-diameter water-cooled wall tube panel of a boiler. By optimizing the construction process, the tube mouth fin 120 is trimmed and set before the tube panel is cut, which can ensure that the cut tube mouth is shielded and protected in time, thereby greatly reducing the probability of foreign matter falling into the tube, especially avoiding the process of using flame to cut the fins after the pipeline is cut, and the process of using flame to cut the fins is the most likely to produce large foreign matter and burn and melt soluble paper; and the present application also improves the tube panel cutting, first using a manual cutting machine to cut the lower tube mouth, when the lower tube mouth is cut to form a gap, inserting an L-shaped fracture protection piece into the gap, and the L-shaped thin iron plate can be inserted into the lower tube mouth and block the lower tube mouth, effectively preventing foreign matter from entering the pipeline. Then, the upper tube mouth is cut by fire welding, which can greatly improve work efficiency. In addition, the present application also optimizes the tube mouth protection process, using a combination of L-shaped fracture protection pieces, soluble paper and cover plates, which greatly reduces the probability of foreign matter falling into the tube. Furthermore, in the present application, foreign matter in the pipe can be flushed away as much as possible through circulating water flushing to ensure the safety of the equipment.

[0068] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A method for replacing a boiler small-diameter water-cooled wall tube panel, characterized in that: It includes: Distinguish the old tube panels that need to be replaced and those that do not need to be replaced, and set positioning lines; trimming and cutting the fins used to connect two adjacent tube panels along the positioning line to form fin holes; Cutting off the lower pipe opening of the tube panel to be replaced along the positioning line, inserting a cutoff protection member for preventing foreign matter from entering the tube into the lower pipe opening, and then cutting off the upper pipe opening of the tube panel to be replaced along the positioning line; After the upper pipe opening is cut, the pipe panel to be replaced is removed, and the fracture protection piece is taken out, and soluble paper is inserted into the lower pipe opening, and the lower pipe opening is covered with a cover plate; Prepare grooves at the upper and lower tube openings of the tube panel that does not need to be replaced, hoist the new tube panel, weld the grooves of the new tube panel and the tube panel that does not need to be replaced, and perform radiographic inspection on the welds; Restore tube panel fins and accessories; The water-cooled wall is subjected to the immersion flushing stage and the circulation flushing stage in sequence, and film inspection is carried out to handle the pipes with foreign matter; Finally, a water pressure test is carried out.

2. The method for replacing a boiler small-diameter water-cooled wall tube panel according to claim 1, characterized in that: The trimming of the fins includes trimming the fins by flame welding.

3. The method for replacing a boiler small-diameter water-cooled wall tube panel according to claim 1, characterized in that: The lower pipe opening is cut by a manual cutting machine, and the upper pipe opening is cut by flame welding.

4. The method for replacing a boiler small-diameter water-cooled wall tube panel according to claim 2 or 3, characterized in that: The fire welding is an oxygen-acetylene fire welding cutter.

5. The method for replacing a boiler small-diameter water-cooled wall tube panel according to claim 1, characterized in that: The fracture protection member is an L-shaped thin iron plate, and the thickness of the L-shaped thin iron plate is 1-1.5 mm.

6. The method for replacing a boiler small-diameter water-cooled wall tube panel according to claim 1, characterized in that: The cover plate is a U-shaped thin iron plate, and the thickness of the U-shaped thin iron plate is 1-1.5 mm.

7. The method for replacing a boiler small-diameter water-cooled wall tube panel according to claim 1, characterized in that: The immersion and flushing stage includes: supplying water to the water-cooled wall to the top of the cutting site to soak the soluble paper to dissolve it; then draining water from the water-cooled wall to make foreign matter mixed in the soluble paper and the furnace tube fall into a specific area at the lower part of the water-cooled wall, then taking an X-ray of the specific area to check the cleanliness, and processing the pipes with foreign matter.

8. The method for replacing a boiler small-diameter water-cooled wall tube panel according to claim 7, characterized in that: The circulating flushing stage includes: simulating the normal operating conditions of the boiler, supplying water to the economizer and passing through the economizer, water-cooled wall, ceiling superheater, wall superheater, steam-water separator, water storage tank, and then returning to the inlet of the economizer through the boiler water circulating pump to form a water system circulation, then draining the water-cooled wall, expelling foreign matter in the water system or depositing it in the specific area, then taking an X-ray to check the cleanliness of the specific area, and processing the pipes with foreign matter.

9. The method for replacing a boiler small-diameter water-cooled wall tube panel according to claim 7 or 8, characterized in that: The specific area includes elbows, trifurcated pipes and throttling holes of furnace bottom pipes corresponding to all replaced water-cooled walls.

10. The method for replacing a boiler small-diameter water-cooled wall tube panel according to claim 7 or 8, characterized in that: The film detection is a radiographic film.