A multifunctional in-situ sampling drill for fixed hole section in ice drilling
By designing a multifunctional ice drilling internal fixed-hole section sampling drilling tool, using nitrogen to drive air and hydraulic sealing technology, efficient and low-cost in-situ collection of water samples, gas samples and particulate matter in ice is achieved, and the current solution is solved There are problems of low efficiency and high cost in the technology, which meets the demand for multi-layer samples in scientific research.
Patent Information
- Application Number
- CN202210685934.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-17
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-06-17
AI Technical Summary
The prior art sample acquisition efficiency, high cost, and small single sample volume in Arctic ice sheets and alpine glacier drills is difficult to meet the demand for multi-layer samples in scientific research.
A multi-functional in-situ sampling drilling tool for internal fixed hole section of ice drilling is designed, using armored cables, cable terminals, outer pipes, gas production devices, ring sealers, nitrogen injection devices, hydraulic pump stations, hydraulic cylinders , push rod seat, sidewall thermal melting drill bit and other components, can eliminate air through nitrogen, hydraulic blocking and thermal melting sampling, and achieve in-situ collection of pollution-free water samples, gas samples and particulate matter.
It greatly improves the utilization rate of a single drill, reduces sampling cost, provides a contamination-free enclosed space, reduces pollution from exogenous substances, meets the needs of multi-layer samples, and improves sampling efficiency and flexibility.
Smart Images

Figure CN115060531B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of drilling, and relates to a sampling drill tool, in particular to a multifunctional in-situ sampling drill tool for a fixed hole section in an ice layer drilling hole. Background Art
[0002] The research work on the Antarctic and Arctic ice sheets and alpine glaciers has played an important role in human understanding of the evolution of the Earth's ancient climate and the impact of human activities on the climate. Obtaining water samples, gas samples and particulate matter samples in glaciers is the basic condition for conducting glacier research. At present, although a large number of core drillings have been carried out in the Antarctic and Arctic ice sheets and alpine glaciers at home and abroad, and many valuable ice core samples have been obtained, the number of drill holes and the amount of samples obtained in local areas are limited due to the high cost of ice core drilling. At the same time, according to different research purposes, scientists sometimes have a greater demand for samples from one or several layers in the entire borehole, and in order to achieve this goal, additional drilling is usually required, which is inefficient and costly. Therefore, how to obtain as many samples as possible in the ice through a borehole is a technical problem that needs to be solved in the drilling field. At present, the method of coring with a serpentine tube sidewall has been used in China to coring a specific hole section in a borehole, but based on the reported structural characteristics, the amount of samples obtained in a single time is small. Summary of the invention
[0003] The purpose of the present invention is to solve the problem of small number of samples and low efficiency in the fixed hole section of glacier drilling, and to provide a multifunctional in-situ sampling drill tool for the fixed hole section in the ice layer drilling, which can perform in-situ sampling of water samples, gas samples in the ice and particulate matter in the hole section of the specified depth of the existing borehole, greatly improving the utilization rate of a single borehole and reducing the sampling cost.
[0004] The technical solution adopted by the present invention to achieve the above-mentioned purpose is: a multifunctional in-situ sampling drill tool for a fixed hole section in an ice layer drilling hole, the in-situ sampling drill tool comprising an armored cable, a cable terminal head and an outer tube, the armored cable and the cable terminal head are connected as a whole, the cable terminal head is detachably fixed to the top of the outer tube, and a sealing ring is used to seal the two, and the in-situ sampling drill tool also includes a gas production device, a first joint, an annular plug, a nitrogen injection device, a hydraulic pump station, a hydraulic cylinder, a push rod seat, a push rod, a side wall hot melt drill bit, a drill bit seat, a guide, a second joint and a water collecting pipe; the gas production device, the nitrogen injection device and the hydraulic pump station are all installed inside the outer tube The annular plug and the flow guide are fixed on the outside of the outer tube, and a plurality of through holes are processed on the outer tube at positions corresponding to the flow guide; an annular space is formed between the annular plug and the outer tube, and the annular plug is made of elastically deformable material, so that when the annular space between the annular plug and the outer tube is filled with oil, the annular plug expands and deforms outward and can fit tightly with the borehole wall; when the oil is unloaded, the annular plug will return to its original shape; there are two annular plugs, which are respectively arranged at the upper and lower parts of the outer tube, and the two annular plugs are respectively called an upper annular plug and a lower annular plug; one end of the first joint is connected to the annular space formed by the upper annular plug and the outer tube, and the other end is connected to the hydraulic pump station The cam is connected to the hydraulic pump station through a pipeline, and the lower part of the cylinder piston rod of the hydraulic cylinder is threadedly connected and fixed together with the push rod seat; the number of the push rods is consistent with the number of the side wall hot melt drill bits, at least three, and one-to-one corresponding, the upper end of the push rod is matched with the pin hole on the push rod seat through the first pin, and the other end is connected to the side wall hot melt drill bit through the second pin, and the push rod can rotate freely around the first pin and the second pin; the side wall hot melt drill bit is a columnar body, and a position corresponding to each side wall hot melt drill bit on the outer tube is reserved to match the shape of the side wall hot melt drill bit The hot melt drill bit of the side wall is connected to the drill seat through a third pin, and the hot melt drill bit of the side wall can rotate around the third pin, so that the hot melt drill bit of the side wall can rotate between a first position and a second position. When the hot melt drill bit of the side wall is in the first position, the hot melt drill bit of the side wall extends out from the outer tube and is perpendicular to the central axis of the outer tube. When the hot melt drill bit of the side wall is in the second position, the hot melt drill bit of the side wall is retracted into the outer tube and is parallel to the central axis of the outer tube. The water collecting pipe is connected to the lower end of the outer tube through a threaded seal and communicates with the inner part of the outer tube. The drill seat is fixed inside the outer tube and is coaxially arranged therewith.
[0005] Among them, the gas production device, nitrogen injection device, hydraulic pump station and heating rod are all electrically connected to the armored cable.
[0006] The first joint and the second joint are both inserted into the outer tube and threadedly connected to the outer tube.
[0007] As a preferred solution, the annular occluder is made of natural rubber with an expansion coefficient of more than 30%, but is not limited thereto.
[0008] The maximum diameters of the upper and lower annular occluders in the retracted state are smaller than the outer diameter of the borehole, and the maximum diameters of the upper and lower annular occluders in the expanded state can adapt to the outer diameter of the borehole, ensuring that they can fit tightly against the borehole wall.
[0009] The hydraulic cylinder is fixed inside the outer tube by two cylinder brackets which are symmetrically arranged up and down.
[0010] The material of the deflector is silicone, and the maximum free outer diameter of the deflector is slightly larger than the diameter of the drilled hole, ensuring that the outer edge of the deflector always fits with the wall of the drilled hole.
[0011] As a preferred solution, the number of the push rods and the number of the side wall hot melt drill bits are six.
[0012] Furthermore, a boss is processed on the upper portion of the push rod for limiting the side wall hot melt drill bit at the second position.
[0013] Furthermore, the nitrogen injection device discharges nitrogen from the cable terminal and the vicinity of the water collecting pipe through two pipelines, and the gas collection device collects gas from the vicinity of the long strip window on the outer pipe through the pipeline.
[0014] As a preferred solution, the side wall hot melt drill bit is made of copper, but is not limited thereto.
[0015] Through the above design scheme, the present invention can bring the following beneficial effects:
[0016] 1. The multifunctional in-situ sampling drill for a fixed hole section in an ice layer provided by the present invention can perform in-situ sampling of water samples, gas samples in ice and particulate matter in a hole section of a specified depth of an existing borehole, thereby greatly improving the utilization rate of a single borehole and reducing the sampling cost.
[0017] 2. The multifunctional in-situ sampling drill tool for a fixed hole section in an ice layer provided by the present invention can discharge all the air in the drill tool and in the annular space gap formed by the drill tool and the borehole wall by injecting inert gases such as nitrogen into the designated hole section, and cooperate with an annular plugger to seal the borehole, thereby providing a pollution-free closed space for gas sampling and reducing the possibility of contamination by exogenous substances during the gas collection process.
[0018] 3. The drilling tool provided by the present invention has two working modes, which can simultaneously meet the needs of pollution-free gas production or long-hole water production, and has good flexibility in use. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to understand the present invention and do not constitute improper limitations of the present invention. In the drawings:
[0020] Figure 1 This is the structural principle diagram of the multifunctional in-situ sampling drill for the fixed hole section in the ice layer drilling.
[0021] Figure 2 for Figure 1 A partial enlarged view of .
[0022] Figure 3 This is a top view of the multifunctional in-situ sampling drill tool for the fixed hole section in the ice layer drilling.
[0023] Figure 4 An axonometric view of the multifunctional in-situ sampling drill tool for the fixed hole section in the ice layer.
[0024] Figure 5 This is a schematic diagram of the working process of the multifunctional in-situ sampling drill tool in the fixed hole section of the ice layer drilling.
[0025] The marks in the figure are as follows: 1-armored cable; 2-cable terminal head; 3-sealing ring; 4-outer pipe; 5-gas production device; 6-first joint; 7-upper annular plug; 8-nitrogen injection device; 9-hydraulic pump station; 10-hydraulic cylinder; 11-first cylinder bracket; 12-second cylinder bracket; 13-cylinder piston rod; 14-push rod seat; 15-first pin; 16-push rod; 17-heating rod; 18-side wall hot melt drill bit; 19-second pin; 20-third pin; 21-drill bit seat; 22-deflector; 23-second joint; 24-lower annular plug; 25-water collecting pipe. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. In order to avoid confusing the essence of the present invention, well-known methods, processes, processes, components and circuits are not described in detail. In the description of the present invention, it should be understood that the terms "first", "second" and "third" are only used for descriptive purposes, and the features defined as "first", "second" and "third" do not represent any order, quantity or importance, but are only used to distinguish different components.
[0027] like Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, a multifunctional in-situ sampling drill tool for a fixed hole section in an ice layer borehole includes an armored cable 1, a cable terminal head 2, a sealing ring 3, an outer tube 4, a gas production device 5, a first joint 6, an upper annular plug 7, a nitrogen injection device 8, a hydraulic pump station 9, a hydraulic cylinder 10, a push rod seat 14, a first pin 15, a push rod 16, a heating rod 17, a side wall hot melt drill bit 18, a second pin 19, a third pin 20, a drill bit seat 21, a deflector 22, a second joint 23, a lower annular plug 24 and a water collecting pipe 25.
[0028] The armored cable 1 is connected to the cable terminal head 2 as a whole, and supplies power to the electrical equipment in the drilling tool and transmits signals. The cable terminal head 2 is fixed to the top of the outer tube 4 by screws, and the two are sealed by a sealing ring 3. The gas extraction device 5, nitrogen injection device 8 and hydraulic pump station 9 are all installed inside the outer tube 4, and the upper annular plug 7, the lower annular plug 24 and the guide 22 are fixed outside the outer tube 4. An annular space is formed between the upper annular plug 7 and the outer tube 4, and an annular space is formed between the lower annular plug 24 and the outer tube 4. A plurality of through holes are processed at the position of the outer tube 4 corresponding to the guide 22. The first joint 6 and the second joint 23 are both inserted into the outer tube 4 and threadedly connected to the outer tube 4; one end of the first joint 6 is connected to the annular space formed by the upper annular plug 7 and the outer tube 4, and the other end is connected to the hydraulic pump station 9; one end of the second joint 23 is connected to the annular space formed by the lower annular plug 24 and the outer tube 4, and the other end is connected to the hydraulic pump station 9; the upper annular plug 7 and the lower annular plug 24 are both made of natural rubber with an expansion coefficient of more than 30%. When the annular space between the upper annular plug 7 and the outer tube 4 and the annular space between the lower annular plug 24 and the outer tube 4 are filled with oil, the upper annular plug 7 and the lower annular plug 24 will expand and deform; when the oil is unloaded, they can return to their original state.
[0029] The drill bit seat 21 is fixed inside the outer tube 4 by screws. The hydraulic cylinder 10 is fixed inside the outer tube 4 by the first cylinder bracket 11 and the second cylinder bracket 12 which are symmetrically arranged up and down, and has strong stability, and is connected to the hydraulic pump station 9 through a pipeline. The upper end of the push rod seat 14 is threadedly connected to the cylinder piston rod 13 of the hydraulic cylinder 10, and the lower end of the push rod seat 14 is provided with a pin hole, and the lower end of the push rod seat 14 is connected to the push rod 16 through the first pin 15. The lower end of the push rod 16 is connected to the side wall hot melt drill bit 18 through the second pin 19, and the push rod 16 can rotate freely around the first pin 15 and the second pin 19. The side wall hot melt drill bit 18 is a columnar body, and the lower part of the side wall hot melt drill bit 18 is connected to the drill bit seat 21 through the third pin 20. The side wall hot melt drill bit 18 can rotate freely around the third pin 20. A row of holes for inserting the heating rod 17 is provided on the side wall hot melt drill bit 18. The heating rod 17 is inserted in the side wall hot melt drill bit 18. The heating rod 17 is vertically arranged with the side wall hot melt drill bit 18. The preferred number of heating rods 17 is ten, and the ten heating rods 17 are evenly arranged along the axial direction of the side wall hot melt drill bit 18 at equal intervals; the push rod seat 14 can move up and down along the axial direction of the drill tool under the drive of the cylinder piston rod 13, and push the side wall hot melt drill bit 18 to rotate around the third pin 20 through the push rod 16. All the side wall hot melt drill bits 18 are in action synchronously and rotate between the first position and the second position. When the side wall hot melt drill bit 18 is in the first position, the side wall hot melt drill bit 18 extends from the outer tube 4 and is perpendicular to the central axis of the outer tube 4. When the side wall hot melt drill bit 18 is in the second position, the side wall hot melt drill bit 18 is retracted into the outer tube 4 and is parallel to the central axis of the outer tube 4, that is, the side wall hot melt drill bit 18 is opened and retracted. A boss is processed on the upper part of the push rod 16 to limit the side wall hot melt drill bit 18 when it is retracted to the second position. The first pin 15, the push rod 16, the second pin 19, the third pin 20 and the side wall hot melt drill bit 18 are the same in number and correspond to each other, and a total of six groups are evenly distributed along the circumference of the outer tube 4. A long strip window is reserved on the outer tube 4 corresponding to the position of each side wall hot melt drill bit 18, and the size of the long strip window should ensure that the side wall hot melt drill bit 18 can extend from the window. The outer tube 4 is processed with multiple through holes at positions corresponding to the flow guide 22 to ensure that the fluid can flow into the interior of the drill bit through the through holes of the outer tube 4. The water collecting pipe 25 is connected to the lower end of the outer tube 4 through a threaded seal and communicates with the interior of the outer tube 4, so that the fluid flowing into the interior of the drill bit through the flow guide 22 can be stored in the water collecting pipe 25. In the description of the present invention, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0030] The armored cable 1 is electrically connected to the gas extraction device 5, the nitrogen injection device 8, the hydraulic pump station 9 and the heating rod 17 respectively.
[0031] The nitrogen injection device 8 discharges nitrogen from the cable terminal head 2 and the vicinity of the water collecting pipe 25 through two pipelines. The nitrogen sprayed from the cable terminal head 2 can expel the air inside the drill tool from top to bottom, and discharge the drill tool from the long strip window position on the outer tube 4. The nitrogen sprayed from the water collecting pipe 25 can expel the air in the lower part of the drill tool from bottom to top, and discharge the drill tool from the long strip window position on the outer tube 4, and at the same time drive the air in the gap between the drill tool and the borehole from bottom to top to the top of the drill tool. The gas extraction device 5 collects gas from the vicinity of the long strip window on the outer tube 4 through a pipeline, which can ensure that the gas released by the melting ice of the side wall hot melt drill bit 18 is collected by the gas extraction device 5 within the shortest distance.
[0032] The side wall hot melt drill bit 18 is made of high thermal conductivity materials such as copper to ensure good thermal conductivity and high ice melting speed.
[0033] The deflector 22 is made of low-temperature resistant rubber such as silicone, and its maximum free outer diameter is slightly larger than the diameter of the drill hole to ensure that the outer edge of the deflector 22 is always in contact with the hole wall, so that the melt water generated by the hot melt drill bit 18 on the side wall is guided through the deflector 22 and enters the interior of the drill bit through the through hole of the outer tube 4.
[0034] The maximum diameters of the upper annular occluder 7 and the lower annular occluder 24 in the retracted state are smaller than the outer diameter of the borehole, and the maximum diameters in the expanded state can adapt to the outer diameter of the borehole.
[0035] The above-mentioned gas extraction device 5, nitrogen injection device 8 and hydraulic pump station 9 are all existing equipment, so the specific models and specifications are not described in detail.
[0036] Figure 5 A schematic diagram of the working process of the multifunctional in-situ sampling drill tool for the fixed hole section in the ice layer drilling hole is shown, and a, b, c and d show four working states of the multifunctional in-situ sampling drill tool for the fixed hole section in the ice layer drilling hole. According to the layout direction of the attached figure of the specification, the sampling action is performed in the direction indicated by the arrow in the figure: the multifunctional in-situ sampling drill tool for the fixed hole section in the ice layer drilling hole performs actions: a The multifunctional in-situ sampling drill tool for the fixed hole section in the ice layer drilling hole reaches the sampling hole section; b The lower annular plugger 24 is sealed, and nitrogen is used to drive out the air around the drill tool; c The upper annular plugger 7 is sealed to close the sampling hole section; d The multifunctional in-situ sampling drill tool for the fixed hole section in the ice layer drilling hole drills and collects water samples and gas samples in the borehole.
[0037] Working principle of the present invention:
[0038] The multifunctional in-situ sampling drill tool for a fixed hole section in an ice layer borehole provided by the present invention can simultaneously collect melt water, gas in the ice and particles in the ice in a specific hole section of the borehole, or can only collect melt water and particles in the ice.
[0039] When melt water, gas in ice and particles in ice are collected simultaneously: before drilling, the various parts of the drill tool must first be disinfected and sterilized, and high-pressure nitrogen with a pressure of 0.8-1 MPa is injected into the nitrogen injection device 8, and then the drill tool is lowered along the borehole to the target depth using the armored cable 1. The upper annular plug 7 and the lower annular plug 24 are in a retracted state during the lowering process.
[0040] When the drilling tool reaches the target depth of the borehole, first control the hydraulic pump station 9 to inject oil into the annular space of the lower annular plug 24 and the outer tube 4 through the second joint 23, so that the lower annular plug 24 expands and fits tightly to the borehole wall, thereby closing the borehole below the drilling tool. Then turn on the nitrogen injection device 8, so that the nitrogen is discharged from the cable terminal head 2 and the water collecting pipe 25 through the pipeline, and then the air inside and around the drilling tool is driven out. Then control the hydraulic pump station 9 to inject oil into the annular space of the upper annular plug 7 and the outer tube 4 through the first joint 6, so that the upper annular plug 7 expands and fits tightly to the borehole wall, thereby closing the borehole above the drilling tool, and thus forming a closed space filled with nitrogen inside the drilling tool and between the upper and lower plugs. When the upper annular plug 7 is sealed, stop the nitrogen injection.
[0041] After that, the hydraulic pump station 9 is controlled to pump oil into the hydraulic cylinder 10, so that the cylinder piston rod 13 of the hydraulic cylinder 10 drives the push rod seat 14 to slowly move downward, and then the side wall hot melt drill bit 18 is pushed by the push rod 16 to rotate outward along the third pin 20, and extend out of the drill tool from the long strip window reserved in the outer tube 4. And melt the ice layer encountered. The moving speed of the cylinder piston rod 13 needs to match the ice melting speed of the side wall hot melt drill bit 18 to ensure that the side wall hot melt drill bit 18 is always in contact with the ice layer. The melted water from the ice will flow downward along the borehole wall under the action of gravity, carrying the particles melted from the ice, and will flow into the inside of the drill tool through the through hole reserved on the outer tube 4 under the guidance of the guide 22, and will be stored in the water collecting pipe 25. When the side wall hot melt drill bit 18 rotates to a horizontal position (ie, the first position), it will stop rotating under the limiting action of the drill bit seat 21. At this time, the oil pressure of the hydraulic cylinder 10 increases, thereby automatically controlling the hydraulic cylinder 10 to stop advancing.
[0042] After the side wall hot melt drill bit 18 begins to melt the ice, the nitrogen injection device 8 is controlled to continuously inject nitrogen into the bottom of the hole at a certain flow rate. The nitrogen at the bottom of the hole and the gas released by cutting the ice layer are mixed and then collected into the gas production device 5 through the pipeline.
[0043] After drilling is completed, the nitrogen injection device 8 stops injecting gas, and the oil cylinder piston rod 13 is controlled to slowly retract, thereby driving the side wall hot melt drill bit 18 to retract into the inner part of the drill tool outer tube 4. When the side wall hot melt drill bit 18 retracts to the second position, it will contact the boss on the push rod 16, thereby stopping rotation. At this time, the oil pressure change of the hydraulic oil cylinder 10 can automatically control the oil cylinder piston rod 13 to stop moving. After the side wall hot melt drill bit 18 is successfully retracted, the upper annular plug 7 and the lower annular plug 24 are controlled to unload oil and return to the minimum diameter state. After that, the drill tool can be pulled to the surface, and the gas sample, water sample and particulate matter sample in the gas extraction device 5 and the water collecting pipe 25 can be recovered.
[0044] Afterwards, nitrogen is re-injected on the surface, the gas extraction device 5 is replaced to complete the drilling tool disinfection, and the drilling tool is lowered again to the next target depth for sampling.
[0045] When only melt water and ice particles are collected, after the drill tool is lowered to the target depth, the hydraulic cylinder 10 can be used to directly control the side wall hot melt drill bit 18 to extend the drill tool to melt the ice layer on the hole wall. If a longer hole section needs to be collected, after the side wall hot melt drill bit 18 is extended to the horizontal position (i.e., the first position), the drill tool can be lowered through the armored cable 1 to continue to melt the ice and drill downward, and the melt water and ice particles will be continuously collected in the water collecting pipe 25.
[0046] In practical applications, the water collecting pipe 25 of different lengths can be replaced according to the actual amount of water to be collected.
[0047] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A multifunctional in-situ sampling drill for a fixed hole section in an ice layer borehole, the in-situ sampling drill comprising an armored cable (1), a cable terminal head (2) and an outer tube (4), the armored cable (1) and the cable terminal head (2) are connected as a whole, the cable terminal head (2) is detachably fixed to the top of the outer tube (4), and a sealing ring (3) is used between the two for sealing, characterized in that: The in-situ sampling drilling tool further comprises a gas collection device (5), a first joint (6), an annular plug, a nitrogen injection device (8), a hydraulic pump station (9), a hydraulic cylinder (10), a push rod seat (14), a push rod (16), a side wall hot melt drill bit (18), a drill bit seat (21), a flow guide (22), a second joint (23) and a water collecting pipe (25); the gas collection device (5), the nitrogen injection device (8) and the hydraulic pump station (9) are all installed inside the outer tube (4); the annular plug and the flow guide (22) are fixed outside the outer tube (4), and a plurality of through holes are processed at the position of the outer tube (4) corresponding to the flow guide (22); an annular space is formed between the annular plug and the outer tube (4), and the annular plug is a resilient plug. The annular plug is made of a deformable material so that when the annular space between the annular plug and the outer tube (4) is filled with oil, the annular plug expands and deforms outward and can fit tightly against the borehole wall; when the oil is unloaded, the annular plug will return to its original shape; there are two annular plugs, which are respectively arranged at the upper and lower parts of the outer tube (4), and the two annular plugs are respectively called an upper annular plug (7) and a lower annular plug (24); one end of the first joint (6) is connected to the annular space formed by the upper annular plug (7) and the outer tube (4), and the other end is connected to the hydraulic pump station (9); one end of the second joint (23) is connected to the annular space formed by the lower annular plug (24) and the outer tube (4), and the other end is connected to the hydraulic pump station (9); the hydraulic cylinder (10) The hydraulic cylinder (10) is connected to the hydraulic pump station (9) through a pipeline, and the lower part of the cylinder piston rod (13) of the hydraulic cylinder (10) is threadedly connected and fixed to the push rod seat (14); the number of the push rods (16) is consistent with the number of the side wall hot melt drill bits (18), at least three, and one-to-one corresponding; the upper end of the push rod (16) cooperates with the pin hole on the push rod seat (14) through a first pin (15), and the other end is connected to the side wall hot melt drill bit (18) through a second pin (19); the push rod (16) can rotate freely around the first pin (15) and the second pin (19); the side wall hot melt drill bit (18) is a columnar body, and a position corresponding to each side wall hot melt drill bit (18) is reserved on the outer tube (4) to correspond to the shape of the side wall hot melt drill bit (18) The side wall hot melt drill bit (18) is provided with a long strip window matching the shape of the side wall hot melt drill bit (18), and a heating rod (17) is evenly inserted inside the side wall hot melt drill bit (18), the upper end of the side wall hot melt drill bit (18) is a free end, and the lower end of the side wall hot melt drill bit (18) is connected to the drill bit seat (21) through a third pin (20), and the side wall hot melt drill bit (18) can rotate around the third pin (20), so that the side wall hot melt drill bit (18) can rotate between a first position and a second position, when the side wall hot melt drill bit (18) is located at the first position, the side wall hot melt drill bit (18) extends from the outer tube (4) and is perpendicular to the central axis of the outer tube (4), and when the side wall hot melt drill bit (18) is located at the second position, the side wall hot melt drill bit (18) is retracted into the outer tube (4) and is parallel to the central axis of the outer tube (4);The water collecting pipe (25) is connected to the lower end of the outer pipe (4) through a threaded seal and is in communication with the interior of the outer pipe (4); the drill bit seat (21) is fixed inside the outer pipe (4) and is coaxially arranged therewith; The gas extraction device (5), the nitrogen injection device (8), the hydraulic pump station (9) and the heating rod (17) are all electrically connected to the armored cable (1).
2. The multifunctional in-situ sampling drill for fixed hole section in ice layer drilling according to claim 1 is characterized by: The first joint (6) and the second joint (23) are both inserted into the outer tube (4) and threadedly connected to the outer tube (4).
3. The multifunctional in-situ sampling drill for fixed hole section in ice layer drilling according to claim 1 is characterized in that: The annular plugger is made of natural rubber with an expansion coefficient of more than 30%.
4. The multifunctional in-situ sampling drill for fixed hole section in ice layer drilling according to claim 1 is characterized by: The maximum diameter of the upper annular occluder (7) and the lower annular occluder (24) in the retracted state is smaller than the outer diameter of the borehole, while the maximum diameter of the upper annular occluder (7) and the lower annular occluder (24) in the expanded state is adapted to the outer diameter of the borehole, ensuring that they can fit tightly against the borehole wall.
5. The multifunctional in-situ sampling drill for fixed hole section in ice layer drilling according to claim 1 is characterized in that: The hydraulic cylinder (10) is fixed inside the outer tube (4) via two cylinder brackets which are symmetrically arranged up and down.
6. The multifunctional in-situ sampling drill for fixed hole section in ice layer drilling according to claim 1 is characterized by: The material of the flow guide (22) is silica gel, and the maximum free outer diameter of the flow guide (22) is slightly larger than the diameter of the drilled hole, so that the outer edge of the flow guide (22) always fits with the wall of the drilled hole.
7. The multifunctional in-situ sampling drill for fixed hole section in ice layer drilling according to claim 1 is characterized by: The number of the push rods (16) and the number of the side wall hot melt drill bits (18) are both six.
8. The multifunctional in-situ sampling drill for fixed hole section in ice layer drilling according to claim 1 is characterized by: The upper part of the push rod (16) is processed with a boss for limiting the side wall hot melt drill bit (18) at the second position.
9. The multifunctional in-situ sampling drill for fixed hole section in ice layer drilling according to claim 1, characterized in that: The nitrogen injection device (8) discharges nitrogen from the vicinity of the cable terminal (2) and the water collecting pipe (25) through two pipelines, and the gas collection device (5) collects gas from the vicinity of the long strip window on the outer pipe (4) through pipelines.
10. The multifunctional in-situ sampling drill for fixed hole section in ice layer drilling according to claim 1, characterized in that: The side wall hot melt drill bit (18) is made of red copper.
