An energy storage emergency power supply with bidirectional current conversion function
By configuring the switching contactor in the energy storage emergency power supply, the bidirectional converter function is realized, which solves the problem in the existing technology that the energy storage power supply equipment cannot carry the load on the load side, and improves the use efficiency and power utilization rate of the emergency power supply.
Patent Information
- Application Number
- CN202210827282.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-13
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-07-13
AI Technical Summary
Existing energy storage power supply equipment cannot realize two-way power flow on the load side and cannot directly carry the load, which limits the efficiency of emergency power supply.
An energy storage emergency power supply with bidirectional current conversion function is designed. By configuring switching contactors KM1 and KM2, the grid-connected rectification mode and the off-grid inverter mode are switched according to changes in the mains voltage to realize the two-way flow of electric energy. When the mains voltage is low, the grid-connected rectification mode is used to charge the battery; when the mains voltage is high, the off-grid inverter mode is switched to use the battery for power supply.
It effectively improves the use efficiency of emergency power equipment, can flexibly adjust the power supply mode under different grid conditions, and improves power utilization.
Smart Images

Figure CN115118000B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of energy storage type emergency power supply, relates to electronic circuit technology, and specifically is an energy storage type emergency power supply with a bidirectional current conversion function. Background Art
[0002] The energy storage power supply widely used now is generally applied to the grid side. Its circuit schematic diagram is as follows Figure 2 As shown. The energy storage inverter serves as a connecting bridge between the DC side and the AC bus side of the energy storage system, and can realize the absorption and release of electric energy of the energy storage system. The advantage of the energy storage inverter is that it can realize the bidirectional flow of electric energy according to the needs of the actual application scenario. When the energy storage inverter works in the discharge mode, the inverter converts the DC side electric energy into a stable AC current with low harmonic content, and provides electric energy to the load through the three-phase AC bus or feeds it back to the grid; when the energy storage inverter works in the charging mode, the inverter converts the electric energy of the three-phase AC bus into stable DC power to charge the energy storage battery. From the basic working principle of the energy storage power supply, it can be seen that the energy storage inverter is facing the grid side, not the load side, and cannot directly carry load;
[0003] Therefore, an energy storage emergency power supply with a bidirectional current conversion function is proposed. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention proposes an energy storage type emergency power supply with a bidirectional current conversion function, which is configured with two switching contactors KM1 and KM2, wherein the switching contactor KM1 is connected to the mains, and the switching contactor KM2 is connected to the battery; when the mains pressure is small, the switching contactor KM1 and the switching contactor KM2 are closed, and the grid-connected rectification mode is turned on to charge the battery; when the mains pressure is large, the switching contactor KM1 is disconnected, the off-grid inverter mode is turned on, and the charged battery is used to power the load; the use efficiency of the emergency power supply equipment is effectively improved.
[0005] To achieve the above object, an energy storage emergency power supply with a bidirectional current conversion function is provided according to an embodiment of a first aspect of the present invention, comprising a battery pack BAT, a bidirectional current converter DB, a transformer BY, switching contactors KM1 and KM2, and circuit breakers QF and QFA;
[0006] Among them, the battery pack BAT is connected to the bidirectional converter DB; the bidirectional converter is also connected to the transformer BY; the transformer BY is connected to the switching contactor KM2; the switching contactor KM2 is connected to the circuit breaker QF; further, the circuit breaker QF is connected to a load; the circuit breaker QF is connected to the switching contactor KM1; the switching contactor KM1 is connected to the circuit breaker QFA; the load is a city power equipment;
[0007] When the mains voltage is at a normal level, the switching contactor KM1 and the circuit breaker QFA are closed to directly supply power to the load; by closing the switching contactor KM2, the AC power of the mains passes through the transformer BY, and the bidirectional converter DB works in the grid-connected rectification mode, converting the AC power of the mains into DC power, which is charged and stored in the battery pack BAT;
[0008] When the mains voltage is at its peak and the power supply capacity is insufficient, the switching contactor KM1 is disconnected and the switching contactor KM2 is closed. The bidirectional converter DB works in the off-grid inverter mode, converting the battery pack BAT into AC power, and the battery pack BAT directly supplies power to the load;
[0009] like Figure 2 As shown, it is a control system block diagram of the energy storage emergency power supply with bidirectional conversion function in the grid-connected rectification mode; including Gw(s), Gn(s), voltage detection module and charging current detection module, PWM and power module;
[0010] If is the actual charging current of the battery pack; Ii is the theoretical charging current of the battery pack; Uf is the voltage of the battery pack; Gw(s) is the voltage regulator, and Gn(s) is the current regulator; Gw(s) and Gn(s) are obtained through the PI transfer function respectively; specifically, the calculation formula of the PI transfer function is:
[0011] Gw(s)=K1p+K1p / s;
[0012] Gn(s)=K2p+K2p / s;
[0013] Gw(s), Gn(s), PWM and power module are connected in sequence; the charging current detection module detects the current between Gw(s), Gn(s), PWM and power module; the voltage detection module detects the voltage between Gn(s), PWM and power module;
[0014] After locking the mains frequency and phase, the inverter starts working when the mains voltage is in the range of 380±20V. The inverter controller continuously detects the charging current and voltage of the battery pack through the voltage detection module and the charging current detection module, controls the PWM pulse width output by the power module, converts the AC power of the mains into DC power, and stably charges the battery pack. In order to achieve good output characteristics of the inverter, the control strategy of the inverter adopts voltage and current dual-loop negative feedback control, adjusts the PWM waveform, and makes the energy storage emergency power supply output stable current in the grid-connected rectification mode.
[0015] like Figure 3The above is a control system block diagram of an energy storage emergency power supply with a bidirectional current conversion function in an off-grid inverter mode; it includes Gw(s), Gn(s), an output voltage detection module and an output current detection module, a PWM signal regulator, and a power module;
[0016] Where If is the actual charging current of the battery pack; Ui is the theoretical charging current of the battery pack; Uf is the voltage of the battery pack; Gw(s) is the voltage regulator, and Gn(s) is the current regulator; Gw(s) and Gn(s) are obtained through the PI transfer function respectively; specifically, the PI transfer function calculation formula is:
[0017] Gw(s)=K1p+K1p / s;
[0018] Gn(s)=K2p+K2p / s;
[0019] Gn(s), Gw(s), PWM signal and power module are connected in sequence; the output current detection module detects the current between Gw(s), PWM signal and power module; the output voltage detection module detects the voltage between Gn(s), Gw(s), PWM signal and power module;
[0020] When the battery pack needs to discharge to the load, the controller of the converter continuously detects the output current and voltage of the converter through the output voltage detection module and the output current detection module, and controls the PWM pulse width output by the power module to convert the DC power of the battery pack into AC power to supply power to the load. In order to achieve good output characteristics of the converter, the control strategy of the converter adopts voltage and current double-loop negative feedback control, adjusts the PWM waveform, and enables the energy storage emergency power supply to output a stable frequency and voltage AC power supply in the off-grid inverter mode.
[0021] A day is divided into peak, flat and valley time periods; each time period corresponds to the time period divided by the peak and valley electricity price mechanism of the mains; that is, the control system of the emergency and energy storage device turns on the device to store electric energy in the battery when the mains electricity is at valley; and turns on the device to release electric energy to the load when the mains electricity is at peak.
[0022] Specifically, in each time period, the working mode of the energy storage emergency power supply with bidirectional conversion function includes the following modes:
[0023] Mode 1: During the time period: 06:00-10:00; in the mains power supply mode;
[0024] At this time, the mains voltage is normal, the AC contactor KM1 is closed, and the mains supplies power to the load; at this time, the bidirectional converter DB stops working, and the AC contactor KM2 is disconnected;
[0025] Method 2: During the period: 10:00–16:00; in energy release power supply mode;
[0026] At this time, during the peak period of the mains power, the AC contactor KM1 is disconnected, and the mains power stops supplying power to the load; the bidirectional converter DB runs and works in the off-grid inverter mode, converting the battery group BAT into AC power, and the AC contactor KM2 is closed to supply power to the load;
[0027] Mode 3: During the period of 16:00-22:00; in the mains power supply mode;
[0028] When the battery voltage is lower than the undervoltage voltage, the bidirectional converter DB stops the inverter operation, the AC contactor KM2 is disconnected, the AC contactor KM1 is closed, and the system switches to the mains power supply state to continue to supply power to the load.
[0029] Mode 4: During the period 22:00-6:00; in energy storage mode;
[0030] During the peak and valley periods of the mains, the mains voltage is normal and enters the charging mode. The AC contactor KM2 is closed, and the AC power of the mains passes through the transformer BY. The bidirectional converter DB works in the grid-connected rectification mode to convert the AC power of the mains into DC power to charge the battery pack BAT. At the same time, the AC contactor KM1 is closed, and the mains supplies power to the load.
[0031] Compared with the prior art, the present invention has the following beneficial effects:
[0032] The present invention configures two switching contactors KM1 and KM2, wherein the switching contactor KM1 is connected to the mains, and the switching contactor KM2 is connected to the battery; when the mains pressure is relatively small, the switching contactor KM1 and the switching contactor KM2 are closed, and the grid-connected rectification mode is turned on to charge the battery; when the mains pressure is relatively large, the switching contactor KM1 is disconnected, the off-grid inverter mode is turned on, and the charged battery is used to supply power to the load; thereby effectively improving the use efficiency of the emergency power supply equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is the principle diagram of the present invention;
[0034] Figure 2 It is a control system block diagram of the present invention in the grid-connected rectification mode;
[0035] Figure 3 This is a control system block diagram of the present invention in off-grid inverter mode. DETAILED DESCRIPTION
[0036] The technical scheme of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] like Figure 1 As shown, an energy storage emergency power supply with a bidirectional current conversion function includes a battery pack BAT, a bidirectional converter DB, a transformer BY, switching contactors KM1 and KM2, and circuit breakers QF and QFA;
[0038] Among them, the battery pack BAT is connected to the bidirectional converter DB; the bidirectional converter is also connected to the transformer BY; the transformer BY is connected to the switching contactor KM2; the switching contactor KM2 is connected to the circuit breaker QF; further, the circuit breaker QF is connected to a load; the circuit breaker QF is connected to the switching contactor KM1; the switching contactor KM1 is connected to the circuit breaker QFA; the load is a city power equipment;
[0039] In a preferred embodiment, the mains power supplies power to the load via the circuit breaker QFA and the switching contactor KM1;
[0040] Therefore, when the mains voltage is at a normal level, the switching contactor KM1 and the circuit breaker QFA are closed to directly supply power to the load; by closing the switching contactor KM2, the AC power of the mains passes through the transformer BY, and the bidirectional converter DB works in the grid-connected rectification mode, converting the AC power of the mains into DC power to charge the battery group BAT for energy storage;
[0041] When the mains voltage is at its peak and the power supply capacity is insufficient, the switching contactor KM1 is disconnected and the switching contactor KM2 is closed. The bidirectional converter DB works in the off-grid inverter mode, converting the battery pack BAT into AC power, and the battery pack BAT directly supplies power to the load;
[0042] That is, the energy storage emergency power supply with bidirectional conversion function has two modes: grid-connected rectification mode and off-grid inverter mode;
[0043] The energy storage emergency power supply with bidirectional current conversion function has mains voltage, output voltage, battery voltage and output current detection inside;
[0044] like Figure 2 As shown, it is a control system block diagram of the energy storage emergency power supply with bidirectional conversion function in the grid-connected rectification mode; including Gw(s), Gn(s), voltage detection module and charging current detection module, PWM and power module;
[0045] Where If is the actual charging current of the battery pack; Ii is the theoretical charging current of the battery pack; Uf is the voltage of the battery pack; Gw(s) is the voltage regulator, and Gn(s) is the current regulator; Gw(s) and Gn(s) are obtained through the PI transfer function respectively; specifically, the PI transfer function calculation formula is:
[0046] Gw(s)=K1p+K1p / s;
[0047] Gn(s)=K2p+K2p / s;
[0048] Gw(s), Gn(s), PWM and power module are connected in sequence; the charging current detection module detects the current between Gw(s), Gn(s), PWM and power module; the voltage detection module detects the voltage between Gn(s), PWM and power module;
[0049] After locking the mains frequency and phase, the inverter starts working when the mains voltage is in the range of 380±20V. The inverter controller continuously detects the charging current and voltage of the battery pack through the voltage detection module and the charging current detection module, controls the PWM pulse width output by the power module, converts the AC power of the mains into DC power, and stably charges the battery pack. In order to achieve good output characteristics of the inverter, the control strategy of the inverter adopts voltage and current dual-loop negative feedback control, adjusts the PWM waveform, and makes the energy storage emergency power supply output stable current in the grid-connected rectification mode.
[0050] like Figure 3 The above is a control system block diagram of an energy storage emergency power supply with a bidirectional current conversion function in an off-grid inverter mode; it includes Gw(s), Gn(s), a voltage detection module and an output current detection module, a PWM signal regulator, and a power module;
[0051] Where If is the actual charging current of the battery pack; Ui is the theoretical charging current of the battery pack; Uf is the voltage of the battery pack; Gw(s) is the voltage regulator, and Gn(s) is the current regulator; Gw(s) and Gn(s) are obtained through the PI transfer function respectively; specifically, the PI transfer function calculation formula is:
[0052] Gw(s)=K1p+K1p / s;
[0053] Gn(s)=K2p+K2p / s;
[0054] Gn(s), Gw(s), PWM signal and power module are connected in sequence; the output current detection module detects the current between Gw(s), PWM signal and power module; the output voltage detection module detects the voltage between Gn(s), Gw(s), PWM signal and power module;
[0055] When the battery pack needs to discharge to the load, the controller of the converter continuously detects the output current and voltage of the converter through the output voltage detection module and the output current detection module, and controls the PWM pulse width output by the power module to convert the DC power of the battery pack into AC power to supply power to the load. In order to achieve good output characteristics of the converter, the control strategy of the converter adopts voltage and current double-loop negative feedback control, adjusts the PWM waveform, and enables the energy storage emergency power supply to output a stable frequency and voltage AC power supply in the off-grid inverter mode.
[0056] It can be understood that the grid-connected rectification mode is triggered when the mains voltage is at a normal level; the off-grid inverter mode is triggered when the mains voltage is at a peak and the power supply capacity is insufficient; in order to further determine the time periods for triggering the grid-connected rectification mode and the off-grid inverter mode; a day is divided into peak, flat and valley time periods; each time period corresponds to the time period divided by the peak and valley electricity price mechanism of the mains; that is, the control system of the emergency and energy storage device, when the mains voltage is at a low point, the device is turned on to store electrical energy in the battery; when the mains voltage is at a peak, the device is turned on to release electrical energy to the load;
[0057] Specifically, in each time period, the working mode of the energy storage emergency power supply with bidirectional conversion function includes the following modes:
[0058] Mode 1: During the time period: 06:00-10:00; in the mains power supply mode;
[0059] At this time, the mains voltage is normal, the AC contactor KM1 is closed, and the mains supplies power to the load; at this time, the bidirectional converter DB stops working, and the AC contactor KM2 is disconnected;
[0060] Method 2: During the period: 10:00–16:00; in energy release power supply mode;
[0061] At this time, during the peak period of the mains power, the AC contactor KM1 is disconnected, and the mains power stops supplying power to the load; the bidirectional converter DB runs and works in the off-grid inverter mode, converting the battery group BAT into AC power, and the AC contactor KM2 is closed to supply power to the load;
[0062] Mode 3: During the period of 16:00-22:00; in the mains power supply mode;
[0063] When the battery voltage is lower than the undervoltage voltage, the bidirectional converter DB stops the inverter operation, the AC contactor KM2 is disconnected, the AC contactor KM1 is closed, and the system switches to the mains power supply state to continue to supply power to the load.
[0064] Mode 4: During the period 22:00-6:00; in energy storage mode;
[0065] During the peak and valley periods of the mains, the mains voltage is normal and enters the charging mode. The AC contactor KM2 is closed, and the AC power of the mains passes through the transformer BY. The bidirectional converter DB works in the grid-connected rectification mode to convert the AC power of the mains into DC power to charge the battery pack BAT. At the same time, the AC contactor KM1 is closed, and the mains supplies power to the load.
[0066] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.
Claims
1. An energy storage emergency power supply with bidirectional current conversion function, It is characterized in that It includes a battery pack BAT, a bidirectional converter DB, a transformer BY, switching contactors KM1 and KM2, and circuit breakers QF and QFA; Among them, the battery pack BAT is connected to the bidirectional converter DB; the bidirectional converter is also connected to the transformer BY; the transformer BY is connected to the switching contactor KM2; the switching contactor KM2 is connected to the circuit breaker QF; the circuit breaker QF is connected to a load; the circuit breaker QF is connected to the switching contactor KM1; the switching contactor KM1 is connected to the circuit breaker QFA; When the mains voltage is at 380±20V, the switching contactor KM1 and the circuit breaker QFA are closed to directly supply power to the load; by closing the switching contactor KM2, the AC power of the mains passes through the transformer BY, and the bidirectional converter DB works in the grid-connected rectification mode; When the mains voltage is at its peak and the power supply capacity is insufficient, the switching contactor KM1 is disconnected, the switching contactor KM2 is closed, and the bidirectional converter DB works in the off-grid inverter mode; In the grid-connected rectification mode, the AC power of the mains is converted into DC power and charged to the battery pack BAT for energy storage; In off-grid inverter mode, the battery pack BAT is converted into AC power, and the battery pack BAT directly supplies power to the load; A day is divided into peak, flat and valley time periods; each time period corresponds to the time period divided by the peak and valley electricity price mechanism of the mains; when the mains electricity is at valley, the grid-connected rectification mode is turned on; when the mains electricity is at peak, the off-grid inverter mode is turned on; The grid-connected rectification mode includes Gw(s), Gn(s), voltage detection module and charging current detection module, PWM and power module; If is the actual charging current of the battery pack; Ii is the theoretical charging current of the battery pack; Uf is the voltage of the battery pack; Gw (s) is the value adjusted by the voltage regulator, and Gn (s) is the value adjusted by the current regulator; Gw (s) and Gn (s) are obtained through the PI transfer function respectively; the calculation formula of the PI transfer function is: Gw(s)=K1p+ K1p / s; Gn(s)=K2p+ K2p / s; Gw(s), Gn(s), PWM and power module are connected in sequence; the charging current detection module detects the current between Gw(s), Gn(s), PWM and power module; the voltage detection module detects the voltage between Gn(s), PWM and power module; The method of charging the battery in the grid-connected rectification mode is as follows: after the mains frequency and phase are locked, the inverter starts to work when the mains voltage is in the range of 380±20V; the inverter controller continuously detects the charging current and voltage of the battery pack through the voltage monitoring module and the charging current detection module, controls the PWM pulse width output by the power module, converts the AC power of the mains into DC power, and stably charges the battery pack; The off-grid inverter mode includes Gw(s), Gn(s), output voltage detection module and output current detection module, PWM signal regulation and power module; If is the actual charging current of the battery pack; Ui is the theoretical charging current of the battery pack; Uf is the voltage of the battery pack; Gw(s) is the voltage regulator, Gn(s) is the current regulator; Gw(s) and Gn(s) are obtained through the PI transfer function respectively; the calculation formula of the PI transfer function is: Gw(s)=K1p+ K1p / s; Gn(s)=K2p+ K2p / s; Gn(s), Gw(s), PWM signal and power module are connected in sequence; the output current detection module detects the current between Gw(s), PWM signal and power module; the output voltage detection module detects the voltage between Gn(s), Gw(s), PWM signal and power module; The off-grid inverter mode supplies power to the load in the following manner: the controller of the converter continuously detects the output current and voltage of the converter through the output voltage detection module and the output current detection module, and controls the PWM pulse width output by the power module to convert the DC power of the battery pack into AC power to supply power to the load; During the peak, flat and valley periods, the working modes of the energy storage emergency power supply with bidirectional current conversion function include the following: Mode 1: During the time period: 06:00-10:00; in the mains power supply mode; At this time, the mains voltage is normal, the AC contactor KM1 is closed, and the mains supplies power to the load; at this time, the bidirectional converter DB stops working, and the AC contactor KM2 is disconnected; Method 2: During the period: 10:00–16:00; in energy release power supply mode; At this time, during the peak period of the mains power, the AC contactor KM1 is disconnected, and the mains power stops supplying power to the load; the bidirectional converter DB runs and works in the off-grid inverter mode, converting the battery group BAT into AC power, and the AC contactor KM2 is closed to supply power to the load; Mode 3: During the period of 16:00 - 22:00; in the mains power supply mode; When the battery voltage is lower than the undervoltage voltage, the bidirectional converter DB stops the inverter operation, the AC contactor KM2 is disconnected, the AC contactor KM1 is closed, and the system switches to the mains power supply state to continue to supply power to the load. Mode 4: During the period 22:00 - 6:00; in energy storage mode; During the peak and valley periods of the mains, the mains voltage is normal and enters the charging mode. The AC contactor KM2 is closed, and the AC power of the mains passes through the transformer BY. The bidirectional converter DB works in the grid-connected rectification mode to convert the AC power of the mains into DC power to charge the battery pack BAT. At the same time, the AC contactor KM1 is closed, and the mains supplies power to the load.