An urban transportation system
By designing the pipeline structure and multi-lane turntable traffic system in the city, traffic safety and environmental problems are solved, people and vehicles are diverted, greening is increased and air purification is achieved, and traffic management costs are reduced.
Patent Information
- Application Number
- CN202210740221.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-28
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-06-28
AI Technical Summary
There are traffic safety problems and living environment problems in modern urban traffic environments, including insufficient safety of motor vehicles and pedestrians, serious urban air pollution, insufficient greening, and high traffic management and maintenance costs.
Design an urban transportation system, including setting up a pipe corridor structure on the ground, a driving lane inside, a non-motorized vehicle lane outside, a non-motorized vehicle lane on the top, and a translucent well and an air drainage device, through a ventilation port and The spray pipes realize air circulation and purification, and are equipped with a multi-lane turntable access system and a three-dimensional parking lot to improve traffic efficiency and safety.
It has achieved the diversion of people and vehicles, improved traffic efficiency and safety, increased urban greening area, reduced electricity consumption and air pollution, and reduced traffic management and maintenance costs.
Smart Images

Figure CN115182211B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of urban roads, and in particular to an urban traffic system. Background Art
[0002] The main traffic arteries in modern cities occupy a large area of the city. The main roads are spacious and open. Motor vehicles shuttle, park and maintain densely on the main roads, branch roads and living areas. Their behavior requires people to be vigilant and risk their lives to walk through the main roads, branch roads, zebra crossings and traffic lights to finally reach their destination. In this process, due to the operation of urban motor vehicles and the large amount of empty environment on the roads, the public areas of urban life lack sufficient natural nutrients and tree-shading effects, the city’s air pollution is serious, and there is a lack of safe roads for walking, which constitutes a hazard to urban traffic safety, the impact of mental tension and environmental disharmony.
[0003] The streets of megacities are spacious and bright, with modern traffic structures such as viaducts and subways. Motor vehicles drive on the streets, and people pass through underground passages or overpasses. The numerous traffic return lines and intersections have resulted in long detours and increased traffic congestion. The establishment of underground passages has higher construction costs and later maintenance costs for flood prevention and lower safety factors. The construction plan of passing through overpasses is even less ideal, with insufficient greening and poor air quality. The management, maintenance and prevention of urban traffic roads are more expensive.
[0004] In short, the construction structure of modern urban traffic environment has serious traffic safety and living environment problems. Summary of the invention
[0005] The technical problem to be solved by the present invention is to solve the problems existing in the above-mentioned background technology and provide an urban transportation system that improves urban traffic efficiency, increases urban greening area, separates people and vehicles, and improves driving and pedestrian safety.
[0006] In order to achieve the above-mentioned technical features, the purpose of the present invention is achieved as follows: an urban transportation system, including a tunnel structure arranged on the ground, a driving lane is arranged inside the tunnel structure, a first non-motorized vehicle lane is arranged on the ground on both sides of the outside of the tunnel structure, sound-proof and light-transmitting windows, vents, and bus stops are arranged on both sides of the tunnel structure, a second non-motorized vehicle lane is arranged on the top of the tunnel structure, and light wells and air drainage devices are arranged along the path of the tunnel structure; passages for pedestrians and non-motorized vehicles to pass to the second non-motorized vehicle lane are arranged on both sides of the outside of the tunnel structure; and greening is arranged on the slopes on both sides of the tunnel structure and the non-traffic area on the top.
[0007] The pipe gallery structure has one channel or multiple channels.
[0008] The entrance and exit, light-transmitting windows, ventilation holes, the top of the bus stop, and one or both sides of the passage of the pipe gallery structure are provided with a first guardrail.
[0009] The opening of the vent in the carriageway is offset from the opening of the outer wall of the pipe gallery structure, and the opening in the carriageway is located in front of the opening of the outer wall of the pipe gallery structure. The opening in the carriageway is at the same height as the opening of the outer wall of the pipe gallery structure, or the opening in the carriageway is higher than the opening of the outer wall of the pipe gallery structure; a protrusion is provided in the vent.
[0010] The bus stop is provided with a bus stop entrance, and the bus stop entrance can be opened and closed.
[0011] A second protective fence is arranged around the light well.
[0012] The air drainage device includes a first channel arranged at the top of the pipe gallery structure, the first channel is connected to the inside of the pipe gallery structure, a second channel is arranged on the side of the first channel, the second channel is connected to the top side of the first channel, the second channel extends upward, and an exhaust channel is arranged on the top; a spray pipe is arranged at the bottom of the second channel on one side of the first channel, a nozzle is arranged on the spray pipe, and the nozzle faces obliquely upward on the opposite side; a water storage sedimentation tank is formed at the bottom of the second channel, and a valve is arranged on the side of the water storage sedimentation tank.
[0013] It also includes a branch road, which is connected to the pipe gallery structure, and a partition door is provided at the connection, and the partition door can be opened and closed.
[0014] When two of the pipe gallery structures intersect vertically and horizontally, a crossroad is formed in the lanes inside the pipe gallery structure, and a multi-lane roundabout system is provided at the crossroad; the multi-lane roundabout system includes a first ring road, a second ring road, and a third ring road which are arranged from inside to outside at the intersection of the lanes of the pipe gallery structure;
[0015] The second ring road is provided with a first cross-line passage on the right side of each intersection and a second cross-line passage on the left side of each intersection at the intersection;
[0016] The first ring road is provided with a third cross-line passage near the second cross-line passage, and a fourth cross-line passage is provided in the direction toward the intersection.
[0017] It also includes a three-dimensional parking lot, which is connected to the pipe gallery structure and is connected to nearby non-motor vehicles, sidewalks and branch roads.
[0018] The present invention has the following beneficial effects:
[0019] 1. The tunnel structure is set as a motor vehicle lane, and non-motor vehicle lanes are set on both sides of the tunnel structure. People and vehicles are separated, the traffic efficiency is high, vehicles and pedestrians do not interfere with each other, and the safety is high. A non-motor vehicle lane is built on the top of the tunnel structure. Through the passage, pedestrians and non-motor vehicles can enter the top of the tunnel structure from the ground, and can cross the tunnel structure, or ride or walk along the second non-motor vehicle lane on the top of the tunnel structure, which has high traffic efficiency.
[0020] 2. The slope protection on both sides of the corridor structure and the non-passable area on the top are greened, which increases the urban greening area and enhances the scope and effect of people's daily leisure and entertainment.
[0021] 3. The bus stop is convenient for pedestrians to take the bus. The light well allows light to enter the corridor structure from the top of the corridor structure, reducing the power consumption in the corridor structure. The air drainage device is used to exhaust the air in the corridor structure so that the air in the corridor structure can circulate.
[0022] 4. The opening of the vent in the driving lane is offset from the opening of the outer wall of the pipe gallery structure, and the opening in the driving lane is located in front of the opening of the outer wall of the pipe gallery structure. With this structure, when a vehicle passes the vent quickly, the vehicle reduces the air pressure around the vent in the pipe gallery structure, and the outside air enters the pipe gallery structure through the vent to balance the air pressure, thereby allowing the pipe gallery structure to continuously obtain fresh air.
[0023] 5. A raised portion is provided inside the vent to facilitate the entry of natural wind from outside into the tunnel structure and prevent dust pollution inside the tunnel structure from flowing out.
[0024] 6. The exhaust channel has a turning exhaust structure, which reduces the noise coming out of the channel. The water in the spray pipe is sprayed upward through the spray group, which not only has a larger area for combining with the air in the channel, but also reduces dust and purifies the polluted air, and forms an upward airflow, which is convenient for the air in the pipe gallery structure to be discharged.
[0025] 7. The branch road is connected to the pipe gallery structure, and a partition door is provided at the connection point, which can be opened and closed. The partition door adopts a transparent sound insulation and wind blocking structure, which plays the role of sound insulation and wind blocking, preventing pollution spillover and managing the entry and exit of motor vehicles.
[0026] 8. The intersection is equipped with a multi-lane roundabout system. All turns are right during the entire process, and the traffic is one-way according to the traffic rules of keeping to the right for those close and to the left for those far away, which improves the efficiency of traffic operation and traffic safety.
[0027] 9. The multi-story parking lot serves as a centralized parking space for nearby motor vehicles and a transfer space for buses, non-motor vehicles and pedestrians. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.
[0029] Figure 2 It is a schematic diagram of the multi-channel structure of the pipeline gallery structure of the present invention.
[0030] Figure 3 This is another schematic diagram of the multi-channel structure of the pipe gallery of the present invention.
[0031] Figure 4 It is a schematic diagram of the transverse cross-sectional structure of the vent of the present invention.
[0032] Figure 5 for Figure 4 Schematic diagram of the AA section structure of the central vent.
[0033] Figure 6 It is a schematic diagram of the structure of the air drainage device of the present invention.
[0034] Figure 7 It is a schematic diagram of the structure of the multi-lane roundabout passage system of the present invention.
[0035] In the figure: pipe gallery structure 10, slope protection 11, first non-motorized vehicle lane 12, second non-motorized vehicle lane 13, non-traffic area 14, first guardrail 15;
[0036] Light-transmitting window 20, vent 30, protrusion 31, channel 40;
[0037] Bus platform 50, bus stop entrance 51, branch road 60, partition door 61;
[0038] Light well 70, second protection fence 71;
[0039] Air drainage device 80, first channel 81, second channel 82, exhaust channel 83, spray pipe 85, water storage sedimentation tank 86, valve 87;
[0040] A multi-lane turntable system 90, a first ring road 91, a second ring road 92, a third ring road 93, and a multi-story parking lot 100;
[0041] The first cross-line channel 1a, the second cross-line channel 1b, the third cross-line channel 1c, and the fourth cross-line channel 1d. DETAILED DESCRIPTION
[0042] The embodiments of the present invention are further described below in conjunction with the accompanying drawings.
[0043] Embodiment 1:
[0044] See also Figure 1-7, an urban transportation system, comprising a pipe gallery structure 10 arranged on the ground, a driving lane is arranged inside the pipe gallery structure 10, a first non-motorized vehicle lane 12 is arranged on the ground on both sides of the outside of the pipe gallery structure 10, soundproof and light-transmitting windows 20, vents 30, and bus stops 50 are arranged on both sides of the pipe gallery structure 10, a second non-motorized vehicle lane 13 is arranged on the top of the pipe gallery structure 10, and a light well 70 and an air drainage device 80 are arranged along the path of the pipe gallery structure 10; a passage 40 for pedestrians and non-motorized vehicles to pass to the top of the pipe gallery structure 10 is arranged on both sides of the outside of the pipe gallery structure 10; greening is arranged on the slope protection 11 on both sides of the pipe gallery structure 10 and the non-passing area 14 on the top. The pipe gallery structure 10 is formed by a reinforced concrete structure or a steel frame structure through segmented assembly and construction, a motor vehicle driving lane is arranged inside the pipe gallery structure 10, and a first non-motorized vehicle lane 12 for non-motorized vehicles and pedestrians is arranged on both sides of the outside of the pipe gallery structure 10, people and vehicles are separated, the traffic efficiency is high, motor vehicles and pedestrians do not interfere with each other, and the safety is high. A second non-motorized vehicle lane 13 for non-motorized vehicles and pedestrians is built on the top of the pipe gallery structure. The passage 40 is a ramp and steps connecting the ground to the second non-motorized vehicle lane 13 on the top of the pipe gallery structure 10. Pedestrians and non-motorized vehicles can enter the top of the pipe gallery structure 10 through the passage 40, and can ride or walk along the second non-motorized vehicle lane on the top of the pipe gallery structure 10, with high traffic efficiency, and can also cross the pipe gallery structure 10 through the passage 40. The slope protection 11 on both sides of the pipe gallery structure 10 and the non-traffic area 14 on the top are greened, increasing the urban greening area. The soundproof and light-transmitting window 20 is made of double-layer or multi-layer hollow or vacuum transparent materials, such as transparent glass, with good light transmission and sound insulation performance, providing light for the pipe gallery structure 10 while blocking the noise in the pipe gallery structure 10. The vent 30 supplies air to the pipe gallery structure 10. The bus stop 50 is convenient for pedestrians to take the bus. The light well 70 allows light to enter the pipe gallery structure 10 from the top of the pipe gallery structure 10, reducing the power consumption in the pipe gallery structure 10. The air drainage device 80 is used to exhaust the air in the pipe gallery structure 10 so that the air in the pipe gallery structure 10 can circulate. The air drainage device 80 can be an exhaust axial flow fan or an exhaust channel.
[0045] See also Figure 1-3 In a preferred embodiment, the pipe gallery structure 10 has one channel, which is suitable for the working condition when the lane width is narrow. The pipe gallery structure 10 can be made by prefabrication or cast-in-place. The pipe gallery structure 10 has multiple channels. When the lane is wide and the strength of one channel structure cannot meet the demand, the driving efficiency can be improved by adding channels. Multiple channels can be added by adding load-bearing columns or walls in a large channel, or multiple single channels can be placed side by side.
[0046] See also Figure 1In a preferred solution, the entrances and exits of the pipe gallery structure 10, the light-transmitting windows, the vents, the entrances to the bus stops and the entrances to the branch roads, and one side or both sides of the passage 40 are provided with first guardrails 15 to protect pedestrians and prevent them from falling from the top of the pipe gallery structure 10 or the passage 40. Furthermore, when the second non-motorized vehicle lane 13 is located at the top edge of the pipe gallery structure 10, a guardrail can be installed on one side of the edge of the top of the pipe gallery structure 10, or guardrails can be installed on both sides of the second non-motorized vehicle lane 13 to protect greenery.
[0047] See also Figure 4 , 5 In a preferred solution, the vents 30 are constructed on the walls on both sides of the corridor structure, the openings in the carriageway are misaligned with the openings on the outer wall of the corridor structure 10, and the openings in the carriageway are located in front of the openings on the outer wall of the corridor structure 10. With this structure, when a vehicle passes the vents 30 quickly, the vehicle reduces the air pressure around the vents 30 in the corridor structure 10, and the outside air enters the corridor structure 10 through the vents 30 to balance the air pressure, so that the corridor structure 10 can continuously obtain fresh air. Preferably, the opening in the carriageway is at the same height as the opening on the outer wall of the corridor structure 10, the structure is simple, and the construction is convenient. In another solution, the opening in the carriageway is higher than the opening on the outer wall of the corridor structure 10, which facilitates better airflow. A raised portion 31 is provided in the vent 30, which plays the role of allowing the outside natural wind to easily enter the interior of the corridor structure 10 and preventing dust pollution inside the corridor structure 10 from flowing out. The raised portion 31 can be a brick wall or a metal partition. Furthermore, the opening of the outer wall of the tunnel structure of the vent 30 is provided with a sound insulation protection net, which can be made of a polypropylene ventilation and noise reduction net or an aluminum honeycomb panel, so as to achieve the effects of sound insulation and noise reduction, ventilation, and preventing pedestrians from entering.
[0048] See also Figure 1 In a preferred solution, the bus station 50 is provided with a bus stop 51, which can be opened and closed. Specifically, the bus stop 51 is composed of a thickened soundproof transparent curtain structure, such as a double-layer, multi-layer or sandwich structure with transparent and soundproof effects of cloth curtains, plastics, glass, etc., to achieve the functions of light transmission, sound insulation, wind blocking and pollution prevention, which is convenient for people to enter and exit. It can also be an automatically opened and closed light-transmitting shielding door, which automatically opens after the bus arrives. It is opened when riding and closed when waiting for the bus, which has the functions of lighting, reducing noise and dust pollution.
[0049] See also Figure 1 In a preferred embodiment, the light well 70 is provided with a glass-enclosed opening, which not only satisfies the lighting requirements but also isolates the noise and prevents dust and exhaust gas from escaping from the light well 70. A second guardrail 71 is provided around the light well 70 to prevent accidents caused by stepping on the glass.
[0050] See also Figure 6 The air drainage device 80 includes a first channel 81 arranged at the top of the pipe gallery structure 10, the first channel 81 is connected to the inside of the pipe gallery structure 10, a second channel 82 is arranged on the side of the first channel 81, the second channel 82 is connected to the top side of the first channel 81, the second channel 82 extends upward, and an exhaust channel 83 is arranged on the top; a spray pipe 85 is arranged at the bottom of the second channel 82 on the side close to the first channel 81, and a nozzle is arranged on the spray pipe 85, and the nozzle faces obliquely upward on the opposite side; a water storage sedimentation tank 86 is formed at the bottom of the second channel 82, and a valve 87 is arranged on the side of the water storage sedimentation tank 86. The turning exhaust structure reduces the noise transmitted from the channel, and a spray pipe 85 can be installed in the second channel 82, and a water storage sedimentation tank 86 can be formed at the bottom of the second channel 82. The nozzle of the spray pipe 85 faces the opposite oblique upper direction, and the water in the spray pipe 85 is sprayed upward through the nozzle in atomization, which not only has a larger area for combining with the air in the channel, but also forms an upward airflow, driving the air in the pipe gallery structure 10 into the air drainage device 80, and then discharged through the exhaust channel 83 after dust removal and purification. A water storage sedimentation tank 86 is formed at the bottom of the second channel 82, so that the dust removal water sprayed by the nozzle is recycled after precipitation in the sedimentation tank 86, for example, a circulating filtration system is used to connect with the spray pipe 85 for recycling. The spray pipe 85 can also be connected to the municipal pipe network. A valve 87 is provided at the bottom of the side of the water storage sedimentation tank 86 to facilitate the discharge of water in the water storage sedimentation tank 86, to prevent the water storage sedimentation tank 86 from being overfilled or the discharged water from being used for greening watering. For the sludge in the water storage sedimentation tank 86, a door can be provided on the side wall of the second channel 82 to enter the second channel 82 for cleaning. Further, in order to increase the air drainage effect of the air drainage device 80, a fan is provided at the connection between the first channel 81 and the second channel 82, and the air inlet of the fan faces the first channel 81. In order to achieve a better dust reduction and purification effect in the second channel 82, a plurality of spray pipes 85 with a spray effect can be further arranged in the second channel 82.
[0051] Furthermore, the first channel 81 is a transparent structure, for example, it is installed with hollow, vacuum, double-layer or multi-layer glass or organic glass, which can not only meet the air drainage function, but also provide lighting and sound insulation for the corridor structure 10.
[0052] Embodiment 2:
[0053] Based on Example 1, see Figure 1, and also includes a branch road 60, which is connected to the pipe gallery structure 10, and a partition door 61 is provided at the connection, and the partition door 61 can be opened and closed. The partition door 61 adopts a light-transmitting, sound-insulating and wind-blocking structure, which plays the role of increasing lighting, sound-insulating and wind-blocking, blocking pollution spillover, and managing the entry and exit of motor vehicles. For example, the shield door structure in the subway station. The branch road is mainly used for the passage of emergency vehicles.
[0054] Embodiment three:
[0055] On the basis of the first embodiment, when two vertical pipe gallery structures 10 are constructed, a cross intersection will be encountered, so a circular turntable passage system with better passage efficiency is designed.
[0056] See also Figure 7 When two of the pipe gallery structures 10 intersect vertically and horizontally, a crossroad is formed, and the crossroad is provided with a multi-lane roundabout system 90; the multi-lane roundabout system 90 includes a first ring road 91, a second ring road 92, and a third ring road 93 arranged from inside to outside at the intersection of the lanes of the pipe gallery structure 10;
[0057] The second ring road 92 is provided with a first cross-line passage 1a on the right side of each intersection and a second cross-line passage 1b on the left side of each intersection at the intersection;
[0058] The first loop channel 91 is provided with a third cross-line passage 1c near the second cross-line passage 1b, and is provided with a fourth cross-line passage 1d in the direction toward the intersection.
[0059] When a vehicle at the first intersection needs to enter the second intersection, it directly turns right to enter the third ring road 93, and then turns right to enter the second intersection.
[0060] When a vehicle at the first intersection needs to enter the third intersection, it first enters the second ring road 92 through the first cross-line passage 1a of the first intersection. When it is about to reach the third intersection, it enters the third ring road 93 from the second cross-line passage 1b on the right side of the third intersection, and then turns right to enter the third intersection.
[0061] When a vehicle at the first intersection needs to enter the fourth intersection, it first enters the second ring road 92 through the first cross-line passage 1a of the first intersection, and then enters the first ring road 91 through the third cross-line passage 1c between the first intersection and the second intersection. When passing the third intersection, it enters the second ring road 92 from the fourth cross-line passage 1d at the third intersection, and then enters the third ring road 93 from the second cross-line passage 1b between the third and fourth intersections, and then turns right to enter the fourth intersection.
[0062] The whole process is all right turns, and the traffic rules of close to the right and far to the left are one-way (forward) driving, which improves the efficiency of traffic operation and traffic safety. In the whole system, the third ring road 93 in front of the left lane is always free of vehicles, so you can turn around in this lane at any time, and the traffic efficiency is high.
[0063] Embodiment 4:
[0064] See also Figure 1 , further comprising a three-dimensional parking lot 100, wherein the three-dimensional parking lot 100 is connected to the pipe gallery structure 10 , The three-dimensional parking lot 100 can be located on the ground or underground, which is convenient for parking and saves ground space. For example, Chinese patent document CN2022202259913 discloses a three-dimensional parking lot for urban motor vehicles.
[0065] Around the three-dimensional parking lot 100, for the convenience of residents, there are non-motor vehicle parking places, bus stops, and branch roads. The non-motor vehicle parking places are connected to the nearby non-motor vehicle roads, and the bus stops are connected to the nearby branch roads.
[0066] Economic benefits: As the background technology status, there is a 1.5-kilometer main road from south to north in a university campus in a certain city. There are about 50 traffic police, auxiliary police, security guards and other personnel, and the annual salary is about 3 million. In addition to traffic maintenance, traffic prevention and other expenses, the annual use expenses are between 4-5 million, which is 40 to 50 million in ten years. Moreover, it has an unforgettable existence for the personal safety and mental impact of pedestrians, as if they have been operating and living in an environment of serious traffic pollution, traffic danger and high vigilance for a long time. The construction cost of the present invention is a one-time investment with a permanent benefit effect. After the construction is completed, the use process only needs to be repaired according to the wear and tear. The main road in the pipe gallery structure has basically become a convenient highway. The traffic maintenance of the main road has formed a maintenance method and maintenance cost similar to that of the highway outside the city, without too much operation and maintenance expenses like the current urban main roads. It solves the problem of a large amount of financial cost burden for urban traffic operation, maintenance and management.
[0067] Working process and principle of the present invention:
[0068] Pedestrians walk on the first non-motorized vehicle lane 12 outside the tunnel structure 10 and the second non-motorized vehicle lane 13 on the top, and vehicles travel through the internal lane of the tunnel structure 10. People and vehicles are separated, and vehicles can travel quickly and safely, and pedestrians walk more safely. The two sides of the tunnel structure 10 are provided with soundproof light-transmitting windows 20 and a light well 70 on the top and other light-transmitting structures to increase the lighting in the tunnel structure 10. Ventilation holes 30 and air drainage devices 80 are provided to ventilate the tunnel structure 10. A bus stop 50 is provided to facilitate pedestrians to take the bus. The top of the tunnel structure 10 is provided with a light well 70 and an air drainage device 80 to provide more sufficient lighting for the tunnel structure 10. The air drainage device 80 is convenient for discharging polluted air in the tunnel structure 10 and spraying, filtering and purifying the polluted air. A road for non-motorized vehicles and pedestrians is built on the top of the tunnel structure. Through the passage 40, pedestrians can walk along the top of the tunnel structure 10 and can cross the tunnel structure 10 through the passage 40. The slope protection 11 on both sides of the pipe gallery structure 10 and the non-traffic area 14 on the top are greened. A multi-lane roundabout system 90 is provided at the intersection of the pipe gallery structure. All the turns are right during the whole process, and the traffic rules of near right and far left are one-way driving, which improves the efficiency of traffic operation and traffic safety. The multi-story parking lot plays the role of centralized parking of nearby motor vehicles and transfer of buses, non-motor vehicles and pedestrians.
Claims
1. An urban transportation system, characterized in that: The invention comprises a pipe gallery structure (10) arranged on the ground, wherein a driving lane is arranged inside the pipe gallery structure (10), first non-motorized vehicle lanes (12) are arranged on the ground on both sides of the outside of the pipe gallery structure (10), soundproof and light-transmitting windows (20), vents (30), and a bus stop (50) are arranged on both sides of the pipe gallery structure (10), a second non-motorized vehicle lane (13) is arranged on the top of the pipe gallery structure (10), and a light well (70) and an air drainage device (80) are arranged along the path of the pipe gallery structure (10); passages (40) for pedestrians and non-motorized vehicles to pass to the second non-motorized vehicle lane (13) are arranged on both sides of the outside of the pipe gallery structure (10); and greening is arranged on the slope protection (11) on both sides of the pipe gallery structure (10) and the non-traffic area (14) on the top; The opening of the vent (30) in the carriageway is misaligned with the opening of the outer wall of the pipe gallery structure (10), and the opening in the carriageway is located in front of the opening of the outer wall of the pipe gallery structure (10). The opening in the carriageway is at the same height as the opening of the outer wall of the pipe gallery structure (10), or the opening in the carriageway is higher than the opening of the outer wall of the pipe gallery structure (10). A protrusion (31) is provided in the vent (30).
2. An urban transportation system according to claim 1, characterized in that: The pipe gallery structure (10) has one channel or multiple channels.
3. An urban transportation system according to claim 1, characterized in that: A first guardrail (15) is provided at the entrance and exit of the pipe gallery structure (10), the light-transmitting window (20), the vent (30), above the bus stop (50), and on one or both sides of the passage (40).
4. An urban transportation system according to claim 1, characterized in that: The bus stop (50) is provided with a bus stop entrance (51), and the bus stop entrance (51) can be opened and closed.
5. An urban transportation system according to claim 1, characterized in that: Second protective fences (71) are provided around the light-transmitting well (70).
6. An urban transportation system according to claim 1, characterized in that: The air drainage device (80) comprises a first channel (81) arranged at the top of the pipe gallery structure (10), the first channel (81) being in communication with the interior of the pipe gallery structure (10), a second channel (82) being arranged on the side of the first channel (81), the second channel (82) being in communication with the top side of the first channel (81), the second channel (82) extending upward, and an exhaust channel (83) being arranged on the top; a spray pipe (85) being arranged at the bottom of the second channel (82) on the side close to the first channel (81), a nozzle being arranged on the spray pipe (85), the nozzle being oriented obliquely upward to the opposite side; a water storage sedimentation tank (86) being formed at the bottom of the second channel (82), a valve (87) being arranged on the side of the water storage sedimentation tank (86).
7. An urban transportation system according to claim 1, characterized in that: It also comprises a branch road (60), wherein the branch road (60) is in communication with the pipe gallery structure (10), and a partition door (61) is provided at the connection point, and the partition door (61) can be opened and closed.
8. An urban transportation system according to claim 1, characterized in that: When two of the pipe gallery structures (10) intersect vertically and horizontally, a crossroad is formed at the internal lanes of the pipe gallery structure (10), and a multi-lane roundabout system (90) is provided at the crossroad; the multi-lane roundabout system (90) comprises a first ring road (91), a second ring road (92), and a third ring road (93) provided from inside to outside at the intersection of the lanes of the pipe gallery structure (10); The second ring road (92) is provided with a first cross-lane passage (1a) on the right side of each intersection and a second cross-lane passage (1b) on the left side of each intersection at the intersection; The first ring road (91) is provided with a third cross-line passage (1c) near the second cross-line passage (1b), and a fourth cross-line passage (1d) in the direction of the intersection.
9. An urban transportation system according to claim 1, characterized in that: It also includes a three-dimensional parking lot (100), wherein the three-dimensional parking lot (100) is connected to the pipe gallery structure (10).
Citation Information
Cited By
Urban traffic target tracking method and system based on pruning and iteration
CN117037029A
