A comprehensive working vehicle control method

Through the comprehensive work vehicle control method, combined with the hydraulic system and belt transportation, automatic oiling of sleeper bolts and quantitative replenishment of ballast are realized, which solves the problems of single operation method and poor coordination in the existing technology, and improves the efficiency of railway temporary repair operations. and security.

CN115193614BActive Publication Date: 2024-10-25ZHUZHOU TIMES ELECTRONICS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210809075.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-11
Publication Date
2024-10-25
Estimated Expiration
2042-07-11

AI Technical Summary

Technical Problem

The existing railway operating vehicles have a single operating method and poor coordination between each operating unit, making it impossible to simultaneously oil the sleeper bolts and automatically replenish the ballast.

Method used

The comprehensive work vehicle control method is adopted, and the lifting drive mechanism and detection sensors are used to collaboratively control the rail oiling mechanism and ballast replenishing device to realize automatic oiling of sleeper bolts and quantitative replenishment of ballast. Combined with the hydraulic system and belt conveying mechanism, the operation is ensured Fixed-point quantification and safety.

Benefits of technology

It achieves centralized control of multiple operating functions, improves the efficiency of railway temporary repair operations, reduces device research and development costs, ensures the safety of the operating process and equipment, and realizes continuous fixed-point and quantitative oiling and ballasting at different driving speeds. Operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115193614B_ABST
    Figure CN115193614B_ABST
Patent Text Reader

Abstract

The present invention discloses a control method for an integrated working vehicle, comprising the following steps: S10) When the integrated working vehicle is running, the lifting and driving mechanism drives the rail-leaning oiling mechanism to perform a downward pressing rail-leaning operation, and each time the detection sensor detects a sleeper bolt signal, the control device outputs a signal to control the rail-leaning oiling mechanism to perform an automatic oiling operation; S20) At the same time, the control device calculates the time to reach the pick hole according to the sleeper bolt signal, the operating running speed, and the distance between the ballast-dropping mouth of the ballast-feeding device and the sleeper bolt, and controls the ballast-feeding device to quantitatively transport the ballast. When the ballast-dropping mouth moves to the top of the pick hole, the control device controls the ballast to fall from the ballast-feeding device and backfill it into the pick hole. The present invention can solve the technical problems that the existing working vehicle has a single operating mode, poor coordination between the various operating units, and cannot simultaneously realize the sleeper bolt oiling and automatic ballast-feeding operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of railway engineering machinery, and in particular to a whole vehicle running and core device control method for a railway line integrated operation vehicle. Background Art

[0002] As of 2019, the total mileage of my country's railways has reached 139,000 kilometers, and the mileage of high-speed railways has reached 35,000 kilometers, with a passenger volume of 70% of the total passenger volume. Its normal operation has an increasing impact on national travel and business activities. In order to ensure the normal operation of the railway, large and medium-sized maintenance operations are usually carried out regularly. However, after the completion of the large and medium-sized maintenance of the railway line and before the arrival of the next large and medium-sized maintenance cycle, the railway line will still have a variety of diseases such as bolt rust, sleeper damage, ballast mud, and roadside bushes. Temporary maintenance operations are also required to be organized by the engineering section. At present, there are still various defects and deficiencies in the temporary maintenance of railway lines, which are mainly manifested as follows: First, the inspection and maintenance of each professional section of engineering, electricity, and supply are self-contained systems, and their inspection devices, maintenance machines, and scattered operations; second, the various machines have a low degree of mechanization and single functions, and most of them need to be carried on the shoulder and pushed, which is labor-intensive; third, the correlation between the various professions is poor, and the utilization rate of maintenance skylights is low.

[0003] In order to reduce the labor intensity of temporary repairs during railway line maintenance, improve the overall efficiency of temporary repairs and the utilization rate of skylights, and meet the needs of integrated maintenance and production management, it is necessary to develop a comprehensive operation vehicle that can meet a variety of temporary repair operations, which can simultaneously carry out automatic bolt oiling, sleeper replacement (including sleeper transportation and lifting and unloading), ballast replacement (including turnout ballast replacement, mud and mud treatment), automatic ballast filling in tamping holes, tree felling and weeding, repair of intrusive shrubs and other temporary repair operations. Since a variety of operating devices are loaded on the comprehensive operation vehicle at the same time, the running of the whole vehicle needs to adapt to the operating requirements of different operating devices, and at the same time, each device needs to work together safely. Therefore, the development of a comprehensive operation vehicle whole vehicle running and core device control system has become the key to ensuring the safe, stable and efficient running and operation of the comprehensive operation vehicle.

[0004] In the prior art, the following technical solutions are mainly related to the present invention:

[0005] Prior art 1 is a Chinese invention application filed by China Railway Construction High-Tech Equipment Co., Ltd. on August 30, 2018, and published on December 28, 2018, with publication number CN 109098050A. The invention discloses a railway sleeper ballast backfilling and compacting integrated operation vehicle, including a frame, a ballast storage bucket installed on the frame, and a ballast backfilling and compacting device installed below the frame. Compared with the prior art, the invention can simultaneously perform ballast cleaning on the sleepers, backfilling of the pick pockets, and ballast compaction maintenance operations, and can simultaneously configure the corresponding intelligent detection and control system to realize the automatic backfilling operation of the tamping pick pockets and the automatic compaction operation of the ballast between the sleepers, as well as the fixed-point quantitative ballast unloading operation and fixed-point compaction operation, thereby replacing the existing manual backfilling of the pick pockets and ballast compaction maintenance operations, which not only greatly saves labor costs, but also greatly improves the efficiency of maintenance operations.

[0006] Prior art 2 is a Chinese utility model patent applied for by China Railway Construction High-Tech Equipment Co., Ltd. and China Railway Corporation on January 25, 2019, and announced on March 27, 2020, with the announcement number CN210194356U. The utility model discloses a pick-hole backfilling vehicle, including a vehicle body and a pick-hole backfilling device. The vehicle body is equipped with a ballast replenishing device, which includes a boom and a grab bucket. The ballast replenishing device replenishes ballast into the pick-hole backfilling device. The pick-hole backfilling vehicle of the utility model can automatically backfill the pick-hole formed by the tamping operation at a fixed point and in a fixed quantity, eliminating the manpower and working hours required for manual backfilling of the pick-hole, and saving labor costs. When ballast is accumulated at the bottom of the slope, the bottom ballast removal mode is adopted. The ballast bucket is moved to the bottom of the slope by the crane arm to grab the ballast and transport it into the ballast bucket. When there is no ballast at the bottom of the slope, the side slope ballast removal mode is adopted. The side slope ballast is gathered by the side plow, and the grab bucket is moved to the side slope to grab the ballast and transport it into the ballast bucket. When grabbing ballast, the bottom of the grab bucket follows the slope angle without destroying the shape of the slope. If the shape of the slope is accidentally destroyed, the side plow can be used to reshape the slope and restore the shape of the slope.

[0007] Prior art 3 is a Chinese invention application filed by Huainan Mining (Group) Co., Ltd. on September 24, 2021, and published on December 10, 2021, with publication number CN113769920A. The invention discloses an automatic oil spraying device and oil spraying method for sleeper bolts, wherein a mounting bracket is mounted on a track lifting and shifting device of a tamping vehicle; a mounting base is fixedly mounted on the mounting bracket, the mounting bracket is provided with a cavity, a lead screw is rotatably mounted in the cavity, a motor is mounted at one end of the mounting bracket, and the motor is connected to the lead screw; a slider is disposed in the cavity and is threadedly connected to the lead screw, a limiter is fitted on one side of the mounting base, and the limiter is connected to the slider; the limiter has a downward mounting column, a third proximity switch and an oil nozzle are mounted on the mounting column; an oil circuit and air circuit system is connected to the oil nozzle; and a control system is connected to the first proximity switch, the second proximity switch, the third proximity switch, and the oil circuit and air circuit system. The invention realizes automatic positioning of the sleeper bolts through the third proximity switch, and the control system controls the oil spray nozzle to automatically spray the sleeper bolts, thereby achieving the purpose of automatic spraying of the sleeper bolts.

[0008] However, the above-mentioned existing technologies 1-3 still have the technical defects of relatively single operation types and being unable to meet the needs of multi-purpose comprehensive operations, especially being unable to meet the technical defects of coordinated control of multiple operation devices. Summary of the invention

[0009] In view of this, the purpose of the present invention is to provide a comprehensive work vehicle control method to solve the technical problems that the existing work vehicles have a single operating mode, poor coordination between the various work units, and cannot simultaneously realize sleeper bolt oiling and automatic ballast replenishing operations.

[0010] In order to achieve the above-mentioned invention object, the present invention specifically provides a technical implementation scheme of a comprehensive working vehicle control method, and the comprehensive working vehicle control method comprises the following steps:

[0011] S10) When the integrated operation vehicle is running, the lifting drive mechanism drives the rail-to-rail oiling mechanism to perform a downward rail-to-rail operation, and each time the detection sensor detects a sleeper bolt signal, the control device outputs a signal to control the rail-to-rail oiling mechanism to perform an automatic oiling operation;

[0012] S20) At the same time, the control device calculates the time to reach the pick hole according to the sleeper bolt signal, the operating speed and the distance between the ballast drop opening of the ballast filling device and the sleeper bolt, and controls the ballast filling device to quantitatively transport the ballast. When the ballast drop opening moves to the top of the pick hole, the control device controls the ballast to fall from the ballast filling device and backfill into the pick hole.

[0013] Furthermore, at the bottom of the frame of the comprehensive working vehicle, an oiling device is installed at the working front end of the ballast filling device. The oiling device includes a rail-resting oiling mechanism, and the lifting drive mechanism can drive the rail-resting wheel assembly of the rail-resting oiling mechanism to perform a rail-resting operation. The rail-resting wheel assembly includes a slide, an axle pressure plate, a sleeve and a rail-resting wheel. The slide and the sleeve constitute a mounting frame of the rail-resting wheel, and the sleeve is sleeved on the transverse guide column. Two rotating shafts are respectively arranged on the front and rear sides of the slide, and the rail-resting wheel is movably mounted on the slide through the axle pressure plate. The step S10) includes:

[0014] When the control device performs operation control on the oiling device, the lifting drive mechanism is first unlocked, and then the lifting drive mechanism is controlled to extend and descend. When the lifting drive mechanism descends until the rail wheel approaches the rail, the height sensor detects the rail signal, and the control device controls the rail drive mechanism to drive the rail wheel to perform automatic railing operation according to the rail signal. After the rail wheel successfully approaches the rail, the sleeper bolt oiling operation function is started. The control device can perform a start logic judgment based on the collected oil tank temperature and liquid level sensor signals. After the start conditions are met, the anti-rust oil hydraulic pump inside the oil tank is controlled to start, and then the integrated operation vehicle is controlled to work in a low constant speed driving mode. During the running process of the integrated operation vehicle, whenever the detection sensor detects a sleeper bolt signal, the control device automatically outputs a control signal to open the oiling solenoid valve of the oil injection component to perform automatic oiling operation. The control device can automatically match the oil injection duration and delay time of the oil injection component according to different operating driving speeds to ensure fixed-point and quantitative oiling operations at different operating speeds. After the oiling operation is completed, the control device controls the lifting drive mechanism to rise and lock, and at the same time controls the anti-rust oil hydraulic pump of the oil tank to stop working.

[0015] Further, the step S10) includes:

[0016] After the comprehensive operation vehicle arrives at the work site, the locking mechanism is opened before the oiling operation is carried out. The lifting drive mechanisms on the left and right sides extend synchronously, and lower the rail-resting oiling mechanism by driving the main frame. When the rail-resting wheel assembly of the rail-resting oiling mechanism contacts the rail, the rail-resting drive mechanism releases the pressure, and the rail-resting wheel assembly moves under the action of the compression spring, and ensures that the wheel rim of the rail-resting wheel of the rail-resting wheel assembly contacts the inner side of the rail to complete the rail-resting action. The oil injection assembly of the rail-resting oiling mechanism turns on the sleeper bolt signal detection and nozzle control. After the oiling operation is completed, the rail-resting drive mechanism stretches to drive the rail-resting wheel to detach from the inner side of the rail, and the lifting drive mechanism drives the rail-resting oiling mechanism to lift, and the rail-resting drive mechanism releases the pressure, and the rail-resting wheel assembly moves under the action of the compression spring to lock the locking mechanism with the main frame.

[0017] Furthermore, two groups of oil spray assemblies are symmetrically arranged on the left and right sides of the rail wheel assembly, and the detection sensors and nozzles of the two groups of oil spray assemblies are installed in a cross-symmetrical structure relative to the left and right sides of the rail. When the detection sensor located on the inner side detects the signal of the inner sleeper bolt, the outer nozzle is controlled to open. When the detection sensor located on the outer side detects the signal of the outer sleeper bolt, the inner nozzle is controlled to open.

[0018] Furthermore, during the oiling operation, when the oil spraying assembly encounters an obstacle on the line, the connecting rod mechanism formed by the swing rod and the oil spraying assembly swings back and forth along the line direction to avoid the obstacle. After passing the obstacle, the swing rod is reset under the action of the torsion spring.

[0019] Furthermore, when the oiling device is operating in a curve, the center of the frame is offset relative to the center of the rail. At this time, adaptive lateral deflection is achieved through the guiding mechanism and the stretching mechanism to ensure that the rail-resting wheel assembly is always in contact with the rail to achieve curve operation.

[0020] Furthermore, when the oiling device is operating in a curve, the relationship between the lateral displacement Δx and the inclination angle θ of the rail-applying oiling mechanism is calculated according to the following formula:

[0021]

[0022]

[0023] Where a is the distance from the upper rotation point to the guide post, h is the vertical distance between the upper rotation point and the lower rotation point, θ is the angle of inclination of the guide post, b is the distance from the upper rotation point to the lower rotation point, c is the distance from the lower rotation point to a, θ 1 is the angle between b and the horizontal direction, θ 2 is the angle between b and c, Δx is the horizontal displacement of the lower turning point when a rotates by angle θ, R is the radius of the curve, L is the distance between point A of the front wheel of the comprehensive working vehicle and point C of the rear wheel, point B is the installation position of the oiling device, and L 1 Draw a perpendicular to line segment AC through point B, and the distance between the foot of the perpendicular and point A.

[0024] Further, the step S20) includes:

[0025] A ballast-replenishing device for ballast backfilling is installed on the frame of the integrated work vehicle. When the control device performs operation control on the ballast-replenishing device, it first unlocks the lifting drive mechanism, and then controls the lifting drive mechanism to extend and descend until the rail-resting wheel contacts the rail surface and maintains a successful rail-resting state. The automatic ballast-replenishing operation function is started, and the control device outputs a signal to control the power supply of the second power mechanism, and establishes communication with the second power mechanism. At the same time, the control device reads the signal of the second power mechanism to determine whether it is working normally. After the control device completes the communication with the second power mechanism, it controls the integrated work vehicle to work in a low constant speed driving mode. While the integrated work vehicle is moving, the second power mechanism is synchronously started and quantitatively delivers ballast to the ballast bucket. During the travel of the comprehensive operation vehicle, when the detection sensor detects a sleeper bolt signal, the control device performs a delay calculation so that the ballast drop port moves to the position in the middle of the sleeper where the sleeper bolt is located corresponding to the detection signal. The control device outputs a signal to control the ballast drop valve to open once for automatic ballast replenishment operation, and the ballast falls from the ballast drop bucket into the pickaxe nest.

[0026] Further, the step S20) includes:

[0027] The integrated operation vehicle is running continuously. When the ballast dropping port is located directly above the pick pocket, the control device outputs a trigger signal to control the valve driving mechanism to drive the ballast dropping valve to open, and the ballast falls from the ballast dropping bucket into the pick pocket. When the ballast dropping is completed, the ballast dropping valve is closed. The control device also infers the distance of the next group of four pick pockets based on the spacing of the next group of sleepers measured by the front detection sensor, and then calculates the time required to pass the next group of four pick pockets in combination with the operating vehicle speed, and automatically adjusts the speed of the second power mechanism. The ballast in the ballast bucket is transported by a belt and falls into the ballast separator bucket, and then falls into the ballast dropping bucket, until the ballast dropping bucket passes above the next group of four pick pockets, and the control device outputs a trigger signal to control the ballast dropping valve to open and perform the next ballast replenishing operation. This is repeated to achieve automatic and accurate ballast replenishing of the integrated operation vehicle during continuous driving.

[0028] Furthermore, the conveying mechanism adopts a belt conveying method and includes a second power mechanism, a speed reduction mechanism, a belt and a roller. The speed reduction mechanism is driven by the second power mechanism, and then the belt is driven to roll, and the roller is used to transmit power to the rolling of the belt. When the second power mechanism drives the speed reduction mechanism to rotate, the belt conveys the ballast from the ballast outlet below the ballast bucket, and the ballast falls into the ballast distribution bucket and then falls evenly into the ballast drop bucket below. The distance of the belt conveying is controlled by controlling the number of rotations of the second power mechanism, so as to achieve single quantitative ballast removal.

[0029] Furthermore, a transverse movement mechanism is installed on the ballast bucket, and the transverse movement mechanism includes a screw module and a transverse movement driving mechanism. The ballast bucket is installed on the ballast bucket through supporting rollers, and a vertical limit block is set on the ballast bucket. The ballast bucket is connected to the slide of the screw module through a transverse push rod, and the screw of the screw module is driven to rotate through the transverse movement driving mechanism, and the slide is driven to move transversely through the rotation of the screw, and the ballast bucket follows the movement of the slide to achieve transverse displacement.

[0030] Furthermore, when the track is a straight line, the ballast bucket is positioned at the center by the screw module, and the four ballast dropping openings of the ballast bucket are respectively located directly above the pick pocket. When the track is a curve, the pick pocket deviation signal measured by the front detection sensor and given by the control device controls the screw module to drive the ballast bucket to move laterally to adjust the lateral position, so that the ballast falls accurately into the pick pocket.

[0031] Furthermore, the control device performs associated control through the running speed of the belt, the operating vehicle speed, and the cross-sectional area of ​​the ballast outlet of the ballast bucket to achieve quantitative ballast replenishment. When the lower part of the ballast bucket is provided with a ballast outlet with a cross-sectional area of ​​A=B×H, and the running speed of the belt is V 0 , the operating speed is V 1 When the detection sensor detects that the distance between two adjacent sleepers is S, the time to the next ballast replenishment is T = S / V 1 During this period, the running distance of the belt is L = V 0 ×T, then the next ballast replenishment amount is V = A × L. During the ballast replenishment operation, V, B, and H are used as the quantitative values. The control device is based on the operating vehicle speed V 1 The belt running speed V is calculated from the change of 0 The second power mechanism is used to adjust the running speed V of the belt. 0 .

[0032] Furthermore, when the integrated operation vehicle is traveling toward one end, the sleeper bolts are detected first and then the ballast filling action is performed. The time for each detection sensor to detect the sleeper bolts is recorded as t i , i = 1, 2, ..., N, t 1 = 0s. Assume that the structural comprehensive response delay time of the control device and the ballast filling device is Δt, and the time of each ballast outlet opening is recorded as t oi , i = 1, 2, ..., N, the vehicle speed when the ballast outlet is opened is V oi , when the ballast drop mouth reaches the middle of the sleeper in front of the i-th sleeper bolt, the following formula is satisfied:

[0033]

[0034] Among them, L r To detect the distance from the sensor to the ballast outlet, VII (t) is the speed of the vehicle traveling toward one end, h is the height of the ballast falling from the ballast drop port to the pick hole, and g is the gravitational acceleration.

[0035] By implementing the technical solution of the comprehensive working vehicle control method provided by the present invention, the following beneficial effects are achieved:

[0036] (1) The comprehensive working vehicle control method of the present invention integrates multiple working functions and performs centralized control, which not only realizes the various functional controls of various devices and working vehicles, but also enables the various devices to work in an orderly manner, greatly improving the working efficiency of railway temporary maintenance operations;

[0037] (2) The integrated working vehicle control method of the present invention is based on the vehicle control system to centrally control the oiling device and the ballast-replenishing device, which not only facilitates the communication and sharing of detection information of the two devices, but also eliminates the need for additional supporting oiling and ballast-replenishing device control systems, thereby reducing the overall R&D cost of the device;

[0038] (3) The comprehensive working vehicle control method of the present invention, based on the PWM output of the hydrostatic high-speed and low constant-speed driving control, monitors the safety of the device operation and transportation process, and controls the safety interlocking of the construction process, effectively ensuring the safety of the equipment during the operation and transportation of the whole vehicle, and also ensuring the safe construction of the operation process;

[0039] (4) The comprehensive working vehicle control method of the present invention adopts methods such as bolt detection, track bending radius detection and lateral control, differential compensation, and hydraulic low constant speed control to achieve continuous fixed-point quantitative oiling and ballast replenishment operations at different driving speeds, and the application effect of the relevant technology is relatively good;

[0040] (5) The integrated work vehicle control method of the present invention can realize the integrated work vehicle whole vehicle function control. The main control objects include the engine, hydraulic running system, oiling device, ballast replenishing device, multi-functional work arm, lifting arm and other equipment, which can well realize the coordination between various work functional units. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other embodiments can be obtained based on these drawings without creative work.

[0042] Figure 1 It is a schematic side view of the structure of a specific embodiment of a comprehensive working vehicle to which the control method of the present invention is applied;

[0043] Figure 2It is a schematic top view of the structure of a specific embodiment of a comprehensive working vehicle to which the control method of the present invention is applied;

[0044] Figure 3 It is a system structure block diagram of a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0045] Figure 4 It is a partial transverse structural schematic diagram of a specific embodiment of a comprehensive working vehicle to which the control method of the present invention is applied;

[0046] Figure 5 It is a partial longitudinal structural schematic diagram of a specific embodiment of a comprehensive working vehicle to which the control method of the present invention is applied;

[0047] Figure 6 It is a schematic diagram of the three-dimensional structure of an oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0048] Figure 7 It is a schematic front view of the structure of an oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0049] Figure 8 It is a schematic diagram of the structure of the guide mechanism of the oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0050] Fig. 9 It is a schematic structural diagram of a stretching mechanism of an oiling device in a specific embodiment of the integrated working vehicle control system on which the method of the present invention is based;

[0051] Fig.10 It is a schematic structural diagram of a first fixing frame of an oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0052] Fig.11 It is a schematic diagram of the crossbeam structure of an oiling device in a specific embodiment of the integrated working vehicle control system on which the method of the present invention is based;

[0053] Fig.12 It is a schematic diagram of the structure of the rail-leaning mechanism of the oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0054] Fig.13 It is a schematic structural diagram of an oil injection assembly of an oiling device in a specific embodiment of an integrated working vehicle control system based on the method of the present invention under a first viewing angle;

[0055] Fig.14 It is a schematic structural diagram of an oil injection assembly of an oiling device in a specific embodiment of an integrated working vehicle control system based on the method of the present invention under a second viewing angle;

[0056] Fig.15 It is a structural schematic diagram of an oil injection assembly of an oil coating device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention under a third viewing angle;

[0057] Fig.16 It is a structural schematic diagram of an oil injection assembly of an oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention under a fourth viewing angle;

[0058] Fig.17 It is a schematic structural diagram of a rail-supporting wheel assembly of an oiling device in a specific embodiment of the integrated working vehicle control system on which the method of the present invention is based;

[0059] Fig.18 It is a schematic structural diagram of a locking mechanism of an oiling device in a specific embodiment of the integrated working vehicle control system on which the method of the present invention is based;

[0060] Fig.19 The schematic diagram of the operation process of the running wheel of the oiling device leaning against the rail in a specific embodiment of the integrated working vehicle control system based on the method of the present invention is as follows: Figure 1 ;

[0061] Fig. 20 The schematic diagram of the operation process of the running wheel of the oiling device leaning against the rail in a specific embodiment of the integrated working vehicle control system based on the method of the present invention is as follows: Figure 2 ;

[0062] Fig.21 The schematic diagram of the action process of the oiling device oil spraying component avoiding obstacles in a specific embodiment of the integrated working vehicle control system based on the method of the present invention is as follows: Figure 1 ;

[0063] Fig. 22 The schematic diagram of the action process of the oiling device oil spraying component avoiding obstacles in a specific embodiment of the integrated working vehicle control system based on the method of the present invention is as follows: Figure 2 ;

[0064] Fig.23 It is a schematic diagram of the action of the oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention to adapt to the lateral deflection in the curved operation;

[0065] Fig.24 It is a schematic diagram of the action principle of the curve operation of the oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0066] Fig.25 It is a schematic diagram of the principle of lateral movement of the oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0067] Fig.26 The inclination angle-vector distance / turning radius curve of the lateral movement of the oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention is shown in FIG. Figure 1 ;

[0068] Fig. 27 The inclination angle-vector distance / turning radius curve of the lateral movement of the oiling device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention is shown in FIG. Figure 2 ;

[0069] Fig.28 It is a schematic diagram of the transverse arrangement structure of a ballast filling device of a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0070] Fig.29 It is a schematic diagram of the longitudinal arrangement structure of a ballast filling device of a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0071] Fig.30 It is a schematic diagram of the plug-in valve structure of the ballast filling device in a specific embodiment of the integrated working vehicle control system on which the method of the present invention is based;

[0072] Fig.31 It is a schematic diagram of the installation structure of the ballast bucket and the ballast dropping bucket of the ballast replenishing device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0073] Fig.32 It is a schematic diagram of the installation structure of the ballast bucket and the ballast dropping bucket of the ballast replenishing device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention from another perspective;

[0074] Fig.33 It is a schematic diagram of the installation structure of the ballast bucket and the ballast dropping bucket of the ballast replenishing device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0075] Fig.34 It is a schematic diagram of the installation structure of the ballast bucket and the ballast dropping bucket of the ballast replenishing device in a specific embodiment of the integrated working vehicle control system based on the method of the present invention from another perspective;

[0076] Fig.35 It is a schematic diagram of the quantitative ballast filling principle of a ballast filling device of a specific embodiment of the integrated working vehicle control system on which the method of the present invention is based;

[0077] Fig.36 It is a schematic diagram of the quantitative ballast filling principle of a ballast filling device from another perspective in a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0078] Fig.37It is a schematic diagram of the differential speed compensation principle of a ballast filling device of a specific embodiment of the integrated working vehicle control system on which the method of the present invention is based;

[0079] Fig.38 It is a system principle block diagram of a specific embodiment of the integrated working vehicle control system based on the method of the present invention;

[0080] In the figure: 1-lifting drive mechanism, 2-anti-drop chain, 3-main frame, 31-guide mechanism, 311-guide column, 312-protective cover, 313-guide sleeve, 314-first mounting seat, 315-tilt sensor, 32-stretching mechanism, 321-second mounting seat, 322-tension spring, 323-pin shaft, 33-first fixing frame, 331-connecting plate, 332-mounting hole, 333-longitudinal beam, 334-positioning hole, 335-main crossbeam, 34-crossbeam, 341-first hinge seat, 342-second hinge seat, 343- Hanging ring, 344-main beam, 345-positioning pin, 346-anti-disconnection connection, 4-rail oiling mechanism, 41-rail driving mechanism, 42-second fixed frame, 43-oil injection assembly, 431-protective cover, 432-detection sensor, 433-nozzle, 434-third mounting seat, 44-rail wheel assembly, 441-slide, 442-rotating shaft, 443-axis pressure plate, 444-sleeve, 445-sensor mounting plate, 446-rail wheel, 45-compression spring, 46-torsion spring, 47-rocker, 48-height sensor, 4 9- transverse guide column, 5- locking mechanism, 51- fourth mounting seat, 52- fifth mounting seat, 53- locking drive mechanism, 54- hook, 6- ballast bucket, 61- ballast outlet, 7- gate valve, 71- frame, 72- rotating door, 73- gate, 74- lead screw, 75- first power mechanism, 76- ballast outlet, 8- conveying mechanism, 81- second power mechanism, 82- speed reduction mechanism, 83- belt, 84- roller, 9- ballast bucket, 91- transverse movement mechanism, 92- lead screw module, 93- transverse movement drive mechanism, 94- transverse movement push rod , 95-vertical limit block, 96-support roller, 10-ballast bucket, 101-ballast valve, 102-valve drive mechanism, 103-ballast mouth, 20-rail, 30-ballast, 40-sleeper, 50-sleeper bolt, 60-ballast bed, 70-pick nest, 80-obstacle, 90-oil pipeline, 100-integrated operation vehicle, 200-oiling device, 300-ballast replenishing device, 400-control device, 500-multi-function operation arm, 600-crane arm, 700-frame, 800-driver control room, 900-fuel tank. DETAILED DESCRIPTION

[0081] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0082] As attached Figure 1 To Attachment Fig.38 As shown, a specific embodiment of the comprehensive working vehicle control method of the present invention is given, and the present invention is further described below in conjunction with the drawings and specific embodiments.

[0083] The comprehensive operation vehicle 100 is a track engineering vehicle suitable for temporary maintenance of railway lines. The layout of the functional mechanisms of the vehicle is shown in the attached figure. Figure 1 and attached Figure 2 The comprehensive working vehicle 100 mainly includes a vehicle frame 700, an integrated driver control room 800, a multifunctional working arm 500, a lifting arm 600, a ballast filling device 300, an oiling device 200, an engine, a hydraulic system, wheels, a bogie and other mechanisms. Among them, the frame 700 provides installation and support for various mechanisms; the engine is the power source of the whole vehicle, supplying power to the whole vehicle and driving the hydraulic pump of the hydraulic system; the hydraulic system, wheels and bogies are the main mechanisms of the running part of the whole vehicle, and the hydraulic system also provides hydraulic power for the multifunctional working arm 500 and the lifting arm 600; the multifunctional working arm 500 is a device that can use quick-change joints to realize switching operations of various working machines (sleeper changer, drilling machine, ballast chain, tamping head, crusher, weeder, etc.); the lifting arm 600 is mainly used for material lifting when replacing rails; the oiling device 200 is used for oiling and maintenance of the sleeper bolts 50 after rusting; the ballast filling device 300 is used for automatic filling operations of tamping holes after tamping operations; the integrated driver control room 800 is the control center of the whole vehicle.

[0084] As attached Figure 3As shown in FIG. 4 , it is a system structure block diagram of the whole vehicle control network system of the integrated working vehicle 100. The control device 400 is composed of several different types of control modules (main control module, digital input, analog input, digital output, analog output, hydraulic control and other modules) according to the number of signals that need to be collected from the periphery and the number of signals that need to be output and controlled. The main control module, digital input module, analog input module, digital output module, analog output module, display module and hydraulic control module are interconnected and communicated through the CAN bus. The established network control system (i.e., the control device 400) needs to directly control the above-mentioned engine, hydraulic running system, auxiliary system, ballast filling device 300 and oiling device 200 to realize high-speed operation of the whole vehicle, running and oiling and ballast filling operations. At the same time, it is also necessary to power the multifunctional working arm 500 and the lifting arm 600, communicate with CAN (Controller Area Network) and hard-wire communication, so as to realize the authorization control and motion status display of these two mechanisms. The integrated driver control room 800 is the hardware carrier of the vehicle running and operating device network control system (i.e., the control device 400) of the integrated operating vehicle 100. It is mainly used for installing and arranging electrical components and providing an enclosed working space for operators.

[0085] The control objects involved in the driving and core device control system of the comprehensive working vehicle 100 mainly include the engine, hydraulic running system, oiling device 200, ballast filling device 300, multifunctional working arm 500, lifting arm 600, auxiliary system and remote diagnosis system. Among them, the engine and running hydraulic system basically constitute the normal main power source. The engine can be started and stopped on the driver's desk of the driver's control room 800, and then the gear shifting, driving direction, driving mode and other operations can be performed on the operation panel. Finally, you only need to push the throttle handle or press the running confirmation switch to realize the driving control of the comprehensive working vehicle 100 in different modes. The driving mode is divided into high-speed running, operating running and emergency running. The high-speed driving mode is used for long-distance driving, and the operating running is divided into low constant speed (for example: 1km / h, 3km / h, 5km / h, 7km / h, 10km / h five constant speeds are optional) and any low speed of operation below 10km / h. During the oiling and ballast filling operations, the vehicle is driven at a low constant speed. In the low constant speed operation mode, the control device 400 outputs a PWM (Pulse Width Modulation) wave to control the proportional solenoid valve in the hydraulic motor, and collects parameters such as vehicle speed, hydraulic system pressure, and temperature in real time to perform PID (Proportional-Integral-Derivative) negative feedback regulation to ensure that the motor speed is constant, thereby ensuring that the comprehensive operation vehicle 100 drives stably at the set speed. The stable vehicle speed facilitates automatic fixed-point oiling and ballast filling operations. The multifunctional operation arm 500 and the lifting arm 600 can be operated at any low speed below 10 km / h, so that construction operators can control the vehicle speed according to actual needs in the operation rooms of the two devices. The emergency driving mode is used when the system fails to ensure that the comprehensive operation vehicle 100 leaves the railway line when it fails to operate, so as to avoid causing the railway to be unable to operate normally. During the engine and hydraulic travel control process, the display module (i.e. display) on the driver's console will also display important parameters of the engine and hydraulic system in real time.

[0086] Both the oiling device 200 and the ballast-replenishing device 300 need to be operated under the low constant speed driving mode, and the control device 400 will fully control all functions of the oiling device 200 and the ballast-replenishing device 300 .

[0087] Example 1

[0088] An embodiment of the integrated work vehicle control system based on the present invention specifically includes:

[0089] The ballast filling device 300 installed on the frame 700 of the comprehensive working vehicle 100 is as shown in the attached Fig.29 As shown;

[0090] The oiling device 200 is installed at the bottom of the frame 700 and is located at the front end of the ballast filling device 300. Figure 4 As shown;

[0091] and a control device 400 for controlling the ballast filling device 300 and the oiling device 200 respectively, as shown in the attached Fig.38 shown.

[0092] The oiling device 200 includes a lifting drive mechanism 1 and a rail-applying oiling mechanism 4 . The oiling assembly 43 of the rail-applying oiling mechanism 4 includes a detection sensor 432 .

[0093] When the integrated operation vehicle 100 is in the running operation, the lifting drive mechanism 1 drives the rail-supporting wheel assembly 44 of the rail-supporting oiling mechanism 4 to perform the rail-supporting operation. Whenever the detection sensor 432 detects a sleeper bolt signal, the control device 400 outputs a signal to control the rail-supporting oiling mechanism 4 to perform the automatic oiling operation.

[0094] At the same time, the control device 400 calculates the time to reach the pick hole 70 according to the sleeper bolt signal, the operating speed and the distance between the ballast drop opening 103 of the ballast filling device 300 and the sleeper bolt 50, and controls the ballast filling device 300 to quantitatively convey the ballast 30. When the ballast drop opening 103 moves to the top of the pick hole 70, the control device 400 controls the ballast 30 to fall from the ballast filling device 300 and backfill into the pick hole 70.

[0095] As attached Figure 6 As shown, the oiling device 200 also includes a main frame 3 and a locking mechanism 5. The main frame 3 further includes a first fixing frame 33 and a crossbeam 34. The first fixing frame 33 is installed at the bottom of the frame 700. Figure 7 The upper part of the lifting drive mechanism 1 is connected to the frame 700, and the lower part is connected to the cross beam 34. The cross beam 34 can be lifted relative to the first fixed frame 33 under the drive of the lifting drive mechanism 1. The rail oiling mechanism 4 is installed on the cross beam 34 along the length direction (as shown in the attached figure). Figure 4 , 6 The left and right sides of the first fixing frame 33 and the direction shown in W in 7 are used to realize the running along the rail and the oiling operation of the sleeper bolts 50. The locking mechanism 5 is arranged on the crossbeam 34 and is used to lock the first fixing frame 33 and the crossbeam 34 in the non-operating mode.

[0096] As attached Figure 7 As shown, the main frame 3 also includes a guide mechanism 31 and a stretching mechanism 32. The guide mechanism 31 is hinged to the first fixed frame 33 and the cross beam 34 respectively, and the stretching mechanism 32 is connected between the first fixed frame 33 and the guide mechanism 31. The upper part of the lifting drive mechanism 1 is hinged to the frame 200, and the lower part is hinged to the cross beam 34. The guide mechanism 31 is used to guide the cross beam 34 during the lifting process, support it during the lateral movement process, and pull it during the walking process. Figure 8 As shown in FIG. 1 , the guide mechanism 31 further includes a guide column 311, a protective cover 312, a guide sleeve 313 and a first mounting seat 314, and a tilt sensor 315 is mounted on the first mounting seat 314. The protective cover 312 is sleeved on the outside of the guide column 311, and the guide sleeve 313 is sleeved on the protective cover 312. The first mounting seat 314 is fixed to the outer side of the guide sleeve 313, the lower part of the guide column 311 is hinged to the crossbeam 34, and the first mounting seat 314 is hinged to the first fixing frame 33. As shown in FIG. Fig. 9 As shown, the stretching mechanism 32 includes a second mounting seat 321, a tension spring 322 and a pin 323. Both ends of the tension spring 322 along the length direction are connected to the second mounting seat 321 through the pin 323. One end of the tension spring 322 is fixed to the first mounting seat 314 through the second mounting seat 321, and the other end is fixed to the first fixing frame 33 through another second mounting seat 321, which is used for limiting and resetting the guide mechanism 31 when it deflects.

[0097] As attached Fig.10 As shown, the first fixing frame 33 is formed by welding metal parts, and is a bilaterally symmetrical H-shaped integrated component, and includes a longitudinal beam 333 and a main cross beam 335. The longitudinal beam 333 is arranged on the main cross beam 335 along the length direction (as shown in the attached Fig.10 The longitudinal beam 333 has a positioning hole 334 at one end along the length direction, and a connecting plate 331 at the other end. The main cross beam 335 has mounting holes 332 at both ends along the length direction. The first mounting seat 314 is hinged to the mounting hole 332, and one end of the tension spring 322 is fixed to the outer side of the longitudinal beam 333 through the second mounting seat 321. The locking mechanism 5 is arranged on the main cross beam 335. Fig.11 As shown, the cross beam 34 further includes a main beam 344, and a longitudinal beam 344 extending in the transverse direction (such as the attached Fig.11 The hanging ring 343, the positioning pin 345 and the second hinge seat 342 are symmetrically arranged on the main beam 344 (in the direction shown in W in the figure). The first hinge seat 341 connected to the lifting drive mechanism 1 is arranged at both ends of the main beam 344 along the lateral direction. The lower part of the guide column 311 is connected to the main beam 344 through the second hinge seat 342, and the hanging ring 343 is used for hanging with the locking mechanism 5 in the non-operating mode. The positioning pin 345 cooperates with the positioning hole 334 at the lower part of the longitudinal beam 333 to realize the rapid positioning of the main beam 344 and the first fixed frame 33 during the lifting process of the cross beam 34. The sleeper bolt oiling device 100 also includes an anti-slip chain 2, the upper end of which is connected to the frame 200, and the lower end can be connected to the cross beam 34 through the anti-slip chain interface 346 in the non-operating mode to realize the anti-slip and anti-dropping of the rail oiling mechanism 4.

[0098] The rail lubrication mechanism 4 is installed at the lower part of both ends of the crossbeam 34 in a symmetrical manner along the horizontal direction, and further includes a rail driving mechanism 41, a second fixing frame 42, a compression spring 45, a torsion spring 46 and a swing rod 47. Fig.12 The second fixing frame 42 is provided with a transverse guide column 49 and is installed below the crossbeam 34. The rail wheel assembly 44 is movably arranged on the transverse guide column 49. The rail driving mechanism 41 is arranged between the second fixing frame 42 and the rail wheel assembly 44. The rail driving mechanism 41 drives the rail wheel assembly 44 to move along the transverse guide column 49 (as shown in the figure). Fig.12 The rail wheel assembly 44 moves in the direction shown in W in the figure to realize the rail-resting action of the rail wheel assembly 44. One end of the swing arm 47 is movably mounted on the rail wheel assembly 44 through the rotating shaft 442, and the other end is hinged to the oil injection assembly 43, so as to realize the swing and reset of the oil injection assembly 43. The oil injection assembly 43 is used for the detection, positioning and oiling operation of the sleeper bolts 600. A height sensor 48 for measuring the distance between the rail-resting oiling mechanism 4 and the rail surface of the rail 20 is installed on the rail wheel assembly 44. The compression spring 45 is arranged on the transverse guide column 49 and is located between the second fixing frame 42 and the rail wheel assembly 44 to provide rail-resting pressure for the rail wheel assembly 44. The torsion spring 46 is arranged on the rotating shaft 442 and is located between the rail wheel assembly 44 and the swing arm 47 to provide a restoring force for the reset of the swing arm 47.

[0099] As attached Fig.13 To Attachment Fig.16 As shown, the fuel injection assembly 43 further includes a protective cover 431, a nozzle 433 and a third mounting seat 434. The third mounting seat 434 is mounted inside the protective cover 431, and the nozzle 433 is mounted on the third mounting seat 434 and connected to the fuel tank 90 through the fuel delivery pipe 90. Figure 5 As shown. The detection sensor 432 is installed inside the protective cover 431 and is used for detecting and positioning the sleeper bolts 50. The two groups of oil injection assemblies 43 are symmetrically arranged on the left and right sides of the rail wheel assembly 44. The detection sensors 432 and nozzles 433 of the two groups of oil injection assemblies 43 are installed in a cross-symmetrical structure relative to the left and right sides of the rail 20. When the detection sensor 432 located on one side of the rail 20 detects the sleeper bolt signal, the control device 400 sends a control signal to the nozzle 433 located on the other side of the rail 20 and in the same horizontal plane as the detection sensor 432 according to the sleeper bolt signal to realize the oil injection operation. As shown in the attached Fig.17 As shown, the rail wheel assembly 44 further includes a slide 441, an axle pressure plate 443, a sleeve 444, a sensor mounting plate 445 and a rail wheel 446. The slide 441 and the sleeve 444 form a mounting frame for the rail wheel 446, and the sleeve 444 is sleeved on the transverse guide column 49. Two rotating shafts 442 are respectively arranged on the front and rear sides of the slide 441, and the rail wheel 446 is movably mounted on the slide 441 through the axle pressure plate 443. The sensor mounting plate 445 is arranged on the front side of the slide 441 for mounting the height sensor 48.

[0100] As attached Fig.17As shown, the rail wheel assembly 44 further includes a slide 441, an axle pressure plate 443, a sleeve 444, a sensor mounting plate 445 and a rail wheel 446. The slide 441 and the sleeve 444 constitute a mounting frame for the rail wheel 446, and the sleeve 444 is sleeved on the transverse guide column 49. Two rotating shafts 442 are respectively arranged on the front and rear sides of the slide 441, and the rail wheel 446 is movably mounted on the slide 441 through the axle pressure plate 443. The sensor mounting plate 445 is arranged on the front side of the slide 441, and is used to install the height sensor 48. The height sensor 48 is used to provide signal feedback when the rail wheel 446 is lowered into place. The rail driving mechanism 41 provides a pre-pressure of the compression spring 45, so that the rail wheel 446 can move along the attached Fig.17 The direction indicated by W in the middle is accurately aligned with the track.

[0101] As attached Fig.18 As shown, the locking mechanism 5 further includes a fourth mounting seat 51, a fifth mounting seat 52, a locking drive mechanism 53 and a hook 54. The hook 54 is hingedly connected to the fifth mounting seat 52 and is installed at the bottom of the main beam 335 through the fifth mounting seat 52. One end of the locking drive mechanism 53 is hingedly connected to the fourth mounting seat 51 and installed on the front or rear side of the main beam 335 through the fourth mounting seat 51, and the other end is hingedly connected to the hook 54, and the locking and unlocking of the beam 34 is achieved by the extension and contraction of the locking drive mechanism 53. The two sets of locking mechanisms 5 are installed on the front and rear sides of the beam 34 in a left-right symmetrical structure (can also be installed on the same side), and the locking and unlocking of the beam 34 is achieved by the extension and contraction of the locking drive mechanism 53. The fourth mounting seat 51 is installed on the front or rear part of the beam 34 of the first fixed frame 33 by bolts, and is used to install the locking drive mechanism 53. The fifth mounting seat 52 is installed on the lower part of the beam 34 of the first fixed frame 33 by bolts, and is used to install the hook 54. The cylinder of the locking drive mechanism 53 is hingedly mounted on the fourth mounting seat 51, and the front part of the push rod is hingedly connected to the hook 54 through a pin shaft, and the rotation of the hook 54 is realized by telescoping. The hook 54 is connected to the fifth mounting seat 52 through a pin shaft, and is locked with the hanging ring 343 on the crossbeam 34 in the locked state.

[0102] In this embodiment, the power device including the lifting drive mechanism 1, the rail driving mechanism 41, and the locking drive mechanism 53 can be a linear push rod type power device such as a cylinder, a hydraulic cylinder, and an electric cylinder. The types of the height sensor 48 and the detection sensor 432 can be flexibly selected. Under the same structural form, laser type, inductive type, proximity switch type, etc. can be selected. The tension spring 322 is used to realize the swing limit and reset function of the guide mechanism 31. Rubber or other elastic elements can also realize this function. The cooperation between the crossbeam 34 and the first fixed frame 33 adopts the method of setting a positioning hole 334 at the lower part of the longitudinal beam 333 and setting a positioning pin 345 on the crossbeam 34. It can also be achieved by opening a hole on the crossbeam 34 to realize a similar function. In this embodiment, the rail mechanism and the injection assembly can independently operate on the sleeper bolt 600 on the same sleeper 500. The schemes using similar structures and operating methods and only expanding the number of rail wheels or the number of nozzles all belong to the scope of protection requested by the present invention.

[0103] Generally, after the track is tamped with ballast, two pick pockets 70 are formed in the roadbed 60 area between the two sleepers 40 on both sides of each rail 20, so four pick pockets 70 are formed between the two sleepers 40 of the two rails 20. In order to solve this technical problem, the specific embodiment of the present invention uses a ballast filling device 300 to fill the pick pockets 70 formed after the track line is tamped with ballast.

[0104] As attached Fig.28 and attached Fig.29 As shown, the ballast filling device 300 further includes:

[0105] A ballast bucket 6 mounted on the frame 700 and used to accommodate the ballast 30;

[0106] The conveying mechanism 8 is arranged below the ballast bucket 6, and quantitatively conveys the ballast 30 in the ballast bucket 6 by controlling the transmission distance of the conveying mechanism 8;

[0107] The ballast bucket 10 disposed below the conveying mechanism 8 controls the ballast 30 to fall and backfill it into the pick pocket 70 , so as to realize a single quantitative backfilling of the ballast 30 .

[0108] The ballast supply device 300 further includes a gate valve 7 connected between the ballast outlet 61 below the ballast bucket 6 and the conveying mechanism 8, which is used to control the ballast 30 in the ballast bucket 6 to fall to the conveying mechanism 8. The ballast supply device 300 further includes a ballast distribution bucket 9 connected between the conveying mechanism 8 and the ballast drop bucket 10, which is used to distribute the ballast 30 quantitatively delivered by the conveying mechanism 8. A ballast drop valve 101 is provided below the ballast drop bucket 10, and a valve driving mechanism 102 is hingedly provided between the ballast drop bucket 10 and the ballast drop valve 101. When the ballast drop outlet 103 of the ballast drop bucket 10 faces the top of the pick pocket 70, the control device 400 outputs a signal to control the valve driving mechanism 102 to operate, and the ballast drop valve 101 is opened under the push of the valve driving mechanism 102 (which can be a motor, a cylinder, an oil cylinder or an electric cylinder), and the ballast 30 falls into the pick pocket 70. Subsequently, the control device 400 outputs a signal to the valve drive mechanism 102 to control the ballast-dropping valve 101 to close, and the ballast 30 continues to fall into the ballast-distributing bucket 9 to repeat the next ballast-replenishing operation. By setting the ballast-dropping valve 101, the valve drive mechanism 102 can be operated continuously in the case of intermittent ballast-replenishing, thereby avoiding its frequent start and stop, and realizing the precise positioning of the ballast 30 falling during ballast-replenishing backfilling.

[0109] The lower part of the ballast bucket 6 is arranged in the horizontal direction (such as the attached Fig.28 The direction indicated by W is as shown in the attached Fig.29 The ballast outlet 61 is connected to the ballast outlet 61 and is used to supply ballast to the pickaxe holes 70 on both sides of the two rails 20. A gate valve 7 is provided below each ballast outlet 61, and a conveying mechanism 8 is provided below the gate valve 7. Two ballast separators 9 are provided below the conveying mechanism 8, and a ballast drop bucket 10 is provided below each of the two ballast separators 9. Fig.34 The ballast bucket 10 is arranged in the transverse direction to correspond to the four pick pockets 70 between every two sleepers 40. The ballast 30 quantitatively transported by the conveying mechanism 8 is divided into two parts by the ballast dividing bucket 9, and then falls through the ballast bucket 10 and is backfilled into the pick pockets 70.

[0110] As attached Fig.30 As shown in FIG. 1 , the gate valve 7 further includes a frame 71, a rotating door 72, a gate 73 and a first power mechanism 75. The gate 73 is disposed on one side of the hollow bottom of the frame 71 and partially closes the bottom of the frame 71. The rotating door 72 is movably disposed on the other side of the frame 71. The first power mechanism 75 is movably connected to the gate 73. The gate 73 can be driven by the first power mechanism 75 to move along the length direction of the frame 71 (as shown in FIG. 1 ). Fig.30The first power mechanism 75 can be specifically a combination of a handwheel, a lead screw and a slider. One end of the lead screw 74 is connected to the handwheel, and the other end is matched with a slider with an internal thread. The slider is fixed on the plug plate 73. When the plug plate 73 and the rotating door 72 are in the open state, the second power mechanism 81 drives the speed reduction mechanism 82 to rotate, and the belt 83 transports the ballast 30 from the ballast outlet 61 below the ballast bucket 6. The ballast 30 falls into the ballast dividing bucket 9 and then falls evenly into the ballast dropping bucket 10 below. The control device 400 controls the conveying distance of the belt 83 by controlling the number of rotations of the second power mechanism 81, thereby realizing a single quantitative ballast removal.

[0111] As attached Fig.29 As shown, the conveying mechanism 8 adopts a belt conveying structure, and further includes a second power mechanism 81, a speed reduction mechanism 82, a belt 83 and a roller 84. The speed reduction mechanism 82 is driven by the second power mechanism 81 (which can be a speed regulating motor), and then the belt 83 is driven to roll. The roller 84 is used to transmit power to the rolling of the belt 83. When the ballast replenishing device 300 fails and needs maintenance, the lower ballast port 76 of the gate valve 7 can be closed by closing the gate 73 and the rotating door 72 to ensure that the ballast 30 will not slip out during maintenance. According to the railway crushed stone ballast standard, the size of the ballast 200 ranges from 16mm to 63mm. Due to the large size range, the belt transmission mechanism not only needs to complete the transportation of the ballast 200 but also needs to prevent it from getting stuck.

[0112] As attached Fig.31 , 32 As shown in FIG. 33, a lateral movement mechanism 91 is installed on the ballast bucket 9, and the lateral movement mechanism 91 further includes a screw module 92 and a lateral movement driving mechanism 93. The ballast bucket 10 is installed on the ballast bucket 9 through a supporting roller 96. The ballast bucket 9 is also provided with a vertical limit block 95. The ballast bucket 10 is connected to the slide of the screw module 92 through a lateral movement push rod 94. The lateral movement driving mechanism 93 (which can be a motor, a cylinder, a hydraulic cylinder or an electric cylinder) drives the screw of the screw module 92 to rotate, and the rotation of the screw drives the slide to move horizontally (as shown in FIG. 34). Fig.31 and attached Fig.32 The ballast bucket 10 moves in the direction indicated by W in the figure, and the ballast bucket 10 follows the movement of the slide to achieve lateral displacement. The control of the ballast filling device 300 can be specifically adopted by the ballast dropping port 103 automatically following the lateral movement control with the bending radius of the oiling device 200. When the track is a straight line, the ballast bucket 10 is positioned in the center position by the screw module 92, and the four ballast dropping ports 103 of the ballast bucket 10 are respectively located directly above the pick pocket 70. When the track is a curve, the pick pocket deviation signal measured by the front detection sensor 432 and given by the control device 400 controls the screw module 92 to drive the ballast bucket 10 to move laterally to adjust the lateral position, so that the ballast 30 falls accurately into the pick pocket 70, thereby realizing offset ballast filling when passing through the curve operation.

[0113] The vehicle running and core device control system of the integrated work vehicle 100 is also equipped with a 4G (short for the fourth generation of mobile communications) module. All fault information of the vehicle can be sent to the 4G module through the CAN bus of the display module, and the 4G module then sends the information to the cloud through wireless Ethernet. The ground terminal can query the historical fault information of the vehicle by accessing the cloud database. The control device 400 can also power and control driving auxiliary functions such as lighting, horn, air conditioning, fan, electric glass heating, wipers, and water spray.

[0114] The multifunctional working arm 500 and the lifting arm 600 are both very critical working devices in comprehensive operations, and both working arms are equipped with independent operation control rooms and local control systems. The integrated driver control room 800 mainly performs authorization control and motion status display on the multifunctional working arm 500 and the lifting arm 600. When controlling the two working arms, first turn on the corresponding switch of the power distribution cabinet to power the corresponding working arm, and then click the enable button on the corresponding display interface, and the corresponding working arm control system can obtain driving control rights and operation control rights. The working arm that obtains the authority can send a driving request signal (sending parameters such as gear shifting, direction, and vehicle speed) to the integrated driver control room 800 through the CAN bus, and the control device 400 in the driver control room 800 performs relevant logical operations and responds to the output to control driving. During the operation, the display module display interface of the driver's station in the driver control room 800 will also display the real-time action status and fault information of the two working arms in real time. The authorization control between different working devices avoids the risk of mutual interference and collision.

[0115] Embodiment 1 of the present invention provides a whole vehicle running and core device control system for a comprehensive work vehicle 100, which uses an integrated driver control room 800 to realize the whole vehicle operation and normal running control, and at the same time controls the vehicle-mounted oiling device 200, ballast replenishing device 300, and authorizes the control of the multifunctional working arm 500 and the lifting arm 600, and finally realizes the safe and stable control of the whole vehicle for multiple temporary repair comprehensive operation tasks of the railway line. Embodiment 1 adopts a whole vehicle running and core device control system for a comprehensive work vehicle, which can solve the functions of hydrostatic high-speed driving, low constant speed running, oiling device 200 control, ballast replenishing device 300 control, and multifunctional working arm 500 and lifting arm 600 authorization control.

[0116] Example 2

[0117] An embodiment of the integrated working vehicle control method of the present invention specifically comprises the following steps:

[0118] S10) When the integrated operation vehicle 100 is running, the lifting drive mechanism 1 drives the rail-to-rail oiling mechanism 4 to perform a downward rail-to-rail operation. Whenever the detection sensor 432 detects a sleeper bolt signal, the control device 400 outputs a signal to control the rail-to-rail oiling mechanism 4 to perform an automatic oiling operation;

[0119] S20) At the same time, the control device 400 calculates the time to reach the pick hole 70 according to the sleeper bolt signal, the operating speed and the distance between the ballast drop opening 103 of the ballast filling device 300 and the sleeper bolt 50, and controls the ballast filling device 300 to quantitatively convey the ballast 30. When the ballast drop opening 103 moves to the top of the pick hole 70, the control device 400 controls the ballast 30 to fall from the ballast filling device 300 and fill it back into the pick hole 70.

[0120] At the bottom of the frame 700 of the integrated working vehicle 100, an oiling device 200 is installed at the front end of the ballast filling device 300. Step S10) further includes:

[0121] When the control device 400 performs operation control on the oiling device 200, it first unlocks the lifting drive mechanism 1, and then controls the lifting drive mechanism 1 to extend and descend. Fig.19 and attached Fig. 20 As shown, when the lifting drive mechanism 1 descends until the rail wheel 446 approaches the rail 20, the height sensor 48 detects the rail signal, and the control device 400 controls the rail drive mechanism 41 according to the rail signal to drive the rail wheel 446 to perform automatic rail operation. After the rail wheel 446 successfully approaches the rail, the bolt oiling operation function is started. The control device 400 can perform a start logic judgment based on the collected oil tank temperature and liquid level sensor signals. After the start conditions are met, the anti-rust oil hydraulic pump inside the oil tank 900 is controlled to start, and then the integrated operation vehicle 100 is controlled to work in a low constant speed driving mode. During the running process of the integrated operation vehicle 100, whenever the detection sensor 432 detects a sleeper bolt signal, the control device 400 automatically outputs a control signal to open the oiling solenoid valve of the oil injection assembly 43 for automatic oiling. The control device 400 can automatically match the oiling duration and delay time of the oil injection assembly 43 according to different operating driving speeds to ensure fixed-point quantitative oiling operations at different operating speeds. After the oiling operation is completed, the control device 400 controls the lifting drive mechanism 1 to rise and lock, and at the same time controls the anti-rust oil hydraulic pump of the oil tank 900 to stop working.

[0122] Step S10) further comprises:

[0123] After the integrated operation vehicle 100 arrives at the operation site, the locking mechanism 5 is first opened before the oiling operation is performed. The lifting drive mechanisms 1 on the left and right sides extend synchronously, driving the main frame 3 to lower the rail-to-rail oiling mechanism 4. When the rail-to-rail oiling mechanism 4 contacts the rail 20, the rail-to-rail drive mechanism 41 releases pressure, and the rail-to-rail wheel assembly 44 moves along the rail 20 under the action of the compression spring 45. Fig.12 and attached Fig.17 The rail-supporting wheel 446 of the rail-supporting wheel assembly 44 moves in the direction indicated by W, and ensures that the wheel rim of the rail-supporting wheel 446 of the rail-supporting wheel assembly 44 contacts the inner side of the rail 20 to complete the rail-supporting action. The oil injection assembly 43 of the rail-supporting oiling mechanism 4 opens the bolt 600 signal detection and the nozzle 433 control. After the oiling operation is completed, the rail-supporting driving mechanism 41 stretches, driving the rail-supporting wheel 446 to separate from the inner side of the rail 300, and the lifting driving mechanism 1 drives the rail-supporting oiling mechanism 4 to rise, and the rail-supporting driving mechanism 41 releases the pressure, and the rail-supporting wheel assembly 44 moves under the action of the compression spring 45, locking the locking mechanism 5 with the main frame 3.

[0124] As attached Fig.21 and attached Fig. 22 As shown, during the oiling operation, when the oil spraying assembly 43 encounters an obstacle 80 on the line, the connecting rod mechanism formed by the swing rod 47 and the oil spraying assembly 43 moves in the line direction (as shown in the attached figure). Fig. 22 After passing the obstacle 80, the swing rod 47 is reset under the effect of the torsion spring 46.

[0125] As attached Fig.23 As shown, when the oiling device 200 is operating in a curve, the center of the frame 700 is offset relative to the center of the rail 20. At this time, adaptive lateral deflection is achieved through the guide mechanism 31 and the stretching mechanism 32 to ensure that the rail-resting wheel assembly 44 is always in contact with the rail 20 to achieve curve operation.

[0126] The two sets of oil spraying assemblies 43 are symmetrically arranged on the left and right sides of the rail wheel assembly 44, and the detection sensors 432 and nozzles 433 of the two sets of oil spraying assemblies 43 are installed in a cross-symmetrical structure relative to the left and right sides of the rail 20. When the detection sensor 432 located on the inner side detects the signal of the inner sleeper bolt 50, the outer nozzle 433 is controlled to open. When the detection sensor 432 located on the outer side detects the signal of the outer sleeper bolt 50, the inner nozzle 433 is controlled to open.

[0127] When the control device 400 performs operation control on the oiling device 200, it can first unlock and lower the lifting drive mechanism 1 in the oiling control area on the driver's console operation panel, and the control device 400 outputs a DO (Digital Output, short for digital signal output) signal to control the corresponding valve to unlock the lifting drive mechanism 1, and then control the lifting drive mechanism 1 to extend and descend. When the lifting drive mechanism 1 descends to the point where the rail wheel 446 approaches the rail 20, the height sensor 48 (which can be specifically an inductive proximity switch) at the lower end of the main frame 3 detects the rail signal, and the control device 400 controls the rail drive mechanism 41 to drive the rail wheel 446 to perform automatic rail operation according to the rail signal. After the rail wheel 446 successfully approaches the rail, the bolt oiling operation function is started. The control device 400 can perform a start logic judgment based on the collected oil tank temperature and liquid level sensor signals (automatically heats at low temperatures), and after the start conditions are met, the anti-rust oil hydraulic pump inside the oil tank 900 is controlled to start, and then the comprehensive operation vehicle 100 is controlled to work in a low constant speed driving mode. During the running process of the integrated operation vehicle 100, whenever the detection sensor 432 detects a sleeper bolt signal, the control device 400 automatically outputs a control signal to open the oiling solenoid valve of the oil injection assembly 43 to perform automatic oiling. The control device 400 can automatically match the oiling duration and delay time of the oil injection assembly 43 according to different operating driving speeds to ensure fixed-point and quantitative oiling operations at different operating speeds. After the oiling operation is completed, the lifting drive mechanism 1 can be raised, locked, and the oil pump stopped in the oiling control area of ​​the driver's station operation panel. The control device 400 controls the lifting drive mechanism 1 to rise and lock, and at the same time controls the anti-rust oil hydraulic pump of the oil tank 900 to stop working. The control device 400 can realize the oiling control function of the oiling mechanism 200 unlocking and locking, lifting, automatic railing, oil tank heating, and automatic oil injection.

[0128] By utilizing the lateral shift characteristics of the oiling device 200, it is possible to realize real-time detection of the bending radius (or vector distance) of the curve of the railway line. During the oiling operation, when the railway engineering work vehicle enters the curve, the rail-supporting wheel 446 under the oiling device 200 needs to move horizontally to the left and right to ensure that the front and rear wheels of the railway engineering work vehicle and the rail-supporting wheel 446 of the oiling device 200 adapt to the curve driving operation. When the guide mechanism 31 moves horizontally, the inclination sensor 315 installed on the mechanism will detect the deflection angle of the mechanism. First, the lateral offset principle of the oiling device 200 is mathematically modeled, and then the inclination angle generated by the lateral offset is converted into the bending radius (or vector distance) of the vehicle curve using the three-point detection principle. The mathematical model is converted into a "inclination angle-vector distance / turning radius" curve relationship, thereby realizing real-time detection of the bending radius (or vector distance) of the curve. The mathematical modeling of the lateral shift principle of the oiling device 200 and the "inclination angle-vector distance / turning radius" curve are shown in the attached figure. Fig.26 and attached Fig. 27As shown in FIG. 4 , the curve shown in d is the curve corresponding relationship between the turning radius and the inclination angle, the curve shown in e is the curve corresponding relationship between the sag and the inclination angle, and the straight line shown in f is the corresponding inclination angle and sag value at the minimum turning radius.

[0129] As attached Fig.24 and attached Fig.25 As shown, when the oiling device 200 is operating in a curve, the relationship between the lateral displacement Δx and the inclination angle θ of the rail oiling mechanism 4 is calculated according to the following formula:

[0130]

[0131]

[0132]

[0133] According to the three-point detection principle, we can find:

[0134]

[0135] Wherein, a is the distance from the upper rotation point to the guide post 311, in mm; h is the distance between the upper rotation point and the lower rotation point in the vertical direction, in mm; θ is the inclination angle of the guide post 311, b is the distance from the upper rotation point to the lower rotation point (when θ=0, b=h), in mm; c is the distance from the lower rotation point to a, in mm; θ 1 is the angle between b and the horizontal direction, in radians (rad); θ 2 is the angle between b and c, in radians (rad); Δx is the horizontal displacement of the lower turning point when a rotates by an angle of θ, in mm; R is the radius of the curve of the line, in mm; L is the distance between the front wheel point A and the rear wheel point C of the comprehensive working vehicle 100, in mm; point B is the installation position of the oiling device 200, L 2 , L 3 Arc The corresponding chord length is in mm; L 1 Draw a perpendicular line to line segment AC through point B. The distance between the foot of the perpendicular and point A is in mm.

[0136] Step S20) further comprises:

[0137] A ballast-replenishing device 300 for ballast backfilling is installed on the frame 700 of the integrated work vehicle 100. When the control device 400 performs operation control on the ballast-replenishing device 300, it first unlocks the lifting drive mechanism 1, and then controls the lifting drive mechanism 1 to extend and descend until the rail-resting wheel 446 contacts the surface of the rail 20 and maintains a successful rail-resting state. The automatic ballast-replenishing operation function is started, and the control device 400 outputs a signal to control the second power mechanism 81 to supply power, and establishes communication with the second power mechanism 81. At the same time, the control device 400 reads the signal of the second power mechanism 81 to determine whether it is working normally. After the control device 400 completes the communication with the second power mechanism 81, it controls the integrated work vehicle 100 to work in a low constant speed driving mode. While the integrated work vehicle 100 is moving, the second power mechanism 81 is synchronously started and quantitatively transports the ballast 30 to the ballast bucket 10. During the movement of the comprehensive operation vehicle 100, when the detection sensor 432 detects a sleeper bolt signal, the control device 400 performs a delay calculation so that the ballast outlet 103 moves to the position in the middle of the sleeper 40 where the sleeper bolt 50 corresponding to the detection signal is located. The control device 400 outputs a signal to control the ballast valve 101 to open once for automatic ballast replenishment operation, and the ballast 30 falls from the ballast bucket 10 into the pickaxe nest 70.

[0138] Step S20) further comprises:

[0139] The integrated operation vehicle 100 runs continuously. When the ballast discharge port 103 is located directly above the pick pocket 70, the control device 400 outputs a trigger signal to control the valve drive mechanism 102 to drive the ballast discharge valve 101 to open, and the ballast 30 falls from the ballast discharge bucket 10 into the pick pocket 70. When the ballast discharge is completed, the ballast discharge valve 101 is closed. The control device 400 also infers the distance of the next group of four pick pockets 70 based on the spacing of the next group of sleepers 40 measured by the front detection sensor 432, and then calculates the time required to pass through the next group of four pick pockets 70 in combination with the operation vehicle speed, and automatically adjusts the rotation speed of the second power mechanism 81. The ballast 30 in the ballast bucket 6 is transported by the belt 83 and falls into the ballast separator 9, and then falls into the ballast bucket 10, until the ballast bucket 10 passes over the next group of four pickaxes 70, and the control device 400 outputs a trigger signal to control the ballast valve 101 to open and perform the next ballast replenishing operation. This is repeated to achieve automatic and accurate ballast replenishing of the comprehensive operation vehicle 100 during continuous driving.

[0140] As a typical specific embodiment of the present invention, the conveying mechanism 8 adopts a belt conveying method, and further includes a second power mechanism 81, a speed reduction mechanism 82, a belt 83 and a roller 84. The speed reduction mechanism 82 is driven by the second power mechanism 81, and then the belt 83 is driven to roll, and the roller 84 is used to transmit power to the rolling of the belt 83. When the second power mechanism 81 drives the speed reduction mechanism 82 to rotate, the belt 83 conveys the ballast 30 from the ballast outlet 61 below the ballast bucket 6, and the ballast 30 falls into the ballast dividing bucket 9 and then falls evenly into the ballast dropping bucket 10 below. The conveying distance of the belt 83 is controlled by controlling the number of rotations of the second power mechanism 81, so as to realize single quantitative ballast removal.

[0141] A transverse mechanism 91 is installed on the ballast bucket 9, and the transverse mechanism 91 further includes a screw module 92 and a transverse driving mechanism 93. The ballast bucket 10 is installed on the ballast bucket 9 through a supporting roller 96, and a vertical limit block 95 is provided on the ballast bucket 9. The ballast bucket 10 is connected to the slide of the screw module 92 through a transverse push rod 94, and the screw of the screw module 92 is driven to rotate through the transverse driving mechanism 93, and the slide is driven to move transversely through the rotation of the screw, and the ballast bucket 10 follows the movement of the slide to achieve transverse displacement.

[0142] When the track is straight, the ballast bucket 10 is positioned at the center by the lead screw module 92, and the four ballast dropping openings 103 of the ballast bucket 10 are respectively located directly above the pick pocket 70. When the track is curved, the lead screw module 92 drives the ballast bucket 10 to move laterally to adjust the lateral position by measuring the pick pocket deviation signal given by the front detection sensor 432 and the control device 400, so that the ballast 30 falls into the pick pocket 70 accurately.

[0143] The ballast filling device 300 is used for the automatic backfilling of the ramming hole 70 after the tamping operation. When the control device 400 controls the operation of the ballast filling device 300, it first unlocks the lifting drive mechanism 1, and then controls the lifting drive mechanism 1 to extend and descend until the rail-resting wheel 446 contacts the surface of the rail 20 and maintains the successful rail-resting state. The automatic ballast filling operation function is started, and the control device 400 outputs a signal to control the second power mechanism 81 to supply power, and establishes communication with the second power mechanism 81 (such as: CAN communication can be specifically used). At the same time, the control device 400 reads the signal of the second power mechanism 81 to determine whether it is working normally. After the control device 400 completes the communication with the second power mechanism 81, it controls the integrated operation vehicle 100 to work in the low constant speed driving mode. While the integrated operation vehicle 100 is moving, the second power mechanism 81 is synchronously started and quantitatively transports the ballast 30 to the ballast bucket 10. During the running of the comprehensive operation vehicle 100, when the detection sensor 432 detects a sleeper bolt signal, the control device 400 performs a delay calculation, so that the ballast drop port 103 moves to the position in the middle of the sleeper 40 where the sleeper bolt 50 corresponding to the detection signal is located (considering that the actual falling time of the ballast 30 is in the middle and slightly to the rear), the control device 400 outputs a signal to control the ballast drop valve 101 to open once for automatic ballast replenishment operation, and the ballast 30 falls from the ballast drop bucket 10 into the pickaxe nest 70. The control device 400 adopts a differential compensation algorithm, and uses parameters such as sleeper bolt detection, sleeper spacing and operating vehicle speed as negative feedback for the opening and closing differential compensation control of the ballast drop port, and performs mathematical modeling based on parameters such as the distance between the ballast drop port 103 and the detection sensor 432, the selected theoretical vehicle speed, and the theoretical sleeper spacing. The specific modeling principle is shown in the attached figure. Fig.37 Then, the results calculated based on these parameters are compared with the values ​​actually detected by the detection sensor 432 for error analysis. When the error is greater than the system setting value, the differential speed correction adjustment of the opening and closing time of the ballast drop opening 103 is performed to ensure that the ballast 30 can fall into the pickaxe 70 between the two sleepers 40 when the ballast filling is opened.

[0144] The control device 400 can be specifically controlled by a servo motor of the belt conveyor mechanism of the ballast filling device 300 based on CAN communication. Fig.35 and attached Fig.36 As shown, the control device 400 performs associated control through the running speed of the belt 83, the operating vehicle speed, and the cross-sectional area of ​​the ballast outlet 61 of the ballast bucket 6 to achieve quantitative ballast replenishment. When the ballast outlet 61 with a cross-sectional area of ​​A=B×H is set at the lower part of the ballast bucket 6, the running speed of the belt 83 is V 0 , the operating speed is V 1 When the detection sensor 432 detects that the distance between two adjacent sleepers 40 is S, the time to the next ballast replenishment is T = S / V 1 During this period, the running distance of the belt 83 is L = V 0×T, then the next ballast replenishment amount is V = A × L. During the ballast replenishment operation, V, B, and H are used as the quantitative values, and the control device 400 is based on the operating vehicle speed V 1 The running speed V of the belt 83 is calculated by the change of 0 The running speed V of the belt 83 is adjusted by the second power mechanism 81. 0 .

[0145] As attached Fig.37 As shown, when the integrated operation vehicle 100 is traveling toward the II end as shown in the figure, the sleeper bolt 50 is detected first and then the ballast filling action is performed. The time for each detection sensor 432 to detect the sleeper bolt 50 is recorded as t i , i = 1, 2, ..., N, t 1 = 0s. Assume that the structural comprehensive response delay time of the control device 400 and the ballast-adding device 300 is Δt, and the time for each ballast-dropping opening 103 to be opened is t oi , i = 1, 2, ..., N, the vehicle speed when the ballast outlet 103 is opened is V oi , when the ballast drop opening 103 reaches the middle of the sleeper 40 in front of the i-th sleeper bolt 50, the following formula is satisfied:

[0146]

[0147] Among them, L r To detect the distance from the sensor 432 to the ballast outlet 103, V II (t) is the speed of the vehicle traveling toward the II end, h is the height of the ballast 30 falling from the ballast drop port 103 to the pick pocket 70, and g is the gravitational acceleration.

[0148]

[0149] Obviously, t 1 is a constant, is also a constant, denoted by k, so:

[0150] t o1 =t 1 +k

[0151] Since the volume of each pick 70 is basically constant, the embodiment 1 can adopt the ballast quantitative backfilling technology when performing ballast backfilling. In the comprehensive working vehicle control method described in the embodiment 2, the ballast filling device 300 uses a belt conveyor mechanism to convey the ballast 30, and realizes quantitative ballast filling by controlling the running speed of the belt 25, the working vehicle speed, and the cross-sectional area of ​​the ballast outlet 61 of the ballast bucket 6. It can be seen from the above calculation that the opening time of the lower ballast outlet 76 only needs to add a delay correction value based on the time of the first sleeper bolt 50 detection.

[0152] In the description of this application, it should be noted that when an element is referred to as being "fixed on" or "set on" another element, it can be directly on the other element or indirectly set on the other element; when an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.

[0153] It should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0154] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.

[0155] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the conditions under which this application can be implemented. Therefore, they have no substantive technical significance. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in this application without affecting the effects and purposes that can be achieved by this application.

[0156] By implementing the technical solution of the comprehensive working vehicle control method described in the specific embodiment of the present invention, the following technical effects can be produced:

[0157] (1) The comprehensive working vehicle control method described in the specific embodiment of the present invention integrates multiple working functions into one and performs centralized control, which not only realizes the various functional controls of various devices and working vehicles, but also enables the various devices to work in an orderly manner, thereby greatly improving the working efficiency of railway temporary maintenance operations;

[0158] (2) The integrated working vehicle control method described in the specific embodiment of the present invention is based on the vehicle control system to centrally control the oiling device and the ballast-replenishing device, which not only facilitates the communication and sharing of detection information of the two devices, but also eliminates the need for additional supporting oiling and ballast-replenishing device control systems, thereby reducing the overall R&D cost of the device;

[0159] (3) The comprehensive work vehicle control method described in the specific embodiment of the present invention is based on the PWM output of the hydrostatic high-speed and low constant-speed driving control, the safety monitoring of the device operation and transportation process, and the safety interlocking control of the construction process, which effectively ensures the safety of the equipment during the operation and transportation of the whole vehicle, and also ensures the safe construction of the operation process;

[0160] (4) The comprehensive working vehicle control method described in the specific embodiment of the present invention adopts methods such as bolt detection, track bending radius detection and lateral control, differential compensation, and hydraulic low constant speed control to achieve continuous fixed-point quantitative oiling and ballast replenishment operations at different driving speeds, and the application effect of the relevant technology is relatively good;

[0161] (5) The integrated work vehicle control method described in the specific embodiment of the present invention can realize the integrated work vehicle whole vehicle function control. The main control objects include the engine, hydraulic running system, oiling device, ballast replenishing device, multi-functional work arm, lifting arm and other equipment, which can well realize the coordination between various work functional units.

[0162] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0163] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as above in the preferred embodiment, it is not used to limit the present invention. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the methods and technical contents disclosed above without departing from the spirit and technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent replacement, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of protection of the technical solution of the present invention.

Claims

1. A comprehensive working vehicle control method, characterized in that: At the bottom of the frame (700) of the comprehensive operation vehicle (100), an oiling device (200) is installed at the front end of the ballast filling device (300); the oiling device (200) includes a rail-supporting oiling mechanism (4); the lifting drive mechanism (1) can drive the rail-supporting wheel assembly (44) of the rail-supporting oiling mechanism (4) to perform a rail-supporting operation; the rail-supporting wheel assembly (44) includes a slide (441), an axle pressure plate (443), a sleeve (444) and a rail-supporting wheel (446); the slide (441) and the sleeve (444) constitute the rail-supporting wheel (446); 6), the sleeve (444) is sleeved on the transverse guide column (49); two rotating shafts (442) are respectively arranged on the front and rear sides of the slide (441), and the rail-supporting wheel (446) is movably installed on the slide (441) through the shaft pressure plate (443); the oiling device (200) also includes a main frame (3) and a locking mechanism (5); the main frame (3) includes a first fixing frame (33) and a crossbeam (34), and the first fixing frame (33) is installed at the bottom of the frame (700); the lifting drive mechanism (1) The upper part is connected to the vehicle frame (700), and the lower part is connected to the cross beam (34); the rail-supporting oiling mechanism (4) is installed at the lower parts of both ends of the cross beam (34) in a symmetrical manner along the transverse direction, and includes a rail-supporting driving mechanism (41), a second fixing frame (42), an oil injection assembly (43), a compression spring (45), a torsion spring (46) and a rocker (47); a transverse guide column (49) is provided on the second fixing frame (42) and is installed below the cross beam (34), and the rail-supporting wheel assembly (44) is movably arranged on the transverse guide column (49); The rail driving mechanism (41) is arranged between the second fixed frame (42) and the rail wheel assembly (44); one end of the swing rod (47) is movably mounted on the rail wheel assembly (44) through a rotating shaft (442), and the other end is hinged to the oil injection assembly (43); the compression spring (45) is arranged on the transverse guide column (49) and is located between the second fixed frame (42) and the rail wheel assembly (44); the torsion spring (46) is arranged on the rotating shaft (442) and is located between the rail wheel assembly (44) and the swing rod (47); the method comprises the following steps: S10) when the integrated operation vehicle (100) is in a traveling operation, the lifting drive mechanism (1) drives the rail-supporting oiling mechanism (4) to perform a rail-supporting operation, and whenever the detection sensor (432) detects a rail sleeper bolt signal, the control device (400) outputs a signal to control the rail-supporting oiling mechanism (4) to perform an automatic oiling operation; S20) At the same time, the control device (400) calculates the time of reaching the pick hole (70) according to the sleeper bolt signal, the operating speed and the distance between the ballast drop opening (103) of the ballast filling device (300) and the sleeper bolt (50), and controls the ballast filling device (300) to quantitatively convey the ballast (30); when the ballast drop opening (103) moves to above the pick hole (70), the control device (400) controls the ballast (30) to fall from the ballast filling device (300) and backfill into the pick hole (70); The step S10) further comprises: When the control device (400) performs operation control on the oiling device (200), the lifting drive mechanism (1) is first unlocked, and then the lifting drive mechanism (1) is controlled to extend and descend; when the lifting drive mechanism (1) descends until the rail-resting wheel (446) approaches the rail (20), the height sensor (48) detects the rail signal, and the control device (400) controls the rail-resting drive mechanism (41) to drive the rail-resting wheel (446) to perform an automatic rail-resting operation according to the rail signal; after the rail-resting wheel (446) successfully rests on the rail, the rail sleeper bolt oiling operation function is started, and the control device (400) can perform a start logic judgment based on the collected oil tank temperature and liquid level sensor signals, and control the oil tank (900) to release the oil in the oil tank (900) when the start conditions are met. The anti-rust oil hydraulic pump of the part is started, and then the comprehensive operation vehicle (100) is controlled to work in a low constant speed driving mode; during the running process of the comprehensive operation vehicle (100), whenever the detection sensor (432) detects a sleeper bolt signal, the control device (400) automatically outputs a control signal to open the oiling solenoid valve of the oil injection component (43) to perform automatic oiling operation; the control device (400) can automatically match the oiling duration and delay time of the oil injection component (43) according to different operating driving speeds, so as to ensure fixed-point and quantitative oiling operation under different operating speeds; after the oiling operation is completed, the control device (400) controls the lifting drive mechanism (1) to rise and lock, and at the same time controls the anti-rust oil hydraulic pump of the oil tank (900) to stop working.

2. The integrated work vehicle control method according to claim 1, characterized in that: The step S10) further comprises: After the comprehensive operation vehicle (100) arrives at the operation site, before the oiling operation is performed, the locking mechanism (5) is first opened; the lifting drive mechanisms (1) located on the left and right sides are synchronously extended to drive the main frame (3) to lower the rail-supporting oiling mechanism (4); when the rail-supporting wheel assembly (44) of the rail-supporting oiling mechanism (4) contacts the rail (20), the rail-supporting drive mechanism (41) releases the pressure, and the rail-supporting wheel assembly (44) moves under the action of the compression spring (45), and ensures that the wheel rim of the rail-supporting wheel (446) of the rail-supporting wheel assembly (44) contacts the inner side of the rail (20). The rail-leaning oiling mechanism (4) is touched to complete the rail-leaning action; the oil injection assembly (43) of the rail-leaning oiling mechanism (4) opens the signal detection of the rail sleeper bolt (600) and the control of the nozzle (433); after the oiling operation is completed, the rail-leaning driving mechanism (41) stretches to drive the rail-leaning wheel (446) to separate from the inner side of the rail (20), the lifting driving mechanism (1) drives the rail-leaning oiling mechanism (4) to rise, the rail-leaning driving mechanism (41) releases the pressure, and the rail-leaning wheel assembly (44) moves under the action of the compression spring (45), thereby locking the locking mechanism (5) and the main frame (3).

3. The integrated working vehicle control method according to claim 2, characterized in that: Two groups of oil spray assemblies (43) are symmetrically arranged on the left and right sides of the rail wheel assembly (44), and the detection sensors (432) and nozzles (433) of the two groups of oil spray assemblies (43) are installed in a cross-symmetrical structure relative to the left and right sides of the rail (20); when the detection sensor (432) located on the inner side detects a signal from the inner side sleeper bolt (50), the outer side nozzle (433) is controlled to open; when the detection sensor (432) located on the outer side detects a signal from the outer side sleeper bolt (50), the inner side nozzle (433) is controlled to open.

4. The integrated working vehicle control method according to claim 1, 2 or 3, characterized in that: During the oiling operation, when the oil spraying assembly (43) encounters an obstacle (80) on the line, the connecting rod mechanism formed by the swing rod (47) and the oil spraying assembly (43) swings back and forth along the line direction to avoid the obstacle; after passing the obstacle (80), the swing rod (47) is reset under the action of the torsion spring (46).

5. The integrated working vehicle control method according to claim 4, characterized in that: The main frame (3) further comprises a guiding mechanism (31) and a stretching mechanism (32), wherein the guiding mechanism (31) is hinged to the first fixing frame (33) and the crossbeam (34) respectively, and the stretching mechanism (32) is connected between the first fixing frame (33) and the guiding mechanism (31); when the oiling device (200) is operating in a curve, the center of the frame (700) is offset relative to the center of the rail (20), and at this time, adaptive lateral deflection is achieved through the guiding mechanism (31) and the stretching mechanism (32), so as to ensure that the rail-supporting wheel assembly (44) is always in contact with the rail (20), so as to achieve curve operation.

6. The integrated working vehicle control method according to claim 5, characterized in that: The guide mechanism (31) comprises a guide column (311), a protective cover (312), a guide sleeve (313) and a first mounting seat (314); the protective cover (312) is sleeved on the outside of the guide column (311), and the guide sleeve (313) is sleeved on the protective cover (312); the first mounting seat (314) is fixed to the outer side of the guide sleeve (313), the lower part of the guide column (311) is hinged to the crossbeam (34), and the first mounting seat (314) is hinged to the first fixing frame (33); when the oiling device (200) is operating in a curve, the relationship between the lateral displacement Δx and the inclination angle θ of the rail-supporting oiling mechanism (4) is calculated according to the following formula: Wherein, a is the distance from the upper rotating point to the guide column (311), h is the distance between the upper rotating point and the lower rotating point in the vertical direction, θ is the inclination angle of the guide column (311), b is the distance from the upper rotating point to the lower rotating point, c is the distance from the lower rotating point to a, θ1 is the angle between b and the horizontal direction, θ2 is the angle between b and c, Δx is the horizontal displacement distance of the lower rotating point when a rotates through angle θ, R is the radius of the line curve, L is the distance between point A of the front wheel and point C of the rear wheel of the comprehensive working vehicle (100), point B is the installation position of the oiling device (200), and L1 is the distance between the foot of the perpendicular line of the line segment AC through point B and point A.

7. The integrated working vehicle control method according to claim 1, 2, 3, 5 or 6, characterized in that: The ballast replenishing device (300) comprises: a ballast bucket (6) mounted on a vehicle frame (700) for accommodating ballast (30); a conveying mechanism (8) disposed below the ballast bucket (6), for quantitatively conveying the ballast (30) in the ballast bucket (6) by controlling the transmission distance of the conveying mechanism (8); a ballast drop bucket (10) disposed below the conveying mechanism (8), for controlling the ballast (30) to fall and backfill it into the pick pocket (70), so as to achieve a single quantitative backfilling of the ballast (30); the conveying mechanism (8) adopts a belt conveying method, and comprises a second power mechanism (81), a speed reduction mechanism (82), a belt (83) and a roller (84); the step S20) further comprises: A ballast-replenishing device (300) for implementing ballast backfilling is installed on the frame (700) of the comprehensive operation vehicle (100); when the control device (400) performs operation control on the ballast-replenishing device (300), the lifting drive mechanism (1) is first unlocked, and then the lifting drive mechanism (1) is controlled to extend and descend until the rail-restoring wheel (446) contacts the surface of the rail (20) and maintains a successful rail-restoring state; the automatic ballast-replenishing operation function is started, the control device (400) outputs a signal to control the second power mechanism (81) to supply power, and establishes communication with the second power mechanism (81), and at the same time, the control device (400) reads the signal of the second power mechanism (81) to determine whether the second power mechanism (81) is working normally; the control device (400) completes the establishment of communication with the second power mechanism (81) After the communication with the mechanism (81), the integrated operation vehicle (100) is controlled to work in a low constant speed driving mode, and while the integrated operation vehicle (100) is moving, the second power mechanism (81) is synchronously started and quantitatively transports the ballast (30) to the ballast bucket (10); during the movement of the integrated operation vehicle (100), when the detection sensor (432) detects a sleeper bolt signal, the control device (400) performs a delay calculation, so that the ballast outlet (103) moves to the middle position of the sleeper (40) where the sleeper bolt (50) corresponding to the detection signal is located, the control device (400) outputs a signal to control the ballast valve (101) to open once to perform automatic ballast replenishment operation, and the ballast (30) falls from the ballast bucket (10) into the pickaxe (70).

8. The integrated working vehicle control method according to claim 7, characterized in that: The step S20) further comprises: The integrated operation vehicle (100) continuously travels. When the ballast discharge port (103) is located directly above the pickaxe (70), the control device (400) outputs a trigger signal to control the valve driving mechanism (102) to drive the ballast discharge valve (101) to open, and the ballast (30) falls from the ballast discharge bucket (10) into the pickaxe (70). When the ballast discharge is completed, the ballast discharge valve (101) is closed. The control device (400) simultaneously infers the distance of the next group of four pickaxes (70) based on the spacing of the next group of sleepers (40) measured by the front detection sensor (432), and then calculates the time required to pass through the next group of four pickaxes (70) in combination with the operation vehicle speed, and automatically adjusts the second power mechanism (8 1); the ballast replenishing device (300) further comprises a ballast distributing bucket (9) connected between the conveying mechanism (8) and the ballast dropping bucket (10), for distributing the ballast (30) quantitatively transported by the conveying mechanism (8); the ballast (30) in the ballast bucket (6) is transported by a belt (83) and falls into the ballast distributing bucket (9), and then falls into the ballast dropping bucket (10), until the ballast dropping bucket (10) passes over the next group of four pickaxes (70), the control device (400) outputs a trigger signal to control the ballast dropping valve (101) to open, and the next ballast replenishing operation is performed; this is repeated, so as to realize automatic and accurate ballast replenishing of the comprehensive operation vehicle (100) during continuous driving.

9. The integrated working vehicle control method according to claim 8, characterized in that: The second power mechanism (81) drives the speed reduction mechanism (82), thereby driving the belt (83) to roll, and the roller (84) is used to transmit power to the rolling of the belt (83); when the second power mechanism (81) drives the speed reduction mechanism (82) to rotate, the belt (83) transports the ballast (30) out from the ballast outlet (61) below the ballast bucket (6), and the ballast (30) falls into the ballast distribution bucket (9) and then falls evenly into the ballast drop bucket (10) below; the conveying distance of the belt (83) is controlled by controlling the number of rotations of the second power mechanism (81), thereby realizing single quantitative ballast removal.

10. The integrated working vehicle control method according to claim 8 or 9, characterized in that: A transverse movement mechanism (91) is installed on the ballast bucket (9), and the transverse movement mechanism (91) includes a screw module (92) and a transverse movement driving mechanism (93); the ballast bucket (10) is installed on the ballast bucket (9) through a supporting roller (96), and a vertical limit block (95) is provided on the ballast bucket (9); the ballast bucket (10) is connected to the slide of the screw module (92) through a transverse push rod (94), and the screw of the screw module (92) is driven to rotate through the transverse movement driving mechanism (93), and the slide is driven to move transversely through the rotation of the screw, and the ballast bucket (10) follows the movement of the slide to achieve transverse displacement.

11. The integrated working vehicle control method according to claim 10, characterized in that: When the track is a straight line, the ballast bucket (10) is positioned at a central position through the screw module (92), and the four ballast dropping openings (103) of the ballast bucket (10) are respectively located directly above the pick nest (70); when the track is a curve, the screw module (92) is controlled by the pick nest deviation signal measured by the front detection sensor (432) and given by the control device (400) to drive the ballast bucket (10) to move laterally to adjust the lateral position, so that the ballast (30) accurately falls into the pick nest (70).

12. The integrated working vehicle control method according to claim 8, 9 or 11, characterized in that: The control device (400) performs associated control through the running speed of the belt (83), the operating vehicle speed, and the cross-sectional area of ​​the ballast outlet (61) of the ballast bucket (6) to achieve quantitative ballast replenishment; when the lower part of the ballast bucket (6) is provided with a ballast outlet (61) with a cross-sectional area of ​​A=B×H, the running speed of the belt (83) is V0, and the operating vehicle speed is V1, the detection sensor (432) detects that the distance between two adjacent sleepers (40) is S, then the time to the next ballast replenishment is T=S / V1, during which the running distance of the belt (83) is L=V0×T, then the next ballast replenishment amount is V=A×L, B and H are two sides of the cross-section; during the ballast replenishment operation, V, B, and H are used as quantitative values, and the control device (400) calculates the running speed V0 of the belt (83) according to the change of the operating vehicle speed V1, and adjusts the running speed V0 of the belt (83) through the second power mechanism (81).

13. The integrated working vehicle control method according to claim 12, characterized in that: When the integrated operation vehicle (100) is traveling toward one end, the sleeper bolts (50) are first detected and then the ballast filling operation is performed. The time when each detection sensor (432) detects the sleeper bolts (50) is recorded as t i , i = 1, 2, ..., N, t1 = 0s; assuming that the structural comprehensive response delay time of the control device (400) and the ballast replenishing device (300) is Δt, the time of each opening of the ballast outlet (103) is recorded as t oi , i = 1, 2, ..., N, the vehicle speed when the ballast outlet (103) is opened is V oi , when the ballast drop opening (103) reaches the middle of the sleeper (40) in front of the i-th sleeper bolt (50), the following formula is satisfied: Among them, L r To detect the distance from the sensor (432) to the ballast outlet (103), V II (t) is the speed of the vehicle traveling toward one end, h is the height of the ballast (30) falling from the ballast drop port (103) to the pickaxe hole (70), and g is the gravitational acceleration.