A method for advanced prevention and control of water damage in overburden layer of working face based on gangue grouting
Through ground directional drilling, the aquifer is transformed into the aquifer, reducing its permeability, solving the problem of construction difficulty and high cost of off-stratum water damage prevention and control in deep coal mining, achieving effective water damage prevention and control effects, and reducing the burden of underground drainage and ecological environment damage.
Patent Information
- Application Number
- CN202210926128.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-03
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-08-03
AI Technical Summary
In the prevention and control of destrata water damage caused by rock cladding on coal mines, especially in deep coal mine mining, there are problems such as construction difficulty, high cost, increased downhole drainage burden and ecological environment damage, especially for the high destrata development location. When mining in deep mining areas, traditional methods are difficult to control and costly.
By collecting the exploration data of the working face, identify the off-stratum locations that pose a threat to the working face, and use ground directional drilling to transform the recharge aquifer to reduce the permeability of the aquifer and thus reduce the recharge amount of the destratum water , extend the supply time and prevent and control the off-stratigraphic damage of rock covering the working surface.
This method is simple and has low construction cost, effectively prevents underground water outburst accidents, reduces the water control cost during deep coal mine mining, avoids underground drainage burden and ecological environment damage, and significantly improves the prevention and control effect.
Smart Images

Figure CN115234298B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for advanced prevention and control of overburden rock separation water hazard in a working face based on gangue grouting, and belongs to the field of mine water hazard prevention and control. Background Art
[0002] During coal mining, the overburden will deform, break and form a large number of cracks. Although there will be no longitudinal through cracks above the water-conducting fracture zone, cracks will be pulled open along the direction between or within the rock layers, which are called delamination cracks (abbreviated as delamination). If there is an aquifer around the delamination, the delamination space will be filled with water. As the working face is closer to the water-conducting fracture zone, the delamination will close. If the delamination water flows into the mining space, delamination water damage will be formed. The key to preventing and controlling delamination water damage in the roof of coal mines is prevention. Therefore, it is necessary to take corresponding water prevention and control measures in advance for mining working faces with hidden dangers of delamination water damage. How to effectively prevent and control delamination water damage in overburden rock is crucial for safe mining of coal mines, especially deep coal mines. In addition, in the large-scale mining of coal, a large amount of gangue is mined, resulting in a large number of gangue piles that seriously pollute the surface ecological environment. How to effectively use coal gangue and transform solid waste is also a problem faced by most coal mines.
[0003] At present, there have been many studies on the formation mechanism and prevention and control measures of abscission water hazards, including the identification of abscission development location, the formation conditions of abscission water bodies, and the process of abscission water inrush (abscission closure). Some scholars have also conducted a lot of research on the prevention and control of abscission water hazards. Among the existing methods for preventing and controlling abscission water hazards, one is to construct "diversion holes" or "interception holes" through underground tunnels to the overburden abscission layer. This method is more effective when the vertical distance between the abscission layer and the coal seam is relatively close. However, when the abscission layer is located at a higher position, especially when the thickness of the coal seam in the west is large, the vertical distance between the abscission layer and the coal seam is large. In this case, the use of this method will encounter problems such as difficulty in underground upward hole construction, large engineering workload, and high cost. The other type is to construct "straight-through diversion holes" on the ground. This method is to construct vertical holes at a certain interval in the middle of the working face before the working face advances. The final hole layer reaches the water-conducting fracture zone. By draining the water in the abscission layer in real time, a large amount of water will not accumulate in the abscission layer, thereby achieving the purpose of preventing and controlling abscission water damage. However, there are the following shortcomings: First, in the process of preventing and controlling abscission water, this method will cause a large amount of water from the abscission layer to replenish the aquifer into the well, increasing the drainage burden of the well, and at the same time causing damage to the aquifer, further aggravating the ecological environment damage in the mining area; second, for deep mining areas, the depth of the construction drilling will increase, which will increase the cost of water control. In addition, there are also corresponding studies on the prevention and control of abscission water by grouting the overburden abscission layer through ground construction drilling holes. This method is to prevent and control abscission water damage by grouting the abscission layer through the ground construction vertical holes during the mining of the working face. However, in order to achieve the expected effect, the location and timing must be found. If there is an error in the selection or the grouting pressure is too high, it is easy to cause man-made water disasters. Therefore, the effect is not easy to control, and the cost of water control in deep mining areas is relatively high. Summary of the invention
[0004] The purpose of the present invention is to provide a method for preventing and controlling water damage in overburden strata of a working face based on gangue grouting, so as to solve the problems existing in the above-mentioned prior art.
[0005] To achieve the above object, the present invention provides a method for preventing and controlling water damage in overburden layer of working face based on gangue grouting, comprising the following steps:
[0006] Collect exploration data of the working face, estimate the height of the water-conducting fracture zone in the overburden of the working face, identify the location of the strata that threaten the working face, and determine the recharge aquifer that threatens the strata that threaten the working face;
[0007] The recharge aquifer is transformed by grouting through directional drilling on the ground to reduce the permeability of the aquifer, thereby reducing the amount of recharge from the aquifer to the delamination space during working face mining and extending the recharge time, thereby achieving the purpose of preventing and controlling water damage in the overburden delamination of the working face.
[0008] Optionally, collect exploration data of the working face and estimate the height of the water-conducting fracture zone in the overburden of the working face. Specifically, collect the working face mining thickness, roof type, working face inclined length, and mining depth, and estimate the height of the water-conducting fracture zone in the working face according to the "Specifications for Coal Pillar Retention and Compression Coal Mining for Buildings, Water Bodies, Railways and Main Shafts and Tunnels" or the empirical formula summarized from the measured values of the height of the water-conducting fracture zone in the mine field.
[0009] Optionally, the position of the delamination layer that threatens the mining of the working face is determined, specifically: according to the borehole column chart in the working face, the position of the delamination layer above the water-conducting fracture zone is determined by using on-site in-situ monitoring or the "combined beam" principle formula, and the delamination layer within the height range H above the water-conducting fracture zone is determined as the position of the delamination layer that threatens the mining of the working face, where H can be calculated by the following formula:
[0010]
[0011] Where: P is the water pressure of the aquifer recharged by the aquifer, MPa; T s is the critical water inrush coefficient of stratum water, MPa / m, T s It can be determined by statistical analysis of the actual stratum water inrush data of the well field. If there is no actual data, 0.06~0.1MPa / m can be taken.
[0012] Optionally, the recharge aquifer can be transformed by grouting using ground directional drilling, specifically: using ground directional drilling in the middle of the working face, drill horizontally along the working face and along the recharge aquifer at 15m above the stratum to inject gangue slurry.
[0013] Optionally, the gangue slurry is a slurry formed by a mixture of coal gangue powder, fly ash and water and water, wherein the slurry volume concentration is 60% to 70%. In the mixture, the coal gangue powder is larger than 200 mesh, accounting for 50% to 100%, the fly ash accounts for 0 to 50%, and the water reducer accounts for 1 to 2%. The specific proportion of coal gangue and fly ash can be determined based on the water-richness analysis of the grouting aquifer.
[0014] Optionally, the specific proportion of the coal gangue and fly ash can be determined based on the water-richness analysis of the grouting aquifer. Specifically, the stronger the water-richness of the aquifer, the greater the proportion of coal gangue powder. If the water-richness of the aquifer reaches strong or above, the proportion of coal gangue powder can be more than 80%.
[0015] Optionally, the permeability of the aquifer is reduced, specifically, the permeability coefficient of the aquifer after grouting should be less than K, where K is calculated using the following formula:
[0016]
[0017] Where: Q is the redundant drainage capacity of the working face, m 3 / h, which can be determined by subtracting the actual normal water inflow from the maximum drainage capacity of the working face; M and h are the thickness and head height of the aquifer recharged by the abscission layer, respectively; t is the water filling time before the closure of the abscission layer, d; A is the interface area of the top of the abscission layer.
[0018] Optionally, the water filling time t before the separation layer closure can be calculated using the following formula:
[0019]
[0020] Where: L is the closure distance of the separation layer, m, which can be determined by on-site in-situ monitoring or by theoretical calculation of the composite beam; H' is the distance between the separation layer and the coal seam roof, m; α1 and α2 are the front and rear fracture angles of the rock layer, °; v is the advancement speed of the working face, m / d.
[0021] The technical effects of the present invention are:
[0022] The present invention is based on the identification of the position of the stratum that threatens the working face, and takes the recharge aquifer as the target layer for grouting transformation. By preparing a reasonable grouting slurry, a directional drilling hole is constructed on the ground along the direction of the working face and in the horizontal direction of the aquifer for grouting, and a reasonable grouting effect identification method is proposed. By reducing the permeability of the stratum recharge aquifer, the recharge amount of the aquifer to the stratum space during the mining of the working face is reduced (even if water inrush occurs, the water volume will not exceed the maximum drainage capacity of the working face), thereby achieving the purpose of preventing and controlling the water damage of the overburden stratum of the working face. Compared with the traditional method, the present method has simple steps and low construction cost, and can effectively prevent the occurrence of underground stratum water inrush accidents and the potential safety hazards of underground water inrush caused by the ground stratum grouting process, and at the same time solves the problem of difficult treatment of gangue in some mines; in addition, the method is easy to promote, especially with the mining of deep coal seams, the advantages of the method in cost and effect are more obvious. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 Flowchart of an embodiment of the present invention. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0026] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0027] The present invention discloses a method for preventing and controlling water damage in overburden separation layer of working face based on gangue grouting. The flow chart of the method is as follows: Figure 1 As shown, the specific steps include:
[0028] S1. Collect exploration data of the working face and estimate the height of the water-conducting fracture zone in the overburden during mining of the working face.
[0029] The thickness of the working face, the type of roof, the inclined length of the working face, and the mining depth are collected, and the height of the water-conducting fracture zone of the working face is estimated according to the empirical formula summarized from the "Specifications for the Installation of Coal Pillars and Compressed Coal Mining in Buildings, Water Bodies, Railways and Main Shafts and Tunnels" or the actual measured values of the height of the water-conducting fracture zone in the mine field.
[0030] S2. Identify the location of the strata that threaten the mining of the working face, and determine the recharge aquifer that threatens the strata that threaten the working face.
[0031] According to the borehole column chart in the working face, the location of the separation layer above the water-conducting fracture zone is determined by using on-site in-situ monitoring or the "combined beam" principle formula. When calculating using the "combined beam" principle formula, first, the rock layers within the range of height where separation layers can be developed are numbered 1, 2, ..., m from bottom to top. If the following formula is satisfied, it is considered that there is a separation layer under the n+1th rock layer.
[0032]
[0033] Where: E n+1 、h n+1 , γ n+1 are the elastic modulus, thickness and gravity of the n+1th rock layer respectively; E i 、h i , γ i are the elastic modulus, thickness and density of the i-th rock layer respectively.
[0034] The separation layer within the height range H above the water-conducting fracture zone is determined as the separation layer position that poses a threat to the mining of the working face, where H can be calculated using the following formula:
[0035]
[0036] Where: P is the water pressure of the aquifer recharged by the aquifer, MPa; T s is the critical water inrush coefficient of stratum water, MPa / m, T sIt can be determined by statistical analysis of the actual stratum water inrush data of the well field. If there is no actual data, 0.06~0.1MPa / m can be taken.
[0037] S3. Use ground directional drilling to carry out grouting transformation on the recharge aquifer.
[0038] Directional drilling is used on the ground to drill horizontally in the middle of the working face along the direction of the working face and along the recharge aquifer at 15m above the stratum to inject gangue slurry.
[0039] Gangue slurry is a slurry formed by a mixture of coal gangue powder, fly ash and water reducing agent and water, wherein the slurry volume concentration is 60% to 70%. In the mixture, coal gangue powder larger than 200 mesh accounts for 50% to 100%, fly ash accounts for 0 to 50%, and water reducing agent accounts for 1 to 2%.
[0040] The specific proportion of coal gangue and fly ash can be determined based on the water-richness analysis of the grouting aquifer. If the water-richness of the aquifer is stronger, the proportion of coal gangue powder will be greater. If the water-richness of the aquifer reaches strong or above, the proportion of coal gangue powder can be more than 80%.
[0041] S4. Reduce the permeability of the aquifer, thereby reducing the amount of recharge from the aquifer to the delamination space during mining at the working face, prolonging the recharge time, and thus achieving the purpose of preventing and controlling water damage in the overburden delamination of the working face.
[0042] The permeability coefficient of the aquifer after grouting should be less than K, where K is calculated using the following formula:
[0043]
[0044] Where: Q is the redundant drainage capacity of the working face, m 3 / h, which can be determined by subtracting the actual normal water inflow from the maximum drainage capacity of the working face; M and h are the thickness and head height of the aquifer recharged by the abscission layer, respectively; t is the water filling time before the closure of the abscission layer, d; A is the interface area of the top of the abscission layer.
[0045] The water filling time t before the separation layer is closed can be calculated using the following formula:
[0046]
[0047] Where: L is the closure distance of the separation layer, m, which can be determined by on-site in-situ monitoring or by theoretical calculation of the composite beam; H' is the distance between the separation layer and the coal seam roof, m; α1 and α2 are the front and rear fracture angles of the rock layer, °; v is the advancement speed of the working face, m / d.
[0048] Taking a coal mine working face as an example, the exploration data of the working face was collected. The working face has a strike length of 968m, a dip length of 230m, a thickness of 12.0m, and a dip angle of 3-6°, which belongs to near-horizontal coal seam mining. The measured crack-mining ratio is about 20.4. The generalized situation and physical and mechanical parameters of the working face overburden are shown in Table 1.
[0049] According to the measured fracture-mining ratio of about 20.4 in the well field, it can be estimated that the height of the overburden water-conducting fracture zone in the working face is 244.8m. The above-mentioned "combined beam principle formula is used to determine the development position of the abscission layer above the water-conducting fracture zone, as shown in Table 1. Since the recharge aquifer of the abscission layer at the bottom of the No. 12 rock layer is the No. 12 rock layer, the head pressure of the No. 12 rock layer is 2.5MPa, T s The critical water inrush coefficient of stratum water is taken as 0.06MPa / m. Therefore, the stratum within the height range of 41.7m above the water-conducting fracture zone is determined as the stratum position that poses a threat to the mining of the working face, that is, the stratum at the bottom of the No. 12 rock layer is the stratum that poses a threat to the mining of the working face. The No. 12 stratum is determined as the target layer for grouting. The ground directional drilling is used in the middle of the working face. Horizontal drilling is carried out along the direction of the working face and along the No. 12 stratum at 15m above the stratum to inject gangue slurry. According to the pumping test data, the water-bearing layer is weak in water richness, with a permeability coefficient of 0.012145~0.03354m / d, and a slurry volume concentration of 60%~70%. In the mixture, the gangue powder is larger than 200 mesh, accounting for 50%, fly ash accounts for 49%, and water reducer accounts for 1%. The thickness of the No. 12 stratum is 114.5m, the head height is 250m, and the redundant drainage capacity of the working face is 120m 3 / h. According to the actual mining situation of the adjacent working face, when the working face advances 345m, the stratum is closed, that is, the stratum closure distance is 345m. The front and rear fracture angles of the rock formation are both 70°. The working face advances at a distance of 5m / d. Therefore, it can be finally determined that the permeability coefficient of the aquifer after grouting should be less than 0.0013m / d.
[0050] Table 1 Physical and mechanical parameters of overburden rock and identification results of stratum development position at working face
[0051]
[0052] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0053] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. A method for preventing and controlling water damage in overburden layer of working face based on gangue grouting. It is characterized in that The following steps are involved: Collect exploration data of the working face, estimate the height of the water-conducting fracture zone in the overburden of the working face, identify the location of the strata that threaten the working face, and determine the recharge aquifer that threatens the strata that threaten the working face; Use directional drilling on the ground to carry out grouting transformation on the recharge aquifer to reduce the permeability of the aquifer, thereby reducing the amount of recharge from the aquifer to the abscission space during mining at the working face, extending the recharge time, and thus achieving the purpose of preventing and controlling water damage in the overburden abscission layer at the working face; The above-mentioned grouting transformation of the recharge aquifer by using ground directional drilling is carried out by using ground directional drilling in the middle of the working face, drilling horizontally along the working face and the recharge aquifer at 15m above the separation layer to inject gangue slurry; The gangue slurry is a slurry formed by a mixture of gangue powder, fly ash and water reducing agent, wherein the slurry volume concentration is 60% to 70%, in which the gangue powder is larger than 200 meshes, accounting for 50% to 100%, the fly ash accounts for 0% to 50%, and the water reducing agent accounts for 1% to 2%. The specific proportion of gangue and fly ash is determined according to the water-richness analysis of the grouting aquifer; The permeability of the aquifer is reduced, and the permeability coefficient of the aquifer after grouting should be less than K, where K is calculated using the following formula: Where: Q is the redundant drainage capacity of the working face, which is determined by subtracting the actual normal water inflow from the maximum drainage capacity of the working face; M and h are the thickness and head height of the aquifer recharged by the abscission layer, respectively; t is the water filling time before the abscission layer is closed; A is the interface area of the top of the abscission layer; The water filling time t before the separation layer is closed is calculated using the following formula: Where: L is the separation distance, which can be determined by on-site monitoring or by theoretical calculation of composite beams; H' is the distance from the separation layer to the coal seam roof; α 1 , α 2 are the front and rear fracture angles of the rock formation; v is the advancement speed of the working face.
2. A method for preventing and controlling water damage in overburden layer of working face based on gangue grouting according to claim 1, It is characterized in that The described collection of working face exploration data and estimation of the height of the overburden water-conducting fracture zone in the working face mining include the following steps: collecting the working face mining thickness, roof type, working face inclined length, and mining depth, and estimating the height of the water-conducting fracture zone in the working face mining according to the "Specifications for Coal Pillar Retention and Compression Coal Mining in Buildings, Water Bodies, Railways and Main Shafts and Tunnels" or the empirical formula summarized from the measured values of the height of the water-conducting fracture zone in the mine field.
3. The method for preventing and controlling water damage in overburden layer of working face based on gangue grouting according to claim 1, It is characterized in that The above-mentioned determination of the position of the delamination layer that threatens the mining of the working face is based on the borehole column chart in the working face, and adopts on-site in-situ monitoring or the "combined beam" principle formula to determine the position of the delamination layer above the water-conducting fracture zone, and the delamination layer within the height range H above the water-conducting fracture zone is determined as the position of the delamination layer that threatens the mining of the working face, wherein H can be calculated by the following formula: Where: P is the water pressure of the aquifer recharged by the aquifer; T s is the critical water inrush coefficient of stratum water, T s It is determined by statistical analysis of actual absorptive water inrush data of the well field. If there is no actual data, 0.06~0.1MPa / m is taken.
4. The method for preventing and controlling water damage in overburden layer of working face based on gangue grouting according to claim 1, It is characterized in that The specific proportion of the coal gangue and fly ash is determined based on the water-richness analysis of the grouting aquifer. If the water-richness of the aquifer is stronger, the proportion of coal gangue powder will be greater; if the water-richness of the aquifer reaches strong or above, the proportion of coal gangue powder will be more than 80%.
Citation Information
Patent Citations
Plugging method for separated layer water recharge source
CN106869966A
Grouting-drainage comprehensive treatment method for coal mine high-level separation layer water damage
CN113187513A