Cementing cement stone interface testing device and method
By simulating the pressure, temperature and impact load of the underground environment, the cementation failure conditions at the interface between the cement sheath and the simulated casing are measured, which solves the problem that the existing technology cannot judge the changes of the cement sheath under impact, and achieves effective guidance for cementing work. and assessment of cement sheath integrity.
Patent Information
- Application Number
- CN202110482778.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-04-30
AI Technical Summary
The existing cement-stone interface testing device cannot accurately judge the changes of the cement sheath under impact conditions, cannot effectively guide actual work, and cannot simulate the mechanical integrity of the cement sheath in the complex underground environment.
A testing device including a cement forming unit, pressure and flow unit, temperature unit, perforation impact unit and data analysis unit was designed to measure the interface between the cement sheath and simulated casing by simulating downhole pressure, temperature and impact load. Cement failure conditions.
It can accurately obtain the critical conditions for cementation failure at the cement-stone interface, provide guidance for actual cementing work, ensure that the cement sheath maintains integrity under complex conditions, and reduce the risk of engineering accidents.
Smart Images

Figure CN115266568B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of cementing of oil and gas well engineering, and in particular to a cementing cement-stone interface testing device and method. Background Art
[0002] In the process of oil and gas well construction, cementing is a key link in oil and gas development. The cementing process is: in the oil and gas well with casing, cement is injected into the outer annulus of the casing using cementing equipment. The solidified cement stone forms a complete cement ring between the casing and the well wall, which plays the role of isolating the underground oil, gas and water layers, supporting and protecting the casing. For oil and gas well production, the cement ring has the characteristics of hardness and brittleness, and it is often easy to produce brittle failure at the bonding interface between the cement ring and the casing.
[0003] After cementing is completed, the drilling tool will generate impact loads on the casing-cement stone-formation during the continued drilling process, that is, impact on the above-mentioned bonding interface. Therefore, it is necessary to accurately grasp the size of the impact load to prevent the destruction of the bonding interface and cause serious accidents, or even cause the oil well to be scrapped. In addition, under the cementing conditions and the complex formation environment of the wellbore, especially in the middle and late stages of oil and gas field exploitation, the high pressure in the well generated by construction processes such as water injection, acidification, fracturing, and thermal recovery will destroy the mechanical integrity of the cement ring, resulting in oil and gas crossflow, and serious engineering accidents. For horizontal wells, in order to increase production later, water fracturing and other measures are required, which will also have a serious impact on the above-mentioned bonding interface at the moment of startup. Therefore, it is necessary to accurately control the interface bonding properties of cementing cement stone under impact load, so as to regulate and improve the performance of cement slurry to ensure that the cement ring can still maintain its integrity under various complex conditions. For this reason, it is necessary to provide a cementing cement stone interface test device to test the bonding properties of the cement stone interface.
[0004] Currently, the commonly used cementing cement stone interface testing device usually includes a kettle body, and there is a cement slurry waiting chamber inside the kettle body. By injecting cement slurry into the cement slurry waiting chamber, the process of cement slurry solidifying into a cement ring between the casing and the well wall is simulated, and then the interface bonding strength of the cement ring is calculated based on the detection data of multiple detectors.
[0005] However, the above device can only simulate the cementing conditions and the formation process of the cement sheath, so as to calculate the interface bonding strength. Based on the bonding strength, the change of the cement sheath medium under the impact condition cannot be judged, and the guiding role for the actual work is small. Summary of the invention
[0006] The embodiment of the present application provides a cementing cement-stone interface testing device and method, which can obtain the critical conditions for cementing failure at the cement-stone interface and has a great guiding role in actual cementing work. The technical solution is as follows:
[0007] In one aspect, a cementing cement-stone interface testing device is provided, the device comprising: a cement forming unit, a pressure and flow unit, a temperature unit, a perforation impact unit, and a data analysis unit;
[0008] The cement forming unit comprises: a simulated casing, a cement ring, a simulated stratum, a kettle body, a heating belt, a base and a top cover;
[0009] The cement ring, simulated stratum, kettle body and heating belt are all ring-shaped and arranged outside the simulated casing in sequence from the inside to the outside. The bottom of the kettle body is sealed and connected to the base, and the top of the kettle body is sealed and connected to the top cover.
[0010] The pressure and flow unit includes an air source, an internal pressure pump, a first pressure valve, a first flow meter, an external pressure pump, a second pressure valve, an internal surrounding pressure sensor, an external surrounding pressure sensor, and at least one second flow meter;
[0011] The gas source is connected to the simulated casing and the top of the cement ring through an internal pressure air inlet pipe, and the internal pressure pump, the first pressure valve and the first flow meter are all arranged on the internal pressure air inlet pipe;
[0012] The external pressure pump is connected to the simulated stratum and the kettle body through an external pressure air inlet pipe, and the second pressure valve is arranged on the external pressure air inlet pipe;
[0013] The bottom of the cement ring is connected to the air outlet pipe, at least one second flow meter is arranged on the air outlet pipe, and both the first flow meter and the second flow meter are electrically coupled to the data analysis unit;
[0014] The inner confining pressure sensor is located in the simulated casing, the outer pressure sensor is located between the simulated formation and the kettle body, and the inner confining pressure sensor and the outer pressure sensor are both electrically coupled to the data analysis unit;
[0015] The temperature unit includes a temperature regulator, an external thermocouple and an internal thermocouple, wherein the temperature regulator and the external thermocouple are located inside the heating belt, the internal thermocouple is located inside the simulation sleeve, and the external thermocouple and the internal thermocouple are both electrically coupled to the data analysis unit;
[0016] The perforation impact unit includes a plurality of vibration tables and a plurality of vibration sensors, the vibration sensors correspond to the vibration tables one by one, the vibration tables are attached to the inner wall of the simulation casing, and the vibration sensors are electrically coupled to the data analysis unit.
[0017] In one possible design, at least two air inlets are provided on the top cover of the cement forming unit, at least one air inlet corresponds to the simulated casing, and at least one air inlet corresponds to the cement ring, and the air inlet is used to connect to the internal pressure air inlet pipe.
[0018] In a possible design, at least two air outlets are provided on the base of the cement forming unit for connecting the air outlet pipe.
[0019] In a possible design, at least one vent is provided on the base of the cement forming unit, the vent corresponds to the simulation casing, and a gas discharge valve is connected to the vent.
[0020] In one possible design, the gas source includes: a nitrogen cylinder containing nitrogen and a switch control valve for controlling the opening and closing of the nitrogen cylinder.
[0021] In a possible design, a plurality of the vibration tables are arranged in a spiral shape on the inner wall of the simulation casing.
[0022] In a possible design, a third pressure valve is also provided on the air outlet pipe.
[0023] In a possible design, a pressure sensor is also provided on the air outlet pipe, and the pressure sensor is electrically coupled to the data analysis unit.
[0024] In a possible design, the perforation impact unit further includes a vibration controller, and the vibration controller and the vibration table are both electrically coupled to the data analysis unit, so that the vibration sensor is electrically coupled to the data analysis unit through the vibration controller.
[0025] In a possible design, the perforation impact unit further includes a power amplifier, which is electrically coupled between the vibration controller and the vibration table.
[0026] In a possible design, the perforation impact unit further includes a sealing rubber ring, which is located between the vibration table and the inner wall of the simulated casing, and the vibration head of the vibration table passes through the sealing rubber ring and abuts against the inner wall of the simulated casing.
[0027] In a possible design, the device further includes a gas circulation unit, which is connected to the gas outlet pipe.
[0028] On the one hand, a cementing cement-stone interface testing method is provided, which is applied to a cementing cement-stone interface testing device provided in any of the above possible designs, and the method comprises:
[0029] Based on the pressure and flow unit, start the internal pressure pump and the external pressure pump, so that the internal surrounding pressure sensor outputs a first preset pressure, and the external surrounding pressure sensor outputs a second preset pressure;
[0030] Based on the temperature unit, the heating belt is started, and the temperature regulator is adjusted so that the outer thermocouple outputs a first preset temperature and the inner thermocouple outputs a second preset temperature;
[0031] Based on the perforation impact unit, multiple vibration tables are started;
[0032] When the rate at which the second flow signal sent by the second flow meter and received by the data analysis unit increases is greater than the first preset rate, the vibration signal sent by the vibration sensor at the corresponding moment is acquired.
[0033] The technical solution provided in the embodiment of the present application provides a holding space for cement forming by setting a cement forming unit, forms a cement ring by pre-casting cement in the cement forming unit, simulates the pressure and temperature environment downhole by means of a pressure and flow unit and a temperature unit, and provides an impact load by a perforation impact unit to simulate the perforation impact that the cement stone is subjected to in the downhole environment, thereby testing the bonding interface between the cement ring and the simulated casing. After the perforation impact unit performs perforation impact, as the impact force increases, the interface bonding between the cement ring and the simulated casing fails, causing gas to flow along the interface and then be discharged from the gas outlet pipe, thereby rapidly increasing the signal measured by the second flow meter. According to the rapid increase time of the second flow meter, the corresponding impact force of the perforation impact is obtained, so as to obtain the critical condition for the failure of the cement stone interface bonding, which has a great guiding role in actual cementing work. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0035] Figure 1 It is a schematic cross-sectional structure diagram of a cementing cement-stone interface testing device provided in an embodiment of the present application;
[0036] Figure 2 It is a structural schematic diagram of a perforation impact unit 4 provided in an embodiment of the present application;
[0037] Figure 3 It is a structural schematic diagram of a connection between a simulated casing 11 and a vibration table 41 provided in an embodiment of the present application;
[0038] Figure 4 It is a flow chart of a cementing cement-stone interface testing method provided in an embodiment of the present application.
[0039] The reference numerals of the components in the accompanying drawings are as follows:
[0040] 1- Cement forming unit;
[0041] 11-simulated casing;
[0042] 12-cement ring;
[0043] 13-Simulated strata;
[0044] 14- kettle body;
[0045] 15- Heating belt;
[0046] 16- base;
[0047] 17-top cover;
[0048] 18- peripheral pressure sleeve;
[0049] 2- Pressure and flow units;
[0050] 21-gas source;
[0051] 211- Nitrogen bottle;
[0052] 212- switch control valve;
[0053] 22- internal pressure pump;
[0054] 23- first pressure valve;
[0055] 24- a first flow meter;
[0056] 25-external pressure pump;
[0057] 26- second pressure valve;
[0058] 27-Internal pressure sensor;
[0059] 28- peripheral pressure sensor;
[0060] 29- second flow meter;
[0061] 3- Temperature unit;
[0062] 31- Temperature regulator;
[0063] 32-external thermocouple;
[0064] 33-internal thermocouple;
[0065] 4-Perforation impact unit;
[0066] 41-vibration table;
[0067] 411-vibration head;
[0068] 42-Vibration sensor;
[0069] 43-Vibration controller;
[0070] 44-power amplifier;
[0071] 45-sealing rubber ring;
[0072] 5-Data analysis unit;
[0073] 6-Internal pressure intake pipe;
[0074] 7-External pressure intake pipe;
[0075] 8- Exhaust pipe;
[0076] 81-gas discharge valve;
[0077] 82- third pressure valve;
[0078] 83-pressure sensor;
[0079] 9- Gas circulation unit. DETAILED DESCRIPTION
[0080] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.
[0081] In this application, unless otherwise clearly specified and limited, the terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0082] Figure 11 is a schematic diagram of the cross-sectional structure of a cementing cement interface testing device provided in an embodiment of the present application, the device comprising: a cement forming unit 1, a pressure and flow unit 2, a temperature unit 3, a perforation impact unit 4 and a data analysis unit 5; the cement forming unit 1 comprises: a simulated casing 11, a cement ring 12, a simulated formation 13, a kettle 14, a heating belt 15, a base 16 and a top cover 17; the cement ring 12, the simulated formation 13, the kettle 14 and the heating belt 15 are all annular, and are arranged in sequence from the inside to the outside of the simulated casing 11, and the bottom of the kettle 14 is sealed and connected to the bottom of the simulated casing 11. The top of the kettle body 14 is sealed and connected to the top cover 17; the pressure and flow unit 2 includes an air source 21, an internal pressure pump 22, a first pressure valve 23, a first flow meter 24, an external pressure pump 25, a second pressure valve 26, an internal pressure sensor 27, an external pressure sensor 28 and at least one second flow meter 29; the air source 21 is connected to the top of the simulation casing 11 and the cement ring 12 through the internal pressure intake pipe 6, and the internal pressure pump 22, the first pressure valve 23 and the first flow meter 24 are all arranged on the internal pressure intake pipe 6; the external pressure pump 25 is connected to the external pressure intake pipe 7 through the external pressure intake pipe 7 The second pressure valve 26 is arranged on the external pressure air inlet pipe 7 between the simulated formation 13 and the kettle body 14; the bottom of the cement ring 12 is connected to the air outlet pipe 8, at least one second flow meter 29 is arranged on the air outlet pipe 8, and the first flow meter 24 and the second flow meter 29 are both electrically coupled to the data analysis unit 5; the inner confining pressure sensor 27 is located in the simulated casing 11, and the outer pressure sensor 28 is located between the simulated formation 13 and the kettle body 14, and the inner confining pressure sensor 27 and the outer pressure sensor 28 are both electrically coupled to the data analysis unit 5; the temperature unit 3 It includes a temperature regulator 31, an external thermocouple 32 and an internal thermocouple 33. The temperature regulator 31 and the external thermocouple 32 are located inside the heating belt 15, and the internal thermocouple 33 is located inside the simulation casing 11. The external thermocouple 32 and the internal thermocouple 33 are both electrically coupled to the data analysis unit 5. The perforation impact unit 4 includes a plurality of vibration tables 41 and a plurality of vibration sensors 42. The vibration sensors 42 correspond to the vibration tables 41 one by one. The vibration tables 41 are attached to the inner wall of the simulation casing 11, and the vibration sensors 42 are electrically coupled to the data analysis unit 5.
[0083] The working principle of the device is described in detail below:
[0084] In the device, the cement forming unit 1 is used to provide the same environment as that in the underground for the formation of cement, including the same pressure and temperature, etc. The perforation impact unit 4 can simulate the impact load of the drilling tool on the casing-cement stone-formation, that is, the impact on the bonding interface between the simulated casing 11 and the cement ring 12.
[0085] The use of the device includes:
[0086] Based on the pressure and flow unit 2, the internal pressure pump 22 and the external pressure pump 25 are started, so that the internal surrounding pressure sensor 27 outputs a first preset pressure, and the external surrounding pressure sensor 28 outputs a second preset pressure;
[0087] Based on the temperature unit 3, the heating belt 15 is started, and the temperature regulator 31 is adjusted so that the outer thermocouple 32 outputs a first preset temperature and the inner thermocouple 33 outputs a second preset temperature;
[0088] Based on the perforation impact unit 4, a plurality of vibration tables 41 are started;
[0089] When the rate at which the second flow rate signal sent by the second flow meter 29 and received by the data analysis unit 5 increases is greater than the first preset rate, the vibration signal sent by the vibration sensor 42 at the corresponding moment is acquired.
[0090] The cementing cement stone interface testing device provided in the embodiment of the present application provides a holding space for cement forming by setting a cement forming unit 1, and forms a cement ring 12 by pre-casting cement in the cement forming unit 1. The pressure and flow unit 2 and the temperature unit 3 are used to simulate the pressure and temperature environment downhole, and the perforation impact unit 4 is used to provide an impact load to simulate the perforation impact that the cement stone is subjected to in the downhole environment, so that the bonding interface between the cement ring 12 and the simulated casing 11 can be tested. After the perforation impact unit 4 performs perforation impact, as the impact force increases, the interface bonding between the cement ring 12 and the simulated casing 11 fails, causing gas to flow along the interface and then be discharged from the gas outlet pipe 8, so that the signal measured by the second flowmeter 29 will increase rapidly. According to the time when the second flowmeter 29 is rapidly increased, the impact force of the corresponding perforation impact is obtained, so as to obtain the critical condition for the failure of the cement stone interface bonding, which has a great guiding role in actual cementing work.
[0091] The following is a detailed description of the structure and working principle of each part of the device:
[0092] In the cement forming unit 1, along the horizontal direction, the size of each component can be reduced in proportion to the actual structure underground, so as to more accurately simulate the underground environment.
[0093] In one possible design, at least two air inlets are provided on the top cover 17 in the cement forming unit 1 , at least one air inlet corresponds to the simulated casing 11 , and at least one air inlet corresponds to the cement ring 12 , and the air inlet is used to connect to the internal pressure air inlet pipe 6 .
[0094] In the above structure, at least one air inlet corresponds to the simulated casing 11, so that the gas in the air inlet pipe can enter the simulated casing 11 through the air inlet, so that the pressure in the casing reaches the actual downhole situation.
[0095] At least one air inlet corresponds to the cement ring 12, so that the gas in the air inlet pipe can enter the gap between the cement ring 12 and the top cover 17, the simulated casing 11, the simulated formation 13, and the base 16 through the air inlet, so that the pressure in the above gap reaches the actual situation downhole.
[0096] In the above structure, the number of the air inlets may be three, one of which corresponds to the simulated casing 11 , and two of which correspond to the cement ring 12 .
[0097] In a possible design, at least two air outlets are provided on the base 16 of the cement forming unit 1 for connecting the air outlet pipe 8 .
[0098] In the above structure, at least one gas outlet corresponds to the cement ring 12, so that the gas between the cement ring 12 and the gaps between the top cover 17, the simulated casing 11, the simulated formation 13, and the base 16 can enter the gas outlet pipe 8 through the gas outlet, thereby facilitating the subsequent judgment of whether the bonding interface has failed by judging whether the pressure in the gas outlet pipe 8 increases.
[0099] In the above structure, the number of the air outlets can be two, which are symmetrically arranged at the base 16 at the bottom of the cement ring 12 .
[0100] In a possible design, at least one vent is provided on the base 16 of the cement forming unit 1 , and the vent corresponds to the simulation casing 11 , and a gas exhaust valve 81 is connected to the vent.
[0101] In the above structure, at least one venting port corresponds to the simulation casing 11, and is used to release the pressure inside the simulation casing 11 by opening the gas discharge valve 81 after the operation is completed.
[0102] In a possible design, the gas source 21 includes: a nitrogen cylinder 211 containing nitrogen and a switch control valve 212 for controlling the opening and closing of the nitrogen cylinder 211 .
[0103] During operation, nitrogen is used to fill the cement forming unit 1. Since nitrogen has the characteristic of stable chemical properties, the safety of the operation process can be guaranteed. The switch control valve 212 is connected to the gas outlet of the nitrogen bottle 211, which can be used to control the release of nitrogen.
[0104] In a possible design, a plurality of the vibration tables 41 are arranged in a spiral shape on the inner wall of the simulated casing 11. This arrangement can simulate the actual perforation impact process downhole, thereby facilitating effective testing of the performance of the cementing interface.
[0105] In a possible design, a third pressure valve 82 is further provided on the air outlet pipe 8 .
[0106] The third pressure valve 82 is used to control the gas pressure in the gas outlet pipe 8 so as to discharge the gas.
[0107] In a possible design, a pressure sensor 83 is further provided on the air outlet pipe 8 , and the pressure sensor 83 is electrically coupled to the data analysis unit 5 .
[0108] The function of the pressure sensor 83 is to transmit the pressure in the air outlet pipe 8 to the data analysis unit 5 for use in the subsequent analysis process.
[0109] In a possible design, a peripheral compression sleeve 18 is further provided between the simulated formation 13 and the kettle body 14 to fill the gap between the simulated formation 13 and the kettle body 14 and reduce the presence of impurity gases.
[0110] Figure 2 It is a structural schematic diagram of a perforation impact unit 4 provided in an embodiment of the present application, please see 2. In a possible design, the perforation impact unit 4 also includes a vibration controller 43, and the vibration controller 43 and the vibration table 41 are electrically coupled to the data analysis unit 5, so that the vibration sensor 42 is electrically coupled to the data analysis unit 5 through the vibration controller 43.
[0111] The vibration controller 43 is used to send a control signal. After the control signal is received by the vibration table 41, the vibration table 41 can vibrate based on the control signal, thereby more accurately simulating the actual perforation impact process downhole. The vibration controller 43 is used to send the control signal and the vibration signal emitted by the vibration sensor 42 to the data analysis unit 5 for subsequent analysis.
[0112] In a possible design, the perforation impact unit 4 further includes a power amplifier 44 , which is electrically coupled between the vibration controller 43 and the vibration table 41 .
[0113] The power amplifier 44 is used to amplify the power of the control signal sent by the vibration controller 43 , so that the vibration controller 43 sends a control signal with relatively low power, which can control the vibration table 41 to vibrate more strongly.
[0114] Figure 3 This is a schematic diagram of the structure of the connection between the simulated casing 11 and the vibration table 41 provided in the embodiment of the present application, see Figure 3In a possible design, the perforating impact unit 4 further includes a sealing rubber ring 45, which is located between the vibration table 41 and the inner wall of the simulated casing 11. The vibration head 411 of the vibration table 41 passes through the sealing rubber ring 45 and abuts against the inner wall of the simulated casing 11, so that during the vibration of the vibration head 411, the sealing rubber ring 45 can play a buffering role between the vibration table 41 and the simulated casing 11, thereby preventing the vibration table 41 from falling off the simulated casing 11 due to excessive vibration amplitude.
[0115] In a possible design, the device further includes a gas circulation unit 9, which is connected to the gas outlet pipe 8 and is used to collect the gas output from the gas outlet pipe 8 and store it for reuse.
[0116] All the above optional technical solutions can be arbitrarily combined to form optional embodiments of the present application, which will not be described one by one here.
[0117] The cementing cement stone interface testing device provided in the embodiment of the present application provides a holding space for cement forming by setting a cement forming unit 1, and forms a cement ring 12 by pre-casting cement in the cement forming unit 1. The pressure and flow unit 2 and the temperature unit 3 are used to simulate the pressure and temperature environment downhole, and the perforation impact unit 4 is used to provide an impact load to simulate the perforation impact that the cement stone is subjected to in the downhole environment, so that the bonding interface between the cement ring 12 and the simulated casing 11 can be tested. After the perforation impact unit 4 performs perforation impact, as the impact force increases, the interface bonding between the cement ring 12 and the simulated casing 11 fails, causing gas to flow along the interface and then be discharged from the gas outlet pipe 8, so that the signal measured by the second flowmeter 29 will increase rapidly. According to the time when the second flowmeter 29 is rapidly increased, the impact force of the corresponding perforation impact is obtained, so as to obtain the critical condition for the failure of the cement stone interface bonding, which has a great guiding role in actual cementing work.
[0118] The device can truly simulate the destruction process of the cement sheath 12 under the high temperature and high pressure state of the wellbore, subjected to the dynamic load impact force brought by perforating and subsequent operations, so as to evaluate the interface bonding integrity of the cement sheath 12 in real time in situ.
[0119] Figure 4 This is a flow chart of a cementing cement interface testing method provided in the embodiment of the present application, please refer to Figure 4 The method is applied to a cementing cement interface testing device provided in any of the above possible designs, and the method comprises:
[0120] 401. Based on the pressure and flow unit 2, start the internal pressure pump 22 and the external pressure pump 25, so that the internal pressure sensor 27 outputs a first preset pressure, and the external pressure sensor 28 outputs a second preset pressure.
[0121] In this step, high pressure gas is injected into the gaps around the simulated casing 11 and cement ring 12 by the internal pressure pump 22, specifically, the internal pressure pump 22 is a high pressure pump. High pressure gas is injected into the gap between the simulated formation 13 and the kettle body 14 by the external pressure pump 25, specifically, the external pressure pump 25 is a high pressure pump.
[0122] The first preset pressure is consistent with the pressure in the casing of the actual wellbore, and the second preset pressure is consistent with the pressure of the actual formation.
[0123] 402. Based on the temperature unit 3, the heating belt 15 is started, and the temperature regulator 31 is adjusted so that the outer thermocouple 32 outputs a first preset temperature and the inner thermocouple 33 outputs a second preset temperature.
[0124] The temperature regulator 31 can adjust the heating power of the heating belt 15, thereby controlling the heating process thereof. The first preset temperature is consistent with the temperature of the formation in the actual wellbore, and the second preset temperature is consistent with the temperature of the casing in the actual wellbore.
[0125] 403. Based on the perforation impact unit 4, multiple vibration tables 41 are started.
[0126] In this step, each vibration table 41 corresponds to a vibration head 411, and each vibration head 411 can impact the inner wall of the simulated casing 11 to form perforations. When the vibration intensity and frequency of the impact reach a certain level, the bonding interface between the cement ring 12 and the simulated casing 11 fails, and the high-pressure gas flows downward along the failed interface and is discharged through the outlet pipe 8, and the flow rate in the outlet pipe 8 is rapidly increased.
[0127] 404. When the rate at which the second flow signal sent by the second flow meter 29 received by the data analysis unit 5 increases is greater than the first preset rate, the vibration signal sent by the vibration sensor 42 at the corresponding moment is acquired.
[0128] The first preset rate is less than the rate at which the gas flow in the gas outlet pipe 8 increases rapidly when the bonding interface fails. That is, as long as the rate of increase is greater than the first preset rate, it is proved that the bonding interface has failed. The first preset rate can be obtained based on field experience, and this embodiment does not limit this.
[0129] The cementing cement stone interface testing method provided in the embodiment of the present application provides a cement forming unit 1 to provide an accommodation space for cement forming, and forms a cement ring 12 by pre-casting cement in the cement forming unit 1. The pressure and flow unit 2 and the temperature unit 3 are used to simulate the pressure and temperature environment downhole, and the perforation impact unit 4 is used to provide an impact load to simulate the perforation impact that the cement stone is subjected to in the downhole environment, so that the bonding interface between the cement ring 12 and the simulated casing 11 can be tested. After the perforation impact unit 4 performs perforation impact, as the impact force increases, the interface bonding between the cement ring 12 and the simulated casing 11 fails, causing gas to flow along the interface and then be discharged from the gas outlet pipe 8, so that the signal measured by the second flowmeter 29 will increase rapidly. According to the time when the second flowmeter 29 is rapidly increased, the corresponding perforation impact impact force is obtained, so as to obtain the critical condition for cement stone interface bonding failure, which has a great guiding role in actual cementing work.
[0130] The method can truly simulate the destruction process of the cement sheath 12 under the high temperature and high pressure state of the wellbore, subjected to the dynamic load impact force brought by perforating and subsequent operations, so as to evaluate the interface bonding integrity of the cement sheath 12 in real time in situ.
[0131] The above are only optional embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A cementing cement stone interface testing device, characterized in that: The device comprises: a cement forming unit (1), a pressure and flow unit (2), a temperature unit (3), a perforation impact unit (4) and a data analysis unit (5); The cement forming unit (1) comprises: a simulated casing (11), a cement ring (12), a simulated stratum (13), a kettle body (14), a heating belt (15), a base (16) and a top cover (17); The cement ring (12), simulated formation (13), kettle body (14), and heating belt (15) are all annular and are arranged in sequence from the inside to the outside outside the simulated casing (11); the bottom of the kettle body (14) is sealedly connected to the base (16); the top of the kettle body (14) is sealedly connected to the top cover (17); and an outer compression sleeve (18) is provided between the simulated formation (13) and the kettle body (14) for filling a gap between the simulated formation (13) and the kettle body (14); The pressure and flow unit (2) comprises an air source (21), an internal pressure pump (22), a first pressure valve (23), a first flow meter (24), an external pressure pump (25), a second pressure valve (26), an internal surrounding pressure sensor (27), an external surrounding pressure sensor (28), and at least one second flow meter (29); The gas source (21) is connected to the simulated casing (11) and the top of the cement ring (12) through an internal pressure air inlet pipe (6); the internal pressure pump (22), the first pressure valve (23) and the first flow meter (24) are all arranged on the internal pressure air inlet pipe (6); The external pressure pump (25) is connected to between the simulated formation (13) and the kettle body (14) through an external pressure air inlet pipe (7), and the second pressure valve (26) is arranged on the external pressure air inlet pipe (7); The bottom of the cement ring (12) is connected to the air outlet pipe (8), at least one second flow meter (29) is arranged on the air outlet pipe (8), and both the first flow meter (24) and the second flow meter (29) are electrically coupled to the data analysis unit (5); The inner confining pressure sensor (27) is located in the simulated casing (11), and the outer pressure sensor (28) is located between the simulated formation (13) and the kettle body (14); the inner confining pressure sensor (27) and the outer pressure sensor (28) are both electrically coupled to the data analysis unit (5); The temperature unit (3) comprises a temperature regulator (31), an external thermocouple (32) and an internal thermocouple (33); the temperature regulator (31) and the external thermocouple (32) are located inside the heating belt (15); the internal thermocouple (33) is located inside the simulation sleeve (11); and the external thermocouple (32) and the internal thermocouple (33) are both electrically coupled to the data analysis unit (5); The perforation impact unit (4) comprises a plurality of vibration tables (41) and a plurality of vibration sensors (42), wherein the vibration sensors (42) correspond to the vibration tables (41) one by one, the vibration tables (41) are attached to the inner wall of the simulated casing (11), the plurality of vibration tables (41) are arranged in a spiral shape on the inner wall of the simulated casing (11), and the vibration sensors (42) are electrically coupled to the data analysis unit (5); The perforation impact unit (4) further comprises a vibration controller (43), a power amplifier (44) and a sealing rubber ring (45); the vibration controller (43) and the vibration table (41) are both electrically coupled to the data analysis unit (5), so that the vibration sensor (42) is electrically coupled to the data analysis unit (5) through the vibration controller (43); the power amplifier (44) is electrically coupled between the vibration controller (43) and the vibration table (41); the sealing rubber ring (45) is located between the vibration table (41) and the inner wall of the simulated casing (11); and the vibration head (411) of the vibration table (41) passes through the sealing rubber ring (45) and abuts against the inner wall of the simulated casing (11).
2. The device according to claim 1, characterized in that At least one vent is provided on the base (16) in the cement forming unit (1), the vent corresponds to the simulation casing (11), and a gas discharge valve (81) is connected to the vent.
3. The device according to claim 1, characterized in that The air outlet pipe (8) is also provided with a third pressure valve (82).
4. The device according to claim 1, characterized in that The air outlet pipe (8) is also provided with a pressure sensor (83), and the pressure sensor (83) is electrically coupled to the data analysis unit (5).
5. The device according to claim 1, characterized in that The device further comprises a gas circulation unit (9), wherein the gas circulation unit (9) is in communication with the gas outlet pipe (8).
6. A cementing cement stone interface testing method, characterized in that: The method is applied to the cementing cement interface testing device according to any one of claims 1 to 5, and the method comprises: Based on the pressure and flow unit (2), starting the internal pressure pump (22) and the external pressure pump (25), so that the internal pressure sensor (27) outputs a first preset pressure, and the external pressure sensor (28) outputs a second preset pressure; Based on the temperature unit (3), the heating belt (15) is started, and the temperature regulator (31) is adjusted so that the outer thermocouple (32) outputs a first preset temperature and the inner thermocouple (33) outputs a second preset temperature; Based on the perforation impact unit (4), a plurality of vibration tables (41) are started; When the rate at which the second flow rate signal sent by the second flow meter (29) and received by the data analysis unit (5) increases is greater than a first preset rate, a vibration signal sent by the vibration sensor (42) at the corresponding moment is acquired.
Citation Information
Patent Citations
Experimental device and method for evaluating influence of impact load of oil pipe on integrity of cement ring
CN108361024A
