An energy-saving distributed two-stage assembly zero-wait flow shop scheduling optimization system

Through brainstorming optimization algorithm and reinforcement learning-driven workpiece sequence optimization, the problem of low resource utilization and high energy consumption in the two-stage assembly zero-wait flow workshop scheduling problem in distributed manufacturing systems is solved, and the balanced allocation and energy of resources is achieved. Reduced consumption, suitable for a variety of scheduling issues.

CN115344011BActive Publication Date: 2024-11-05LANZHOU UNIVERSITY OF TECHNOLOGY
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202210262538.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-17
Publication Date
2024-11-05
Estimated Expiration
2042-03-17

AI Technical Summary

Technical Problem

In distributed manufacturing systems, traditional mathematical methods are difficult to effectively solve the problem of zero waiting flow workshop scheduling in two-stage assembly, resulting in low resource utilization, high energy consumption, and difficult to achieve balanced resource allocation.

Method used

Using brainstorming optimization algorithm (BSO) combined with reinforcement learning, through workpiece sequence initialization, factory optimization, energy-saving modules and resource allocation balance modules, map clustering mechanisms and adjust product and work sequences, optimize assembly completion time, and pass critical paths and equipment. The utilization standard deviation realizes resource balanced configuration.

Benefits of technology

It realizes fast search and feasible solutions, reduces production energy consumption, improves resource utilization efficiency, is simple and easy to implement, and can be expanded to other scheduling problems such as site selection and vehicle path planning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115344011B_ABST
    Figure CN115344011B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of manufacturing production scheduling and route overall planning, and in particular to an optimization system for energy-saving distributed two-stage assembly zero-wait flow shop scheduling problem, comprising a workpiece sequence initialization module, a factory optimization module, an energy-saving module and a resource allocation balancing module; the workpiece sequence initialization module maps the clustering mechanism in the brainstorming optimization algorithm to product allocation; the factory optimization module optimizes the assembly completion time of the product by adjusting the order of products and work; the energy-saving module is a continuous work path from the first workpiece to the last workpiece, in which there is no idle time in the process, which is called a critical path; the resource allocation balancing module is a resource balancing method, which uses the standard deviation of equipment utilization between factories to represent the balance of resource allocation; the beneficial effects are: the invention systematically analyzes the problem characteristics of energy-saving zero-wait flow shop scheduling, and applies reinforcement learning to the workpiece movement strategy within and between factories.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of manufacturing production scheduling and route overall planning, and in particular to an optimization system for energy-saving distributed two-stage assembly zero-wait flow shop scheduling problem. Background Art

[0002] The problem of high-efficiency and energy-saving distributed two-stage assembly zero-wait flow shop scheduling is an important problem in distributed manufacturing systems and has important application value in practical engineering. The workshop scheduling problem refers to the use of limited resources, processing equipment, etc. to process workpieces in a reasonable order to optimize indicators such as time, cost, and energy consumption. In the actual distributed flow shop scheduling process, the number of workpieces and machines that need to be processed is large, and the number of processes involved in the production stage is huge. The low processing efficiency and low resource utilization of traditional single factories can no longer adapt to the inevitable trend of production and manufacturing models in the context of globalization. Distributed manufacturing makes full use of the resources of multiple production lines and adopts a reasonable processing and resource allocation model.

[0003] With the introduction of the concepts of "carbon neutrality" and "carbon peak", reducing energy consumption is an important issue that conforms to China's national conditions and benefits the people's livelihood. Energy consumption in industrial production accounts for a large part of all energy consumption. Production and manufacturing under green indicators are of great significance in this era. In the flow shop scheduling problem, different processing speeds will produce different energy consumption. Reasonable setting of processing speed can reduce energy consumption. Rational use of resources is the key to improving production efficiency. Irrational use of resources prolongs the construction period and makes the workload of each production line unbalanced. Balanced resource allocation refers to the optimal allocation and rational use of existing resources to reduce excessive or unbalanced allocation of resources, avoid waste of resources, and improve resource utilization efficiency.

[0004] The essence of the two-stage assembly zero-wait flow shop scheduling problem is an integrated decision, and an effective solution method needs to be found to obtain a high-quality solution. Traditional mathematical methods, such as branch and bound and linear programming, need to be used after the mathematical model of the problem is established, so there are specific limitations in solving difficult-to-model workshop scheduling problems. Metaheuristic algorithms are an emerging and effective method for solving scheduling problems. They are widely used because of their simple structure and independence from the characteristics of the problem being solved. Reinforcement learning selects appropriate behaviors based on the state and feedback of the problem, which helps the algorithm quickly find high-quality feasible solutions in the solution space.

[0005] The brain storm optimization algorithm (BSO) is a swarm intelligence algorithm inspired by human brainstorming behavior and has significant advantages in solving high-dimensional and large-scale optimization problems. Summary of the invention

[0006] The purpose of the present invention is to provide an energy-saving distributed two-stage assembly zero-wait flow shop scheduling problem optimization system in view of the problems existing in the prior art.

[0007] In order to achieve the above object, the present invention provides the following technical solutions:

[0008] An energy-saving distributed two-stage assembly zero-wait flow shop scheduling problem optimization system, characterized by comprising a workpiece sequence initialization module, a factory optimization module, an energy-saving module and a resource allocation balancing module;

[0009] The artifact sequence initialization module maps the clustering mechanism in the brainstorming optimization algorithm to the product allocation;

[0010] Preferably, in the artifact sequence initialization module, in the product allocation stage, individuals in the brainstorming optimization algorithm are mapped to products to be allocated, the number of artifacts in each product is the individual dimension, the mapped individuals have different dimensions, and the clusters in the brainstorming optimization algorithm are mapped to factories, and the number of factories is the number of single clusters in the brainstorming optimization algorithm.

[0011] Preferably, in the workpiece sequence initialization module, in a one-dimensional target space, products are clustered according to their assembly completion time.

[0012] Preferably, in the workpiece sequence initialization module, the calculation of the assembly completion time of the product depends only on the size of the product to be allocated, and not on the number of jobs.

[0013] The factory optimization module optimizes the assembly completion time of products by adjusting the order of products and work;

[0014] Preferably, in the factory optimization module, four strategies are used in the brainstorming optimization algorithm to generate new individuals, including two types of intra-cluster searches and two types of inter-cluster searches.

[0015] Preferably, in the plant optimization module, four sequence-related operations are used, including key plant insertion operation (CI), key plant exchange operation (CS), key plant insertion to other plant operation (CIO) and key plant exchange to other plant operation (CSO).

[0016] The energy-saving module is a continuous working path starting from the first workpiece to the last workpiece, and there is no idle time in the process, which is called a critical path.

[0017] Preferably, in the energy saving module, the critical path length of the factory is the assembly completion time.

[0018] Preferably, in the energy-saving module, two energy-saving methods are used to reduce production energy consumption: considering the characteristics of the zero-wait flow shop scheduling problem, non-critical operations in the factory with the longest assembly completion time are slowed down to reduce energy consumption; in non-critical factories, random speed regulation is used for critical or non-critical operations.

[0019] The resource allocation balancing module proposes a resource balancing method, which uses the standard deviation of equipment utilization between factories to represent the balance of resource allocation.

[0020] Preferably, in the resource allocation balancing module, find out the product with the shortest processing time in the factory with the longest assembly completion time, place it in the possible position of the factory to minimize the assembly completion time, and obtain the product sequence based on the balance of idle time between factories.

[0021] A computer-readable storage medium contains a computer program, which can implement the method steps provided above when processed by a CPU.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] (1) The present invention systematically analyzes the problem characteristics of energy-saving zero-wait flow shop scheduling and applies reinforcement learning to the workpiece movement strategy within and between factories.

[0024] (2) A heuristic method driven by the brainstorming optimization algorithm is used to generate high-quality initialization sequences, enabling the system to quickly search for feasible solutions.

[0025] (3) The logic of the present invention is simple, easy to implement and expand. The optimization system can solve scheduling problems in other fields, such as site selection problems, vehicle path planning problems, etc. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the optimization system structure for energy-saving distributed assembly zero-wait flow shop scheduling problem provided by an example of the present invention.

[0027] Figure 2 It is a calculation example diagram for solving the problem in the present invention.

[0028] Figure 3 It is a schematic diagram of generating the initial solution sequence in the present invention.

[0029] Figure 4 It is a sequence operation diagram of workpieces within and between factories provided by an example of the present invention.

[0030] Figure 5 This is a comparison chart between this system and other systems. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0032] Example 1

[0033] An energy-saving distributed two-stage assembly zero-wait flow shop scheduling optimization system, including a workpiece sequence initialization module, a factory optimization module, an energy-saving module and a resource allocation balancing module;

[0034] The workpiece sequence initialization module maps the clustering mechanism in the brainstorming optimization algorithm to product allocation; in the product allocation stage, individuals in the brainstorming optimization algorithm are mapped to products to be allocated, the number of workpieces in each product is the individual dimension, the mapped individuals have different dimensions, the clusters in the brainstorming optimization algorithm are mapped to factories, and the number of factories is the number of single clusters in the brainstorming optimization algorithm; in the one-dimensional target space, products are clustered according to their assembly completion time; the calculation of the product assembly completion time depends only on the size of the product to be allocated, not on the number of jobs.

[0035] The factory optimization module optimizes the assembly completion time of products by adjusting the sequence of products and tasks; four strategies are used in the brainstorming optimization algorithm to generate new individuals, including two types of intra-cluster searches and two types of inter-cluster searches; four sequence-related operations are used, including key factory insertion operation (CI), key factory exchange operation (CS), key factory insertion to other factory operation (CIO) and key factory exchange to other factory operation (CSO).

[0036] The energy-saving module is a continuous working path starting from the first workpiece to the last workpiece, with no idle time in the process, which is called the critical path; the critical path length of the factory is the assembly completion time; in order to reduce production energy consumption, two energy-saving methods are used: considering the characteristics of the zero-wait flow shop scheduling problem, the non-critical operations of the factory with the longest assembly completion time are slowed down to reduce energy consumption; in non-critical factories, random speed regulation is used for critical or non-critical operations.

[0037] The resource allocation balancing module proposes a resource balancing method, which uses the standard deviation of equipment utilization between factories to represent the balance of resource allocation; finds the product with the shortest processing time in the factory with the longest assembly completion time, and places it in the possible position of the factory to minimize the assembly completion time, and obtains the product sequence based on the balance of idle time between factories.

[0038] A computer-readable storage medium contains a computer program, which can implement the method steps provided above when processed by a CPU.

[0039] Example 2

[0040] Figure 1 The schematic diagram of the optimization system structure for energy-saving distributed assembly zero-wait flow shop scheduling problem provided by the example of the present invention includes an initial scheduling workpiece sequence generation module, an intra-factory optimization module, an inter-factory optimization module, an energy-saving module and a resource allocation balancing module.

[0041] Figure 2 It is a calculation example diagram for solving the problem in the present invention. For the energy-saving distributed two-stage assembly flow shop scheduling problem, P products are assigned to F factories for processing, and each factory has m processes processed on m machines. P products have n workpieces, and the number of workpieces for each product is different. Each factory has an assembly machine for assembling the work that constitutes a specific product after processing. The processing flow within each factory is the same and satisfies the zero waiting constraint. Each machine in the factory has a processing speed. The speed selected for each operation cannot be changed until the operation is completed.

[0042] like Figure 2 As shown, each factory has 3 processing machines and 1 assembly machine. Pi,j, Vi,j represent the standard processing time and speed level, i∈{1,2,3}. The product sequence of the work π1={2,5,6}, π2{1,7}, π3={49}, π4={38}. The processing order of the product in the factory is f1={π1,π4}, f2={π2,π3}. Ph and Vh represent the standard assembly time and assembly speed level of the 4 products in the 2 factories.

[0043] Assembly completion time is The energy consumption is 146.9 and the resource allocation balance is 1.414.

[0044] Figure 3 This is a schematic diagram of the generation of the initial solution sequence. After calculating the assembly completion time of each product, the products are arranged in non-increasing order. F products are taken from the sequence and assigned to f factories in the order of F1 to Ff. In the second allocation, f products are taken from the remaining sequence and assigned to f factories in the order of Ff to F1. Odd number assignment is based on the first allocation, and even number assignment is based on the second allocation. This method distributes products evenly to factories and optimizes resource allocation as much as possible. The speed of the initialization stage is set to three levels: low, medium, and high. j,i The processing speed and product assembly speed are randomly generated in {V1, V2, V3}.

[0045] Figure 4(a) is a schematic diagram of the insertion operation, and (b) is a schematic diagram of the exchange operation. The internal operation of the key factory optimizes the optimal solution currently found, avoids the blind operation of random multiple factories, and reduces the computational complexity. The key factory operates on all products of other factories instead of randomly selecting a factory, which reduces randomness and ensures the algorithm's ability to find excellent product sequences. The key factory changes during the four insertion and exchange operations, so the scope of the operation is all factories, which prevents the algorithm from losing potential optimal solutions.

[0046] (1) Key factory f c Products in Remove and insert in sequence any other possible location within the critical plant.

[0047] (2) Take out the products in the key factory fc one by one and exchanged with any other products remaining in the key plant to obtain a new key plant product sequence.

[0048] (3) Key factories c The product Take them out one by one and insert them into other factories f o all possible positions of .

[0049] (4) Key factories c The key factories All products from other factories o Take them out and swap them one by one.

[0050] Figure 5 This is a comparison chart of the system of the present invention and other systems. In order to analyze the effectiveness of the system, the system of the present invention is compared with several other systems. The selected comparison system is: IG (Q.-K. Pan, L. Gao, X.-Y. Li, FM Jose, Effective constructive heuristics and meta-heuristics for the distributed assembly permutation flowshop scheduling problem, Applied Soft Computing, 81 (2019).).

[0051] The comparison results show that the results obtained by the RLBSO system are better than those of the comparison system at different problem scales. This is because the reinforcement learning-driven brainstorming optimization algorithm starts from the characteristics of the problem, integrates the learning mechanism into the system for guidance, and designs different optimization subsystems for different stages. The division of labor and cooperation between the subsystems jointly ensure the quality of the solution.

[0052] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An energy-saving distributed two-stage assembly zero-wait flow shop scheduling optimization system, characterized in that: It includes workpiece sequence initialization module, factory optimization module, energy saving module and resource allocation balancing module; The workpiece sequence initialization module maps the clustering mechanism in the brainstorming optimization algorithm to the product allocation; in the workpiece sequence initialization module, in the product allocation stage, the individuals in the brainstorming optimization algorithm are mapped to the products to be allocated, the number of workpieces in each product is the individual dimension, the mapped individuals have different dimensions, the clusters in the brainstorming optimization algorithm are mapped to factories, and the number of factories is the number of single clusters in the brainstorming optimization algorithm; in the workpiece sequence initialization module, in the one-dimensional target space, the products are clustered according to the assembly completion time of the products; in the workpiece sequence initialization module, the calculation of the assembly completion time of the products depends only on the size of the products to be allocated, not on the number of jobs; The factory optimization module optimizes the assembly completion time of products by adjusting the order of products and work; in the factory optimization module, four strategies are used in the brainstorming optimization algorithm to generate new individuals, including two types of intra-cluster searches and two types of inter-cluster searches; in the factory optimization module, four sequence-related operations are used, including key factory insertion operations, key factory exchange operations, key factory insertion to other factories operations, and key factory exchange to other factories operations; The energy-saving module is a continuous working path starting from the first workpiece to the last workpiece, with no idle time in the process, which is called the critical path; in the energy-saving module, the critical path length of the factory is the assembly completion time; in the energy-saving module, in order to reduce production energy consumption, two energy-saving methods are used: considering the characteristics of the zero-wait flow shop scheduling problem, the non-critical operations of the factory with the longest assembly completion time are slowed down to reduce energy consumption; in non-critical factories, random speed regulation is used for critical or non-critical operations; The resource allocation balancing module proposes a resource balancing method, which uses the standard deviation of equipment utilization between factories to represent the balance of resource allocation; in the resource allocation balancing module, the product with the shortest processing time in the factory with the longest assembly completion time is found, and placed in the possible position of the factory to minimize the assembly completion time, and the product sequence is obtained based on the balance of idle time between factories.

Citation Information

Patent Citations

  • Control method and system of group robot

    CN107831685A

  • Production dispatching method and system of distributed hybrid flow shop

    CN110597213A

  • Distributed hybrid flow shop scheduling method, medium and system

    CN112766659A

  • Optimization system for scheduling problem of distributed assembly zero-waiting flow shop

    CN113095572A

  • Energy-saving workshop scheduling system for distributed heterogeneous factories

    CN113344383A