Drainage system for floor caisson of building toilet and its construction method

By designing a water filter and a special drainage pipeline on the caisson floor of the sunken toilet, combined with the brickwork and debris backfill structure, effective drainage and waterproofing of accumulated water are achieved, and the problem of difficulty in draining water in the caisson floor is solved. Improved bathroom safety and ease of maintenance.

CN115387447BActive Publication Date: 2024-10-11CHENGDU BETTER CONSTR & INSTALLATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211210666.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-30
Publication Date
2024-10-11
Estimated Expiration
2042-09-30

AI Technical Summary

Technical Problem

The water accumulated in the caisson floor of the sunken bathroom is difficult to drain, resulting in corrosion of the waterproof layer, structural damage, health hazards and maintenance difficulties.

Method used

Design a drainage system for the caisson floor of the building bathroom, including a water filter, a special drainage pipeline for the caisson floor, a brick backfill structure and a debris backfill structure. The accumulated water is diverted to the water filter through the reserved drainage path, combined with a special The waterproof treatment layer and surface treatment layer ensure drainage efficiency and waterproof performance.

Benefits of technology

It effectively solves the problem of water accumulation in the caisson floor that cannot be discharged, prevents water leakage, reduces the generation of odor, reduces the difficulty of maintenance, and improves the safety and healthy environment of the bathroom.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115387447B_ABST
    Figure CN115387447B_ABST
Patent Text Reader

Abstract

The present invention provides a drainage system for the caisson floor of a building toilet and a construction method thereof, so as to solve the technical problem that the accumulated water in the caisson floor is difficult to be discharged. The drainage system for the caisson floor of a building toilet comprises: a) a water filter: the water filter is installed in the caisson floor; b) a drainage pipeline dedicated to the caisson floor: the drainage pipeline dedicated to the caisson floor comprises a drainage riser that connects the water filters distributed on different floors into a drainage flow path; c) a surface treatment layer of the caisson floor: the surface treatment layer of the caisson floor is arranged on the upper surface of the caisson floor; d) a brick backfill structure: the brick backfill structure is arranged above the surface treatment layer of the caisson floor; e) a crushed material backfill structure: the crushed material backfill structure is arranged in the crushed material backfill space to backfill the crushed material backfill space; f) a backfill structure surface treatment layer: the backfill structure surface treatment layer is arranged on the upper surface of the brick backfill structure and the crushed material backfill structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building toilet waterproofing, and in particular to a building toilet caisson bottom plate drainage system and a construction method thereof. Background Art

[0002] In recent years, the design and construction of residential buildings have increasingly widely adopted the same-floor drainage method for bathrooms, that is, the drainage pipes of the bathroom are set on the same floor where the bathroom is located. In this case, the floor of the bathroom needs to be sunken to leave space for the drainage pipes, and this type of bathroom is called a sunken bathroom. The floor of a sunken bathroom is also called a caisson floor. There is a 350mm to 450mm thick backfill layer on the caisson floor of the sunken bathroom (usually backfilled by dumping slag).

[0003] For the waterproofing construction of sunken toilets, the current conventional construction process is that the housing construction unit first performs waterproofing on the caisson bottom plate, and then the decoration unit performs secondary waterproofing on the concrete surface layer laid after backfilling is completed. The waterproof structure completed by the above construction process has the following problems: as the house is used for a longer time, the surface water of the bathroom is easy to penetrate into the backfill layer through weak points such as corners and tile gaps. In the long run, a large amount of water will accumulate in the backfill layer, causing the following hazards: (1) The accumulated water will soak for a long time, destroy the adhesion of the waterproof layer, corrode the waterproof layer, and leak along the concrete construction defects, affecting the residents downstairs; (2) When the caisson is full of water, it will overflow, affecting the structure and use of the building, which is even more harmful; (3) If the accumulated water is retained for a long time, it will ferment anaerobicly and breed various pathogens. The gas produced after anaerobic decomposition will also make the bathroom have an odor, which may cause respiratory and intestinal diseases in severe cases and damage the health of the residents; (4) If rectification is required, the finished bathroom sanitary ware, floor tiles, waterproof layer, etc. need to be removed, and the backfill material and pipes in the caisson need to be renovated. This kind of work is large in volume and extremely troublesome to repair. Summary of the invention

[0004] The purpose of the present invention is to provide a drainage system for the bottom plate of a caisson in a building toilet and a construction method thereof, so as to solve the technical problem that the accumulated water in the bottom plate of the caisson is difficult to drain.

[0005] According to a first aspect of the present invention, there is provided a drainage system for a caisson floor of a building toilet, comprising: a) a water filter: the water filter is installed in the caisson floor, a sealing material is provided at the joint between the water filter and the caisson floor, the water filter comprises a water filter housing, a water filter tray and a water inlet interface provided at the upper end of the water filter housing, a drainage interface provided at the lower end of the water filter housing, water filter holes which are not covered by the waterproof material above the caisson floor are distributed on the water filter tray, the water inlet interface is used to connect to a drainage riser installed above the caisson floor, the drainage interface is used to connect to a drainage riser installed below the caisson floor, the water filter holes and the water inlet interface are both connected to the drainage riser through the water filter housing and the drainage The water interface is connected; b) a dedicated drainage pipeline for the caisson bottom plate: the dedicated drainage pipeline for the caisson bottom plate includes a drainage riser that connects the water filters distributed on different floors into a drainage flow path; c) a surface treatment layer for the caisson bottom plate: the surface treatment layer for the caisson bottom plate is arranged on the upper surface of the caisson bottom plate, and the surface treatment layer for the caisson bottom plate includes a waterproof reinforcement layer around the water filter, a first integral waterproof layer and an integral waterproof protection and slope finding layer arranged in sequence from bottom to top, the waterproof reinforcement layer around the water filter is formed by a waterproof material arranged around the water filter, the first integral waterproof layer is formed by brushing a first waterproof coating, and the integral waterproof protection and slope finding layer is formed by brushing cement mortar and slopes toward the water filter; d) a brickwork backfill structure: the brickwork backfill structure is provided The brick backfill structure is arranged above the surface treatment layer of the caisson bottom plate, and a crushed material backfill space is reserved in the upper area of ​​the water filter and the pipe installation area on the caisson bottom plate. The brick backfill structure comprises a hollow brick masonry layer and a porous brick masonry layer arranged in sequence from bottom to top. The hollow brick masonry layer comprises a hollow brick plane array formed by hollow bricks, and the hollow brick plane array is provided with horizontally arranged gaps between adjacent hollow bricks and longitudinally arranged gaps between adjacent hollow bricks. The porous brick masonry layer comprises a porous brick plane array formed by porous bricks, and the hollow brick plane array is densely distributed above the hollow brick plane array; e) crushed material backfill structure: the crushed material backfill structure is arranged in the crushed material backfill space to backfill the crushed material backfill space. The crushed material backfill structure includes a water filtration crushed material backfill structure and a structural crushed material backfill structure. The water filtration crushed material backfill structure adopts water filtration crushed material and fills the upper area of ​​the water filter, and the structural crushed material backfill structure adopts structural crushed material and fills the gap in the pipe installation area on the bottom plate of the caisson; f) Backfill structure surface treatment layer: The backfill structure surface treatment layer is arranged on the upper surface of the brick backfill structure and the crushed material backfill structure, and the backfill structure surface treatment layer includes a steel mesh layer, a concrete casting layer and a second integral waterproof layer arranged in sequence from bottom to top. The steel mesh layer is formed by laying steel mesh, and the concrete casting layer is formed by casting concrete laid on the steel mesh layer. The second integral waterproof layer is formed by painting a second waterproof coating.

[0006] According to an embodiment of the drainage system for the caisson bottom plate of a building bathroom of the present invention, the water filter is close to the corner of the caisson bottom plate, the water inlet interface is arranged at the center of the water filter disk, the water filter holes are distributed around the water inlet interface, the water filter holes include a first water filter hole and a second water filter hole respectively arranged at intervals along the circumference of the water filter disk, the first water filter hole is a circular hole and faces the inner side of the corner, the second water filter hole is a strip hole and faces the outer side of the corner, the length direction of the second water filter hole deviates from the diameter direction of the water filter disk passing through the center point of the second water filter hole so that the water flowing through the second water filter hole forms a vortex.

[0007] According to an embodiment of the drainage system for the caisson floor of a building bathroom of the present invention, the water filter and the dedicated drainage pipeline for the caisson floor are located beside the main drainage pipe of the bathroom.

[0008] According to an embodiment of the drainage system for the bottom plate of a caisson in a building bathroom of the present invention, the waterproof reinforcement layer around the water filter includes a polyethylene polypropylene composite waterproof roll material layer and a JS composite waterproof material layer arranged in sequence from bottom to top.

[0009] According to an embodiment of the drainage system for the caisson floor of a building bathroom of the present invention, the first integral waterproof layer and / or the second integral waterproof layer comprises a polymer cement waterproof coating layer.

[0010] According to an embodiment of the drainage system for the caisson floor of a building toilet of the present invention, the water filtering debris is pebbles, and the structural debris is brick debris.

[0011] According to an embodiment of the drainage system of the caisson floor of a building bathroom of the present invention, in the hollow brick masonry layer, the length direction of each hollow brick is uniformly consistent with the length direction of the caisson floor, and the through hole in each hollow brick is consistent with the width direction of the caisson floor; in the length direction of the caisson floor, a longitudinal arrangement gap of the adjacent hollow bricks is formed between any adjacent hollow bricks; in the width direction of the caisson floor, a transverse arrangement gap of the adjacent hollow bricks is formed between any adjacent hollow bricks.

[0012] According to an embodiment of the drainage system for the caisson floor of a building bathroom of the present invention, the longitudinal gap between adjacent hollow bricks is 1.5 mm to 30 mm, and the transverse gap between adjacent hollow bricks is 1.5 mm to 100 mm.

[0013] According to an embodiment of the drainage system for the caisson floor of a building bathroom of the present invention, the upper end of the dedicated drainage pipeline for the caisson floor is usually in a closed state relative to the external atmospheric environment and / or is provided with an openable and closable regulating valve relative to the external atmospheric environment.

[0014] According to an embodiment of the drainage system for the caisson floor of a building toilet of the present invention, a vacuum device is connected to the lower end of the dedicated drainage pipeline for the caisson floor.

[0015] According to an embodiment of the drainage system for the bottom plate of a caisson in a building bathroom of the present invention, an inspection pipe is pre-buried in the filter crushed material backfill structure, the upper end of the inspection pipe protrudes a certain height from the surface treatment layer of the backfill structure to ensure that it is still exposed to the ground after later decoration, and an inspection hole cover is installed on the upper end of the inspection pipe, and the lower end of the inspection pipe is inserted into the upper end surface of the filter crushed material backfill structure.

[0016] According to a second aspect of the present invention, a method for constructing a drainage system for a caisson floor of a building toilet is provided, wherein the drainage system for a caisson floor of a building toilet is the drainage system for a caisson floor of a building toilet of the first aspect; the method comprises: completing the installation of the water filter, during which the water filter is installed in the caisson floor by pre-buried in a concrete casting mold of the caisson floor and then concrete casting the caisson floor, or the water filter is installed in the caisson floor by drilling holes in the caisson floor that has been concrete cast and then placing a sealing mold into the caisson floor for concrete casting; completing the construction of a surface treatment layer of the caisson floor; completing the construction of the brick backfill structure; completing the construction of the crushed material backfill structure; completing the construction of a surface treatment layer of the backfill structure.

[0017] The above-mentioned building bathroom caisson floor drainage system and construction method thereof add a specially designed water filter and a special drainage pipeline for the caisson floor (mainly a drainage riser) on the caisson floor, and use a specially designed brick backfill structure and crushed material backfill structure to drain the water accumulated in the bathroom caisson through a reserved drainage path to the water filter for discharge, thereby solving the problem that the water accumulated in the caisson cannot be drained and leaks to the lower level.

[0018] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments. Additional aspects and advantages provided by the present invention will be partially given in the following description, partially become apparent from the following description, or be learned through practice. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings constituting a part of this specification are used to assist in understanding the present invention. The contents provided in the drawings and the related descriptions in this specification can be used to explain the present invention, but do not constitute improper limitations on the present invention. In the drawings:

[0020] Figure 1 It is a structural schematic diagram of the drainage system of the caisson bottom plate of the building bathroom according to an embodiment of the present invention.

[0021] Figure 2 Schematic diagram of the installation of the water filter in the embodiment of the present invention.

[0022] Figure 3-Figure 17 The following are process photos of the construction method of an embodiment of the present invention. DETAILED DESCRIPTION

[0023] The following is a clear and complete description of the embodiments of the present invention in conjunction with the accompanying drawings. A person of ordinary skill in the art will be able to implement the embodiments of the present invention based on these descriptions. Before describing the embodiments of the present invention in conjunction with the accompanying drawings, it should be particularly noted that:

[0024] The technical solutions and technical features provided in each section, including the following description, can be combined with each other without conflict. In addition, where possible, these technical solutions, technical features and related combinations can be assigned specific technical themes and protected by relevant patents.

[0025] The embodiments of the present invention involved in the following description are generally only a part of the embodiments rather than all the embodiments. Based on these embodiments, all other embodiments obtained by ordinary technicians in this field without making any creative work should fall within the scope of patent protection.

[0026] The terms "include", "comprises", "have" and any variations thereof in this specification and the corresponding claims and related parts are intended to cover non-exclusive inclusions. Other related terms and units can be reasonably interpreted based on the relevant content provided in this specification.

[0027] Figure 1 This is a schematic diagram of the structure of the drainage system of the caisson floor of a building toilet according to an embodiment of the present invention. Figure 1 As shown, the drainage system of the caisson bottom plate of the building bathroom includes: a water filter 11, a special drainage pipeline 12 for the caisson bottom plate, a surface treatment layer 13 of the caisson bottom plate, a brick backfill structure 14, a crushed material backfill structure 15, and a backfill structure surface treatment layer 16.

[0028] a) Water filter 11.

[0029] like Figure 1As shown, the water filter 11 is installed in the caisson bottom plate 21, and a sealing material is provided at the joint between the water filter 11 and the caisson bottom plate 21. The water filter 11 comprises a water filter housing 111, a water filter disc 112 and a water inlet interface 113 arranged at the upper end of the water filter housing 111, and a drainage interface 114 arranged at the lower end of the water filter housing 111. The water filter disc 112 is provided with water filter holes that are not covered by the waterproof material above the caisson bottom plate 21. The water inlet interface 113 is used to connect with the drainage riser 121 installed above the caisson bottom plate 21, and the drainage interface 114 is used to connect with the drainage riser 121 installed below the caisson bottom plate 21. The water filter holes and the water inlet interface 113 are both connected to the drainage interface 114 through the water filter housing 111.

[0030] The water filter 11 can be made of PVC material, specifically, can be made by PVC plastic injection molding. Since the water filter tray 112 is provided with water filter holes that are not covered by the waterproof material above the caisson bottom plate 21, the water filter holes play a role in filtering water, preventing larger particles above the water filter tray 112 from entering the water filter 11.

[0031] The water filter housing 111 can be designed as a cylindrical hollow structure, with a water filter disc 112 and a water inlet interface 113 at the upper end of the cylindrical hollow structure, and a drainage interface 114 at the lower end. The water filter holes on the water filter disc 112, the water inlet interface 113 and the drainage interface 114 are all connected to the interior of the cylindrical hollow structure. In this way, it can be achieved that "the water filter holes and the water inlet interface 113 are connected to the drainage interface 114 through the water filter housing 111".

[0032] In a preferred embodiment, the water filter 11 is close to the corner of the caisson bottom plate 21, the water inlet interface 113 is arranged at the center of the water filter plate 112, and the water filter holes are distributed around the water inlet interface. The water filter holes include first water filter holes and second water filter holes (from the first water filter hole to the second water filter hole) which are arranged at intervals along the circumference of the water filter plate 112. Fig.11 In the figure, one can see the first water filter hole and the second water filter hole distributed on the surface of the water filter plate 112. The first water filter hole is a circular hole facing the inside of the corner, and the second water filter hole is a strip hole facing the outside of the corner. The length direction of the second water filter hole deviates from the diameter direction of the water filter plate passing through the center point of the second water filter hole, so that the water flowing through the second water filter hole forms a vortex.

[0033] The arrangement of the first water filter hole and the second water filter hole can bring the following effects: the amount of water from the outside of the corner is large, and the second water filter hole is designed as a strip hole and deviated in a certain direction, so that the water flowing through the second water filter hole can form a vortex, which can not only ensure the drainage efficiency, but more importantly, the vortex can be used to accelerate the movement of the water flow, thereby attracting the water flow to flow toward the water filter 11. The water flow power inside the corner is weakened and water is easy to accumulate. Designing the first water filter hole as a circular hole helps to distribute more first water filter holes and allows water to be discharged into the water filter 11 in a vertical downward manner with the shortest path. Combining the first water filter hole and the second water filter hole in the above manner is equivalent to using the second water filter hole to accelerate the plane movement of the water flow and using the first water filter hole to accelerate the vertical fall of the water flow, thereby improving the drainage efficiency.

[0034] b) Special drainage pipeline for caisson bottom plate 12.

[0035] The caisson bottom dedicated drainage pipeline 12 includes a drainage riser 121 that connects the water filters 11 distributed on different floors into a drainage flow path. The drainage riser 121 can be made of PVC material, and the connection between the drainage riser 121 and the water filter 11 and the drainage riser 121 itself can be achieved by a hot melt machine.

[0036] The different floors here should refer to different floors of the same unit, so that the water filters 11 on different floors can be connected into a drainage flow path through the drainage riser 121.

[0037] It should be noted that the water filter 11 and the dedicated drainage pipe 12 for the caisson bottom plate are specially designed and manufactured for the drainage system for the caisson bottom plate of the building toilet according to the embodiment of the present invention. The installation method of the water filter 11 and the dedicated drainage pipe 12 for the caisson bottom plate will be described in conjunction with the following construction method for the drainage system for the caisson bottom plate of the building toilet.

[0038] The water filter 11 and the dedicated drainage pipeline 12 for the caisson bottom plate are usually located beside the main drainage pipe of the toilet. Therefore, the water filter 11 and the dedicated drainage pipeline 12 for the caisson bottom plate are usually located in a corner of the toilet.

[0039] It should be noted that a drainage riser 121 can also be arranged above the water filter 11 in the caisson floor of the building toilet on the top floor of the same unit. The drainage riser 121 can pass through the roof and be installed with an openable and closable regulating valve relative to the external atmospheric environment. During the normal operation of the water filter 11 in the caisson floor of the building toilet on each floor of the unit, as the accumulated water in the caisson floor of the building toilet on each floor of the unit is discharged through the corresponding water filter 11 and the drainage riser 121, the water flow movement will take away the air in the pipeline. Therefore, when the openable and closable regulating valve is completely closed, negative pressure is easily formed in the drainage flow path. At this time, the accumulated water in the caisson floor of the building toilet on each floor of the unit can be discharged through the corresponding water filter 11 and the drainage riser 121. However, if the vacuum degree in the drainage flow path is high, it may cause the accumulated water in the caisson floor of the building toilet on some floors to be difficult to discharge. At this time, the openable and closable regulating valve can be opened to play a role in breaking the vacuum.

[0040] c) Surface treatment layer 13 of caisson bottom plate.

[0041] The caisson bottom plate surface treatment layer 13 is arranged on the upper surface of the caisson bottom plate 21, and the caisson bottom plate surface treatment layer 13 includes a water filter peripheral waterproof reinforcement layer, a first integral waterproof layer and an integral waterproof protection and slope adjustment layer which are arranged in sequence from bottom to top. The water filter peripheral waterproof reinforcement layer is formed by a waterproof material arranged around the water filter, the first integral waterproof layer is formed by brushing a first waterproof coating, and the integral waterproof protection and slope adjustment layer is formed by brushing cement mortar and slopes toward the water filter 11.

[0042] In an optional embodiment, the waterproof reinforcement layer around the water filter includes a polyethylene polypropylene composite waterproof roll layer and a JS composite waterproof material layer arranged in sequence from bottom to top. Both the polyethylene polypropylene composite waterproof roll and the JS composite waterproof material are existing waterproof materials. The polyethylene polypropylene composite waterproof roll is a new type of waterproof roll that is made by adding anti-aging agents, stabilizers, adhesion promoters, etc. to virgin polyethylene synthetic polymer materials and high-strength new polypropylene polyester filament non-woven fabrics, and compounded once through an automated production line. The JS composite waterproof material is a two-component waterproof coating composed of an organic liquid material and a variety of additives and an inorganic powder (composed of high-iron high-aluminum cement or white silicate cement quartz powder and various additives). It is a waterproof material that has the advantages of both high elasticity of organic materials and good durability of inorganic materials. After coating, a high-strength and tough waterproof coating film is formed.

[0043] In an optional embodiment, the first integral waterproof layer comprises a polymer cement waterproof coating layer. Polymer cement is a two-component waterproof coating composed of a liquid material composed of an optimized combination of synthetic high molecular polymer emulsion (such as polyacrylate, polyvinyl acetate, styrene-butadiene rubber emulsion, etc.) and various additives and a matching powder material (composed of special cement, quartz powder and various additives). It is a waterproof material that has both the high elasticity of synthetic high molecular polymer materials and the good durability of inorganic materials. Optionally, the slope of the integral waterproof protection and slope leveling layer can be set to 2%.

[0044] d) Brick backfill structure14.

[0045] The brick backfill structure 14 is arranged above the surface treatment layer 13 of the caisson bottom plate. The brick backfill structure 14 has reserved crushed material backfill space in the upper area of ​​the water filter 11 and the pipe installation area on the caisson bottom plate. The brick backfill structure 14 includes a hollow brick masonry layer 141 and a porous brick masonry layer 142 arranged in sequence from bottom to top. The hollow brick masonry layer 141 includes a hollow brick plane array formed by hollow bricks 141a. The hollow brick plane array is distributed with transverse arrangement gaps between adjacent hollow bricks and longitudinal arrangement gaps between adjacent hollow bricks. The porous brick masonry layer 142 includes a porous brick plane array formed by porous bricks 142a. The hollow brick plane array is densely distributed above the hollow brick plane array.

[0046] The hollow bricks 141a are relatively light in weight, and the through holes in the hollow bricks 141a also have a drainage function. The hollow bricks 141a are laid into a hollow brick plane array, and the hollow brick plane array is provided with gaps between adjacent hollow bricks arranged horizontally and gaps between adjacent hollow bricks arranged vertically. This not only effectively reduces the load on the caisson bottom plate 21 and reduces costs, but also makes the hollow brick masonry layer 141 have a very excellent drainage effect. On the basis of the hollow brick masonry layer 141, porous bricks 142a are fully paved, and the through holes in the porous bricks 142a also have a drainage function. At the same time, the porous bricks 142a have a strong bearing capacity and can ensure the structural strength of the bathroom floor.

[0047] In a common implementation, in the hollow brick masonry layer 141, the length direction of each hollow brick 141a is uniformly consistent with the length direction of the caisson bottom plate 21, and the through hole in each hollow brick 141a is consistent with the width direction of the caisson bottom plate; in the length direction of the caisson bottom plate 21, a longitudinal arrangement gap of the adjacent hollow bricks is formed between any adjacent hollow bricks 141a; in the width direction of the caisson bottom plate 21, a transverse arrangement gap of the adjacent hollow bricks is formed between any adjacent hollow bricks.

[0048] In a common implementation, the gap between adjacent hollow bricks in the longitudinal direction is 1.5 mm to 30 mm, and the gap between adjacent hollow bricks in the transverse direction is 1.5 mm to 100 mm.

[0049] The significant advantage of the brick backfill structure 14 is that it has a strong drainage performance, which is significantly better than the traditional slag dumping backfill and other backfilling structures by material accumulation. In this way, the brick backfill structure 14 is not easy to breed bacteria during long-term use, and effectively prevents the generation of odor.

[0050] e) Crushed material backfill structure 15.

[0051] The crushed material backfill structure 15 is arranged in the crushed material backfill space to backfill the crushed material backfill space, and the crushed material backfill structure 15 comprises a water filter crushed material backfill structure 151 and a structural crushed material backfill structure 152. The water filter crushed material backfill structure 151 uses water filter crushed material and fills the upper area of ​​the water filter, and the structural crushed material backfill structure 152 uses structural crushed material and fills the gap in the pipe installation area on the bottom plate of the caisson. In an optional embodiment, the water filter crushed material uses pebbles, and the structural crushed material uses brick crushed material.

[0052] The main function of the structural debris backfill structure 152 is to fill the remaining space (mainly the area around the pipes on the bottom plate of the caisson) where the porous bricks 142a are laid, so as to avoid the instability of the structure caused by the voids there. The structural debris of the structural debris backfill structure 152 can be effectively blocked by the porous bricks 142a without causing adverse effects on the drainage effect of the brick backfill structure 14. The main function of the water filter debris backfill structure 151 is to perform preliminary filtration on the drainage, further preventing the water filter 11 from being blocked.

[0053] exist Figure 1 As can be seen in the figure, the top of the water filter material backfill structure 151 is still covered with porous bricks 142a, but this is only one embodiment. In a more preferred embodiment, the top surface of the water filter material backfill structure 151 can directly extend upward to the lower surface of the backfill structure surface treatment layer 16 described below, which makes it more convenient to repair the water filter material backfill structure 151 and the water filter 11.

[0054] In addition, considering that the water permeability of the filter material may decrease to a certain extent during long-term use (since the main function of the filter material is to perform preliminary filtration of drainage, some particles will be attached to the filter material), in order to facilitate future maintenance, a maintenance pipe (not shown in Figure 1) can be pre-buried in the filter material backfill structure 151. The upper end of the maintenance pipe protrudes a certain height from the surface treatment layer 16 of the backfill structure described below to ensure that it is still exposed to the ground after later decoration. The upper end of the maintenance pipe is installed with a maintenance hole cover, and the lower end of the maintenance pipe is slightly inserted into the upper end surface of the filter material backfill structure 151. Under normal circumstances, the maintenance hole cover closes the upper end of the maintenance pipe; under special circumstances, the maintenance hole cover can be opened and the filter material backfill structure 151 or even the water filter 11 below the filter material backfill structure 151 can be inspected through the maintenance pipe, for example, impurity dissolving liquid is injected into the maintenance pipe. In addition, the inspection pipe can actually serve as a backup floor drain. When special circumstances occur, the inspection hole cover can be opened to drain water.

[0055] f) Backfill the surface treatment layer 16 of the structure.

[0056] The backfill structure surface treatment layer 16 is arranged on the upper surface of the brick backfill structure 14 and the crushed material backfill structure 15, and the backfill structure surface treatment layer 16 comprises a steel mesh layer, a concrete pouring layer and a second integral waterproof layer arranged in sequence from bottom to top, the steel mesh layer is formed by laying steel mesh, the concrete pouring layer is formed by pouring concrete laid on the steel mesh layer, and the second integral waterproof layer is formed by brushing a second waterproof coating. In an optional embodiment, the second integral waterproof layer comprises a polymer cement waterproof coating layer.

[0057] The above-mentioned building bathroom caisson floor drainage system adds a specially designed water filter 11 and a caisson floor dedicated drainage pipeline 12 (mainly a drainage riser 121) on the caisson floor 21, and uses a specially designed brick backfill structure 14 and a crushed material backfill structure 15 to drain the water accumulated in the bathroom caisson through a reserved drainage path to the water filter for discharge, thereby solving the problem that the water accumulated in the caisson cannot be drained and leaks to the lower layer.

[0058] Figure 2 It is a schematic diagram of the installation of a water filter in the drainage system of the caisson bottom plate of a building bathroom according to an embodiment of the present invention. Figure 3-Figure 17 This is a process photo of the construction method of the embodiment of the present invention. Figure 2-Figure 17 , the construction method of the building bathroom caisson bottom plate drainage system according to an embodiment of the present invention is described.

[0059] <Installation of water filter>

[0060] Method 1

[0061] The water filter 11 is installed in the caisson bottom plate by pre-buried in a concrete casting mold of the caisson bottom plate 21 and then the concrete casting of the caisson bottom plate 21 is performed. This method may specifically include the following steps:

[0062] (1) Positioning on the bottom mold: Position and lay out the drainage riser according to the position of the design drawing. When laying out the lines, pay attention to the positioning of the upper and lower floors to ensure coaxiality.

[0063] (2) Pre-embedded water filter: Fix the water filter to the bottom mold with iron nails. The installation should be stable. Check the center line position after installation. To avoid leakage into the casing and blockage during concrete pouring, the casing needs to be wrapped and protected.

[0064] (3) Concrete pouring: After the water filter is fixed, the bottom plate reinforcement can be tied and concrete can be poured. After the concrete pouring is completed and cleaned, the protective wrapping can be removed in front of the installation riser.

[0065] Method 2

[0066] The water filter 11 can also be installed in the caisson bottom plate 21 which has been cast with concrete by drilling holes and then placing a sealing mold 31 therein for concrete casting (hanging holes).

[0067] This method may specifically include the following steps:

[0068] (1) Figure 3 As shown, the caisson bottom plate 21 is positioned and laid out and holes are opened: the drainage riser 121 is positioned and laid out according to the position on the design drawing, and attention must be paid to the positioning of the upper and lower floors to ensure coaxiality when laying out. A professional hole opener is used to open holes in the bottom plate.

[0069] (2) Figure 4-Figure 5 As shown, water filter housing installation: install the water filter housing 111, and ensure that the water filter housing 111 is located in the center of the hole after installation.

[0070] (3) Figure 2 , Figure 5-Figure 7 As shown, the lifting hole is sealed: C30 fine stone concrete lifting hole is used, the first lifting hole is 2 / 3H (H is the thickness of the caisson bottom plate 21, the same below), and the second lifting hole is 1 / 3H, and a height of 1cm is reserved for leveling with a sealing agent.

[0071] (4) Laying of special drainage pipelines on the caisson bottom plate: Install the water filter 11 and the drainage riser 121. The drainage riser 121 is fixed to the wall through two brackets (such as Figure 8 shown).

[0072] The sealing mold 31 can seal the lower port of the caisson bottom plate while holding the water filter housing, so as to prevent the loss of C30 fine stone concrete when the hole is sealed. The sealing mold 31 can be a two-piece tray, as shown in 2 and Figure 6 shown.

[0073] <Construction of surface treatment layer of caisson bottom plate>

[0074] (1) Waterproof reinforcement layer at the cave entrance: Use polypropylene waterproofing and JS coating waterproof reinforcement layer around the cave entrance. To avoid blockage of the water filter outlet during subsequent construction, wrap the water filter with adhesive tape for protection. Fig. 9 shown.

[0075] (2) Base cleaning: The caisson base should be cleaned of dust, oil stains and visible water on the surface.

[0076] (3) The first overall waterproof layer is applied with a 1.5 mm thick polymer cement waterproof coating (JS-II). After completion, a 48-hour waterproof and water-tightening test is conducted. Fig.10 shown.

[0077] (4) Overall waterproof protection and slope leveling layer: The overall waterproof protection and slope leveling layer has a slope of 2% and slopes toward the water collector 11. Fig.11 shown.

[0078] <Brick backfill structure construction>

[0079] (1) Hollow brick masonry layer: In order to reduce the backfill load of the bathroom and reserve drainage channels, the hollow bricks laid on the bottom layer should not be fully laid. According to the size of the porous bricks on the surface layer, the gap between the hollow bricks should be controlled and the gap should be increased as much as possible, which can effectively reduce the load and reduce costs. Fig.12 shown.

[0080] (2) Porous brick masonry layer: On the basis of the hollow brick masonry layer, porous bricks are fully laid. The edges and corners of the porous brick masonry layer and the pipe positions cannot be laid with whole bricks and stones. The whole bricks must be broken up to ensure that the surface layer (backfilling the structure with structural debris) is laid tightly. Fig.13 shown.

[0081] <Crushed material backfill structure construction>

[0082] Fill the water filter with pebbles: When laying porous bricks and hollow bricks, do not fill the area within 200mm of the water filter. Use 20mm pebbles to fill the area tightly to prevent the bottom residue from clogging the drainage drain. Fig.14 shown.

[0083] <Construction of surface treatment layer of backfill structure>

[0084] (1) Lay φ4@150 steel mesh to form a steel mesh layer. Fig.15 shown.

[0085] (2) Concrete pouring layer: pour C20 fine stone concrete on the hollow brick surface layer, with φ4@150 steel mesh inside. When pouring the C20 fine stone concrete rigid layer, the bathroom is sloped and the slope is controlled at 5%. Fig.16 shown.

[0086] (3) Maintenance: Moisture-preservation and heat-insulating maintenance shall be carried out on the rigid layer according to the pouring time requirements to ensure that the concrete strength meets the design requirements.

[0087] (4) Secondary waterproof layer painting: clean the base layer and apply secondary JS coating waterproofing to form the second overall waterproof layer. Fig.17 shown.

[0088] The above is a description of the relevant contents of the present invention. A person skilled in the art will be able to implement the present invention based on these descriptions. Based on the above contents of this specification, all other embodiments obtained by a person skilled in the art without making creative work should fall within the scope of the present invention.

Claims

1. The drainage system of the caisson floor of the building bathroom is characterized by: include: a) Water filter: The water filter is installed in the bottom plate of the caisson, A sealing material is provided at the joint between the water filter and the bottom plate of the caisson. The water filter comprises a water filter housing, a water filter tray and a water inlet interface arranged at the upper end of the water filter housing, and a drainage interface arranged at the lower end of the water filter housing. The water filter tray is provided with water filter holes which are not covered by the waterproof material above the bottom plate of the caisson. The water inlet interface is used to connect to the drainage riser installed above the caisson bottom plate. The drainage interface is used to connect with the drainage riser installed below the caisson bottom plate. The water filter hole and the water inlet interface are both connected to the drainage interface through the water filter housing; b) Special drainage pipeline for caisson bottom plate: The dedicated drainage pipeline for the caisson bottom plate includes a drainage riser that connects the water filters distributed on different floors into a drainage flow path; c) Surface treatment layer of caisson bottom plate: The surface treatment layer of the caisson bottom plate is arranged on the upper surface of the caisson bottom plate. The surface treatment layer of the caisson bottom plate includes a water filter peripheral waterproof reinforcement layer, a first integral waterproof layer and an integral waterproof protection and slope leveling layer, which are arranged in sequence from bottom to top. The water filter peripheral waterproof reinforcement layer is formed by a waterproof material arranged around the water filter. The first integral waterproof layer is formed by applying a first waterproof coating. The overall waterproof protection and slope leveling layer is formed by brushing cement mortar and slopes toward the water filter; d) Brick backfill structure: The brick backfill structure is arranged above the surface treatment layer of the caisson bottom plate. The brick backfill structure has a space reserved for backfilling of crushed materials in the upper area of ​​the water filter and the pipe installation area on the bottom plate of the caisson. The brick backfill structure comprises a hollow brick masonry layer and a porous brick masonry layer arranged in sequence from bottom to top. The hollow brick masonry layer comprises a hollow brick plane array formed by masonry of hollow bricks, wherein the hollow brick plane array is provided with horizontal arrangement gaps between adjacent hollow bricks and vertical arrangement gaps between adjacent hollow bricks. The porous brick masonry layer comprises a porous brick plane array formed by porous bricks, and the porous brick plane array is densely distributed above the hollow brick plane array; e) Crushed material backfill structure: The scrap backfilling structure is arranged in the scrap backfilling space to backfill the scrap backfilling space. The crushed material backfill structure includes a water filtration crushed material backfill structure and a structural crushed material backfill structure. The water filter material backfill structure uses water filter material and fills the upper area of ​​the water filter, and the top surface of the water filter material backfill structure directly extends upward to the lower surface of the surface treatment layer of the backfill structure described below; The structural scrap backfill structure uses structural scraps to fill the gap in the pipeline installation area on the bottom plate of the caisson; f) Backfill structure surface treatment layer: The backfill structure surface treatment layer is arranged on the upper surface of the brick backfill structure and the crushed material backfill structure. The surface treatment layer of the backfill structure comprises a steel mesh layer, a concrete pouring layer and a second integral waterproof layer arranged in sequence from bottom to top. The steel mesh layer is formed by laying steel mesh. The concrete pouring layer is formed by pouring concrete laid on the steel mesh layer. The second integral waterproof layer is formed by applying a second waterproof coating; Among them, in the hollow brick masonry layer, the length direction of each hollow brick is uniformly consistent with the length direction of the caisson bottom plate, and the through hole in each hollow brick is consistent with the width direction of the caisson bottom plate; in the length direction of the caisson bottom plate, a longitudinal arrangement gap of the adjacent hollow bricks is formed between any adjacent hollow bricks; in the width direction of the caisson bottom plate, a transverse arrangement gap of the adjacent hollow bricks is formed between any adjacent hollow bricks, and the longitudinal arrangement gap of the adjacent hollow bricks is 1.5mm to 30mm, and the transverse arrangement gap of the adjacent hollow bricks is 1.5mm to 100mm; On the basis of the hollow brick masonry layer, porous bricks are fully laid, and a structural crushed material backfill structure is laid in the crushed material backfill space reserved on the porous brick masonry layer corresponding to the pipeline installation area on the bottom plate of the caisson; An inspection pipe is pre-buried in the water filter material backfill structure, the upper end of the inspection pipe protrudes a certain height from the surface treatment layer of the backfill structure to ensure that it is still exposed to the ground after later decoration, an inspection hole cover is installed on the upper end of the inspection pipe, and the lower end of the inspection pipe is inserted into the upper end surface of the water filter material backfill structure; The upper end of the dedicated drainage pipeline for the caisson bottom plate is usually in a closed state relative to the external atmospheric environment and is provided with an openable and closable regulating valve relative to the external atmospheric environment. The lower end of the dedicated drainage pipeline for the caisson bottom plate is connected to a vacuum pumping device.

2. The drainage system for the floor of a building toilet caisson as claimed in claim 1, characterized in that: The water filter is located near the corner of the caisson bottom plate. The water inlet interface is arranged at the center of the water filter tray. The water filter holes are distributed around the water inlet interface. The water filter holes include first water filter holes and second water filter holes which are spaced apart from each other along the circumference of the water filter plate. The first water filter hole is a circular hole and faces the inner side of the corner. The second water filter hole is a strip-shaped hole and faces the outside of the corner. The length direction of the second water filter hole deviates from the diameter direction of the water filter plate passing through the center point of the second water filter hole so that water flowing through the second water filter hole forms a vortex.

3. The drainage system for the floor of a building toilet caisson as claimed in claim 1, characterized in that: The water filter and the dedicated drainage pipeline for the caisson bottom plate are located beside the main drainage pipe of the toilet.

4. The drainage system for the floor of a building toilet caisson as claimed in claim 1, characterized in that: The waterproof reinforcement layer around the water filter includes a polyethylene polypropylene composite waterproof coiled material layer and a JS composite waterproof material layer arranged in sequence from bottom to top.

5. The drainage system for the floor of a building toilet caisson as claimed in claim 1, characterized in that: The first integral waterproof layer and / or the second integral waterproof layer comprises a polymer cement waterproof coating layer.

6. The drainage system for the floor of a building toilet caisson as claimed in claim 1, characterized in that: The water filtering debris is made of pebbles, and the structural debris is made of brick debris.

7. A construction method for drainage system of caisson bottom plate of building toilet, characterized by: The building toilet caisson floor drainage system is the building toilet caisson floor drainage system as claimed in any one of claims 1 to 6; It includes: completing the installation of the water filter, during which the water filter is installed in the caisson bottom plate by pre-buried in a concrete casting mold of the caisson bottom plate and then the concrete casting of the caisson bottom plate is carried out, or the water filter is installed in the caisson bottom plate by drilling holes in the caisson bottom plate that has been cast with concrete and then placing a sealing mold into the caisson bottom plate for concrete casting; completing the construction of the surface treatment layer of the caisson bottom plate; completing the construction of the brick backfill structure; completing the construction of the crushed material backfill structure; completing the construction of the surface treatment layer of the backfill structure.