Fluid displacement front dynamic resistivity monitoring system and method

By designing a dynamic resistivity monitoring system for leading edge of fluid displacement under high pressure conditions in the slot hole reservoir, the change of core resistivity is monitored in real time, and the resistivity changes in water flow, gas flow and gas-water injection are analyzed, which solves the high temperature The problem of difficult monitoring of fluid flow rules and saturation distribution under high pressure conditions has achieved accurate analysis of the length of the gas-water mixing belt.

CN115436433BActive Publication Date: 2024-12-03CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202110615513.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-02
Publication Date
2024-12-03
Estimated Expiration
2041-06-02

AI Technical Summary

Technical Problem

The existing detection methods are difficult to effectively monitor the fluid flow rules and saturation distribution in the slot reservoir under high temperature and high pressure conditions, especially the length of the gas-water mixing belt when the three-phase mixing of oil, gas and water is not possible.

Method used

A dynamic resistivity monitoring system for the leading edge of fluid displacement under high pressure conditions of the slot reservoir was designed, including core holder, resistivity monitor, experimental fluid injection device, gas-liquid separation metering device, back pressure control device and heating The device uses real-time monitoring of the resistivity changes of each measurement point of the core, draw a resistivity change diagram, analyze the resistivity changes patterns during water flooding, gas flooding and gas-water injection, and determine the length of the gas-water mixing belt.

Benefits of technology

Real-time monitoring and tracking of the three-phase fluid distribution under high temperature and high pressure conditions is realized, and the position of the displacement leading edge is accurately analyzed. The measurement results are highly accurate, stable and repeatable, and the length of the gas-water mixing belt can be effectively identified.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115436433B_ABST
    Figure CN115436433B_ABST
Patent Text Reader

Abstract

The present invention discloses a dynamic resistivity monitoring system and method for fluid displacement front, the system comprising: a core holder for placing cores, and a plurality of measuring points are arranged on the core holder; a resistivity monitor for measuring the resistivity value of each measuring point on the core holder; an experimental fluid injection device for injecting fluid into the core holder; a gas-liquid separation and metering device for gas-liquid separation and metering of the fluid discharged from the core holder; a back pressure control device for controlling the back pressure of the core holder; a confining pressure device for applying confining pressure to the core holder; and a heating device for adjusting the temperature of the core holder. The present invention installs a resistivity monitor on a fracture-cavity carbonate rock physical model, and monitors and tracks the three-phase fluid distribution in the physical model through real-time feedback of fluid resistivity change information, thereby tracking the displacement front position during the displacement process and analyzing the length of the gas-water mixing zone. The measurement results of the monitoring system are highly accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of fracture-cavity oil reservoir development, and in particular relates to a system and method for monitoring the dynamic resistivity of a fluid displacement front under high pressure conditions in a fracture-cavity oil reservoir. Background Art

[0002] At present, there are three main methods for detecting fluid distribution in core displacement experiments, namely, resistivity method, CT scanning technology and oil-water metering method.

[0003] The resistivity method is a commonly used method for testing fluids in laboratories, that is, during the displacement experiment, the principle of different resistivities of different media compositions is used to obtain the dynamic distribution of fluids by monitoring resistivity changes. At present, this technology is widely used in sandstone reservoirs, but the current domestic experimental equipment can only meet the requirements of detecting fluid saturation changes under normal temperature and pressure conditions (2MPa, below 80°C). However, fracture-cave reservoirs are buried at ultra-deep depths, with high temperature and pressure, and due to the particularity of their complex fracture-cave reservoir structure: complex fracture-cave structures, extremely strong reservoir heterogeneity, and harsh reservoir conditions of high temperature and high pressure are all key factors in controlling the flow laws of fluids. Conventional resistivity monitoring instruments and monitoring methods are difficult to effectively monitor and identify, which restricts the understanding of the flow laws of fluids in high-temperature and high-pressure fracture-cave reservoirs.

[0004] The CT method obtains the dynamic distribution of fluid through a three-dimensional image of the fluid distribution inside the measured object. Currently, it can only scan the model fluid saturation under normal temperature and common conditions, and qualitatively monitor and track the fluid flow law and saturation distribution during the displacement process under normal temperature and pressure conditions. It cannot quantitatively reflect the dynamic changes of the fluid saturation in the model, has poor observation capabilities for the length of the gas-water mixing zone, and cannot meet the detection requirements of high temperature and high pressure reservoir conditions in fracture-cavity reservoirs.

[0005] The oil-water metering rule is to obtain the relationship between water saturation (Sw) and relative permeability ln (Kro / Krw) based on the oil-water relative permeability curve, and then apply the Buckley-Leverett equation to obtain the water-drive oil saturation distribution at any time. This method is introduced in the article "Comparative Study of Fluid Saturation Distribution by Scanning Technology and Buckley-Leverett Water-Drive Oil Theory" published by Sun Lei et al. This method is only applicable to the calculation of water-drive oil saturation during water-drive development in sandstone reservoirs. Sandstone reservoirs are porous reservoirs, and there are regular water-drive front sweep characteristics during water-drive oil. The Buckley-Leverett equation can be used to quantitatively characterize the oil-water saturation distribution. However, the fracture-cavity reservoir is extremely heterogeneous, and the oil, gas and water flow patterns and flow laws are completely different from those of conventional sandstone reservoirs. The water-drive front sweep theory is not suitable for fracture-cavity reservoirs. Therefore, this method cannot be applied to the monitoring of oil-water saturation in fracture-cavity reservoirs, and it is not suitable for the inversion calculation of oil, gas and water three-phase fluid saturation in fracture-cavity reservoirs.

[0006] The visualization model monitoring method of normal pressure can only qualitatively observe the flow law and distribution of fluid at normal temperature, and cannot simulate the flow law of fluid under high temperature and high pressure in real oil reservoirs; the physical simulation method of conventional displacement can simulate the real reservoir conditions of high temperature and high pressure, but can only analyze the production dynamic law and improve the recovery effect through production data such as pressure, oil production, and water production, but cannot monitor and track the flow law of reservoir fluid and the distribution of fluid saturation, and cannot analyze the characteristics of gas-water mixed zone and quantitatively evaluate them.

[0007] Therefore, there is a particular need for a method that can analyze the length of the gas-water mixing zone when oil, gas and water are mixed under high temperature and high pressure conditions. Summary of the invention

[0008] The purpose of the present invention is to provide a method for analyzing the length of the gas-water mixing zone when oil, gas and water are mixed in three phases under high temperature and high pressure conditions.

[0009] The present invention provides a dynamic resistivity monitoring system for fluid displacement front under high pressure conditions in a fracture-cavity oil reservoir, comprising: a core holder, the core holder is used to place a core, and the core holder is provided with a plurality of measuring points; a resistivity monitor, connected to the core holder, and used to measure the resistivity value of each measuring point on the core holder; an experimental fluid injection device, connected to the inlet of the core holder, and used to inject fluid into the core holder; a gas-liquid separation metering device, connected to the outlet of the core holder, and used to perform gas-liquid separation and metering on the fluid discharged from the core holder; a back pressure control device, connected to the outlet of the core holder, and used to control the back pressure of the core holder; a confining pressure device, connected to the core holder, and used to apply confining pressure to the core holder; and a heating device, sleeved outside the core holder, and used to adjust the temperature of the core holder.

[0010] Optionally, a cylindrical rubber tube is provided in the core holder, and the rubber tube is used to place the core. A plurality of metal rings are embedded in the inner wall of the rubber tube along the radial direction, and each metal ring is connected to the resistivity monitor, wherein each measuring point is arranged on one of the metal rings.

[0011] Optionally, the experimental fluid injection device includes: a plurality of piston-type intermediate containers, all connected to the inlet of the core clamp and used to contain experimental liquid; an injection pump connected to the plurality of piston-type intermediate containers and used to inject the experimental liquid in the piston-type intermediate containers into the core clamp; a gas storage container, used to contain experimental gas; a gas flow controller, respectively connected to the inlet of the gas storage container and the core clamp, used to control the flow of the experimental gas injected into the core clamp; a gas booster pump, connected to the gas storage container, used to provide high-pressure experimental gas and deliver the high-pressure experimental gas to the gas storage container; an air compressor, connected to the gas booster pump, to provide power for the gas booster pump.

[0012] The present invention also provides a method for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in fracture-cavern oil reservoirs. The method comprises: vacuumizing a core and performing a water saturation test on the core; performing an oil saturation test on the water saturated core; performing a water drive test, a gas drive test and a gas-water co-injection test on the oil saturated core, and obtaining the resistivity value of each measuring point in each experiment through a resistivity monitor; and performing a water drive test, a gas drive test and a gas-water co-injection test on the oil saturated core. Resistivity values ​​are obtained, and a core water drive resistivity change chart, a core gas drive resistivity change chart, and a core gas-water co-injection process resistivity change chart are drawn; the core water drive resistivity change chart is analyzed to obtain the resistivity change law of the position where the water drive front reaches; the core gas drive resistivity change chart is analyzed to obtain the resistivity change law of the position where the gas drive front reaches; the core gas-water co-injection process resistivity change chart is analyzed, and the length of the gas-water mixed zone is obtained by combining the resistivity change law of the position where the water drive front reaches and the resistivity change law of the position where the gas drive front reaches.

[0013] Optionally, multiple sampling time points are determined, and during each experiment, the resistivity value of each measurement point at each sampling time point is obtained.

[0014] Optionally, the method further includes: numbering the measurement points in ascending order along the fluid injection direction.

[0015] Optionally, the following steps are used to draw a resistivity change map: draw a coordinate system with time as the horizontal axis and the resistivity value as the vertical axis, mark the resistivity value of each measuring point in the coordinate system, and for each measuring point, connect the marked points corresponding to the measuring point in sequence to obtain a resistivity change map.

[0016] Optionally, the resistivity variation rule of the water drive front reaching the position is: ρ i,j -ρ i,j-1 ≥a,ρ i,jis the resistivity value of the jth measurement point at the i-th sampling time point, ρ i,j-1 is the resistivity value of the j-1th measuring point at the i-th sampling time point, a is the first resistivity threshold, and the core position corresponding to the j-1th measuring point at the i-th sampling time point is the arrival position of the water drive front.

[0017] Optionally, the resistivity variation rule of the gas drive front reaching the position is: ρ h,k -ρ h,k+1 ≥b,ρ h , k is the resistivity value of the kth measurement point at the hth sampling time point, ρ h,k+1 is the resistivity value of the k+1th measuring point at the hth sampling time point, b is the second resistivity threshold, and at the hth sampling time point, the core position corresponding to the kth measuring point is the gas drive front arrival position.

[0018] Optionally, the following steps are used to obtain the length of the gas-water mixing zone: according to the resistivity change law of the water drive front arrival position and the resistivity change law of the gas drive front arrival position, based on the dynamic resistivity change chart of the core gas-water co-injection process, the water drive front arrival position and the gas drive front arrival position are obtained at each sampling time point; based on the water drive front arrival position and the gas drive front arrival position at each sampling time point, the sampling time point at which the water drive front arrival position and the gas drive front arrival position exist at the same time is obtained as the gas-water separation time point; the length between the water drive front arrival position and the core fluid injection end corresponding to the gas-water separation time point is taken as the length of the gas-water mixing zone.

[0019] The beneficial effects of the present invention are as follows: the dynamic resistivity monitoring system and method for fluid displacement front under high pressure conditions in fracture-cavity oil reservoirs of the present invention installs a resistivity monitor on a fracture-cavity carbonate rock physical model, and uses real-time feedback of fluid resistivity change information to monitor and track the three-phase fluid distribution in the physical model, thereby tracking the displacement front position during the displacement process and analyzing the length of the gas-water mixing zone. The measurement results of the monitoring system are highly accurate, stable, and repeatable, and the resistivity changes at various positions of the core during different displacement processes are dynamically monitored.

[0020] The present invention has other features and advantages, which will be apparent from or will be described in detail in the accompanying drawings and the following specific embodiments incorporated herein, which together serve to explain the specific principles of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The above and other objects, features and advantages of the present invention will become more apparent through a more detailed description of exemplary embodiments of the present invention in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present invention.

[0022] Figure 1 A block diagram of a dynamic resistivity monitoring system for fluid displacement front under high pressure conditions in a fracture-cavity reservoir according to an embodiment of the present invention is shown.

[0023] Figure 2 A schematic diagram of a core holder of a system for monitoring dynamic resistivity of a fluid displacement front under high pressure conditions in a fracture-vuggy reservoir according to an embodiment of the present invention is shown.

[0024] Figure 3 A flow chart of a method for monitoring dynamic resistivity of a fluid displacement front under high pressure conditions in a fracture-vuggy reservoir according to an embodiment of the present invention is shown.

[0025] Description of Reference Numerals

[0026] 1. Injection pump; 2. Piston intermediate container; 3. Gas booster pump; 4. Metal ring; 5. Gas storage container; 6. Gas flow controller; 7. Air compressor; 8. Core holder; 9. Heating device; 11. Confining pressure device; 12. Gas-liquid separation metering device; 13. Resistivity monitor; 14. Back pressure control device. DETAILED DESCRIPTION

[0027] The preferred embodiments of the present invention will be described in more detail below. Although the preferred embodiments of the present invention are described below, it should be understood that the present invention can be implemented in various forms and should not be limited to the embodiments set forth herein.

[0028] The invention provides a dynamic resistivity monitoring system for fluid displacement front under high pressure condition in fracture-cavity oil reservoir, comprising: a core holder, the core holder is used for placing cores, and a plurality of measuring points are arranged on the core holder; a resistivity monitor, connected with the core holder, and used for measuring the resistivity value of each measuring point on the core holder; an experimental fluid injection device, connected with the inlet of the core holder, and used for injecting fluid into the core holder; a gas-liquid separation metering device, connected with the outlet of the core holder, and used for gas-liquid separation and metering of the fluid discharged from the core holder; a back pressure control device, connected with the outlet of the core holder, and used for controlling the back pressure of the core holder; a confining pressure device, connected with the core holder, and used for applying confining pressure to the core holder; and a heating device, sleeved outside the core holder, and used for adjusting the temperature of the core holder.

[0029] Specifically, the monitoring device includes a core holder (the most important part): the entire holder is made of stainless steel, the wetted part is made of 316L material, the insulating material is PEEK, and the rest is made of 304 material, with a working pressure of 30MPa. The core specification of the holder is Φ100×300mm, and the sealing material is fluororubber, which can ensure that the holder is reliably sealed and durable under working conditions of 200℃. The holder can hold multi-array motors and single-stage electrodes, insulated electrodes H, and cooperate with the bridge to make the data stability reach ±0.2; resistivity monitor: The resistivity uses a resistance scanning tester for data acquisition and processing, which is used to accurately monitor the real-time changes of resistivity under different displacement conditions. The resistivity measurement range is: 0.01KΩ~0.99MΩ. Experimental fluid injection device: inject fluid into the core holder; Electric heating jacket: use electric heating jacket to heat the core holder, the highest can reach 200℃; Pressure sensor and temperature sensor: pressure sensor is used to measure injection pressure, confining pressure, outlet pressure and back pressure. Accuracy: 0.1% F·S, output signal: 4~20mA. Temperature sensor is used to measure and control the temperature of the holder. The measurement and temperature control range is: room temperature~150℃, accuracy 0.1%, output signal: 4~20mA; Confining pressure pump: working pressure: 35MPa; Gas-liquid separation metering device: used to separate the produced gas and liquid, and measure the gas and liquid volume. Volume: 200ml, made of 304 material; Back pressure metering system: working pressure of back pressure pump: 30Mpa; back pressure container volume 200ml, pressure resistance 30MPa; back pressure valve pressure resistance is 30MPa.

[0030] The completed fluid saturation dynamic monitoring system is equipped with a control console to achieve integrated control of the experimental process. The data of the experimental results are collected through the data acquisition control software. In addition to real-time acquisition of resistivity values, it can also collect the values ​​of parameters such as temperature, pressure, and resistance data in real time; collect the parameters of the constant pressure and constant speed pump in real time and control the start, stop and flow of the pump; collect and calculate the data of the output fluid in real time; display the working status of the control element in real time; display and prompt the workflow of each working stage; and have temperature and pressure upper limit alarm functions.

[0031] Specifically, the gas is pressurized by an air compressor and then injected into a gas storage container (volume: 2000mL, pressure resistance 45MPa). The outlet of the gas storage container is connected to a gas flow meter (range: 0-1000ml / min, working pressure: ≤10Mpa) to control the flow rate of the output gas flowing into the core holder. The injection liquid (water and oil) is stored in the upper part of a piston container (volume: 1000ml, pressure resistance: 40MPa). The injection pump (flow range: 0.01-20ml / min, pressure range: 0-30MPa) injects liquid into the lower part of the piston container to push the injection liquid in the upper part to flow into the core holder. The flow rate of the fluid is controlled by the injection pump.

[0032] The injection gas and injection liquid are injected from the injection end of the core holder. The outlet end of the core holder is connected to the back pressure control device. The liquid inside the holder can flow out only when it exceeds the confining pressure, which can stabilize the production pressure difference at both ends of the core holder. The produced liquid flows out and enters the gas-liquid separation metering device, so as to read the output of the oil, gas and water three-phase fluid in the produced liquid. During the experiment, the dynamic resistivity of each part of the core is transmitted to the resistivity meter through each measuring point, and finally the dynamic change values ​​of resistivity and fluid saturation are obtained.

[0033] The fluid saturation dynamic monitoring system can monitor the resistivity changes at various positions of the core during the oil saturation process of the fully water-bearing core. By comparing the fluid saturation charts before and after gas-water injection and the fluid saturation change charts during oil saturation and water flooding, the displacement front can be tracked and the length of the gas-water mixing zone can be analyzed.

[0034] The fluid saturation dynamic monitoring system conducts experiments at different pressures and temperatures to obtain resistivity values ​​at different pressures and temperatures.

[0035] According to an exemplary embodiment, a dynamic resistivity monitoring system for fluid displacement front under high-pressure conditions in fracture-cavity reservoirs installs a resistivity monitor on a fracture-cavity carbonate physical model, and uses real-time feedback of fluid resistivity change information to monitor and track the three-phase fluid distribution in the physical model, thereby tracking the displacement front position during the displacement process and analyzing the length of the gas-water mixing zone. The monitoring system has high measurement accuracy, good stability, and strong repeatability, and dynamically monitors the resistivity changes at various positions of the core during different displacement processes.

[0036] As an optional solution, a cylindrical rubber tube is provided in the core holder for placing the core, and a plurality of metal rings are embedded in the inner wall of the rubber tube along the radial direction, each of which is connected to the resistivity monitor, wherein each measuring point is provided on a metal ring.

[0037] Specifically, the cylindrical barrel of the core holder is made of stainless steel (the built-in core size is Φ100×300mm, and the pressure resistance is 40MPa). The stainless steel barrel is built with a cylindrical rubber barrel with a slightly smaller diameter. The inner wall of the rubber barrel is embedded with round silver wires. The core physical model (core size is Φ100×300mm) is placed inside the rubber barrel. A total of 14 round silver wires surround the core. The silver wires are evenly distributed with a spacing of 2 cm. Each silver wire is connected by a separate lead wire, passing through the gap between the stainless steel barrel and the rubber barrel to pass through the core holder and connect to the resistivity meter. After the core is placed in the rubber barrel of the core holder, it is covered by two steel sealing covers on both sides, and the core is fixed by rotating the adjustment rod to apply pressure. Liquid is injected into the gap between the stainless steel barrel and the rubber tube from the injection port on the core holder to increase the confining pressure inside the gap and realize the pressure control of the core physical model. The joints of the entire core holder are sealed with fluororubber to ensure the normal operation of the holder under the conditions of 30MPa and 200℃. The holder is placed in a constant temperature oven, and the overall temperature control of the core holder is realized by controlling the temperature in the oven.

[0038] As an optional solution, the experimental fluid injection device includes: a plurality of piston-type intermediate containers, all connected to the inlet of the core clamp, for containing experimental liquid; an injection pump, connected to the plurality of piston-type intermediate containers, for injecting the experimental liquid in the piston-type intermediate containers into the core clamp; a gas storage container, for containing experimental gas; a gas flow controller, respectively connected to the inlet of the gas storage container and the core clamp, for controlling the flow of the experimental gas injected into the core clamp; a gas booster pump, connected to the gas storage container, for providing high-pressure experimental gas and delivering the high-pressure experimental gas to the gas storage container; and an air compressor, connected to the gas booster pump, for providing power for the gas booster pump.

[0039] Specifically, the experimental fluid injection device: injection pump: used to inject water or experimental medium into the resistivity holder, with a flow range of 0.01-20 ml / min; pressure range of 0-30 MPa (stainless steel pump head); repeatability ≤±0.5%; setting accuracy ≤±1.5%; infusion mode double-plunger reciprocating pump; communication form is serial port mode RS-232; piston-type intermediate container: used to hold experimental liquid, with a volume of 1000 ml and a pressure resistance of 40 MPa; gas booster pump: according to the needs of the experiment, it provides high-pressure gas for the simulation experiment and stores it in the corresponding buffer container to prepare for the subsequent hydrate formation experiment. The inlet pressure of this device is 0.3~8Mpa; the reciprocating stroke is 45mm; the pressure ratio is 60:1; the outlet pressure is 1500~6000psi; the working medium is nitrogen; the regulating valve is used to control the gas pressure output from the gas storage container, and then inject it into the model at the pressure required by the experiment, the maximum input pressure is 10000psi; the output pressure is 50~6000psi; the gas storage container: the effective volume is 2000ml, the pressure resistance is 45MPa; the gas flow meter: the range is 0~1000ml / min; the working pressure is ≤10MPa; the repeatability is ±0.2%F·S; the accuracy is ±1%F·S; the air compressor provides power for the gas booster pump, pump pneumatic valve, etc. The rated pressure is 0.8MPa; the volume flow is 0.48m3 / min; the working noise is ≤60db; the storage tank capacity is 180L.

[0040] The present invention also provides a method for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in fracture-cavity reservoirs. The method uses the above-mentioned dynamic resistivity monitoring system for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in fracture-cavity reservoirs. The method comprises: evacuating the core and performing a water saturation experiment on the core; performing an oil saturation experiment on the water saturated core; performing a water drive experiment, a gas drive experiment and a gas-water co-injection experiment on the oil saturated core respectively, and obtaining the resistivity value of each measuring point in each experiment through a resistivity monitor; and performing a water drive experiment, a gas drive experiment and a gas-water co-injection experiment on the oil saturated core respectively. According to the resistivity value of the point, the core water drive resistivity change chart, the core gas drive resistivity change chart and the core gas-water co-injection process resistivity change chart are drawn; the core water drive resistivity change chart is analyzed to obtain the resistivity change law of the position where the water drive front reaches; the core gas drive resistivity change chart is analyzed to obtain the resistivity change law of the position where the gas drive front reaches; the core gas-water co-injection process resistivity change chart is analyzed, and the length of the gas-water mixed zone is obtained by combining the resistivity change law of the position where the water drive front reaches and the resistivity change law of the position where the gas drive front reaches.

[0041] The core was vacuumed and a water-saturated experiment was conducted on the core; an oil-saturated experiment was conducted on the water-saturated core; a water drive experiment, a gas drive experiment, and a gas-water co-injection experiment were conducted on the oil-saturated core, respectively, to obtain the resistivity value of each measuring point in each experiment, and a water drive resistivity change chart was drawn for the resistivity value measured in the water drive experiment, a gas drive resistivity change chart was drawn for the resistivity value measured in the gas drive experiment, and a gas-water co-injection process resistivity change chart was drawn for the resistivity value measured in the gas-water co-injection experiment. It is known that the resistivity order of the three-phase fluid is ρ 气 >ρ 油 >ρ 水 : The resistivity change chart of water drive and the resistivity change chart of gas drive are analyzed respectively to obtain the resistivity change law of the position where the water drive front reaches and the resistivity change law of the position where the gas drive front reaches. Combined with this change law, the length of the gas-water mixed zone is obtained from the resistivity change chart of the core gas-water co-injection process.

[0042] The fluid saturation dynamic monitoring system conducts experiments at different pressures and temperatures to obtain resistivity values ​​at different pressures and temperatures, and the length of the gas-water mixing zone at different pressures and temperatures is obtained through the fluid saturation dynamic monitoring method.

[0043] According to an exemplary embodiment, the dynamic resistivity monitoring method of the fluid displacement front under high pressure conditions in fracture-cavity reservoirs dynamically monitors the resistivity changes at various positions of the core during the displacement process, effectively tracks the position of the displacement front during the displacement process, and then analyzes the length of the gas-water mixing zone under high temperature and high pressure conditions.

[0044] As an optional solution, a plurality of sampling time points are determined, and in each experimental process, the resistivity value of each measuring point at each sampling time point is obtained.

[0045] Specifically, during the experiment, the experiment time is divided into a plurality of sampling time points, each sampling time point is determined, and the resistivity value of each measuring point at each sampling time point is obtained.

[0046] As an optional solution, the following also includes: numbering the measurement points in ascending order along the fluid injection direction.

[0047] Specifically, the measuring points are numbered in ascending order along the fluid injection direction for easy identification.

[0048] As an optional solution, the following steps are used to draw a resistivity change map: a coordinate system is drawn with time as the horizontal axis and resistivity value as the vertical axis, the resistivity value of each measuring point is marked in the coordinate system, and for each measuring point, the marked points corresponding to the measuring point are connected in sequence to obtain a resistivity change map.

[0049] Specifically, with time as the horizontal axis and resistivity value as the vertical axis, the resistivity values ​​corresponding to each measuring point are connected in sequence to obtain a resistivity change map. A water drive resistivity change map is drawn for the resistivity values ​​measured in the water drive experiment, a gas drive resistivity change map is drawn for the resistivity values ​​measured in the gas drive experiment, and a gas-water co-injection process resistivity change map is drawn for the resistivity values ​​measured in the gas-water co-injection experiment.

[0050] As an optional solution, the resistivity variation law of the water flooding front reaching the position is: i,j -ρ i,j-1 ≥a,ρ i , j is the resistivity value of the jth measurement point at the i-th sampling time point, ρ i,j-1 is the resistivity value of the j-1th measuring point at the i-th sampling time point, a is the first resistivity threshold, and the core position corresponding to the j-1th measuring point at the i-th sampling time point is the arrival position of the water drive front.

[0051] Specifically, after the core is vacuumed, it is first saturated with water by water drive, and then saturated with oil by oil drive water. After saturation, the core fluid composition is oil and bound water. The core saturated with oil is water driven. During the water drive process, for a certain position of the core, the initial resistivity remains basically unchanged. After water is injected, the water drive front pushes the crude oil forward and gradually forms an oil wall. After the oil wall reaches the measurement point, the resistivity increases slightly due to the increase in oil content; the water drive front pushes the oil wall to migrate and pass through the measurement point. Subsequently, due to the gradual increase in water saturation, the resistivity drops rapidly, and the peak point of the resistivity is the position of the water drive front. According to this principle, the position of the oil-water front during the water drive process can be determined. With the advancement of the oil-water displacement front, the core fluid as a whole shows a decrease in oil content and an increase in water content, that is, the resistivity value at each position of the core decreases. After the water drive is completed, the fluid composition is water and residual oil. The resistivity values ​​at each position of the core during the water drive process are measured, and a core water drive resistivity change chart under dynamic conditions is drawn.

[0052] As an optional solution, the resistivity variation law of the gas drive front reaching the position is: h,k -ρ h,k+1 ≥b,ρ h , k is the resistivity value of the kth measurement point at the hth sampling time point, ρ h,k+1 is the resistivity value of the k+1th measuring point at the hth sampling time point, b is the second resistivity threshold, and at the hth sampling time point, the core position corresponding to the kth measuring point is the gas drive front arrival position.

[0053] Specifically, before gas drive of saturated oil core, the fluid composition is oil and bound water; during gas drive, for a certain position of the core, the initial resistivity remains basically unchanged. After a certain cumulative amount of gas is injected, the gas drive front pushes the crude oil forward and gradually forms an oil wall. After the oil wall reaches the measurement point, the resistivity rises slightly, indicating that the subsequent gas drive front has reached the measurement point; the front continues to move forward, and due to the subsequent increase in gas saturation, the resistivity value of the measurement point rises sharply, and the starting point of the resistivity change is the position of the gas drive front. Like water drive, this phenomenon can be used to determine the position of the gas drive front during the gas drive process. As the gas-oil drive front advances, the core as a whole shows a decrease in oil content and an increase in gas content, that is, the resistivity values ​​at various positions of the core increase greatly. Measure the resistivity values ​​at various positions of the core during the gas drive process, and draw a chart of the core gas drive resistivity change under dynamic conditions.

[0054] As an optional scheme, the following steps are adopted to obtain the length of the gas-water mixed zone: according to the resistivity change law of the water drive front arrival position and the resistivity change law of the gas drive front arrival position, based on the dynamic resistivity change plate of the core gas-water co-injection process, the water drive front arrival position and the gas drive front arrival position at each sampling time point are obtained; based on the water drive front arrival position and the gas drive front arrival position at each sampling time point, the sampling time point at which the water drive front arrival position and the gas drive front arrival position exist at the same time is obtained as the gas-water separation time point; the length between the water drive front arrival position corresponding to the gas-water separation time point and the core fluid injection end is taken as the length of the gas-water mixed zone.

[0055] Specifically, before gas-water co-injection in the oil-saturated core, the fluid composition is oil and residual water; the displacement front pushes the crude oil forward and gradually forms an oil wall. After the oil wall reaches the measuring point, the resistivity first increases slightly (with a small slope). After the displacement front reaches the measuring point, due to the sudden increase in gas saturation at the front, the resistivity increases significantly (with a large slope). Subsequently, with the increase in gas-water two-phase saturation, the resistivity changes irregularly, and the resistivity changes with different three-phase fluid saturation ratios are different. The displacement front in the early stage of gas-water co-injection is the gas-water mixed drive front. After the gas-water mixed drive front reaches the measuring point, the resistivity increase is between the resistivity before pure water displacement and the resistivity of the pure gas drive front. Due to the difference in gas-water viscosity, the gas mobility in the core is greater than the water velocity. In the later stage of gas-water co-injection, gas-water separation occurs to form a pure gas drive front. After the pure gas drive front reaches the measuring point, the resistivity increase is the largest.

[0056] After gas-water co-injection, the core as a whole shows an increase in gas content, an increase in water content, a decrease in oil content, and the resistivity values ​​at various locations of the core increase to varying degrees. The resistivity values ​​at various locations of the core were measured during the gas-water co-injection process, and the resistivity change patterns at various locations of the core were analyzed by comparing them with the water drive resistivity change chart and the gas drive resistivity change chart, thereby achieving dynamic identification of the gas-water mixed drive front and the pure gas drive front, and further analyzing the length of the gas-water mixed zone under different temperature and pressure conditions.

[0057] Embodiment 1

[0058] Figure 1 A block diagram of a dynamic resistivity monitoring system for fluid displacement front under high pressure conditions in a fracture-cavity reservoir according to an embodiment of the present invention is shown. Figure 2 A schematic diagram of a core holder of a system for monitoring dynamic resistivity of a fluid displacement front under high pressure conditions in a fracture-vuggy reservoir according to an embodiment of the present invention is shown.

[0059] As 1 and Figure 2 As shown in the figure, the dynamic resistivity monitoring system of fluid displacement front under high pressure conditions in the fracture-cavity reservoir includes:

[0060] A core holder 8, the core holder 8 is used to place the core, and a plurality of measuring points are arranged on the core holder 8;

[0061] A resistivity monitor 13, connected to the core holder 8, for measuring the resistivity value of each measuring point on the core holder 8;

[0062] An experimental fluid injection device, connected to the inlet of the core holder 8, for injecting fluid into the core holder 8;

[0063] A gas-liquid separation and metering device 12 is connected to the outlet of the core holder 8 and is used for gas-liquid separation and metering of the fluid discharged from the core holder 8;

[0064] A back pressure control device 14 is connected to the outlet of the core holder 8 and is used to control the back pressure of the core holder 8;

[0065] A confining pressure device 11, connected to the core holder 8, for applying confining pressure to the core holder 8;

[0066] The heating device 9 is sleeved outside the core holder 8 and is used to adjust the temperature of the core holder 8 .

[0067] A cylindrical rubber tube is provided in the core holder 8 for placing the core, and a plurality of metal rings 4 are embedded in the inner wall of the rubber tube along the radial direction, each of which is connected to the resistivity monitor 13 , wherein each measuring point is provided on a metal ring 4 .

[0068] Among them, the experimental fluid injection device includes: a plurality of piston-type intermediate containers 2, all connected to the inlet of the core clamp 8, for containing experimental liquid; an injection pump 1, connected to the plurality of piston-type intermediate containers 2, for injecting the experimental liquid in the piston-type intermediate container 2 into the core clamp 8; a gas storage container 5, for containing experimental gas; a gas flow controller 6, respectively connected to the inlet of the gas storage container 5 and the core clamp 8, for controlling the flow of the experimental gas injected into the core clamp 8; a gas booster pump 3, connected to the gas storage container 5, for providing high-pressure experimental gas, and delivering the high-pressure experimental gas to the gas storage container 5; an air compressor 7, connected to the gas booster pump 3, for providing power for the gas booster pump 3.

[0069] Embodiment 2

[0070] Figure 3 A flow chart of a method for monitoring dynamic resistivity of a fluid displacement front under high pressure conditions in a fracture-vuggy reservoir according to an embodiment of the present invention is shown.

[0071] like Figure 3 As shown, the method for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in the fracture-cavity reservoir uses the above-mentioned system for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in the fracture-cavity reservoir, and the method includes:

[0072] Step 1: Vacuum the core and conduct a water saturation test on the core;

[0073] Step 2: Conduct oil saturation experiment on the water saturated core;

[0074] Step 3: Carry out water drive experiment, gas drive experiment and gas-water co-injection experiment on the oil-saturated core respectively, and obtain the resistivity value of each measuring point in each experiment through the resistivity monitor;

[0075] Therein, a plurality of sampling time points are determined, and in each experimental process, the resistivity value of each measuring point at each sampling time point is obtained.

[0076] The method also includes: numbering the measuring points in ascending order along the fluid injection direction.

[0077] Step 4: Draw the core water drive resistivity change chart, the core gas drive resistivity change chart and the core gas-water co-injection process resistivity change chart according to the resistivity value of each measuring point in the water drive experiment, the gas drive experiment and the gas-water co-injection experiment;

[0078] The following steps are used to draw a resistivity change map: a coordinate system is drawn with time as the horizontal axis and resistivity value as the vertical axis, the resistivity value of each measuring point is marked in the coordinate system, and for each measuring point, the marked points corresponding to the measuring point are connected in sequence to obtain a resistivity change map.

[0079] Step 5: Analyze the core water flooding resistivity change chart to obtain the resistivity change law at the location where the water flooding front reaches;

[0080] Among them, the resistivity variation law of the water flooding front reaching the position is: ρ i,j -ρ i,j-1 ≥a,ρ i,j is the resistivity value of the jth measurement point at the i-th sampling time point, ρ i,j-1 is the resistivity value of the j-1th measuring point at the i-th sampling time point, a is the first resistivity threshold, and the core position corresponding to the j-1th measuring point at the i-th sampling time point is the arrival position of the water drive front.

[0081] Step 6: Analyze the core gas drive resistivity change chart to obtain the resistivity change law at the gas drive front arrival position;

[0082] Among them, the resistivity variation law of the gas drive front reaching the position is: ρ h,k -ρ h,k+1 ≥b,ρ h,k is the resistivity value of the kth measurement point at the hth sampling time point, ρ h,k+1 is the resistivity value of the k+1th measuring point at the hth sampling time point, b is the second resistivity threshold, and at the hth sampling time point, the core position corresponding to the kth measuring point is the gas drive front arrival position.

[0083] Step 7: Analyze the resistivity change chart of the core gas-water co-injection process, and combine the resistivity change law of the water drive front arrival position and the resistivity change law of the gas drive front arrival position to obtain the length of the gas-water mixing zone.

[0084] The following steps are adopted to obtain the length of the gas-water mixed zone: according to the resistivity change law of the water drive front arrival position and the resistivity change law of the gas drive front arrival position, based on the dynamic resistivity change plate of the core gas-water co-injection process, the water drive front arrival position and the gas drive front arrival position at each sampling time point are obtained; based on the water drive front arrival position and the gas drive front arrival position at each sampling time point, the sampling time point at which the water drive front arrival position and the gas drive front arrival position exist at the same time is obtained as the gas-water separation time point; the length between the water drive front arrival position corresponding to the gas-water separation time point and the core fluid injection end is taken as the length of the gas-water mixed zone.

[0085] The embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those skilled in the art without departing from the scope and spirit of the described embodiments.

Claims

1. A method for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in a fracture-cavity reservoir, characterized in that: The method comprises: The core is vacuumed and a water saturation test is performed on the core; Oil saturation experiments were conducted on water-saturated cores; Water drive experiment, gas drive experiment and gas-water co-injection experiment were carried out on the oil-saturated core respectively, and the resistivity value of each measuring point in each experiment was obtained by a resistivity monitor; According to the resistivity value of each measuring point in the water drive experiment, gas drive experiment and gas-water co-injection experiment, the core water drive resistivity change chart, the core gas drive resistivity change chart and the core gas-water co-injection process resistivity change chart are drawn; Analyze the core water flooding resistivity change chart to obtain the resistivity change law of the position where the water flooding front reaches; Analyze the core gas drive resistivity change chart to obtain the resistivity change law at the gas drive front arrival position; Analyze the resistivity change chart of the core gas-water co-injection process, and combine the resistivity change law of the water drive front arrival position and the resistivity change law of the gas drive front arrival position to obtain the length of the gas-water mixing zone; The method utilizes a dynamic resistivity monitoring system for fluid displacement front under high pressure conditions in fracture-cavity reservoirs, and the system comprises: A core holder, the core holder is used to place the core, and the core holder is provided with a plurality of measuring points; A resistivity monitor connected to the core holder and used to measure the resistivity value of each measuring point on the core holder; an experimental fluid injection device, connected to the inlet of the core holder, and used for injecting fluid into the core holder; A gas-liquid separation and metering device, connected to the outlet of the core holder, for performing gas-liquid separation and metering on the fluid discharged from the core holder; a back pressure control device connected to the outlet of the core holder and used to control the back pressure of the core holder; a confining pressure device, connected to the core holder, and used to apply confining pressure to the core holder; A heating device, which is sleeved outside the core holder and is used to adjust the temperature of the core holder; A cylindrical rubber tube is provided in the core holder, and the rubber tube is used to place the core. A plurality of metal rings are embedded in the inner wall of the rubber tube in the radial direction, and each metal ring is connected to the resistivity monitor, wherein each measuring point is set on one of the metal rings; The experimental fluid injection device comprises: A plurality of piston-type intermediate containers, all connected to the inlet of the core holder, for containing experimental liquid; an injection pump connected to the plurality of piston-type intermediate containers and used for injecting the experimental liquid in the piston-type intermediate containers into the core holder; Gas storage container, used to contain experimental gas; a gas flow controller, connected to the gas storage container and the inlet of the core holder, respectively, for controlling the flow of the experimental gas injected into the core holder; A gas booster pump connected to the gas storage container, used to provide high-pressure experimental gas and deliver the high-pressure experimental gas to the gas storage container; An air compressor is connected to the gas booster pump to provide power for the gas booster pump.

2. The method for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in fracture-cavity reservoirs according to claim 1, characterized in that: A plurality of sampling time points are determined, and in each experimental process, the resistivity value of each measuring point at each sampling time point is obtained.

3. The method for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in fracture-cavity reservoirs according to claim 1, characterized in that: Also includes: The measuring points are numbered from small to large along the fluid injection direction.

4. The method for monitoring dynamic resistivity of fluid displacement front under high pressure conditions in fracture-cavity reservoirs according to claim 2, characterized in that: Use the following steps to draw a resistivity variation chart; A coordinate system is drawn with time as the horizontal axis and resistivity value as the vertical axis, the resistivity value of each measuring point is marked in the coordinate system, and for each measuring point, the marked points corresponding to the measuring point are connected in sequence to obtain a resistivity change chart.

5. The method for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in fracture-cavity reservoirs according to claim 3, characterized in that: The resistivity variation law of the position where the water drive front reaches is: i,j -ρ i,j-1 ≥a,ρ i,j is the resistivity value of the jth measurement point at the i-th sampling time point, ρ i,j-1 is the resistivity value of the j-1th measuring point at the i-th sampling time point, a is the first resistivity threshold, and the core position corresponding to the j-1th measuring point at the i-th sampling time point is the arrival position of the water drive front.

6. The method for monitoring dynamic resistivity of fluid displacement front under high pressure conditions in fracture-cavity reservoirs according to claim 3, characterized in that: The resistivity variation law of the gas drive front reaching the position is: h,k -ρ h,k+1 ≥b,ρ h,k is the resistivity value of the kth measurement point at the hth sampling time point, ρ h,k+1 is the resistivity value of the k+1th measuring point at the hth sampling time point, b is the second resistivity threshold, and at the hth sampling time point, the core position corresponding to the kth measuring point is the gas drive front arrival position.

7. The method for monitoring the dynamic resistivity of the fluid displacement front under high pressure conditions in a fracture-cavity reservoir according to claim 5 or 6, characterized in that: The following steps are used to obtain the length of the gas-water mixing zone: According to the resistivity variation law of the water drive front arrival position and the resistivity variation law of the gas drive front arrival position, based on the dynamic resistivity variation chart of the core gas-water co-injection process, the water drive front arrival position and the gas drive front arrival position at each sampling time point are obtained; Based on the water drive front arrival position and the gas drive front arrival position at each sampling time point, a sampling time point at which the water drive front arrival position and the gas drive front arrival position exist simultaneously is obtained as a gas-water separation time point; The length between the water drive front arrival position corresponding to the gas-water separation time point and the core fluid injection end is taken as the gas-water mixing zone length.

Citation Information

Patent Citations

  • Device and method for monitoring fluid flow in rock sample at high temperature and high pressure

    CN102175726A

  • Rock complex resistivity measuring device and system

    CN107748291A

  • Multifunctional long core radial multi-pair point dynamic monitoring displacement system

    CN108051643A

  • Resistivity measuring method, device and system

    CN108508274A

  • Downhole hydraulic pulsation nanometer decompression and augmented injection experimental apparatus and method

    CN109707354A