Electric meter data transmission system, method, device, equipment and medium
By establishing multiple data transmission channels and channel identifiers in the electric energy meter data transmission system, parallel communication is achieved, which solves the problem of low communication efficiency of electric energy meters and improves the execution efficiency and system efficiency of electric meter control instructions.
Patent Information
- Application Number
- CN202211145592.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-20
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-09-20
AI Technical Summary
In the server mode of the existing electric energy meter, the communication efficiency of the electric meter is low, which causes the data transmission process to wait until the execution of the current command is completed before the data transmission channel can be released, affecting efficiency.
By setting up multiple data transmission channels between the front-end data acquisition module and the network module in the server, parallel communication is achieved, allowing each channel to transmit meter control instructions and responses, and independently processing instructions and responses from different meters through channel identification.
It improves the execution efficiency of electric meter control instructions in the electric meter data transmission system, realizes parallel communication between the front-end data acquisition module and the electric energy meter, independently processes the instructions and responses of different electric meters, and avoids waiting and impact during the communication process.
Smart Images

Figure CN115515026B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of communication technology, and in particular to an electric meter data transmission system, method, device, equipment and medium. Background Art
[0002] As an electronic intelligent instrument for measuring electric energy, the electric energy meter has functions such as electric energy metering, real-time monitoring, automatic control, information interaction, and data processing. It is widely used in commercial real estate, municipal buildings, schools, hospitals, various industries, precision manufacturing, transportation infrastructure and other fields.
[0003] At present, domestic electric energy meters are mainly connected in client mode, while European electric energy meters are mainly connected in server mode. The server mode of the electric energy meter means that the front-end data acquisition module in the server actively connects to the server-end electric energy meter after generating a task, and disconnects after the communication with the electric energy meter is completed. In this mode, the electric energy meter can only communicate with the front-end data acquisition module in the server through a single data transmission channel. In this process, if the server generates other electric energy meter control instructions for the same electric energy meter, it needs to wait for the current electric energy meter control instruction to be executed and the data transmission channel to be released before it can be executed. The communication efficiency of the electric energy meter is low. Summary of the invention
[0004] The embodiments of the present application provide an electric meter data transmission system, method, device, equipment and medium to solve the problem of low communication efficiency of electric energy meters in the prior art.
[0005] The technical solutions provided by the embodiments of this application are as follows:
[0006] On the one hand, an embodiment of the present application provides an electric meter data transmission system, comprising at least one electric energy meter, at least one network module, and a server provided with a front-end data acquisition module; at least one electric energy meter is connected to at least one network module in a one-to-one correspondence, and at least one network module is communicatively connected to the front-end data acquisition module;
[0007] A front-end data acquisition module is used to receive each meter control instruction initiated for a target electric energy meter; for each meter control instruction, establish a data transmission channel between a network module connected to the target electric energy meter, and send the meter control data in the meter control instruction to the network module through the data transmission channel; and receive the meter control responses respectively returned by the electric energy meter forwarded by the network module based on each meter control request, and obtain the control result data of the target electric energy meter from each meter control response;
[0008] At least one network module is used to receive the meter control data in each meter control instruction of the target electric energy meter sent by the front-end data acquisition module; for each meter control data in the meter control instruction of the target electric energy meter, generate a channel identifier for a data transmission channel for transmitting the meter control data, and generate a meter control request based on the channel identifier and the meter control data, and send the meter control request to the connected electric energy meter; and receive the meter control responses returned by the connected electric energy meter based on each meter control request, and for each meter control response, send the meter control response to the front-end data acquisition module through the data transmission channel represented by the channel identifier in the meter control response;
[0009] At least one electric energy meter is used to receive each electric energy meter control request sent by the connected network module, execute the electric energy meter control operation for each electric energy meter control request according to the electric energy meter control data in the electric energy meter control request, and generate the electric energy meter control response based on the manipulation result data corresponding to the electric energy meter control operation and the channel identifier in the electric energy meter control request and send it to the connected network module.
[0010] On the other hand, an embodiment of the present application provides an electric meter data transmission method applied to a front-end data acquisition module disposed in a server in an electric meter data transmission system, comprising:
[0011] Receiving control instructions for each electric meter initiated for the target electric energy meter;
[0012] For each electric meter control instruction, a data transmission channel is established between a network module connected to a target electric energy meter, and the electric meter control data in the electric meter control instruction is sent to the network module through the data transmission channel, so that the network module generates a channel identifier for the data transmission channel used to transmit the electric meter control data for each electric meter control instruction of the target electric energy meter, generates an electric meter control request based on the channel identifier and the electric meter control data, and sends the electric meter control request to the connected electric energy meter;
[0013] The receiving network module returns a meter control response through a data transmission channel represented by a channel identifier in each meter control response based on each meter control request, wherein each meter control response in the meter control response is generated by the target electric energy meter performing a meter control operation according to the meter control data in the meter control request for each meter control request, and based on the manipulation result data corresponding to the meter control operation and the channel identifier in the meter control request;
[0014] The control result data of the target electric energy meter is obtained from the control response of each electric energy meter.
[0015] On the other hand, an embodiment of the present application provides an electric meter data transmission device for a front-end data acquisition module disposed in a server in an electric meter data transmission system, comprising:
[0016] An instruction receiving module, used for receiving each electric meter control instruction initiated for the target electric energy meter;
[0017] a data transmission module, for establishing a data transmission channel between a network module connected to a target electric energy meter for each electric energy meter control instruction, and sending the electric energy meter control data in the electric energy meter control instruction to the network module through the data transmission channel, so that the network module generates a channel identifier for the data transmission channel for transmitting the electric energy meter control data for each electric energy meter control instruction of the target electric energy meter, and generates an electric energy meter control request based on the channel identifier and the electric energy meter control data, and sends the electric energy meter control request to the connected electric energy meter;
[0018] a response receiving module, used for receiving the meter control response returned by the network module through the connected electric energy meter based on each electric energy meter control request through the data transmission channel represented by the channel identifier in each electric energy meter control response, wherein each electric energy meter control response is generated by the target electric energy meter performing the electric energy meter control operation according to the electric energy meter control data in the electric energy meter control request for each electric energy meter control request, and based on the manipulation result data corresponding to the electric energy meter control operation and the channel identifier in the electric energy meter control request;
[0019] The result determination module is used to obtain the control result data of the target electric energy meter from the control response of each electric energy meter.
[0020] On the other hand, an embodiment of the present application provides an electronic device, including: a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the electric meter data transmission method provided in the embodiment of the present application is implemented.
[0021] On the other hand, an embodiment of the present application further provides a computer-readable storage medium, which stores computer instructions. When the computer instructions are executed by a processor, the electric meter data transmission method provided in the embodiment of the present application is implemented.
[0022] The beneficial effects of the embodiments of the present application are as follows:
[0023] In the embodiment of the present application, a plurality of data transmission channels are established between the front-end data acquisition module and the network module, and the meter control data in each meter control instruction is transmitted to the network module through each data transmission channel, so that the network module generates each meter control request for each meter control data received and sends it to the electric energy meter, and receives the meter control response and returns it to the front-end data acquisition module through the corresponding data transmission channel, so as to realize parallel communication between the front-end data acquisition module and the electric energy meter, and improve the execution efficiency of the meter control instruction in the electric meter data transmission system. Moreover, after receiving the meter control data, the network module will generate a channel identifier for transmitting the meter control data. By adding the corresponding channel identifier to each meter control request and each meter control response transmitted between the network module and the electric energy meter, the network module can return the received multiple meter control responses according to the transmission channel represented by the channel identifier included in each meter control response, and realize parallel communication. At the same time, the meter control response can also correspond to the meter control instruction, so that the transmission process of different meter control instructions and meter control responses between the network module and the front-end data acquisition module is independent and does not affect each other.
[0024] Other features and advantages of the present application will be described in the subsequent description, and in part, will become apparent from the description, or will be understood by practicing the present application. The purpose and other advantages of the present application can be realized and obtained by the structures specifically pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0026] Figure 1 This is a schematic diagram of the framework of the electric meter data transmission system in the embodiment of the present application;
[0027] Figure 2 This is a schematic diagram of the overall framework of the electric meter data transmission method in the embodiment of the present application;
[0028] Figure 3 A schematic diagram of a flow chart of a method for establishing an electric meter model by a front-end data acquisition module in an embodiment of the present application;
[0029] Figure 4 A schematic diagram of a flow chart of a method for a front-end data acquisition module to acquire and analyze the operation data of an electric meter in an embodiment of the present application;
[0030] Figure 5 This is a functional structure diagram of the electric meter data transmission device in the embodiment of the present application;
[0031] Figure 6Schematic diagram of the hardware structure of the electronic device in the embodiment of the present application. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solution and beneficial effects of this application clearer, the technical solution in the embodiment of this application will be clearly and completely described below in conjunction with the drawings in the embodiment of this application. Obviously, the described embodiment is only a part of the embodiment of this application, not all the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0033] In order to facilitate those skilled in the art to better understand the present application, the technical terms involved in the present application are briefly introduced below.
[0034] The meter control instructions are control instructions generated by the server according to the settings of the user terminal, which may include meter data acquisition instructions, power-off instructions, meter parameter threshold setting instructions, meter clock reading instructions, meter clock setting instructions, meter upgrade instructions, etc.
[0035] The channel identifier is the identifier of the data transmission channel established between the network unit and the front-end data acquisition module set up in the server. It is the unique identification information representing the data transmission channel generated by the network unit when receiving the meter control data transmitted by the front-end data acquisition module through the data transmission channel.
[0036] The meter operation data refers to the data generated during the operation of the electricity meter. It can be specifically divided into periodic meter operation data and sporadic meter operation data. The periodic meter operation data can be the electricity quantity, current, voltage and other data recorded by the electricity meter reported according to the set period. The sporadic meter operation data refers to the data corresponding to sporadic events such as the opening of the electricity meter cover.
[0037] It should be noted that the terms "first", "second", etc. mentioned in this application are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that such terms can be interchangeable where appropriate, so that the embodiments described herein can be implemented in an order other than that illustrated or described herein.
[0038] After introducing the technical terms involved in the present application, the technical solutions provided by the embodiments of the present application are described in detail.
[0039] The present application embodiment provides an electric meter data transmission system, referring to Figure 1As shown, the electric meter data transmission system 100 provided in the embodiment of the present application includes: a server provided with a front-end data acquisition module 110, at least one network module 120, and at least one electric energy meter 130; at least one electric energy meter 130 is connected to at least one network module 120 in a one-to-one correspondence, and at least one network module 120 is communicatively connected to the front-end data acquisition module 110;
[0040] The front-end data acquisition module 110 is used to receive each meter control instruction initiated for the target electric energy meter 131; for each meter control instruction, establish a data transmission channel between the network module connected to the target electric energy meter, and send the meter control data in the meter control instruction to the network module through the data transmission channel; and receive the meter control response returned by the electric energy meter forwarded by the network module based on each meter control request, and obtain the control result data of the target electric energy meter from each meter control response;
[0041] At least one network module 120 is used to receive the meter control data in each meter control instruction of the target electric energy meter sent by the front-end data acquisition module 110; for each meter control data in the meter control instruction of the target electric energy meter, generate a channel identifier for a data transmission channel for transmitting the meter control data, and generate a meter control request based on the channel identifier and the meter control data, and send the meter control request to the connected electric energy meter; and receive the meter control response returned by the connected electric energy meter based on each meter control request, and for each meter control response, send the meter control response to the front-end data acquisition module 110 through the data transmission channel represented by the channel identifier in the meter control response;
[0042] At least one electric energy meter 130 is used to receive each electric energy meter control request sent by the connected network module 121, perform a meter control operation for each electric energy meter control request according to the electric energy meter control data in the electric energy meter control request, and generate a meter control response based on the control result data corresponding to the electric energy meter control operation and the channel identifier in the electric energy meter control request and send it to the connected network module 121.
[0043] In a possible implementation, the front-end data acquisition module 110 is specifically used to receive each meter control instruction initiated by the user terminal, add each meter control instruction to the instruction queue, and obtain each meter control instruction initiated for the target electricity meter 131 from the instruction queue according to the arrangement order of each meter control instruction in the instruction queue and the idle status of the thread pool of the electricity meter corresponding to each meter control instruction.
[0044] In a possible implementation, the front data acquisition module 110 is also used to determine the number of data transmission channels that can currently be established based on the number of data transmission channels currently established with at least one network module; when the number of data transmission channels that can currently be established is greater than the channel warning value, start establishing data transmission channels; when the number of data transmission channels that can currently be established is less than the channel warning value, stop establishing data transmission channels.
[0045] In a possible implementation, the front-end data acquisition module 110 is further configured to disconnect the data transmission channel with the network module after receiving the meter control responses respectively returned by the target electric energy meters based on the meter control requests forwarded by the network module.
[0046] In a possible implementation, at least one electric energy meter 130 is further used to determine network data of the electric energy meter, and send the network data and attribute data of the electric energy meter to the connected network module 121;
[0047] At least one network module 120 is further used to receive network data and attribute data of the electric energy meter sent by the connected electric energy meter, establish a data transmission channel with the front-end data acquisition module 110, and send the network data and attribute data of the electric energy meter to the front-end data acquisition module through the data transmission channel;
[0048] The front-end data acquisition module 110 is also used to receive the network data and attribute data of the electric energy meter sent by the network module, disconnect the transmission channel with the network module after receiving, and establish an electric meter model based on the network data and attribute data of the electric energy meter.
[0049] In a possible implementation, at least one electric energy meter 130 is further used to generate electric energy meter operation data and send it to the connected network module 121;
[0050] At least one network module 120 is further used to receive the meter operation data sent by the connected electric energy meter, establish a data transmission channel with the front data acquisition module 110, and send the meter operation data to the front data acquisition module through the data transmission channel;
[0051] The front-end data acquisition module 110 is also used to receive the meter operation data sent by the network module, disconnect the transmission channel with the network module after receiving the data, and analyze the meter operation data to obtain the operation analysis result.
[0052] After introducing the electric meter data transmission system 100 provided in the embodiment of the present application, the electric meter data transmission method provided in the embodiment of the present application and applied to the front-end data acquisition module 110 provided in the server in the electric meter data transmission system 100 is described in detail below in combination with the electric meter data transmission system 100 provided in the embodiment of the present application. Figure 2As shown, the general flow of the electric meter data transmission method provided in the embodiment of the present application and applied to the front-end data acquisition module 110 set in the server in the electric meter data transmission system 100 is as follows:
[0053] Step 201: receiving control instructions for each electric energy meter initiated for a target electric energy meter.
[0054] In actual applications, the server can generate multiple meter control instructions for a certain electric energy meter in the electric energy meter data transmission system 100, so that after the front-end data acquisition module 110 in the server receives each meter control instruction, it initiates a connection to the electric energy meter as the server as a client. Among them, the server can generate meter control instructions for one or more electric energy meters according to the preset time set by the user, or it can generate meter control instructions based on the execution time, execution object and execution operation in the meter control task sent to the server by the user through the user terminal. The meter control instructions generated by the server include but are not limited to: meter data acquisition instructions, power-off instructions, meter parameter threshold setting instructions, meter clock reading instructions, meter clock setting instructions, and meter upgrade instructions. After receiving each meter control instruction, the front-end data acquisition module 110 in the server can perform relevant processing operations on each meter control instruction to obtain each meter control instruction initiated for the target electric energy meter 131. Specifically, it can be adopted but not limited to the following methods:
[0055] Step 1: After receiving each meter control instruction initiated by the user terminal, each meter control instruction is added to the instruction queue.
[0056] In practical applications, after the front-end data acquisition module 110 set in the server receives each meter control instruction initiated by the user terminal, each meter control instruction can be added to the instruction queue. Among them, the instruction queue includes multiple instruction sub-queues, and the number of instruction sub-queues is the same as the number of electric energy meters in the meter data transmission system 100. Each instruction sub-queue stores the meter control instructions of the corresponding electric energy meter one by one. For example: if the meter data transmission system 100 includes two electric energy meters, the instruction queue in the meter data transmission system 100 includes three instruction sub-queues, among which instruction sub-queue 1 stores the meter control instructions of the first electric energy meter; instruction sub-queue 2 stores the meter control instructions of the second electric energy meter.
[0057] Step 2: According to the arrangement order of each meter control instruction in the instruction queue and the idle status of the thread pool of the electric energy meter corresponding to each meter control instruction, each meter control instruction initiated for the target electric energy meter 131 is obtained from the instruction queue.
[0058] In actual applications, the front-end data acquisition module 110 set in the server will initialize a thread pool for each electric energy meter in the electric energy meter data transmission system 100 after startup, and the size of each thread pool matches the processing capacity of the electric energy meter and the maximum number of channels that can be connected to the network module connected to the electric energy meter. The front-end data acquisition module 110 can poll multiple instruction sub-queues in the instruction queue in real time respectively. When there is an instruction sub-queue with a non-zero number of electric meter control instructions to be executed in multiple instruction sub-queues, the front-end data acquisition module 110 obtains the number of idle threads of the thread pool of the electric energy meter corresponding to the instruction sub-queue with a non-zero number of electric meter control instructions to be executed, and determines that the first number of electric meter control instructions initiated for the target electric energy meter 131 can be obtained in the instruction sub-queue of the electric energy meter according to the number of idle threads of the electric energy meter. If the number of meter control instructions in the instruction subqueue of the target electric energy meter 131 is greater than the first number, then the first number of meter control instructions are determined in the instruction subqueue of the target electric energy meter 131 as the meter control instructions initiated for the target electric energy meter 131 according to the arrangement order of the meter control instructions in the instruction subqueue and the priority of the instructions; if the number of meter control instructions in the instruction subqueue of the target electric energy meter 131 is less than or equal to the first number, then all the meter control instructions in the instruction subqueue of the target electric energy meter 131 are used as the meter control instructions initiated for the target electric energy meter 131. For example: the front data acquisition module 110 arranged in the server sets 10 threads for each electric energy meter in the electric energy meter data transmission system 100. Currently, there are 8 to-be-executed electric energy meter control instructions in the instruction subqueue of the first electric energy meter, and the number of idle threads of the first electric energy meter is 4. Then, the front data acquisition module 110 will select 4 to-be-executed electric energy meter control instructions with a higher order and a higher priority from the 8 to-be-executed electric energy meter control instructions as the electric energy meter control instructions initiated for the target electric energy meter 131; currently, there are 8 to-be-executed electric energy meter control instructions in the instruction subqueue of the second electric energy meter, and the number of idle threads of the second electric energy meter is 8. Then, the front data acquisition module 110 will use all the 8 to-be-executed electric energy meter control instructions as the electric energy meter control instructions initiated for the target electric energy meter 131.
[0059] Step 202: For each meter control instruction, a data transmission channel is established between a network module connected to a target electric energy meter, and the meter control data in the meter control instruction is sent to the network module through the data transmission channel, so that the network module generates a channel identifier for the data transmission channel used to transmit the meter control data for each meter control instruction of the target electric energy meter, and generates a meter control request based on the channel identifier and the meter control data, and sends the meter control request to the connected electric energy meter.
[0060] In actual applications, after receiving each meter control instruction initiated for the target electric energy meter 131, the front-end data acquisition module 110 set in the server will allocate idle threads from the thread pool of the target electric energy meter 131 to execute the meter control instruction, and each idle thread is used to execute one meter control instruction. In each thread, based on the meter control instruction executed by the thread, the front-end data acquisition module set in the server establishes a data transmission channel between the network module connected to the target electric energy meter, and sends the meter control data in the meter control instruction to the network module through the data transmission channel. After receiving each meter control data in each meter control instruction from multiple data transmission channels, the network module connected to the target electric energy meter 131 can generate a channel identifier for the data transmission channel for transmitting the meter control data for each transmission channel, and generate a meter control request based on the channel identifier of the data transmission channel and the meter control data transmitted by the data transmission channel, and send it to the connected electric energy meter. For example: the front-end data acquisition module 110 set in the server receives a total of two meter control instructions initiated for the target electric energy meter 131, wherein the first meter control instruction corresponds to the first idle thread, and the second meter control instruction corresponds to the second idle thread; in each thread, the front-end data acquisition module establishes a data transmission channel between the network module connected to the target electric energy meter, and sends the meter control data in the meter control instruction to the network module connected to the target electric energy meter. The network module first receives the first meter control data in the first meter control instruction through the data transmission channel, and sets the channel identifier of the data transmission channel for transmitting the first meter control data to channel A. Similarly, the network module sets the channel identifier of the data transmission channel for transmitting the second meter control data to channel B. The network module then generates a first meter control request based on the first meter control data and the channel identifier set to channel A and sends it to the connected electric energy meter, and generates a second meter control request based on the second meter control data and the channel identifier set to channel B and sends it to the connected electric energy meter. When the front-end data acquisition module 110 set in the server establishes a data transmission channel between the network module connected to the target electric energy meter for each electric meter control instruction, it can judge whether the data transmission channel can be established at present based on the current resource usage of the server. Specifically, the following steps can be adopted but not limited to:
[0061] Step 1: The front-end data acquisition module 110 disposed in the server determines the number of currently establishable data transmission channels based on the number of data transmission channels currently established with at least one network module.
[0062] In actual applications, the front data acquisition module 110 arranged in the server can establish data transmission channels with multiple network modules at the same time to realize parallel processing of meter control instructions for different electric energy meters. However, since the number of data transmission channels connected to the front data acquisition module 110 in the server is limited by the internal resources of the server, before establishing the data transmission channel, the front data acquisition module 110 can count the number of data transmission channels established with each network module, and determine the number of data transmission channels that can be currently established based on the current resource usage of the server.
[0063] Step 2: When the number of currently configurable data transmission channels is greater than the channel warning value, start to establish the data transmission channels; when the number of currently configurable data transmission channels is less than the channel warning value, stop establishing the data transmission channels;
[0064] In actual applications, when the front data acquisition module 110 establishes a data transmission channel, if the number of data transmission channels that can be built is greater than the channel warning value, the front data acquisition module 110 can start to establish the data transmission channel; if the number of data transmission channels that can be built is less than the channel warning value, the front data acquisition module 110 stops establishing the data transmission channel, and when there is a data transmission channel disconnection so that the number of data transmission channels that can be built is greater than the channel warning value, it starts to establish the data transmission channel.
[0065] Step 203: receiving a meter control response returned by the network module through the connected electric energy meter based on each meter control request through the data transmission channel represented by the channel identifier in each meter control response, wherein each meter control response in the meter control response is generated by the target electric energy meter for each meter control request, performing a meter control operation according to the meter control data in the meter control request, and based on the control result data corresponding to the meter control operation and the channel identifier in the meter control request.
[0066] In actual applications, after receiving each meter control request sent by the network module, the energy meter performs a meter control operation according to the meter control data in the meter control request for each meter control request. After the operation is completed, the energy meter generates a meter control response according to the manipulation result data corresponding to the meter control operation and the channel identifier in the meter control request and sends it to the connected network module 121. After receiving each meter control response returned by the energy meter, the network module sends the meter control response to the front-end data acquisition module 110 through the data transmission channel represented by the channel identifier in the meter control response for each meter control response. For example: after receiving the first meter control request, the energy meter can perform the corresponding meter control operation according to the first meter control data in the first meter control request. Similarly, after receiving the second meter control request, the energy meter can perform the corresponding meter control operation according to the second meter control data therein. After the meter control operation corresponding to the first meter control data is completed, the electric energy meter can generate a first meter control response based on the obtained first manipulation result data and the channel identifier set as channel A in the first meter control request and send it to the connected network module 121. Similarly, after the meter control operation corresponding to the second meter control data is completed, a second meter control response including the second manipulation result data and the channel identifier set as channel B can be generated and sent to the connected network module 121. Among them, the first meter control request and the second meter control request are sent to the connected electric energy meter by the network module in the order of receiving, but the order in which the electric energy meter returns the first meter control response and the second meter control response is determined according to the execution of the instructions of the electric energy meter.
[0067] In specific implementation, a full-duplex bus, such as an RS-422 bus, can be used between the network module and the electric energy meter connected to the network module, so as to realize simultaneous information transmission in two directions between the network module and the electric energy meter connected to the network module, thereby avoiding the problem of bus level disorder caused by the inability to ensure the time isolation of transmission and reception in the communication between the electric energy meter and the network module.
[0068] Step 204: Acquire the control result data of the target electric energy meter from the control response of each electric energy meter.
[0069] In practical applications, the front-end data acquisition module 110 set in the server can determine the control result data of the target electric energy meter after receiving the control response of each electric meter. The control result data of the target electric energy meter is related to the electric meter control instruction generated by the server. When the electric meter control instruction generated by the server is an operation-type instruction such as a power-off instruction, an electric meter upgrade instruction, an electric meter parameter threshold setting instruction, and an electric meter clock setting instruction, the control result data of the target electric energy meter in the electric meter control response corresponding to the instruction is an operation success or an operation failure; when the electric meter control instruction generated by the server is a data acquisition instruction such as an electric meter data acquisition instruction and an electric meter clock reading instruction, the control result data of the target electric energy meter in the electric meter control response corresponding to the instruction is the corresponding data. After the front-end data acquisition module 110 obtains the control result data of the target electric energy meter, the server can save the control result data of the target electric energy meter so that the user terminal polls to obtain the control result data. The server can also save the control result data of the target electric energy meter and return it directly to the user terminal after the front-end data acquisition module 110 obtains the control result data of the target electric energy meter.
[0070] In the process of the front-end data acquisition module 110 initiating a connection to the electric energy meter as the server as a client and performing communication, a plurality of data transmission channels are established between the front-end data acquisition module 110 and the network module, and the electric energy meter control data in each electric energy meter control instruction is transmitted to the network module through each data transmission channel, and each electric energy meter control response received by the network module from the connected electric energy meter and returned according to the corresponding channel can be received, so that the parallel communication between the front-end data acquisition module 110 and the electric energy meter can be realized, and the execution efficiency of the electric energy meter control instruction can be improved. Moreover, after receiving the electric energy meter control data, the network module will generate a channel identifier for transmitting the electric energy meter control data. By adding the corresponding channel identifier to each electric energy meter control request and each electric energy meter control response transmitted between the network module and the electric energy meter, the network module can return the received multiple electric energy meter control responses according to the transmission channel represented by the channel identifier included in each electric energy meter control response, and can correspond the electric energy meter control response to the electric energy meter control instruction, so that the transmission process of different electric energy meter control instructions and electric energy meter control responses between the network module and the front-end data acquisition module 110 is independent and does not affect each other. Furthermore, after the front-end data acquisition module 110 disposed in the server receives the meter control responses respectively returned by the target electric energy meters forwarded by the network module based on the meter control requests, the data transmission channel with the network module can be disconnected.
[0071] In actual applications, multiple data transmission channels can be connected simultaneously between the front-end data acquisition module 110 set in the server and the network module. For each transmission channel, when the front-end data acquisition module 110 set in the server receives the meter control response corresponding to the meter control request transmitted by the transmission channel, the transmission channel will be disconnected.
[0072] In an optional implementation of this embodiment, the electric energy meter in the electric energy meter data transmission system 100 needs to initiate a connection with the front-end data acquisition module 110 as a server as a client to complete the establishment of an electric energy meter model in the front-end data acquisition module 110 of the server. Figure 3 As shown, the front-end data acquisition module 110 establishes an electric meter model, specifically, it can adopt but not limited to the following methods:
[0073] Step 301: The front-end data acquisition module set in the server receives the network data and attribute data of the electric energy meter sent by the network module, and disconnects the data transmission channel with the network module after receiving. The network data and attribute data of the electric energy meter are determined by the electric energy meter and sent to the network module, and the network module establishes a data transmission channel with the front-end data acquisition module, and sends the network data and attribute data of the electric energy meter to the front-end data acquisition module through the data transmission channel.
[0074] In practical applications, a SIM card can be inserted into the electric energy meter. The inserted SIM card can determine the network data of the electric energy meter. The electric energy meter can act as a server to obtain the network data corresponding to the SIM card, and after obtaining the network data, it can initiate a connection with the front-end data acquisition module 110 as a server as a client. The electric energy meter can send the network data and the attribute data stored in the memory of the electric energy meter to the network module, and the network module establishes a data transmission channel with the front-end data acquisition module 110, and sends the network data of the electric energy meter and the attribute data stored in the memory of the electric energy meter to the front-end data acquisition module 110 set in the server through the data transmission channel.
[0075] Step 302: The front-end data acquisition module 110 disposed in the server establishes an electric meter model based on the network data and attribute data of the electric energy meter.
[0076] The front-end data acquisition module 110 arranged in the server can receive the network data and attribute data of the electric energy meter sent by the network module through the data transmission channel, establish an electric energy meter model according to the network data and attribute data of the electric energy meter and the electric energy meter setting information sent by the user terminal, and bind the correspondence between the electric energy meter and the data transmission channel that sends the network data and attribute data of the electric energy meter.
[0077] In an optional implementation of this embodiment, the electric energy meter in the electric energy meter data transmission system 100 needs to initiate a connection with the front-end data acquisition module 110 as a server as a client, so that the front-end data acquisition module 110 of the server can analyze the electric energy meter operation data reported by the electric energy meter. Figure 4 As shown, the front-end data acquisition module 110 acquires and analyzes the meter operation data, specifically, it can adopt but not limited to the following methods:
[0078] Step 401: The front-end data acquisition module set in the server receives the meter operation data sent by the network module, and disconnects the data transmission channel with the network module after receiving the data. The meter operation data is determined by the electric energy meter and sent to the network module, and the network module establishes a data transmission channel with the front-end data acquisition module, and sends the network data and attribute data of the electric energy meter to the front-end data acquisition module through the data transmission channel.
[0079] In actual applications, during operation, the electric energy meter can initiate a connection with the front-end data acquisition module 110 as a server as a client, so as to send the electric energy meter operation data to the front-end data acquisition module 110 set in the server through the network module, wherein the electric energy meter operation data is mainly divided into periodic electric energy meter operation data and sporadic electric energy meter operation data, and the periodic electric energy meter operation data can generally be the electric energy meter record data such as electricity, current, voltage and other data reported according to the set period, and the sporadic electric energy meter operation data refers to the data corresponding to the sporadic events such as the opening of the electric energy meter cover. After the electric energy meter determines the electric energy meter operation data to be sent at present, it sends the electric energy meter operation data to the network module, and after receiving the electric energy meter operation data, the network module establishes a data transmission channel with the front-end data acquisition module 110 set in the server, and sends the electric energy meter operation data to the front-end data acquisition module 110 set in the server through the data transmission channel.
[0080] Step 402: The front-end data acquisition module disposed in the server analyzes the operation data of the electric meter to obtain an operation analysis result.
[0081] In actual applications, after the front-end data acquisition module 110 arranged in the server receives the meter operation data, it will parse the meter operation data. If the meter operation data is periodic meter operation data, the front-end data acquisition module will save the parsing results to the server so that the operation and maintenance personnel can access the server or the user can view the periodic meter operation data through the user terminal; if the meter operation data is sporadic meter operation data, the front-end data acquisition module 110 will issue a prompt or alarm based on the parsing results of the sporadic meter operation data, so that the operation and maintenance personnel can immediately understand the sporadic events currently occurring in the electric energy meter and take corresponding measures.
[0082] When the electric energy meter acts as a client to initiate a connection with the front data acquisition module 110 as a server and communicates, after the electric energy meter sends the data to the network module, a data transmission channel with the front data acquisition module 110 is established through the network module to send the data to the front data acquisition module 110. The front data acquisition module 110 disconnects the transmission channel with the network module after receiving the data. This process does not require the use of a long connection to connect to the front data acquisition module 110 set in the server and maintain the link through a heartbeat like a traditional electric energy meter. Instead, when there is data to be sent, a data transmission channel is established through the network module to send the data to the front data acquisition module 110. The front data acquisition module 110 can disconnect the data transmission channel after receiving the data, effectively reducing the occupancy of network resources.
[0083] Based on the above embodiments, the present application provides an electric meter data transmission device, referring to Figure 5 As shown, the electric meter data transmission device 500 provided in the embodiment of the present application at least includes:
[0084] The instruction receiving module 501 is used to receive the electric meter control instructions initiated for the target electric energy meter;
[0085] The data transmission module 502 is used to establish a data transmission channel between a network module connected to a target electric energy meter for each electric energy meter control instruction, and send the electric energy meter control data in the electric energy meter control instruction to the network module through the data transmission channel, so that the network module generates a channel identifier for the data transmission channel for transmitting the electric energy meter control data for each electric energy meter control instruction of the target electric energy meter, and generates an electric energy meter control request based on the channel identifier and the electric energy meter control data, and sends the electric energy meter control request to the connected electric energy meter;
[0086] A response receiving module 503 is used to receive a meter control response returned by the network module through the connected electric energy meter based on each electric energy meter control request through the data transmission channel represented by the channel identifier in each electric energy meter control response, wherein each electric energy meter control response is generated by the target electric energy meter performing a meter control operation according to the electric energy meter control data in the electric energy meter control request for each electric energy meter control request, and based on the manipulation result data corresponding to the electric energy meter control operation and the channel identifier in the electric energy meter control request;
[0087] The result determination module 504 is used to obtain the control result data of the target electric energy meter from the control response of each electric energy meter.
[0088] In a possible implementation manner, after receiving each meter control instruction initiated by the user terminal, the instruction receiving module 501 is specifically used to:
[0089] After receiving each meter control command initiated by the user terminal, each meter control command is added to the command queue;
[0090] According to the arrangement order of each meter control instruction in the instruction queue and the idle status of the thread pool of the electric energy meter corresponding to each meter control instruction, each meter control instruction initiated for the target electric energy meter is obtained from the instruction queue.
[0091] In a possible implementation manner, the electric meter data transmission device 500 provided in this embodiment further includes:
[0092] The channel quantity judgment module 505 is used to determine the number of data transmission channels that can be currently established based on the number of data transmission channels currently established with at least one network module; when the number of data transmission channels that can currently be established is greater than the channel warning value, start to establish data transmission channels; when the number of data transmission channels that can currently be established is less than the channel warning value, stop establishing data transmission channels.
[0093] In a possible implementation manner, the electric meter data transmission device 500 provided in this embodiment further includes:
[0094] The channel control module 506 is used to disconnect the data transmission channel with the network module after receiving the meter control responses respectively returned by the target electric energy meters forwarded by the network module based on the meter control requests.
[0095] In a possible implementation manner, the electric meter data transmission device 500 provided in this embodiment further includes:
[0096] The first data receiving module 507 is used to receive the network data and attribute data of the electric energy meter sent by the network module, and disconnect the transmission channel with the network module after receiving. The network data and attribute data of the electric energy meter are determined by the electric energy meter and sent to the network module, and the network module establishes a data transmission channel with the front-end data acquisition module, and sends the network data and attribute data of the electric energy meter to the front-end data acquisition module through the data transmission channel;
[0097] The model building module 508 is used to build an electric meter model based on the network data and attribute data of the electric energy meter.
[0098] In a possible implementation manner, the electric meter data transmission device 500 provided in this embodiment further includes:
[0099] The second data receiving module 509 is used to receive the meter operation data sent by the network module, and disconnect the transmission channel with the network module after receiving the data. The meter operation data is determined by the electric energy meter and sent to the network module, and the network module establishes a data transmission channel with the front-end data acquisition module, and sends the network data and attribute data of the electric energy meter to the front-end data acquisition module through the data transmission channel;
[0100] The data analysis module 510 is used to analyze the operation data of the electric meter to obtain the operation analysis result.
[0101] It should be noted that the principle of solving the technical problem of the electric meter data transmission device 500 provided in the embodiment of the present application and applied to the front data acquisition module 110 set in the server in the electric meter data transmission system 100 is similar to the electric meter data transmission method provided in the embodiment of the present application and applied to the front data acquisition module 110 set in the server in the electric meter data transmission system 100. Therefore, the implementation of the electric meter data transmission device 500 provided in the embodiment of the present application and applied to the front data acquisition module 110 set in the server in the electric meter data transmission system 100 can refer to the implementation of the electric meter data transmission method provided in the embodiment of the present application and applied to the front data acquisition module 110 set in the server in the electric meter data transmission system 100, and the repeated parts will not be repeated.
[0102] After introducing the electric meter data transmission method and device provided in the embodiment of the present application and applied to the front data acquisition module 110 set in the server in the electric meter data transmission system 100, the electronic device provided in the embodiment of the present application is briefly introduced next.
[0103] See also Figure 6 As shown, the electronic device 600 provided in the embodiment of the present application includes at least: a processor 601, a memory 602, and a computer program stored in the memory 602 and executable on the processor 601. When the processor 601 executes the computer program, the electric meter data transmission method provided in the embodiment of the present application for the front data acquisition module 110 set in the server in the electric meter data transmission system 100 is implemented.
[0104] It should be noted that Figure 6 The electronic device 600 shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0105] The electronic device 600 provided in the embodiment of the present application may further include a bus 603 connecting different components (including the processor 601 and the memory 602). The bus 603 represents one or more of several types of bus structures, including a memory bus, a peripheral bus, a local bus, and the like.
[0106] The memory 602 may include a readable medium in the form of a volatile memory, such as a random access memory (RAM) 6021 and / or a cache memory 6022 , and may further include a read-only memory (ROM) 6023 .
[0107] The memory 602 may also include a program tool 6025 having a set (at least one) of program modules 6024, including but not limited to: an operating subsystem, one or more applications, other program modules and program data, each of which or some combination may include the implementation of a network environment.
[0108] The electronic device 600 may also communicate with one or more external devices 604 (e.g., keyboards, remote controls, etc.), and may also communicate with one or more devices that enable a user to interact with the electronic device 600 (e.g., mobile phones, computers, etc.), and / or communicate with any device that enables the electronic device 600 to communicate with one or more other electronic devices 600 (e.g., routers, modems, etc.). Such communication may be performed through an input / output (I / O) interface 605. Furthermore, the electronic device 600 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) through a network adapter 606. Figure 6 As shown, the network adapter 606 communicates with other modules of the electronic device 600 via the bus 603. It should be understood that although Figure 6 Not shown, other hardware and / or software modules may be used in conjunction with the electronic device 600, including but not limited to: microcode, device drivers, redundant processors, external disk drive arrays, disk arrays (Redundant Arrays of Independent Disks, RAID) subsystems, tape drives, and data backup storage subsystems.
[0109] The computer-readable storage medium provided in the embodiment of the present application is introduced below. The computer-readable storage medium provided in the embodiment of the present application stores computer instructions, and when the computer instructions are executed by the processor, the electric meter data transmission method provided in the embodiment of the present application for the front data acquisition module 110 provided in the server in the electric meter data transmission system 100 is implemented. Specifically, the computer instructions can be built-in or installed in the electronic device 600, so that the electronic device 600 can implement the electric meter data transmission method provided in the embodiment of the present application for the front data acquisition module 110 provided in the server in the electric meter data transmission system 100 by executing the built-in or installed computer instructions.
[0110] In addition, the electric meter data transmission method provided in the embodiment of the present application and applied to the front data acquisition module 110 set in the server in the electric meter data transmission system 100 can also be implemented as a program product, which includes a program code. When the program product can be run on the electronic device 600, the program code is used to enable the electronic device 600 to execute the electric meter data transmission method provided in the embodiment of the present application and applied to the front data acquisition module 110 set in the server in the electric meter data transmission system 100.
[0111] The program product provided in the embodiments of the present application may adopt any combination of one or more readable media, wherein the readable medium may be a readable signal medium or a readable storage medium, and the readable storage medium may be but is not limited to an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus or device, or any combination of the above. Specifically, more specific examples of readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable disk, a hard disk, RAM, ROM, Erasable Programmable Read Only Memory (EPROM), optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0112] The program product provided in the embodiment of the present application may adopt a CD-ROM and include program code, and may also be run on a computing device. However, the program product provided in the embodiment of the present application is not limited thereto. In the embodiment of the present application, the readable storage medium may be any tangible medium containing or storing a program, and the program may be used by or in combination with an instruction execution system, apparatus, or device.
[0113] It should be noted that, although several units or subunits of the device are mentioned in the above detailed description, this division is merely exemplary and not mandatory. In fact, according to the embodiments of the present application, the features and functions of two or more units described above can be embodied in one unit. Conversely, the features and functions of one unit described above can be further divided into multiple units to be embodied.
[0114] In addition, although the operations of the method of the present application are described in a specific order in the drawings, this does not require or imply that the operations must be performed in this specific order, or that all the operations shown must be performed to achieve the desired results. Additionally or alternatively, some steps may be omitted, multiple steps may be combined into one step, and / or one step may be decomposed into multiple steps.
[0115] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0116] Obviously, those skilled in the art can make various changes and modifications to the embodiments of the present application without departing from the spirit and scope of the embodiments of the present application. Thus, if these modifications and variations of the embodiments of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. An electric meter data transmission system, characterized in that: The system comprises a server provided with a front-end data acquisition module, at least one network module, and at least one electric energy meter; the at least one electric energy meter is connected to the at least one network module in a one-to-one correspondence, and the at least one network module is connected to the front-end data acquisition module in a communication manner; The front-end data acquisition module is used to receive each meter control instruction initiated for the target electric energy meter; for each meter control instruction, establish a data transmission channel between the network module connected to the target electric energy meter, and send the meter control data in the meter control instruction to the network module through the data transmission channel; and receiving the meter control responses respectively returned by the electric energy meter based on each meter control request forwarded by the network module, and obtaining the control result data of the target electric energy meter from each meter control response; and also used to receive the network data and attribute data of the electric energy meter sent by the network module, disconnect the data transmission channel with the network module after receiving, and establish an electric meter model based on the network data and attribute data of the electric energy meter; At least one of the network modules is used to receive the meter control data in each meter control instruction of the target electric energy meter sent by the front-end data acquisition module; for the meter control data in each meter control instruction of the target electric energy meter, generate a channel identifier for a data transmission channel used to transmit the meter control data, generate a meter control request based on the channel identifier and the meter control data, and send the meter control request to the connected electric energy meter; and receiving meter control responses respectively returned by the connected electric energy meters based on each meter control request, and for each meter control response, sending the meter control response to the front-end data acquisition module through a data transmission channel represented by a channel identifier in the meter control response; It is also used to receive the network data and attribute data of the electric energy meter sent by the connected electric energy meter, establish a data transmission channel with the front-end data acquisition module, and send the network data and attribute data of the electric energy meter to the front-end data acquisition module through the data transmission channel; at least one of the electric energy meters is used to receive each electric energy meter control request sent by the connected network module, for each electric energy meter control request, perform an electric energy meter control operation according to the electric energy meter control data in the electric energy meter control request, and generate an electric energy meter control response based on the manipulation result data corresponding to the electric energy meter control operation and the channel identifier in the electric energy meter control request and send the response to the connected network module; It is also used to determine the network data of the electric energy meter, and send the network data and attribute data of the electric energy meter to the connected network module.
2. The electric meter data transmission system according to claim 1, characterized in that: The front-end data acquisition module is specifically used to receive each meter control instruction initiated by the user terminal, add each meter control instruction to the instruction queue, and obtain each meter control instruction initiated for the target electric energy meter from the instruction queue according to the arrangement order of each meter control instruction in the instruction queue and the idle status of the thread pool of the electric energy meter corresponding to each meter control instruction.
3. The electric meter data transmission system according to claim 1, characterized in that: The front-end data acquisition module is further used to determine the number of currently establishable data transmission channels based on the number of data transmission channels currently established with at least one of the network modules; when the number of currently establishable data transmission channels is greater than the channel warning value, start to establish the data transmission channels; When the number of the currently establishable data transmission channels is less than the channel warning value, the establishment of the data transmission channels is stopped.
4. The electric meter data transmission system according to claim 1, characterized in that: The front-end data acquisition module is further used to disconnect the data transmission channel with the network module after receiving the meter control responses respectively returned by the target electric energy meters based on the meter control requests forwarded by the network module.
5. The electric meter data transmission system according to claim 1, characterized in that: At least one of the electric energy meters is further used to generate electric energy meter operation data and send it to a connected network module; At least one of the network modules is further used to receive the meter operation data sent by the connected electric energy meter, establish a data transmission channel with the front-end data acquisition module, and send the meter operation data to the front-end data acquisition module through the data transmission channel; The front-end data acquisition module is also used to receive the meter operation data sent by the network module, disconnect the data transmission channel with the network module after receiving the data, and analyze the meter operation data to obtain the operation analysis result.
6. A method for transmitting electric meter data, characterized in that: Applied to a front-end data acquisition module provided in a server in the electric meter data transmission system according to any one of claims 1 to 5, the electric meter data transmission method comprises: Receiving control instructions for each electric meter initiated for the target electric energy meter; For each electric meter control instruction, a data transmission channel is established between a network module connected to the target electric energy meter, and the electric meter control data in the electric meter control instruction is sent to the network module through the data transmission channel, so that the network module generates a channel identifier for the data transmission channel used to transmit the electric meter control data for each electric meter control instruction of the target electric energy meter, generates an electric meter control request based on the channel identifier and the electric meter control data, and sends the electric meter control request to the connected electric energy meter; Receiving the meter control response returned by the network module through the connected electric energy meter based on each electric energy meter control request through the data transmission channel represented by the channel identifier in each electric energy meter control response, wherein each electric energy meter control response is generated by the target electric energy meter performing a meter control operation according to the electric energy meter control data in the electric energy meter control request for each electric energy meter control request, and based on the manipulation result data corresponding to the electric energy meter control operation and the channel identifier in the electric energy meter control request; Acquire the control result data of the target electric energy meter from the control response of each electric energy meter; The electric meter data transmission method further includes: Receive the network data and attribute data of the electric energy meter sent by the network module, and disconnect the data transmission channel with the network module after receiving; wherein the network data and attribute data of the electric energy meter are determined by the electric energy meter and sent to the network module, the network module establishes a data transmission channel with the front-end data acquisition module, and sends the network data and attribute data of the electric energy meter to the front-end data acquisition module through the data transmission channel; An electric energy meter model is established based on the network data and attribute data of the electric energy meter.
7. An electric meter data transmission device, characterized in that: The pre-data acquisition module provided in the server in the electric meter data transmission system according to any one of claims 1 to 5 is applied, and the electric meter data transmission device comprises: An instruction receiving module, used for receiving each electric meter control instruction initiated for the target electric energy meter; a data transmission module, for establishing, for each electric meter control instruction, a data transmission channel between a network module connected to the target electric energy meter, and sending the electric meter control data in the electric meter control instruction to the network module through the data transmission channel, so that the network module generates, for each electric meter control data in the electric meter control instruction of the target electric energy meter, a channel identifier for the data transmission channel used to transmit the electric meter control data, generates an electric meter control request based on the channel identifier and the electric meter control data, and sends the electric meter control request to the connected electric energy meter; a response receiving module, used for receiving the meter control response returned by the network module through the connected electric energy meter based on each electric energy meter control request through the data transmission channel represented by the channel identifier in each electric energy meter control response, wherein each electric energy meter control response is generated by the target electric energy meter performing a meter control operation according to the electric energy meter control data in the electric energy meter control request for each electric energy meter control request, and based on the manipulation result data corresponding to the electric energy meter control operation and the channel identifier in the electric energy meter control request; A result determination module, used for obtaining the control result data of the target electric energy meter from the control response of each electric energy meter; A first data receiving module is used to receive the network data and attribute data of the electric energy meter sent by the network module, and disconnect the transmission channel with the network module after receiving the network data and attribute data of the electric energy meter; wherein the network data and attribute data of the electric energy meter are determined by the electric energy meter and sent to the network module, and the network module establishes a data transmission channel with the front-end data acquisition module, and sends the network data and attribute data of the electric energy meter to the front-end data acquisition module through the data transmission channel; The model building module is used to build an electric meter model based on the network data and attribute data of the electric energy meter.
8. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the electric meter data transmission method as claimed in claim 6 when executing the computer program.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and when the computer instructions are executed by a processor, the electric meter data transmission method according to claim 6 is implemented.
Citation Information
Patent Citations
Electric energy meter data transmission method and device based on message queue telemetering transmission protocol
CN113596625A
System and method for intelligent automated remote management of electromechanical devices
US20100083356A1