Substation equipment settlement monitoring method, device, equipment and storage medium

The soil settlement model is established through a multi-physics simulation model, which solves the problems of high cost and low accuracy in substation equipment foundation settlement monitoring, achieves efficient and accurate settlement monitoring, and reduces monitoring costs and operation and maintenance work.

CN115540816BActive Publication Date: 2024-10-29GUANGDONG POWER GRID CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202211250617.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-12
Publication Date
2024-10-29
Estimated Expiration
2042-10-12

AI Technical Summary

Technical Problem

The cost of foundation settlement monitoring of substation equipment is high and the accuracy of monitoring results is low, especially in the case of large equipment and uneven settlement. The existing technology requires the installation of multiple monitoring points and the need to predict the settlement distribution in advance, resulting in a cumbersome and uncertain monitoring process. sex.

Method used

Using a multi-physics simulation model, by acquiring equipment and soil parameters, a soil settlement model is established, and groundwater level data is used for settlement monitoring, which reduces the need for multiple monitoring points, avoids complex predictive operations, and improves the accuracy of monitoring results. .

Benefits of technology

It reduces monitoring costs and operation and maintenance work, improves the accuracy of monitoring results, and can quickly obtain settlement data of substation equipment without predicting uneven settlement distribution in advance, simplifying the monitoring process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115540816B_ABST
    Figure CN115540816B_ABST
Patent Text Reader

Abstract

The present application discloses a settlement monitoring method, device, equipment and storage medium for substation equipment. By acquiring equipment parameters of the substation equipment and soil parameters of the area where the substation equipment is located, a multi-physical field simulation model is used to analyze soil settlement data of the substation equipment at multiple groundwater level data according to the equipment parameters and soil parameters, and a basic settlement model is obtained. The basic settlement model has a mapping relationship between soil settlement data and groundwater level data. The basic settlement model is used to monitor the settlement of the substation equipment according to the actual groundwater level data of the area where the substation is located, and the settlement data of the substation equipment is obtained. The uncertainty factors caused by complex operations are effectively avoided to ensure the accuracy of the monitoring results; and only one set of groundwater level monitoring equipment is needed to obtain groundwater level changes, so that settlement data can be quickly obtained, without the need to install multiple monitoring points, which greatly reduces the monitoring cost and monitoring operation and maintenance work.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of equipment safety monitoring, and in particular to a method, device, equipment and storage medium for monitoring the subsidence of substation equipment. Background Art

[0002] The foundation stability of substation equipment is crucial to the safe operation of the substation. Due to reasons such as groundwater loss, the foundation settlement of substation equipment occurs, so it is necessary to monitor the foundation settlement of substation equipment.

[0003] At present, the foundation settlement monitoring of substation equipment is usually carried out with monitoring devices such as level or Beidou. By installing monitoring devices such as level or Beidou at multiple monitoring points of the substation, the data collected by the monitoring devices are analyzed to determine whether the substation equipment has foundation settlement. However, the current technology requires the installation of a set of monitoring devices for each substation equipment, resulting in very high installation and operation and maintenance costs. In addition, for large substation equipment with uneven settlement, multiple monitoring points need to be installed, and the distribution of uneven settlement needs to be predicted in advance, which makes the entire monitoring process cumbersome and increases uncertain factors, affecting the accuracy of the monitoring results. Summary of the invention

[0004] The present application provides a settlement monitoring method, device, equipment and storage medium for substation equipment to solve the technical problems of high cost and low accuracy of monitoring results in the foundation settlement monitoring method of substation equipment.

[0005] In order to solve the above technical problems, in a first aspect, the present application provides a settlement monitoring method for substation equipment, comprising:

[0006] Obtain equipment parameters of substation equipment and soil parameters of the area where the substation equipment is located;

[0007] Using a multi-physics field simulation model, according to equipment parameters and soil parameters, the soil settlement data of the substation equipment at multiple groundwater level data are analyzed to obtain a foundation settlement model, which has a mapping relationship between soil settlement data and groundwater level data;

[0008] Using the foundation settlement model and according to the actual groundwater level data of the substation area, the settlement of the substation equipment is monitored to obtain the settlement data of the substation equipment.

[0009] In some implementations, a multi-physics field simulation model is used to analyze soil settlement data of substation equipment at multiple groundwater level data according to equipment parameters and soil parameters to obtain a basic settlement model, including:

[0010] Based on the equipment parameters and the soil parameters, the model parameters of the multi-physics field simulation model are configured to obtain the target multi-physics field simulation model, wherein the multi-physics field simulation model includes a groundwater flow physics field and a solid mechanics physics field, wherein the groundwater flow physics field is used to simulate the flow of water in saturated soil, and the solid mechanics physics field is used to simulate soil deformation;

[0011] The steady-state solver is used to solve the soil settlement data of the target multi-physics field simulation model under the action of multiple groundwater level data to obtain the basic settlement model.

[0012] In some implementations, configuring model parameters of a multi-physics simulation model based on equipment parameters and soil parameters to obtain a target multi-physics simulation model includes:

[0013] Based on the equipment parameters and the soil parameters, the first calculation domain parameters of the groundwater flow physical field are configured, the first calculation domain includes the first boundary parameters, the first external load parameters and the first medium parameters, and the first medium parameters are unsaturated porous media;

[0014] Based on the equipment parameters and the soil parameters, the second calculation domain parameters of the solid mechanics physical field are configured, the second calculation domain includes second boundary parameters, second external load parameters and second medium parameters, and the first medium parameters are linear elastic materials.

[0015] In some implementations, a steady-state solver is used to solve soil settlement data of a target multi-physics simulation model under the action of multiple groundwater level data to obtain a basic settlement model, including:

[0016] The groundwater level data is represented by pressure head. The pressure head boundary of the groundwater flow physical field starts from a preset pressure head and increases to the target pressure head by a preset increment. The steady-state solver is used to solve the soil settlement data of the target multi-physics field simulation model at each increase in pressure head to obtain the basic settlement model.

[0017] In some implementations, the groundwater flow physics is:

[0018]

[0019] Among them, ρ is the density of water, p is the pressure, C m is the soil water capacity, S e is the effective saturation of soil, S p is the soil water storage coefficient, κ r is the water pressure permeability of soil under saturated state, κ s is the relative permeability of soil, μ is the dynamic viscosity of water, g is the acceleration of gravity, D is the depth of groundwater, Q m For water source.

[0020] In some implementations, the solid mechanics physics fields are:

[0021]

[0022] Among them, F y is the yield surface, P and q are the stress variables of the soil, M is the slope of the critical state line of the soil, and p cs is the consolidation pressure of the soil under the current suction, p s is the tensile strength of the soil under the current suction, b is the smoothness coefficient, s y is the yield strength of the soil under the current suction, p ref is the reference pressure.

[0023] In some implementations, the basic settlement model is used to monitor the settlement of the substation equipment according to the actual groundwater level data of the area where the substation is located, and the settlement data of the substation equipment is obtained, including:

[0024] Obtain the actual groundwater level data of the area where the substation is located monitored by the groundwater level monitoring equipment;

[0025] The actual groundwater level data is input into the basic settlement model, and the settlement data corresponding to the actual groundwater level data is determined according to the mapping relationship in the basic settlement model.

[0026] In a second aspect, the present application also provides a substation equipment settlement monitoring device, comprising:

[0027] An acquisition module, used to acquire equipment parameters of substation equipment and soil parameters of the area where the substation equipment is located;

[0028] An analysis module is used to analyze soil settlement data of substation equipment at multiple groundwater level data using a multi-physics field simulation model according to equipment parameters and soil parameters, and obtain a basic settlement model, wherein the basic settlement model has a mapping relationship between soil settlement data and groundwater level data;

[0029] The monitoring module is used to monitor the substation equipment's subsidence using the basic subsidence model according to the actual groundwater level data of the substation area, and obtain the subsidence data of the substation equipment.

[0030] In a third aspect, the present application further provides a computer device, including a processor and a memory, the memory being used to store a computer program, and when the computer program is executed by the processor, the settlement monitoring method for substation equipment as in the first aspect is implemented.

[0031] In a fourth aspect, the present application further provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the settlement monitoring method for substation equipment as in the first aspect.

[0032] Compared with the prior art, this application has at least the following beneficial effects:

[0033] By obtaining the equipment parameters of the substation equipment and the soil parameters of the area where the substation equipment is located, using a multi-physics field simulation model, according to the equipment parameters and soil parameters, the soil settlement data of the substation equipment at multiple groundwater level data are analyzed to obtain a basic settlement model. The basic settlement model has a mapping relationship between soil settlement data and groundwater level data. Using the basic settlement model, according to the actual groundwater level data of the area where the substation is located, the settlement of the substation equipment is monitored to obtain the settlement data of the substation equipment. Therefore, only the relevant conventional parameters of the soil and equipment need to be obtained in the initial stage to simulate the basic settlement model of the substation equipment, and there is no need to predict the distribution of uneven settlement in advance. Complex operations such as effectively avoiding the uncertainty factors brought by complex operations can effectively avoid the uncertainty factors brought by complex operations and ensure the accuracy of the monitoring results; and only one set of groundwater level monitoring equipment is needed to obtain the groundwater level change, and the settlement data of the substation equipment can be quickly obtained through the basic settlement model without installing multiple monitoring points, which greatly reduces the monitoring cost and monitoring operation and maintenance work. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 A schematic diagram of a flow chart of a method for monitoring substation equipment settlement according to an embodiment of the present application;

[0035] Figure 2 A schematic diagram of a multi-physics field simulation model shown in an embodiment of the present application;

[0036] Figure 3 A schematic diagram of a foundation settlement model shown in an embodiment of the present application;

[0037] Figure 4 A schematic diagram of the structure of a substation equipment settlement monitoring device shown in an embodiment of the present application;

[0038] Figure 5 A schematic diagram of the structure of a computer device shown in an embodiment of the present application. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0040] Please refer to Figure 1 , Figure 1The following is a flow chart of a method for monitoring the substation equipment settlement provided in an embodiment of the present application. The method for monitoring the substation equipment settlement in an embodiment of the present application can be applied to computer devices, including but not limited to smart phones, laptops, tablet computers, desktop computers, physical servers, cloud servers and other devices. Figure 1 As shown, the settlement monitoring method of the substation equipment in this embodiment includes steps S101 to S103, which are described in detail as follows:

[0041] Step S101, obtaining equipment parameters of substation equipment and soil parameters of an area where the substation equipment is located.

[0042] In this step, the equipment parameters include but are not limited to the equipment mass and the size of the contact surface between the substation equipment and the soil; the soil parameters include but are not limited to water density, hydrodynamic viscosity, expansion index, collision index of suction change, compression index under saturation state, compression index of suction change, slope of critical state line, soil stiffness parameter, plastic potential smoothing parameter, tension to suction ratio, initial yield value of suction, initial void ratio, reference pressure and initial consolidation pressure, etc.

[0043] Step S102, using a multi-physics field simulation model, according to the equipment parameters and the soil parameters, analyzing the soil settlement data of the substation equipment at multiple groundwater level data, and obtaining a basic settlement model, wherein the basic settlement model has a mapping relationship between the soil settlement data and the groundwater level data.

[0044] In this step, the COMSOL Multiphysics simulation software can be used to establish and run the above-mentioned multi-physics field simulation model, including configuring the first calculation domain parameters of the groundwater level physical field and the second calculation domain parameters of the solid mechanics physical field through the simulation software, and then solving the soil settlement data of the multi-physics field simulation model under the action of different groundwater level data to obtain the mapping relationship between different groundwater level data and soil settlement data.

[0045] In some embodiments, step 102 includes:

[0046] Based on the equipment parameters and the soil parameters, the model parameters of the multi-physics field simulation model are configured to obtain a target multi-physics field simulation model, wherein the multi-physics field simulation model includes a groundwater flow physics field and a solid mechanics physics field, wherein the groundwater flow physics field is used to simulate the flow of water in saturated soil, and the solid mechanics physics field is used to simulate soil deformation;

[0047] The soil settlement data of the target multi-physics field simulation model under the action of the plurality of groundwater level data are solved by using a steady-state solver to obtain the foundation settlement model.

[0048] In this embodiment, optionally, the groundwater flow physical field is constructed by Richards equation to characterize the flow of water in saturated soil, so as to analyze the influence of water flow state under different groundwater levels on soil settlement and obtain the influence relationship. The groundwater flow physical field is:

[0049]

[0050] Among them, ρ is the density of water, p is the pressure, C m is the soil water capacity, S e is the effective saturation of soil, S p is the soil water storage coefficient, κ r is the water pressure permeability of soil under saturated state, κ s is the relative permeability of soil, μ is the dynamic viscosity of water, g is the acceleration of gravity, D is the depth of groundwater, Q m For water source.

[0051] Optionally, the solid mechanics physical field is constructed by extending the Barcelona basic model to characterize soil deformation, so as to analyze the influence of soil deformation on soil settlement under different groundwater levels and obtain the influence relationship. The solid mechanics physical field is:

[0052]

[0053] Among them, F y is the yield surface, P and q are the stress variables of the soil, M is the slope of the critical state line of the soil, and p cs is the consolidation pressure of the soil under the current suction, p s is the tensile strength of the soil under the current suction, b is the smoothness coefficient, s y is the yield strength of the soil under the current suction, p ref is the reference pressure.

[0054] Furthermore, the above two physical fields are solved by a steady-state solver to obtain a basic settlement model.

[0055] Optionally, the model parameters of the multi-physics field simulation model include first computational domain parameters of groundwater flow physics field and second computational domain parameters of solid mechanics physics field. The configuration process of the model parameters includes:

[0056] Based on the equipment parameters and soil parameters, configuring the first calculation domain parameters of the groundwater flow physical field, the first calculation domain includes a first boundary parameter, a first external load parameter and a first medium parameter, and the first medium parameter is an unsaturated porous medium;

[0057] Based on the equipment parameters and soil parameters, the second calculation domain parameters of the solid mechanics physical field are configured, the second calculation domain includes second boundary parameters, second external load parameters and second medium parameters, and the first medium parameters are linear elastic materials.

[0058] In this optional embodiment, for example, for the groundwater flow physical field, the above-mentioned simulation software is used to configure the calculation domain of the physical field with the equipment grounding size, select the calculation domain, and set the first medium parameter of the calculation domain to an unsaturated porous medium. Then select the upper and lower boundaries of the calculation domain, and set these two boundaries as no-flow boundaries; select the left boundary of the calculation domain, and set the boundary as a pressure head boundary; select the right boundary of the calculation domain, and set the boundary as a symmetric boundary. Finally, the equipment mass is used as the external load, and the gravity acceleration is g, where the initial state of the calculation domain is set to p=0.

[0059] For the solid mechanics physics field, the above simulation software is used to configure the calculation domain of the physics field with the equipment grounding size, and the soil in the calculation domain is set as a linear elastic material. Then the left side of the upper boundary of the calculation domain is set as a free boundary, and a boundary load is applied to the right side of the upper boundary of the calculation domain (for example, 1m to the left from the symmetric boundary), that is, the second external load parameter; select the lower boundary of the calculation domain and set it as a fixed constraint; select the left boundary of the calculation domain and set it as a roller support; select the right boundary of the calculation domain and set it as a symmetric boundary.

[0060] In some embodiments, the method of using a steady-state solver to solve the soil settlement data of the target multi-physics field simulation model under the action of the plurality of groundwater level data to obtain the basic settlement model includes:

[0061] The groundwater level data is characterized by pressure head, and the pressure head boundary of the groundwater flow physical field starts from a preset pressure head and increases to a target pressure head by a preset increment. The steady-state solver is used to solve the soil settlement data of the target multi-physics field simulation model at each time the pressure head increases, so as to obtain the basic settlement model.

[0062] In this embodiment, the initial pressure head of the pressure head boundary is set to the preset pressure head, and during the solution process of the steady-state solver, the pressure head is gradually increased to the target pressure head by a preset increment. It can be understood that the preset pressure head and the target pressure head can be set based on the actual groundwater level of the area where the substation equipment is located, and the pressure head range between the preset pressure head and the target pressure head can cover the actual groundwater level range of the area where the substation equipment is located.

[0063] Step S103, using the foundation settlement model, according to the actual groundwater level data of the area where the substation is located, the settlement of the substation equipment is monitored to obtain the settlement data of the substation equipment.

[0064] In this step, the multi-physics field simulation model is solved by simulation software to output a soil settlement curve, which represents the mapping relationship between groundwater level data and soil settlement data, and this mapping relationship is used as the basic settlement model; then the actual groundwater level data of the area where the substation is located monitored by the groundwater level monitoring equipment is obtained; the actual groundwater level data is input into the basic settlement model, and the settlement data corresponding to the actual groundwater level data is determined according to the mapping relationship in the basic settlement model.

[0065] It should be noted that the present application only needs to monitor the changes in the groundwater level under the entire substation equipment, and a basic settlement model can be established for any equipment in the substation, thereby realizing settlement monitoring at any point in the substation without installing monitoring devices for each device, thereby reducing monitoring costs and monitoring operation and maintenance efficiency.

[0066] As an example but not a limitation, to facilitate understanding of the main points of the invention of this application, an application scenario is provided below for description. Figure 2 A schematic diagram of a multi-physics field simulation model provided in an embodiment of the present application is shown. Figure 3 A schematic diagram of a basic settlement model provided in an embodiment of the present application is shown.

[0067] In COMSOL Multiphysics simulation software, a multi-physics field simulation model of outdoor substation equipment is established. The basic size of the substation equipment is 2m×2m, and the total mass of the substation equipment and the foundation is 10000kg. Figure 2 A simplified 2D axisymmetric model of the multiphysics simulation model shown.

[0068] Add groundwater flow physics: use the Richards equation to solve the flow of water in saturated soil; add solid mechanics physics, use the extended Barcelona basic model in linear elastic materials to characterize soil material properties, and solve soil deformation. The soil parameters of the area where the substation equipment is located are obtained through measurement, as shown in the following table:

[0069]

[0070]

[0071] like Figure 2As shown in the figure, in the groundwater flow physical field, select the entire calculation domain and set it as an unsaturated porous medium; select the upper and lower boundaries and set them as no-flow boundaries; select the left boundary and set it as a pressure head boundary, and its initial pressure head (water level line) is 3m, which gradually increases to 50m during the calculation process; select the right boundary and set it as a symmetric boundary; add gravity as an external load, and the gravity acceleration is g; the initial state of the calculation domain is set to p=0.

[0072] like Figure 2 As shown, in the solid mechanics physics field, the soil is set as a linear elastic material. The left side of the upper boundary is set as a free boundary; a boundary load of 2500Pa is applied to the right side of the upper boundary (1m to the left from the symmetric boundary); the lower boundary is selected and set as a fixed constraint; the left boundary is selected and set as a roller support; the right boundary is selected and set as a symmetric boundary.

[0073] Furthermore, the above multi-physics simulation model is calculated using a steady-state solver to obtain Figure 3 The soil settlement curve shown is the foundation settlement model.

[0074] A set of groundwater level monitoring equipment is installed in the substation equipment to monitor the groundwater level changes over a long period of time. The groundwater level depth is transmitted to the computer equipment every time period (such as 1 day or 1 week, etc.), and the water level data is input into the above-mentioned basic settlement model to obtain the current settlement data of the substation equipment.

[0075] In order to implement the settlement monitoring method of substation equipment corresponding to the above method embodiment, the corresponding functions and technical effects are achieved. Figure 4 , Figure 4 The structural block diagram of a substation equipment settlement monitoring device provided in an embodiment of the present application is shown. For the convenience of description, only the parts related to the present embodiment are shown. The substation equipment settlement monitoring device provided in an embodiment of the present application includes:

[0076] An acquisition module 401 is used to acquire equipment parameters of a substation equipment and soil parameters of an area where the substation equipment is located;

[0077] The analysis module 402 is used to analyze the soil settlement data of the substation equipment at multiple groundwater level data respectively by using a multi-physics field simulation model according to the equipment parameters and the soil parameters, and obtain a basic settlement model, wherein the basic settlement model has a mapping relationship between the soil settlement data and the groundwater level data;

[0078] The monitoring module 403 is used to use the foundation settlement model to monitor the settlement of the substation equipment according to the actual groundwater level data of the area where the substation is located, so as to obtain the settlement data of the substation equipment.

[0079] In some embodiments, the analysis module 402 includes:

[0080] a configuration unit, configured to configure model parameters of the multi-physics field simulation model based on the device parameters and the soil parameters, and obtain a target multi-physics field simulation model, wherein the multi-physics field simulation model includes a groundwater flow physics field and a solid mechanics physics field, wherein the groundwater flow physics field is used to simulate the flow of water in saturated soil, and the solid mechanics physics field is used to simulate soil deformation;

[0081] The solving unit is used to solve the soil settlement data of the target multi-physics field simulation model under the action of the plurality of groundwater level data by using a steady-state solver to obtain the basic settlement model.

[0082] In some embodiments, the configuration unit is specifically used to:

[0083] Based on the equipment parameters and soil parameters, configuring the first calculation domain parameters of the groundwater flow physical field, the first calculation domain includes a first boundary parameter, a first external load parameter and a first medium parameter, and the first medium parameter is an unsaturated porous medium;

[0084] Based on the equipment parameters and soil parameters, the second calculation domain parameters of the solid mechanics physical field are configured, the second calculation domain includes second boundary parameters, second external load parameters and second medium parameters, and the first medium parameters are linear elastic materials.

[0085] In some embodiments, the solving unit is specifically used to:

[0086] The groundwater level data is characterized by pressure head, and the pressure head boundary of the groundwater flow physical field starts from a preset pressure head and increases to a target pressure head by a preset increment. The steady-state solver is used to solve the soil settlement data of the target multi-physics field simulation model at each time the pressure head increases, so as to obtain the basic settlement model.

[0087] In some embodiments, the groundwater flow physics field is:

[0088]

[0089] Among them, ρ is the density of water, p is the pressure, C m is the soil water capacity, S e is the effective saturation of soil, S p is the soil water storage coefficient, κ r is the water pressure permeability of soil under saturated state, κ s is the relative permeability of soil, μ is the dynamic viscosity of water, g is the acceleration of gravity, D is the depth of groundwater, Qm For water source.

[0090] In some embodiments, the solid mechanics physical field is:

[0091]

[0092] Among them, F y is the yield surface, P and q are the stress variables of the soil, M is the slope of the critical state line of the soil, and p cs is the consolidation pressure of the soil under the current suction, p s is the tensile strength of the soil under the current suction, b is the smoothness coefficient, s y is the yield strength of the soil under the current suction, p ref is the reference pressure.

[0093] In some embodiments, the monitoring module 403 is specifically used to:

[0094] Obtaining actual groundwater level data of the area where the substation is located monitored by groundwater level monitoring equipment;

[0095] The actual groundwater level data is input into the basic settlement model, and the settlement data corresponding to the actual groundwater level data is determined according to the mapping relationship in the basic settlement model.

[0096] The above-mentioned settlement monitoring device of the substation equipment can implement the settlement monitoring method of the substation equipment of the above-mentioned method embodiment. The options in the above-mentioned method embodiment are also applicable to this embodiment and will not be described in detail here. The rest of the contents of the embodiment of this application can refer to the contents of the above-mentioned method embodiment, and will not be repeated in this embodiment.

[0097] Figure 5 This is a schematic diagram of the structure of a computer device provided in one embodiment of the present application. Figure 5 As shown, the computer device 5 of this embodiment includes: at least one processor 50 ( Figure 5 Only one is shown in the figure) a processor, a memory 51, and a computer program 52 stored in the memory 51 and executable on the at least one processor 50, and when the processor 50 executes the computer program 52, the steps in any of the above method embodiments are implemented.

[0098] The computer device 5 may be a computing device such as a smart phone, a tablet computer, a desktop computer, a cloud server, etc. The computer device may include but is not limited to a processor 50 and a memory 51. Those skilled in the art will appreciate that Figure 5It is only an example of the computer device 5 and does not constitute a limitation on the computer device 5. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.

[0099] The processor 50 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0100] In some embodiments, the memory 51 may be an internal storage unit of the computer device 5, such as a hard disk or memory of the computer device 5. In other embodiments, the memory 51 may also be an external storage device of the computer device 5, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the computer device 5. Further, the memory 51 may also include both an internal storage unit of the computer device 5 and an external storage device. The memory 51 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program, etc. The memory 51 may also be used to temporarily store data that has been output or is to be output.

[0101] In addition, an embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.

[0102] An embodiment of the present application provides a computer program product. When the computer program product is run on a computer device, the computer device implements the steps in the above-mentioned method embodiments when executing the computer device.

[0103] In several embodiments provided in the present application, it is understood that each box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from that marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved.

[0104] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device to execute all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage media include: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0105] The specific embodiments described above further describe the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only a specific embodiment of the present application and is not intended to limit the scope of protection of the present application. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of protection of the present application.

Claims

1. A method for monitoring the subsidence of substation equipment, characterized in that: include: Acquiring equipment parameters of substation equipment and soil parameters of an area where the substation equipment is located; Using a multi-physics field simulation model, according to the equipment parameters and the soil parameters, the soil settlement data of the substation equipment at multiple groundwater level data are analyzed to obtain a basic settlement model, wherein the basic settlement model has a mapping relationship between the soil settlement data and the groundwater level data; wherein, based on the equipment parameters and the soil parameters, the model parameters of the multi-physics field simulation model are configured to obtain a target multi-physics field simulation model, wherein the multi-physics field simulation model includes a groundwater flow physics field and a solid mechanics physics field, wherein the groundwater flow physics field is used to simulate the flow of water in saturated soil, and the solid mechanics physics field is used to simulate soil deformation; wherein, based on the equipment parameters and soil parameters, the first calculation domain parameters of the groundwater flow physical field are configured, the first calculation domain includes a first boundary parameter, a first external load parameter and a first medium parameter, and the first medium parameter is an unsaturated porous medium; based on the equipment parameters and soil parameters, the second calculation domain parameters of the solid mechanics physical field are configured, the second calculation domain includes a second boundary parameter, a second external load parameter and a second medium parameter, and the first medium parameter is a linear elastic material; using a steady-state solver, the soil settlement data of the target multi-physics field simulation model under the action of the plurality of groundwater level data are solved to obtain the foundation settlement model; The foundation settlement model is used to monitor the settlement of the substation equipment according to the actual groundwater level data of the area where the substation is located, so as to obtain the settlement data of the substation equipment.

2. The method for monitoring the substation equipment according to claim 1, characterized in that: The method of using a steady-state solver to solve the soil settlement data of the target multi-physics field simulation model under the action of the plurality of groundwater level data to obtain the basic settlement model includes: The groundwater level data is characterized by pressure head, and the pressure head boundary of the groundwater flow physical field starts from a preset pressure head and increases to a target pressure head by a preset increment. The steady-state solver is used to solve the soil settlement data of the target multi-physics field simulation model at each time the pressure head increases, so as to obtain the basic settlement model.

3. The method for monitoring the substation equipment settlement according to any one of claims 1 to 2, characterized in that: The groundwater flow physical field is: Among them, ρ is the density of water, p is the pressure, C m is the soil water capacity, S e is the effective saturation of soil, S p is the soil water storage coefficient, k r is the water pressure permeability of the soil under saturated condition, k s is the relative permeability of soil, μ is the dynamic viscosity of water, g is the acceleration of gravity, D is the depth of groundwater, Q m For water source.

4. The method for monitoring the substation equipment settlement according to any one of claims 1 to 2, characterized in that: The solid mechanics physical field is: Among them, F y is the yield surface, P and q are the stress variables of the soil, M is the slope of the critical state line of the soil, and p cs is the consolidation pressure of the soil under the current suction, p s is the tensile strength of the soil under the current suction, b is the smoothness coefficient, s y is the yield strength of the soil under the current suction, p ref is the reference pressure.

5. The method for monitoring the substation equipment settlement according to claim 1, characterized in that: The method of using the foundation settlement model to monitor the settlement of the substation equipment according to the actual groundwater level data of the area where the substation is located to obtain the settlement data of the substation equipment includes: Obtaining actual groundwater level data of the area where the substation is located monitored by groundwater level monitoring equipment; The actual groundwater level data is input into the basic settlement model, and the settlement data corresponding to the actual groundwater level data is determined according to the mapping relationship in the basic settlement model.

6. A subsidence monitoring device for substation equipment, characterized in that: include: An acquisition module, used to acquire equipment parameters of substation equipment and soil parameters of the area where the substation equipment is located; The analysis module is used to use a multi-physics field simulation model to analyze the soil settlement data of the substation equipment at multiple groundwater level data according to the equipment parameters and the soil parameters, and obtain a basic settlement model, wherein the basic settlement model has a mapping relationship between the soil settlement data and the groundwater level data; wherein, based on the equipment parameters and the soil parameters, the model parameters of the multi-physics field simulation model are configured to obtain a target multi-physics field simulation model, wherein the multi-physics field simulation model includes a groundwater flow physics field and a solid mechanics physics field, wherein the groundwater flow physics field is used to simulate the flow of water in saturated soil, and the solid mechanics physics field is used to simulate soil deformation. Simulation; wherein, based on the equipment parameters and soil parameters, the first calculation domain parameters of the groundwater flow physical field are configured, the first calculation domain includes a first boundary parameter, a first external load parameter and a first medium parameter, and the first medium parameter is an unsaturated porous medium; based on the equipment parameters and soil parameters, the second calculation domain parameters of the solid mechanics physical field are configured, the second calculation domain includes a second boundary parameter, a second external load parameter and a second medium parameter, and the first medium parameter is a linear elastic material; using a steady-state solver, the soil settlement data of the target multi-physics field simulation model under the action of multiple groundwater level data are solved to obtain the foundation settlement model; The monitoring module is used to utilize the foundation settlement model to monitor the settlement of the substation equipment according to the actual groundwater level data of the area where the substation is located, so as to obtain the settlement data of the substation equipment.

7. A computer device, characterized in that: It comprises a processor and a memory, the memory is used to store a computer program, and when the computer program is executed by the processor, the settlement monitoring method of the substation equipment according to any one of claims 1 to 5 is implemented.

8. A computer-readable storage medium, characterized in that: It stores a computer program, and when the computer program is executed by a processor, the settlement monitoring method for substation equipment according to any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • Near-G-series high-speed train ground settlement prediction method based on three-dimensional geologic model and back analysis

    CN107480349A