A two-component dot painting and marking device with automatic cleaning function
By designing a two-component point marking device with automatic cleaning function, the device blockage and cleaning agent leakage caused by paint solidification is solved, and the paint spraying and cleaning agent recycling is realized, protecting the environment and health and reducing costs.
Patent Information
- Application Number
- CN202211186840.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-28
- Publication Date
- 2025-08-15
- Estimated Expiration
- 2042-09-28
AI Technical Summary
The existing two-component coatings are prone to solidification during use, resulting in clogging of the device. During the cleaning process, the cleaning agent leaks out and pollutes the environment and endangers workers' health, and lacks the device with automatic cleaning function.
Design a two-component point marking device with automatic cleaning function. By opening and closing the cylinder, the valve cover is controlled to automatically switch between paint and cleaning agent. After the paint is sprayed, the cleaning agent is automatically cleaned and the cleaning agent is recovered to avoid leakage of cleaning agents.
It realizes automatic cleaning of paints and recycling of cleaning agents, protects the environment and workers' health, saves the cost of cleaning agents, and achieves efficient, energy-saving and environmentally friendly spraying operations.
Smart Images

Figure CN115652764B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of road marking, in particular to a two-component dot-painting marking device with an automatic cleaning function. Background Art
[0002] Currently, in the field of road marking technology, when it comes to two-component road marking, due to the characteristic that two-component paint will solidify within a certain period of time, in order to avoid clogging of the device due to paint solidification, the working end pipeline part of the dispensing device needs to be cleaned in time. Currently, cleaning the working end is mainly done manually, using a cleaning agent with a certain pressure to clean the working device. This cleaning process often causes leakage because the cleaning agent cannot be recovered. The cleaning agent will pollute the environment and harm the health of workers. Therefore, it is very necessary to design a two-component dispensing road marking device with an automatic cleaning function. Summary of the Invention
[0003] The purpose of the present invention is to provide a two-component dot painting and marking device with an automatic cleaning function. The present invention can realize dot painting and marking operations, clean the dot painting and marking device, and recycle the cleaning agent, thereby avoiding exposure and leakage of the cleaning agent, which is beneficial to protecting the environment and the health of workers and saving the cost of cleaning agent.
[0004] To achieve the above object, the present invention adopts the following technical solutions:
[0005] A two-component dot painting and marking device with automatic cleaning function includes a two-component feeding and storage hopper, the two-component feeding and storage hopper is horizontally arranged in the left and right directions, a column is fixedly connected to the middle of the upper surface of the two-component feeding and storage hopper, a storage cavity is provided in the same center of the two-component feeding and storage hopper, a paint feeding pipe connected with the storage cavity is installed in the middle of the rear side of the two-component feeding and storage hopper, a dot painting and marking hopper is fixedly provided on the front side of the two-component feeding and storage hopper, a plurality of paint diversion channels arranged at intervals on the left and right are provided on the front upper side of the two-component feeding and storage hopper, the paint diversion channels are horizontally arranged in the front and rear directions, the rear end of the paint diversion channels is connected with the storage cavity, the front end of the paint diversion channel is arranged on the upper side of the front side of the two-component feeding and storage hopper, a plurality of dot painting channels arranged at intervals on the left and right are provided in the dot painting and marking hopper, and each dot painting channel is respectively arranged in front and back correspondence with each paint diversion channel, and the feeding of the dot painting channel The end is arranged on the upper side of the rear side of the dot coating and marking hopper and is butted with the front end of the corresponding paint diversion channel, the discharge end of the dot coating channel is arranged on the bottom surface of the dot coating and marking hopper, and the bottom of the dot coating and marking hopper is fixedly installed with a dot coating base, and a number of dot coating spray holes arranged at intervals left and right and transparent up and down are opened on the dot coating base, and each dot coating spray hole is butted with the discharge end of each dot coating channel one by one up and down, and a valve cover is hingedly connected to the front lower side of the dot coating and marking hopper under the dot coating base, the upper side surface of the valve cover is in contact with the bottom surface of the dot coating base and blocks each dot coating spray hole, and a reflux channel connected to each dot coating spray hole is provided between the upper side surface of the valve cover and the bottom surface of the dot coating base, an opening and closing mechanism for driving the valve cover to open and close is installed on the column, a cleaning component connected to each dot coating channel is installed on the top of the dot coating and marking hopper, and two drainage channels that are symmetrical left and right and connected to the reflux channel are provided at the left and right end portions of the dot coating base.
[0006] Both the two-component feeding and storage hopper and the dot coating and marking hopper are rectangular structures. The left and right ends of the two-component feeding and storage hopper are fixedly installed with a first cleaning pipe connected to the storage chamber. A first electric valve is installed on the first cleaning pipe. The liquid inlet end of the first cleaning pipe is connected to the liquid outlet end of the cleaning agent pump installed on the marking vehicle, and the liquid inlet end of the cleaning agent pump is connected to the liquid outlet end of the cleaning agent storage tank installed on the marking vehicle.
[0007] The valve cover is arranged horizontally along the left and right directions, and the left and right lengths of the valve cover are greater than the left and right lengths of the coating base. The left and right sides of the valve cover are fixedly connected with swing arms. The upper end of the left swing arm is hinged to the lower part of the left front face of the coating and marking hopper, and the upper end of the right swing arm is hinged to the lower part of the right front face of the coating and marking hopper. A reflux groove is provided in the middle of the upper side surface of the valve cover along the left and right directions. The reflux groove is the reflux channel. The two drainage channels have the same structure and are L-shaped. The liquid inlet end of the left drainage channel is arranged on the left side of the bottom surface of the coating base and is located directly above the left end of the reflux groove. The liquid inlet end of the drainage channel is connected to the reflux channel. The left end of the flow trough is connected, the liquid outlet end of the drainage channel on the left is arranged on the left end surface of the coating base and is connected to the liquid inlet end of the cleaning agent recovery tank installed on the marking vehicle through a reflux pipe. Two L-shaped ear plates spaced apart and vertically arranged are fixedly connected to the middle of the rear side of the valve cover, and the right angle of the L-shaped ear plate is located at the rear lower part. A horizontally arranged bayonet pin is fixedly connected between the upper parts of the upper plates of the two L-shaped ear plates. A card seat located between the two L-shaped ear plates is fixedly connected to the middle of the front side of the coating base. A semicircular card slot is opened on the top of the card seat along the left and right directions, and the card pin is matched and connected in the semicircular card slot.
[0008] The opening and closing mechanism includes an opening and closing cylinder, an L-shaped support plate is fixedly connected to the front side of the column, the front side of the horizontal plate of the L-shaped support plate and the lower side of the vertical plate are integrally formed and fixedly connected, the upper side of the vertical plate of the L-shaped support plate is bent forward horizontally to form a horizontal folding plate, the opening and closing cylinder is vertically arranged, the piston rod of the opening and closing cylinder extends downward, the upper end of the cylinder body of the opening and closing cylinder is hinged to the bottom surface of the horizontal folding plate, the lower end of the piston rod of the opening and closing cylinder is fixedly connected to a hinged support rod, the hinged support rod extends vertically between the front side plates of the two L-shaped ear plates, and a connecting pin that horizontally passes through the lower end of the hinged support rod along the left and right direction is fixedly connected between the front side plates of the two L-shaped ear plates, and the connecting pin is hinged to the lower end of the hinged support rod.
[0009] The cleaning assembly includes a cleaning diverter cover plate, which is fixedly mounted on the top of the coating and marking hopper in a horizontal manner along the left and right directions. The bottom surface of the cleaning diverter cover plate is in contact with the top surface of the coating and marking hopper. A diverter groove is provided in the middle of the bottom surface of the cleaning diverter cover plate along the left and right directions. The coating channel is L-shaped, and the right angle of the coating channel is located in the front upper part thereof and is arranged directly below the diverter groove. A plurality of vertical through holes are provided in the middle of the upper side of the coating and marking hopper at intervals of left and right and located below the diverter groove. The vertical through holes are large at both ends and small in the middle. Each vertical through hole corresponds to each coating channel one by one up and down. The upper end of the vertical through hole is connected to the diverter trough, and the lower end of each vertical through hole is respectively connected to each dot coating channel. Two pipe joints with front and rear intervals and connected to the diverter trough are fixedly installed on the left side and the right side of the top middle part of the cleaning diverter cover plate. The two pipe joints on the left are connected to the second cleaning pipe, and the two pipe joints on the right are connected to the high-pressure air pipe. The second cleaning pipe is installed with a second electric valve, and the high-pressure air pipe is installed with a third electric valve. The liquid inlet end of the second cleaning pipe is connected to the liquid outlet end of the cleaning agent pump, and the air inlet end of the high-pressure air pipe is connected to the air outlet end of the air pump installed on the marking vehicle.
[0010] A sealing ring is fixedly embedded in the middle of the bottom surface of the dot coating base and surrounds the periphery of each dot coating spray hole. The upper side surface of the valve cover is in tight and sealing contact with the sealing ring.
[0011] The lower side surface of the clamping seat is an inclined surface with a high front and a low back, and the lower side of the rear side of the valve cover is provided with a chamfer.
[0012] Compared with the prior art, the present invention has outstanding substantive features and significant progress. Specifically, the working principle of the present invention is as follows: when the dot coating and marking operation is performed, the piston rod of the opening and closing cylinder is in a retracted state, the valve cover is located at the front side of the dot coating base and is tilted, the valve cover is in an open state, and each dot coating spray hole is opened, so that the first electric valve and the second electric valve are both closed, and the third electric valve is opened. The paint is pumped into the storage cavity inside the two-component feed storage hopper through the paint feed pipe at a certain pressure (this is a conventional operation in this field, and the specific principle will not be repeated here), and the paint enters each dot coating and marking hopper correspondingly through each paint diversion channel. In the coating channel, the paint enters the various coating spray holes inside the coating base under the action of gravity. At the same time, the air pump pumps high-pressure gas into the diversion groove through the high-pressure air pipe at a certain frequency. The high-pressure gas then enters each coating channel through each vertical through-hole. The high-pressure gas squeezes the paint in each coating channel and each coating spray hole downward at a certain frequency, so that the paint is sprayed downward through each coating spray hole to form dots on the road surface, realizing the coating and marking function. After a certain period of coating, the cleaning operation starts, so that the piston rod of the opening and closing cylinder extends downward, and the piston rod of the opening and closing cylinder pushes the hinge rod to move downward, and the hinge rod drives the two L-shaped ear plates through the connecting pin. The valve cover moves downward, and the valve cover rotates clockwise through the two swing arms, so that the upper side of the valve cover fits the bottom surface of the dot coating base, and the bayonet is correspondingly matched and connected to the semicircular groove on the base. The piston rod of the opening and closing cylinder continues to extend downward, so that the two L-shaped ear plates and the valve cover rotate clockwise around the bayonet, so that the valve cover fits the dot coating base more closely and presses the sealing ring until the piston rod of the cylinder extends downward to the limit position, and then the first electric valve and the second electric valve are both opened, and the third electric valve is closed. Then, the cleaning agent pump draws the cleaning agent from the cleaning agent storage tank, and the cleaning agent is sprayed into the two-component feed storage tank through the first cleaning pipe at a certain pressure. The storage chamber inside the hopper cleans the storage chamber and each paint diversion channel, and at the same time, the cleaning agent is sprayed into the diversion groove through the second cleaning pipe at a certain pressure. The cleaning agent in the diversion groove enters each dot coating channel through each vertical through hole and then cleans each dot coating channel and each dot coating spray hole. The cleaned cleaning agent is collected in the reflux groove on the valve cover through each dot coating spray hole, and then flows back into the cleaning agent recovery box through the drainage channel and the reflux pipe, thereby realizing the recycling of the cleaning agent, avoiding the exposure and leakage of the cleaning agent, being beneficial to protecting the environment and the health of workers, saving the cleaning agent cost, and realizing efficient, energy-saving and environmentally friendly spraying operation.
[0013] After cleaning is completed, the piston rod of the opening and closing cylinder is retracted upward to the initial state, and the piston rod of the opening and closing cylinder drives the two L-shaped ear plates and the valve cover to rotate counterclockwise upward through the hinge rod. When the valve cover is opened, all the dot coating spray holes are opened, and the next dot coating and marking work cycle can be entered, realizing the timed automatic cleaning function. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of the present invention.
[0015] Figure 2 It is a front view of the present invention when it is in a cleaning operation state.
[0016] Figure 3 It is a left side view of the present invention when it is in a cleaning operation state.
[0017] Figure 4 yes Figure 3 sectional view of .
[0018] Figure 5 It is a left side view of the present invention when it is in the dot coating operation state.
[0019] Figure 6 yes Figure 5 sectional view of . DETAILED DESCRIPTION
[0020] The embodiments of the present invention are further described below with reference to the accompanying drawings.
[0021] like Figure 1-6As shown, a two-component dot painting and marking device with automatic cleaning function includes a two-component feeding storage hopper 1, the two-component feeding storage hopper 1 is horizontally arranged in the left and right directions, a column 2 is fixedly connected to the middle of the upper surface of the two-component feeding storage hopper 1, a storage cavity 3 is provided in the same center of the two-component feeding storage hopper 1, a paint feeding pipe 4 connected to the storage cavity 3 is installed in the middle of the rear side of the two-component feeding storage hopper 1, a dot painting and marking hopper 5 is fixedly provided on the front side of the two-component feeding storage hopper 1, and a two-component feeding storage hopper 1 is provided. The upper front side of the material storage hopper 1 is provided with a plurality of paint diversion channels 6 spaced apart from each other. The paint diversion channels 6 are arranged horizontally in the front and rear directions. The rear end of the paint diversion channel 6 is connected to the material storage chamber 3. The front end of the paint diversion channel 6 is arranged on the upper side of the front side of the two-component feeding storage hopper 1. The dot coating and marking hopper 5 is provided with a plurality of dot coating channels 7 spaced apart from each other. Each dot coating channel 7 is arranged in a front-to-back correspondence with each paint diversion channel 6. The feeding end of the dot coating channel 7 is provided The coating hopper 5 is placed on the upper side of the rear side and docked with the front end of the corresponding coating diversion channel 6. The discharge end of the coating channel 7 is set on the bottom surface of the coating hopper 5. The bottom of the coating hopper 5 is fixedly installed with a coating base 8. A plurality of coating spray holes 9 are provided on the coating base 8. The coating spray holes 9 are respectively docked with the discharge ends of the coating channels 7 one by one. The front lower side of the coating hopper 5 is hinged with a coating base 8 below. The valve cover 10 is mounted on the top of the dot coating base 8, and the upper side of the valve cover 10 is in contact with the bottom surface of the dot coating base 8, thereby blocking each dot coating nozzle hole 9. A reflux channel connected to each dot coating nozzle hole 9 is provided between the upper side of the valve cover 10 and the bottom surface of the dot coating base 8. The column 2 is equipped with an opening and closing mechanism that drives the valve cover 10 to open and close. The top of the dot coating and marking hopper 5 is equipped with a cleaning component connected to each dot coating channel 7. The left and right ends of the dot coating base 8 are each equipped with two symmetrical drainage channels 11 connected to the reflux channel. The column 2 is used to securely connect the two-component feed storage hopper 1 to the marking bracket on the marking vehicle.
[0022] The two-component feeding storage hopper 1 and the dot coating and marking hopper 5 are both rectangular structures. The left and right ends of the two-component feeding storage hopper 1 are fixedly installed with a first cleaning pipe 12 connected to the storage chamber 3. A first electric valve 13 is installed on the first cleaning pipe 12. The liquid inlet end of the first cleaning pipe 12 is connected to the liquid outlet end of the cleaning agent pump installed on the marking vehicle, and the liquid inlet end of the cleaning agent pump is connected to the liquid outlet end of the cleaning agent storage tank installed on the marking vehicle.
[0023] The valve cover 10 is arranged horizontally along the left and right directions. The left and right lengths of the valve cover 10 are greater than the left and right lengths of the coating base 8. The left and right sides of the valve cover 10 are fixedly connected with swing arms 14. The upper end of the left swing arm 14 is hinged to the lower left front face of the coating and marking hopper 5, and the upper end of the right swing arm 14 is hinged to the lower right front face of the coating and marking hopper 5. A reflux groove 15 is provided in the middle of the upper side surface of the valve cover 10 along the left and right directions. The reflux groove 15 is the reflux channel. The two drainage channels 11 have the same structure. The drainage channel 11 is L-shaped. The liquid inlet end of the left drainage channel 11 is arranged on the left side of the bottom surface of the coating base 8 and is located directly above the left end of the reflux groove 15. The liquid inlet end of the drainage channel 11 It is connected to the left end of the reflux groove 15, the liquid outlet end of the left drainage channel 11 is arranged on the left end surface of the coating base 8 and is connected to the liquid inlet end of the cleaning agent recovery box installed on the marking vehicle through a reflux pipe. The middle part of the rear side of the valve cover 10 is fixedly connected with two L-shaped ear plates 16 spaced apart and vertically arranged on the left and right sides. The right angle of the L-shaped ear plate 16 is located at the rear lower part. A horizontally arranged bayonet 17 along the left and right directions is fixedly connected between the upper parts of the upper side plates of the two L-shaped ear plates 16. The middle part of the front side of the coating base 8 is fixedly connected with a holder 18 located between the two L-shaped ear plates 16. A semicircular slot 19 is opened on the top of the holder 18 along the left and right directions, and the bayonet 17 is correspondingly matched and snapped into the semicircular slot 19.
[0024] The opening and closing mechanism includes an opening and closing cylinder 20, and the front side of the column 2 is fixedly connected with an L-shaped support plate 21. The front side of the horizontal plate and the lower side of the vertical plate of the L-shaped support plate 21 are integrally formed and fixedly connected. The upper side of the vertical plate of the L-shaped support plate 21 is bent forward horizontally to form a horizontal folding plate 22. The opening and closing cylinder 20 is vertically arranged, and the piston rod of the opening and closing cylinder 20 extends downward. The upper end of the cylinder body of the opening and closing cylinder 20 is hinged to the bottom surface of the horizontal folding plate 22, and the lower end of the piston rod of the opening and closing cylinder 20 is fixedly connected with a hinge rod 23, which extends vertically between the front side plates of the two L-shaped ear plates 16. A connecting pin 24 that horizontally passes through the lower end of the hinge rod 23 in the left and right direction is fixed between the front side plates of the two L-shaped ear plates 16, and the connecting pin 24 is hinged to the lower end of the hinge rod 23.
[0025] The cleaning assembly includes a cleaning diverter cover 25, which is fixedly mounted on the top of the dot coating and marking hopper 5 in a horizontal manner along the left and right directions. The bottom surface of the cleaning diverter cover 25 is in contact with the top surface of the dot coating and marking hopper 5. A diverter groove 26 is provided in the middle of the bottom surface of the cleaning diverter cover 25 along the left and right directions. The dot coating channel 7 is L-shaped, and the right angle of the dot coating channel 7 is located at its front upper part and is arranged directly below the diverter groove 26. A plurality of vertical through holes 27 are provided in the middle of the upper side of the dot coating and marking hopper 5, which are spaced apart left and right and are located below the diverter groove 26. The vertical through holes 27 are large at both ends and small in the middle. Each vertical through hole 27 corresponds to each dot coating channel 7 one by one up and down, and each vertical through hole The upper end of 27 is connected to the diverter groove 26, and the lower ends of each vertical through hole 27 are respectively connected to each dot coating channel 7. Two pipe joints 28 with front and rear intervals and connected to the diverter groove 26 are fixedly installed on the top middle left and middle right sides of the cleaning diverter cover 25. The two pipe joints 28 on the left are connected to the second cleaning pipe 29, and the two pipe joints 28 on the right are connected to the high-pressure air pipe 30. The second cleaning pipe 29 is installed with a second electric valve 31, and the high-pressure air pipe 30 is installed with a third electric valve 32. The liquid inlet end of the second cleaning pipe 29 is connected to the liquid outlet end of the cleaning agent pump, and the air inlet end of the high-pressure air pipe 30 is connected to the air outlet end of the air pump installed on the marking vehicle.
[0026] A sealing ring 33 is fixedly embedded in the middle of the bottom surface of the coating base 8 and surrounds the periphery of each coating spray hole 9 . The upper side of the valve cover 10 is in tight and sealing contact with the sealing ring 33 .
[0027] The lower side surface of the holder 18 is an inclined surface with a higher front and a lower rear side, and the lower side of the rear side of the valve cover 10 is chamfered.
[0028] The opening and closing cylinder 20, the first electric valve 13, the second electric valve 31, the third electric valve 32, the air pump and the cleaning agent pump are all existing technologies, and their specific structures and working principles are not described in detail.
[0029] The working principle of the present invention is as follows: when the dot coating and marking operation is performed, the piston rod of the opening and closing cylinder 20 is in a retracted state, the valve cover 10 is located on the front side of the dot coating base 8 and is tilted, the valve cover 10 is in an open state, and each dot coating spray hole 9 is opened, so that the first electric valve 13 and the second electric valve 31 are both closed, and the third electric valve 32 is opened. The paint is pumped into the storage chamber 3 inside the two-component feed storage hopper 1 through the paint feed pipe 4 at a certain pressure (this is a conventional operation in this field, and the specific principle will not be repeated here), and the paint enters each dot coating channel 7 inside the dot coating and marking hopper 5 respectively through each paint diversion channel 6, and the paint enters each dot coating spray hole inside the dot coating base 8 under the action of gravity. 9, at the same time, the air pump pumps high-pressure gas into the diverter groove 26 through the high-pressure gas pipe 30 at a certain frequency, and the high-pressure gas enters the various dot coating channels 7 through the various vertical through holes 27. The high-pressure gas squeezes the paint in the various dot coating channels 7 and the various dot coating spray holes 9 downward at a certain frequency, so that the paint is sprayed downward onto the road surface through the various dot coating spray holes 9 to form dots, thereby realizing the dot coating and marking function; after a certain period of dot coating, the cleaning operation is started, so that the piston rod of the opening and closing cylinder 20 is extended downward, and the piston rod of the opening and closing cylinder 20 pushes the hinge support rod 23 to move downward, and the hinge support rod 23 drives the two L-shaped ear plates 16 and the valve cover 10 to move downward through the connecting pin 24, so that the valve cover 10 moves in a forward direction through the two swing arms 14. The clockwise rotation action makes the upper side of the valve cover 10 fit with the bottom surface of the coating base 8, and at the same time, the bayonet 17 is correspondingly matched and connected to the semicircular slot 19 on the base 18. The piston rod of the opening and closing cylinder 20 continues to extend downward, so that the two L-shaped ear plates 16 and the valve cover 10 rotate clockwise around the bayonet 17, so that the valve cover 10 fits the coating base 8 more closely and presses the sealing ring 33 until the piston rod of the cylinder extends downward to the limit position, and then the first electric valve 13 and the second electric valve 31 are both opened, and the third electric valve 32 is closed. Then, the cleaning agent pump draws the cleaning agent from the cleaning agent storage tank, so that the cleaning agent is sprayed into the inside of the two-component feed storage hopper 1 through the first cleaning pipe 12 at a certain pressure. The material storage chamber 3 is then cleaned, and the material storage chamber 3 and each paint diversion channel 6 are cleaned. At the same time, the cleaning agent is sprayed into the diversion groove 26 through the second cleaning pipe 29 at a certain pressure. The cleaning agent in the diversion groove 26 then enters each dot coating channel 7 through each vertical through hole 27, and then cleans each dot coating channel 7 and each dot coating spray hole 9. The cleaned cleaning agent is collected in the reflux groove 15 on the valve cover 10 through each dot coating spray hole 9, and then flows back into the cleaning agent recovery box through the drainage channel 11 and the reflux pipe, so as to realize the recycling of the cleaning agent, avoid the exposure and leakage of the cleaning agent, protect the environment and the health of workers, save the cost of cleaning agent, and realize efficient, energy-saving and environmentally friendly spraying operation.
[0030] After cleaning is completed, the piston rod of the opening and closing cylinder 20 is retracted upward to the initial state, and the piston rod of the opening and closing cylinder 20 drives the two L-shaped ear plates 16 and the valve cover 10 to rotate counterclockwise upward through the hinge rod 23, and the valve cover 10 is opened. Then, all the dot coating spray holes 9 are opened, and the next dot coating and marking work cycle can be entered, realizing the timed automatic cleaning function.
[0031] The marking vehicle, detergent pump, detergent storage tank, return pipe, and detergent recovery tank are not shown in the figure. The marking vehicle is equipped with an electrical control system and a control console to control the operation of various components. This console, similar to the control console on an engineering vehicle, includes electrical control buttons, joysticks, knobs, etc. This is conventional technology in the field and involves existing automatic control technology, not a new computer program.
[0032] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention has been described in detail with reference to the above embodiments, it should be understood by those skilled in the art that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A two-component dot painting and marking device with automatic cleaning function, characterized by: The hopper comprises a two-component feeding storage hopper, which is horizontally arranged along the left and right directions, a column is fixedly connected to the middle of the upper surface of the two-component feeding storage hopper, a storage cavity is provided in the same center inside the two-component feeding storage hopper, a paint feeding pipe connected to the storage cavity is installed in the middle of the rear side of the two-component feeding storage hopper, a dot painting and marking hopper is fixedly provided on the front side of the two-component feeding storage hopper, a plurality of paint diversion channels spaced apart on the left and right are provided on the front upper side of the two-component feeding storage hopper, the paint diversion channels are horizontally arranged along the front and rear directions, the rear end of the paint diversion channels is connected with the storage cavity, the front end of the paint diversion channel is provided on the upper side of the front side of the two-component feeding storage hopper, a plurality of dot painting channels spaced apart on the left and right are provided in the dot painting and marking hopper, each dot painting channel is respectively arranged in front and back correspondence with each paint diversion channel, and the feeding end of the dot painting channel is provided in the dot painting and marking hopper. The upper side of the rear side is butted with the front end of the corresponding paint diversion channel, the discharge end of the spot coating channel is arranged on the bottom surface of the spot coating and marking hopper, and the bottom of the spot coating and marking hopper is fixedly installed with a spot coating base, and a number of spot coating spray holes arranged at intervals left and right and transparent up and down are opened on the spot coating base, and each spot coating spray hole is butted up and down with the discharge end of each spot coating channel one by one, and the front lower side of the spot coating and marking hopper is hinged with a valve cover located below the spot coating base, the upper side surface of the valve cover is in contact with the bottom surface of the spot coating base and blocks each spot coating spray hole, and a reflux channel connected to each spot coating spray hole is provided between the upper side surface of the valve cover and the bottom surface of the spot coating base, an opening and closing mechanism for driving the valve cover to open and close is installed on the column, and a cleaning component connected to each spot coating channel is installed on the top of the spot coating and marking hopper, and two drainage channels that are symmetrical left and right and connected to the reflux channel are provided at the left and right end portions of the spot coating base; The cleaning assembly includes a cleaning diverter cover plate, which is fixedly mounted on the top of the coating and marking hopper in a horizontal manner along the left and right directions. The bottom surface of the cleaning diverter cover plate is in contact with the top surface of the coating and marking hopper. A diverter groove is provided in the middle of the bottom surface of the cleaning diverter cover plate along the left and right directions. The coating channel is L-shaped, and the right angle of the coating channel is located in the front upper part thereof and is arranged directly below the diverter groove. A plurality of vertical through holes are provided in the middle of the upper side of the coating and marking hopper at intervals of left and right and located below the diverter groove. The vertical through holes are large at both ends and small in the middle. Each vertical through hole corresponds to each coating channel one by one up and down. The upper end of the vertical through hole is connected to the diverter trough, and the lower end of each vertical through hole is respectively connected to each dot coating channel. Two pipe joints arranged at a front-to-back interval and connected to the diverter trough are fixedly installed on the left and right sides of the top middle part of the cleaning diverter cover plate. The two pipe joints on the left are connected to the second cleaning pipe, and the two pipe joints on the right are connected to the high-pressure air pipe. The second cleaning pipe is installed with a second electric valve, and the high-pressure air pipe is installed with a third electric valve. The liquid inlet end of the second cleaning pipe is connected to the liquid outlet end of the cleaning agent pump, and the air inlet end of the high-pressure air pipe is connected to the air outlet end of the air pump installed on the marking vehicle; A sealing ring is fixedly embedded in the middle of the bottom surface of the dot coating base and surrounds the periphery of each dot coating spray hole. The upper side surface of the valve cover is in tight and sealing contact with the sealing ring.
2. The two-component dot painting and marking device with automatic cleaning function according to claim 1, characterized in that: Both the two-component feeding and storage hopper and the dot coating and marking hopper are rectangular structures. The left and right ends of the two-component feeding and storage hopper are fixedly installed with a first cleaning pipe connected to the storage chamber. A first electric valve is installed on the first cleaning pipe. The liquid inlet end of the first cleaning pipe is connected to the liquid outlet end of the cleaning agent pump installed on the marking vehicle, and the liquid inlet end of the cleaning agent pump is connected to the liquid outlet end of the cleaning agent storage tank installed on the marking vehicle.
3. The two-component dot painting and marking device with automatic cleaning function according to claim 2, characterized in that: The valve cover is arranged horizontally along the left and right directions, and the left and right lengths of the valve cover are greater than the left and right lengths of the coating base. The left and right sides of the valve cover are fixedly connected with swing arms. The upper end of the left swing arm is hinged to the lower part of the left front face of the coating and marking hopper, and the upper end of the right swing arm is hinged to the lower part of the right front face of the coating and marking hopper. A reflux groove is provided in the middle of the upper side surface of the valve cover along the left and right directions. The reflux groove is the reflux channel. The two drainage channels have the same structure and are L-shaped. The liquid inlet end of the left drainage channel is arranged on the left side of the bottom surface of the coating base and is located directly above the left end of the reflux groove. The liquid inlet end of the drainage channel is connected to the reflux channel. The left end of the flow trough is connected, the liquid outlet end of the drainage channel on the left is arranged on the left end surface of the coating base and is connected to the liquid inlet end of the cleaning agent recovery tank installed on the marking vehicle through a reflux pipe. Two L-shaped ear plates spaced apart and vertically arranged are fixedly connected to the middle of the rear side of the valve cover, and the right angle of the L-shaped ear plate is located at the rear lower part. A horizontally arranged bayonet pin is fixedly connected between the upper parts of the upper plates of the two L-shaped ear plates. A card seat located between the two L-shaped ear plates is fixedly connected to the middle of the front side of the coating base. A semicircular card slot is opened on the top of the card seat along the left and right directions, and the card pin is matched and connected in the semicircular card slot.
4. The two-component dot painting and marking device with automatic cleaning function according to claim 3, characterized in that: The opening and closing mechanism includes an opening and closing cylinder, an L-shaped support plate is fixedly connected to the front side of the column, the front side of the horizontal plate of the L-shaped support plate and the lower side of the vertical plate are integrally formed and fixedly connected, the upper side of the vertical plate of the L-shaped support plate is bent forward horizontally to form a horizontal folding plate, the opening and closing cylinder is vertically arranged, the piston rod of the opening and closing cylinder extends downward, the upper end of the cylinder body of the opening and closing cylinder is hinged to the bottom surface of the horizontal folding plate, the lower end of the piston rod of the opening and closing cylinder is fixedly connected to a hinged support rod, the hinged support rod extends vertically between the front side plates of the two L-shaped ear plates, and a connecting pin that horizontally passes through the lower end of the hinged support rod along the left and right direction is fixedly connected between the front side plates of the two L-shaped ear plates, and the connecting pin is hinged to the lower end of the hinged support rod.
5. The two-component dot painting and marking device with automatic cleaning function according to claim 3, characterized in that: The lower side surface of the clamping seat is an inclined surface with a high front and a low back, and the lower side of the rear side of the valve cover is provided with a chamfer.
Citation Information
Patent Citations
Two-component dispensing and marking device with automatic cleaning function
CN218911082U