An integral tubular busbar hoisting solution specifically for wind power stepped concrete towers

By installing brackets and tower rings at the bottom of the wind power step-type concrete tower, the integral pipe busbar main body is gradually lifted, which solves the lifting problems caused by the height and structure of the tower, and improves the lifting safety and efficiency.

CN115719938BActive Publication Date: 2024-11-19ZHONGSHAN TAIYANG KEHUI IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211565417.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-07
Publication Date
2024-11-19
Estimated Expiration
2042-12-07

AI Technical Summary

Technical Problem

The height of the wind power step-type concrete tower is high and the internal structure is complex, which makes it difficult to lift the integral pipe busbar, and there are collision risks and safety risks during the lifting process.

Method used

Install the bracket and tower ring on the bottom platform of the tower, gradually lift the integral pipe busbar main body to be fixed on the bracket, and then lift it to the inner wall of the tower main body in turn, ensuring safety and stability through the coordinated operation of multiple cranes.

Benefits of technology

The lifting process is simplified, the safety factor is improved, the collision and damage between the pipe busbar and the tower equipment is avoided, and the crane technology and cost requirements are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115719938B_ABST
    Figure CN115719938B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of power transmission and distribution equipment, and particularly relates to an integral tubular busbar hoisting scheme specially used for a stepped concrete tower of a wind power plant. The scheme comprises the following steps: firstly installing a bracket for placing a plurality of integral tubular busbar bodies on a platform at the bottom of the tower, then installing a tower ring to a height exceeding the integral tubular busbar body, then hoisting all the integral tubular busbar bodies to be installed onto the bracket for fixing, then hoisting all the tower rings, and finally completing the process of hoisting the integral tubular busbar bodies from bottom to top in sequence inside the tower body. The method is simple and convenient during the hoisting process, effectively solves the problem of difficult hoisting, and improves the safety factor at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The invention belongs to the technical field of power transmission and distribution equipment, and in particular relates to an integral tubular busbar hoisting solution specially used for a stepped concrete tower of a wind power plant. [Background technology]

[0002] At present, new onshore wind turbines are mainly developed in the low wind speed areas in the central and eastern parts of my country. To build new wind turbines in low wind speed areas, the tower needs to be raised to about 160 meters to capture higher wind speeds and more abundant wind resources. In the past, the height of conventional steel towers could only reach 140 meters at most. If the height exceeds this, the steel tower is very likely to resonate with the hub and cause accidents. In recent years, with the breakthroughs in various technologies of concrete towers and the accumulation of experience, this has laid the foundation for mature applications. Concrete towers have high structural rigidity, high damping ratio, and are relatively stable, with lower requirements for control technology. At present, the height of domestic concrete towers can reach 230 meters. In the wind power industry, the use of concrete towers as tower frames has become the only choice in the case of higher towers.

[0003] There are many types of concrete tower structures, one of which is a stepped concrete tower. The hoisting and installation of the integral tubular busbar are relatively complicated. The lower diameter of this type of concrete tower is large, but the upper diameter is small. The internal and external radial shapes are both stepped, with radial steps and large radial step differences. The internal structure is complex, with many special-shaped brackets such as ladders, steel angle bars, lamp brackets, and platforms, which occupy a large space. When hoisting, the higher the tower is, the more difficult it is to hoist, because the higher the tower is, the smaller the diameter is, and the smaller the internal space is. When the integral tubular busbar is hoisted from the outside of the concrete tower to the upper part of the concrete tower, the required crane overhang is long, and it is difficult for the external hoisting personnel to know the exact hoisting position of the internal integral tubular busbar, which will inevitably cause the tubular busbar to collide with the tower and other equipment inside during the hoisting process, resulting in damage and triggering accidents. In addition, the integral tubular busbar installers inside the concrete tower also have a greater risk of life safety. In addition, the height of the concrete tower is nearly 180 meters. If the length of the integral tubular busbar itself is about 20 meters, then the crane boom will undoubtedly be longer, the requirements for crane technicians will be high, and the cost will be higher. [Summary of the invention]

[0004] In order to solve the problem in the prior art that such stepped concrete wind power towers are difficult to hoist due to their high height, complex internal structure and narrow upper space, the present invention provides an integral tubular busbar hoisting solution specifically for stepped concrete wind power towers.

[0005] The present invention is achieved through the following technical solutions:

[0006] An integral tubular busbar hoisting scheme specifically for a stepped concrete tower of a wind power plant comprises the following steps:

[0007] S1: Install the tower bottom platform in place, and then install the bracket on the tower bottom platform;

[0008] S2: installing the tower ring on the bottom platform of the tower;

[0009] S3: hoisting the integral tubular busbar body to be installed inside the tower body to the platform at the bottom of the tower by a crane;

[0010] S4: using the first crane to complete the hoisting of the remaining tower rings;

[0011] S5: using a third crane to sequentially hoist all of the integral tubular busbar bodies inside the tower body to the inner wall of the tower body and connect them to a mounting bracket;

[0012] S6: The bracket is withdrawn from the door at the bottom of the tower body.

[0013] As described above, in a one-piece tubular busbar hoisting solution specifically for a wind power stepped concrete tower, in step S2, the tower ring is installed on the tower bottom platform until the tower ring height exceeds the height of the one-piece tubular busbar body.

[0014] The above-mentioned integral tubular busbar hoisting solution specially used for wind power stepped concrete tower also includes the following steps in step S3:

[0015] S31: Connecting the hook of the first hoist to the top of the integral tubular busbar body in a horizontal state, and connecting the hook of the second hoist to the bottom of the integral tubular busbar body in a horizontal state;

[0016] S32: The first crane and the second crane simultaneously lift the integral tubular busbar body so that when the height of the integral tubular busbar body from the ground exceeds a preset safety distance, the second crane stops lifting and the first crane continues lifting until the integral tubular busbar body is in a vertical state;

[0017] S33: The hook of the second crane is detached from the bottom end of the integral tubular busbar body, and the first crane continues to hoist the integral tubular busbar body to the inside of the tower and connects it to the bracket; the hook of the first crane is detached from the top end of the integral tubular busbar body.

[0018] The above-mentioned integral tubular busbar hoisting solution specially used for wind power stepped concrete tower also includes the following steps in step S5:

[0019] S51: The hook of the third crane is connected to the top of the integral tubular busbar body;

[0020] S52: the bottom end of the integral tubular busbar body is separated from the bracket;

[0021] S53: The third crane sequentially hoists the integral tubular busbar body from bottom to top to the inner wall of the tower body and connects it to the mounting bracket;

[0022] S54: The hook of the third crane is detached from the top of the integral tubular busbar body.

[0023] In the above-mentioned one-piece tubular busbar hoisting solution specially used for a stepped concrete tower of a wind power plant, the third crane is arranged on the top of the tower body.

[0024] As described above, in the one-piece tubular busbar hoisting solution specially used for the stepped concrete tower of wind power generation, the bracket is installed on the bottom platform of the tower before hoisting, and when the bottom platform of the tower is hoisted, the bracket is hoisted.

[0025] As described above, in the one-piece tubular busbar hoisting scheme specially used for the stepped concrete tower of wind power generation, a top hoist is provided at the top of the one-piece tubular busbar body, and the top hoist is used to connect the first hoist and the one-piece tubular busbar body.

[0026] As described above, in the one-piece tubular busbar hoisting scheme specially used for the stepped concrete tower of wind power generation, a bottom hoist is provided at the bottom end of the one-piece tubular busbar body, and the bottom hoist is used to connect the second hoist and the one-piece tubular busbar body.

[0027] In the above-mentioned integral tubular busbar hoisting solution specially used for a stepped concrete tower of a wind power plant, the bracket is connected to the integral tubular busbar body by bolts.

[0028] In the above-mentioned one-piece tubular busbar hoisting solution specially used for a stepped concrete tower of a wind power plant, the material of the bracket is angle iron.

[0029] Compared with the prior art, the present invention has the following advantages:

[0030] The present invention discloses a scheme for hoisting an integral tubular busbar specially used for a stepped concrete tower of a wind power plant. The scheme comprises the following steps: firstly installing a bracket for placing a plurality of integral tubular busbar bodies on a platform at the bottom of the tower, then installing a tower ring to a height exceeding the integral tubular busbar body, then hoisting all the integral tubular busbar bodies to be installed onto the bracket for fixing, then hoisting all the tower rings, and finally completing the process of hoisting the integral tubular busbar bodies from bottom to top in sequence inside the tower body. The method is simple and convenient during the hoisting process, effectively solves the problem of difficult hoisting, and improves the safety factor at the same time.

Brief Description of the Drawings

[0031] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0032] Figure 1 It is a stepped concrete tower;

[0033] Figure 2 This is the external hoisting plan diagram of the integral tubular busbar;

[0034] Figure 3 This is the position diagram of the integral tubular busbar hoisted at the bottom of the tower body;

[0035] Figure 4 yes Figure 3 A local enlarged view of area A;

[0036] Figure 5 This is the internal hoisting plan diagram of the integral tubular busbar;

[0037] Figure 6 It is the main view of the bracket;

[0038] Figure 7 It is the main view of the top spreader;

[0039] Figure 8 It is the exploded view of the integral tubular busbar and the butt-joint tubular busbar;

[0040] Fig. 9 It is the main view of the integral tubular busbar body;

[0041] Fig.10 It is a disassembly diagram of the limit device and the protective assembly;

[0042] Fig.11 It is the front view of the fixing buckle and the longitudinal flat steel;

[0043] Fig.12It is a side view of the integral tubular busbar body;

[0044] Fig.13 It is the main view of the dedicated bracket;

[0045] Fig.14 yes Fig.13 Exploded diagram of

[0046] Fig.15 It is the front view of the side support frame;

[0047] Fig.16 It is the front view of the top hanger. [Specific implementation method]

[0048] In order to make the technical problem, technical solution and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0049] See also Figures 1 to 16 , an integral tubular busbar hoisting scheme specially used for wind power stepped concrete tower, comprising the following steps:

[0050] S1: Install the tower bottom platform 9 in place, and then install the bracket 91 on the tower bottom platform 9;

[0051] S2: Install the tower ring 92 on the tower bottom platform 9;

[0052] S3: hoisting the integral tubular busbar body 1 to be installed inside the tower body 98 onto the tower bottom platform 9 by a crane;

[0053] S4: Use the first crane 93 to complete the hoisting of the remaining tower rings 92;

[0054] S5: using the third crane 95 to sequentially hoist all the integral tubular busbar bodies 1 inside the tower body 98 to the inner wall of the tower body 98 and connect them to the mounting bracket;

[0055] S6: The bracket 91 is withdrawn from the door at the bottom of the tower body 98 .

[0056] The present invention discloses a scheme for hoisting an integral tubular busbar specially used for a stepped concrete tower of a wind power plant. The scheme comprises the following steps: firstly installing a bracket for placing a plurality of integral tubular busbar bodies on a platform at the bottom of the tower, then installing a tower ring to a height exceeding the integral tubular busbar body, then hoisting all the integral tubular busbar bodies to be installed onto the bracket for fixing, then hoisting all the tower rings, and finally completing the process of hoisting the integral tubular busbar bodies from bottom to top in sequence inside the tower body. The method is simple and convenient during the hoisting process, effectively solves the problem of difficult hoisting, and improves the safety factor at the same time.

[0057] Furthermore, as a preferred implementation mode of the present invention but not a limitation, in step S2, the tower ring 92 is installed on the tower bottom platform 9 until the height of the tower ring 92 is stacked to exceed the height of the integral tubular busbar body 1, which can effectively protect the top of the integral tubular busbar from damage.

[0058] Furthermore, as a preferred implementation manner of this solution but not limiting, step S3 also includes the following steps:

[0059] S31: Connecting the hook of the first hoist 93 to the top of the integral tubular busbar body 1 in a horizontal state, and connecting the hook of the second hoist 94 to the bottom of the integral tubular busbar body 1 in a horizontal state;

[0060] S32: The first crane 93 and the second crane 94 are hoisted simultaneously, and when the height of the integral tubular busbar body 1 from the ground exceeds a preset safety distance, the second crane 94 stops hoisting, and the first crane 93 continues hoisting until the integral tubular busbar body 1 is in a vertical state;

[0061] S33: The hook of the second crane 94 is detached from the bottom end of the integral tubular busbar body 1, and the first crane 93 continues to hoist the integral tubular busbar body 1 to the inside of the tower and connects it to the bracket 91; the hook of the first crane 93 is detached from the top end of the integral tubular busbar body 1.

[0062] Furthermore, as a preferred implementation manner of this solution but not limiting, step S5 also includes the following steps:

[0063] S51: The hook of the third hoist 95 is connected to the top of the integral tubular busbar body 1;

[0064] S52: the bottom end of the integral tubular busbar body 1 is separated from the bracket 91;

[0065] S53: The third crane 95 sequentially hoists the integral tubular busbar body 1 from bottom to top to the inner wall of the tower body 98 and connects it to the mounting bracket;

[0066] S54: The hook of the third hoist 95 is detached from the top of the integral tubular busbar body 1 .

[0067] Furthermore, as a preferred implementation of the present solution but not a limitation, the third crane 95 is disposed on the top of the tower body 98 .

[0068] Furthermore, as a preferred implementation mode of the present invention but not a limitation, the bracket 91 is installed on the tower bottom platform 9 before hoisting. When the tower bottom platform 9 is hoisted, the bracket 91 is hoisted, thereby eliminating the hoisting process of the bracket and achieving higher efficiency.

[0069] Furthermore, as a preferred implementation mode of the present invention but not a limitation, a top hanger 96 is provided at the top of the integral tubular busbar body 1. The top hanger 96 is used to connect the first hoist 93 and the integral tubular busbar body 1. On the one hand, it can well ensure the connection firmness between the hook and the integral tubular busbar. On the other hand, it can prevent the connection from twisting and deformation when the integral tubular busbar body swings during the lifting process.

[0070] Furthermore, as a preferred implementation mode of the present invention but not a limitation, a bottom hanger 97 is provided at the bottom end of the integral tubular busbar body 1, and the bottom hanger 97 is used to connect the second hoist 94 and the integral tubular busbar body 1. On the one hand, it can well ensure the connection firmness between the hook and the integral tubular busbar, and on the other hand, it can prevent the connection from twisting and deformation when the integral tubular busbar body swings during the lifting process.

[0071] Furthermore, as a preferred implementation of the present solution but not a limitation, the bracket 91 is connected to the integral tubular busbar body 1 by bolts, so as to facilitate installation and disassembly by workers during the hoisting process.

[0072] Furthermore, as a preferred implementation of the present solution but not a limitation, the material of the bracket 91 is angle iron, which reduces the weight while ensuring the stability of the bracket.

[0073] Also disclosed is an integral tubular busbar specifically used for a wind power concrete tower, comprising an integral tubular busbar main body 1; or comprising a plurality of integral tubular busbar main bodies 1, and a butt-jointed tubular busbar main body 2 for connecting two of the integral tubular busbar main bodies 1; the integral tubular busbar main body 1 comprises a protective device 3, one or more tubular busbars 4 arranged in the protective device 3, a box 5 connected to the bottom end of the tubular busbar 4, and one or more limit devices 6 for limiting the swing of the tubular busbar 4.

[0074] The present application discloses an integral tubular busbar specially used for wind power concrete tower. When leaving the factory, the integral tubular busbar main body, protective device, box body and limit device can be directly connected as a whole and transported to the wind turbine machine site without the need for transfer to the tower factory for installation, thereby improving efficiency. Moreover, under the action of the protective device, the integral tubular busbar has high strength and can be directly hoisted. By connecting with the docking section tubular busbar, the installation of the integral tubular busbar suitable for use in the concrete tower can be completed more efficiently.

[0075] Furthermore, as a preferred implementation mode of the present invention but not a limitation thereof, the protection device 3 includes a support assembly 32 arranged on the box body 5, a support plate 33 for protecting the top end of the tubular busbar 4, and one or more protection assemblies 31 for connecting the support assembly 32 and the support plate 33. The protection assembly can be assembled at the production plant without the need for transfer to the tower plant for installation, thus saving costs. Moreover, under the action of the protection device, the strength can be improved, which can meet the requirements of on-site lifting and improve efficiency.

[0076] Furthermore, as a preferred implementation mode of the present scheme but not a limitation, the protection component 31 includes a plurality of longitudinal flat steels 311 arranged around the tubular busbar 4, and the plurality of longitudinal flat steels 311 are connected by a plurality of transverse flat steels 312 or oblique flat steels 313, and a triangular fixed structure is adopted, so that the overall strength of the protection component is high, and the tubular busbar can be effectively protected, thereby meeting the requirements of loading and lifting.

[0077] Furthermore, as a preferred implementation mode of the present invention but not a limitation, the protection device 3 also includes a limiting device 6 arranged between the two protection components 31, and the limiting device 6 includes a limiting member 61 arranged on one side of the protection component 31 and for the tubular busbar 4 to pass through, and a fixing member 62 arranged on the other side of the protection component 31 and used to fix the limiting member 61, which is helpful to avoid damage to the tubular busbar due to large shaking when installing a higher tower.

[0078] Furthermore, as a preferred implementation mode of the present invention but not a limitation, it also includes a fixing buckle 7, which is used to connect the two integral tubular busbar bodies 1. The fixing buckle makes the loading and transportation more secure, plays a limiting role, and is small and practical, low cost and high strength.

[0079] Furthermore, as a preferred implementation mode of the present invention but not a limitation, the spacing distance between the limit devices 6 is consistent with the length of the longitudinal flat steel 311, which is beneficial for assembling the protective component without cutting excess flat steel, thereby improving efficiency.

[0080] Furthermore, as a preferred embodiment of the present invention but not a limitation, a buffer device 8 is also included, which is arranged at the connection between the box body 5 and the bottom end of the tubular busbar 4, the connection between the support plate 33 and the top end of the tubular busbar 4, and the connection between the tubular busbar 4 and the limiting device 6, so that the overall strength is enhanced and the device has vertical shock-absorbing and buffering performance.

[0081] Furthermore, as a preferred implementation mode of the present invention but not a limitation, it also includes a first connecting mechanism 21, which includes a first connecting member 211 arranged at the bottom of the connecting section tubular busbar body 2, and a second connecting member 212 arranged at the top of the integral tubular busbar body 1 and used to connect the first connecting member 211. During transportation, the support plate is fixed to the top of the integral tubular busbar body to protect the second connecting member and the top of the tubular busbar from damage. During installation, the support plate is detached from the top of the integral tubular busbar body to connect the second connecting member to the first connecting member, so as to achieve quick installation and improve efficiency.

[0082] Furthermore, as a preferred embodiment of the present invention but not a limitation, it also includes a second connecting mechanism 22, which includes a third connecting member 221 arranged at the top of the connecting section tubular busbar body 2, and a fourth connecting member 222 arranged at the bottom of the integral tubular busbar body 1 in the box body 5 and used to connect the third connecting member 221.

[0083] Furthermore, as a preferred implementation of the present solution but not limiting, the buffer device 8 is rubber or sponge.

[0084] Also disclosed is a special bracket for hoisting a tubular busbar for a stepped concrete tower of a wind power plant, comprising a plurality of side support frames 10 and connecting strips 11 for connecting the side support frames 10. The plurality of side support frames 10 are connected to the connecting strips 11 to form a space for placing an integral tubular busbar. The side support frames 10 comprise a support base 101, a support top seat 102, support ribs 103 for connecting the support base 101 and the support top seat 102, and a fixing platform 104 arranged on the support top seat 102, wherein the fixing platform 104 is connected to the support assembly of the integral tubular busbar.

[0085] The present application discloses a special bracket for hoisting tubular busbars for stepped concrete towers of wind power plants. The bracket can be installed on the bottom platform of the tower before hoisting and hoisted and installed together with the bottom platform of the tower. The fixing platform on the supporting base and the supporting top seat are respectively connected to the bottom platform of the tower and the integral tubular busbar. The supporting base and the supporting top seat are welded and reinforced by supporting ribs, and then connected with connecting bars to form a space for placing the integral tubular busbars and play a fixing role. After the entire hoisting process is completed, the connecting bars and the side supporting frames can be connected and transported out of the tower door by removing the bolts connecting the connecting bars and the side supporting frames. The present application can safely and reasonably stack these 5 to 6 bundles of integral tubular busbars, and after the integral tubular busbars are installed on the tower wall, the bracket of the tower can be easily and simply withdrawn. Moreover, the cost is low and the bracket can be recycled.

[0086] Furthermore, as a preferred implementation mode of the present solution but not a limitation, the fixing platform 104, the supporting base 101, the supporting top seat 102 and the connecting strip 11 are all channel steels of different lengths.

[0087] Further, as a preferred embodiment of the present invention but not a limitation, the channel steel includes a waist portion, an upper leg portion, and a lower leg portion, the upper leg portion of the fixing platform 104 is provided with one or more first mounting holes 1041, the lower leg portion of the fixing platform 104 is provided with one or more second mounting holes 1042, the upper leg portion of the support top seat 102 is provided with one or more third mounting holes 1021, the upper leg portion of the support base 101 is provided with one or more fourth mounting holes 1011, the lower leg portion of the support base 101 is provided with one or more fifth mounting holes 1012, and the waist portion of the connecting strip 11 is provided with multiple The sixth mounting hole 111 is connected to the supporting assembly of the integral tubular busbar by bolts to fix the integral tubular busbar, the second mounting hole 1042 is connected to the third mounting hole 1021 by bolts, the fifth mounting hole 1012 is connected to the bottom platform of the tower by bolts, and the sixth mounting hole 111 is respectively connected to the third mounting hole 1021 or the fourth mounting hole 1011 by bolts to connect and fix multiple side support frames 10, so that the side support frames can be more conveniently disassembled and assembled while improving the supporting strength, thereby improving work efficiency.

[0088] Furthermore, as a preferred implementation mode of the present solution but not a limitation, the support rib 103 includes a support portion 1031 and a reinforcement portion 1032 , the support portion 1031 is used to support the support top seat 102 , and the reinforcement portion 1032 is used to stabilize the structure of the side support frame 10 .

[0089] Furthermore, as a preferred implementation mode of the present solution but not a limitation, the reinforcing portion 1032 connects the supporting top seat 102 and the supporting base 101 at an inclined angle, so that the reinforcing portion, the supporting portion and the supporting base form a triangular structure, thereby improving the supporting stability.

[0090] Further, as a preferred implementation manner of the present solution but not a limitation, the support rib 103 is a channel steel, and the support rib 103 is fixed to the support top seat 102 and the support base 101 by welding.

[0091] Furthermore, as a preferred implementation mode of the present solution but not a limitation, the channel steel openings face the same side, which is conducive to convenient and quick disassembly and assembly of the side support frame.

[0092] Furthermore, as a preferred implementation of the present solution but not a limitation, the bolt also includes a nut, a round washer and a spring washer, so that the contact area of ​​the connection is increased, the pressure is dispersed and it is not easy to fall off, thereby improving safety.

[0093] Also disclosed is a special tubular busbar hanger specifically for a wind power stepped concrete tower, comprising a flexible connecting mechanism 12, a side fixing mechanism 13 connected to the outer side of the integral tubular busbar body 1 and used to prevent the integral tubular busbar body 1 from deforming, and a fixed hanging plate 14 connected to the support plate 33, one end of the flexible connecting mechanism 12 is connected to a crane hook, and the other end is connected to the side fixing mechanism 13 and the support plate 33.

[0094] The present application discloses a special hoist for a tubular busbar specially used for a stepped concrete tower of a wind power plant. The outer side of the integral tubular busbar is connected to the outer side of the integral tubular busbar through a side fixing mechanism, and the inner side of the integral tubular busbar is connected to a fixed hanging plate, so that the force distribution of the integral tubular busbar is uniform during hoisting, and the side fixing mechanism prevents the main body of the integral tubular busbar from being deformed. The present application also has the advantages of low cost and reusability.

[0095] Furthermore, as a preferred embodiment of the present invention but not a limitation, the flexible connection mechanism 12 includes a plurality of suspension ropes 121, a rope tie 122 connecting the top ends of the plurality of suspension ropes 121, a first suspension ring 123 connected to the rope tie 122 and used to connect to the crane hook, and a plurality of second suspension rings 124 connected to the bottom ends of the suspension ropes 121, and through holes are provided on the side fixing mechanism 13 and the support plate 33, and the second suspension ring 124 passes through the through holes to connect the side fixing mechanism 13 and the support plate 33.

[0096] In this embodiment, the first lifting ring can be conveniently and quickly installed on the rope tie, and the second lifting ring can be conveniently and quickly installed on the through holes of the side fixing mechanism and the support plate. During lifting, not only can the integral tubular busbar body be subjected to uniform force, but the work efficiency of the staff when installing and disassembling the lifting equipment on the integral tubular busbar body can also be improved.

[0097] Furthermore, as a preferred implementation of the present solution but not a limitation, the fixed hanging plate 14 is rectangular in shape, and its four sides are provided with upward flanges 141 , and the flanges 141 are symmetrically provided with through holes for connecting the second hanging ring 124 .

[0098] In this embodiment, upward flanges are provided on the four sides. This structural feature makes the overall strength of the fixed hanger plate higher, and the symmetrically arranged through holes make the force more uniform when the second lifting ring is connected to the fixed hanger plate, thereby improving the safety and stability during lifting.

[0099] Furthermore, as a preferred implementation of the present solution but not a limitation, a plurality of connection holes 142 are provided at the bottom of the fixed hanger plate 14, and the fixed hanger plate 14 and the support plate 33 are bolted via the connection holes 142, and the plurality of connection holes 142 are arranged in a staggered manner.

[0100] In this embodiment, the connecting holes are arranged in a staggered manner, so that the bolts are also arranged in a staggered manner when passing through the connecting holes to install the fixed support plate and the fixed hanger plate. The staggered arrangement can reduce the weakening of the cross-section of the fixed hanger plate by the connecting holes, ensure the strength of the fixed hanger plate, and improve safety.

[0101] Furthermore, as a preferred implementation manner of the present solution but not a limitation, the side fixing mechanism 13 includes four channel steel bars 131 , and the four channel steel bars 131 are respectively connected to four side edges of the integral tubular busbar body 1 .

[0102] In this embodiment, the channel steel bar is connected to the four side edges of the outer side of the integral tubular busbar body, following the principle of "three-point balance, four-point lifting" in engineering. Three points can determine a plane, so all three points can be subjected to force, and the fourth point is used to maintain balance, so that the integral tubular busbar body will not rotate during the lifting process, thereby improving stability.

[0103] Further, as a preferred embodiment of the present scheme but not a limitation, the waist of the channel steel bar 131 is provided with a first through hole 1311 for connecting the second hanging ring 124, and a second through hole 1312, a third through hole 1313, a fourth through hole 1314 and a fifth through hole 1315 for connecting the integral tubular busbar body 1, the first through hole 1311 is located at one end of the channel steel bar 131, the second through hole 1312 is located below the first through hole 1311, the third through hole 1313 is located in the middle of the channel steel bar 131, and the fourth through hole 1314 and the fifth through hole 1315 are symmetrically arranged with the first through hole 1311 and the second through hole 1312 with the third through hole 1313 as the midpoint.

[0104] In this embodiment, the channel steel bar is provided with a total of five through holes, the first through hole and the fifth through hole are symmetrically arranged with the third through hole as the midpoint, the second through hole and the fourth through hole are symmetrically arranged with the third through hole as the midpoint, the second through hole can be connected to the first through hole or the fifth through hole, and the remaining four holes are connected to the integral tubular busbar body. During installation, there is no need to consider the installation direction of the channel steel bar, thereby improving work efficiency, and this connection method can make the top height of the channel steel bar higher than the top height of the integral tubular busbar body, thereby protecting the integral tubular busbar body.

[0105] Furthermore, as a preferred implementation mode of the present solution but not a limitation, the waists of the four channel steel bars 131 are respectively in contact with the waists of the channel steels on the four sides of the integral tubular busbar body 1 .

[0106] In this embodiment, the waist of the channel steel bar is in contact with the waist of the channel steel of the integral tubular busbar body, which increases the contact area of ​​the connection surface, makes the connection more stable, and is more convenient when installing and removing the bolts.

[0107] Furthermore, as a preferred implementation manner of the present solution but not a limitation, two through holes are respectively provided on the flanges 141 of the two long sides of the fixed hanger plate 14 , and one through hole is respectively provided on the flanges 141 of the two short sides of the fixed hanger plate 14 .

[0108] The working principle of this embodiment is as follows:

[0109] The present invention discloses a scheme for hoisting an integral tubular busbar specially used for a stepped concrete tower of a wind power plant. The scheme comprises the following steps: firstly installing a bracket for placing a plurality of integral tubular busbar bodies on a platform at the bottom of the tower, then installing a tower ring to a height exceeding the integral tubular busbar body, then hoisting all the integral tubular busbar bodies to be installed onto the bracket for fixing, then hoisting all the tower rings, and finally completing the process of hoisting the integral tubular busbar bodies from bottom to top in sequence inside the tower body. The method is simple and convenient during the hoisting process, effectively solves the problem of difficult hoisting, and improves the safety factor at the same time.

[0110] The above are implementation methods provided in combination with specific contents, and it is not intended that the specific implementation of this application is limited to these descriptions. Any method structure similar to the present application, or a number of technical deductions or replacements based on the concept of the present application, should be considered as the protection scope of this application.

Claims

1. A method for hoisting an integral tubular busbar specifically for a stepped concrete tower of a wind power plant, characterized in that: The following steps are involved: S1: installing a tower bottom platform (9) in place, and then installing a bracket (91) on the tower bottom platform (9); S2: installing a tower ring (92) on the tower bottom platform (9); S3: hoisting the integral tubular busbar body (1) to be installed inside the tower body (98) onto the tower bottom platform (9) by means of a crane; S4: using the first crane (93) to complete the hoisting of the remaining tower rings (92); S5: using a third crane (95) to sequentially hoist all of the integral tubular busbar bodies (1) inside the tower body (98) to the inner wall of the tower body (98) and connect them to a mounting bracket; S6: the bracket (91) is withdrawn from the door at the bottom of the tower body (98); In step S2, the tower ring (92) is installed on the tower bottom platform (9) until the height of the tower ring (92) exceeds the height of the integral tubular busbar body (1); Step S3 also includes the following steps: S31: connecting the hook of the first hoist (93) to the top end of the integral tubular busbar body (1) in a horizontal state, and then connecting the hook of the second hoist (94) to the bottom end of the integral tubular busbar body (1) in a horizontal state; S32: the first crane (93) and the second crane (94) are lifting simultaneously, so that when the height of the integral tubular busbar body (1) from the ground exceeds a preset safety distance, the second crane (94) stops lifting, and the first crane (93) continues lifting until the integral tubular busbar body (1) is in a vertical state; S33: the hook of the second crane (94) is detached from the bottom end of the integral tubular busbar body (1), and the first crane (93) continues to hoist the integral tubular busbar body (1) into the tower and connects it to the bracket (91); the hook of the first crane (93) is detached from the top end of the integral tubular busbar body (1); Step S5 also includes the following steps: S51: the hook of the third hoist (95) is connected to the top end of the integral tubular busbar body (1); S52: the bottom end of the integral tubular busbar body (1) is separated from the bracket (91); S53: the third crane (95) sequentially hoists the integral tubular busbar body (1) from bottom to top onto the inner wall of the tower body (98) and connects it to the mounting bracket; S54: The hook of the third hoist (95) is detached from the top end of the integral tubular busbar body (1).

2. The method for hoisting an integral tubular busbar specially used for a stepped concrete tower of a wind power plant according to claim 1, characterized in that: The third crane (95) is arranged on the top of the tower body (98).

3. The method for hoisting an integral tubular busbar specially used for a stepped concrete tower of a wind power plant according to claim 1, characterized in that: A top hanger (96) is provided at the top of the integral tubular busbar body (1), and the top hanger (96) is used to connect the first hanger (93) and the integral tubular busbar body (1).

4. The method for hoisting an integral tubular busbar specially used for a stepped concrete tower of a wind power plant according to claim 1, characterized in that: A bottom hanger (97) is provided at the bottom end of the integral tubular busbar body (1), and the bottom hanger (97) is used to connect the second hanger (94) and the integral tubular busbar body (1).

5. The method for hoisting an integral tubular busbar specially used for a stepped concrete tower of a wind power plant according to claim 1, characterized in that: The bracket (91) is connected to the integral tubular busbar body (1) by bolts.

6. The method for hoisting an integral tubular busbar specially used for a stepped concrete tower of a wind power plant according to claim 1, characterized in that: The bracket (91) is made of angle iron.