A concrete structure coupling construction method suitable for super-high ancient city wall construction

By grooving the stones and laying masonry mortar, binding the steel reinforcement frame and pouring concrete, the problems of time-consuming, labor-intensive and costly construction of traditional ultra-high ancient city walls have been solved, and the stability and construction efficiency have been improved.

CN115749052BActive Publication Date: 2026-02-10THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211483990.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-24
Publication Date
2026-02-10
Estimated Expiration
2042-11-24

AI Technical Summary

Technical Problem

Traditional construction of ultra-high ancient city walls is time-consuming, labor-intensive, costly, and its stability is difficult to guarantee.

Method used

The concrete structure coupling construction method is adopted, which involves grooving the stones, laying masonry mortar, binding the steel reinforcement cage and pouring concrete to form structural walls and hidden beams, so that the stones, structural walls and hidden beams can share the load.

Benefits of technology

The elimination of the need for large-scale foundation construction improves construction efficiency, reduces costs, and enhances the stability of the ultra-high ancient city wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115749052B_ABST
    Figure CN115749052B_ABST
Patent Text Reader

Abstract

The application provides a concrete structure coupling construction method suitable for super-high ancient city wall construction. First, stone materials are subjected to slotting treatment, then hoisting and mortar setting treatment at the stone slot, and the process is repeated until all the stone blocks of the first batch are installed. Then, the first batch of structural wall steel reinforcement frameworks are bound, and the stirrups and reinforcement of the structural wall hidden beam, the tie reinforcement of the structural wall, and the formwork are installed and the concrete is poured to complete the first batch of stone blocks, the structural wall body and the structural wall hidden beam body. Then, other batches of structures are constructed by repeating the process. The application does not need to construct a large foundation, but realizes common stress by slotting mortar, tie reinforcement, structural wall hidden beam, stirrup, reinforcement and other structures, ensures the stability of the super-high ancient city wall stone blocks, ensures the construction quality, and is more convenient, time-saving and labor-saving in the construction process. Compared with the traditional construction method, the construction cost is lower.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The application belongs to the technical field of building construction, and particularly relates to a concrete structure coupling construction method suitable for super-high ancient city wall construction. BACKGROUND

[0002] In recent years, more and more ancient buildings appear in people's field of vision, especially ancient city walls. The ancient city walls generally have a characteristic that the height of the city wall is very high, and some even reach dozens of meters. The ancient city wall is usually built by stone blocks. How to ensure the stability of the city wall and prevent it from overturning is a difficult problem. In the traditional technology for constructing super-high ancient city walls, the foundation of the city wall is generally made large and thick, so that the stability of the super-high ancient city wall can be ensured. However, this method requires a large foundation to meet the construction requirements of the ancient city wall, which is time-consuming and labor-intensive, and has a high cost. If the foundation is not thick enough, the stability of the city wall will become a problem when the city wall is very high, and the safety risk is large. Based on this, the application designs a concrete structure coupling construction method suitable for super-high ancient city wall construction, which can complete the construction of the ancient city wall without constructing a large foundation. SUMMARY

[0003] In view of the problems in the prior art, the application provides a concrete structure coupling construction method suitable for super-high ancient city wall construction, which solves the problems of time-consuming, labor-intensive, high cost and the like in the traditional super-high ancient city wall construction method.

[0004] The application achieves the above technical purpose through the following technical means.

[0005] A concrete structure coupling construction method suitable for super-high ancient city wall construction, comprising the following steps:

[0006] Step 1: slotting treatment is performed on the stone blocks;

[0007] Step 2: the stone blocks after the slotting treatment are placed at the specified positions, and the stone blocks are seamlessly attached to each other;

[0008] Step 3: the masonry mortar is laid on the groove on the top of the first layer of stone blocks;

[0009] Step 4: steps 2 and 3 are repeated to install the next layer of stone blocks until the installation of all the stone blocks in the first batch is completed;

[0010] Step 5: after the installation of the stone blocks in the first batch is completed, the steel reinforcement framework of the structure wall corresponding to the first batch of stone blocks is bound, and the stirrup and reinforcement of the structure wall hidden beam, and the tie steel of the structure wall are simultaneously bound;

[0011] Step 6: the structure wall formwork and the structure wall hidden beam formwork are made and installed;

[0012] Step 7: pouring concrete to form the structural wall body and the structural wall hidden beam body;

[0013] Step 8: repeating steps 2 to 7 until the construction of all batches of stones, structural wall bodies and structural wall hidden beam bodies is completed.

[0014] Further, in step 1, the stones at the construction position of the structural wall hidden beam are slotted at positions matched with the structural wall hidden beam, and the stones at other positions are only slotted at the top.

[0015] Further, in the super-high ancient city wall, the arrangement interval of the stirrups and the skeleton steel bars of the structural wall hidden beam in the vertical direction is 3m, and the stirrups and the skeleton steel bars are arranged in the slots of the stones and the structural wall region.

[0016] Further, the arrangement interval of the stirrups in the horizontal direction is 150mm, and the diameter of the stirrups is not less than 12mm.

[0017] Further, in the super-high ancient city wall, the arrangement interval of the tie steel bars of the structural wall in the vertical direction is 3m; the tie steel bars are L-shaped, one end of which extends into the top slot of the stone, and the other end of which extends into the structural wall region.

[0018] Further, the arrangement interval of the tie steel bars in the horizontal direction is 100mm, and the diameter of the tie steel bars is not less than 14mm.

[0019] Further, the structural wall and the stones are connected as a whole and jointly bear stress, the structural wall hidden beam and the surrounding stones are connected as a whole and jointly bear stress, and the tie steel bars and the structural wall are connected as a whole and jointly bear stress, thereby preventing the super-high ancient city wall from overturning.

[0020] The present application has the following beneficial effects:

[0021] The concrete structure coupling construction method suitable for super-high ancient city wall construction provided by the present application does not need to construct a large foundation, but realizes joint stress by structures such as slotted mortar, tie steel bars, structural wall hidden beams, stirrups and skeleton steel bars, thereby ensuring the stability of the stones of the super-high ancient city wall, ensuring the construction quality, making the construction process more convenient and fast, saving time and effort, and reducing the construction cost compared with the traditional construction method. DRAWINGS

[0022] Figure 1 The present application is a concrete structure coupling construction facade diagram suitable for super-high ancient city wall construction.

[0023] Figure 2 The present application is a stone slotting diagram.

[0024] In the figure: 1 - stone; 2 - slot; 3 - masonry mortar; 4 - steel framework; 5 - stirrup; 6 - skeleton steel; 7 - tie steel; 8 - structure wall; 9 - structure wall hidden beam. DETAILED DESCRIPTION

[0025] The application will be further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the application is not limited thereto.

[0026] The concrete structure coupling construction method suitable for ultra-high ancient city wall construction comprises the following steps:

[0027] Step 1: slotting of stone 1;

[0028] Referring to Figure 1 , 2 , the stone 1 is subjected to slotting treatment, so as to facilitate the subsequent construction of steel bars, mortar, structure wall hidden beam 9 and the like, wherein the slotting position and the size of the slot 2 of the stone 1 at the construction position of the structure wall hidden beam 9 are matched with the structure wall hidden beam 9, and the stone 1 at the remaining positions is only provided with a slot 2 at the top.

[0029] Step 2: installation of the first layer of stone 1;

[0030] The stone 1 subjected to slotting treatment is sequentially placed at the specified position, so as to ensure the seamless fitting between the stones 1.

[0031] Step 3: mortar at the top of the first layer of stone 1;

[0032] Referring to Figure 1 , the masonry mortar 3 for bonding is laid in the slot 2 formed at the top of each stone 1 of the first layer, and the strength grade of the masonry mortar 3 is not less than C35.

[0033] Step 4: repeating steps 2 and 3, installation of the next layer of stone 1, until the installation of all the stones 1 of the first batch is completed; in this embodiment, during the construction of the stone 1, every 3m high is a batch from bottom to top.

[0034] Step 5: after the installation of the stones 1 of the first batch is completed, referring to Figure 1 , the steel framework 4 of the structure wall 8 corresponding to the stones 1 of the first batch is started to be bound, and the stirrup 5 and the skeleton steel 6 of the structure wall hidden beam 9 and the tie steel 7 of the structure wall 8 are simultaneously bound at the corresponding position, and the interval of the stirrup 5 and the skeleton steel 6 of the structure wall hidden beam 9 in the vertical direction is 3m, and the interval of the tie steel 7 of the structure wall 8 in the vertical direction is also 3m, and the setting positions of the two are different, only the setting intervals are the same.

[0035] The hoop 5 and the skeleton steel 6 are arranged in the notch 2 of the stone 1 and the area of the structure wall 8, the tie steel 7 is L-shaped, one end of which extends into the notch 2 of the top of the stone 1, and the other end extends into the area of the structure wall 8;

[0036] The arrangement interval of the hoop 5 in the horizontal direction is 150 mm, and the diameter of the hoop 5 is not less than 12 mm; the arrangement interval of the tie steel 7 in the horizontal direction is 100 mm, and the diameter of the tie steel 7 is not less than 14 mm.

[0037] Step 6: After the stone 1, the steel skeleton 4, the hoop 5, the skeleton steel 6 and the tie steel 7 in the first batch are installed, the inner formwork of the structure wall corresponding to the stone 1 in the first batch and the structure wall hidden beam formwork are made and installed.

[0038] Step 7: Pouring C40 concrete to form the structure wall body and the structure wall hidden beam body corresponding to the stone 1 in the first batch.

[0039] Step 8: Repeat steps 2 to 7 until the construction reaches the top of the ancient city wall, that is, the construction of the stone 1, the structure wall body and the structure wall hidden beam body of all batches is completed.

[0040] The structure wall 8 and the stone 1 of the super-high ancient city wall are connected as a whole, which can prevent the stone 1 of the super-high ancient city wall from overturning due to insufficient stability caused by too high height; the structure wall hidden beam 9 and the stone 1 of the ring are connected as a whole, and the tie steel 7 and the structure wall 8 are connected as a whole, which further ensures the stability of the stone 1 of the super-high ancient city wall.

[0041] The embodiment is a preferred embodiment of the present application, but the present application is not limited to the above-mentioned embodiments, any obvious improvement, replacement or modification made by those skilled in the art without departing from the essential content of the present application shall fall within the protection scope of the present application.

Claims

1. A concrete structure coupling construction method suitable for the construction of ultra-high ancient city walls, characterized in that, Includes the following steps: Step 1: Groove the stone (1); Step 2: Place the grooved stone (1) in the designated position, with the stone (1) fitting together seamlessly; Step 3: Lay masonry mortar (3) in the groove (2) at the top of the first layer of stones (1); Step 4: Repeat steps 2 and 3 to install the next layer of stones (1) until all stones (1) in the first batch are installed; Step 5: After the first batch of stones (1) is installed, tie the steel reinforcement skeleton (4) of the structural wall (8) corresponding to the first batch of stones (1), and simultaneously tie the stirrups (5) and skeleton steel reinforcement (6) of the hidden beam (9) of the structural wall, and the tie steel reinforcement (7) of the structural wall (8). Step 6: Fabricate and install the structural wall formwork and the formwork for the hidden beams of the structural wall; Step 7: Pour concrete to form the structural wall and the hidden beam of the structural wall; Step 8: Repeat steps 2 to 7 until all batches of stones (1), structural walls, and hidden beams of structural walls are completed; In step 1, for the stone (1) at the construction position of the hidden beam (9) of the structural wall, the slot position and the size of the slot (2) are matched with the hidden beam (9) of the structural wall. For the stone (1) at other positions, the slot (2) is only opened at the top. The stirrups (5) and the reinforcing bars (6) are arranged at 3m intervals in the vertical direction, and are all set in the groove (2) of the stone (1) and the area of ​​the structural wall (8). The tie bars (7) are arranged at 3m intervals in the vertical direction; the tie bars (7) are L-shaped, with one end extending into the groove (2) at the top of the stone (1) and the other end extending into the area of ​​the structural wall (8); The position of the hidden beam is formed by cutting grooves into two adjacent stones and then piecing them together.

2. The concrete structure coupling construction method applicable to the construction of ultra-high ancient city walls according to claim 1, characterized in that, The stirrups (5) are arranged at a horizontal spacing of 150mm, and the diameter of the stirrups (5) is not less than 12mm.

3. The concrete structure coupling construction method applicable to the construction of ultra-high ancient city walls according to claim 1, characterized in that, The tie bars (7) are arranged at a horizontal spacing of 100mm, and the diameter of the tie bars (7) is not less than 14mm.

4. The concrete structure coupling construction method applicable to the construction of ultra-high ancient city walls according to claim 1, characterized in that, The structural wall (8) is connected to the stone block (1) as a whole and shares the load. The hidden beam (9) of the structural wall is connected to the surrounding stone block (1) as a whole and shares the load. The tie steel bar (7) is connected to the structural wall (8) as a whole and shares the load, preventing the collapse of the super-high ancient city wall.

Citation Information

Patent Citations

  • Natural rock block fake-dry-masonry decorating wall and construction method

    CN102587611A

  • Miscellaneous building archaized wall structure and construction method thereof

    CN111877596A

  • Construction method of T-shaped steel plate tie city wall

    CN114776132A