By adopting a combination structure of steel main keel and lightweight alloy secondary keel in the outdoor ceiling of honeycomb panels and combining the connection method of flange, the problems of large span and large materials are solved, and the effect of reducing costs and improving structural stability is achieved.
Patent Information
- Application Number
- CN202211522588.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-30
- Publication Date
- 2025-06-13
- Estimated Expiration
- 2042-11-30
AI Technical Summary
When using steel keels in the existing honeycomb panel outdoor ceiling, the span is large and the materials are used, resulting in high overall cost and long construction period.
The combined structure of the main keel and the secondary keel is made of steel and the secondary keel is made of light alloy material. It is connected by a flange to form a stable structure to reduce the span of the keel.
It effectively reduces the use of steel material, reduces the overall cost, and improves the stability and strength of the structure, avoiding the safety hazards of traditional nailing connections.
Smart Images

Figure CN115749108B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering construction, and particularly relates to an installation structure of a honeycomb panel outdoor ceiling. Background Art
[0002] For a honeycomb panel ceiling, it is generally fixed and installed through steel keels. For the sake of installation reliability and safety, there is a relatively large demand for steel keels. When the honeycomb panel is triangular in shape, the keel used for the outdoor ceiling of the honeycomb panel has the characteristic of a large span, and the keels are arranged in a triangular shape. Generally, the triangular honeycomb panel is fixed to the keel by the traditional nail connection method. The screws bear the self-weight tension of the honeycomb panel for a long time, which poses a safety hazard; all steel keels carry and install the triangular honeycomb panel, resulting in a large amount of steel used, a large self-weight, a high overall cost, and a long construction period. Summary of the Invention
[0003] The purpose of the present invention is to provide an installation structure of a honeycomb panel outdoor ceiling to solve the problems of large span and large amount of materials used in steel keels.
[0004] To achieve this purpose, the present invention adopts the following technical solutions:
[0005] The installation structure of the honeycomb panel outdoor ceiling includes:
[0006] Main keels, there are multiple main keels, and the multiple main keels are arranged at the intersection points of adjacent installed honeycomb panels, and the multiple main keels are arranged parallel to each other;
[0007] Flange plates, the top surface of the flange plates is connected to the main keels and is located at the intersection points;
[0008] Secondary keels, there are multiple secondary keels, and both ends of the multiple secondary keels are detachably connected to the bottom surfaces of adjacent two flange plates respectively; the honeycomb panel is detachably connected to the secondary keels, and the secondary keels are made of lightweight alloy materials.
[0009] Optionally, the main keels are made of steel; the secondary keels are made of aluminum alloy.
[0010] Optionally, the multiple flange plates on adjacent two main keels are arranged staggeredly, and any adjacent two flange plates are connected by the secondary keels.
[0011] Optionally, multiple groups of strip holes are circumferentially spaced on the flange plates, each group includes at least two concentric strip holes, and a first connecting member passes through at least two strip holes in each group and connects the secondary keels.
[0012] Optionally, the honeycomb panel has a frame, and the frame is detachably connected to the honeycomb panel and the secondary keels.
[0013] Optionally, a threaded sleeve is provided at the center of the top surface of the flange, a threaded pipe column is provided below the main keel, and the threaded pipe column is threadedly connected to the threaded sleeve.
[0014] Optionally, the installation structure of the honeycomb panel outdoor ceiling further includes a decorative buckle plate, and the decorative buckle plate is detachably connected to the secondary keel.
[0015] Optionally, the top surface of the flange has reinforcing ribs, the reinforcing ribs are in a cross shape, and the center of the flange is located on the axis of the main keel.
[0016] Optionally, the top of the secondary keel has an axial first sliding groove, the bottom of the secondary keel is provided with an axial second sliding groove, the first connecting member is slidably connected to the first sliding groove and connected to the flange, and the second connecting member is slidably connected to the second sliding groove and connected to the honeycomb panel.
[0017] Optionally, the bottom surface of each flange is connected to six secondary keels, and the six secondary keels are divided into two groups, and the two groups of secondary keels are symmetrically connected to both sides of the main keel.
[0018] Advantages of the present invention:
[0019] For the installation structure of the honeycomb panel outdoor ceiling of the present invention, by providing a flange, a plurality of secondary keels made of lightweight alloy can be connected to the main keel made of steel, which is beneficial to reducing the span of the main keel and the secondary keel, with good stability and high structural strength; the secondary keel is made of lightweight alloy, which greatly reduces the use of steel material, and thus is beneficial to reducing the overall cost of the ceiling. Description of the Drawings
[0020] Figure 1 is a schematic diagram of the composition of the installation structure of the honeycomb panel outdoor ceiling of the present invention;
[0021] Figure 2 is a schematic diagram of the connection between the flange and the secondary keel in the installation structure of the honeycomb panel outdoor ceiling of the present invention;
[0022] Figure 3 is the front view of the installation structure of the honeycomb panel outdoor ceiling of the present invention.
[0023] In the figure:
[0024] 100, honeycomb panel;
[0025] 1, main keel; 11, threaded pipe column; 2, flange; 21, strip hole; 22, threaded sleeve; 23, reinforcing rib; 3, secondary keel; 31, first sliding groove; 32, second sliding groove; 4, first connecting member; 5, border; 6, second connecting member; 7, decorative buckle plate. Detailed Embodiments
[0026] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It can be understood that the specific embodiments described herein are only used to explain the present invention, rather than limiting the present invention. In addition, it should be noted that for the sake of description, only the parts related to the present invention rather than all the structures are shown in the drawings.
[0027] In the description of the present invention, unless otherwise clearly defined and limited, the terms "connected", "connected", and "fixed" shall be understood in a broad sense. For example, it may be a fixed connection, a detachable connection, or integrated; it may be a mechanical connection or an electrical connection; it may be directly connected, or indirectly connected through an intermediate medium, and it may be the communication inside two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.
[0028] In the present invention, unless otherwise clearly defined and limited, the first feature being "above" or "below" the second feature may include the direct contact between the first and second features, or may include the situation where the first and second features are not in direct contact but in contact through other features between them. Moreover, the first feature being "above", "above", and "on" the second feature includes that the first feature is directly above and obliquely above the second feature, or simply means that the horizontal height of the first feature is higher than that of the second feature. The first feature being "below", "below", and "under" the second feature includes that the first feature is directly below and obliquely below the second feature, or simply means that the horizontal height of the first feature is lower than that of the second feature.
[0029] In the description of this embodiment, the orientation or positional relationships such as "above", "below", "right", etc. are based on the orientation or positional relationships shown in the drawings, and are only for the convenience of description and simplifying the operation, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus cannot be understood as a limitation to the present invention. In addition, the terms "first" and "second" are only used for distinction in description and have no special meanings.
[0030] An installation structure of an outdoor ceiling of a honeycomb panel is provided in an embodiment of the present invention. Taking the triangular honeycomb panel 100 as an example, as Figures 1 - 3 shown, the installation structure of the outdoor ceiling of the honeycomb panel includes a main keel 1, a flange 2, and a secondary keel 3. There are multiple main keels 1, and the multiple main keels 1 are arranged at the intersection points of adjacent installed honeycomb panels 100, and the multiple main keels 1 are arranged parallel to each other; the top surface of the flange 2 is connected to the main keel 1 and is located at the intersection point; there are multiple secondary keels 3, and both ends of the multiple secondary keels 3 are detachably connected to the bottom surfaces of two adjacent flanges 2 respectively; the honeycomb panel 100 is detachably connected to the secondary keel 3, and the secondary keel 3 is made of a lightweight alloy material relative to the main keel 1.
[0031] The installation structure of the honeycomb panel outdoor ceiling of the present invention, during installation, first install the main keel 1. For the triangular honeycomb panel 100, the main keel 1 is arranged at the intersection of the triangle, and the main keel 1 is fixed to the bottom of the floor steel beam through a channel steel adapter. By setting a flange 2 below the main keel 1, the flange 2 is made of steel, and the flange 2 is arranged at the intersection of the triangle, which is convenient for the secondary keel 3 to be arranged according to the shape of the honeycomb panel 100. The connection between the secondary keel 3 and the flange 2 is a detachable connection method, such as bolt connection. When installing the honeycomb panel 100, the edge of the honeycomb panel 100 corresponds to the secondary keel 3 one by one, and the honeycomb panel 100 is detachably connected, such as bolt connection. By setting the flange 2, multiple secondary keels 3 made of light alloy can be connected to the steel main keel 1. The secondary keels 3 are connected through the flange 2 to form a triangular layout framework, which is beneficial to reducing the span of the main keel 1 and the secondary keel 3, with good stability and high structural strength; the secondary keel 3 is made of light alloy, which greatly reduces the use of steel material, and thus is beneficial to reducing the overall cost of the ceiling.
[0032] Optionally, the main keel 1 is made of steel; the secondary keel 3 is made of aluminum alloy.
[0033] In the prior art, the main keel 1 is uniformly made of steel, so the consumption of steel is large, resulting in high cost and heavy self-weight. By using the secondary keel 3 made of light alloy to replace part of the main keel 1 to arrange and connect the honeycomb panel 100, the consumption of steel material is saved, and the self-weight of the light alloy is small, and the safety of the ceiling is better. Aluminum alloy is preferably used in the light alloy, generally in the form of profiles.
[0034] Optionally, the multiple flanges 2 on two adjacent main keels 1 are arranged staggeredly, and any two adjacent flanges 2 are connected to the secondary keel 3.
[0035] As Figure 1 shown in the embodiment, the three main keels 1 are parallel to each other, and multiple flanges 2 are arranged at intervals on each main keel 1. The flanges 2 on two adjacent main keels 1 are arranged staggeredly, that is, two flanges 2 on one main keel 1 and two flanges 2 on two adjacent main keels 1 form a quadrilateral, and two triangular honeycomb panels 100 can be installed inside the quadrilateral. As Figure 2 , one end of the secondary keel 3 is connected to the flange 2, and the size of the flange 2 needs to be designed with a sufficient circular surface according to the size of the secondary keel 3 for easy connection. For the triangular honeycomb panel 100, six secondary keels 3 are connected to each flange 2, and are symmetrically connected to the flange 2 in two groups, so that the other end of the secondary keel 3 can be connected to the flange 2 on the adjacent main keel 1, and each secondary keel 3 can be respectively connected to one side of two triangular honeycomb panels 100 on both sides along the two longitudinal sides.
[0036] Optionally, a plurality of groups of strip holes 21 are circumferentially and spacedly arranged on the flange 2, each group includes at least two strip holes 21 arranged concentrically, and the first connecting member 4 passes through at least two strip holes 21 of each group and connects the secondary keel 3.
[0037] As Figure 2 shown, strip holes 21 are arranged circumferentially on the flange 2, and at least two strip holes 21 form a group for connecting one secondary keel 3 to achieve connection at at least two points of the secondary keel 3. The strip holes 21 are preferably circular arc-shaped and concentric with the flange 2. When installing the secondary keel 3, the first connecting member 4 can be first connected to the secondary keel 3, and then the first connecting member 4 is passed through the strip holes 21 of the flange 2. The first connecting member 4 drives one end of the secondary keel 3 to slide in the strip holes 21 for installation and positioning at a specified position, and finally a limit nail is used for limiting.
[0038] Optionally, the honeycomb panel 100 has a frame 5, and the frame 5 detachably connects the honeycomb panel 100 and the secondary keel 3.
[0039] As Figure 3 shown, a frame 5 is fixedly arranged around the circumference of the honeycomb panel 100, and the fixing methods include but are not limited to bolt connection and embedded installation. The honeycomb panel 100 can be connected to the secondary keel 3 through the frame 5. The frame 5 and the secondary keel 3 are correspondingly arranged. The frame 5 has mounting holes. The second connecting member 6 is pre-passed through the secondary keel 3 and can slide axially. Move the axial position of the second connecting member 6 to make it correspond to the mounting holes on the frame 5. The second connecting member 6 passes through the mounting holes and is locked by a locking member to complete the installation of the honeycomb panel 100. In this embodiment, the second connecting member 6 is a bolt and the locking member is a nut.
[0040] Optionally, a threaded sleeve 22 is provided at the center of the top surface of the flange 2, and a threaded pipe column 11 is provided below the main keel 1. The threaded pipe column 11 is threadedly connected to the threaded sleeve 22.
[0041] As Figure 3 shown, a threaded sleeve 22 with internal threads is fixedly welded on the top surface of the flange 2, and a threaded pipe column 11 with external threads is fixedly welded below the main keel 1. The threaded pipe column 11 is threadedly connected to the threaded sleeve 22 to install and fix the flange 2 on the main keel 1, and the height of the flange 2 can be adjusted by threaded connection for easy installation.
[0042] Optionally, the installation structure of the outdoor ceiling of the honeycomb panel further includes a decorative buckle plate 7, and the decorative buckle plate 7 is detachably connected to the secondary keel 3.
[0043] As Figure 3 shown, the decorative buckle plate 7 is also called a decorative cover plate, which is arranged at the gap between the honeycomb panels 100 to seal the gap. The decorative buckle plate 7 is connected to the secondary keel 3 by bolts and is the last installation step during installation.
[0044] Optionally, the top surface of the flange 2 has reinforcing ribs 23, which are in a cross shape, and the center of the flange 2 is located on the axis of the main keel 1.
[0045] As Figure 2 and Figure 3 shown, the flange 2 is an intermediate connecting member connecting the main keel 1 and the secondary keel 3. Therefore, by providing the reinforcing ribs 23, the structural strength of the flange 2 can be improved, so as to save the material usage and reduce the material cost. The reinforcing ribs 23 are plate members vertically welded to the top surface of the flange 2, and two groups of plate members are arranged perpendicular to each other in the circumferential direction of the threaded sleeve 22. The center of the flange 2 is concentric with the threaded sleeve 22 and passes through the axis of the main keel 1, so that a plurality of flanges 2 are arranged collinearly on the same main keel 1, which is convenient for installation and positioning.
[0046] Optionally, the top of the secondary keel 3 has an axial first chute 31, and the bottom of the secondary keel 3 is provided with an axial second chute 32. The first connecting member 4 is slidably connected to the first chute 31 and connected to the flange 2, and the second connecting member 6 is slidably connected to the second chute 32 and connected to the honeycomb panel 100.
[0047] As Figure 1 shown, the middle position of the flange 2 is the end face of one of the secondary keels 3. The secondary keel 3 is an aluminum alloy profile, and the secondary keel 3 has a rectangular cross-sectional shape. The top surface is provided with a slotted first chute 31 along the axis. The slit is smaller than the head of the first connecting member 4, so that the head of the first connecting member 4 can slide in the first chute 31 to adjust the installation position. Two slotted second chutes 32 are arranged at intervals along the axis on the lower surface of the secondary keel 3, and two second connecting members 6 are respectively slidably connected. When the second connecting member 6 slides and installs in the second chute 32, it is convenient to be connected to the mounting holes on the frame 5 in alignment. Preferably, both the first connecting member 4 and the second connecting member 6 are bolts and are locked and fixed by nuts.
[0048] Optionally, the bottom surface of each flange 2 is connected to six secondary keels 3. The six secondary keels 3 are divided into two groups, and the two groups of secondary keels 3 are symmetrically connected to both sides of the main keel 1.
[0049] In this embodiment, the triangular honeycomb panel 100 is taken as an example. As Figure 1 and Figure 2 shown, the six secondary keels 3 are divided into two groups, which are respectively connected to the flanges 2 of the main keels 1 on both sides, and are fixed after adjusting the positions of the corresponding secondary keels 3 through the elongated holes 21. Among the six secondary keels 3, one honeycomb panel 100 can be respectively connected to both sides in the axial direction of each secondary keel 3, which is beneficial to saving space and material usage and reducing costs.
[0050] The installation structure of the honeycomb panel outdoor ceiling provided by the embodiment of the present invention uses an aluminum alloy keel for the secondary keel 3, and the flatness and processing accuracy of the keel are relatively good. The flange 2 is a standard part, and the secondary keel 3 does not need to be cut and spliced at an angle. After simply cutting the material straight, it can be connected to the flange 2 through bolts. This improves the processing efficiency of the material and greatly saves costs. The secondary keel 3 can be installed on the flange 2 disorderly, which is convenient for on-site construction. Since all bolt (including the first connecting piece 4 and the second connecting piece 6) connection methods are adopted, the potential safety hazards of nailing connection of the traditional honeycomb panel 100 are eliminated, and it can also be disassembled, making maintenance more convenient.
[0051] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, rather than limiting the implementation manners of the present invention. For those of ordinary skill in the art, various obvious changes, re-adjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to enumerate all the implementation manners here. Any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention shall be included within the protection scope of the claims of the present invention.
Claims
1. Installation structure of honeycomb board outdoor ceiling, Characterized in that, Comprising: Main keels (1), a plurality of the main keels (1) are provided, and the plurality of main keels (1) are arranged at the intersection points of adjacent honeycomb boards (100) to be installed, and the plurality of main keels (1) are arranged in parallel with each other; Flange plates (2), the top surface of the flange plates (2) is connected to the main keels (1) and is located at the intersection points; Secondary keels (3), a plurality of the secondary keels (3) are provided, and both ends of the plurality of secondary keels (3) are detachably connected to the bottom surfaces of two adjacent flange plates (2) respectively; the honeycomb board (100) is detachably connected to the secondary keels (3), and the secondary keels (3) are made of lightweight alloy material.
2. The installation structure of honeycomb board outdoor ceiling according to claim 1, Characterized in that, The main keel (1) is made of steel; the secondary keel (3) is made of aluminum alloy.
3. The installation structure of honeycomb board outdoor ceiling according to claim 1, Characterized in that, The flange plates (2) on the adjacent two main keels (1) are arranged staggeredly, and any two adjacent flange plates (2) are connected by the secondary keels (3).
4. The installation structure of honeycomb board outdoor ceiling according to claim 1, Characterized in that, A plurality of groups of strip holes (21) are circumferentially spaced on the flange plate (2), each group includes at least two concentric strip holes (21), and a first connecting member (4) passes through at least two strip holes (21) of each group and connects the secondary keel (3).
5. The installation structure of honeycomb board outdoor ceiling according to any one of claims 1-4, Characterized in that, The honeycomb board (100) has a frame (5), and the frame (5) is detachably connected to the honeycomb board (100) and the secondary keel (3).
6. The installation structure of honeycomb board outdoor ceiling according to any one of claims 1-4, Characterized in that, A threaded sleeve (22) is provided at the center of the top surface of the flange plate (2), and a threaded pipe column (11) is provided below the main keel (1), and the threaded pipe column (11) is threadedly connected to the threaded sleeve (22).
7. The installation structure of honeycomb board outdoor ceiling according to any one of claims 1-4, Characterized in that, It further includes a decorative buckle plate (7), and the decorative buckle plate (7) is detachably connected to the secondary keel (3).
8. The installation structure of honeycomb board outdoor ceiling according to any one of claims 1-4, Characterized in that, The top surface of the flange plate (2) has a reinforcing rib (23), the reinforcing rib (23) is in a cross shape, and the center of the flange plate (2) is located on the axis of the main keel (1).
9. The installation structure of honeycomb board outdoor ceiling according to claim 4, Characterized in that, The top of the secondary keel (3) has an axially arranged first sliding groove (31), and the bottom of the secondary keel (3) is provided with an axially arranged second sliding groove (32). The first connecting piece (4) is slidably connected to the first sliding groove (31) and is connected to the flange plate (2), and the second connecting piece (6) is slidably connected to the second sliding groove (32) and is connected to the honeycomb panel (100).
10. The installation structure of the honeycomb panel outdoor ceiling according to claim 1, wherein, the bottom surface of each flange plate (2) is connected to six secondary keels (3). The six secondary keels (3) are divided into two groups, and the two groups of secondary keels (3) are symmetrically connected to both sides of the main keel (1). The honeycomb panel (100) is a triangular honeycomb panel.
Citation Information
Patent Citations
Mounting structure of cellular board outdoor suspended ceiling
CN218881303U
Flange plate of triangular suspended ceiling
CN219622084U