Air conditioner control method, device and air conditioner
By detecting the temperature of the indoor heat exchanger in the air conditioner and adjusting the operating status of the compressor and expansion valve, the problem of the indoor heat exchanger being prone to high temperatures in the heating mode of the air conditioner is solved, improving the reliability and user experience of the air conditioner. .
Patent Information
- Application Number
- CN202211493556.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-25
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-11-25
AI Technical Summary
When the air conditioner is running in the heating mode, the indoor heat exchanger is likely to be in a high temperature state, which affects the normal operation and service life of the air conditioner and results in poor user experience.
By receiving the trigger signal of the air conditioner to turn on the heating mode, the compressor is controlled to turn on, and after the compressor is turned on for the first preset time, the actual temperature of the indoor heat exchanger is detected, and the operating status of the compressor and expansion valve is measured based on the actual temperature. Adjustment, including slowly or quickly reducing the compressor frequency and increasing the expansion valve opening, to avoid overheating of the indoor heat exchanger.
Effectively monitor and cool down to protect the indoor heat exchanger, improve the operating reliability of the air conditioner and user comfort experience, and extend the service life of the air conditioner.
Smart Images

Figure CN115751633B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of household appliances, and in particular to a control method and device for an air conditioner and an air conditioner. Background Art
[0002] With the development of society and the continuous improvement of people's living standards, various air conditioning devices have become one of the indispensable electrical equipment in people's daily lives. Various air conditioning devices can help people reach a temperature they can adapt to when the ambient temperature is too high or too low.
[0003] Current air conditioning devices mainly include various types of air conditioners and fans. Air conditioners can be divided into vertical, wall-mounted, and ceiling-mounted types according to different settings. Vertical air conditioners are mainly used in public places such as living rooms with large areas, schools, and hospitals. Wall-mounted air conditioners are mainly used in indoor environments with moderate areas, such as bedrooms at home. When the air conditioner is running in heating mode, the indoor heat exchanger in the indoor unit is easily in a high temperature state, which affects the normal operation of the air conditioner and may shorten its service life, affecting the user experience. Summary of the invention
[0004] An object of the present invention is to monitor the temperature of an indoor heat exchanger of an air conditioner and to promptly detect high temperature overheating.
[0005] A further object of the present invention is to provide temperature reduction protection for the indoor heat exchanger by adjusting the operating states of the compressor and the expansion valve.
[0006] In particular, the present invention provides a control method for an air conditioner, comprising: receiving a trigger signal for turning on a heating mode of the air conditioner and controlling the compressor of the air conditioner to turn on; detecting the actual temperature of an indoor heat exchanger of the air conditioner after the compressor is turned on for a first preset time; and adjusting the operating status of the compressor and the expansion valve of the air conditioner according to the actual temperature.
[0007] Optionally, the step of adjusting the operating status of the compressor and the expansion valve of the air conditioner according to the actual temperature includes: determining whether the actual temperature is greater than or equal to a first preset temperature; and if so, controlling the frequency of the compressor to slowly decrease according to the first frequency, and the opening of the expansion valve to slowly increase according to the first opening and continue for a second preset time.
[0008] Optionally, after the frequency of the compressor is controlled to slowly decrease according to the first frequency and the opening of the expansion valve is slowly increased according to the first opening and continued for a second preset time, if the actual temperature still rises to greater than or equal to the second preset temperature, the frequency of the compressor is controlled to quickly decrease according to the second frequency and the opening of the expansion valve is quickly increased according to the second opening and continued for a second preset time, wherein the second preset temperature is greater than the first preset temperature, the second frequency is greater than the first frequency, and the second opening is greater than the first opening.
[0009] Optionally, after controlling the frequency of the compressor to rapidly decrease according to the second frequency and the opening of the expansion valve to rapidly increase according to the second opening and continue for a second preset time, if the actual temperature still rises to greater than or equal to a third preset temperature, the compressor is controlled to stop for greater than or equal to a third preset time, and the expansion valve maintains the current opening, wherein the third preset temperature is greater than the second preset temperature.
[0010] Optionally, after the compressor is controlled to stop for a period greater than or equal to a third preset time, if the actual temperature is lower than a fourth preset temperature, the compressor is controlled to resume the initial frequency.
[0011] Optionally, after the compressor is controlled to restore the initial frequency, if the actual temperature is less than a fifth preset temperature, the frequency of the compressor is controlled to increase rapidly according to the second frequency.
[0012] Optionally, after controlling the frequency of the compressor to increase rapidly according to the second frequency, if the actual temperature is lower than the sixth preset temperature, controlling the frequency of the compressor to increase slowly according to the first frequency, wherein the fourth preset temperature, the fifth preset temperature, and the sixth preset temperature increase successively and are all lower than the first preset temperature.
[0013] Optionally, when the actual temperature is lower than the first preset temperature, the compressor is controlled to maintain an initial frequency, and the expansion valve is controlled to maintain an initial opening.
[0014] According to another aspect of the present invention, there is also provided an air conditioner control device, comprising: a processor and a memory, wherein a control program is stored in the memory, and when the control program is executed by the processor, it is used to implement any of the above-mentioned air conditioner control methods.
[0015] According to yet another aspect of the present invention, there is provided an air conditioner having the control device of the air conditioner.
[0016] The control method, device and air conditioner of the air conditioner of the present invention receive a trigger signal for turning on the heating mode of the air conditioner and control the compressor of the air conditioner to turn on, detect the actual temperature of the indoor heat exchanger of the air conditioner after the compressor is turned on for a first preset time, and adjust the operating status of the compressor and the expansion valve of the air conditioner according to the actual temperature. The temperature of the indoor heat exchanger of the air conditioner can be monitored, and high temperature overheating can be discovered in time, providing an accurate basis for adjusting the operating status of related components, and effectively ensuring the working reliability of the air conditioner.
[0017] Furthermore, the control method, device and air conditioner of the air conditioner of the present invention, when the actual temperature of the indoor heat exchanger is greater than or equal to the first preset temperature, control the frequency of the compressor to slowly decrease according to the first frequency, and the opening of the expansion valve to slowly increase according to the first opening and continue for a second preset time; if the actual temperature still rises to greater than or equal to the second preset temperature, control the frequency of the compressor to quickly decrease according to the second frequency, and the opening of the expansion valve to quickly increase according to the second opening and continue for a second preset time; if the actual temperature still rises to greater than or equal to the third preset temperature, control the compressor to stop for greater than or equal to the third preset time, and the expansion valve maintains the current opening, and gradually adjusts the operating states of the compressor and the expansion valve to avoid problems with components caused by overly drastic adjustment methods, and performs cooling protection on the indoor heat exchanger, thereby improving the heating effect of the air conditioner while improving the working reliability of the air conditioner, thereby improving the user's comfort experience.
[0018] Based on the following detailed description of specific embodiments of the present invention in conjunction with the accompanying drawings, those skilled in the art will become more aware of the above and other objects, advantages and features of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Hereinafter, some specific embodiments of the present invention will be described in detail in an exemplary and non-limiting manner with reference to the accompanying drawings. The same reference numerals in the accompanying drawings indicate the same or similar components or parts. It should be understood by those skilled in the art that these drawings are not necessarily drawn to scale. In the accompanying drawings:
[0020] Figure 1 is a schematic diagram of a method for controlling an air conditioner according to an embodiment of the present invention;
[0021] Figure 2 is a detailed flow chart of a method for controlling an air conditioner according to an embodiment of the present invention; and
[0022] Figure 3 is a schematic block diagram of a control device for an air conditioner according to an embodiment of the present invention. DETAILED DESCRIPTION
[0023] This embodiment first provides a control method for an air conditioner, which can monitor the temperature of the indoor heat exchanger of the air conditioner, promptly detect high temperature overheating, provide an accurate basis for adjusting the operating status of related components, and effectively ensure the working reliability of the air conditioner. Figure 1 FIG. 1 is a schematic diagram of a method for controlling an air conditioner according to an embodiment of the present invention. Figure 1 As shown, the control method of the air conditioner can perform the following steps:
[0024] Step S102, receiving a trigger signal for the air conditioner to start a heating mode and controlling the compressor of the air conditioner to start;
[0025] Step S104, detecting the actual temperature of the indoor heat exchanger of the air conditioner after the compressor is turned on for a first preset time;
[0026] Step S106, adjusting the operating states of the compressor and the expansion valve of the air conditioner according to the actual temperature.
[0027] In the above steps, step S102 receives a trigger signal for turning on the heating mode of the air conditioner and controls the compressor of the air conditioner to start. Specifically, the trigger signal for turning on the heating mode of the air conditioner can be obtained in a variety of ways. For example, it can be obtained through a remote control, a display device, a voice device, or a mobile terminal bound to the air conditioner. The mobile terminal can be a smart device that is easy to move, such as a smart phone, a tablet computer, etc. Receiving a trigger signal for turning on the heating mode of the air conditioner means that the air conditioner starts to operate in the heating mode.
[0028] After the air conditioner turns on the heating mode, controlling the compressor to turn on may actually be controlling the heat exchange system of the air conditioner to turn on, wherein the heat exchange system includes a compressor. In addition, the heat exchange system may also include components such as an indoor heat exchanger, an outdoor heat exchanger, and an expansion valve. The indoor heat exchanger is arranged in the indoor unit of the air conditioner, and the outdoor heat exchanger is arranged in the outdoor unit of the air conditioner. When the air conditioner is running in the heating mode, the indoor heat exchanger is used as a condenser, and the outdoor heat exchanger is used as an evaporator.
[0029] Specifically, when the air conditioner is operating in heating mode, the compressor will compress the refrigerant into a high-temperature and high-pressure gas, and then liquefy the high-temperature and high-pressure refrigerant gas through the indoor heat exchanger to become a low-temperature and high-pressure liquid. At this time, the refrigerant will release a large amount of heat, which will have the effect of raising the indoor temperature. After that, the expansion valve will throttle and reduce the pressure of the liquid refrigerant, absorb the heat of the outdoor air through the outdoor heat exchanger, and become an isothermal and isobaric gas again for circulation.
[0030] When the air conditioner is running in the heating mode, the indoor heat exchanger is easily in a high temperature state, which affects the normal operation of the air conditioner and may shorten its service life, affecting the user's experience. Therefore, after receiving the trigger signal of the air conditioner to turn on the heating mode and controlling the compressor of the air conditioner in step S102, step S104 can be executed to detect the actual temperature of the indoor heat exchanger of the air conditioner after the compressor is turned on for the first preset time. The actual temperature of the indoor heat exchanger is monitored to detect high temperature overheating in time, provide an accurate basis for adjusting the operating status of related components, and effectively ensure the working reliability of the air conditioner.
[0031] The actual temperature of the indoor heat exchanger is monitored after the compressor is turned on for the first preset time, because the indoor heat exchanger generally does not reach a high temperature state in a very short time after the compressor is turned on, so there is no need to monitor it at the beginning. In a specific embodiment, the first preset time can be 2 minutes. To detect the actual temperature of the indoor heat exchanger, specifically, a temperature sensor can be provided at the indoor heat exchanger, so that the actual temperature of the indoor heat exchanger can be detected by the temperature sensor.
[0032] Step S106 adjusts the operating state of the compressor and the expansion valve of the air conditioner according to the actual temperature. In a specific embodiment, the frequency of the compressor and the opening of the expansion valve can be adjusted. More specifically, the frequency of the compressor can be reduced and the opening of the expansion valve can be increased. It should be noted that the compressor is arranged in the outdoor unit of the air conditioner, and the expansion valve is arranged between the indoor heat exchanger and the outdoor heat exchanger.
[0033] When the air conditioner is running in heating mode, the expansion valve can throttle and reduce the pressure of the low-temperature and high-pressure liquid refrigerant passing through the indoor heat exchanger, and allow the low-temperature and low-pressure refrigerant to enter the outdoor heat exchanger after passing through the expansion valve. By increasing the opening of the expansion valve, the flow of the refrigerant flowing out of the indoor heat exchanger can be increased, so that the heat generated at the indoor heat exchanger can be reduced, that is, the temperature of the indoor heat exchanger can be reduced. By reducing the frequency of the compressor, the high-temperature and high-pressure gas entering the indoor heat exchanger can be reduced, thereby reducing the heat released by the refrigerant at the indoor heat exchanger to a certain extent, and thus the temperature of the indoor heat exchanger can also be reduced.
[0034] The control method of the air conditioner in this embodiment receives a trigger signal for turning on the heating mode of the air conditioner and controls the compressor of the air conditioner to turn on. After the compressor is turned on for a first preset time, the actual temperature of the indoor heat exchanger of the air conditioner is detected, and the operating status of the compressor and the expansion valve of the air conditioner is adjusted according to the actual temperature. The temperature of the indoor heat exchanger of the air conditioner can be monitored, and high temperature overheating can be discovered in time, providing an accurate basis for adjusting the operating status of related components, thereby effectively ensuring the working reliability of the air conditioner.
[0035] In some optional embodiments, the air conditioner can achieve higher technical effects by further optimizing and configuring the above steps. The control method of the air conditioner of this embodiment is described in detail below in combination with the introduction of an optional execution process of this embodiment. This embodiment is only an example of the execution process. During the specific implementation, the execution order and operating conditions of some steps can be modified according to the specific implementation requirements. Figure 2 Detailed flow chart of a method for controlling an air conditioner according to an embodiment of the present invention. The method for controlling an air conditioner may include the following steps:
[0036] Step S202, receiving a trigger signal for the air conditioner to start a heating mode and controlling the compressor of the air conditioner to start;
[0037] Step S204, detecting the actual temperature of the indoor heat exchanger of the air conditioner after the compressor is turned on for a first preset time;
[0038] Step S206, determining whether the actual temperature is greater than or equal to the first preset temperature, if so, executing step S210, if not, executing step S208;
[0039] Step S208, controlling the compressor to maintain the initial frequency and the expansion valve to maintain the initial opening;
[0040] Step S210, controlling the frequency of the compressor to slowly decrease according to the first frequency, and the opening of the expansion valve to slowly increase according to the first opening and continue for a second preset time;
[0041] Step S212, determining whether the actual temperature rises to a value greater than or equal to a second preset temperature, if so, executing step S216, if not, executing step S214;
[0042] Step S214, controlling the compressor to maintain the current frequency and the expansion valve to maintain the current opening;
[0043] Step S216, controlling the frequency of the compressor to decrease rapidly according to the second frequency, and controlling the opening of the expansion valve to increase rapidly according to the second opening and continue for a second preset time period;
[0044] Step S218, determining whether the actual temperature rises to a value greater than or equal to a third preset temperature, if so, executing step S220, if not, executing step S214;
[0045] Step S220, controlling the compressor to stop for a period greater than or equal to a third preset time, and the expansion valve to maintain a current opening;
[0046] Step S222, determining whether the actual temperature is less than a fourth preset temperature, if so, executing step S224, if not, executing step S220;
[0047] Step S224, controlling the compressor to restore the initial frequency.
[0048] In the above steps, step S202 and step S204 are first executed to receive a trigger signal for the air conditioner to start the heating mode and control the compressor of the air conditioner to start. After the compressor is turned on for a first preset time, the actual temperature of the indoor heat exchanger of the air conditioner is detected, and then the operating status of the compressor and the expansion valve are gradually adjusted according to the actual temperature of the indoor heat exchanger.
[0049] Specifically, step S206 determines whether the actual temperature is greater than or equal to the first preset temperature. If the judgment result of step S206 is no, that is, the actual temperature is less than the first preset temperature, step S208 is executed to control the compressor to maintain the initial frequency and the expansion valve to maintain the initial opening. The actual temperature is less than the first preset temperature, which means that the temperature of the indoor heat exchanger is low at this time and is not in a high temperature state. There is no need to adjust the compressor and the expansion valve. Therefore, the compressor is controlled to maintain the initial frequency and the expansion valve is controlled to maintain the initial opening. In a specific embodiment, the first preset temperature can be 58°C.
[0050] If the judgment result of step S206 is yes, that is, the actual temperature is greater than or equal to the first preset temperature, step S210 is executed to control the frequency of the compressor to slowly decrease according to the first frequency, and the opening of the expansion valve to slowly increase according to the first opening and continue for a second preset time. The actual temperature is greater than or equal to the first preset temperature, indicating that the temperature of the indoor heat exchanger is high at this time, and no intervention may affect the normal operation of the air conditioner. Therefore, the frequency of the compressor can be controlled to slowly decrease according to the first frequency, and the opening of the expansion valve can be slowly increased according to the first opening and continue for a second preset time. By slowly adjusting the frequency of the compressor and the opening of the expansion valve, the indoor heat exchanger is prevented from continuing to heat up significantly.
[0051] The process of slowly adjusting the compressor frequency and the expansion valve opening can last for a second preset time. In a specific embodiment, the second preset time can be 10 minutes. For example, the initial frequency of the compressor is A, and the first frequency is B. Then, within the second preset time of 10 minutes of slowly reducing the compressor frequency, the frequency of the compressor per minute can be: AB, A-2B, A-3B, A-4B... The initial opening of the expansion valve is C, and the first opening is D. Then, within the second preset time of 10 minutes of slowly increasing the expansion valve opening, the opening of the expansion valve per minute can be: C+D, C+2D, C+3D, C+4D...
[0052] After the compressor and the expansion valve are slowly adjusted for the second preset time in step S210, step S212 can be executed to determine whether the actual temperature rises to or greater than the second preset temperature. If the judgment result of step S212 is no, that is, the actual temperature is less than the second preset temperature, step S214 is executed to control the compressor to maintain the current frequency and the expansion valve to maintain the current opening. The actual temperature is less than the second preset temperature, which means that after the compressor and the expansion valve are slowly adjusted, even if the indoor heat exchanger is still increasing in temperature, it has not increased to the second preset temperature. At this time, there is no need to further adjust the compressor and the expansion valve, so the compressor is controlled to maintain the current frequency and the expansion valve is controlled to maintain the current opening. The second preset temperature is greater than the first preset temperature. In a specific embodiment, the second preset temperature can be 62°C.
[0053] If the judgment result of step S212 is yes, that is, the actual temperature is greater than or equal to the second preset temperature, step S216 is executed to control the frequency of the compressor to decrease rapidly according to the second frequency, and the opening of the expansion valve to increase rapidly according to the second opening and continue for the second preset time. The actual temperature is greater than or equal to the second preset temperature, which means that after the compressor and the expansion valve are slowly adjusted, the indoor heat exchanger is still continuing to increase in temperature and rises to the second preset temperature. At this time, the indoor heat exchanger is in a high temperature state, which is more urgent. Therefore, the frequency of the compressor can be controlled to decrease rapidly according to the second frequency, and the opening of the expansion valve can be controlled to increase rapidly according to the second opening and continue for the second preset time. By quickly adjusting the frequency of the compressor and the opening of the expansion valve, the indoor heat exchanger can be further prevented from continuing to heat up significantly.
[0054] The process of rapidly adjusting the compressor frequency and the expansion valve opening can also last for a second preset time. The second frequency is greater than the first frequency, and the second opening is greater than the first opening. For example, the second preset time can be 10 minutes, and the frequency of the compressor after slowly reducing the frequency for the second preset time is A-10B, and the second frequency is E. Then, within the second preset time of 10 minutes of rapidly reducing the compressor frequency, the frequency of the compressor per minute can be: A-10B-E, A-10B-2E, A-10B-3E, A-10B-4E... After the expansion valve slowly increases the opening for the second preset time, the opening is C+10D, and the second opening is F. Then, within the second preset time of 10 minutes of rapidly increasing the expansion valve opening, the opening of the expansion valve per minute can be: C+10D+F, C+10D+2F, C+10D+3F, C+10D+4F...
[0055] After the compressor and the expansion valve are quickly adjusted for the second preset time in step S216, step S218 can be executed to determine whether the actual temperature rises to a value greater than or equal to the third preset temperature. If the judgment result of step S218 is no, that is, the actual temperature is less than the third preset temperature, step S214 is executed to control the compressor to maintain the current frequency and the expansion valve to maintain the current opening. If the actual temperature is less than the third preset temperature, it means that after the compressor and the expansion valve are quickly adjusted, even if the indoor heat exchanger is still increasing in temperature, it has not increased to the third preset temperature. At this time, there is no need to further adjust the compressor and the expansion valve, so the compressor is controlled to maintain the current frequency and the expansion valve is controlled to maintain the current opening. The third preset temperature is greater than the second preset temperature. In a specific embodiment, the third preset temperature can be 65°C.
[0056] It should be noted that although step S214 can be executed when the judgment results of step S212 and step S218 are negative, the current frequency and current opening degree in step S214 are not the same in these two cases. When the judgment result of step S212 is negative, step S214 is executed. At this time, the current frequency is the frequency after the compressor slowly reduces the second preset time length, and the current opening degree is the opening degree after the expansion valve slowly increases the second preset time length. When the judgment result of step S218 is negative, step S214 is executed. At this time, the current frequency is the frequency after the compressor further quickly reduces the second preset time length, and the current opening degree is the opening degree after the expansion valve further quickly increases the second preset time length.
[0057] If the judgment result of step S218 is yes, that is, the actual temperature is greater than or equal to the third preset temperature, step S220 is executed to control the compressor to stop for greater than or equal to the third preset time, and the expansion valve maintains the current opening. The actual temperature is greater than or equal to the third preset temperature, which means that after the compressor and the expansion valve are quickly adjusted, the indoor heat exchanger is still continuing to increase the temperature and rises to the third preset temperature. At this time, the indoor heat exchanger is in a high temperature state and it is very urgent. Therefore, the compressor can be controlled to stop for greater than or equal to the third preset time, and the expansion valve maintains the current opening. By controlling the compressor to stop, it is possible to directly and effectively prevent the indoor heat exchanger from continuing to heat up significantly. In this case, the expansion valve maintains the current opening, which means that the expansion valve further quickly increases the opening after the second preset time.
[0058] The compressor is controlled to stop for a time greater than or equal to the third preset time. In fact, after the compressor stops for the third preset time, step S222 can be executed to determine whether the actual temperature is less than the fourth preset temperature, and if the judgment result of step S222 is yes, that is, the actual temperature is less than the fourth preset temperature, step S224 is executed to control the compressor to restore the initial frequency. If the judgment result of step S222 is no, that is, the actual temperature is greater than or equal to the fourth preset temperature, step S220 is executed to continue to control the compressor to stop, and the shutdown time will be greater than the third preset time. In a specific embodiment, the third preset time can be 3 minutes, and the fourth preset temperature can be 50°C.
[0059] That is to say, the compressor is controlled to be stopped for a period of time greater than or equal to the third preset time, and no upper limit is set. The compressor is stopped until the actual temperature of the indoor heat exchanger is less than the fourth preset temperature, at which time the compressor is controlled to restore the initial frequency. According to the above embodiment, the initial frequency of the compressor is A. After the compressor is controlled to be stopped for a period of time greater than or equal to the third preset time, if the actual temperature is less than the fourth preset temperature, it means that the compressor shutdown has a good effect of cooling the indoor heat exchanger. At this time, the compressor can be controlled to restore the initial frequency A.
[0060] In addition, after the compressor is controlled to resume the initial frequency in step S224, if the actual temperature is less than the fifth preset temperature 52, the frequency of the compressor can also be controlled to rise rapidly according to the second frequency. In a specific embodiment, the fifth preset temperature can be 52°C. In other words, after the compressor is controlled to resume the initial frequency, the temperature of the indoor heat exchanger generally begins to rise, but even after the rise, it is still less than the fifth preset temperature, indicating that the temperature of the indoor heat exchanger has not risen significantly, and the frequency of the compressor can be quickly increased to improve the heating amount and heating effect of the air conditioner.
[0061] After the frequency of the compressor is controlled to rise rapidly according to the second frequency, if the actual temperature is less than the sixth preset temperature 54, the frequency of the compressor can be controlled to rise slowly according to the first frequency. As mentioned above, the second frequency is greater than the first frequency. In addition, the fourth preset temperature, the fifth preset temperature, and the sixth preset temperature increase in sequence and are all less than the first preset temperature. In a specific embodiment, the sixth preset temperature may be 54°C.
[0062] It should be noted that the specific numerical values of the above preset values are only examples and are not intended to limit the present invention. In some other embodiments, other numerical values may be set according to actual conditions. However, the magnitude relationship between the preset values must meet the requirements, for example, the fourth preset temperature, the fifth preset temperature, and the sixth preset temperature increase in sequence and are all less than the first preset temperature.
[0063] After controlling the frequency of the compressor to increase rapidly according to the second frequency, the temperature of the indoor heat exchanger continues to increase but is still lower than the sixth preset temperature, indicating that although the temperature of the indoor heat exchanger is not too high at this time, in order to avoid being in a high temperature state, the frequency of the compressor can be controlled to increase slowly according to the first frequency to slow down the temperature increase of the indoor heat exchanger.
[0064] After the frequency of the compressor is increased, if the actual temperature of the indoor heat exchanger is greater than or equal to the sixth preset temperature, it is possible to re-judge whether the actual temperature is greater than or equal to the first preset temperature, and make corresponding adjustments according to the previous steps. In addition, after the frequency of the compressor and the opening of the expansion valve are adjusted in steps S208 and S214, it is also possible to re-judge whether the actual temperature is greater than or equal to the first preset temperature and make corresponding adjustments according to the judgment result.
[0065] The control method of the air conditioner of this embodiment is as follows: when the actual temperature of the indoor heat exchanger is greater than or equal to the first preset temperature, the frequency of the compressor is controlled to slowly decrease according to the first frequency, and the opening of the expansion valve is slowly increased according to the first opening and continued for a second preset time; if the actual temperature still rises to greater than or equal to the second preset temperature, the frequency of the compressor is controlled to quickly decrease according to the second frequency, and the opening of the expansion valve is quickly increased according to the second opening and continued for a second preset time; if the actual temperature still rises to greater than or equal to the third preset temperature, the compressor is controlled to stop for greater than or equal to the third preset time, and the expansion valve maintains the current opening, and the operating states of the compressor and the expansion valve are adjusted step by step to avoid problems with components caused by excessively drastic adjustments, and the indoor heat exchanger is cooled for protection, thereby improving the working reliability of the air conditioner while ensuring the heating effect of the air conditioner and improving the user's comfort experience.
[0066] This embodiment also provides a control device for an air conditioner. Figure 3 2 is a schematic block diagram of a control device 200 for an air conditioner according to an embodiment of the present invention. The control device 200 for the air conditioner includes a processor 210 and a memory 220, wherein the memory 220 stores a control program 221, and the control program 221 is used to implement the control method for the air conditioner in any of the above embodiments when executed by the processor 210. That is, the control method for the air conditioner in any of the above embodiments is described from the side of the control device 200 for the air conditioner, that is, the control device 200 for the air conditioner executes the relevant steps.
[0067] The processor 210 may be a central processing unit (CPU) or a digital processing unit, etc. The processor 210 sends and receives data via a communication interface. The memory 220 is used to store programs executed by the processor 210. The memory 220 is any medium that can be used to carry or store desired program codes in the form of instructions or data structures and can be accessed by a computer, and may also be a combination of multiple memories 220. The above-mentioned control program 221 can be downloaded from a computer-readable storage medium to a corresponding computing / processing device or downloaded and installed to the control device 200 via a network (e.g., the Internet, a local area network, a wide area network, and / or a wireless network).
[0068] This embodiment also provides an air conditioner, which may have the control device 200 of the air conditioner of the above embodiment. That is, the control device 200 of the air conditioner may not be arranged outside the air conditioner, but may be arranged on the air conditioner. In a specific embodiment, the air conditioner may include an indoor unit and an outdoor unit, wherein the indoor unit may include: a housing, and an air outlet may be arranged on the housing. Specifically, a cavity is defined inside the housing, and the indoor fan and the indoor heat exchanger may be arranged in the cavity.
[0069] When the air conditioner is running in heating mode, the indoor heat exchanger in the cavity works as a condenser, and the indoor fan can send the hot air after heat exchange by the indoor heat exchanger to the indoor environment through the air outlet. In addition, an air guide plate can be provided at the air outlet, wherein the air guide plate can include a horizontal guide plate and a vertical guide plate, the vertical guide plate can adjust the left and right air outlet, and the horizontal guide plate can adjust the up and down air outlet.
[0070] The control method of the air conditioner in the above embodiment prevents the indoor heat exchanger from overheating by adjusting the operating state of the compressor and the expansion valve. Specifically, it is achieved by gradually reducing the frequency of the compressor and increasing the opening of the expansion valve. The opening of the expansion valve of the air conditioner is adjusted to control the expansion valve to increase the flow rate of the refrigerant flowing out of the indoor heat exchanger. The increase in the flow rate of the refrigerant flowing out of the indoor heat exchanger reduces the heat generated at the indoor heat exchanger, that is, the temperature of the indoor heat exchanger can be reduced.
[0071] In some other embodiments, other measures can be taken to avoid overheating of the indoor heat exchanger. For example, the speed of the indoor fan can be increased to avoid hot air from gathering at the indoor heat exchanger, thereby effectively reducing the temperature of the indoor heat exchanger. For another example, the air outlet area of the air guide plate can be increased. The increase in the air outlet area of the air guide plate can avoid hot air from gathering at the indoor heat exchanger, effectively reduce the temperature of the indoor heat exchanger, and promote the full circulation of hot air in the indoor environment, so that the temperature distribution of the indoor environment is uniform, avoid a large amount of hot air from entering the indoor heat exchanger through the air inlet, and further ensure that the temperature of the indoor heat exchanger will not be too high.
[0072] It should be noted that, while adjusting the air outlet area of the air guide plate to increase the air outlet area, the posture of the transverse guide plate can also be adjusted to enable the indoor unit of the air conditioner to achieve downward air outlet. Since hot air tends to rise, downward air outlet can promote the hot air to diffuse to the middle and lower parts of the indoor environment, thereby making the overall temperature of the indoor environment uniform and preventing a large amount of hot air from entering the indoor heat exchanger through the air inlet and raising the temperature of the indoor heat exchanger. Therefore, by achieving downward air outlet, the temperature of the indoor heat exchanger can be further prevented from rising.
[0073] In some specific embodiments, for the three measures of increasing the opening of the expansion valve, increasing the speed of the indoor fan, and increasing the air outlet area of the air guide plate, any one of the above measures can be used alone to promote uniform temperature distribution and reduce the temperature of the indoor heat exchanger, or any two or three of them can be used together to promote uniform temperature distribution and reduce the temperature of the indoor heat exchanger. In the embodiment of using any two or three of the measures to reduce the temperature of the indoor heat exchanger, any two or three of the measures can be used at the same time, or any two or three of the measures can be used in sequence according to actual conditions, for example, according to the actual temperature of the indoor heat exchanger.
[0074] At this point, those skilled in the art should recognize that, although multiple exemplary embodiments of the present invention have been shown and described in detail herein, many other variations or modifications that conform to the principles of the present invention can still be directly determined or derived based on the content disclosed in the present invention without departing from the spirit and scope of the present invention. Therefore, the scope of the present invention should be understood and recognized as covering all these other variations or modifications.
Claims
1. A method for controlling an air conditioner, comprising: receiving a trigger signal for the air conditioner to start a heating mode and controlling the compressor of the air conditioner to start; detecting an actual temperature of an indoor heat exchanger of the air conditioner after the compressor is turned on for a first preset time period; as well as The operating states of the compressor and the expansion valve of the air conditioner are adjusted according to the actual temperature. The step of adjusting the operating state of the compressor and the expansion valve of the air conditioner according to the actual temperature includes: judging whether the actual temperature is greater than or equal to a first preset temperature; and if so, controlling the frequency of the compressor to slowly decrease according to the first frequency, and the opening of the expansion valve to slowly increase according to the first opening and continue for a second preset time, After the frequency of the compressor is controlled to be slowly reduced according to the first frequency, and the opening of the expansion valve is slowly increased according to the first opening and continued for the second preset time, if the actual temperature still rises to be greater than or equal to the second preset temperature, the frequency of the compressor is controlled to be rapidly reduced according to the second frequency, and the opening of the expansion valve is rapidly increased according to the second opening and continued for the second preset time, wherein the second preset temperature is greater than the first preset temperature, the second frequency is greater than the first frequency, and the second opening is greater than the first opening; After the frequency of the compressor is controlled to decrease rapidly according to the second frequency and the opening of the expansion valve is rapidly increased according to the second opening and continues for the second preset time, if the actual temperature still rises to be greater than or equal to a third preset temperature, the compressor is controlled to stop for a period greater than or equal to a third preset time, and the expansion valve maintains a current opening, wherein the third preset temperature is greater than the second preset temperature; After the compressor is controlled to stop for a period greater than or equal to the third preset time, if the actual temperature is less than a fourth preset temperature, the compressor is controlled to resume the initial frequency.
2. The method according to claim 1, wherein: After controlling the compressor to restore the initial frequency, if the actual temperature is less than a fifth preset temperature, the frequency of the compressor is controlled to increase rapidly according to the second frequency.
3. The method according to claim 2, wherein: After controlling the frequency of the compressor to increase rapidly according to the second frequency, if the actual temperature is lower than the sixth preset temperature, controlling the frequency of the compressor to increase slowly according to the first frequency, wherein the fourth preset temperature, the fifth preset temperature, and the sixth preset temperature increase sequentially and are all lower than the first preset temperature.
4. The method according to claim 1, wherein: When the actual temperature is lower than the first preset temperature, the compressor is controlled to maintain an initial frequency, and the expansion valve is controlled to maintain an initial opening degree.
5. A control device for an air conditioner, comprising a processor and a memory, wherein the memory stores a control program, and when the control program is executed by the processor, it is used to implement the control method for the air conditioner according to any one of claims 1 to 4.
6. An air conditioner comprising the control device for the air conditioner according to claim 5.
