A monitoring and early warning system for building foundation settlement and deformation
By designing a monitoring network and signal processing system including longitudinal and transverse pull ropes, using force varistor sensors and signal processors, the complexity and real-time monitoring problems of foundation settlement monitoring in the prior art are solved, and the foundation settlement is achieved. Accurate positioning and early warning improve monitoring coverage and reliability.
Patent Information
- Application Number
- CN202211417581.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-14
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-11-14
AI Technical Summary
The existing building foundation settlement monitoring technology is complex and cannot achieve real-time monitoring and early warning, and it is impossible to effectively locate the deformation position and range caused by foundation settlement.
Design a building foundation settlement deformation monitoring and early warning system including a monitoring network, a signal transmitting unit and a signal receiving unit. The stress changes of longitudinal and transverse pull ropes are converted into electrical signals, and real-time monitoring and use force varistor sensors and signal processors to achieve real-time monitoring and Early warning, locate the position and range of foundation settlement.
The coverage area and reliability of foundation settlement monitoring are improved, early warning of uneven settlement and precise positioning of deformation positions are achieved, project cost is reduced, and 24-hour dynamic monitoring is achieved.
Smart Images

Figure CN115762084B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a building foundation settlement deformation monitoring and early warning system. Background Art
[0002] In construction projects, the deformation of building foundations needs to be strictly controlled. During the operation phase after the construction of the building foundation, necessary observations of foundation horizontal and vertical displacements should be carried out to determine whether the foundation deformation is within a reasonable range and to ensure the safety of the building. With the progress of urbanization in my country, the urban construction area is expanding. The surface soil in some parts of my country is loose and soft. It is not easy to build high-rise buildings under such karst geological conditions. After the building is built, if the foundation settlement is uneven and the settlement range is too large during the use of the building, it is very easy to cause cracking, tilting or even collapse of the upper building.
[0003] The existing technology for monitoring the settlement of building foundations requires the arrangement of multiple reference points to form a settlement observation network, and the use of equipment such as levels / total stations for monitoring. The monitoring procedure is complicated and real-time monitoring cannot be completed. For example, patent CN104264651A discloses a comprehensive test system for horizontal and vertical displacement of roadbed, which uses angle sensors, magnetic field strength sensors, electromagnetic strength displays, horizontal displacement displays and settlement magnetic rings. This monitoring method is complicated, and the accuracy of settlement observation results is affected by the selection of reference points and the troublesome installation and burial of settlement pipes. It is impossible to achieve early warning of foundation settlement and locate the position and range of deformation caused by settlement. Summary of the invention
[0004] The purpose of the present invention is to provide a monitoring and early warning system for building foundation settlement and deformation, so as to improve the coverage area and reliability of building foundation settlement monitoring, reduce the project cost, realize the monitoring and early warning of building foundation settlement and locate the deformation position and range caused by uneven settlement.
[0005] To achieve the above-mentioned purpose, the technical solution of the present invention is to design a building foundation settlement deformation monitoring and early warning system, including a monitoring network, a signal transmitting unit and a signal receiving unit;
[0006] The monitoring network includes a plurality of longitudinal and transverse pull ropes, which are arranged perpendicularly to each other on the bottom surface of the building foundation, and the ends of the longitudinal and transverse pull ropes extend to fixed base points outside the measured building, so as to convert the settlement of the building foundation into stress changes of the pull ropes;
[0007] The signal transmitting unit is arranged on the longitudinal pull rope and the transverse pull rope, and includes a force sensitive resistor sensor, a battery and a signal transmitter, which are connected by wires to form a closed loop, and are used to convert the stress change of the pull rope into an electrical signal;
[0008] The signal receiving unit is installed at the remote end, and includes a signal receiver, a processor and an alarm, and is used to receive electrical signals in real time, perform programmed analysis and evaluation on the stress and corresponding time of each longitudinal pull rope and transverse pull rope, realize monitoring and early warning of building foundation settlement, and analyze and locate the position and range of deformation caused by building foundation settlement.
[0009] By adopting the above technical solution, the monitoring network is laid on the bottom surface of the building foundation. When the building foundation sinks, the sinking area drives the corresponding area of the monitoring network to move downward. The two ends of the longitudinal and transverse ropes are fixedly connected to the fixed base points outside the building. Stress is generated on the longitudinal and transverse ropes in the sinking area corresponding to the monitoring network, so that the force-sensitive resistor sensor is subjected to force, the resistance value changes, the current in the closed loop changes accordingly, and the signal intensity emitted by the signal transmitter changes. The signal frequency emitted by the signal transmitter corresponding to each rope is different. The signal receiving unit at the remote end receives the change in signal intensity, the alarm sounds an alarm, the processor receives the signal for programming analysis and evaluation, and finds the corresponding longitudinal and transverse ropes on the monitoring network according to the changed signal. The settlement deformation of the building foundation is regional, so the longitudinal and transverse ropes are plural, and the intersection area of the plural longitudinal and transverse ropes on the monitoring network is the range of the building foundation deformation.
[0010] Preferably, the force-sensitive resistor sensor is a force-sensitive sensor with a negative resistance effect, wherein the structure of the force-sensitive sensor with a negative resistance effect is a prior art and will not be described in detail here.
[0011] By adopting the above technical scheme, the settlement deformation of the building foundation is in the form of a curve, and the lowest point of the building foundation deformation can be located; when stress is generated on the longitudinal and transverse ropes in the corresponding sinking area of the monitoring network, the force-sensitive resistor sensor with a negative resistance effect is subjected to stress, the resistance of the force-sensitive resistor sensor decreases, and the current in the closed loop increases accordingly, and the signal strength emitted by the signal transmitter increases. The processor performs programming analysis and evaluation based on the received signal, and can find the corresponding longitudinal and transverse ropes with the largest change in the signal strength increase law on the monitoring network. The intersection area of the longitudinal and transverse ropes on the monitoring network is the lowest point of the building foundation deformation.
[0012] Preferably, the longitudinal pull rope and the transverse pull rope are both wrapped with a flexible protective sleeve, and the flexible protective sleeve is a steel wire tube.
[0013] By adopting the above technical solution, the flexible protective casing effectively reduces the friction of the soil on the pull rope, thereby avoiding affecting the change of stress on the pull rope.
[0014] Preferably, a node fixing device is provided at the intersection between the transverse pull rope and the longitudinal pull rope, and the node fixing device is fixedly connected to the building foundation layer. The node fixing device is provided with a transverse through hole and a longitudinal through hole for the monitoring network to pass through, and the transverse through hole and the longitudinal through hole are arranged up and down.
[0015] By adopting the above technical solution, the top of the node fixing device is fixedly connected to the building foundation layer, the longitudinal pull rope passes through the longitudinal through hole of the node fixing device, and the transverse pull rope passes through the transverse through hole of the node fixing device; when the building foundation is displaced longitudinally, the building foundation drives the node fixing device to move, the node fixing device slides on the longitudinal pull rope through the longitudinal through hole, the node fixing device drives the transverse pull rope to move, the two ends of the transverse pull rope are fixedly connected to the fixed base point, stress is generated on the transverse pull rope, so that the force-sensitive resistor sensor with negative resistance effect on the transverse pull rope is stressed, the resistance value of the force-sensitive resistor sensor becomes smaller, the current in the closed loop becomes larger accordingly, the signal intensity emitted by the signal transmitter becomes larger, the remote signal receiving unit receives the signal, the alarm sounds an alarm, and the processor receives the signal intensity increase for programming analysis and evaluation, thereby determining the displacement amount of the longitudinal displacement of the building foundation; similarly, when the building foundation is displaced laterally, according to the above principle, the displacement amount of the lateral displacement of the building foundation can also be determined.
[0016] Preferably, a plurality of signal transmitting units are provided at intervals on the longitudinal pull rope and the transverse pull rope, and the force-sensitive resistor sensor is connected in series to the longitudinal pull rope and the transverse pull rope.
[0017] By adopting the above technical solution, when multiple settlements occur in the foundation of a building and the same longitudinal or transverse rope is subjected to multiple forces, the processor performs programmed analysis and evaluation based on the increase in the strength of received signals of different frequencies, thereby still being able to monitor and warn of the settlement of the building foundation and locate the deformation range area caused by uneven settlement.
[0018] The present application also discloses a monitoring and early warning method using a building foundation settlement and deformation monitoring and early warning system, comprising the following steps:
[0019] 1) Install and fix the monitoring and early warning system according to claims 1-5, and set the grid size of the monitoring network according to the building foundation area;
[0020] 2) When the building construction is completed and the overall settlement is within the allowable range, the system will constantly record the law of the signal strength increase corresponding to each pull rope on the monitoring network;
[0021] 3) When the signal strength increase of the longitudinal and transverse pull ropes on the monitoring network exceeds the preset warning scale, the alarm will sound an alarm to achieve monitoring and early warning of building foundation settlement;
[0022] 4) When the signal strength increase pattern of several longitudinal and transverse ropes on the monitoring network is abnormal, the alarm will sound an alarm to realize the monitoring and early warning of uneven settlement of the building foundation. At the same time, according to the intersection area of these longitudinal and transverse ropes on the monitoring network, the location of deformation caused by settlement of the building foundation can be located;
[0023] 5) When the signal strength increase pattern of the longitudinal or transverse pull rope in a single direction is abnormal on the monitoring network, the alarm will sound to realize the monitoring and early warning of the horizontal displacement of the building foundation. At the same time, the displacement of the horizontal displacement of the building foundation can be determined based on the signal strength increase of the longitudinal or transverse pull rope.
[0024] The advantages and beneficial effects of the present invention are:
[0025] 1. Longitudinal and transverse ropes are evenly laid along the entire foundation surface of the building to form a monitoring network, which fully covers the building foundation and can achieve complete control of the entire foundation surface.
[0026] 2. A logical relationship is established between the settlement of the building foundation, the stress of the longitudinal and transverse ropes on the monitoring network, and the signal strength increase of the signal transmitting unit. This logical relationship can be used to warn of the settlement of the building foundation and analyze the location and range of deformation caused by uneven settlement.
[0027] 3. By setting up a node fixing device, the horizontal displacement of the building foundation can be effectively monitored, and the displacement of the horizontal displacement of the building foundation can be analyzed according to the signal strength increase of the corresponding longitudinal or transverse pull rope on the monitoring network.
[0028] 4. The building foundation settlement and deformation monitoring and early warning system is simple to install and easy to operate, and the installation location is easy to construct. Compared with monitoring devices of other monitoring methods, it has a greater cost advantage.
[0029] 5. The building foundation settlement and deformation monitoring and early warning system realizes 24-hour all-weather monitoring, dynamic real-time wireless transmission, automatic analysis and early warning, reducing the input of manpower and material resources and avoiding the influence of human factors on monitoring data. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the cross-sectional arrangement of the present invention.
[0031] Figure 2 It is a top view schematic diagram of the monitoring network of the present invention.
[0032] Figure 3 It is a schematic diagram of a node fixing device of the present invention.
[0033] Figure 4 It is a schematic diagram of the longitudinal draw cord of the present invention. DETAILED DESCRIPTION
[0034] The specific implementation of the present invention is further described below in conjunction with the accompanying drawings and embodiments. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0035] The technical solution specifically implemented in the present invention is:
[0036] like Figures 1 to 4 As shown, a building foundation settlement deformation monitoring and early warning system includes a monitoring network 2, a signal transmitting unit 3 and a signal receiving unit 4;
[0037] The monitoring network 2 includes a plurality of longitudinal pull ropes 5 and transverse pull ropes 6, which are arranged perpendicularly to each other on the bottom surface of the building foundation 1, and the ends of the longitudinal pull ropes 5 and transverse pull ropes 6 extend to fixed base points 7 outside the building foundation 1 to be measured, so as to convert the settlement of the building foundation 1 into stress changes of the pull ropes;
[0038] The signal transmitting unit 3 is arranged on the longitudinal pull rope 5 and the transverse pull rope 6, and includes a force sensitive resistor sensor 8, a battery 9 and a signal transmitter 10, which are connected by wires to form a closed loop for converting the stress change of the pull rope into an electrical signal;
[0039] The signal receiving unit 4 is installed at the remote end, and includes a signal receiver 11, a processor 12 and an alarm 13, which is used to receive electrical signals in real time, perform programmed analysis and evaluation on the stress and corresponding time of each longitudinal pull rope 5 and transverse pull rope 6, realize monitoring and early warning of the settlement of the building foundation 1, and analyze and locate the position and range of deformation caused by the settlement of the building foundation 1.
[0040] By adopting the above technical solution, the monitoring network 2 is arranged on the bottom surface of the building foundation 1. When the building foundation 1 sinks, the sinking area drives the corresponding area of the monitoring network 2 to move downward. The two ends of the longitudinal pull rope 5 and the transverse pull rope 6 are fixedly connected to the fixed base point 7 outside the building foundation 1. Stress is generated on the longitudinal pull rope 5 and the transverse pull rope 6 of the corresponding sinking area of the monitoring network 2, so that the force-sensitive resistor sensor 8 is subjected to force, the resistance value changes, and the current in the closed loop changes accordingly. The signal intensity emitted by the signal transmitter 10 changes, wherein the signal frequency emitted by the signal transmitter 10 corresponding to each pull rope is different. The signal receiving unit 4 at the remote end receives the change in signal intensity, the alarm 13 sounds an alarm, and the processor 12 receives the signal for programming analysis and evaluation. According to the changed signal, the corresponding longitudinal pull rope 5 and transverse pull rope 6 on the monitoring network 2 are found. The settlement deformation of the building foundation 1 is regional, so the longitudinal pull rope 5 and the transverse pull rope 6 are plural, and the intersection area of the plural longitudinal pull ropes 5 and the transverse pull ropes 6 on the monitoring network 2 is the range of the building foundation deformation.
[0041] Preferably, the force-sensitive resistor sensor 8 is a force-sensitive sensor with a negative resistance effect, wherein the structure of the force-sensitive sensor 8 with a negative resistance effect is a prior art and will not be described in detail here.
[0042] By adopting the above technical scheme, the settlement deformation of the building foundation 1 is in the form of a curve, and the lowest point of the deformation of the building foundation 1 can be located; when stress is generated on the longitudinal ropes 5 and the transverse ropes 6 in the corresponding sinking area of the monitoring network 2, the force-sensitive resistor sensor 8 with a negative resistance effect is subjected to stress, the resistance value of the force-sensitive resistor sensor 8 decreases, and the current in the closed loop increases accordingly, and the signal intensity emitted by the signal transmitter 10 increases. The processor 12 performs programming analysis and evaluation based on the received signal, and can find the corresponding longitudinal ropes 5 and transverse ropes 6 on the monitoring network 2 with the largest change in the signal intensity increase law. The intersection area of the longitudinal ropes 5 and the transverse ropes 6 on the monitoring network 2 is the lowest point of the deformation of the building foundation 1.
[0043] Preferably, the longitudinal pull rope 5 and the transverse pull rope 6 are both wrapped with a flexible protective sleeve 14, and the flexible protective sleeve is a steel wire tube.
[0044] By adopting the above technical solution, the flexible protective sleeve 14 effectively reduces the friction of the soil on the pull rope, thereby avoiding affecting the change of stress on the pull rope.
[0045] Preferably, a node fixing device 15 is provided at the intersection between the transverse pull rope 5 and the longitudinal pull rope 6, and the node fixing device 15 is fixedly connected to the building foundation 1. The node fixing device 15 is provided with a transverse through hole 16 and a longitudinal through hole 17 for the monitoring network 2 to pass through, and the transverse through hole 16 and the longitudinal through hole 17 are arranged up and down.
[0046] By adopting the above technical solution, the top of the node fixing device 15 is fixedly connected to the building foundation 1, the longitudinal pull rope 5 passes through the longitudinal through hole 16 of the node fixing device 15, and the transverse pull rope 6 passes through the transverse through hole 17 of the node fixing device 15; when the building foundation 1 is displaced longitudinally, the building foundation 1 drives the node fixing device 15 to move, the node fixing device 15 slides on the longitudinal pull rope 5 through the longitudinal through hole 16, the node fixing device 15 drives the transverse pull rope 6 to move, and the two ends of the transverse pull rope 6 are fixedly connected to the fixed base point 7, and the transverse pull rope 6 is generated The stress causes the force-sensitive resistor sensor 8 with the negative resistance effect on the transverse pull rope 6 to be stressed, and the resistance value of the force-sensitive resistor sensor 8 becomes smaller, and the current in the closed loop becomes larger accordingly. The signal strength emitted by the signal transmitter 10 becomes larger, the remote signal receiver 11 receives the signal, the alarm 13 sounds an alarm, and the processor 12 receives the increase in the signal strength for programmed analysis and evaluation, thereby determining the amount of longitudinal displacement of the building foundation 1; similarly, when the building foundation 1 displaces laterally, the amount of lateral displacement of the building foundation 1 can also be determined according to the above principle.
[0047] Preferably, a plurality of signal transmitting units 3 are provided at intervals on the longitudinal pull rope 5 and the transverse pull rope 6 , and the force sensitive resistor sensor 8 is connected in series to the longitudinal pull rope 5 and the transverse pull rope 6 .
[0048] By adopting the above technical solution, when the building foundation 1 sinks at multiple locations and the same longitudinal rope 5 or transverse rope 6 is subjected to stress at multiple locations, the processor 12 performs programming analysis and evaluation based on the increase in the strength of the received signals of different frequencies, and can still achieve monitoring and early warning of the settlement of the building foundation 1 and positioning of the deformation range area caused by uneven settlement.
[0049] The present application also discloses a monitoring and early warning method using a building foundation settlement and deformation monitoring and early warning system, comprising the following steps:
[0050] 1) Install and fix the monitoring and early warning system according to claims 1-5, and set the grid size of the monitoring network 2 according to the building foundation area;
[0051] 2) When the building construction is completed and the overall settlement is within the allowable range, the system will constantly record the law of the signal strength increase corresponding to each pull rope on the monitoring network;
[0052] 3) When the signal strength increase of the longitudinal pull rope 5 and the transverse pull rope 6 on the monitoring network 2 exceeds the preset warning scale, the alarm 13 sounds an alarm to achieve monitoring and early warning of the settlement of the building foundation 1;
[0053] 4) When the signal strength increase pattern of the longitudinal and transverse ropes 5 and 6 on the monitoring network 2 is abnormal, the alarm 13 sounds an alarm to realize the monitoring and early warning of the uneven settlement of the building foundation 1. At the same time, according to the intersection area of the longitudinal and transverse ropes 5 and 6 on the monitoring network 2, the position of the deformation caused by the settlement of the building foundation 1 can be located;
[0054] 5) When the signal strength increase pattern in only one direction of the longitudinal guy rope 5 or the transverse guy rope 6 is abnormal on the monitoring network 2, the alarm 13 sounds an alarm to realize the monitoring and early warning of the horizontal displacement of the building foundation 1. At the same time, the displacement of the horizontal displacement of the building foundation 1 can be judged based on the signal strength increase of the longitudinal guy rope 5 or the transverse guy rope 6.
[0055] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A monitoring and early warning method for a building foundation settlement and deformation monitoring and early warning system, characterized in that: A building foundation settlement deformation monitoring and early warning system comprises a monitoring network, a signal transmitting unit and a signal receiving unit; The monitoring network includes a plurality of longitudinal and transverse pull ropes, which are arranged perpendicularly to each other on the bottom surface of the building foundation, and the ends of the longitudinal and transverse pull ropes extend to fixed base points outside the measured building foundation, so as to convert the settlement of the building foundation into stress changes of the pull ropes; The signal transmitting unit is arranged on the longitudinal pull rope and the transverse pull rope, and includes a force sensitive resistor sensor, a battery and a signal transmitter, which are connected by wires to form a closed loop, and are used to convert the stress change of the pull rope into an electrical signal; The signal receiving unit is installed at the remote end, and includes a signal receiver, a processor and an alarm, and is used to receive electrical signals in real time, perform programming analysis and evaluation on the corresponding signals of each longitudinal pull rope and transverse pull rope, realize monitoring and early warning of building foundation settlement, and analyze and locate the position of deformation caused by building foundation settlement; The monitoring and early warning method comprises the following steps: 1) Set the grid size of the monitoring network according to the building foundation area; 2) When the building is completed and the overall settlement is within the allowable range, the system will constantly record the law of the signal strength increase corresponding to each pull rope on the monitoring network; 3) When the signal strength increase of the longitudinal and transverse pull ropes on the monitoring network exceeds the preset warning scale, the alarm will sound an alarm to achieve monitoring and early warning of building foundation settlement; 4) When the signal strength increase pattern of several longitudinal and transverse ropes on the monitoring network is abnormal, the alarm will sound an alarm to realize the monitoring and early warning of uneven settlement of the building foundation. At the same time, according to the intersection area of these longitudinal and transverse ropes on the monitoring network, the location of deformation caused by settlement of the building foundation can be located; 5) When the signal strength increase pattern of the longitudinal or transverse pull rope in a single direction is abnormal on the monitoring network, the alarm will sound to monitor and warn of the horizontal displacement of the building foundation. At the same time, the displacement of the horizontal displacement of the building foundation can be determined based on the increase in the signal strength of the longitudinal or transverse pull rope.
2. The monitoring and early warning method of a building foundation settlement and deformation monitoring and early warning system according to claim 1 is characterized in that: The force-sensitive resistor sensor is a force-sensitive sensor with a negative resistance effect.
3. The monitoring and early warning method of a building foundation settlement and deformation monitoring and early warning system according to claim 2 is characterized in that: The longitudinal pull rope and the transverse pull rope are both wrapped with a flexible protective sleeve.
4. The monitoring and early warning method of a building foundation settlement deformation monitoring and early warning system according to claim 3 is characterized in that: A node fixing device is provided at the intersection between the transverse pull rope and the longitudinal pull rope, and the node fixing device is fixedly connected to the building foundation. The node fixing device is provided with a transverse through hole and a longitudinal through hole for the monitoring network to pass through, and the transverse through hole and the longitudinal through hole are arranged up and down.
5. The monitoring and early warning method of a building foundation settlement and deformation monitoring and early warning system according to claim 4 is characterized in that: A plurality of signal transmitting units are arranged at intervals on the longitudinal pull rope and the transverse pull rope, and the force sensitive resistor sensor is connected in series to the longitudinal pull rope and the transverse pull rope.