Methodology for Formulating Source-Grid-Load-Storage Collaborative Interaction Schemes for Practical Power Grid Application Scenarios

By constructing a power grid characteristic model and screening adjustable resources, a resource pool for source-grid-load-storage scenarios is generated, and collaborative control schemes are screened. This solves the problem of insufficient security and economy of the power grid in practical application scenarios, and realizes intelligent interaction and flexible regulation of the power grid.

CN115765015BActive Publication Date: 2026-11-10STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211514306.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-30
Publication Date
2026-11-10
Estimated Expiration
2042-11-30

AI Technical Summary

Technical Problem

Existing technologies lack effective monitoring and regulation of source-grid-load-storage coordinated control in actual power grid applications, and cannot meet the needs of power grid peak shaving and valley filling, equipment over-limit, and new energy consumption, resulting in insufficient power grid security and economy.

Method used

By constructing a power grid characteristic model, analyzing power grid characteristic quantities, screening adjustable resources, generating a resource pool for source-grid-load-storage scenarios, conducting aggregation potential assessment and combination, generating preliminary collaborative control schemes, performing safety verification and optimal scheme screening, and formulating adjustment strategies to improve the power grid's flexible adjustment capabilities.

Benefits of technology

It has achieved intelligent interaction and safe control of power generation, grid, load and storage, improved the grid's flexible adjustment and resource allocation capabilities, and optimized the comprehensive energy utilization efficiency and energy cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115765015B_ABST
    Figure CN115765015B_ABST
Patent Text Reader

Abstract

This invention discloses a method for formulating a coordinated interaction scheme for power generation, grid, load, and storage in practical power grid application scenarios. The method includes: identifying power grid characteristic quantities, control objectives, and boundary constraints for power grid regulation application scenarios, and constructing a typical application scenario model; analyzing the power grid characteristic quantities of the area under study, and constructing an application scenario model for the area under study based on the matched typical application scenarios; analyzing power generation and consumption characteristics to determine the regulation methods, regulation capacity, and supply-demand gap in the area under study; matching the control objectives, supply-demand gap, regulation methods, and regulation capacity to identify adjustable resources within the area under study, assessing and combining their aggregation potential to generate a preliminary set of coordinated control schemes; performing safety verification on the schemes, and selecting the optimal coordinated control scheme with the goals of optimal economy, autonomy, and user satisfaction. This invention enables intelligent and secure controllable interaction between power generation, grid, load, and storage, improving the power grid's flexible regulation and resource allocation capabilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power system dispatching, operation and auxiliary decision-making technology, and specifically relates to a method for formulating a source-grid-load-storage collaborative interaction scheme for actual power grid application scenarios. Background Technology

[0002] With the advancement of the new power system construction, the State Grid Corporation of China has increased its efforts in load regulation capabilities and the construction of regional power grid source-grid-load-storage coordinated control functions. A key research focus is on how to achieve observable, measurable, controllable, and adjustable control of various resources in the regional power grid, including distributed generation, grid structure, load-side resources, and energy storage. Fully leveraging the role of these resources in typical application scenarios such as peak shaving and valley filling, equipment exceeding limits, and renewable energy consumption is crucial for enhancing the security of the regional power grid. Previous source-grid-load-storage coordinated control focused on optimizing distributed generation consumption strategies or power grid economic operation from a theoretical model perspective, primarily addressing distributed generation consumption or improving the economic efficiency of grid operation. It lacked consideration for the actual grid structure and the actual data acquisition, monitoring, and control capabilities of source-grid-load-storage resources, and insufficient consideration for grid and equipment safety verification, making it unsuitable for actual power grid application scenarios and the development of day-ahead and day-intraday coordinated interaction schemes. Summary of the Invention

[0003] This invention provides a method for formulating a source-grid-load-storage collaborative interaction scheme for actual power grid application scenarios, realizing intelligent interaction and safe control of source-grid-load-storage, improving the power grid's flexible adjustment capability and resource allocation capability, and achieving improved energy utilization efficiency and optimized energy costs.

[0004] To achieve the above technical objectives, the present invention adopts the following technical solution:

[0005] A method for formulating a source-grid-load-storage coordinated interaction scheme for practical power grid applications includes:

[0006] Step 1: Regularly analyze the power grid characteristic quantities, control objectives, and boundary constraints of typical power grid regulation application scenarios, and construct typical application scenario models.

[0007] Step 2: Analyze the power grid characteristic quantities of the area to be studied, match typical application scenarios based on the power grid characteristic quantities, adjust the control objectives and boundary constraints in the matched typical application scenario model, and construct an application scenario model that conforms to the power grid characteristics of the area to be studied.

[0008] Step 3: Analyze the power generation and consumption characteristics of the area under study to determine the regulation methods, regulation capacity, and supply-demand gap of the area under study;

[0009] Step 4: Screen adjustable resources in the power generation, grid, load and storage system within the electrical range of the area to be studied, and match them based on control objectives, supply and demand gaps, adjustment methods and adjustment capabilities to identify adjustable resources within the area to be studied.

[0010] Step 5: Extract the adjustable resources identified in Step 4 to generate a resource pool for the source-grid-load-storage scenario in the area to be studied;

[0011] Step 6: Assess the aggregation potential of various adjustable resources in the scene resource pool;

[0012] Step 7: Combine various adjustable resources in the scene resource pool to generate a preliminary set of collaborative control schemes;

[0013] Step 8: Perform security verification on each collaborative control scheme, and store the collaborative control schemes that pass the security verification into the collaborative control scheme group;

[0014] Step 9: Select the optimal collaborative control scheme from the collaborative control scheme group, with the goals of economy, autonomy, and user satisfaction.

[0015] Step 10: Generate the corresponding adjustment strategy according to the optimal collaborative control scheme, and determine the adjustment priority of various adjustable resources in the scheme.

[0016] Furthermore, the power grid characteristics include the distribution and adjustability of various resources, the power grid structure and weak links, and the power demand of the load for power supply.

[0017] Furthermore, the control objectives include renewable energy consumption, load peak shaving and valley filling, elimination of heavy overloads, economic operation of the power grid, and ensuring the power supply needs of residents and factories.

[0018] Furthermore, the boundary constraints are obtained by analyzing the power grid characteristic quantities and control objectives.

[0019] Furthermore, based on the application objectives, power grid regulation application scenarios are divided into the following four typical scenarios: safety target scenarios, economic target scenarios, power supply guarantee target scenarios, and environmental protection target scenarios.

[0020] The safety target scenarios include a main transformer heavy overload scenario, which is as follows:

[0021] Power grid characteristic quantities:

[0022] Control objective:

[0023] Boundary constraints: energy storage charging and discharging constraints, distributed generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints.

[0024] In the formula These are the active power and rated power of the transformer, respectively.

[0025] When the active power of the main transformer exceeds 80% of the rated capacity, this scenario is activated. Through the interaction of source-grid-load-storage, the load rate of the main transformer is reduced to the economic operating range of 60% to 80%.

[0026] The power supply guarantee target scenario includes a power supply guarantee demand scenario, which is as follows:

[0027] Power grid characteristic quantities: or

[0028] Control objective: and

[0029] Boundary constraints: energy storage charging and discharging constraints, distributed power generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints;

[0030] In the formula For important users or users requiring power supply, The backup power supply transformer capacity and load for the user, The capacity and load of the user's backup power supply line; and These are variables representing the standby main transformer and line standby status (0-1). When the standby main transformer or line is under maintenance, or when the relevant automatic transfer switch is deactivated, the variable takes the value of 0; otherwise, it takes the value of 1.

[0031] This scenario is activated when the available backup power for critical users and power supply users is insufficient, and sufficient backup capacity is provided to target users through the interaction of source-grid-load-storage.

[0032] The environmental protection target scenarios include new energy consumption scenarios, which are as follows:

[0033] Power grid characteristic quantities:

[0034] Control objective:

[0035] Boundary constraints: energy storage charging and discharging constraints, distributed power generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints;

[0036] In the formula They will contribute to the wind power and solar power plans respectively. These represent the installed capacity of wind power and solar power, These are the wind energy and solar energy utilization coefficients for time period t, respectively. This is an early warning value for the renewable energy consumption rate.

[0037] This scenario is activated when the renewable energy absorption rate calculated based on the power generation plan and output forecast is lower than the warning value, and the renewable energy absorption rate is improved through the interaction of source-grid-load-storage.

[0038] The economic target scenarios include peak shaving and valley filling, and economic operation of the power grid.

[0039] The peak shaving and valley filling scenario is as follows:

[0040] Power grid characteristic quantities:

[0041] Control objective:

[0042] Boundary constraints: energy storage charging and discharging constraints, distributed generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints.

[0043] In the formula These are the load peaks and load troughs of the original load curve, respectively. For the load after the interaction of source-grid-load-storage, This refers to the load at the first sampling point after the interaction of the source-grid-load-storage system. This is the early warning value for the peak-to-valley difference;

[0044] When load forecasting and monitoring detect that the peak-to-valley difference of the original load curve is greater than the warning value, this scenario is activated to smooth the load curve through the interaction of source-grid-load-storage.

[0045] The aforementioned power grid economic operation scenario is the basic scenario for the normal operation of the power grid. When there are no other special scenario requirements, the power grid is in the economic operation scenario, and the application scenario model is as follows:

[0046] Power grid characteristic quantities: or or or ;

[0047] Control objective:

[0048] Boundary constraints: energy storage charging and discharging constraints, distributed power generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints;

[0049] The economic operating cost of the power grid is given by the formula: t is the dispatching time, T is the dispatching period, and T is an integer hour; This represents the unit output at time t. This indicates the unit's operating cost. This represents the wind power output at time t. Indicates the cost of wind power output. This represents the photovoltaic output at time t. Indicates the cost of photovoltaic power output. This represents the energy output at time t. Indicates time-of-use electricity pricing. This represents the load adjustment at time t. Indicates the unit load transfer cost. This represents the amount of load transferred at time t; , , , These represent the number of traditional generating units, wind turbines, photovoltaic units, and energy storage units in the target area, respectively. and These refer to the input power of the large power grid and the electricity price of the large power grid, respectively. This scenario improves the economic efficiency of the entire / local power grid operation through the interaction of source-grid-load-storage.

[0050] Furthermore, the typical application scenario models constructed include renewable energy consumption, peak shaving and valley filling, main transformer overload, economic operation of the power grid, and load power supply protection.

[0051] Furthermore, in step 3, by analyzing the historical and real-time power generation and consumption characteristics of the study area, the regulation methods and regulation capabilities are clarified; by conducting load forecasting for the study area and based on power generation and grid power supply plans, the supply and demand gap is clarified.

[0052] Furthermore, the aggregation potential assessment mentioned in step 6 refers to evaluating the aggregation potential of individual resources and various resources in the scenario resource pool from multiple aspects, including the responsiveness of adjustable resources, grid interaction capabilities, and resource regulation economics.

[0053] Furthermore, step 9 involves selecting the optimal collaborative control scheme based on three dimensions: economy, autonomy, and user satisfaction. The objective function for selecting the optimal collaborative control scheme is:

[0054]

[0055] In the formula These are weighted coefficients for economic efficiency, autonomy, and user satisfaction, respectively. These are the comprehensive evaluation indicators for the plan, the economic evaluation indicators, the autonomy evaluation indicators, and the user satisfaction evaluation indicators.

[0056] Economic indicators:

[0057]

[0058]

[0059] For the economical operating cost of the power grid; This serves as the base value for power grid operating costs. This represents the unit output at time t. This indicates the unit's operating cost. This represents the wind power output at time t. Indicates the cost of wind power output. This represents the photovoltaic output at time t. Indicates the cost of photovoltaic power output. This represents the energy output at time t. Indicates time-of-use electricity pricing. This represents the load adjustment amount at time t, where t is the scheduling time and T is the scheduling period, which is an integer number of hours. Indicates the unit load transfer cost. This represents the amount of load transferred at time t; , , , These represent the number of traditional generating units, wind turbines, photovoltaic units, and energy storage units in the target area, respectively. and These are the power input to the main power grid and the electricity price of the main power grid, respectively.

[0060] Autonomy indicators:

[0061]

[0062] In the formula The maximum permitted trading volume under an agreement with a major power grid;

[0063] User satisfaction metrics:

[0064]

[0065] To calculate the electricity costs for users under different optimized scheduling strategies, The base cost value defined for the user layer; Electricity consumption curves after users participate in demand-side response; The user's original electricity consumption curve; Let t be the active power removed from the load.

[0066] Furthermore, after obtaining the optimal collaborative control scheme, step 10 further evaluates the interactive effectiveness of each resource from four aspects: economy, interactivity, control fit, and response accuracy.

[0067] (1) Economic evaluation, that is, measuring the economic efficiency of the adjustment scheme by the marginal cost of the selected flexible resources in the scheme that call up a certain proportion of the load:

[0068]

[0069] The marginal cost of utilizing flexible resources to meet 5% of the load demand is calculated as follows:

[0070] st

[0071] :

[0072] In the formula: F is the cost of flexible resource scheduling, t is the scheduling time, and T is the scheduling period, which is an integer number of hours; The marginal price of flexible resources is the dual variable of the energy balance equation, representing the change in the flexible resource scheduling cost function caused by each additional unit of flexible resource allocation. These are 0-1 flags for resource allocation for generating units, wind power, photovoltaics, energy storage, load shedding, and load shifting, respectively. When the collaborative interaction scheme selects this flexible resource, the flag value is 1; otherwise, it is 0.

[0073] (2) Interactivity evaluation, which measures the interactivity of the scheme by the degree to which the adjustment scheme makes up for the power supply gap / demand gap:

[0074]

[0075] In the formula: These represent the durations of peak and off-peak electricity supply periods, respectively. It is an overall interactive capability evaluation indicator:

[0076]

[0077]

[0078] In the formula: These are the interaction capability indicators during periods of heavy equipment overload and underload. These are the power shortages during peak hours and the demand shortages during off-peak hours: These are the increased output capacity of energy storage during peak load periods, the increased output capacity of distributed power sources, and the controllable load reduction capacity: These are: reduced output capacity of energy storage during off-peak periods, abandoned capacity of distributed power sources, and increased capacity of controllable loads.

[0079] (3) Control fit evaluation, that is, by evaluating the fit of the overall control of the scheme through the deviation between the scenario target of the scheme and the expected control value of the key state variables of the power grid and the scheme after execution;

[0080]

[0081] In the formula: As a fit index, These are the target value for the scenario and the actual target value for the scenario after the solution is implemented. These are the expected control values ​​and actual values ​​after the implementation of the key state variables of the power grid, respectively. The selection of these state variables is based on the following scenario requirements: power of important tie lines, transformer power, total load, and total power generation. These are the target value weighting coefficient and the state variable weighting coefficient:

[0082] (4) Response accuracy evaluation, which measures the response accuracy of each resource by the deviation between the actual response value of the source-grid-load-storage flexibility resources and the value issued by the scheme instruction:

[0083]

[0084] In the formula: Let i be the response accuracy index for resource i. The first and second terms represent the accuracy in the timing of the resource being called and the accuracy in the total amount of resources called, respectively. These are the time-series weighting coefficient and the total weighting coefficient, respectively: , These are the response value and instruction value for resource i, respectively.

[0085] Beneficial effects

[0086] This invention collects and observes operational data of various resources such as power generation, grid, load, and storage based on the existing power grid data acquisition system. It aggregates various adjustable resources and constructs typical interaction scenarios of power generation, grid, load, and storage to address important operational needs such as mitigating heavy grid overload, economic operation, and load power supply. Through resource potential assessment, collaborative control scheme screening, safety verification, and interaction effectiveness evaluation, it promotes power and energy matching among power generation, grid, load, and storage at different time and spatial scales, forming a full-business process coordinated control system of "data acquisition, panoramic monitoring, potential assessment, and collaborative regulation". This enables intelligent interaction and safe control of power generation, grid, load, and storage, improves the power grid's flexible adjustment and resource allocation capabilities, and achieves improved comprehensive energy utilization efficiency and optimized energy costs.

[0087] This invention standardizes a method for constructing source-grid-load-storage application scenarios. By identifying the characteristic quantities of the application scenario, analyzing the power generation and consumption characteristics of a designated area, clarifying the adjustment methods and capabilities, and performing load forecasting and power supply analysis for the area to identify the supply-demand gap, it matches adjustable resources applicable to the area in the total resource pool to generate adjustable resources for the scenario. By combining various adjustable resources in the scenario, a preliminary set of collaborative control schemes is generated. Each centralized control scheme is sequentially checked for grid safety and equipment safety, and the optimal collaborative control scheme is selected based on objectives such as economy, autonomy, and user satisfaction. According to the selected optimal resource coordination control scheme, corresponding adjustment strategies are generated, clarifying the adjustment priorities of various resources. This significantly reduces the computational complexity of collaborative control, facilitating online analysis and calculation and assisting in rapid decision-making. Attached Figure Description

[0088] Figure 1 This application describes the overall process for developing a collaborative interaction scheme for the entire network's sources, grid, load, and storage.

[0089] Figure 2 This application embodiment describes the construction and collaborative control implementation process for a specific application scenario. Detailed Implementation

[0090] The embodiments of the present invention will be described in detail below. These embodiments are based on the technical solutions of the present invention and provide detailed implementation methods and specific operation processes to further explain the technical solutions of the present invention.

[0091] As attached Figure 1 The overall process for formulating a coordinated interaction scheme for the entire power grid, its load, and energy storage is shown in the figure. This scheme, designed for application scenarios across the entire power grid, analyzes and predicts the power generation plan and load demand of the entire grid for a specified period based on information such as the daily (pre-day) provincial and regional power supply plans, distributed power sources, centrally dispatched and non-centrally dispatched generating unit plans, energy storage power station charging and discharging plans, and load forecasts. This analysis of the overall grid supply and demand situation and the load status of key equipment (sections, substations, or lines) determines whether there are issues such as regional power grid equipment exceeding limits, power backflow, or distributed power source absorption within the next 1-2 hours (the following day). By comprehensively considering the potential for resource aggregation and regulation capabilities, the scheme optimizes and formulates a coordinated interaction control strategy for the power grid, ensuring the safe operation of the regional power grid.

[0092] As attached Figure 2As shown in the process of constructing and coordinating control for specific application scenarios, this invention proposes a standardized process for constructing application scenarios and coordinating control for a specified analysis area and control objectives. First, the scope of the analysis area is defined, key characteristic quantities of the application scenarios within that area are identified, an application scenario model is constructed, and control and regulation objectives are formulated (such as renewable energy consumption, load peak shaving and valley filling, heavy overload elimination, economic operation of the power grid, and ensuring power supply for essential loads of residents and factories). By analyzing the power generation and consumption characteristics of the area, regulation methods and capabilities are clarified. Load forecasting and power supply analysis are conducted for the area to identify the supply-demand gap. Based on the regulation objectives, supply-demand gap, regulation methods, and regulation capabilities, adjustable resources applicable to the area in the total resource pool are matched, and corresponding adjustable resources are extracted to generate a source-grid-load-storage scenario resource pool. A panoramic monitoring of the scenario's adjustable resources and regulation potential is generated, and the aggregation potential of the scenario resource pool is assessed.

[0093] Specifically, this embodiment provides a method for formulating a source-grid-load-storage coordinated interaction scheme for actual power grid application scenarios, referring to... Figure 1 , Figure 2 As shown, it includes the following steps:

[0094] Step 1: Regularly analyze the power grid characteristic quantities, control objectives, and boundary constraints of typical power grid regulation application scenarios, and construct typical application scenario models.

[0095] The power grid's characteristic quantities include the load rate of transmission and transformation equipment, the predicted and planned output of new energy power generation, the peak and valley load values, and the reserve power capacity for special power supply loads. The corresponding control objectives are distributed power generation absorption rate, load peak shaving and valley filling, elimination of heavy overloads, economical operation of the power grid, and ensuring power supply for essential loads such as those used by residents and factories. Based on the scenario's characteristic quantities and control objectives, boundary constraints are clearly defined, forming a typical application scenario model containing characteristic quantities, control objectives, and boundary constraints.

[0096] Based on the purpose of application, interactive scenarios can be divided into security-oriented scenarios, economic-oriented scenarios, power supply-oriented scenarios, and environmental-oriented scenarios.

[0097] (1) The main safety target scenario is the main transformer heavy overload scenario, and the typical application scenario model of main transformer heavy overload is as follows:

[0098] Power grid characteristic quantities:

[0099] Control objective:

[0100] Boundary constraints: energy storage charging and discharging constraints, distributed power generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints;

[0101] In the formula These are the active power and rated power of the transformer, respectively.

[0102] When the active power of the main transformer exceeds 80% of the rated capacity, this scenario is activated. Through the interaction of source-grid-load-storage, the load rate of the main transformer is reduced to the economic operating range of 60%~80%.

[0103] (2) The main power supply guarantee target scenarios are power supply guarantee demand scenarios, among which the typical application scenario model of the power supply guarantee demand scenario is:

[0104] Power grid characteristic quantities: or

[0105] Control objective: and

[0106] Boundary constraints: energy storage charging and discharging constraints, distributed generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints.

[0107] In the formula For important users or users requiring power supply, The backup power supply transformer capacity and load for the user, The capacity and load of the backup power supply line for the user. and These are variables representing the standby main transformer and line standby status (0-1). When the standby main transformer or line is under maintenance, or when the relevant automatic transfer switch is deactivated, the variable takes the value of 0; otherwise, it takes the value of 1.

[0108] This scenario is activated when the available backup power for critical users and power supply users is insufficient, and sufficient backup capacity is provided to target users through the interaction of source-grid-load-storage.

[0109] (3) The environmental protection target scenarios are mainly new energy consumption scenarios, among which the typical application scenarios of new energy consumption are:

[0110] Power grid characteristic quantities:

[0111] Control objective:

[0112] Boundary constraints: energy storage charging and discharging constraints, distributed generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints.

[0113] In the formula They will contribute to the wind power and solar power plans respectively. These represent the installed capacity of wind power and solar power, These are the wind energy and solar energy utilization coefficients for time period t, respectively. This is an early warning value for the renewable energy consumption rate.

[0114] This scenario is activated when the renewable energy absorption rate is lower than the warning value based on the power generation plan and output forecast. The renewable energy absorption rate is improved through the interaction of power generation, grid, load and storage.

[0115] (4) Economic target scenarios mainly include peak shaving and valley filling, and economic operation of the power grid.

[0116] Typical application scenarios for peak shaving and valley filling include:

[0117] Power grid characteristic quantities:

[0118] Control objective:

[0119] Boundary constraints: energy storage charging and discharging constraints, distributed generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints.

[0120] In the formula These are the load peaks and load troughs of the original load curve, respectively. The load is the result of the interaction between the source, grid, load, and storage. The peak-valley difference warning value can be arbitrarily defined as 50%.

[0121] When load forecasting and monitoring detect that the peak-to-valley difference of the original load curve is greater than the warning value, this scenario is activated to smooth the load curve through the interaction of source-grid-load-storage.

[0122] Economic operation of the power grid is the basic scenario for the normal operation of the power grid. When there are no other special scenario requirements, it is in the economic operation scenario of the power grid. The application scenario model is as follows:

[0123] Power grid characteristic quantities: or or or ;

[0124] Control objective:

[0125] Boundary constraints: energy storage charging and discharging constraints, distributed generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints.

[0126] The economic operating cost of the power grid is given by the formula: t is the dispatching time, T is the dispatching period, and T is an integer hour; This represents the unit output at time t. This indicates the unit's operating cost. This represents the wind power output at time t. Indicates the cost of wind power output. This represents the photovoltaic output at time t. Indicates the cost of photovoltaic power output. This represents the energy output at time t. Indicates time-of-use electricity pricing. This represents the load adjustment at time t. Indicates the unit load transfer cost. This represents the amount of load transferred at time t. , , , These represent the number of traditional generating units, wind turbines, photovoltaic units, and energy storage units in the target area, respectively. and These are the power input to the main power grid and the electricity price of the main power grid, respectively.

[0127] This scenario improves the economic efficiency of the entire / local power grid operation through the interaction of power generation, grid, load, and storage.

[0128] Step 2: Analyze the power grid characteristic quantities of the area under study, match typical application scenarios based on the power grid characteristic quantities, adjust the control objectives and boundary constraints in the matched typical application scenario model, and construct an application scenario model that conforms to the power grid characteristics of the area under study.

[0129] The study area is physically disconnected or electrically isolated. The characteristics of the power grid in the area are analyzed from the aspects of power grid structure, special source-grid-load-storage equipment and demand. Typical application scenarios are matched according to the power grid characteristics. The adjustment and control objectives and constraints of the reference typical application scenarios are adjusted to construct an application scenario model that conforms to the characteristics of the power grid in the area.

[0130] Step 3: Analyze the power generation and consumption characteristics of the area under study to determine the regulation methods, regulation capacity, and supply-demand gap of the area under study.

[0131] By analyzing the historical and real-time power generation and consumption characteristics of the study area, the regulation methods and capabilities are clarified; by conducting load forecasting for the study area and based on power generation and grid supply plans, the supply-demand gap is identified.

[0132] This embodiment analyzes historical and real-time power generation and consumption characteristics, performs load forecasting, and utilizes data for resource selection in subsequent steps, all based on mature power grid model data or functions on the cloud (enterprise middleware or control cloud). Real-time data is collected from multiple data sources, including power grid diagrams, power grid operation modes, meteorological information, power generation plans, load forecasts, power plant and energy storage regulation capabilities, and large user adjustable loads, to construct power supply demand models for various adjustable resources and loads, such as power sources, power grids, loads, and energy storage. Data on grid-side energy storage, distributed energy storage, large charging stations, wind farms, distributed power sources, adjustable air conditioning loads, and power consumption of large users in various districts and counties are categorized, organized, and displayed to analyze the power generation and load consumption characteristics of various power sources within a specified area.

[0133] Based on the collection of historical load data, meteorological conditions, large user production plans, distributed power generation data, equipment maintenance and power transfer data, and user electricity consumption information, this study identifies the dominant influencing factors affecting load changes. A high-precision hierarchical and zoned load forecasting model adapted to the source-load interaction environment is established for prediction calculations. This model is then further refined through distributed power generation forecasting and equipment maintenance and power transfer methods to achieve load forecasting for ultra-short-term (1-2 hours) and short-term (1-day to several days) periods. Corresponding power generation plans are obtained through the power generation management system to achieve power generation forecasting.

[0134] Based on the characteristics of the actual power grid and the mature data acquisition functions of existing systems, various resource data related to power generation, grid, load and storage are collected from the enterprise middle platform or control cloud, including power grid diagrams, power grid operation modes, meteorological information, power generation plans, load forecasts, adjustable loads of large users, and the regulation capabilities of power plants and energy storage power plants. This data is used to construct adjustable resource and load power supply demand models for power sources, power grids, loads, and energy storage, thereby reducing the cost and difficulty of data acquisition.

[0135] Step 4: Screen adjustable resources in the power generation, grid, load and storage system within the electrical range of the area to be studied, and match them based on control objectives, supply and demand gaps, adjustment methods and adjustment capabilities to identify adjustable resources within the area to be studied.

[0136] The adjustable resources provided for screening in this embodiment are all individual resources or aggregation models that are aggregated and marked from resources collected from the cloud in the source-grid-load-storage system.

[0137] The aggregation and labeling method aggregates and labels resources from three dimensions: space, time, and resource type. This can be used for monitoring, control, and analysis decisions during application scenario construction. Spatially, it includes dimensions such as 220 kV zones, 110 kV power supply areas, 10 kV busbars, 10 kV power distribution areas, and grid connection points. Temporally, it includes second-level, 15-minute-level, 30-minute-level, 1-hour-level, and 2-hour-level metrics. Resource types include large industrial users, adjustable air conditioning loads, energy storage, load aggregators (including smart parks, commercial buildings, integrated energy systems, etc.), large charging piles, distributed power sources, small hydropower, and conventional units such as thermal power.

[0138] In a more optimized embodiment, a comprehensive monitoring of the load and resource pool is also implemented. By collecting historical, real-time, and predicted values ​​of different resources such as power generation, load, and energy storage, the system monitors load consumption curves, power generation curves of various power plants, and the controllable quantities, response rates, and control effects of individual and aggregated resource models at different time periods. These are then categorized and visualized in charts, enabling comprehensive monitoring of the load and resource pool. The monitoring interface displays an overview of the power generation, grid, load, and storage resources, the operational status of various adjustable resources, and the upward and downward adjustment capabilities of load-side resources at different time scales. This supports business scenarios such as renewable energy consumption, load peak shaving and valley filling, heavy overload elimination, economic grid operation, and load power supply assurance. Spatially, resources are statistically analyzed and displayed according to their geographical distribution; temporally, resources are statistically analyzed and displayed based on their attributes at different time scales; and object-wise, resources are statistically analyzed and displayed according to their different resource types (power generation, grid, load, and storage).

[0139] This embodiment describes a method for constructing a panoramic monitoring function for load and resource pools. By monitoring load consumption curves and power generation curves of various power plants in real time, it monitors the controllable quantities, response rates, and control effects of various resources and aggregation models at different time periods. It also monitors the overview of source-grid-load-storage resources and the operation of various adjustable resources in real time, as well as the up-and-down adjustment capabilities of load-side resources at different time scales. This provides support for business scenarios such as new energy power consumption, load peak shaving and valley filling, heavy overload elimination, economic operation of the power grid, and load power supply guarantee.

[0140] Step 5: Extract the adjustable resources identified in Step 4 to generate a resource pool for the source-grid-load-storage scenario in the area to be studied. Further, a panoramic monitoring of the adjustable resources and adjustment potential of the scenario can be generated.

[0141] Step 6: Assess the aggregation potential of various adjustable resources in the scenario resource pool: In this embodiment, the aggregation potential of individual resources and various resources in the scenario resource pool is assessed from multiple evaluation indicators, including the response capability of adjustable resources, grid interaction capability, and resource regulation economy.

[0142] Step 7: Combine various adjustable resources in the scene resource pool to generate a preliminary set of collaborative control schemes.

[0143] Step 8: Perform security verification on each collaborative control scheme and store the collaborative control schemes that pass the security verification into the collaborative control scheme group.

[0144] Step 9: Select the optimal collaborative control scheme from the collaborative control scheme group, aiming for the best economic efficiency, autonomy, and user satisfaction. The objective function for selecting the optimal collaborative control scheme is:

[0145]

[0146] In the formula These are weighted coefficients for economic efficiency, autonomy, and user satisfaction, respectively. These are the comprehensive evaluation indicators for the plan, the economic evaluation indicators, the autonomy evaluation indicators, and the user satisfaction evaluation indicators.

[0147] (1) Economic indicators:

[0148]

[0149]

[0150] This refers to the economic operating cost of the power grid. This is the base value for power grid operation costs.

[0151] (2) Autonomy indicators:

[0152]

[0153] In the formula The maximum permitted trading volume under an agreement with a major power grid.

[0154] (3) User satisfaction indicators:

[0155]

[0156] To calculate the electricity costs for users under different optimized scheduling strategies, The base cost value defined for the user layer. The electricity consumption curve after users participate in demand-side response. This is the user's original electricity consumption curve. Let t be the active power removed from the load.

[0157] Constraints include active power balance, generator output constraints, photovoltaic and wind farm output constraints, energy storage station charging and discharging constraints, load transfer constraints, flexible load adjustment constraints, and equipment overload limits. A mature optimization solution method is used to solve the objective function, obtain the optimal adjustment values ​​for various resources, and select the optimal collaborative control scheme.

[0158] Step 10: Generate the corresponding adjustment strategy according to the optimal collaborative control scheme, and determine the adjustment priority of various adjustable resources in the scheme.

[0159] The adjustment strategy mainly considers which type of resource to adjust, whether to adjust according to the aggregation model or control individual resources, and the adjustment priority considers the order in which resources are adjusted. For example, in the case of heavy overload, the adjustment strategy mainly considers changing the grid operation mode, increasing power generation output and load control. The adjustment priority is to first adjust the grid operation mode, then adjust the energy storage station or adjust small hydropower and distributed power sources, and finally take load orderly power consumption control measures.

[0160] After obtaining the optimal coordinated control scheme, the effectiveness of this coordinated control can be further evaluated. After implementing corresponding resource control according to the coordinated control strategy, the effectiveness and regulatory capacity of the resource control are tracked and calculated. Evaluation indicators include at least economic evaluation, interaction evaluation, control fit evaluation, and response accuracy evaluation. These indicators reflect the actual regulatory effect of resource participation in coordinated control. Specifically:

[0161] (1) Economic evaluation, that is, measuring the economic efficiency of the adjustment scheme by the marginal cost of the selected flexible resources in the scheme that call up a certain proportion of the load:

[0162]

[0163] The marginal cost of utilizing flexible resources to meet 5% of the load demand is calculated as follows:

[0164] st

[0165] :

[0166] In the formula: F is the cost of flexible resource scheduling, t is the scheduling time, and T is the scheduling period, which is an integer number of hours; The marginal price of flexible resources is the dual variable of the energy balance equation, representing the change in the flexible resource scheduling cost function caused by each additional unit of flexible resource allocation. These are 0-1 flags for resource allocation for generating units, wind power, photovoltaics, energy storage, load reduction, and load shifting. The flag is set to 1 when the collaborative interaction scheme selects this flexible resource, and 0 otherwise.

[0167] (2) Interactivity evaluation, which measures the interactivity of the scheme by the degree to which the adjustment scheme makes up for the power supply gap / demand gap:

[0168]

[0169] In the formula: These represent the durations of peak and off-peak electricity supply periods, respectively. It is an overall interactive capability evaluation indicator:

[0170]

[0171]

[0172] In the formula: These are the interaction capability indicators during periods of heavy equipment overload and underload, representing peak-hour power supply deficit and off-peak-hour demand deficit, respectively: These are the increased output capacity of energy storage during peak load periods, the increased output capacity of distributed power sources, and the controllable load reduction capacity: These are: reduced output capacity of energy storage during off-peak periods, abandoned capacity of distributed power sources, and increased capacity of controllable loads.

[0173] (3) Control fit evaluation, that is, by evaluating the fit of the overall control of the scheme through the deviation between the scenario target of the scheme and the expected control value of the key state variables of the power grid and the scheme after execution;

[0174]

[0175] In the formula: As a fit index, These are the target value for the scenario and the actual target value for the scenario after the solution is implemented. These are the expected control values ​​and actual values ​​after the implementation of the key state variables of the power grid, respectively. The selection of these state variables is based on the following scenario requirements: power of important tie lines, transformer power, total load, and total power generation. These are the target value weighting coefficient and the state variable weighting coefficient:

[0176] (4) Response accuracy evaluation, which measures the response accuracy of each resource by the deviation between the actual response value of the source-grid-load-storage flexibility resources and the value issued by the scheme instruction:

[0177]

[0178] In the formula: Let i be the response accuracy index for resource i. The first and second terms represent the accuracy in the timing of the resource being called and the accuracy in the total amount of resources called, respectively. These are the time-series weighting coefficient and the total weighting coefficient, respectively: These are the response value and instruction value for resource i, respectively.

[0179] Therefore, based on the source-grid-load-storage coordinated interaction scheme formulated for the entire network application scenario in this embodiment, based on relevant information such as the provincial and local power supply plan, distributed power sources, centrally dispatched and non-centrally dispatched unit power generation plans, energy storage power station charging and discharging plans, and load forecasts within the day (before the day), the scheme analyzes and predicts the entire network's power generation plan and load power demand for a specified period. This enables the analysis of the entire network's supply and demand situation and the load situation of key equipment (sections, substations, or lines), and determines whether there are problems such as regional power grid equipment exceeding limits, power backflow, and distributed power source absorption within the next 1-2 hours (the next day). Taking into account the potential for aggregation and regulation of various resources, the scheme optimizes and formulates source-grid-load-storage coordinated interaction control strategies to ensure the safe operation of the regional power grid.

[0180] Features of the embodiments of the present invention:

[0181] 1. Based on the actual characteristics of the power grid and the mature data acquisition functions of existing systems, this paper proposes to collect various resource data related to power grid, grid operation mode, meteorological information, power generation plan, load forecast, large user adjustable load, power plant and energy storage power station regulation capacity from enterprise middle platform or control cloud. It constructs power supply demand models of adjustable resources such as power source, power grid, load, and energy storage, classifies and displays various resource data, and analyzes the characteristics of power generation and consumption.

[0182] 2. This invention proposes to construct a resource aggregation potential assessment system from three aspects: resource response capability, power grid interaction capability, and resource regulation economy. The system calculates aggregation potential indicators for the control capability, control effect, and regulation economy of each resource unit and various aggregation models in the resource pool, and generates resource units and aggregation models with quantified collaborative interaction control indicators.

[0183] 3. This invention proposes a method for constructing source-grid-load-storage application scenarios. It identifies the characteristic quantities of the application scenario, clarifies the analysis area, constructs an application scenario model, and formulates control and regulation objectives. By analyzing the power generation and consumption characteristics of the region, it clarifies the regulation methods and capabilities, performs load forecasting and power supply analysis for the region, and identifies the supply-demand gap. It matches adjustable resources applicable to the region in the total resource pool, generating a panoramic monitoring of adjustable resources and regulation potential for the scenario.

[0184] 4. This invention proposes a method for formulating collaborative control strategies. After clarifying the application scenario model and constraints, corresponding adjustable resources are extracted to generate a resource pool for the source-grid-load-storage scenario. The convergence potential evaluation indicators, such as the response capability, grid interaction capability, and regulation economy of the adjustable resources in this scenario, are calculated. By combining various adjustable resources, a preliminary set of collaborative control schemes is generated. Each centralized control scheme is sequentially checked for grid safety and equipment safety. Among the schemes that pass the safety check, the optimal collaborative control scheme is selected based on economy, autonomy, and user satisfaction. According to the selected optimal resource coordination control scheme, corresponding adjustment strategies are generated, clarifying the adjustment priorities of various resources.

[0185] 5. This invention proposes a method for evaluating the effectiveness of coordinated control based on grid regulation contribution and regulation effect. Regulation contribution evaluation indicators include at least economic evaluation and interaction evaluation, which reflect the regulation contribution of resources participating in coordinated control to the grid. Control performance indicators include control fit evaluation, response accuracy evaluation, and other indicators, which reflect the actual regulation effect of resources participating in coordinated control.

[0186] Typical application scenario construction examples:

[0187] Case 1: Peak shaving and valley filling

[0188] Urban power grid load demand, coupled with the characteristics of industrial, commercial, and air conditioning loads, is unevenly distributed over time, exhibiting a typical double-peak and double-valley pattern. The midday peak is from 10:00 AM to 1:00 PM, the evening peak is from 7:00 PM to 10:00 PM, and the load declines after 1:00 PM and 10:00 PM, gradually reaching its lowest point between 1:00 AM and 5:00 AM. Peak shaving and valley filling are grid-wide application scenarios. Their main characteristic is that they do not consider the grid structure, only the supply and demand relationship between power generation and load. The control objective is to reduce the peak-valley difference in grid load by adopting peak-shifting and peak-avoidance power consumption. Adjustable resources include the electricity consumption periods of large users, central air conditioning temperatures, and energy storage charging and discharging plans. The scenario resource pool consists of real-time monitoring of large user electricity consumption, central air conditioning temperatures, and energy storage station charging and discharging status, analyzing and identifying large industrial users with adjustable production plans, central air conditioning systems with adjustable temperatures, and energy storage stations. The coordinated control process involves charging the energy storage station during off-peak hours and discharging during peak hours. The central air conditioning temperature is set above 26℃ during peak hours whenever possible. For large industrial users, peak-to-valley differences are calculated using transferred electricity, and grid safety is checked. Under the premise that the transferred electricity does not exceed 20% of the large user's rated capacity, the power supply deficit during peak hours is shifted forward as much as possible. It is then determined whether the sum of the shifted load and the original load exceeds the power supply limit. If it does, the load is shifted to an earlier time period. After traversing all deficit periods, the next user participates in peak shifting, until all users have participated. The control strategy and priorities are as follows: Level 1 is adjusting the charging and discharging schedule of the energy storage station; Level 2 is controlling the central air conditioning temperature; and Level 3 is adjusting the production schedule of large users.

[0189] Case 2: Localized Overload Elimination

[0190] In some areas, the load growth rate is too rapid, and power grid equipment such as main transformers and critical lines are prone to severe overload during peak load periods (load rate = [actual power supply load / rated capacity] × 100%, exceeding 80% is considered severe overload), which may induce equipment failure. Localized severe overload scenarios are characterized by a designated power grid area, such as a power supply zone or a 10 kV busbar, where heavily loaded main transformers or lines exist. The control objective is to ensure that the load rate of main equipment does not exceed 80%, and the control method is to utilize adjustable resources from the power grid and load storage in that area. Data is obtained from different platform systems, and after flexible load fine-tuning and aggregation potential assessment, a load resource regulation strategy is calculated with optimal complementarity and reliability as the objectives, taking into account factors such as load-side resource regulation target requirements, control strategies, regulation time, maintenance time, and priorities. The control strategy considers the full absorption of distributed power sources. From the perspective of user electricity experience and grid operation, and in combination with the orderly electricity consumption mode of the grid, the priority of source-grid-load-storage interaction is set. The first level is to adjust the grid operation mode and transfer grid load; the second level is to adjust the output of energy storage and make full use of the rapid response characteristics of energy storage; and the third level is to adjust flexible load and adjust the power size using flexible load. The lower the priority level, the earlier it is called.

[0191] The above embodiments are preferred embodiments of this application. Those skilled in the art can make various changes or improvements based on them. Without departing from the overall concept of this application, such changes or improvements should fall within the scope of protection claimed in this application.

Claims

1. A method for formulating a source-grid-load-storage coordinated interaction scheme for practical power grid application scenarios, characterized in that, include: Step 1: Regularly analyze the power grid characteristic quantities, control objectives, and boundary constraints of typical power grid regulation application scenarios, and construct typical application scenario models. According to the purpose of application, power grid regulation application scenarios are divided into the following four typical scenarios: safety target scenarios, economic target scenarios, power supply target scenarios, and environmental protection target scenarios. The safety target scenarios include a main transformer heavy overload scenario, which is as follows: Power grid characteristic quantities: ; Control objective: ; Boundary constraints: energy storage charging and discharging constraints, distributed power generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints; In the formula These are the active power and rated power of the transformer, respectively. When the active power of the main transformer exceeds 80% of the rated capacity, this scenario is activated. Through the interaction of source-grid-load-storage, the load rate of the main transformer is reduced to the economic operating range of 60% to 80%. The power supply guarantee target scenario includes a power supply guarantee demand scenario, which is as follows: Power grid characteristic quantities: or ; Control objective: and ; Boundary constraints: energy storage charging and discharging constraints, distributed power generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints; In the formula For important users or users requiring power supply, The backup power supply transformer capacity and load for the user, The capacity and load of the user's backup power supply line; and These are 0-1 variables representing the standby main transformer and line standby status, respectively. When the standby main transformer or line is under maintenance, or when the relevant automatic transfer switch is deactivated, the variable takes the value of 0, and otherwise takes the value of 1. This scenario is activated when the available backup power for critical users and power supply users is insufficient, and sufficient backup capacity is provided to target users through the interaction of source-grid-load-storage. The environmental protection target scenarios include new energy consumption scenarios, which are as follows: Power grid characteristic quantities: ; Control objective: ; Boundary constraints: energy storage charging and discharging constraints, distributed power generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints; In the formula They will contribute to the wind power and solar power plans respectively. These represent the installed capacity of wind power and solar power, These are the wind energy and solar energy utilization coefficients for time period t, respectively. This is an early warning value for the renewable energy consumption rate. This scenario is activated when the renewable energy absorption rate calculated based on the power generation plan and output forecast is lower than the warning value, and the renewable energy absorption rate is improved through the interaction of source-grid-load-storage. The economic target scenarios include peak shaving and valley filling, and economic operation of the power grid. The peak shaving and valley filling scenario is as follows: Power grid characteristic quantities: ; Control objective: ; Boundary constraints: energy storage charging and discharging constraints, distributed power generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints; In the formula These are the load peaks and load troughs of the original load curve, respectively. For the load after the interaction of source-grid-load-storage, This refers to the load at the first sampling point after the interaction of the source-grid-load-storage system. This is the early warning value for the peak-to-valley difference; When load forecasting and monitoring detect that the peak-to-valley difference of the original load curve is greater than the warning value, this scenario is activated to smooth the load curve through the interaction of source-grid-load-storage. The aforementioned power grid economic operation scenario is the basic scenario for the normal operation of the power grid. When there are no other special scenario requirements, the power grid is in the economic operation scenario, and the application scenario model is as follows: Power grid characteristic quantities: or or or ; Control objective: ; Boundary constraints: energy storage charging and discharging constraints, distributed power generation output constraints, grid energy balance constraints, controllable load constraints, and transmission and transformation equipment capacity constraints; The economic operating cost of the power grid is given by the formula: t is the dispatching time, T is the dispatching period, and T is an integer hour; This represents the unit output at time t. This indicates the unit's operating cost. This represents the wind power output at time t. Indicates the cost of wind power output. This represents the photovoltaic output at time t. Indicates the cost of photovoltaic power output. This represents the energy output at time t. Indicates time-of-use electricity pricing. This represents the load adjustment at time t. Indicates the unit load transfer cost. This represents the amount of load transferred at time t; , , , These represent the number of traditional generating units, wind turbines, photovoltaic units, and energy storage units in the target area, respectively. and These refer to the input power of the large power grid and the electricity price of the large power grid, respectively; this scenario improves the economic efficiency of the entire / local power grid operation through the interaction of source-grid-load-storage; Step 2: Analyze the power grid characteristic quantities of the area to be studied, match typical application scenarios based on the power grid characteristic quantities, adjust the control objectives and boundary constraints in the matched typical application scenario model, and construct an application scenario model that conforms to the power grid characteristics of the area to be studied. Step 3: Analyze the power generation and consumption characteristics of the area under study to determine the regulation methods, regulation capacity, and supply-demand gap of the area under study; Step 4: Screen adjustable resources in the power generation, grid, load and storage system within the electrical range of the area to be studied, and match them based on control objectives, supply and demand gaps, adjustment methods and adjustment capabilities to identify adjustable resources within the area to be studied. Step 5: Extract the adjustable resources identified in Step 4 to generate a resource pool for the source-grid-load-storage scenario in the area to be studied; Step 6: Assess the aggregation potential of various adjustable resources in the scene resource pool; Step 7: Combine various adjustable resources in the scene resource pool to generate a preliminary set of collaborative control schemes; Step 8: Perform security verification on each collaborative control scheme, and store the collaborative control schemes that pass the security verification into the collaborative control scheme group; Step 9: Select the optimal collaborative control scheme from the collaborative control scheme group, with the goals of economy, autonomy, and user satisfaction. Step 10: Generate the corresponding adjustment strategy according to the optimal collaborative control scheme, and determine the adjustment priority of various adjustable resources in the scheme.

2. The method for formulating a source-grid-load-storage coordinated interaction scheme according to claim 1, characterized in that, The power grid characteristics include the distribution and adjustability of various resources, the power grid structure and weak links, and the power demand of the load for power supply.

3. The method for formulating a source-grid-load-storage coordinated interaction scheme according to claim 1, characterized in that, The control objectives include renewable energy consumption, load peak shaving and valley filling, elimination of heavy overload, economic operation of the power grid, and ensuring the power supply needs of residents and factories.

4. The method for formulating a source-grid-load-storage coordinated interaction scheme according to claim 1, characterized in that, The boundary constraints are derived by analyzing the power grid characteristics and control objectives.

5. The method for formulating a source-grid-load-storage coordinated interaction scheme according to claim 1, characterized in that, The typical application scenario models constructed include renewable energy consumption, peak shaving and valley filling, main transformer overload, economic operation of the power grid, and load power supply protection.

6. The method for formulating a source-grid-load-storage coordinated interaction scheme according to claim 1, characterized in that, In step 3, the historical and real-time power generation and consumption characteristics of the study area are analyzed to clarify the regulation methods and capabilities; the load forecasting of the study area and the power generation and grid supply plans are used to clarify the supply and demand gap.

7. The method for formulating a source-grid-load-storage coordinated interaction scheme according to claim 1, characterized in that, The aggregation potential assessment mentioned in step 6 refers to evaluating the aggregation potential of individual resources and various resources in the scenario resource pool from multiple aspects, including the responsiveness of adjustable resources, grid interaction capabilities, and the economic efficiency of resource regulation.

8. The method for formulating a source-grid-load-storage coordinated interaction scheme according to claim 1, characterized in that, Step 9: Selecting the Optimal Cooperative Control Scheme. The selection is based on three dimensions: economy, autonomy, and user satisfaction. The objective function for selecting the optimal cooperative control scheme is: ; In the formula These are weighted coefficients for economic efficiency, autonomy, and user satisfaction, respectively. These are the comprehensive evaluation indicators for the plan, the economic evaluation indicators, the autonomy evaluation indicators, and the user satisfaction evaluation indicators. Economic indicators: ; ; For the economical operating cost of the power grid; This serves as the base value for power grid operating costs. This represents the unit output at time t. This indicates the unit's operating cost. This represents the wind power output at time t. Indicates the cost of wind power output. This represents the photovoltaic output at time t. Indicates the cost of photovoltaic power output. This represents the energy output at time t. Indicates time-of-use electricity pricing. This represents the load adjustment amount at time t, where t is the scheduling time and T is the scheduling period, which is an integer number of hours. Indicates the unit load transfer cost. This represents the amount of load transferred at time t; , , , These represent the number of traditional generating units, wind turbines, photovoltaic units, and energy storage units in the target area, respectively. and These are the power input to the main power grid and the electricity price of the main power grid, respectively. Autonomy indicators: ; In the formula The maximum permitted trading volume under an agreement with a major power grid; User satisfaction metrics: ; To calculate the electricity costs for users under different optimized scheduling strategies, The base cost value defined for the user layer; Electricity consumption curves after users participate in demand-side response; The user's original electricity consumption curve; Let t be the active power removed from the load.

9. The method for formulating a source-grid-load-storage coordinated interaction scheme according to claim 1, characterized in that, Step 10: After obtaining the optimal collaborative control scheme, further evaluate the interactive effectiveness of each resource from four aspects: economy, interactivity, control fit, and response accuracy. (1) Economic evaluation, that is, measuring the economic efficiency of the adjustment scheme by the marginal cost of the selected flexible resources in the scheme that call up a certain proportion of the load: ; The marginal cost of utilizing flexible resources to meet 5% of the load demand is calculated as follows: ; s.t ; : ; In the formula: F is the cost of flexible resource scheduling, t is the scheduling time, and T is the scheduling period, which is an integer number of hours; The marginal price of flexible resources is the dual variable of the energy balance equation, representing the change in the flexible resource scheduling cost function caused by each additional unit of flexible resource allocation. These are 0-1 flags for resource allocation for generating units, wind power, photovoltaics, energy storage, load shedding, and load shifting, respectively. When the collaborative interaction scheme selects this flexible resource, the flag value is 1; otherwise, it is 0. (2) Interactivity evaluation, which measures the interactivity of the scheme by the degree to which the adjustment scheme makes up for the power supply gap / demand gap: ; In the formula: These are the durations of peak and off-peak electricity supply periods, respectively. It is an overall interactive capability evaluation indicator: ; ; In the formula: These are the interaction capability indicators during periods of heavy equipment overload and underload. These are the power supply shortages during peak periods and the demand shortages during off-peak periods: These are the increased output capacity of energy storage during peak load periods, the increased output capacity of distributed power sources, and the controllable load reduction capacity: These are the reduced output capacity of energy storage during off-peak periods, the abandoned capacity of distributed power sources, and the increased capacity of controllable loads. (3) Control fit evaluation, that is, by comparing the scenario objectives of the scheme and the expected control values ​​of key state variables of the power grid with the deviations after the scheme is implemented, the overall control fit of the scheme is evaluated; ; In the formula: As a fit index, These are the target value for the scenario and the actual target value for the scenario after the solution is implemented. These are the expected control values ​​and actual values ​​after the implementation of the key state variables of the power grid, respectively. The selection of these state variables is based on the following scenario requirements: power of important tie lines, transformer power, total load, and total power generation. These are the target value weighting coefficient and the state variable weighting coefficient: (4) Response accuracy evaluation, which measures the response accuracy of each resource by the deviation between the actual response value of the source-grid-load-storage flexibility resources and the value issued by the scheme instruction: ; In the formula: Let i be the response accuracy index for resource i. The first and second terms represent the accuracy in the timing of the resource being called and the accuracy in the total amount of resources called, respectively. These are the time-series weighting coefficient and the total weighting coefficient, respectively: , These are the response value and instruction value for resource i, respectively.

Citation Information

Patent Citations

  • Power grid new energy consumption capability evaluation calculation method, device and system based on multi-scene generation technology

    CN111400918A

  • Source-network-load-storage flexible coordination control and operation optimization method

    CN112072641A